Annual Administrative Report 2009-2010

7.5 Public Works (Roads) Directorate & Mechanical Wing :-

(A) P. W. (Roads) Directorate

The Public Works (Roads) Directorate has been playing key role in the development and expansion of road infrastructure in the State of . At present, in various districts of West Bengal the work of major and minor, important bridges under Core Plan are in progress. With partial financial assistance from the Central Government the construction work of a bridge over River Jalangi at Radhanagarghat in Murshidabad - Nadia border has been started. The construction work of another bridge has been started over River Jalangi at Fazil Nagar in Nadia District under the border area development programme of the Central Government. In the fiscal year the construction work of 10 important bridges has been completed by the P.W. (Roads) Directorate. Among these the bridge connecting the districts of Malda and Uttar Dinajpur, over River Mahananda at Madhabpurghat, the bridge over Sarenga Khal in Howrah District, the bridge over River Ichamati at Dhapdhara, two bridges on Bagda - Duffafulia Road in North 24 Parganas, the bridge over Kashiakhari in the District of Dakshin Dinajpur and the bridge over Dimti Canal in Uttar Dinajpur are worth mentioning here. The work of road connecting Lochan Das Setu over River Ajoy linking districts of Burdwan, Birbhum and Murshidabad has been completed. As a result the transport system has been improved and made faster. Innumerable important bridges have been constructed by the P.W. (Roads) Directorate in almost all the districts of the State in the last three decades. In spite of this, present circumstances demand more bridges for more development of the communication system. For achieving this goal, the plan to construct more bridges, by receiving opinions of the Zilla Parishad, is under consideration. On behalf of the P.W. (Roads) Department the construction work of the bridge over River Dima on the Rajabhatkhaowa - Jaigaon Road in the Jalpaiguri District has been started. In the infrastructural development of the state the work of widening and strengthening of important roads along with construction of some bridges, in almost all the districts of the state is being carried out with loan assistance, primarily from the NABARD. The P.W. (Roads) Department construct flyovers / subways over various rail lines by sharing expenditure with the railway authorities through the Railway Safety Fund Programme. Among the ongoing projects, the work of the flyover at Rangamati on Jhargram Main Road over the South -Eastern Section of the Railways in the district of Paschim Medinipur is nearing completion. Apart from this the work of flyovers at Bagnan, Barrackpore, Durgapur and Baruipur are progressing at a fast pace. All the handicaps and hindrances for the construction of the flyover at Dankuni have been sorted out. The work of this flyover has been started.

45 Annual Administrative Report 2009-2010

Status of Sanctioned RIDF Projects under Public Work (Roads) Directorated for the financial year 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) (ROADS) Burdwan 1 XIII W/S of Sagrai-Raina Road(0.00 to 748.49 598.79 849.70 40 13.00 Kmp 2 XIII W/S of Kaichar-Nandigram-Singhi 308.81 247.05 379.82 100 Road (10.00 to 16.50 km) Birbhum 3 XIII W/S of Rampurhat-Parulia-Sherpur 499.15 399.32 600.29 60 Road (0.00 to 13.00 kmp) Coochbehar 4 XIII W/S of Kakina Road (0.00 to 2.00 227.61 182.09 287.42 50 kmp & Widening from 2.00 to 8.75 Km) Darjeeling 5 XIII Imp. of Naxalbari-Ambari Road 103.39 82.71 152.96 100 (8.00 to 13.70 km) Hooghly 6 XIII W/S of Kotulpur - Kamarpukur 339.90 271.92 428.26 70 Road (6.00 to 13.52 km) 7 XIII W/S of Balagarh-Inchura Road 272.00 217.78 385.88 10 (0.00 to 5.00 km) Howrah 8 XIII W/S of Maheshpur-Birshibpur- 468.00 374.40 380.37 60 Hatgachia Road (0.00 to 8.77 km) Murshidabad 9 XIII Imp. & Strengthening of Salkia- 437.63 350.10 509.62 100 Panutia Road (0.00 to 8.00 kmp) 10 XIII Imp. & Strengthening of Salar- 190.34 152.27 202.64 100 Talibpur Road (1.70 to 6.72 km

46 Annual Administrative Report 2009-2010

Bridge over River Bidyadhari at Haroa connecting Lauhati Haroa Road with Berachampa Haroa Road

Detail

This bridge connects Lauhati Haroa Road with Berachampa Haroa Road at Haroa. It is an unique link with Basirhat from Kolkata.

