LeporelloE12d_Layout 1 20.01.2017 14:15 Seite 1

A new era Successful Trio Internationality New Impetus Active worldwide Future with BAM

Hardly any construction company in is Three brilliant minds that changed construc- Already early in the company’s history the acti- Building upwards and downwards – during the Wayss & Freytag is now a globally active group Wayss & Freytag gets a new platform: as a

able to look back on as long a company history tion: with Conrad Freytag, founder of the com- vities were not limited to the Palatinate. In reconstruction of Germany industrial and resi- of companies. New business fields are added: group company of the Royal BAM Group, which

as Wayss & Freytag. Entrepreneurial spirit, far- pany, a new era in construction started. Gustav 1910, the company already had twelve bran- dential buildings and a modern infrastructure environmental technology, building preserva- was established in 2002, the company realizes

sightedness and visionary drive were the foun- The kennel of company dog Employment contract of Emil Adolf Wayss made ground-breaking tests with The scientist: Emil The entrepreneur: The visionary: ches in Germany. In 1903, the first foreign Around 1925: 1909: 1923: are built. Wayss & Freytag plays an active role Between 1952 and 1964: Underground 1956: Fertiliser silo tion and consulting. In shield technology, EPB 1983: 1984: 1991: outstanding engineering and tunnelling pro- 1995: 2003: CERN (European 2003: Flock was the first structure in Mörsch with his signature. Mörsch (1872- Gustav Wayss Conrad Freytag Construction of the Rohrschwefel Odeon building in 1975, 4,000 m of railway construction of Farbwerke Salah Al- Deen Al- Metro Antwerp ME- Caisson of the Stoerebelt Bridge, Organization for Nu- Westerschelde dations of a technological development the new technology possible. Emil Mörsch esta- branch was established in Riga. Further registe- in the development and creates new inventions shields and solid rock TBMs are used besides jects in Europe. Customer orientation, sustaina- Germany to be built using Conrad Freytag signed perso- 1950) laid the scien- (1851- 1917) carried (1846- 1921) reali- sewerage system in (sulphur) ware- Rio de Janeiro, tower shafts as well Eschersheimer Land- Hoechst AG in Ayubi Expressway in COMA Construction Messe (fair) pum- longest suspension clear Research) Nuclear Tunnel, NL without which major bridges, high-rise buil- reinforced concrete. Its pur- nally for the company. blished the scientific basis for construction with tific foundation in his out the first reinfor- sed the potential of red offices in Luxemburg, Strasbourg, Vienna, Istanbul, Turkey house, Marseille, Brazil which allow construction works at the highest as 47 television straße Lot 1, Frank- Frankfurt- Hoechst hydro and mix-shields. Shield technology in Baghdad, Iraq with a lots 1 and 2 hydro- ping station, bility and cost efficiency become increasingly bridge in Europe Research Centre, Ge- pose was to test the load- be- standard work ced concrete con- the new technology. France towers are built furt/Main immediately after contract value of shield drive Cologne neva. Biggest particle dings and industrial buildings would not have aring and weathering reinforced concrete. Their personalities com- „Der Eisenbetonbau“ structions in His motto: „Driven Innsbruck, Rome, Milan, Trieste, Genoa, Naples, level: Slipforming and climbing construction using slipforming its completion waterbearing loose soils creates new possibili- 590 million DM - up important. Wayss & Freytag Ingenieurbau ac- accelerator in the world been realised. And yet, the success story began behaviour of reinforced con- plemented one another congenially, which con- (Concrete- Steel Germany with his to maintain excel- Budapest, Messina, Sarajevo, St. Petersburg methods in building construction, the inremen- and climbing con- ties for tunnel construction. to that date the big- cepts this challenge. Committed and compe- crete. The kennel is now exhi- Construction). company. lence!“ struction methods. gest contract in W&F relatively simply: with flower tubs and a kennel. bited in “Deutsches Museum” tributed to the triumphal success of the new and Buenos-Aires followed. tal launching method in bridge construction history. tent teams build for the world of tomorrow. in Munich. construction method around the world. and shield technology in underground con-

struction.

