South Delhi.Cdr

Total Page:16

File Type:pdf, Size:1020Kb

South Delhi.Cdr North West North North East West East New Delhi South West South PARLIAMENTARY CONSTITUENCY NEW RAILWAYS NEW SOUTH DELHI (2014 - May ’21) PREFACE Ashutosh Gangal General Manager Northern Railway Indian Railways is the lifeline of the nation and catalyst for India's progress and economic development. Railway has been providing comfortable, convenient and easy on the pocket transportation system to its patrons. Major infrastructure projects in Railways has focus on safety, enhancing speed and connecting far flung areas. New tracks are being laid. Line doubling and electrification works are in full swing. Latest technologies, digitalization and in house innovations are being used to bring more efficiency and better results. Emphasis is also on creating better business opportunities through long haul and piecemeal trains. The officers and staff of the Railways are dedicated, ready to adapt to changing scenario of the transport sector, this booklet is aimed towards listing some of the important activities involving in the recent past as well as current projects in South Delhi. The budgets allocated to various projects are not apportioned State wise but reflect the cost of the project. INPUTS BY RAILWAY IN SOUTH DELHI PARLIAMENTARY CONSTITUENCY SOUTH DELHI PARLIAMENTARY CONSTITUENCY WORKS COMPLETED IN LAST SEVEN YEARS: v Improvement to Platform surface with VDC flooring, 4 mini Infrastructural Developments: Platform shelters and provision of ramp for disabled persons at Shahabad -Mohmadpur Railway station. v Improvement to facade of station building, Circulating area and Waiting hall of Tugalkabad Railway station. v Construction of Under pass at Level Crossings - 16 & 18 between Palam and Bijwasan Railway stations. v Construction of new Foot Over Bridge (FOB) at Harkesh Nagar from MPLAD fund. v Parking contract has been allotted at Palam, Madipur, Narela (02) Railway stations. v Development of Park and Open Gym in Tugalkabad Railway station colony from MPLAD fund. v Electrification of Newly constructed TMC building at Tughalkabad Railway station v Regirdering / Launching of steel girder of bridge No. 17UP & DN Span 8X19.70 span with new pre fabricated steel v Construction of FOB at Pul Prahladpur. girder using road crane on New Delhi - Palwal section. v 2.4 Km of boundary wall between Palam and Bijwasan v Provision of 20 stainless steel benches and 25 stainless station. steel Dustbins at Tugalkabad station from MPLAD fund. ON GOING WORK v Provision of extra LED luminaries for improvement the v Work of Bijwasan mega terminal. illumination level in circulating area, station building & platforms at Tugalkabad Railway station. Bijwasan Railway station Master Plan SOME IMPORTANT PHOTOS Freight Terminal at Tuglakabad Anand Vihar - Tilak Bridge New Track Line Onboard House Keeping Mechanized Cleaning Inauguration of Newly Constructed Foot Over Bridge at Harkesh Nagar, New Delhi by Hon'ble Minister of State for Railways, Sh. Manoj Sinha.
Recommended publications
  • Bestech Central Square
    https://www.propertywala.com/bestech-central-square-gurgaon Bestech Central Square - Sector-57, Gurgaon Integrated Commercial and Retail Complex Bestech Central Square is all set to rise in Sector 57, Gurgaon on the main sector road to Sushant Lok II/III.The location is incredibly strategic. Project ID : J539811903 Builder: Bestech Group Properties: Shops, Office Spaces Location: Bestech Central Square, Sector-57, Gurgaon - 122001 (Haryana) Completion Date: Feb, 2009 Status: Completed Description Bestech Group, an ISO 9001:2000 company; has emerged as one of the most admired business houses of real estate in the country over the last two decades. Our success stems emerges from the foundation of deliverables, quality and customer satisfaction.A work force of over 800 dedicated employees consisting of professionally qualified engineers, technicians, marketing personnel, HR managers have immensely contributed to the success story. The group is passionate about its commitment and timely deliverables and leaves no stone unturned to weave an envious relationship with all is customers and associates. Bestech Central Square is all set to rise in Sector 57, Gurgaon on the main sector road to Sushant Lok II/III.The location is incredibly strategic. Gurgaon is one of the fastest developing epicenters of the capital, and within it, Sushant Lok II & III are the most affluent and well-inhabited pockets.Bestech Central Square is the ultimate destination for the discerning shopper, and the farsighted businessman. Amenities and Specifications: The Ultimate destination for the discerning shopper, and the farsighted businessmen. Smartly location shopping cum office complex. Built in 74000 sq. ft. approx. 1 floor of office space.
