Integrated District Planning

Total Page:16

File Type:pdf, Size:1020Kb

Integrated District Planning Integrated District Planning Field Issues and Trends Nagarajan M. IAS District Development Officer Sabarkantha-Himatnagar [email protected] Field Reality Government of India State Government District Level Taluka Problem Area Village 2 MOBILE INSPECTION SYSTEM FOR RURAL DEVELOPMENT WORKS Inspection of MGNREGA, TSC Toilets, IAY Awas, BNRGSK, BRGF works & Health Facility using latest technology and user friendly m-governance tools Implemented By : M. Nagarajan, IAS District Development Officer Sabarkantha, Gujarat Email address: [email protected] 3 Tribal Taluka District Sabarkantha & Arvalli - Gujarat4 Facts About Sabarkantha District Panchayat Geographical 73.39 East (Longitude) Location 23.03 North (Latitude) 40.5 C (Max.) Temperature 9.04 C (Min.) Average Rain fall 750mm Rivers Hathmati,Sabarmati,Khari,Meshwo,Vatrak,Mazum,Harnav Area 739012 Hectare Cultivable Area 456832 Hectare Irrigated Area 230370 Hectare Panchayat 742 Revenue Villages 1372 Tribal Taluka Khedbrahma, Vijaynagar, Meghraj, Bhiloda, Poshina Literacy Rate 76.6% 5 Seismic Zone Zone III Sabarkantha District Panchayat Profile Description 2011 Actual Population 24,27,346 5 Tribal Taluka Population Growth 16.56% BRGF District Proportion to High Priority District-Health 4.02% Gujarat Population Density/km2 328 Average Literacy 76.6% Sex Ratio 950 Sex Ratio(0-6) 899 6 The idea • To use latest technology to eliminate delays and errors in inspection and monitoring • To use Tablet device to capture field work/ inspection report • To use pervasive cellular network to send reports directly to district from the field. • Minimum human intervention reduces the chances of mistakes and provides valid and reliable data. 7 Concept Administrative Authority at Taluka & District Level Work 1 – Awas 8 Work 2 – Toilet Work 3 – MGNREGA Work Any Other Work… Process Flow Access Reports from anywhere Server database internet GSM/ GPRS Field inspection officer with Tab having Pre installed software Instant Report in 9 your inbox. Key Features of System 1. Inspection through tab (mobile device), highly adaptive for all. 2. Capture the work stage details, Images and Videos of work with other relevant data 3. Geo-tagging of work at various stage with GPS coordinates. 4. Inspection order can be generated through system which is mailed automatically to Inspecting officer and Ordering authority. 10 Key Features of System 5. Inspection report can be completed even without any mobile network coverage 6. Inspection reports can be sent immediately through GPRS connectivity 7. Reports are generated & emailed automatically to all concern officer in pdf format. 8. Inspection report’s GPS Co-ordinate is linked with map and it shows the location on the map. 11 Outcome of Mobile Inspection in all type of Works 1. Ground Truthing & Up to date information of all development works executed/under- execution in all 13 blocks. 2. Online monitoring of progress of all development works 3. Avoid duplicity of work by mapping of GPS locations and analysis 4. Control the Quality of work by analysis of Videos and Photos. 12 Outcome of Mobile Inspection in all type of works 5. Facility for various type of reports i.e. work wise, stage wise, village wise etc. 6. Instant report and it’s comparison with previous report enables us to know progress or delay in development works. 7. Auto Geo tagging of all development works ensures reliability in execution and inspection of development work. 13 Outcome of survey and inspection of spill over houses of IAY 1. Up to date information of progress of Houses. 2. Monitoring of payments distributed to beneficiary A. Awas completed but installment pending B. Advance installment given but awas is not yet started C. Installment given but awas not completed upto respective stage. 3. Toilet Availability Details 14 Outcome of survey and inspection of spill over houses of IAY 4. Year wise sanctioned works reports. 5. Stage wise report of all works 6. Instant Reports and their Comparison 7. Geo tagging of all works using GPS Coordinates 8. Captures photo of works progress status, beneficiary and beneficiary photo id. 15 Work flow Generates and send order of Ordering Authority inspection Uploaded to cloud server By Email & using Data SMS Connectivity Inspecting Authority inspects and sends report 16 New Work registration 17 Online Inspection Order Generation 18 Inspection order email & SMS automatically 19 Equipments provided -Tab, Internet, Software, App etc. 20 Mobile Inspection App flow…… 21 Mobile Inspection App flow……(contd) 22 Mobile Inspection App flow……(contd) 23 Mobile Inspection App flow……(contd) 24 Mobile Inspection App flow……(contd) 25 Report View 26 Detailed Individual Report 27 PDF Report View 28 Dashboard View 29 Other Spin Off Benefits 1. Automated report generation & e-mailing of individual inspection reports and statements to authorities. 