Longest German

Bridge over the River Isar in Mu- Foundation of construction mate- Foundation of „Offene Han- Head office in Frankfurt/MainGroßmarkthalle (wholesale Lignite- fired power plantFirst Frimmers- fully mechanized TBM in Longest and highest motorway Telecommunications Tower, Royal BAM Group is established from nich: two- span prestressed con- Construction of Frankfurt „Waldsta- First prestressed bridge to be built Thyssen highrise Maracaibo,building, steel- Venezuela „Knie“ Bridge (Rhine knee) rial merchant Freytag und Heid- First reinforced concrete construction delsgesellschaft (general First monolithic reinforced con-First project in tunnel construction: First prefabricated reinforced concrete First project developments Firstin reinforced concrete frame First high- rise building in Buenos market hall) Frankfurt/Main Caisson Old Maas Tunnel, Hyperbolic natural draughtProduction cooling of prestressed concrete Stuttgart: First television tower Longest prestresseddorf concrete near Grevenbroich/Rhineland bridge Germany at Munich under- Örtaköy bridges (3 bridges), bridge in Germany: Kochertal bridge First mixshield with TBM / W&F deve- Rheinufertunnel Largest bridge inKuala Europe; HollandscheLumpur 421 Betonm Groep beco- HBG and BAM NBM/ Grouft Tunnel, road tunnel, crete bridge, Span length arches: Bridge over the River Isar at Grünwald Coking coal tower, Eschweiler dion“Bridge (soccer over stadium) Streck Valley Pirma- Schwandorf power station, 140 m Motorway bridge “Helderbachtal”with prefabricated parts in Ger- JSC Wayss & Freytag Stands of the Volkspark stadium, frame construction, 94 m high, beco- Immersed tunnelover the River Rhine, JSCDüssel- Wayss & Freytag Guider – Dourbeye road, Cameroon Top- down method Zeeburgused for Bridge,the first Amsterdam Stralsund shipyard withArena the Auflargest Schalke, first multi- Parking Neue Messe, StuttgartBAB A8 (federal motorway A8), Luise- Kiesselbach Platz Tunnel, schuch OHG in Neustadt an der in Germany: a kennel partnership) crete building: warehouseEmil Mörsch in becomesRailway tunnel Technical in Wasserburg Director a. Inn piles hotel constructionPier in Vragnizza,in Karlovyconstruction: Croatia Erlweinspeicher Aires, Argentina (100 m high) 200 m long hall, with Rotterdam, NL, compressed air tower “Wilhelmine Victoria”sleepers withmine, high- dimensional in the world, 211 metersSecond high bridgeWayss over & Freytag the River KG Ti- largest steam power plantground in the railway construction Bosporus crossing, Turkey near Geislingen 1,128 m l,185 m h Sportclub Al Khobar, Riyadh,Metro Antwerploped MECOMA, for metro Belgium construction Lille, Dusseldorf/Grauholz StoerebeltTunnel, CH bridge 6,611mmes new majority shareholderICE long distance railwayFederal station Chancellery road Berlin tunnel: Rennsteig Tunnel 7.9 km Sluiskil Tunnel, NL 37.50 m Wayss & Freytag becomes a joint stock built to withstand surface sens, span width 81 m, length monolithic reinforced concreteNew construction company JSC Frankfurt-Wayss & , length 198many, m near Oelde, Westphalia Research reactor Garching „Atomicmes Egg“ Düsseldorf’ sin landmark the world, 8272 m long Ij- Tunnel Amsterdam,dorf, cantilever NL construction Park stadium Gelsenkirchen Caisson Willemsbrug,Botlek Tunnel, Rotterdam, Rotterdam, NL NL Expressway Bagdad, Iraq time in Germany duringCantilever the construction construction of method ship lift in Europe functional stadium in GermanyWesterscheldeKatzenberg Tunnel, TunnelNL 60 m parallel drives, Luxembourgfirst privately financed motor- Munich Weinstraße Wayss & Freytag“ Strasbourg Vary and St. Petersburg (storehouse) in Dresden barrel (tunnel) vault roof works Gelsenkirchen accuracyLangen in the sleeper factory, gris, Mossul, Iraq world Saudi- Arabia France Frankfurt/Main company damage 212 m chimney in climbing formworkFreytag method with tensioning the Kö- Galerie (shopping mall), Dusseldorf below sea-each level 8,984 m, with two TBMs way section in Germany 1898 1900 1902 1912 1926 1935 1957 1959 1974 1979 1982 1984 1995 1999 2001 2003 2009 2014 1875 1884 1893 1899 1901 1904 1906 1911 1914 1919 1921 1925 1928 1929 1932 1938 1940 19421948 1950 1953 1956 1958 1960 1962 1964 19661968 1969 1972 1973 1976 1978 1981 1983 1985 1987 1989 1993 1996 1998 2000 2002 2004 2007 2010 2015 LeporelloE12d_Layout 1 20.01.2017 14:15 Seite 7

Dr. Jur. Karl Freytag Board member Prof. Dr. Hermann 41 years with Wayss & Frey- More than 50 years with Wayss & Federal Cross of Merit for social Board member Dipl.- Eng. Erich Dipl.- Eng. Claus Becker, Maria- Elisabeth Lippert, first fe- Dipl.- Eng. Rolf Berger, Head of Dipl.- Eng. Erdogan Gürkan Dipl.- Eng. Dieter Kuhlmann Adolf Kielhöfer Ludwig Zöllner Commerzienrat Otto Meyer Son of the founder Bay started as assistant to tag: Prof. Peter Bonatz, Head Freytag: senior mechanical commitment: chairman of cen- Jacob advanced shield driving Head of Tunneling Construction, male supervisory board member Hamburg branch, project ma- Head of Technical Department Head of Technical Department Building is a team sport Carl Heidschuch Board member 1895 Board member 1895 Engineer Matthias Koenen Board member 1895 Board member 1895 Emil Mörsch of Technical Department 1 foreman Johann Hoffmann tral works council Jakob Gut technology with his ideas laureate of STUVA award 1999 in German construction company nager 4th Tunnel Tube Tunneling Division Project manager Arena „Auf Schalke“ Teams at Wayss & Freytag Ingenieurbau 140 Years Wayss & Freytag

„Team Wayss & Freytag“ with company dog “Flock” May 1, 1918 Background: Underground railway construction Berlin, 1975: Sleeper factory team 1968: Subway Construction Munich 1985: Trainees and student apprentices on 1991: Construction meeting at Thyssen Stahl AG Frankfurter Allee, 1917 fly- over project galvanizing plant Background 1999: Federal Chancellery Berlin