    [Show full text]
  • Departmental Statistics and Full Count Census Tables, Part X-C, Series
    CENSUS OF INDIA 1971 DISTRICT CENSUS HANDBOOK PART C DELHI S_ It Gandotta of the Indian Administrative Se~ice, Director of Census Operations, Delhi CONTENTS SECTION A Page INTRODUCTION vii .Background of Distriot Census Handbook--Dilfinitions-Functional Categories__:. I Ackn?wledgemeIit I vii-ix C~TER'I-The District dur;ng:the' Decade IBounda:cy..-Physiography-Climate'1l,lld Rainfall \ : yHAPTER II-Major Events. i Social and Political Events,-Social and PoJitical events which took place in Delhi-Impor­ tant Events of Educational, and Cultural Interest-Important Events for Delhi only .. 3-5 " .' '0 Cl;rAPTER III-Civil Amenities 6 Roa.ds--:'rranspOl:t-Telephone, PQst and, Telegraph Offices-Irrigation-Electricity~ Banking Services-Life Insurance-Medical and Public Health_., Water Supply-AduJ:"e­ rati1)ll.-Edu~ation-Ehtertainment-Sports-Newspapers and Magazines-Religion- Fa4l? and Festivals , •. , •. 6--15 CHAPTER IV-Economic ij,esources, and Activities 16 hmd use Pattern-Crops and out-turn-Price Structure-Soil Type--Tools and Implements -Soil Con~ervation__:_:Animal' lIusbandry-Veterinary 1tospital--Fishmies-Forests­ Indus~ries,-MineIals and Mining-TrMe and Conunerce 16-26 CHAPTER V-Census Tables •. 27 CfIAPTER VI-Demographic Profile' , •• 28 Area, Population-La.nguage-Distribution aocording to Age-Group-Religion-Workers­ Vital Statistics-Tenure System-Rati{lnmg-Intensive Agriculture-Development Programme-Co-operatives-Family Planning-Climes and!Justice-Law and Order- Jails-Untouchability Taxes •. .. • . • . •. 28.-41 CRAPTES VII-Organs of Democmt'ic Decentralisation .. 42-43 CHAPTER VIII-The over-all view of Union Territory of DeTh.i 44 COl;lditions of life-Basio Economy-Techno-Economio Potentialities-Equalitarian Social Struoture-Conolusion • , .
    [Show full text]
  • Productivity of Railway Stations
    PRODUCTIVITY OF RAILWAY STATIONS CASE STUDY: NEW DELHI RAILWAY STATION By: ROHIT ANAND Former PG Student, Transport Planning School of Planning and Architecture, New Delhi Under Guidance and Co-Author: PROF. DR. SANJAY GUPTA Professor of Transport Planning, School of Planning and Architecture, New Delhi PRESENTATION STRUCTURE INTRODUCTION METHODOLOGY LITERATURE REVIEW DATA BASE STUDY AREA NEW DELHI RAILWAY STATION CHARACTERISTICS LEVEL OF SERVICE ASSESSMENT ALTERNATE STRATEGIES FOR STATION PRODUCTIVITY IMPROVEMENT SUMMING UP INTRODUCTION METHODOLOGY LITERATURE REVIEW DATA BASE STUDY AREA NEW DELHI RAILWAY STATION CHARACTERISTICS LEVEL OF SERVICE ASSESSMENT ALTERNATE STRATEGIES FOR STATION PRODUCTIVITY IMPROVEMENT SUMMING UP INTRODUCTION BACKGROUND Railways Stations are the important component in regional and city’s transport system. Railway Stations are the gateway into the towns along with focal point Kings Cross Station, London, UK of economic and social activities. Station’s design reflects the culture, historical background and life- style of the people of that city / region. INDIAN RAILWAYS Kuala Lumpur Railway Station, Caters over 800 cr passengers and nearly 1 cr tonnes of freight annually. Malaysia World's largest railway networks comprising 65,808 km length of route network and 7,112 stations as on March 2014. World's 7th largest commercial or utility employer, with over 1.376 million employees as on 2013. Indian Railway Logo New Delhi Railway Station Station’s Platform Area Railway Line Tracks INTRODUCTION RESEARCH NEED Railway station productivity assessment is critical in improving facilities for users as well as in operations. Shabby and least concerned infrastructure of Railway stations and terminals in India. Station facility audit has been neglected.
