Statistical Digest 2013

Total Page:16

File Type:pdf, Size:1020Kb

Statistical Digest 2013 Statistical Digest 2013 CEYLON ELECTRICITY BOARD Colombo 00200 Sri Lanka www.ceb.lk SUMMARY STATISTICS - 2013 Annual Units 2012 2013 Percentage Change Number of Power Stations (with PPP) No. 159 180 13.21% Installed Capacity (with PPP) MW. 3,312 3,362 1.52% Maximum Demand (with PPP) MW. 2146 2164 0.83% Gross Generation (with PPP) GWh. 11,801 11,962 1.37% Self Generation Scheme GWh. 1 0 - Trans. & Distri. Losses % 10.67 10.79 1.12% (On Net Generation) Gross Units Sold GWh. 10,474 10,621 1.41% Average Selling Price Per Unit Rs./kWh 15.56 17.93 15.27% Average Cost per Unit Rs./kWh 23.66 17.70 -25.19% (@ selling point) Revenue from Billed Sales m.Rs. 162,956 190,488 16.90% (with FAC) Fuel Adjustment Charge m.Rs. 25,532 32,885 28.80% Consumer Accounts No. 4,979,862 5,210,761 4.64% No. of Area Offices No. 60 60 0.00% No. CSCs No. 204 208 1.96% No. of POS Centers Operated by CEB No. 49 51 4.08% % of Household Electrified % 94.0 (a) 96.0 (a) 3.00% System Load Factor % 62.8 63.1 0.53% Total Employed (as @ year end) No. 16,709 16,326 -2.29% Capital Investments m.Rs. 99,878 75,771 Net Fixed Assets in Operation (average) m.Rs. 444,235 451,501 Rate of Return on fixed assets % -9.95 1.59 No. of Consumers per Employee No./ Employee 298 319 7.09% Av. Elect: Consumption per Capita kWh/ Person 515 519 0.66% No. of Consumers per length of dist.line No./ km. 35.2 34.1 Electricity Elasticity (w.r.t. GDP) 0.7 0.2 Total Energy Consumption in Sri Lanka KTOE 9277 (b) Per Capita Energy Consumption in Sri Lanka kgOE/Person 456 (b) Share of Elect. to Total Energy Supply % 9.6 (b) CSC - Consumer Service Centres POS - Point of Sales P.P.P. - Private Power Purchase. (a) - Estimated. (b) - Provisional Note - (1) All financial data are provisional. (2) Revenue in 2013 includes FAC. (Domestic - up to 30 = 25%, 31 to 60 = 35%, Above 60= 40% ; Industrial & Hotel = 15% ; GP = 25% ; GV = 0 or 25%) (3) Local standard time was adjusted to +5 1/2 GMT in April, 2006. (4) Tariff structure changed effective from 20/04/2013 GENERATION STATISTICS Ownership & Source No.of Power Stations Installed Capacity in MW. % % 2012 2013 Change 2012 2013 Change C.E.B. - Total 25 25 0.00% 2,214 2,228 0.62% - Hydro 17 17 0.00% 1,357 1,361 0.26% - Thermal-Oil 6 6 0.00% 554 564 1.84% - Thermal-Coal 1 1 0.00% 300 300 0.00% - Wind 1 1 0.00% 3 3 0.00% P.P.P. - Total 134 155 15.67% 1,098 1,134 3.34% - Hydro-Small 109 131 20.18% 227 267 17.57% - Thermal 8 7 -12.50% 784 771 -1.66% -NCRE 17 17 0.00% 87 96 11.33% Total 159 180 13.21% 3,312 3,362 1.52% NCRE - Non Conventional Renewable Energy ( Solar, Dendro, Biomass, Wind) Gross Generation in GWh Peacentage of Total Ownership & Source 2012 2013 % increase 2012 2013 C.E.B. - Total 6,162 8,808 42.9% 52% 74% - Hydro 2,727 6,010 120.4% 23% 50% - Thermal-Oil 2,029 1,326 -34.6% 17% 11% - Thermal-Coal 1,404 1,469 4.7% 12% 12% - Wind 2 2 0.2% 0% 