ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental protection Rules, 1986)

(2014-2015)

FOR KUMARDHUBI UG (UNDERGROUND MINE) Area Limited

Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Ltd.) G. T. Road (West End) - 713 304

CMPDI ISO 9001:2008 Company

ENVIRONMENTAL STATEMENT FOR KUMARDHUBI UNDERGROUND MINE

FOR THE YEAR: 2014-2015

CONTENTS

SL. CHAPTER PARTICULARS PAGE NO. NO. EXECUTIVE SUMMARY 1-2 1 CHAPTER-I INTRODUCTION 3-4 2 CHAPTER-II ENVIRONMENTAL 5-9 STATEMENT FORM-V (PART A TO 1)

LIST OF ANNEXURES

ANNEXURE PARTICULARS PAGE NO. NO. 1 AMBIENT AIR QUALITY & 11 NOISE LEVEL REPORT II WATER QUALITY REPORT 12-14 III LOCATION PLAN 15 IV PLAN SHOWING LOCATION 16 OF MONITORING STATIONS

1

EXECUTIVE SUMMARY

E-1 The Kumardhubi underground with a peak capacity of 0.10 MTY, of Eastern Coalfields Limited is located in the western part of in District of . The mine is under the administrative control of of ECL. EC has been granted for a capacity of 0.10 MTY as part of Cluster No. 2 (Group of Mines of ECL in Raniganj Coalfield) on 16.01.2015 which will be applicable from FY 2015 – 16.

The colliery lies at a distance of 20 km towards west from Asansol. The area is well connected by roads and railways. G.T. Road (N.H. – 2) and Line pass through the middle of the colliery leasehold area and Rly. Station lies within the leasehold area. The location map of Kumardhubi UG is given in annexure-III.

E-2 In compliance with the Gazette Notification No.G.S.R329 (E) dated 13th March, 1992, the Ministry of Environment and Forests, Government of India, G.M (Environment), ECL entrusted CMPDI, RI-I to prepare Environmental statement of Kumardhubi UG for the year 2014-2015. This report is prepared with a view to fulfill the statuary obligations laid down by Ministry of Environment & Forests (MoEF).

E-3 The Environmental Monitoring was carried out quarterly as per the guideline of Ministry of Environment & Forests (MoEF). The Environmental Monitoring results for four quarters ending March, 2015 are appended as Annexure-I & II and discussed in Part-C of Statement Form.

E-4 Ambient air quality is monitored to study the level of air . The main air pollutant is suspended particulate matter (SPM). It is difficult to quantify the amount of air pollutants generated due to mining.

E-5 Water is not directly used during mining for coal production. It percolates into working area during mining operation. However, water is consumed for other purposes, mainly for domestic supply and industrial use. Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption.

Mine water analysis results are given in Annexure-II.

E-6 The noise levels recorded are generally below permissible limits prescribed by Ministry of Environment & Forest (MoEF).

======Environmental Statement for Kumardhubi UG for 2014-15 2

E-7 Raw material used in coal mining activities are explosive and POL for machines and automobiles.

E-8 Hazardous waste was generated in the form of used cap-lamp batteries and automobile batteries. These batteries were deposited in the Area Stores.

E-9 Measures are being taken to control air, water and noise pollution which have been discussed in detail in part-G, H & I of Statement Form.

======Environmental Statement for Kumardhubi UG for 2014-15 3

CHAPTER – I

INTRODUCTION

1.1 GENESIS:

The Gazette Notification vide G.S.R No. 329 (E) dated13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R No. 386 (E) Dtd.22nd April’93 reads as follows.

“Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.”

In compliance with the above, the work of Environmental Statement for Kumardhubi UG was entrusted to CMPDI by GM (Environment), Eastern Coalfields Limited.

1.2 MINE DESCRIPTION: Kumardhubi Colliery is an existing underground mine since pre-nationalisation period. Existing manpower of the mine as on 01.04.2013 was 596, out of which surface manpower was 110 and underground manpower was 486. Coal mining is being done through two entries, BL Incline and No. 2 Pit. The details are as follows - B.L. Incline : SP Top seam is being developed by Bord and Pillar Method with one SDL and at resent the production is about 90 tonne per day. No. 2 Pit : A small patch at SP Top seam is being developed by Bord and Pillar Method with manual loading and at present the production is about 60 tonne per day. In near future, working will be shifted to BP Top seam.