Length of the Bridge Proper 132 m.

Length of the Approach Road including Viaduct 232 m.

Total Length 364 m.

Approximate Cost Rs. 650 lakh.

47 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) Nadia 11 XIII W/S of NH-34 - Simurali Rly. Stn. 176.65 141.32 229.81 100 (0.00 to 3.00 kmp) 12 XIII W/S of Majdia-Banpur-Gede Road 333.52 266.82 371.76 100 (0.00 to 7.50 km) South 24-Parganas 13 XIII W/S of Joynagar-Jalaberia-Kultali 262.97 210.38 278.40 90 Road (0.20 to 7.40 km) 14 XIII W/S of Sajua-Maheshtala Road 228.28 182.62 193.23 100 (0.00 to 5.00 kmp) 15 XIII W/S of Ghutiary Shariff-Chakberia 245.12 196.10 204.66 70 Road (0.00 to 5.00 kmp) Dakshin Dinajpur 16 XIV W/S of Harirampur - Beldanga 466.72 373.38 549.63 100 Road (0.00 kmp - 9.40 kmp) 17 XIV Imp. of Daulatpur-Harirampur- 405.94 324.75 386.20 80 Dehaband Road (0.00-7.50 kmp) Uttar Dinajpur 18 XIV Strengthening of Biprit-Solpara 1019.78 815.82 899.52 100 Road (0.00 kmp - 17.50 kmp) 19 XIV W/S of Kanki-Goagaon Road 376.93 301.54 436.04 80 (20.00-27.00 km) Paschim Medinipur 20 XIV W/S of Mundamari - Pingla- 514.39 411.51 496.60 95 Paramanandapur - Moyna Road (10.00 kmp - 18.00 kmp & 20.00 kmp - 22.00 kmp) 21 XIV W/S of - Anandanagar - 369.77 295.82 349.36 60 Chandra - Dheruaghat Road (15.00 kmp - 24.20 kmp) 22 XIV W/S of Barbedia - Jamna Road 224.20 179.36 244.85 0 (18.00 -22.40 kmp) 23 XIV W/S of - Hoomgarh Road 225.21 180.17 237.52 100 (7.00 - 13.00 kmp)

48 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) 24 XIV W/S of Debra - Martala Road (0.00 465.73 372.58 429.54 90 - 10.25 kmp) Purba Medinipur 25 XIV W/S of Mecheda - Tamluk Road 946.59 757.27 930.76 100 (0.30 kmp - 14.40 kmp) 26 XIV W/S of Ratulia - Gobardhanpur 143.30 114.64 138.60 100 Road (0.00 kmp - 3.50 kmp) 27 XIV W/S of Khejuria-Heria Road 608.50 486.80 656.82 90 (13.00-22.00 kmp) Howrah 28 XIV W/S of Andul - Domjur Road 235.19 188.15 220.34 100 (1.00 kmp - 6.00 kmp) 29 XIV W/S of Amta - Jhikiria Road (3.50 339.37 271.50 331.06 100 kmp - 10.50 kmp) 30 XIV Improvement of Bagnan - Bainan - 254.96 203.97 257.99 100 Gaighata Road (0.00 -4.80 kmp) Burdwan 31 XIV W/S of Chupi - Purbasthali Road 231.65 185.32 217.95 100 (0.00 kmp -6.20 kmp) 32 XIV W/S of Bhatar - Bonpas Road (0.00 277.95 222.36 224.07 100 kmp - 8.50 kmp) 33 XIV W/S of Bhatar - Nasigram Road 266.07 212.86 215.19 100 (0.00 kmp - 8.00 kmp) 34 XIV W/S of Aherbelma - Pahalanpur 496.14 396.91 480.67 90 Road (0.00 kmp - 13.00 kmp) 35 XIV W/S of Hatgobindapur - 538.94 431.15 498.81 100 Purbabalisha Road (0.00 kmp- 15.36 kmp) 36 XIV W/S of Kusumgram - Samaspur 407.01 325.61 310.49 25 Road (0.00 - 11.75 kmp) Darjeeling 37 XIV Imp. of Naxalbari-Ambari Road 182.72 146.18 212.78 100 (0.00 - 8.00 kmp)