0% P.P.P. - Total 5,640 3,154 -44.1% 48% 26% - Hydro-Small 565 916 62.2% 5% 8% - Thermal 4,906 1,977 -59.7% 42% 17% -NCRE 169 260 54.0% 1% 2% Total Generation 11,801 11,962 1.4% 100% 100% Av. Daily Generation - GWh/day 32.33 32.77 1.4% Gross Generation by Source in GWh. Installed Capa. by Source in MW. Hydro 3,292 6,926 110.4% 1,584 1,628 2.74% Thermal-Oil 6,935 3,304 -52.4% 1,338 1,335 -0.21% Thermal-Coal 1,404 1,469 4.7% 300 300 0.00% NCRE 171 263 53.3% 90 99 10.95% Total Generation 11,801 11,962 1.4% 3,312 3,362 1.52% Self Generation Scheme-GWh Day Maximum Demand in MW. 1759.2 1853.5 5.36% * - At Wednesday 9th May, 2012 Night Maximum Demand in MW. 2146.4* 2164.2** 0.83% ** - At Monday 8th April, 2013 Hydro Reservoir Capacity in GWh 1259 1259 Generation by Ownership - 2012 & 2013 Generation by Source - 2012 & 2013 2012 2013 2012 2013 59% 28% 48% 52% 26% 58% 74% 12% 28% 12% 1% 2% CEB PPP Hydro Thermal - Oil Thermal - Coal NCRE DATA ON FUEL USED FOR THERMAL GENERATION Fuel Cost in m. Rs Fuel Used in Name of Type of 2012 2012 2013 2013 m. Litres Power Station Fuel m.Rs. k/Wh m.Rs. k/Wh 2012 2013 K.P.S.(small GT) L.A.D. 4,692 47.93 68 66.75 46 1 K.P.S.(GT 7) L.A.D. 3,361 27.93 684 41.31 41 6 K.P.S.(C.Cy.) L.A.D. 13,823 24.15 5,756 24.85 124 50 Naphtha 7,421 9,408 91 105 SP.P.S.(Diesel) - A L.A.D. 130 14.62 243 20.08 1 2 L.H.F. 5,609 3,360 91 41 SP.P.S.(Diesel) - B L.A.D. 60 13.26 220 18.16 1 2 L.H.F. 7,011 6,785 114 83 Chunnakam - Diesel L.A.D. 170 32.94 10 34.56 2 0 Uthuru Janani L.A.D. - - 9 18.84 - 0 Uthuru Janani L.F.O. - 2,361 - 27 Puttalam-Coal L.A.D. 207 7.92 210 7.76 2 2 Coal 10,906 11,193 625(M. kg) 678(M. kg) TOTAL 53,389 15.55 40,308 14.26 513 318 Fuel Cost for Thermal Genera on Ɵ C.E.B 25 22442 20 15 1262012506 11193 10906 10 9408 7421 7200 Million Rs. Thousands 5 0 Naptha LAD LHF COAL 2012 2013 Fuel Used For Thermal GeneraƟon C.E.B. 678 700 625 600 500 400 300 217 205 200 151 91 105 62 Million Liters / Kgs 100 0 Naptha LAD LHF COAL 2012 2013 RURAL ELECTRIFICATION SCHEMES % Share of Consumer Accounts by Division YEAR No. of Schemes 2012 2013 2007 460 17% 2008 346 18% 27% 28% 20% 2009 487 24% 31% 35% 2010 526 2011 561 2012 694 DistribuƟon Division 1 DistribuƟon Division 2 2013 799 DistribuƟon Division 3 DistribuƟon Division 4 ELECTRICITY SALES BY PROVINCE IN GWh( million kWh) Monthly Province C.E.B. Percentage C.E.B. Percentage Av.Sales Change of Total kWh/Cons. 2012 2012/13 2013 2013 2013 Colombo City 1,247 -0.2% 1,244 11.7% 630 North Western 1,049 -0.2% 1,046 9.9% 126 North Central 384 3.5% 397 3.7% 93 Northern 213 12.9% 240 2.3% 92 Division - 1 Total 2,892 1.2% 2,928 27.6% 170 Western-North 1,755 0.3% 1,761 16.6% 263 Central 776 14.0% 884 8.3% 86 Eastern 472 2.0% 482 4.5% 102 Division - 2 Total 3,003 4.1% 3,127 29.4% 144 Western-South II 1,072 1.4% 1,088 10.2% 249 Uva 381 -15.5% 322 3.0% 87 Sabaragamuwa 485 -0.7% 482 4.5% 103 Division - 3 Total 1,938 -2.4% 1,891 17.8% 148 Western-South I 537 2.5% 551 5.2% 185 