At present, coal at surface is transported to the nearby coal depot by colliery dumpers through tippler and from coal depot coal is disposed off by local despatch. There is a proposal to transport coal from coal depot to the Mugma Central Pool Railway Siding which is around 10-11 km from the coal depot by contractual truck.

1.2.1 COMMUNICATION: The colliery lies at a distance of 20 km towards west from Asansol. The area is well connected by roads and railways. G.T. Road (N.H. – 2) and Grand Chord Line pass through the middle of the colliery leasehold area and Kumardubi Rly. Station lies within the leasehold area. The location map of the Kumardhubi UG is given in Annexure-III.

======Environmental Statement for Kumardhubi UG for 2014-15 4

1.3 ENVIRONMENTAL SCENARIO: The Environmental monitoring was carried out quarterly as per guideline of Ministry of Environment and Forests (MoEF) by CMPDI, RI-I starting from Q/E Dec’2012. Accordingly, ambient air quality was monitored at four stations. Water quality was monitored according to effluent discharge. Noise level was recorded at four locations.

The Environmental monitoring result for four quarters ending March’2015 is appended as Annexure- I & II. The environmental monitoring result for the year 2014-2015 ( having 304 working days) can be concluded as given below:-

AMBIENT AIR QUALITY 3 The SPM concentration was found in the range of 128.7 to 270.4 µg/m . The SO2 3 concentration remained below 10.0 µg/m and NOX concentration was in the range of 12.1 to 24.2 µg/m3.

WATER QUALITY The analysis result reveals that most of the parameters are below permissible limits prescribed by Ministry of Environment & Forests (MoEF) as General Standards for Class-‘A’ effluent (Effluent discharged into inland surface water).

NOISE LEVEL The noise level were found in the range of 44.7 to 58.0 dB(A). The noise level recorded is below permissible limit prescribed by Ministry of Environment and Forest (MoEF).

======Environmental Statement for Kumardhubi UG for 2014-15 5

CHAPTER - II

ENVIRONMENTAL STATEMENT

FORM – V Environmental Statement for the financial year ending March, 2015

PART – A

(I) NAME AND ADDRESS OF THE MINE

Name : KUMARDHUBI UNDERGROUND

Address : AGENT, KUMARDHUBI UG

Place :

Post :

Dist : DHANBAD, JHARKHAND

(II) INDUSTRY CATEGORY : Primary

(III) PRODUCTION CAPACITY : 0.17 MTY (as per highest pre – 94 production capacity achieved during 1975 – 76) EC granted in Jan, 2015 for 0.10 MTY capacity applicable from 2015 – 16. IV) TOTAL PRODUCTION IN 2014-15: 77, 084 Te

PART – B WATER AND RAW MATERIAL CONSUMPTION

(I) WATER CONSUMPTION (Cu.m/day)

During Previous financial year During current financial year (2013-2014) (2014-2015) A. MINING i Dust suppression 160 175 ii Fire fighting iii Others (service building etc.) B. COOLING C. DOMESTIC i Colony ii Others (service building etc.) TOTAL 160 175

======Environmental Statement for Kumardhubi UG for 2014-15 6

A. WATER CONSUMPTION PER UNIT OF PRODUCT

Name of Water consumption per unit of product product During Previous financial During current financial year year (2013-2014) (2014-2015) ROM Coal 799 Ltrs/Te* 694 Ltrs/Te* Note- Only for Production Purpose

(II) RAW MATERIAL CONSUMPTION :

Name of raw Name of Consumption of raw material material products (per unit of output) During Previous During current financial year financial year (2013-2014) (2014-2015) 1. Explosive Coal 0.44 Kg/te 0.38 Kg/te 2. Diesel 0.12 Lt/te 0.04 Lt/te 3. Lubricants 0.01 Lt/te 0.09 Lt/te

PART – C

POLLUTION GENERATED

Pollution Quantity of pollution Percentage variation from generated prescribed standards with reasons WATER Mine water discharged The analysis results reveal Analysis results are given in that most of the parameters Annexure-II. are below permissible limits prescribed by MOEF as General Standards for class ‘A’ effluent (Effluent discharged into inland surface water.) AIR It is difficult to quantify the Ambient air quality result exact amount of air pollutants shows that the values of RPM, from UG operation because of SPM, SO2 and NOx are well existence of other regional within prescribed standards. pollution sources. The main air pollutant is suspended particulate matter (SPM). The air quality results are appended as Annexure-I.