49 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) Bankura 38 XIV W/S of Chatna - Dalpur - Bishpuria 491.74 393.39 379.64 10 Road (0.00 kmp - 17.45 kmp) Birbhum 39 XIV W/S of Bolpur - Kankalitala - 553.76 443.01 594.99 70 Labhpur Road (0.00 km - 11.50 kmp) 40 XIV W/S of Bolpur Kankalitala - 430.76 344.61 446.10 100 Labhpur Road (11.50 kmp - 23.50 kmp) 41 XIV W/S of Chowhatta Hatia - Sainthia 685.01 548.01 747.47 25 Road (0.00 kmp - 18.67 kmp) Hooghly 42 XIV W/S of Pandua - Polba Road (0.00 375.22 300.18 363.63 100 to 8.00 kmp) 43 XIV W/S of Tarakeswar - Kanaria Road 246.53 197.2 236.92 100 (0.00 kmp - 5.20 kmp) 44 XIV W/S of Boro Seakhala-Jangipur 314.43 251.54 231.99 50 Road (10.30 kmp - 17.80 kmp) 45 XIV W/S of Mogra - Sultangacha Road 195.49 156.39 189.43 100 (0.00 kmp - 5.00 kmp) 46 XIV W/S of Arambag - Gourhati - 443.34 354.67 424.96 60 Bander Road (11.00 kmp - 21.60 kmp) 47 XIV W/S of Tamba - Kamarpara Road 338.74 270.99 325.68 100 (0.00 kmp - 6.11 kmp) North 24-Parganas 48 XIV W/S of Kalambagan - Beara Road 417.22 333.78 416.17 100 (0.00 kmp - 5.80 kmp) 49 XIV W/S of Hingalganj - Duldulia 903.42 722.74 939.88 90 Hemnagar Road (18.00 kmp - 33.00 kmp)

50 Annual Administrative Report 2009-2010

Bridge over River Petkulchand

Detail

This bridge connects Mainland at Mahendra Kheyaghat with Kisorimohanpur Island. The road termi- nates at the end(i.e at Kishorimohanpur) by the side of River Matla.

Length of the Bridge Proper 120 m.

Length of the Approach Road including Viaduct 360 m.

Total Length 480 m.

Approximate Cost Rs.300 lakh.