Southern 801 2.0% 816 7.7% 103 Division - 4 Total 1,338 2.2% 1,367 12.9% 126 Bulk Sup. To LECO 1,302 0.5% 1,308 12.3% - TOTAL 10,474 1.4% 10,621 100.0% 170 ELECTRICITY SALES BY TARIFF IN GWh( million kWh) Monthly Tariff C.E.B. Percentage C.E.B. Percentage Av.Sales Change of Total kWh/Cons. 2012 2012/13 2013 2013 2013 Domestic 3,522 -1.0% 3,488 32.8% 63 Religious 55 6.7% 58 0.5% 153 General Purpose Total 2,042 0.8% 2,059 19.4% 321 GP 1 -Small 1,074 4.3% 1,121 10.6% 176 GP 2 - Medium 740 -5.4% 699 6.6% 16,716 GP 3 - Large 228 4.6% 239 2.2% 197,029 Hotel Total 160 4.5% 168 1.6% 30,042 H 1 -Small 1 27.4% 2 0.0% 585 H 2 - Medium 100 3.5% 104 1.0% 40,101 H 3 - Large 59 5.7% 62 0.6% 645,834 Industrial Total 3,285 1.8% 3,344 31.5% 5,242 IP 1 -Small 272 0.8% 274 2.6% 469 IP 2 - Medium 1,628 3.0% 1,676 15.8% 32,530 IP 3 - Large 1,385 0.6% 1,394 13.1% 577,758 Government Total - - 89 0.8% 24,027 GV 1 -Small - - 0.1 0.0% 3,958 GV 2 - Medium - - 87.4 0.8% 23,883 GV 3 - Large - - 1.5 0.0% 128,081 Bulk Supply to LECO L2 -11kV & above 1,302 0.5% 1,308 12.3% - Street Lighting 109 -0.4% 108 1.0% - TOTAL 10,474 1.4% 10,621 100.0% 170 * - Due to new tariff category introduced effective from 01/04/2013.
Recommended publications
  • The Household Water Usage Community Awareness Regarding
    Original Article DOI: http://doi.org/10.4038/jmj.v32i1.90 The household water usage Community awareness regarding water pollution and factors associated with it among adult residents in MOH area, Uduvil 1Rajeev G , 2Murali V 1 RDHS Jaffna,2 Ministry of Health Abstract Introduction Introduction: Water pollution is a one of the Water is the driving force of nature and most public health burdens and the consumption of important natural resource that permeates all contaminated water has adverse health effects and aspects of the life on Earth. It is essential for even affects fetal development. The objective was human health and contributes to the sustainability to describe the household water usage pattern, of ecosystems. Safe water access and adequate community awareness of water pollution and sanitation are two basic determinants of good health factors associated with it among adult residents in (1). Both of these are important to protect people MOH area, Uduvil. from water related diseases like diarrhoeal diseases and typhoid (2). Method: A descriptive cross-sectional study was conducted on a community-based sample Clean drinking water is important for overall health of 817 adult residents with multi stage cluster and plays a substantial role in health of children sampling method. The data was collected by and their survival. Giving access to safe water is an interviewer administered questionnaire. one of the most effective ways to promote health Statistically significance for selected factors and and reduce poverty. All have the right to access awareness were analyzed with chi square and enough, continuous, safe, physically accessible, Mann-Whitney U test.