======Environmental Statement for Kumardhubi UG for 2014-15 7

PART – D

HAZARDOUS WASTE

(As specified under Hazardous waste management and handling Rules, 1989)

Hazardous waste Total quantity During Previous financial During current financial year year (2013-2014) (2014-2015) A) From process i)Used oil 1200 Liters 1200 Liters ii)Lead-Acid Batteries 01 Nos 01 Nos B) From pollution control facilities

. PART – E

SOLID WASTE

Particulars Total quantity (In Million Cu.m) During Previous financial During current financial year year (2013-2014) (2014-2015) a) From process (Mining) b) From pollution control facilities c) Quantity recycled or reutilized

PART – F

PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH THESE CATEGORIES OF WASTE.

No hazardous waste is produced. Used oil such as mobile lubricants are used in lubricating the machine/haulage etc.

No solid waste was generated during the year 2014-15.

======Environmental Statement for Kumardhubi UG for 2014-15 8

PART – G

IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION.

In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented.

1.0 CONTROL MEASURES:

The following measures have been taken to control air pollution.

i) Water sprinkling is done on coal transportation road with the help of water tanker. ii) Regular sprinkling of water at coal transfer and loading points. Details of fixed sprinklers- No of fixed Location Source of sprinklers water 2 BL Incline & UG No – 2 Pit

2.0 WATER POLLUTION CONTROL MEASURES:

The following measures have been taken to control water pollution from mine:

i) Most of the parameters of mine water conform to General Standard of MOEF for Class- A effluent as mentioned earlier. The mine water is discharged to nala after settling. ii) Some portions of mine water is also used for different purposes in underground mine and for domestic supply after passing it through slow sand filtration plant. iii) The septic tanks & soak pits are provided in residential quarters of project colony. For two unit quarters one septic tank is provided. The effluent is finally discharged to soak pits provided with each septic tank.

3.0 NOISE POLLUTION CONTROL MEASURES

i) Regular maintenance of machines and other equipment at workshop including mine fan.

ii) Providing green belt around core activity area, along road side in colony and in other vacant space.

======Environmental Statement for Kumardhubi UG for 2014-15 9

PART – H

ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENAL PROTECTION INCLUDING ABATEMENT OF POLLUTION.

The following are the additional investment proposals for environmental protection :

i) The Environmental monitoring of the project will be continued quarterly as per the guideline of Ministry of Environment and Forest (MoEF).

ii) Necessary Consent for discharge may be taken from Competent Authority.

PART – I

ANY OTHER PARTICULARS IN RESPECT OF ENVIRONMENTAL PROTECTION AND ABATEMENT OF POLLUTION.

The Environmental Monitoring is carried out quarterly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MoEF) and based on the result there of, colliery takes necessary action if needed.

======Environmental Statement for Kumardhubi UG for 2014-15 10

This page is left empty

======Environmental Statement for Kumardhubi UG for 2014-15 11

Annexure-I Air Quality Monitoring Report (Q/E June, 2014 to Q/E March, 2015) Noise Stn Monitoring Sampling Station TSPM PM10 SO2 NOX Level No Station Date Category dB(A) 21-May-14 264.5 126.3 <10.0 22.8 58.0 22-May-14 270.4 128.9 <10.0 24.1 - 19-Aug-14 234.7 102.1 <10.0 20.1 54.6 Lamp cabin A1 20-Aug-14 228.6 106.3 <10.0 22.3 - Industrial of Pit No.-2 10-Dec-14 214.6 104.8 <10.0 20.7 54.2

11-Dec-14 224.7 118.7 <10.0 21.4 - 29-Jan-15 228.1 128.3 <10.0 22.4 52.1 30-Jan-15 226.2 122.9 <10.0 20.9 - 21-May-14 230.6 114.3 <10.0 24.8 57.1 22-May-14 227.6 112.0 <10.0 24.6 - 19-Aug-14 206.3 92.7 <10.0 22.8 56.9 Near B. L. A2 20-Aug-14 216.1 89.3 <10.0 20.6 - Industrial Incline 10-Dec-14 196.2 108.2 <10.0 22.8 52.6

11-Dec-14 189.2 116.2 <10.0 22.0 - 29-Jan-15 214.5 116.4 <10.0 24.2 54.7 30-Jan-15 216.5 188.8 <10.0 24.1 - 21-May-14 159.3 82.8 <10.0 18.6 51.2 22-May-14 161.4 83.4 <10.0 16.9 - 19-Aug-14 144.8 74.8 <10.0 16.2 50.3 Agent's A3 20-Aug-14 142.1 70.3 <10.0 18.4 - Industrial Office 10-Dec-14 138.1 86.4 <10.0 17.4 48.4