51 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) 50 XIV W/S of Bangaon - Jhoudanga - 707.60 566.08 701.65 100 Panchpota Hemnagar Road (2.00 kmp - 17.00 kmp) Coochbehar 51 XIV W/S of Dinhata - Balarampur 741.13 592.90 788.89 60 Road (0.00 kmp - 17.00 kmp) Nadia 52 XIV W/S of Madanpur - Bhagirathi 181.62 145.30 175.93 100 Silpashram Road (0.00 kmp - 3.98 kmp) 53 XIV W/S of Dignagar - Beliadanga - 339.90 271.92 302.15 100 Baganchara Road (0.00 kmp - 7.00 kmp) 54 XIV W/S of Chapra - Gongra Road 359.89 287.91 298.16 100 (0.00 kmp - 7.75 kmp) South 24-Parganas 55 XIV W/S of Bhangar Bazar - Kulti 107.32 85.86 101.73 100 Road (0.00 kmp - 2.65 kmp) 56. XIV W/S of Sajua - Maheshtala Road 89.92 71.94 83.60 100 (5.00 kmp -7.10 kmp) 57. XIV W/S of Sikarpur - Kulti Canal 323.27 258.62 292.99 80 Road (7.00 kmp - 12.20 kmp) 58 XIV W/S of Canning - Herobhanga 332.31 265.85 320.49 50 Road (0.00 kmp - 7.00 kmp) 59 XIV W/S of Ghutiari Sariff - 265.33 212.26 253.25 100 Chakraberia Road (5.00 kmp - 9.25 kmp) 60 XIV W/S of Joynagar - Moydah 407.20 325.76 392.90 100 Jibanmandalhat Road (0.00 kmp- 9.00 kmp) Murshidabad 61 XIV Akhergunj-Katlamari Road (11.00 244.39 195.51 255.25 100 - 16.00 kmp)

52 Annual Administrative Report 2009-2010

Bridge over River Bidyadhari at Chaitalghat

Detail

This bridge connects Malancha and Chaitalghat. It is one of the important Bridge which connects North and South 24 Parganas

Length of the Bridge Proper 358 m.

Length of the Approach Road including Viaduct 1200m.

Total Length 1558 m.

Approximate Cost Rs.3500 lakh.

53 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) 62 XIV Bhatsala - Khusberia Road (0.00- 227.07 181.66 238.82 100 5.00 kmp) 63 XIV Rajapur - Garaimari Road (0.00- 319.73 255.78 336.54 100 6.50 kmp) 64 XIV Ramnagar - Bazarshow - 297.18 237.74 275.74 70 Chowrigacha - Khagraghat Road (10.00 - 15.00 kmp) 65 XIV Salkia - Panutia Road (8.00 - 148.28 118.62 148.69 100 11.30 kmp) Jalpaiguri 66 XIV W/S of Malbazar-Baradighi Road 326.21 260.97 390.05 100 (0.00-9.00 kmp) 67 XIV I/S of Huslurdanga-Sushthirhat 265.20 212.16 302.78 100 Road (0.00 - 10.00 kmp) Bankura 68 XV Consturction of Balance work of 389.33 311.46 376.21 30 Link Rd to bridge over Darakeswar (6.409 - 9.089 on Kotulpur Side & 9.860 - 10.650 Indus Side of Samroghat Bridge) Purba Medinipur 69 XV W/S of Khejuria-Heria Road (0.00 859.03 687.22 625.14 10 to 13.00) 70 XV W/S of Majhigram H.C. to Katwa - 536.90 429.52 520.56 25 Churpuni - Billaswar - Palita Road (0.00 to 9.50 & 10.80 to 11.40) 71 XV W/S of Sankarpur-Nabhujibazar 342.45 273.96 341.06 5 road (7.43 - 16.43) 72 XV Strengthening of Pandua-Kalna 283.56 226.85 274.89 5 Road to Teraband School Road (0.00 to 8.24) Malda 73 XV W/S of Bhaluka Road Rly. Stn. to 593.23 474.58 577.75 — Tulshihata Road (5.00 to 13.60)