    [Show full text]
  • Documents in Support of Their Respective Positions
    IN THE SUPREME COURT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA In the matter of an application under Article 17 and 126 of the Constitution. RAVINDRA GUNAWARDENA KARIYAWASAM Chairman, Centre for Environment and Nature Studies, No. 1149, Old Kotte Road, Rajagiriya. PETITIONER SC FR Application No. 141/2015 VS. 1. CENTRAL ENVIRONMENT AUTHORITY No. 104,Denzil Kobbekaduwa Road, Battaramulla. 2. CHAIRMAN, CENTRAL ENVIRONMENT AUTHORITY No. 104, Denzil Kobbekaduwa Road, Battaramulla. 3. SRI LANKA ELECTRICITY BOARD P.O. Box 540, Colombo 2. 4. CHAIRMAN, SRI LANKA ELECTRICITY BOARD P.O. Box 540, Colombo 02. 5. CHIEF MINISTER, NORTHERN PROVINCE No. 26, Somasundaram Avenue, Chundukuli, Jaffna. 6. PONNUTHURAI AYNGARANESAN, MINISTER OF ENVIRONMENT, NORTHERN PROVINCE No. 295, Kandy Road, Ariyalai, Jaffna. 7. CHAIRMAN, VALIKAMAM SOUTH PRADESHIYA SABHA Valikamam. 1 8. NORTHERN POWER COMPANY (PVT) LTD. No. 29, Castle Street, Colombo 10. 9. HON. ATTORNEY GENERAL Attorney General‟s Department, Colombo 12. 10. BOARD OF INVESTMENT OF SRI LANKA Level 26, West Tower, World Trade Center, Colombo 1. 11. NATIONAL WATER SUPPLY AND DRAINAGE BOARD P.O. Box 14, Galle Road, Mt. Lavinia. RESPONDENTS 1. DR. RAJALINGAM SIVASANGAR Chunnakam East, Chunnakam. 2. SINNATHURAI SIVAMAINTHAN Chunnakam East, Chunnakam. 3. SIVASAKTHIVEL SIVARATHEES Chunnakam East, Chunnakam. ADDED RESPONDENTS BEFORE: Priyantha Jayawardena, PC, J. Prasanna Jayawardena, PC, J. L.T.B. Dehideniya, J. COUNSEL: Nuwan Bopage with Chathura Weththasinghe for the Petitioner. Dr. Avanti Perera, SSC for the 1st to 4th, 9th, 10th and 11th Respondents. Dr. K.Kanag-Isvaran,PC with L.Jeyakumar instructed by M/S Sinnadurai Sundaralingam and Balendra for the 5th Respondent. Dinal Phillips,PC with Nalin Dissanayake and Pulasthi Hewamanne instructed by Ms.
    [Show full text]
  • Download the Conference Book
    Colombo Conclave 2020 Colombo Conclave 2020 Published in December, 2020 © Institute of National Security Studies Sri Lanka ISBN 978-624-5534-00-5 Edited by Udesika Jayasekara, Ruwanthi Jayasekara All rights reserved. No portion of the contents maybe reproduced or reprinted, in any form, without the written permission of the Publisher. Opinions expressed in the articles published in the Colombo Conclave 2020 are those of the authors/editors and do not necessarily reflect the view of the INSSL. However, the responsibility for accuracy of the statements made therein rests with the authors. Published by Institute of National Security Studies Sri Lanka 8th Floor, ‘SUHURUPAYA’, Battarmulla, Sri Lanka. TEL: +94112879087, EMAIL: [email protected] WEB: www.insssl.lk Printed by BANDARA TRADINGINT (PVT) LTD No. 106, Main Road, Battaramulla, Sri Lanka TEL: +9411 22883867 / +94760341703, EMAIL: [email protected] CONTENTS CONCEPT PAPER 1 INAUGURAL SESSION Biography 5 Admiral (Prof.) Jayanath Colombage RSP, VSV, USP, rcds, psc MSc (DS), MA (IS), Dip in IR, Dip in CR, FNI (Lond) Director General, Institute of National Security Studies Sri Lanka and Secretary to the Ministry of Foreign Affairs Welcome Remarks 6 Admiral (Prof.) Jayanath Colombage RSP, VSV, USP, rcds, psc MSc (DS), MA (IS), Dip in IR, Dip in CR, FNI (Lond) Director General, Institute of National Security Studies Sri Lanka and Secretary to the Ministry of Foreign Affairs Biography 9 Maj Gen (Retd) Kamal Gunaratne WWV RWP RSP USP ndc psc MPhil Secretary, Ministry of Defence Keynote Address 10 Maj Gen (Retd) Kamal Gunaratne WWV RWP RSP USP ndc psc MPhil Secretary, Ministry of Defence SESSION 1 - REDEFINING THREATS TO NATIONAL SECURITY Biography 15 Amb.
