LIST OF PROJECTS / WORKS COMMISSIONED AT VARIOUS RAILWAY STATIONS COMING UNDER HASSAN LOKSABHA CONSTITUENCY FOR LAST 3 YEARS.

Holenarasipur Station Building, circulating area and New Steel FOB connecting platform No 1 & 2 approach road developed as Adarsh station. at Holenarasipur

Commissioned Hassan-Bengaluru (167 Km) new line via Nelamangala and Shravanabelagola.

Hassan Loksabha constituency consists of following Legislative Assemblies Arkalgud, Arsikere, Belur, Hassan, Holenarasipur, Sakleshpur and Shravanabelagola. Important railway station coming under Hassan Loksabha constituency are Arsikere, Hassan, Holenarasipur, Sakleshpur and Shravanabelagola stations.

New Line & Electrification Works / Projects Cost in Crores • New line between Nelamangala to Shravanabelagola Completed. ₹. 238 • New rail line work between Chikmagaluru to Sakaleshpur is in progress ₹. 380 awaiting land acquisition. • Doubling between Arsikere to Tumukur is in progress. ₹. 80 • Electrification between Arsikere and Chikjajur. ₹. 24

New Trains and Stoppages/Extension. • Train Number 22679/ 22680 Hassan - Yesvantpur Superfast Intercity Daily. Introduced on 07.03.2017 Ex. Yesvantpur and Hassan • Train Number 16575 Yesvantpur to Mangalore Junction Tri-weekly Express, introduced on 11.04.2017 Ex-Yesvantpur and 12.04.2017 Ex-Mangalore Junction. Stoppages at Hassan and Sakaleshpur. • Train Number 22695/ 82653 Yesvantpur - Jaipur Weekly Express, stoppage at Arsikere. • Train Number 16587/ 16588 Yesvantpur - Bikaner Bi-Weekly Express, stoppage at Arsikere Junction. • Train Number 18111/ 18112 Tatanagar - Yesvantpur Weekly Express, stoppage at Arsikere. • Train Number 17325/ 17326 Hubballi - Mysuru, Vishwamanava Daily Express via KSR Bengaluru, stoppage at Arsikere. • Train Number 16577/ 16578 Harihar - Yesvantpur Tri weekly intercity express. Stoppage at Arsikere. • Train Number 16229/ 16230 Mysuru - Varanasi Bi-Weekly Express. Stoppage at Arsikere. • Train Number 16579/ 16580 Yesvantpur- Shimoga Town Bi-Weekly Express. Stoppage at Arsikere. • Train Number 16581/ 16582 Yesvantpur - Shivamogga Tri-Weekly Express. Stoppage at Arsikere. • Train Number 16575/ 16576 Yesvantpur - Mangalore Junction Tri-weekly Express, Stoppages at Hassan and Sakaleshpur. • Train Number 56215/ 56216 Mysuru - Shravanabelagola passenger Daily extended till Yesvantpur.

Passenger Amenities WORKS / PROJECTS COMPLETED Cost in Lakhs • Provision of Rail level platform on road-2 with LED lighting facilities 12 ₹. 47.2 coach length done at Holenarasipur station. • Improvements to circulating area and approach road at Holenarasipur ₹. 46.5 station done. • Provision of platform shelter on platform No.2 and 3 done at Arsikere ₹. 44.1 station. • Extension of concrete shelter on platform No-2 and 3 done at Arsikere ₹. 27.6 station. • Extension of platform No.1 to accommodate 21 coaches done at ₹. 26.8 Sakaleshpur station. • Provision of Low cost platform Shelter on platform No-2 done at ₹. 26.1 Holenarasipur station. • Holenarasipur station developed as Adarsh Station completed. ₹. 24.8 • Installation of water softening plant for supply to passenger on platform ₹. 20 No. 1 done at Arsikere station. • Provision of Electro - Chlorination Plant done at Hassan and Arsikere ₹. 14.2 stations. • Provision of Toilets at platform pay use toilet done at Hassan, ₹. 12.9 Sakaleshpur and Holenarasipur stations. • Provision water pedestals and seating arrangements done at Hassan ₹. 11 station. • Construction of platform toilets at Holenarasipur and Habbangatta ₹. 10.4 stations. • Provision of merchant waiting hall at Hassan station completed. ₹. 10 • Provision of auto announcement system done at Holenarasipur station. ₹. 4.9 • Provision of Water Coolers done at Arsikere, Holenarasipur and Hassan ₹. 3.5 stations. • Granite platform benches at Holenarasipur, Hassan and Arsikere ₹. 3.30 stations. • Provision of Low Level Platform shelter done at , Mavinkere and ₹. 3.1 Bageshpura stations. WORKS / PROJECTS IN PROGRESS Cost In Lakhs • Extension of platform Number 2 and platform Number 3 at Hassan ₹. 45.8 station to accommodate 24 coaches is under progress. • Construction of Concrete Over Head Tank 1.0 lakh litres Capacity at ₹. 29.4 Hassan is under progress. • Provision of bituminous approach road at Maranahalli and Bageshpura ₹. 20.4 stations under progress. • Provision of Bituminous approach road at Habbangatta and Sakaleshpur ₹. 7.5 stations is under progress. • Provision of Bituminous approach road to stations at Adihalli station is ₹. 3.5 under progress. WORKS / PROJECTS PLANNED Cost in Lakhs • Provision of Platform Shelter on platform No. 2 at Holenarasipur station ₹. 86 is planned. • Extension Passenger platforms at Mavinakere, Holenarsipur, Hassan, ₹. 47.5 Bageshpura and Habanghatta station for augmentation of various trains to 24 coaches, over Mysuru division is planned. • Provision of Solar street light system at approach roads of Holenarasipur ₹. 3.5 station is planned.