54 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) Purulia 74 XV W/S of Damda-Chakoltore-Daradi- 472.39 377.91 455.57 15 Kenda-Manbazar Road (0.00 to to 12.00) North 24-Parganas 75 XV W/S of Patsimulia-Boaldah Road 470.51 376.41 454.50 45 (0.00 to 10.75) 76 XV W/S of Bamungachi-Bamunmura 253.96 203.17 244.23 10 Road (0.00 to 6.75) 77 XV W/S of Habra-Chatra Road via 385.80 308.64 369.04 10 Simulpur (0.00 to 9.35) Coochbehar 78 XV W/S of Tufangunj-Balabhut Road 582.81 466.25 571.54 5 (0.00 to 12.00) Nadia 79 XV W/S of Chapra-Gongra Road (7.75- 236.51 189.21 234.57 0 13.05) 80 XV W/S of Karimpur-Natidanga- 550.91 440.73 — — Nazirpur Road (0.00 ot 11.00) 81 XV W/S of road from NH - 34 to 500.19 400.15 483.46 0 Balagarghat Road (0 to 7.34) South 24-Parganas 82 XV W/S of Neela-Dewantala Road (0.78 140.82 112.66 104.60 80 to 2.68) and extend to Hooghly river bank (0.00 to 1.10) 83 XV W/S of Dolonghata More to 168.09 134.47 160.44 50 Ramkrishnapur Road (0.00 to 3.40) Murshidabad 84 XV W/S of Sagardighi to NH34 (Suki 243.75 195.00 175.89 10 more) road (0.00 to 6.70) 85 XV W/S of Bhatsala-Kushaberia Road 371.03 296.82 351.75 20 (5.00 to 13.00)

55 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) 86 XV W/S of Rajapur-Garaimari Road 107.30 85.84 103.49 10 (6.50 to 8.60) Dakshin Dinajpur 87 XV W/S of Kushmandi-Mahipaldighi 321.25 257.00 292.37 0 Road (0.00 to 5.50) 88 XV W/S of Daulatpur - Harirampur- 225.76 180.61 204.44 0 Dehaband Road (9.00 to 13.00) Paschim Medinipur 89 XV W/S of Lodhasuli-Rogra Road (0.00 476.87 381.50 475.20 10 to 11.00) 90 XV W/S of Garbeta- 386.40 309.12 294.64 0 Town Road (0.00 to 9.00) 91 XV W/S of Jhargram-Jamboni Road 167.49 133.99 166.14 10 (0.00 to 4.00) BRIDGES North 24-Parganas 92 XI Bridge over River Katakhali at 2653.00 2122.40 2566.00 50 Hasnabad Purulia 93 XI Bridge over River Kangsabati 761.22 608.98 900.57 75 Burdwan 94 XIV Construction of R.C. Box bridge 57.81 46.25 45.61 90 along with approaches over Debkhal at Raina at 13th km of Sagrai - Raina Road 95 XIV Construction of R.C.C. Box bridge 57.34 45.87 54.87 90 along with approaches over Debkhal at Shyamsundar 9th km of Sagrai - Raina Road Bankura 96 XV Construction of Balance Work of 837.71 670.17 852.52 0 Bridge on Dwarakeswar at Samroghat at 10th km of Kotulpur- Indus Rd.

56 Annual Administrative Report 2009-2010

Bridge over River Ichamati at Sindrani

Detail

This bridge connects Sindhrani with Bajitpur. It is an important link with Bongaon Chakdah Road and Bongaon Bagda Road.

Length of the Bridge Proper 105 m.

Length of the Approach Road including Viaduct 510m.

Total Length 615 m.

Approximate Cost Rs.275 lakh.

57 Annual Administrative Report 2009-2010

Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) South 24-Parganas 97 XV Balance Work of Bridge across 424.87 339.90 216.65 5 Bhangar bazar - Katakhal near Bhangar bazar Burdwan 98 XV Construction of 3 cell box bridge 82.45 65.96 — — at1st km of Aherbelma-Pahalanpur Road 99 XV Construction of 3 cell box bridge 68.10 54.48 — — at15th km of Aherbelma-Pahalanpur Road 100 XV Construction of 3 cell box bridge 138.38 110.70 139.48 — at 4th km of Jamuria-Chakdola Road Status of Core Plan Schemes of P.W. (Roads) Directorate for the Financial Year 2009-2010