    [Show full text]
  • Ceylon Electricity Board Long Term Generation Expansion Plan
    CEYLON ELECTRICITY BOARD LONG TERM GENERATION EXPANSION PLAN 2013-2032 Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka October 2013 Long Term Generation Expansion Planning Studies 2013- 2032 Compiled and prepared by The Generation Planning Unit Transmission and Generation Planning Branch Ceylon Electricity Board, Sri Lanka Long-term generation expansion planning studies are carried out every two years by the Transmission & Generation Planning Branch of the Ceylon Electricity Board, Sri Lanka and this report is a bi-annual publication based on the results of the latest expansion planning studies. The data used in this study and the results of the study, which are published in this report, are intended purely for this purpose. Price Rs. 3000.00 © Ceylon Electricity Board, Sri Lanka, 2013 Note: Extracts from this book should not be reproduced without the approval of General Manager – CEB Foreword The ‘Report on Long Term Generation Expansion Planning Studies 2013-2032’, presents the results of the latest expansion planning studies conducted by the Transmission and Generation Planning Branch of the Ceylon Electricity Board for the planning period 2013- 2032, and replaces the last of these reports prepared in April 2011. This report, gives a comprehensive view of the existing generating system, future electricity demand and future power generation options in addition to the expansion study results. The latest available data were used in the study. The Planning Team wishes to express their gratitude to all those who have assisted in preparing the report. We would welcome suggestions, comments and criticism for the improvement of this publication.
    [Show full text]
  • Oil Spill Contamination of Ground Water in Chunnakam Aquifer, Jaffna, Srilanka S
    Oil spill contamination of Ground water in Chunnakam Aquifer, Jaffna, Srilanka S. Saravanan1 1National Water Supply and Drainage Board ABSTRACT The Chunnakam aquifer has high capacity and contains acceptable quality water for drinking and other usages. Water supplies are generated from this area. Fuel smell had been continuously observed in Chunnakam water intake site. The intake site is located very close to the Chunnakam fossil fuel power station, and on analysis, the intake well and the adjacent wells showed oil contamination. A research study was carried out during the peri- od November 2013 to August 2014. The total number of 150 wells was analyzed, of these 109 (73%) wells have shown higher oil level than the Srilankan standard 614(1983) of 1.0 mg/l, 07 (4%) wells were under the limit and 34 wells (23%) were not contaminated with oil and grease. From the analysis the oil and grease contamination was observed within 1.5 km surrounding of the power station. The high oil and grease concentration layers were observed in the surrounding of the Chunnakam power station area. Keywords Oil and Grease, Chunnakam, Ground water, Wells, Power station 1. Introduction Agriculture is practiced to a larger extent in this area. Therefore the aquifer is exposed to number of severe The Jaffna peninsula is located in the Northern vulnerabilities such as over-extraction of groundwater tip of Srilanka. It covers an area of 1,012.01 excessive fertilizer usage, and other forms of pollution by km2, including inland waters with a population anthropogenic activities. (Feasibility study, March 2006) of 607,158.(Statistical Hand book, Jaffna 2013) Fossil fuel power plants use chemical energy, In Jaffna, four main groundwater aquifers are avail- which is stored in fossil fuels such as coal, fuel oil, able for water consumption based on the water capac- natural gas or oil shale.