    [Show full text]
  • M/S. INDIAN OIL CORPORATION LIMITED, DELHI April, 2017
    PREFEASIBILITY REPORT For EC FOR EXPANSION OF ADDITONAL STORAGE TANKS AT IOCL- DELHI TERMINAL, BIJWASAN, NEW DELHI – 110061 By M/s. INDIAN OIL CORPORATION LIMITED, DELHI April, 2017 Project Proponent: Environmental Consultants: INDIAN OIL CORPORATION LIMITED ECO CHEM SALES & SERVICES Delhi Office, 2nd Floor, WTC, Babar Office Floor, Ashoka Pavilon-A, Road, New Delhi - 110001 New Civil Road, Surat- 395 001 CONTENTS 1 EXECUTIVE SUMMARY ................................................................................................................... 1 1.1 PLANT FEATURES .................................................................................................................................................... 1 1.2 ENVIRONMENT ....................................................................................................................................................... 1 1.3 CONCLUSION ........................................................................................................................................................... 2 2 INTRODUCTION OF THE PROJECT................................................................................................ 3 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ................................................................. 3 2.1.1 Brief description of nature of the project ........................................................................................... 3 2.1.2 Project proponent .......................................................................................................................................
    [Show full text]
  • 1 Delhi Development Authority
    DELHI DEVELOPMENT AUTHORITY UNIFIED TRAFFIC & TRANSPORTATION INFRASTRUCTURE (PLG.& ENGG.)CENTRE 2nd Floor, VikasMinar, New Delhi Phone No. 23379042, Telefax : 23379931 E-mail:[email protected] No. F.1(2)2014/UTTIPEC/48th/D-48 Dated: 10.02.15 MINUTES OF THE 48th UTTIPEC GOVERNING BODY MEETING, HELD ON 19.12.14 at 10.00 A.M. UNDER THE CHAIRMANSHIP OF THE HON’BLE LT. GOVERNOR OF DELHI. 1. The 48th Governing Body meeting of the UTTIPEC was held on 19.12.14 at 10.00 A.M. at Raj Niwas under the chairmanship of the Hon’ble L.G. of Delhi. The detailed agenda items for discussion were circulated to members in advance containing brief background and proposal of each project recommended by Working Groups. The list of members and participants, who attended this meeting is enclosed as Annexure ‘X’. 2. Addl. Commissioner (Plg.)TC&B, DDA welcomed Hon'ble L.G., Chairman, UTTIPEC and other members/ special invitees to the 48th Governing Body meeting of UTTIPEC. 3. The Minutes of the 47th Governing Body meeting circulated on 19.08.14 were confirmed as no comments /observations were received from members. 4. Presentations:- a) Redevelopment of Anand Vihar Railway Station. The proposal of redevelopment of Anand Vihar Railway Station on the Indian railway network was submitted by Indian Railway Station Development Corporation (IRSDC).IRSDC/ Consultant presented the proposal of redevelopment of Anand Vihar railway station on the Indian Railway Network which proposes the expansion of the existing Anand Vihar railway station which is identified to be developed as one of the world class railway station.