Sl. Name of the Project Head Length Estimated Physical No. in Km Amount Progress (in Lakh) (%) (1) (2) (3) (4) (5) (6) (ROADS & BRIDGES) North 24-Parganas 1 IRQP of K.N.I. (VIP) Road & Construction of G 8.00 1050.40 90 Service Road (left side) 2 Strengthening of Sikara-Kulingram-Gopalpur- G 16.32 491.87 0 Haroa Road 3 Strengthening of Taki-Murarisha-Bhebla- G 20.80 616.74 0 Chaital Road 4 Improvement of Murarisha crossing at 9th km SCP 1.00 62.12 0 of Taki - Murarisha - Bhebia - Chaital Road by rigid pavement. 5 W/S of Gobardanga-Gopalpurhat Road (8.80 G 7.65 486.06 0 to 16.35 kmp) (Rs. 486.06) 6 Improvement of Bhurkundahat-Godamarahat G 7.20 196.04 — Road (0.00 to 7.20 kmp) (Rs. 196.04)

58 Annual Administrative Report 2009-2010

Bridge over River Ichamati at Basirhat

Detail

This bridge connects Basirhat with Sangrampur. It is an important link with Barasat Basirhat Road and Sangrampur Swarupnagar Road.

Length of the Bridge Proper 200 m.

Length of the Approach Road including Viaduct 128m.

Total Length 328 m.

Approximate Cost Rs.2500 lakh.

59 Annual Administrative Report 2009-2010

Sl. Name of the Project Head Length Estimated Physical No. in Km Amount Progress (in Lakh) (%) (1) (2) (3) (4) (5) (6) 7 Improvement of Nilganj - Santoshpur Road SCP 8.30 221.68 10 South 24-Parganas 8 W/S of Basanti-Herobanga Road (0.00 - SCP 10.00 884.55 100 10.00 kmp) 9 W/S of Moydah - Khukurdaha Road (0.00- SCP 7.40 254.78 100 7.40 kmp) 10 Strengthening of Sarerhat-Birlapur Road G 10.40 511.98 60 (6.00 - 16.40 kmp) 11 W/S of Kashinagar-Roypur-Ferryghat SCP 5.50 297.99 0 Road(0.00-5.50 kmp) Howrah 12 Improvement of Munshirhat - Pero - Khila - G 8.60 295.89 100 Rajpur Road (5.00 to 13.60 kmp) with construction of 2 Nos. culverts 13 Improvement of Amta - Rajapur - Dihibhursut G 12.00 298.63 0 Road from 0.00 to 12.00 kmp by way of Strengthening the existing hard crust of 5.00 m wide carriageway. 14 Construction of bridge over river Damodar at G — 1160.39 0 Bakpota ghat ( beside the existing single lane bridge) on Udaynarayanpur - Bokpotaghat - Ichanagari Road in the district of Howrah. Hooghly 15 Widening & strengthening of Nalikul - G 6.20 298.17 0 Seakhala Road (0.00 to 6.20 kmp) 16 Constn. of bridge over river Mundeswari at — — 1127.48 20 Dighurighat on Pursurah - Radhanagar Road Nadia 17 W/S of Majdia - Bhajanghat Road (1.00 kmp to SCP 5.50 242.92 100 6.50 kmp) 18 Constn. of bridge over river Churni on SCP — 388.06 35 Bajit - Shibnibasg Road 19 Constn. of bridge over river Chariganga SCP — 650.00 0 20 IRQP of Ranaghat-Aranghata (N) Road (0 - 5.70 G 9.43 128.80 100 & 6.00 to 9.73 kmp)

60 Annual Administrative Report 2009-2010

Barasat R.O.B.

Detail

This R.O.B Connects NH34 with NH35 crossing the rail track just by the side of Barasat Rail Station.

Length of the Bridge Proper 56 m.

Length of the Approach Road including Viaduct 539m.

Total Length 595 m.

Approximate Cost Rs.1110 lakh.