    [Show full text]
  • Statistical Digest 2011
    LECO ELECTRICITY SALES GENERAL STATISTICS LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km. C.E.B. TARIFF - EFFECTIVE FROM 01-01-2011 TO 31-12-2011 % % DOMESTIC - Unit Rate Fixed Charge SALES BY TARIFF IN GWh. CONSUMER ACCOUNTS BY TARIFF Units 2010 2011* Change 2010 2011 Change (for each 30 days billing period) % % Population (Mid Year) Thous. 20,653 20,869 1.0 % Block 1 - First 30 units @ Rs 3.00 per unit + Rs. 30.00 2010 2011 Change 2010 2011 Change 220 kV Route Length O.H. 483 483 0.0 % GNP at Current Prices Rs.m. 5,534,327 6,470,617 16.9 % Block 2 - 31 - 60 units @ Rs 4.70 per unit + Rs. 60.00 132 kV Route Length O.H. 1,714 1,724 0.6 % Chunnakam Domestic 503 538 7.0% 404,495 412,858 2.1% GNP at Constant (2002) Prices Rs.m. 2,612,603 2,832,318 8.4 % Block 3 - 61 - 90 units @ Rs 7.50 per unit + Rs. 90.00 GDP at Current Prices Rs.m. 5,604,104 6,542,663 16.7 % 132 kV Route Length U.G. 41 50 21.0 % Block 4 - 91 - 120 units @ Rs 21.00 per unit + Rs. 315.00 Transmission Religious 7 8 9.7% 2,287 2,325 1.7% Block 5 - 121 - 180 units @ Rs 24.00 per unit + Rs. 315.00 GDP at Constant (2002) Prices Rs.m. 2,645,542 2,863,854 8.3 % 33 kV Route Length O.H. 24,370 25,257 3.6 % General Total 321 367 14.3% 64,514 67,634 4.8% Block 6 - Above 180 units @ Rs 36.00 per unit + Rs.
    [Show full text]
  • AEL.N0000 Contents
    THE BEAUTY OF THE APPLICATION OF BOLDNESS CREATIVITY A COMMITMENT TO SUCCESS BUILDING RELATIONSHIPS ENGINEERING EXCELLENCE Annual Report 2013/14 Access Engineering PLC This is an integrated Annual Report capturing economic, social and environmental performance STOCK CODE AEL.N0000 Contents FINANCIAL PREAMBLE REPORTS About Us 03 Annual Report of the Board of Directors Portfolio at a Glance 04 on the Affairs of the Company 136 Highlights of the Year 06 Statement of Directors’ Responsibility 142 About This Report 08 Independent Auditors’ Report 143 Statement of Comprehensive Income 144 Statement of Financial Position 145 MESSAGE Statement of Changes in Equity 146 Cash Flow Statement 147 A Message from the Chairman 10 Notes to the Financial Statements 148 MANAGEMENT DISCUSSION & ANNEXES ANALYSIS Five Year Summary 188 Joint Statement of the Managing Director and the Chief Operating Officer 13 Operating Structure 189 Review of Business Operations 18 Awards and Accolades 190 Value Creation and Stakeholder Milestones 191 Capital Formation 62 GRI Content Index 192 A Stakeholder Approach to Value Creation 63 Notice of Meeting 196 Internal Capital Formation 65 Form of Proxy Enclosed External Capital Formation 69 Corporate Information Inner Back Cover STEWARDSHIP Board of Directors 94 Corporate Management Team 95 Corporate Governance 99 Report of the Audit Committee 123 Enterprise Risk Management 126 SCAN to view the HTML web version of this Annual Report http://accessengineering2013-14.annualreports.lk/ Specs of Strategy, planning and specified goals are common to any enterprise. At Access Engineering we live and breathe plans, blueprints, specifications and all manner of systems and processes that ‘come with the territory’.
