Roads) Directorate & Mechanical Wing

Roads) Directorate & Mechanical Wing

Annual Administrative Report 2009-2010 7.5 Public Works (Roads) Directorate & Mechanical Wing :- (A) P. W. (Roads) Directorate The Public Works (Roads) Directorate has been playing key role in the development and expansion of road infrastructure in the State of West Bengal. At present, in various districts of West Bengal the work of major and minor, important bridges under Core Plan are in progress. With partial financial assistance from the Central Government the construction work of a bridge over River Jalangi at Radhanagarghat in Murshidabad - Nadia border has been started. The construction work of another bridge has been started over River Jalangi at Fazil Nagar in Nadia District under the border area development programme of the Central Government. In the fiscal year the construction work of 10 important bridges has been completed by the P.W. (Roads) Directorate. Among these the bridge connecting the districts of Malda and Uttar Dinajpur, over River Mahananda at Madhabpurghat, the bridge over Sarenga Khal in Howrah District, the bridge over River Ichamati at Dhapdhara, two bridges on Bagda - Duffafulia Road in North 24 Parganas, the bridge over Kashiakhari in the District of Dakshin Dinajpur and the bridge over Dimti Canal in Uttar Dinajpur are worth mentioning here. The work of road connecting Lochan Das Setu over River Ajoy linking districts of Burdwan, Birbhum and Murshidabad has been completed. As a result the transport system has been improved and made faster. Innumerable important bridges have been constructed by the P.W. (Roads) Directorate in almost all the districts of the State in the last three decades. In spite of this, present circumstances demand more bridges for more development of the communication system. For achieving this goal, the plan to construct more bridges, by receiving opinions of the Zilla Parishad, is under consideration. On behalf of the P.W. (Roads) Department the construction work of the bridge over River Dima on the Rajabhatkhaowa - Jaigaon Road in the Jalpaiguri District has been started. In the infrastructural development of the state the work of widening and strengthening of important roads along with construction of some bridges, in almost all the districts of the state is being carried out with loan assistance, primarily from the NABARD. The P.W. (Roads) Department construct flyovers / subways over various rail lines by sharing expenditure with the railway authorities through the Railway Safety Fund Programme. Among the ongoing projects, the work of the flyover at Rangamati on Jhargram Main Road over the South -Eastern Section of the Railways in the district of Paschim Medinipur is nearing completion. Apart from this the work of flyovers at Bagnan, Barrackpore, Durgapur and Baruipur are progressing at a fast pace. All the handicaps and hindrances for the construction of the flyover at Dankuni have been sorted out. The work of this flyover has been started. 45 Annual Administrative Report 2009-2010 Status of Sanctioned RIDF Projects under Public Work (Roads) Directorated for the financial year 2009-2010 Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) (ROADS) Burdwan 1 XIII W/S of Sagrai-Raina Road(0.00 to 748.49 598.79 849.70 40 13.00 Kmp 2 XIII W/S of Kaichar-Nandigram-Singhi 308.81 247.05 379.82 100 Road (10.00 to 16.50 km) Birbhum 3 XIII W/S of Rampurhat-Parulia-Sherpur 499.15 399.32 600.29 60 Road (0.00 to 13.00 kmp) Coochbehar 4 XIII W/S of Kakina Road (0.00 to 2.00 227.61 182.09 287.42 50 kmp & Widening from 2.00 to 8.75 Km) Darjeeling 5 XIII Imp. of Naxalbari-Ambari Road 103.39 82.71 152.96 100 (8.00 to 13.70 km) Hooghly 6 XIII W/S of Kotulpur - Kamarpukur 339.90 271.92 428.26 70 Road (6.00 to 13.52 km) 7 XIII W/S of Balagarh-Inchura Road 272.00 217.78 385.88 10 (0.00 to 5.00 km) Howrah 8 XIII W/S of Maheshpur-Birshibpur- 468.00 374.40 380.37 60 Hatgachia Road (0.00 to 8.77 km) Murshidabad 9 XIII Imp. & Strengthening of Salkia- 437.63 350.10 509.62 100 Panutia Road (0.00 to 8.00 kmp) 10 XIII Imp. & Strengthening of Salar- 190.34 152.27 202.64 100 Talibpur Road (1.70 to 6.72 km 46 Annual Administrative Report 2009-2010 Bridge over River Bidyadhari at Haroa connecting Lauhati Haroa Road with Berachampa Haroa Road Detail This bridge connects Lauhati Haroa Road with Berachampa Haroa Road at Haroa. It is an