M/S. SKS ISPAT and POWER LTD. at Village Siltara, District Raipur, Chhattisgarh
Total Page:16
File Type:pdf, Size:1020Kb
EIA – EMP REPORT EIA – EMP REPORT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REPORT For MODIFICATION/ENHANCEMENT IN THE EXISTING CONFIGURATION OF INDUCTION FURNACES WITHIN THE EXISTING STEEL PLANT TO ACHIEVE TOTAL CAPACITY OF 5, 15,666 TPA AT VILLAGE SILTARA, DISTRICT RAIPUR, CHHATTISGARH BASELINE PERIOD: 15th MARCH to 15th JUNE 2019 Project Proponent M/S. SKS ISPAT AND POWER LTD. At Village Siltara, District Raipur, Chhattisgarh Environmental Consultant M/s Anacon Laboratories Pvt. Ltd., Nagpur QCI-NABET Accredited EIA Consultant for Metallurgical Industries (Sector 8) MoEF&CC (GOI) and NABL Recognized Laboratory ISO 9001:2015, ISO 14001:2015, BS OHSAS 18001:2007 Lab. & Consultancy: FP-34, 35, Food Park, MIDC, Butibori, Nagpur – 441122 Mob: +91-9372960077 Email: [email protected], [email protected] Website: www.anaconlaboratories.com Project No. : ANqr /PD/20A/2016/50 MARCH 2021 M/S SKS ISPAT & POWER LTD. EIA-EMP STUDIES FOR MODIFICATION/ENHANCEMENT IN THE EXISTING CONFIGURATION OF INDUCTION FURNACES WITHIN THE EXISTING STEEL PLANT TO ACHIEVE TOTAL CAPACITY OF 5,15,666 TPA AT VILLAGE SILTARA, DISTRICT RAIPUR, CHHATTISGARH Project No. : ANqr /PD/20A/2016/50 Version: 02 Release Date: 06th March, 2021 DISCLAIMER The EIA report is prepared by M/s. Anacon Laboratories Pvt. Ltd., Nagpur (a consultant organization accredited by QCI-NABET) as per the approved TOR issued by the Expert Appraisal Committee (Industry –I), MoEFCC, New Delhi Vide F. No J-11011/99/2006-IA II(I) dated 20th October, 2016 and validity extension on dated 24th February 2020 (and also grant of additional extension of ToR validity as per Notification dated 18th January 2021 ) with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of profession and taking account of the resources devoted to it by agreement with the client & complying MoEF&CC & QCI-NABET requirements. For and on behalf of M/s. Anacon Laboratories Pvt. Ltd. Particulars Signature Prepared Mr. Shrikant Vyawhare : by (EIA Coordinator) Approved Dr. D. G. Garway : by (Head of ACO & MD) Month & : March 2021 Year Declaration by Expert Declaration by Experts contributing to the EIA - EMP Studies for “Modification/Enhancement in the existing configuration of induction furnaces within the existing steel plant to achieve total capacity of 5,15,666 TPA” at Village Siltara, District Raipur, Chhattisgarh M/s SKS Ispat & Power Ltd. I hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA. EIA Co-ordinator: Name: Mr. Shrikant Vyawhare Signature and Date: ..................................................................................................................................... Period of involvement: October 2016 to March 2021 Contact information: Email id.: [email protected]; Tel. No. 0712-2242077 Functional area experts: S. Functional Name of the Involvement Signature and date No. areas expert/s (period and task**) March 2019 to March 2021 (Identification & Assessment of 1. AP* Dr. D. G. Garway Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 (Identification & Assessment of 2. WP* Dr. D. G. Garway Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 Mrs. Farin (Identification & Assessment of 3. SHW* Tabassum Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 Ms. Shilpa (Identification & Assessment of 4. SE* Chandekar Impacts, Suggestion Mitigation Measures) January 2018 to March 2021 Mr. Shrikant (Identification & Assessment of 5. EB* Vyawhare Impacts, Suggestion Mitigation Measures and as EC) DECLARATION OF ASSOCIATION IN THE EIA 1 S. Functional Name of the Involvement Signature and date No. areas expert/s (period and task**) March 2019 to March 2021 HG* Mr. Gyanchand (Identification & Assessment of 6. GEO* Bohra Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 Mr. Swarup (Identification & Assessment of 7. Tripathy Impacts, Suggestion Mitigation Measures) SC* January 2018 to March 2021 Mr. Shrikant (Identification & Assessment of 8. Vyawhare Impacts, Suggestion Mitigation Measures and as EC) March 2019 to March 2021 Mrs. Farin (Identification & Assessment of 9. AQ* Tabassum Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 Mr. Gyanchand (Identification & Assessment of 10. NV* Bohra Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 Mr. Swarup (Identification & Assessment of 11. LU* Tripathy Impacts, Suggestion Mitigation Measures) March 2019 to March 2021 (Identification & Assessment of 12. RH* Mr. Rakesh Gupta Impacts, Suggestion Mitigation Measures) Team Member March 2019 to March 2021 (Identification & Assessment of 1. HG GEO Mr. Nikhil Oak Impacts, Suggestion Mitigation Measures) DECLARATION OF ASSOCIATION