    [Show full text]
  • Performance Improvement of a Diesel Engine Power Plant with Optimal Utilization of Waste Heat
    Performance Improvement of a Diesel Engine Power Plant with Optimal Utilization of Waste Heat Udalamattha Gamage Kithsiri Derating Vs Temperature and Relative Humidity 14 12 10 8 6 Derating /% 4 2 0 100 80 80 90 60 100 110 40 120 20 130 0 Relative Humidity/% Temperature/oF Master of Science Thesis KTH School of Industrial Engineering and Management Energy Technology EGI-2016-018MSC EKV1130 Division of Heat & Power SE-100 44 STOCKHOLM Master of Science Thesis EGI-2016-018MSC EKV1130 Performance Improvement of a Diesel Engine Power Plant with Optimal Utilization of Waste Heat U. Gamage Kithsiri Approved Examiner Supervisor (KTH) 2016-05-20 Miroslav Petrov - KTH/ITM/EGI Miroslav Petrov Collaboration Supervisors (OUSL) Open University of Sri Lanka Dr. N. S. Senanayake Ruchira Abeyweera Abstract Due to temperature and humidity deviations from the standard ISO conditions in real operational conditions in the tropical countries the performance of diesel engines used for power generation drops significantly. One of the reasons for dropping the engine performance is due to engine de-rating, hence increasing the specific fuel consumption. The present study was undertaken to develop a model for predicting whether the prevailing site conditions cause de-rating at a specific power plant in Sri Lanka. The model was developed with the aid of recorded information in previous studies and was validated with site conditions revenant to a selected location in Sri Lanka. In the study a set of equations was developed corresponding to different temperatures to predict engine de-rating as a function of relative air humidity. To achieve the required standard conditions in view of avoiding any de-rating of the engines, the charge air temperature needed to be reduced.
    [Show full text]
  • A Thesis Submitted to the Central European University, Department Of
    A thesis submitted to the Department of Environmental Sciences and Policy of Central European University in part fulfilment of the Degree of Master of Science Beyond the case of Northern Power Plant and oil waste contamination in Chunnakam, Sri Lanka: Social, Economic and Environmental Implications CEU eTD Collection Shynuga THIRUKESWARAN June, 2019 Budapest Erasmus Mundus Masters Course in Environmental Sciences, Policy and Management MESPOM This thesis is submitted in fulfillment of the Master of Science degree awarded as a result of successful completion of the Erasmus Mundus Masters course in Environmental Sciences, Policy and Management (MESPOM) jointly operated by the University of the Aegean (Greece), Central European University (Hungary), Lund University (Sweden) and the University of Manchester (United Kingdom). CEU eTD Collection ii Notes on copyright and the ownership of intellectual property rights: (1) Copyright in text of this thesis rests with the Author. Copies (by any process) either in full, or of extracts, may be made only in accordance with instructions given by the Author and lodged in the Central European University Library. Details may be obtained from the Librarian. This page must form part of any such copies made. Further copies (by any process) of copies made in accordance with such instructions may not be made without the permission (in writing) of the Author. (2) The ownership of any intellectual property rights which may be described in this thesis is vested in the Central European University, subject to any prior agreement to the contrary, and may not be made available for use by third parties without the written permission of the University, which will prescribe the terms and conditions of any such agreement.
    [Show full text]
  • Road Development Authority
    Constitution of the Democratic Socialist According to the accounts presented to Republic of Sri Lanka. audit by the Authority for the year under review, debtor balances totalling Road Development Authority Rs.3,014.91 million not recovered from various parties by the Authority during a period from 1 to 10 years as at 31 The cadre of the Road Development December 2014 and creditor balances Authority consisted of 5,964 officers totalling Rs.1,492.38 million not paid by including 79 officers in the top level the Authority during a period from 1 to management, 651 officers in the 10 years had not been settled even Engineering Service and 886 officers in the during the year under review. Technical Service. According to the financial statements as at 31 December 2014, the Approval of the Cabinet of Ministers had deficit of the Authority amounted to been granted to obtain loans amounting Rs.4,962.67 million and a provision of to Rs.151.77 billion from local banks for Rs.21,432.6 million had been made by the the rehabilitation of 64 roads with a General Treasury for improvement and length of 1,434 kilo meters which comes maintenance of roads. The income under the Road Development Authority. collected from the expressways during the Accordingly, contracts valued at year 2014 amounted to Rs.3,156.4 million. Rs.137.52 billion had been awarded for the rehabilitation of 64 roads, and Construction, rehabilitation and the total loans obtained in cash from 07 maintenance of expressways, highways and local banks during the years 2012,2013 bridges are being carried out by the Maga and 2014 for the rehabilitation of those Neguma Emulsion Production Company, roads amounted to Rs.108.25 billion.