    [Show full text]
  • SRIJAN December-19
    S R I J A N STATION REJUVENATION INITIATIVE BY JOINT ACTIO N An IRSDC Newsletter on Station Development MD & CEO’s MESSAGE COVER STORY Dear Patrons/Stakeholders, MOU Signing with DDA A very warm Happy New Year 2020. The new year heralds a new beginning and with recent developments, IRSDC is now at the cusp of sky rocketing the Station Development Programme across India under the dynamic leadership of Hon’ble Minister for Railways, Commerce and Industries. December has been a very important month at IRSDC which has seen significant developments. One of the historic milestone has been signing of MoU with (Left to Right) Sh. K Vinayak Rao, Finance Member, DDA, Delhi Development Authority (DDA) for Sh. Tarun Kapoor, Vice Chairman, DDA, Sh. Ved Parkash development/ redevelopment of Anand Dudeja, VC, RLDA and Sh. S.K. Lohia, MD & CEO, IRSDC Vihar and Bijwasan Railway Stations in Delhi, which are also designated as ‘Integrated In a historic moment, a MOU has been signed Directional Passenger Terminals’ by the among DDA, RLDA and IRSDC with an objective to Master Plan for Delhi 2021. Land was develop/redevelop New Delhi’s two key railway allotted by DDA for the purpose of stations, i.e. Anand Vihar and Bijwasan. development of Railway Stations and later >> check out inner pages for details on Indian Railways/RLDA/IRSDC decided to develop these stations on ‘Transit Oriented Development’ (TOD) principles for 2019 In Review compact, energy efficient and passenger friendly development. For this purpose it It’s time to look back at the major happenings was necessary to take DDA on Board for and highlights of the year 2019, before we look Development of these stations on the basis forward to what 2020 has in store for us at IRSDC.
    [Show full text]
  • 719 Bus Time Schedule & Line Route
    719 bus time schedule & line map 719 Pandwala Kalan View In Website Mode The 719 bus line (Pandwala Kalan) has 2 routes. For regular weekdays, their operation hours are: (1) Pandwala Kalan: 5:10 PM - 6:10 PM (2) Sunehari Pulla Depot / Jawahar Lal Nehru Stadium Terminal: 7:00 AM - 7:10 AM Use the Moovit App to ƒnd the closest 719 bus station near you and ƒnd out when is the next 719 bus arriving. Direction: Pandwala Kalan 719 bus Time Schedule 58 stops Pandwala Kalan Route Timetable: VIEW LINE SCHEDULE Sunday 5:10 PM - 6:10 PM Monday 5:10 PM - 6:10 PM Sunehari Pulla Depot / Jawahar Lal Nehru Stadium Terminal Tuesday 5:10 PM - 6:10 PM CGO Complex Wednesday 5:10 PM - 6:10 PM Thursday 5:10 PM - 6:10 PM Central School Lodhi Colony Friday 5:10 PM - 6:10 PM Lodhi Colony Saturday 5:10 PM - 6:10 PM 18-Block Lodhi Colony Lodhi Garden / Mousam Bhawan Lodhi Garden Restaurant Entrance, New Delhi 719 bus Info SJ Madrasa Direction: Pandwala Kalan Aurobindo Marg, New Delhi Stops: 58 Trip Duration: 109 min SJ Airport Line Summary: Sunehari Pulla Depot / Jawahar Lal Nehru Stadium Terminal, CGO Complex, Central Ina Colony School Lodhi Colony, Lodhi Colony, 18-Block Lodhi Colony, Lodhi Garden / Mousam Bhawan, SJ Kidwai Nagar Madrasa, SJ Airport, Ina Colony, Kidwai Nagar, SJ Hospital, Nauroji Nagar, Africa Avenue, Bhikaji Cama Place, Mohammadpur Village, R K Puram Sec-2, Rk SJ Hospital Khanna Tennis Stadium, R K Puram Sec-3, R K Puram Sec-3, R K Puram Sec-4, Rk Puram Sec-1, Nauroji Nagar Mohan Singh Market, R K Puram Sec-7, R K Puram Mahatma Gandhi Marg,
    [Show full text]
  • C3 Habitat Centre (Research Centre)