61 Annual Administrative Report 2009-2010

Sl. Name of the Project Head Length Estimated Physical No. in Km Amount Progress (in Lakh) (%) (1) (2) (3) (4) (5) (6) Murshidabad 21 Constn. of bridge over river Jalangi on SCP — 858.38 40 Rajpur-Garaimari Road 22 W/S of Kuli-Moregram Road (20-24.45) G (03) 4.45 560.69 50 23 Constn. of bridge over river Dwarka at G — 1370.67 60 Ganthlaghat on Jibanti-Sherpur Road Birbhum 24 W/S of Joydev-Kenduli-Illambazar Road SCP 11.00 416.83 30 25 W/S of Rajnagar-Khoriasole Road G 19.80 528.80 0 26 W/S of Nalhati Bye Pass G 3.00 276.79 0 27 Constn. of bridge over Guskara Kandar & SCP — 876.00 50 Dwarka river on Rampurhat - Purulia Road Darjeeling 28 W/S on Garidhura - Mirik - Simanabusty TSP 5.00 243.63 40 Road (10.00 - 15.00 kmp) 29 Strengthening of Kharibari - Phansidewa Road G 5.00 271.82 0 from 16.00 - 21.00 kmp Jalpaiguri 30 Impv. and strengthening of a road from TSP 25.40 — 100 Sonapur More (NH-31) to Hasimara (NH- 31C) via Chalapata Forest (Rs. 724.00) 31 Special repair of Moynaguri - Changrabandha G 11.27 321.44 0 (1.00 - 5.00 kmp, 7.00 - 10.00 kmp & 14.33- 18.60 kmp) 32 Construction of bridge over river Dima at TSP — 957.81 0 5th kmp of Rajabhatkhawaa - Jaigoan Road 33 Construction of a bridge over river Panga at TSP — 425.92 10 6th km of Jalpaiguri - Chaulhati Road in replacement of the existing damaged weak bridge. Coochbehar 34 Improvement & strengthening of Changrabandha- G 17.00 673.17 0 Mathabangha - Coochbehar Road (18.00 to 31.00 & 40.00 to 44.00 kmp)

62 Annual Administrative Report 2009-2010

Birati R.O.B.

Detail

This R.O.B Connects NH34 with B.T Road crossing the rail track just by the side of Birati Rail Station.

Length of the Bridge Proper 54 m.

Length of the Approach Road including Viaduct 573 m.

Total Length 627 m.

Approximate Cost Rs.1450 lakh.

63 Annual Administrative Report 2009-2010

Sl. Name of the Project Head Length Estimated Physical No. in Km Amount Progress (in Lakh) (%) (1) (2) (3) (4) (5) (6) 35 Constn. of bridge over river Raidak - 1 at SCP — 606.61 40 Balabhuton Toofanganj - Balabhut Road 36 Construction of a bridge over river Kaljani SCP — 3399.00 10 (near Balarampur) at including approach link at 2nd km on Dinhata - Balarampur - Burdwan 37 Constn. of bridge over river Khari alongwith G — 820.88 50 road of Samashpur - Mukshimpara 38 W/S Muchipara - Shibpur Road G 19.60 302.05 50 39 W/S of Domohani - Gourandi - SCP 9.20 599.01 0 Ranakuraghat (1.70 km) Domohani - Churulia - Ajoyghat Road (6.80) & Promila - Nazrul Samadhi link road (0.70 km) 40 Constn. of bridge over river Kunnor G — 519.24 80 41 W/S of Bolghana - Chandrapur Road SCP 11.00 298.87 70 Purulia 42 W/S of Sindhri - Manbazar Road TSP 5.00 123.10 — East Midnapore 43 W/S of Mundumari - Pingla - Paramanandapur - SCP 8.00 421.49 0 Moyna Road (22-00-30.00 kmp) 44 W/S of Kolaghat - Gopalnagar - Jessor Road SCP 7.80 265.76 0 45 W/S of Chandrakona - - Sarenga - G 6.20 247.59 0 Simlighat Road (3.80 - 10.00 kmp) 46 W/S of Chandrakona - Goaltore - Sarenga - G 8.00 400.18 0 Simlighat Road (10.00 - 18.00 kmp) Bankura 47 Improvement of Indus - Saspur - Akui SCP 7.00 607.43 0 Road (0.00 to 7.00 kmp) 48 Construction of bridge over river Kngshabati TSP — 735.42 25 at Kechendaghat on Bankura - Ranibandh Road Dakshin Dinajpur 49 Improvement of Tapan - Kardha - Vikahar - G 10.00 396.35 0 Amtolighat (2.40 - 12.40 kmp) alongwith one culvert

64 Annual Administrative Report 2009-2010

Madhyamgram R.O.B.

