Application (Form-1)
Total Page:16
File Type:pdf, Size:1020Kb
APPLICATION (FORM-1) ENVIRONMENTAL CLEARANCE FOR METAL STONE QUARRY (MINING LEASE AREA 1.210 Ha) AT Khasra No- 363/1,363/2,370/1 Village- Sunjhiri, Tehsil- Keolari, District- Seoni, State-Madhya Pradesh Project Proponent: Shri Majid Khan S/o Shri Mohamad Khan, Resi.- Nehru Chouk, Waraseoni, District- Seoni(MP) February 2019 Sunjhiri Metal Stone Quarry at Village- Sunjhiri, Tehsil- Keolari, Dist – Seonit of FORM - I Shri Majid Khan S/o Shri Mohamad Khan (Area: 1.210 Ha) APPENDIX-I FORM-1 (I) Basic Information Sr. No. Item Details 1 Name of the project Sunjhiri Metal Stone Quarry Of Majid Khan S/o Shri Mohamad Khan 2 Sl.No. in the schedule 1 (a) as per MoEF notification dt. 14.09.2006 as per OM dt. 18.05.2012 3 Proposed capacity/ area/ length/ Production– 4050 M3 per year, tonnage to be handled/ command area/ Mine Lease Area – 1.210 Ha lease area/ number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/ Area etc. Mine Lease Area – 1.210 Ha 6 Category of Project i.e. ‘A’ or ‘B’ B – 2 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify. 9 Location The Area falls in SOI, Topo-sheet No. 63 B/3 The geographical location of the mine with respect to the boundary pillar of lease area are given below :- BP. Latitude Longitude No. A 22°24'34.46"N 80°02'05.86"E B 22°24'34.93"N 80°02'05.66"E C 22°24'35.76"N 80°02'05.64"E D 22°24'36.81"N 80°02'06.16"E E 22°24'37.43"N 80°02'07.45"E F 22°24'37.82"N 80°02'07.34"E G 22°24'38.11"N 80°02'09.18"E H 22°24'37.64"N 80°02'09.23"E I 22°24'37.57"N 80°02'08.77"E J 22°24'33.00"N 80°02'10.97"E K 22°24'35.09"N 80°02'06.51"E L 22°24'34.48"N 80°02'06.35"E Plot/Survey/Khasra No. Khasra No. 363/1,363/2,370/1 Village Sunjhiri Tehsil Keolari District Seoni State Madhya Pradesh 10 Nearest railway station/airport along Nearest railway station: Page 2 Sunjhiri Metal Stone Quarry at Village- Sunjhiri, Tehsil- Keolari, Dist – Seonit of FORM - I Shri Majid Khan S/o Shri Mohamad Khan (Area: 1.210 Ha) Sr. No. Item Details with distance in kms. Keolari ~ 13.80 Km W Nearest Airport: Jabalpur Airport ~ 84.20 Km, N 11 Nearest Town, city, District Nearest village: Sunjhiri : 1.93 km NE Headquarters along with distance in Nearest City: Seoni ~61.00 Km SW kms. Nearest Town: Keolari ~ 13.80 Km W District HQ: Seoni ~ 61.00 Km, SW 12 Village Panchayats, Zilla Parishad, Village Panchayat: Gram Panchayat – Village: Municipal Corporation, Local body Sunhera, Tehsil: Keolari, District: Seoni, Madhya (complete postal addresses with Pradesh telephone nos. to be given) Zilla Parishad: Collector Office Campus, Seoni, Madhya Pradesh. 481011 Tel: 07632-240150 E Mail: [email protected] 13 Name of the applicant Shri. Majid Khan S/o Shri Mohamad Khan 14 Registered Address Shri. Majid Khan S/o Shri Mohamad Khan Resi.- Nehru Chouk, Waraseoni, Dist.- Seoni(M.P.) 15 Address for correspondence Resi.- Nehru Chouk, Waraseoni, Dist.- Seoni(M.P.) Name Shri. Majid Khan S/o Shri Mohamad Khan Designation Owner/Partner/CEO) Owner Address Shri. Majid Khan S/o Shri Mohamad Khan Resi.- Nehru Chouk, Waraseoni, Dist.- Seoni(M.P.) Pin Code 481331 E-mail [email protected] Telephone No. +919039239148 Fax No. Not Available 16 Details of Alternative Sites examined, if Not applicable. Mining is site specific project. Mine any. Location of these sites should be lease area is falling in Toposheet No. 63 B/3 shown on a toposheet. 17 Inter-linked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 It yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves Not Applicable. approval/clearance under: (a) The Forest (Conservation) Act, No forest land involved. 