Traffic Facilities WORKS/ PROJECTS COMPLETED Cost in Lakhs • Provision of additional running line cum loading line 3 done at Bageshpura ₹. 391.2 station. • Subway in lieu of Level Crossing Gate Number 112 between and ₹. 221.5 Devanur stations completed. • Three Subways in lieu of Level Crossing Gates Numbering 23, 24 and 41 between ₹. 143.1 Hassan and Sakaleshpur stations completed. • Subway in lieu of Level Crossing Gate Number 128 between Habbangatta and ₹. 114.5 Arsikere stations completed. • Subway in lieu of Level Crossing Gate Number 129 between Hassan and Arsikere ₹. 90.8 stations completed. • Extension of pit line from 12 coaches to 24 coaches done at Arsikere Junction. ₹. 90.3 • Subway in lieu of Level Crossing Gate Number 110 between Hassan and Arsikere ₹. 52.3 stations completed. • Subway in lieu of Level Crossing Gate Number 120 between Hassan and Arsikere ₹. 52.3 stations completed. • Subway in lieu of Level Crossing Gate Number 71 between Mandagere and ₹. 40.8 Holenarasipur stations completed. • Widening of loading unloading area between Road No.5 and Road No.6 both on ₹. 22.2 Mysuru end and Arsikere ends done at Hassan station. • New station building work done at Bageshpura station. ₹. 23.5 • Improvements to lighting facilities with LED lights on Pit line done at Arsikere ₹. 14 station. WORKS / PROJECTS IN PROCRESS Cost in Crores • Road Over Bridge in lieu of Level Crossing Gate No. 89 between Mavinkere and ₹. 20 Hassan is in progress. WORKS / PROJECTS PLANNED Cost in Crores • Road Over Bridge in lieu of Level Crossing Gate No. 79 between Holenarasipur ₹. 41 and Mavinkere stations is planned. • Road Over Bridge in lieu of Level Crossing Gate No. 3 at Hassan is planned. ₹. 29

Additional Facilities WORKS/ PROJECTS COMPLETED Cost in Lakhs • Reconstruction staff quarter and improvement of colony roads at Arsikere and ₹. 639.7 Hassan, Improvement to underground drainage arrangements of Railway colony done at Hassan. • Provision of Cement concrete apron for Road No.3 for 24 coaches done at ₹.141.5 Arsikere Junction. • Improvement done to facade of station building at Holenarasipur station. ₹. 30 WORKS / PROJECTS IN PROGRESS Cost in Lakhs • Supply installation of testing and commissioning of pit line lighting with LED ₹. 44.4 fitting at 3 in Mysuru and 1 in Arsikere of 540 meters of each. • Proposed construction of Senior Section Engineer P.WAY office at Hassan is ₹. 37.3 under progress. • Construction of RPF Dog Kennel and Construction of new railway canteen at ₹. 26.5 Arsikere Junction at Arsikere is under progress. • Provision of Diesel Generating sets at Holenarasipur station is under progress. ₹. 4.7 WORKS / PROJECTS PLANNED Cost in Lakhs • Proposal for strengthening of super structure by regirdering on Bridge No.192D ₹. 73.9 at Arsikere Station Yard is planned.