11-Dec-14 142.4 86.3 <10.0 16.3 - 29-Jan-15 148.9 96.7 <10.0 18.5 46.3 30-Jan-15 144.7 94.9 <10.0 18.5 - 21-May-14 148.0 74.6 <10.0 14.9 46.6 22-May-14 146.0 73.2 <10.0 12.1 - 19-Aug-14 132.2 68.1 <10.0 12.8 44.7 A4 Dispensary 20-Aug-14 128.7 64.8 <10.0 14.1 - Residential 10-Dec-14 136.4 74.2 <10.0 15.1 44.7 11-Dec-14 138.9 78.7 <10.0 14.8 - 29-Jan-15 142.2 84.6 <10.0 16.6 46.1 30-Jan-15 140.1 80.3 <10.0 12.6 - Air Quality Standards for Coal Mines Stipulated by Ministry of Environment and Forests (MoEF), Vide Notification No. GSR 742(E), Dt: 25.09.2000 for Coal mines located in the old coal fields of , Raniganj, Bokaro.

SPM RPM SO2 NOx Noise 24 hour average 700 300 120 120 75 Annual Average 500 250 80 80

Environmental standards vide MOEF, Govt. of India Extraordinary Gazette notification No.660 dated 16.11.2009. (NAAQS, 2009)

Pollutant Concentration PM10 PM2.5 SO2 NOx (microgram/cum) Annual Average 60 40 50 20 24 hr Average 100 60 80 80

======Environmental Statement for Kumardhubi UG for 2014-15 12

Annexure-II

MINE WATER QUALITY

Area Mugma Mugma Mugma Mugma Effluent Water Project Kumardhubi Kumardhubi Kumardhubi Kumardhubi (MOEF Qtr Ending June'14 Sept'14 Dec'14 Mar'15 Schedule-VI Sample No 41W1 41W1 41W1 41W1 Standard) Sampling Mine discharge Mine discharge Mine discharge Mine discharge Station B.L. Incline B.L. Incline B.L. Incline B.L. Incline Date of Sample 22-May-14 20-Aug-14 28-Nov-14 30-Jan-15 Colour 3 4 3 3 5 Odour Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable TSS 26 <25.0 <25.0 30 100.0 pH 8.38 8.20 8.12 8.61 5.5-9.0 Temperature(Deg Shall not C) exceed 50C Normal Normal Normal Normal above the receiving water temp Oil & Grease <2.0 <2.0 <2.0 <2.0 10.0 Total Residual <0.02 <0.02 <0.02 <0.02 1.0 Chlorine Ammonical 0.18 0.21 0.36 0.42 50.0 Nitrogen Total Kjeldahi 1.14 1.15 1.12 1.18 100.0 Nitrogen Free <0.4 <0.4 <0.4 <0.4 5.0 BOD 10 10 8 10 30.0 COD 32 24 32 24 250.0 Arsenic <0.005 <0.005 <0.005 <0.005 0.2 Lead <0.005 <0.005 <0.005 <0.005 0.1 Hexavalent 0.04 0.03 0.04 0.03 0.1 Chromium Total Chromium 0.08 0.06 0.06 0.06 2.0 Copper <0.03 <0.03 <0.03 <0.03 3.0 Zinc 0.03 0.03 0.02 0.03 5.0 Selenium <0.005 <0.005 <0.005 <0.005 0.05 Nickel <0.10 <0.10 <0.10 <0.10 3.0 Fluoride 0.14 0.28 0.42 0.42 2.0 Dissolved 1.46 1.42 1.34 1.58 5.0 Phosphate Sulphide 0.009 0.007 0.006 0.009 2.0 Phenolics <0.001 <0.001 <0.001 <0.001 1.0 Manganese 0.16 0.18 0.18 0.24 2.0 Iron 0.09 0.11 0.09 0.14 3.0 Nitrate Nitrogen 1.2 1.3 2.3 3.2 10.0 Note : All parameters are in mg/l unless specified otherwise