    [Show full text]
  • 6 Research Symposium, Organized by Uva for the 6Th Research Symposium
    6th Research Symposium “Towards Emerging Trends in Value Addition” January 28 & 29, 2016 Uva Wellassa University of Sri Lanka # i Copyright © 2016 by Uva Wellassa University of Sri Lanaka Chancellor's Message It is with great pleasure that I send this message and good wishes to the 6th Research Symposium organized by Uva Wellassa University. All copy rights reserved. No part of this publication may be reproduced, stored in a As the Chancellor of the university I'm privileged and glad to retrieval system, or transmitted in any from or by any means, electronic, participate in this conference being its chief guest and I extend my mechanical, photocopying or otherwise without the prior permission of the copy profound gratitude to the Vice Chancellor and his staff for inviting rights owner, the Vice Chancellor Uva Wellassa University of Sri Lanka. me to join this academic forum. Uva Wellassa University which is focused to add value to the local resources is an exemplary academic milieu in the Sri Lankan higher education system as it emphasizes knowledge, skills, attitudes as well as the values, discipline and ethics of tomorrow's graduates who are responsible for country's future. Further, it is true ISBN 978-955-0481-09-5 that UWU undergraduates are guided to be entrepreneurial experts by cultivating innovative ideas in them from the inception. Therefore, this 6th Research Symposium has provided them an ideal platform to exhibit their new innovative knowledge in research activities by selecting the apt theme “Towards Emerging Trends in Value Addition.” Price: Rs. 2000.00 US$ 100.00 I trust that this research symposium will give an immense opportunity to researchers of all the fields to discuss, debate and exchange interactive views on their novel research findings.
    [Show full text]
  • Generation Report for June 2015
    Generation Report June 2015 PUBLIC UTILITIES COMMISSION OF SRI LANKA 0 Generation Report (June 2015) Generation Mix (June 2015) in GWh 57 140 (5%) (14%) 326 (32%) CEB Hydro CEB Thermal Oil CEB Coal 380 119 (37%) (12%) IPP Thermal SPP Wind Total Generation - 1,022GWh Generation Mix 2015 in GWh 403 419 (6%) (7%) 2,362 (38%) CEB Hydro CEB Thermal Oil 2,668 CEB Coal (43%) 354 IPP Thermal (6%) Renewable Total Generation - 6,206GWh Note: Generation from Mini Hydro, Solar and Biomass power plants in May and June is not included in renewable generation figure. 1 Monthly Dispatch from all Generation Units (June 2015) Power Station Capacity (MW) Dispatch (GWh) Plant Factor Wimalasurendra 50 7.05 19.58% Old Laxapana 53.5 20.24 52.54% Canyon 60 10.22 23.65% New Laxapana 115 36.58 44.18% Polpitiya 75 27.42 50.77% Kotmale 201 22.92 15.84% Victoria 210 40.09 26.52% Randenigala 122 30.32 34.52% Rantambe 49 13.20 37.42% Ukuwela 40 19.27 66.92% Bowatenna 40 4.01 13.92% Upper Kotmale 150 27.75 25.70% Samanalawewa 120 33.77 39.08% Kukule 75 22.76 42.15% Inginiyagala 10 6.58 91.43% Udawalawe 6 2.77 64.08% Nilambe 3.2 0.58 24.98% KPS Small GTs 85 0.09 0.14% KPS GT 7 115 0.08 0.10% KCCP 165 90.42 76.11% Sapugaskanda A 72 16.34 31.52% Sapugaskanda B 72 0.02 0.03% New Chunnakam 24 11.69 67.63% Puttalam Coal I 285 189.57 92.38% Puttalam Coal II 285 79.30 38.64% Puttalam Coal III 285 111.47 54.32% Asia Power 51 14.49 39.46% Barge 60 32.04 74.17% AES - Kelanitissa 163 10.60 9.04% Westcoast 270 83.19 42.79% Northern Power 27 0.00 0.00% SPP Wind 128.45 57.21 61.86%
    [Show full text]