IN THE EIA 2 Name of Name of the S. Functional Involvement the Team Signature and date No. areas (period and task**) expert/s Member/s December 2019 to March 2021 (Identification & Dr. D. G. Mrs. Farin 1. WP Assessment of Impacts, Garway Tabassum Suggestion Mitigation Measures) *One TM against each FAE may be shown **Please attach additional sheet if required Declaration by the Head of the accredited consultant organization/ authorized person I, Dr. D.G. Garway, hereby, confirm that the above mentioned experts prepared the EIA “Modification/Enhancement in the existing configuration of induction furnaces within the existing steel plant to achieve total capacity of 5,15,666 TPA” at Village Siltara, District Raipur, Chhattisgarh M/s SKS Ispat & Power Ltd. “It is certified that no unethical practice like ‘copy and paste’, and used external data / text without proper acknowledgement, while preparing this EIA report”. I also confirm that the consultant organization shall be fully accountable for any mis- leading information mentioned in this statement. Signature: ........................................................................................................................................................ Name: Dr. D. G. Garway Designation: Head of ACO & MD Name of the EIA consultant organization: M/s. Anacon Laboratories Pvt. Ltd. NABET Certificate No. & Issue Date: Accreditation Certificate No.: NABET/EIA/1922/RA 0150 dtd. 03 Feb 2020 Valid till September 30, 2022 DECLARATION OF ASSOCIATION IN THE EIA 3 EXECUTIVE SUMMARY EIA-EMP studies for modification/enhancement in the existing configuration of induction furnaces within the existing steel plant to achieve total capacity of 5,15,666 TPA at Village Siltara, District Raipur, Chhattisgarh. M/s. SKS Ispat and Power Ltd. EXECUTIVE SUMMARY 1.0 INTRODUCTION M/s SKS Ispat & Power Ltd., a company incorporated on April 17th 2000, with registrar of companies, Mumbai, Maharashtra to carry out the business of manufacturing and trading of all kinds of steel alloys. SKS Ispat & Power Ltd are committed to be part of Chhattisgarh state for industrialization progress undertaken by the Government of Chhattisgarh for optimum utilization of natural and human resources available in the state. The group is specialized in manufacturing & marketing of “long products” and over the period and has emerged as one of the leading traders in structural steel in India. The project proponent has following facilities at their existing integrated steel plant has got EC vide F. No. J-11011/99/2006-IA II(I) dtd. August 25, 2006 from MoEF, New Delhi with an investment of around Rs.1000 Crores at Village- Siltara, Tehsil & District Raipur, Chhattisgarh. Sponge Iron plant - 2, 70,000 TPA (2x100 TPD and 2x350 TPD). Captive power plant - 85 MW (25 MW Waste Heat Recovery Boilers (WHRB) and 2x30 MW CFBC & AFBC boilers), Steel Melting Shop (SMS) – 3,31,500 TPA Ferro Alloy plant (29,400 TPA). Rolling Mill (4 Nos.) - 3, 84,000 TPA. Gasifire (5 Nos.) - 5 x 8000 Mm3/Hr. Oxygen/Nitrogen Plant – 170 NM3/Hr. SKSIPL has now proposed modification/enhancement of production capacity of its Steel Division from 3, 31,500 TPA to 5, 15,666 TPA after installation of additional 4Nos. more 15 T Capacity furnaces along with CCM within the premises of existing Steel plant. It is thus a brownfield project. As per Environmental Impact Assessment Notification dated 14th September, 2006 and subsequent amendment thereof, the proposed project falls under “Category A”, Schedule 3 (a), and requires Environmental Clearance (EC) from the EAC (Industry – I), MoEF&CC, New Delhi and Consent to Establish (CTE) from Chhattisgarh Environment Conservation Board, Chhattisgarh. Online application in prescribed format Form - I, Pre-feasibility report along-with proposed TORs for undertaking detailed EIA study for the proposed modification/enhancement project was submitted to EAC (Industry – I), MoEF&CC, New Delhi on 29th March, 2016. The proposal was considered by Expert Appraisal Committee (Industry – I), MoEF&CC, New Delhi during its 9th meeting held on 28th July, 2016. The committee approved the Terms of Reference Vide F. No. J-11011/99/2006-IA.II (I) dated 20th October, 2016. Further Terms of Reference Vide F. No. J-11011/99/2006-IA.II (I) validity extension of ToR has been granted by MoEFCC vide letter dated 24th February 2020 upto 19th October 2020. The projects get delayed in the process of Public Hearing conduction from CECB Chhattisgarh due to COVID 19 Pandemic. Moreover, as per the MoEFCC Notification dated 18th January 2021, the period of 1st April 2020 to 31st March 2021 shall not be considered for the calculation of validity of ToR. Hence the ToR is valid. The public hearing successfully