======Environmental Statement for Kumardhubi UG for 2014-15 13

Annexure-II

DRINKING WATER QUALITY REPORT

Area Mugma Mugma Mugma Mugma Indian Project Kumardubi UG Kumardubi UG Kumardubi UG Kumardubi UG Drinking Water Quarter June'14 Sept'14 Dec'14 Mar'15 Standard Sample No 41DW1 41DW1 41DW1 41DW1 (IS-10500) Sampling Tap water Tap water Tap water Tap water Station supplied direct supplied direct supplied direct supplied direct from Barakar from Barakar from Barakar from river river river Date of 22-May-14 20-Aug-14 28-Nov-14 30-Jan-15 sampling Colour,Hazen 4 3 3 2 5 unit Max Odour Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable Taste Agreeable Agreeable Agreeable Agreeable Agreeable Turbidity,NTU 3.4 3.4 3.2 3.1 5 Max pH 8.56 8.60 8.34 8.82 6.5-8.5 Total 84 8 32 28 300.0 Hardness Iron 0.16 0.14 0.12 0.29 0.30 Chlorides 8 13 8 12 250.0 Res Free <0.02 0.04 0.06 0.04 0.20 chlorine Dissolved 296 78 214 246 500.0 Solids Calcium 12 12.8 25.6 27.2 75.0 Copper <0.03 <0.03 <0.03 <0.03 0.05 Manganese <0.02 <0.02 <0.02 <0.02 0.10 Sulphate 42 33 42 37 200.0 Nitrate 8.86 1.77 2.66 1.77 45.0 Fluoride 0.38 0.06 0.18 0.72 1.0 Selenium <0.005 <0.005 <0.005 <0.005 0.01 Arsenic <0.005 <0.005 <0.005 <0.005 0.05 Lead <0.005 <0.005 <0.005 <0.005 0.05 Zinc 0.04 0.04 0.04 0.24 5.00 Hex <0.01 <0.01 <0.01 0.03 0.05 Chromium Boron <0.01 <0.01 <0.01 <0.01 1.00 Coliforms Nil Nil Nil Nil Nil (MPN) Phonolics <0.001 <0.001 <0.001 <0.001 0.001 Alkalinity 96 84 80 92 200.0

NOTE: All parameters are in mg/l unless specified otherwise.

======Environmental Statement for Kumardhubi UG for 2014-15 14

Annexure-II

DRINKING WATER QUALITY REPORT

Area Mugma Mugma Mugma Mugma Mugma Indian Project Kumardubi UG Kumardubi UG Kumardubi UG Kumardubi UG Kumardubi UG Drinking Water Quarter June'14 June'14 June'14 June'14 June'14 Standard (IS-10500) Sample No 41GW1 41GW2 41GW3 41GW4 41GW5 Sampling Dugwell beside Dugwell beside Dugwell near Dugwell at Dugwell at Station Neheru road G.T. Road near railway crossing kuour bazar Madhyabidyalay, opposite Maszid gate Kumardubi Panchmahali shivmandir Date of 22-May-14 22-May-14 22-May-14 22-May-14 22-May-14 sampling Colour,Hazen 4 3 2 3 3 5 unit Max Odour Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable Unobjectionable Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Turbidity,NTU 3.7 4.1 3.8 3.6 4.0 5 Max pH 7.23 7.36 7.20 7.56 7.10 6.5-8.5 Total 216 92 348 184 192 300.0 Hardness Iron 0.12 0.09 0.08 0.12 0.14 0.30 Chlorides 72 49 99 75 73 250.0 Res Free <0.02 <0.02 <0.02 <0.02 <0.02 0.20 chlorine Dissolved 404 248 516 424 448 500.0 Solids Calcium 80 38.4 120 41.6 68.8 75.0 Copper <0.03 <0.03 <0.03 <0.03 <0.03 0.05 Manganese <0.02 <0.02 <0.02 <0.02 <0.02 0.10 Sulphate 31 48 51 42 48 200.0 Nitrate 13.73 14.18 12.40 13.29 15.50 45.0 Fluoride 0.30 0.35 0.41 0.41 0.43 1.0 Selenium <0.005 <0.005 <0.005 <0.005 <0.005 0.01 Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Lead <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Zinc 0.04 0.03 0.03 0.04 0.04 5.00 Hex <0.01 <0.01 <0.01 <0.01 <0.01 0.05 Chromium Boron <0.01 <0.01 <0.01 <0.01 <0.01 1.00 Coliforms Nil Nil Nil Nil Nil Nil (MPN) Phonolics <0.001 <0.001 <0.001 <0.001 <0.001 0.001 Alkalinity 84 120 176 100 248 200.0

NOTE: All parameters are in mg/l unless specified otherwise.