1980 No wildlife sanctuary/National park in 5 km radius. (b) The Wildlife (Protection) Act, 1972 Area does not fall in CRZ. (c) The C.R.Z Notification, 1991 22 Whether there is any Government No Order/Policy relevant/relating to the site 23 Forest land involved (hectares) None Page 3 Sunjhiri Metal Stone Quarry at Village- Sunjhiri, Tehsil- Keolari, Dist – Seonit of FORM - I Shri Majid Khan S/o Shri Mohamad Khan (Area: 1.210 Ha) Sr. No. Item Details 24 Whether there is any litigation pending No litigation is pending in any court of law. against the project and/ or land in which the project is propose to be set up (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. [II] Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Permanent or temporary Mining activity will cause permanent change in the change in landuse, land topography and land use of mining area. After cover or topography completion of mining, the lower part of mined out pit 1.1 including increase in Yes will be converted into water reservoir and thick intensity of land use (with plantation will be developed on the upper benches of respect to local landuse mined out area and on the safety zone area. plan) This is proposed existing mine hence there is no Clearance of existing land, vegetation. 1.2 Yes vegetation and building? The land is devoid of any other structures, there will not be clearance of any building/structures. After completion of mining, the lower part of mined out pit will be converted into water reservoir and thick 1.3 Creation of new land uses Yes plantation will be developed on the upper benches of mined out area and on the safety zone area. Pre-construction Mineral reserves have been proved during existing 1.4 investigations e.g. bore Yes mining in the nearby area. As, per available reserve houses, soil testing ? the life of mine is 18 Years. Proposed infrastructure will consist of Mine Office, 1.5 Construction works? Yes First Aid Centre, Drinking Facility, Rest Shelter and Approach Road. The mining lease area is devoid any structure as this is a proposed existing mine, hence no demolition work is involved during implementation and operation phase of 1.6 Demolition Works ? No the project. Demolition of any structure shall be done at the end of mine life as per the Mine Closure plan. Temporary sites used for Temporary sheds will be provided with basic facilities construction works or 1.7 Yes of drinking water, sanitation, etc. for construction housing of construction workers. workers? Page 4 Sunjhiri Metal Stone Quarry at Village- Sunjhiri, Tehsil- Keolari, Dist – Seonit of FORM - I Shri Majid Khan S/o Shri Mohamad Khan (Area: 1.210 Ha) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Above ground buildings, Proposed infrastructure will consist of Mine office, first structures or earthworks aid centre, drinking water facility, rest shelter and 1.8 Yes including linear structures, approach road will be created during the life of mine cut and fill or excavations i.e.e 18 year plan period. Underground works There will be no underground mining activity. 1.9 including mining or No Open cast Manual method of mining will be used for tunneling? mining operation. After completion of mining, the lower part will be 1.10 Reclamation works? Yes converted into water body, with plantation on the upper benches and along the safety zone. 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not Applicable It is proposed to produce 4050 m3 stone for the five Production and year period as per mine plan. The mining will be done 1.13 Yes manufacturing Process? by open cast Manual method with the help of excavators and tippers and associated equipment’s. The excavated stone will be directly transported to the Facilities for storage of 1.14 Yes crusher within lease area for sizing and sale. The goods or materials? blasting will be done by licensed contractor. Soil cover is present in the area. Soil cover will be completely removed during the first and fourth year of mining. 552 m3 soil will be generated which will be spread in the safety zone for plantation purpose. About 1019 m3 OB will be generated from mining will be dumped and stacked separately within lease area at specific location. Facilities for treatment or No process effluent will be generated from the mining 1.15 disposal of solid waste or Yes activities. But during rainy season water will be liquid effluents? accumulated in the mine pit which will be stored and used for dust suppression and plantation. Excess water if any, will be pumped to settling tank on surface and will be allowed to flow outside mine only after ensuring proper settling. Domestic effluent from mines office will be discharged in septic tank followed by soak pit. Facilities for long term Not Applicable as most of the workers will be from the 1.16 housing of operational No nearby villages.