Highways Schemes Programme 2021/2022 - Medium Term (Schemes starting between 14th August and 10th December)

Anticipated Road Traffic Electoral Division District Town / Parish / Village Street Activity Limits Notes Earliest Start Duration Finish Date Number Management Date on Site

Hackleton & Grange Park NOR The Choakles (Wootton) Emergency Drainage Start date not fixed August 25 days TBC 2 Way Signals

Hollowell Road Junction DAV Welford Road Drainage Investigation to Lodge Start date not fixed August 2 days TBC A4500 to Berrywood Rd Bugbrooke NOR Northampton Sandy Lane Carriageway Resurfacing Rbt Section 58 in place August 23 days TBC Road Closure Some C/W Castle NOR Northampton Billing Road Installation of Vivacity Sensors Contract agreed August 1 day TBC incursion Headwall & Ditchlining & Crick DAV Welton C51 Watford Road Replacement Start date not fixed August 13 days TBC Two way signals Section 58 in place. Scarecrow Festival 10th- Bugbrooke SOU Harpole Carrs Way Carriageway Resurfacing 12th Sept September 5 days TBC Road Closure Nene Valley, Delapre and Eagle Drive (Brackmills Rushmere NOR Northampton A45 Roundabout) Drainage Survey Start date not fixed September 3 days TBC Lane Closure Bedford Road / Cliftonville Phase 2 of Cliftonville Road SMART Delapre & Rushmere NOR Northampton A428/A4501Road Corridor Needs Cadent confirmation September 60 days TBC Road Closure Wootton NOR Northampton Church View Footway Reconstruction Section 58 in place September 15 days TBC Wootton NOR Northampton Church View Carriageway Resurfacing Section 58 in place September 5 days TBC Bugbrooke NOR Northampton A4500 Weedon Road Carriageway Resurfacing J16 to Sandy Lane Rbt Section 58 in place September 4 days TBC Road Closure Parapet Repair (Braybrooke North - SOU Braybrooke C8 Harborough Road Structure 6319) Combine with Culvert 6318 September 1 day TBC Croughton Road (Croughton Middleton Cheney SOU Aynho B4031 West Bridge) Mortar and masonry repairs Start date not fixed September 10 days TBC DAV Road footway Start date not fixed September 15 days TBC Bugbrooke SOU Bugbrooke Mill Lane Carriageway Resurfacing Section 58 in place, Nights October 17 days TBC Road Closure Moulton DAV Overstone Sywell Road Traffic Calming TCM 2 imminent October 10 days TBC Road / Church Silverstone SOU Street Carriageway Surfacing Start date not fixed October 1 day TBC Road Closure Deanshanger, & Roade SOU Heathencote C26 Shutlanger Road Bridge Strengthening Start date not fixed October 55 days TBC Towcester & Roade SOU Shutlanger C26 Shutlanger Road Mortar and masonry repairs Start date not fixed October 20 days TBC Woodford & Weedon DAV Byfield A362 Banbury Road VAS HS2 Works October 1 day TBC Silverstone DAV Lower Boddington Banbury Road VAS x 2 HS2 Works October 1 day TBC Silverstone DAV Upper Boddington Warwick Road VAS x 2 HS2 Works October 1 day TBC Sixfields NOR Northampton (Upton) High Street S278 Remedials Start date not fixed October 20 days TBC West Hunsbury NOR Northampton (Pineham) Dragonfly Way Weight Limit Signing S106 October 2 days TBC Silverstone SOU Chipping Warden Location to be confirmed VAS x 2 HS2 Works October 1 day TBC Land ownership approval Long Buckby DAV Holdenby Road Overhaul Culvert required. October 10 days TBC Silverstone SOU Culworth Location to be confirmed VAS HS2 Works October 1 day TBC Silverstone SOU Thorpe Mandeville Location to be confirmed VAS x 2 HS2 Works October 1 day TBC Silverstone SOU Whitfield Location to be confirmed VAS x 2 HS2 Works October 2 days TBC Moulton DAV Northampton A5199 Welford Road Embankments Repair Start date not fixed October 25 days TBC Middleton Cheney SOU Warkworth Kings Sutton Road Permanent Structure Repair EA consent required October 20 days TBC Road Closure bus hardstanding and priority Danvers and Wardoun SOU Aston le Walls Welsh Road working Start date not fixed October 35 days TBC Woodford and Weedon DAV High Street Traffic Calming Start date not fixed November 10 days TBC Silverstone SOU Greens Norton Duncote Road Drainage Repair Start date not fixed November 15 days TBC Investigation for Canal Bridge Option Study Report being Bugbrooke SOU Gayton Milton Road Works (CRT Bridge 47) reviewed. November 2 days TBC Option Study Report being Northampton (Hunsbury nvestigation for Canal Bridge reviewed. Canal River Trust Sixfields NOR Meadows) C86 Banbury Lane Works (CRT Bridge 9) Involvement November 2 days TBC Woodford and Weedon DAV Weedon Bec Cavalry Hill Weight Limit Signing Start date not fixed November 5 days TBC Requires IDB approval & ecology survey, design Woodford & Weedon DAV Fawsley Road Culvert Repair ongoing November 10 days TBC Long Buckby DAV Flore High Street Traffic Calming TCM Imminent November 10 days TBC

Hollowell Road Junction Possible conflict with Brixworth DAV Creaton Welford Road Footway Reconstruction to Hollowell Lodge Cadent Gas November 10 days TBC Long Buckby DAV Flore Nether Lane Structure Repair EA consent required December 15 days TBC