Detail

This R.O.B Connects NH34 with B.T Road crossing the rail track just by the side of Madhyamgram Rail Station.

Length of the Bridge Proper 51 m.

Length of the Approach Road including Viaduct 429m.

Total Length 480 m.

Approximate Cost Rs.1050 lakh.

65 Annual Administrative Report 2009-2010

Sl. Name of the Project Head Length Estimated Physical No. in Km Amount Progress (in Lakh) (%) (1) (2) (3) (4) (5) (6)

50 Construction of a bridge over river Ghupsikhri SCP — 306.23 5 at 4th km of Kamarpara - Kurnail - Chingispur Road Malda 51 Construction of bridge over river Mahananda G Deptt. 666.53, bridge & at Madhabpurghat M ZP D 80.53 & DD’ ssite D ZP 123.78 approach completed 52 Construction of bridge over river Pagla - SCP — — work Bhagirathi on Gour - Mehadipur Road could not (Rs. 510.80) be proceeded due to LA problem STATUS REPORT OF ONGOING WORKS EXECUTED FROM CENTRAL ROAD FUND (CRF) UNDER P.W. (ROADS) DIRECTORATE DURING THE FINANCIAL YEAR 2009-2010

SI. Name of the Work Length in m/ Amount Amount of Physical km for Bridge of A / A Tech. Sanc. Progress / Road (in Lakh) (in Lakh) (%) (1) (2) (3) (4) (5) (6) 1 Widening and strengthening of Solapatta - 6.65 509.00 509.00 0 Sonakania Road (30.05 to 36.70 km) 2 Improvement of decentralized portion of 29.00 1509.00 1509.00 0 NH - 2 from km. 582.00 kmp to 611.00 kmp 3 Strengthening work for balance portion of 29.99 1743.00 1743.00 8 Decentralised NH - 2, Byepass from 611.00 kmp to 615.00 kmp, 615.60 kmp to 620.00 kmp, 622.00 kmp to 625.00 kmp, 627.00 kmp to 628.00 kmp, 629.00kmp to 631.00 kmp, 644.00 kmp to 645.00 kmp, 646.00 kmp to 651.00 kmp, 654.00 kmp to 662.00 kmp & Link of length 1.62 kmconnecting STKK Road and western approach of Iswar Gupta Setu of length 1.670 km.

66 Annual Administrative Report 2009-2010

List of Flyover and R.O.Bs.:-

SI. No. Name of Schemes Present Status 1 ROB at Bagnan 15% 2 ROB at Rangamati 90% 3 ROB at Dankuni Work Started 4 ROB at Baruipur 15% 5 ROB at Barrackpur 30% 6 ROB at Durgapur 20%

List of Scheme under Additional Central Assistance for the financial year 2009 -10 of P.W. (Roads) Directorate

SI. Name of the work Persent Status No. 1. Construction of bridge over river Jalangi at Radhanagarghat on 10% Beldanga - Patkabari Road

(B) Mechanical Wing The Mechanical Wing of P.W. (Roads) Directorate is entrusted with the work of upkeepment and maintenance of vehicles, tools, plants and machineries of this department. This wing has been provided with Mobile Bridge Inspection machine by MORTH, Government of , which is required for the purpose of inspection and preparing report on condition of bridges. This wing performs an important task during the whole year – the entire transhipment of vehicles and passengers from Harwood Point (Main Land) to Kachuberia (Sagar Island).

67