Foothills 138 Kv Project Construction Update - May 2014
Total Page:16
File Type:pdf, Size:1020Kb
Foothills 138 kV Project Construction update - May 2014 Thank you for your ongoing participation in this project. The scope of the Foothills 138 kV Project includes the High River and Okotoks Transmission Project and the Okotoks to Janet Project. This project was approved for construction in October 2013 and we want to provide you with an update about where we are in the construction process. SUBSTATION CONSTRUCTION Work on the High River and Okotoks substation upgrades is expected to begin in May 2014 and will continue through October 2015. You may see or hear construction crews near the substations during this time. Construction on the new Foothills Substation east of High River is expected to begin in July 2014 Structural substation foundation work and will take about 11 months to complete. Substation construction activities will include: • site preparation activities, including brushing and leveling the ground • materials delivery • structural foundation work • major equipment installation • connecting transmission lines to the substation • clean up and energization of the substation TRANSMISSION LINE CONSTRUCTION Transmission line construction is expected to begin in the fall of 2014. We will provide you with an update and further details about construction activities before work on the lines begins. Major substation equipment installation TRANSMISSION LINE REMOVAL The removal of the existing 727L transmission line between the Janet and Okotoks substations will be the last phase of construction and will take place once the new lines are in-service. " " " " " " " " " " ! ! " " ! " ! UV797 Cheadle JANET Janet CHESTERMERE 74S ! ") Bennett Langdon ENMAX " ! LANGDON ! #25 102S UV24 Indus ! ENMAX ") UV22X CALGARY #65 ! CARSELAND Dalemead "525S ! Carseland Heritage Pointe ! ALTALINKDe Wint on ! UV2 2611 3 Avenue SE UV552 OKOTOKS Calgary,UV54 9AB T2A 7W7 ! OKOTOKS " UV547 Gladys 678S " ! ! Aldersyde " MAGCAN Mazeppa UV783 ! UV799 "! 142S ! Approved Foothills " 237S Substation " FoothillsHIG H 138RIVER kV Project ! " " " ! UV543 65S " ") Eltham " Blackie ! " " " " Project construction update - May 2014 " " ! ! " HIGH UV23 " ! RIVER ! " ! UV797 Cheadle LEGEND ! JANET Janet CHESTERMERE 74S ! ") Bennett Langdon ") Approved Substation ENMAX " Approved Removal of ! LANGDON Existing Transmission Line ! #25 " Approved Expansion of 102S UV24 Existing Substation Existing Transmission Line Indus ! ! ENMAX ") UV22X " Approved Upgrade of Hamlet or Locality CALGARY #65 Existing Substation Road ! CARSELAND ") Dalemead ENMAX Substation Urban Area "525S ! " Carseland Existing Substation Water Body Heritage Pointe ! Approved Transmission De Winton ! UV2 Line UV552 OKOTOKS UV549 ! OKOTOKS " UV547 Gladys 678S " ! ! Aldersyde " MAGCAN Mazeppa UV783 ! UV799 142S "! Approved Foothills ! HIGH RIVER 237S Sub!station " ! UV543 65S " ") Eltham Blackie ! HIGH UV23 ! RIVER Contact us LEGEND ! 1-877-767-4484 (toll-free) ") Approved Substation Approved Removal of Email: [email protected] Existing Transmission Line " Approved Expansion of Visit us online at www.altalink.ca/fatd Existing Substation Existing Transmission Line ! " Approved Upgrade of Hamlet or Locality Existing Substation Road ") ENMAX Substation Urban Area " Existing Substation Water Body Approved Transmission Line.