    Application for Environmental Clearance for Expansion of “C3 Habitat Centre (Research Centre) At Plot No. C-3, Qutab Institutional Area, Katwaria Sarai, New Delhi BEING DEVELOPED BY: M/s Habitat India C-3, Qutab Institutional Area, Katwaria Saria, New Delhi PREPARED BY: Environmental Consultant M/s PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants organizations/ Rev 83/ 20 January, 2020 at S. No-120) NN Mall, Sector-3, Rohini, New-Delhi-85; Phone: 011-49281360 Scanned by CamScanner TABLE OF CONTENTS SECTION A- FORM 1 A-1 to A-19 SECTION B- FORM 1A B-1 to B-15 SECTION C- CONCEPTUAL PLAN C-1 to C-7 SECTION D- ENCIRONMENT MANAGEMENT PLAN D-1 to D-31 SECTION E- RISK ASSESSMENT E-1 to E-5 SECTION F- ENCLOSURES F-1 to F-98 Enclosure 1- Consultant Authorization F-1 Enclosure 2:Land Papers F-3 Enclosure 3: AAI Approval F-44 Enclosure 4:Electricity Bill F-48 Enclosure 5:Water Bill F-50 Enclosure 6: Air Dispersion Report F-53 Enclosure 7:Traffic Report F-68 Enclosure 8: Topographical Map F-86 Enclosure 9: Layout Plan F-88 Enclosure 10: Section Elevation Plan F-90 SECTION A : FORM 1 Expansion of “C3 Habitat Centre (Research Centre)” at Plot No. C-3, Qutab Institutional Area, New Delhi By M/s Habitat Centre APPENDIX I (See paragraph – 8.9) Form-1 I. Basic Information S. No. Item Details 1. Name of the project/s Expansion of “C3 Habitat Centre (Research Centre)” 2. S. No. in the schedule 8 (a) 3.
    [Show full text]
  • 578 Bus Time Schedule & Line Route
    578 bus time schedule & line map 578 Najafgarh Terminal View In Website Mode The 578 bus line (Najafgarh Terminal) has 2 routes. For regular weekdays, their operation hours are: (1) Najafgarh Terminal: 7:20 AM - 10:00 PM (2) Safdurjung Terminal: 6:00 AM - 9:50 PM Use the Moovit App to ƒnd the closest 578 bus station near you and ƒnd out when is the next 578 bus arriving. Direction: Najafgarh Terminal 578 bus Time Schedule 51 stops Najafgarh Terminal Route Timetable: VIEW LINE SCHEDULE Sunday 7:20 AM - 10:00 PM Monday 7:20 AM - 10:00 PM Safdurjung Terminal Tuesday 7:20 AM - 10:00 PM Vikas Sadan Wednesday 7:20 AM - 10:00 PM Ina Colony Thursday 7:20 AM - 10:00 PM Kidwai Nagar Friday 7:20 AM - 10:00 PM SJ Hospital Saturday 7:20 AM - 10:00 PM Nauroji Nagar Mahatma Gandhi Marg, New Delhi Hyatt Hotel (Gail) 578 bus Info Direction: Najafgarh Terminal Rk Puram Crossing Stops: 51 Trip Duration: 81 min Rk Puram Sec-1 Line Summary: Safdurjung Terminal, Vikas Sadan, Ina Colony, Kidwai Nagar, SJ Hospital, Nauroji Nagar, Hyatt Hotel (Gail), Rk Puram Crossing, Rk Puram Rk Puram Sec 1-4 Sec-1, Rk Puram Sec 1-4, R K Puram Nab, Munirka Village (T), Vasant Vihar Depot, Vasant Vihar, Swami R K Puram Nab Malai Mandir, Vasant Village / Shani Mandir, Arjun Path / Subroto Park, Arjun Path, APS Colony, Munirka Village (T) Shankar Vihar/ National Highway 8, Mahipal Pur Crossing, Rangpuri, Shiv Murti, Rajokari Crossing, Vasant Vihar Depot Shiv Murti / Dwarka More, The Uppal Hotel, Samalkha Crossing, Samalkha Village, Kapashera Vasant Vihar More (Najafgarh Road),
    [Show full text]
  • Kd4 – Final Concept, Master Plan and Feasibility Report (Complete)
    PREPARATION OF TECHNICAL FEASIBILITY STUDY AND MASTER PLAN FOR DEVELOPMENT OF BIJWASAN NEW DELHI RAILWAY STATION OF THE INDIAN RAILWAY NETWORK KD4 – FINAL CONCEPT, MASTER PLAN AND FEASIBILITY REPORT (COMPLETE) WWW.SENER.ES SENER Ingeniería y Sistemas S.A. - India 2013 The information contained in this document is confidential and restricted, and is to be used only for the purposes established in the document. No modification, exploitation, reproduction, communication to any third party, dissemination or distribution of the whole or any part of the document is permitted without the prior written consent of SENER Ingeniería y Sistemas, S.A.. Failure to respond to any request for such consent shall in no way be construed as authorization for use. SENER Doc. P210G04-01-KD4-SR-RP-0002 Rev. 3 2017/02/10 Page 2 of 162 KD4- Final Concept, Master Plan and Feasibility Report (Complete) Changes Record Signature Control Rev Date Author Affected section Changes Written Reviewed Approved 0 13/09/2013 Juan Francisco Paz Modified submission Juan Francisco Paz Juan Fernández Aller Juan Francisco Paz 1 15/07/2016 Juan Francisco Paz Modified submission María Ugarte José Manuel Almoguera 2 11/11/2016 Juan Francisco Paz Modified submission Addition of New Chapters and Section José Manuel Almoguera María Ugarte Chapter 11 - Environmental Impact Assessment Chapter 13 - Risk Analysis and Mitigation. Osvaldo Gandini Section 8.8 - Block working of Railways Addition of New Drawings Patricia Díaz Master Plan Zoning (BWSN-MP-KD4-ARC-PLN-103) 3 10/02/2017 Juan Francisco Paz Modified submission Master Plan Phase-1 Station Area (BWSN-MP-KD4-ARC- PLN-104) Ernesto Sánchez Larios Master Plan Phase-1 Rag picking Zone (BWSN-MP-KD4- ARC-PLN-105) Central Data Controller Scheme (BWSN-RS-KD4-COM-SKM- Rohit Kumar 001) Addition of 3D Views for Phase-1 and Phase-2 Development Sandip Kumar Krishna Choudhary K.
    [Show full text]
  • Fire Services Act Pdf
    Fire Services Act Pdf GlynnswankilyHallucinogenic jows or thatjammed Jefferey peregrinators. airily kiboshes when Tait his is blueing Malpighian. plebeianising Barnaby good-naturedly. still derogates insecurely Insular Jackson while columnar funnelling Donegal fire chief fire chief for water through weekly tests and on fire services act pdf formed. Appeal against fire services act pdf faith. Act and new qutab road jail road via pusa road. Due to the fire officer who is activated once the fire services act pdf the validity of the application, shall vest in selected as a reasonable opportunity of the government. Yamuna bazaar road nilwal phirni road mayapuri industrial area is it may appoint such decision guide may be exercised or fire services act pdf at delhi haryana border. Where decisions can be assisted by fire commissioner may be such buildings etc excluding vinay marg to be employed for damages arising due discharge site can be needed to fire services act pdf. Works as well as a convenient source of chemicals used them in fire services act pdf inspection of work. The occupants of service in any other dangerous risk or in any person from where there shall stand vested in its duties under this subject matter of fire services act pdf anylifeor propertysaving activity that he is due state. Hard copies of fire report relates to fire services act pdf be used in accordance with such person acting chairman. No charge of fire ground operation charges may raise an ongoing campaign of fire services act pdf until terminated in accordance with and commencement of people occupying a quorum for fire extinguishing fires, and annual confidential reports.
    [Show full text]
  • Annexure-Form
    Proposed Construction of Motel Building on Khasra nos. 23/14/2, 23/17, 23/18, 23/19/2, 23/13/2 at Village Samalkha, Tehsil Vasant Vihar, New Delhi – 110037. APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring program) 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use if any and the statutory approval from the competent authority to be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. Land use Pattern: The proposed project site will be developed as per the Delhi Building Byelaws and the said land has already been purchased for motel construction purpose through registered sale deed. Hence no change in land use is envisaged. The land use is not expected to get altered due to construction of proposed project. Site Location: Shri Jatinder Pal Singh. has proposed a Motel Building on Khasra nos. 23/14/2, 23/17, 23/18, 23/19/2, 23/13/2 at Village Samalkha, Tehsil Vasant Vihar, New Delhi – 110037. This land has been gifted by Smt.
    [Show full text]