======Environmental Statement for Kumardhubi UG for 2014-15 A3

GW5 SW1 A2 A2 GW8 A13 MW1 GW7 GW1 MW3

GW6 A1 GW4

A14 GW3MW11 SW9 A8 MW2 A4

SW3 SW7 GW9 MW5 A5 MW4 GW2 MW9 GW10 SW11 SW2 A9 A6 MW6 SW10 R5

MW7 SW6 R2 A7 SW8 R4 A10 A12 MW10 GW11 A11 MW8 R3

SW4 R1 MINE BOUNDARY BUILDING QUARRY ROAD POND / RIVER NALA L E G N D

N

KUMARDHUBI COLLIERY

CERAM

MAITHON

FROM DELHI FROM FROM

DELHI JORE (p) LTD (p)

132000 VOLTS TANK

D.H.T.L

JORE

TANK

SINOICATE

MAITHON

TANK MINERAL

RADHA

BOUNDARY LINE G.T. ROAD G.T. LINE BOUNDARY MAITHON

E.S.I.HOSPITAL COLLIERY APPROACHED COLLIERY

COLLIERY

STATION

SECTRUC

UMARDHUBAN

FEFRACTORIES

E=130515.50

QUARRY

630 628 RANI N=102204.80 KHARKIA 627

629

B.S.K.COLLEGE

B.S.K.COLLEGE D.V.C. YARD D.V.C.

626

O/B FILLED UP FILLED O/B 624 2K

622 O.H.T.LINE 621

25 B.S.K.COLLEGE 510 563 623 53 33000V. KUMARDHUBI UG 568 567

71

'3K' QUARRY '3K' O/B FILLED UP FILLED O/B 572 606 A4/N4

605

DHOWARAH

SANATORY 572 UNIT KSUMARDHUBI EAST 573

132000 VOLTS

BHATTA

M/STOCK

BUNGLOW GARDEN

O.H.T.LINE &

REFACTPRY SANJOY 'C'

VILLAGE VALLEY

VILLAGE STATION RLY DUBI KUMAR

TALDANGA

ARUN REFRACTORES ARUN TANK STATION PLATFORM STATION A3/N3

41DW1

N H - 2 DN 2 - H N

OFFICE

PRIVATE BUILDING PRIVATE

CANTEEN

QUARRY OB/FILLED 2 KM UP

41GW1 WELL A1/N1

N H - 2 DN

NHS QUATER

SPAP FACTORY SPAP

DHOWARAH

TANK

STOCK YARD STOCK

D.V.C.

(WATER LOGG) (WATER SANATORY N H - 2 UP

HIGH SCHOOL HIGH SOUTH IN

SONAR DANGA SONAR

J.K.R.R. BASTI

F O/B DUMP O/B

41GW2

TANK

FIRE BRICKS FIRE

FACTORY TANK 41W1 A2/N2

41GW3

MAGAZINE (ABND)

GOSWAMY PARA VILLAGE PARA GOSWAMY

O/B DUMP O/B

1 G QUARRY G 1

O B FILLED UP FILLED B O TANK

41GW5

OFFICE

COLLY.

TANK O/B DUMP O/B

41GW4

1 G QUARRY G 1

O B FILLED UP FILLED B O

5K QUQRRY 5K (WATER LOGGED) (WATER F 150 M 150 F F A4/N4- Dispensary A3/N3- Agents Office A2/N2- Near B.L. Incline

A1/N1- Lamp Cabin of Pit No.2 2 G QUARRY G 2

E D G E UP FILLED B O

Air Quality Stations R A

K A R

A B 41GW3- Dugwell at Bazar, Kumardhubi 41DW1- PHE Supply Tap Water 41GW5- Dugwell beside Nehru Road opposite Shiv Mandir 41GW4- Dugwell at Madhya Vidyalay 41W1- Mine Discharge water of B.L. Incline 41GW2- Dugwell near Rly. Crossing Gate 41GW1- Dugwell beside G.T.Road near Maszid Water Quality Station Subject Job Title Customer

PLAN SHOWING

MONITORING STATIONS F ENVIRONMENTAL STATEMENT OF KUMARDHUBI U/G EASTERN COAL FIELDS CMPDI ISO 9001 Company Approved Drawn By Checked Created Drg.No. Scale Activity Not to scale Name PLATE N0.-2 Designation Job No. Sheet Signature REV. No. 1 Date