unique link with Basirhat from Kolkata. Length of the Bridge Proper 132 m. Length of the Approach Road including Viaduct 232 m. Total Length 364 m. Approximate Cost Rs. 650 lakh. 47 Annual Administrative Report 2009-2010 Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) Nadia 11 XIII W/S of NH-34 - Simurali Rly. Stn. 176.65 141.32 229.81 100 (0.00 to 3.00 kmp) 12 XIII W/S of Majdia-Banpur-Gede Road 333.52 266.82 371.76 100 (0.00 to 7.50 km) South 24-Parganas 13 XIII W/S of Joynagar-Jalaberia-Kultali 262.97 210.38 278.40 90 Road (0.20 to 7.40 km) 14 XIII W/S of Sajua-Maheshtala Road 228.28 182.62 193.23 100 (0.00 to 5.00 kmp) 15 XIII W/S of Ghutiary Shariff-Chakberia 245.12 196.10 204.66 70 Road (0.00 to 5.00 kmp) Dakshin Dinajpur 16 XIV W/S of Harirampur - Beldanga 466.72 373.38 549.63 100 Road (0.00 kmp - 9.40 kmp) 17 XIV Imp. of Daulatpur-Harirampur- 405.94 324.75 386.20 80 Dehaband Road (0.00-7.50 kmp) Uttar Dinajpur 18 XIV Strengthening of Biprit-Solpara 1019.78 815.82 899.52 100 Road (0.00 kmp - 17.50 kmp) 19 XIV W/S of Kanki-Goagaon Road 376.93 301.54 436.04 80 (20.00-27.00 km) Paschim Medinipur 20 XIV W/S of Mundamari - Pingla- 514.39 411.51 496.60 95 Paramanandapur - Moyna Road (10.00 kmp - 18.00 kmp & 20.00 kmp - 22.00 kmp) 21 XIV W/S of Midnapore - Anandanagar - 369.77 295.82 349.36 60 Chandra - Dheruaghat Road (15.00 kmp - 24.20 kmp) 22 XIV W/S of Barbedia - Jamna Road 224.20 179.36 244.85 0 (18.00 -22.40 kmp) 23 XIV W/S of Garbeta - Hoomgarh Road 225.21 180.17 237.52 100 (7.00 - 13.00 kmp) 48 Annual Administrative Report 2009-2010 Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) 24 XIV W/S of Debra - Martala Road (0.00 465.73 372.58 429.54 90 - 10.25 kmp) Purba Medinipur 25 XIV W/S of Mecheda - Tamluk Road 946.59 757.27 930.76 100 (0.30 kmp - 14.40 kmp) 26 XIV W/S of Ratulia - Gobardhanpur 143.30 114.64 138.60 100 Road (0.00 kmp - 3.50 kmp) 27 XIV W/S of Khejuria-Heria Road 608.50 486.80 656.82 90 (13.00-22.00 kmp) Howrah 28 XIV W/S of Andul - Domjur Road 235.19 188.15 220.34 100 (1.00 kmp - 6.00 kmp) 29 XIV W/S of Amta - Jhikiria Road (3.50 339.37 271.50 331.06 100 kmp - 10.50 kmp) 30 XIV Improvement of Bagnan - Bainan - 254.96 203.97 257.99 100 Gaighata Road (0.00 -4.80 kmp) Burdwan 31 XIV W/S of Chupi - Purbasthali Road 231.65 185.32 217.95 100 (0.00 kmp -6.20 kmp) 32 XIV W/S of Bhatar - Bonpas Road (0.00 277.95 222.36 224.07 100 kmp - 8.50 kmp) 33 XIV W/S of Bhatar - Nasigram Road 266.07 212.86 215.19 100 (0.00 kmp - 8.00 kmp) 34 XIV W/S of Aherbelma - Pahalanpur 496.14 396.91 480.67 90 Road (0.00 kmp - 13.00 kmp) 35 XIV W/S of Hatgobindapur - 538.94 431.15 498.81 100 Purbabalisha Road (0.00 kmp- 15.36 kmp) 36 XIV W/S of Kusumgram - Samaspur 407.01 325.61 310.49 25 Road (0.00 - 11.75 kmp) Darjeeling 37 XIV Imp. of Naxalbari-Ambari Road 182.72 146.18 212.78 100 (0.00 - 8.00 kmp) 49 Annual Administrative Report 2009-2010 Sl. RIDF Name of the Project Sanctioned RIDF Awarded Present No. Trenches Cost Cost Cost physical (Rs.In (Rs.In (Rs.In progress Lakh) Lakh) Lakh) in % (1) (2) (3) (4) (5) (6) (7) Bankura 38 XIV W/S of Chatna - Dalpur - Bishpuria 491.74 393.39 379.64 10 Road (0.00 kmp - 17.45 kmp) Birbhum 39 XIV W/S of Bolpur - Kankalitala - 553.76 443.01 594.99 70 Labhpur Road (0.00 km - 11.50 kmp) 40 XIV W/S of Bolpur Kankalitala - 430.76 344.61 446.10 100 Labhpur Road (11.50 kmp - 23.50 kmp) 41 XIV W/S of Chowhatta Hatia - Sainthia 685.01 548.01 747.47 25 Road (0.00 kmp - 18.67 kmp) Hooghly 42 XIV W/S of Pandua - Polba Road (0.00 375.22 300.18 363.63 100 to 8.00 kmp) 43 XIV W/S of Tarakeswar - Kanaria Road 246.53 197.2 236.92 100 (0.00 kmp - 5.20 kmp) 44 XIV W/S of Boro Seakhala-Jangipur 314.43 251.54 231.99 50 Road (10.30 kmp - 17.80 kmp) 45 XIV W/S of Mogra - Sultangacha Road 195.49 156.39 189.43 100 (0.00 kmp - 5.00 kmp) 46 XIV W/S of Arambag - Gourhati - 443.34 354.67 424.96 60 Bander Road (11.00 kmp - 21.60 kmp) 47 XIV W/S of Tamba - Kamarpara Road 338.74 270.99 325.68 100 (0.00 kmp - 6.11 kmp) North 24-Parganas 48 XIV W/S of Kalambagan - Beara Road 417.22 333.78 416.17 100 (0.00 kmp - 5.80 kmp) 49 XIV W/S of Hingalganj - Duldulia 903.42 722.74 939.88 90 Hemnagar Road (18.00 kmp - 33.00 kmp) 50 Annual Administrative Report 2009-2010 Bridge over River Petkulchand Detail This bridge connects Mainland at Mahendra Kheyaghat with Kisorimohanpur Island.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us