2. Google Map view of all Inspected Work. 3. Various Statistical reports as per user requirement 4. Charting facility with KPI Dashboards 5. Data can be used for planning of works – GIS based planning, Spatial analysis, Village Development planning 30 •Automated report generation & e- mailing of individual inspection •Can be viewed online anytime, anywhere 31 Map View Report shows Individual works location on Google Map with status 32 Government Process Re-Engineering • The picture of photo id of the beneficiary is taken and cross verified with the id card number entered in the report. • The reports are printed, reviewed authorised and kept in the payment file of the work. 100% of all payments made only after mobile inspection since 01 jan 2014. • Works sanctioned by other authorities but implemented through Taluka Panchayat are also covered now. 33 Total Development Spend Approx. Per year, across 13 Blocks 34 Total Inspections as on 22/08/2014 ………… 21049 Taluka wise details Taluka No. of Taluka No. of Inspection Inspection Himatnagar 2876 Modasa 1205 Khedbrahma 3875 Bhiloda 3081 Prantij 1923 Dhansura 1053 Talod 1418 Malpur 1538 Vadali 163 Bayad 1476 Idar 142 Meghraj 1996 Vijaynagar 203 Total 10349 Total 10700 Total Inspections as on 22/08/2014 …………21049 Work wise details Name of Work No. of Inspection Toilet (NBA) 3179 Awas (IAY) 13116 Awas (SAY) 112 C.C. Road 562 MNREGA Work 549 Other (BRGF) works 916 BNRGSK 62 Kacha Makan 2553 Total 21049 Total Inspections of spill over IAY houses……12149 Taluka No. of Taluka No. of Inspection Inspection Himatnagar 1215 Modasa 356 Khedbrahma 3285 Bhiloda 2434 Prantij 428 Dhansura 9 Talod 598 Malpur 1369 Vadali 131 Bayad 741 Idar 28 Meghraj 1495 Vijaynagar 60 Total 6404 Total 5745 Total Survey of Kacha Makan as on 22/08/2014… Taluka No. of Survey Meghraj 354 Dhansura 502 Prantij 796 Talod 323 Bayad 285 Khedbrahma 172 Himatnagar 121 Total 2553 Open Access to data for public at: www.dfs.skdp.in/visit Good Governance 39 Project Management Life-Cycle Proposal Preliminary Technical Administrative Work Sanction Sanction Sanction order Pre Work Currently Progress/ Mobile Mid Inspection Inspection Covers this Post part Final Interim Completion Payment Payment Certificate 40 Future Plans • Connecting Planning and Implementation seamlessly • Publish Open Data in Data.Gov.in • Linking benefits to Citizens across departments • Integrating Works implementation, Public service delivery, Planning and reporting. 41 SKOCH Platinum Award Winner 42 Some pointers • Planning – Implementation Feedback loop. Planning Implementation 43 Some pointers….. • Think and work with the Districts • Access is preferable than Data – Think Webservice, APIS (Json, Geo json) – Is the Central or State Government willing to take or give data to/from the Districts. 44 Some pointers….. New sources for Geo Data - UAV/Drones 45 Some pointers….. • Decentralized planning needs a decentralized mindset. • Technocrat – Bureaucrat – People Nexus • Reporting and MIS takes precendence over enabling workflow. Can we change it. • Empower the workflow and data comes by default. 46 Some pointers….. • Moving from RTI - Proactive Disclosure - Open Data – Big Data • No District Data in Data.Gov.in portal • Working with Statistics than Data 47 Some pointers….. • ICDS – Child weight tracking, attendance • ASHA – Service delivery and quality • PHC – OPD Monitoring, stock and lab workflow 48 Some pointers….. • Which is the basic database of citizen – Aadhar, NPR, MCTS, Voter Data, FPS Data • What is final geo standard or code for administrative area. 49 THANK YOU M. Nagarajan, IAS District Development Officer Himatnagar - Sabarkantha, Gujarat Email: [email protected] 50 .
Recommended publications
  • List of NSH / ICH Intra Circle / L2 Hub Circle Name NSH / L1 Hub Name Name Telangana WARANGAL NSH KARIMNAGAR ICH Khammam ICH
    List of NSH / ICH Intra Circle / L2 Hub Circle Name NSH / L1 Hub Name Name Telangana WARANGAL NSH KARIMNAGAR ICH Khammam ICH Telangana HYDERABAD NSH NIZAMABAD ICH NALGONDA ICH ANDHRA PRADESH KURNOOL NSH ANANTAPUR ICH ANDHRA PRADESH TIRUPATHI NSH Cuddapah ICH NELLORE ICH ANDHRA PRADESH VIJAYAWADA NSH GUNTUR ICH ONGOLE ICH ELURU ICH ANDHRA PRADESH VISAKHAPATNAM NSH RAJAHMUNDRY ICH SRIKAKULAM ICH Vizianagaram ICH ASSAM Dibrugarh NSH Jorhat ICH Tinsukia ICH ASSAM GUWAHATI NSH NAGAON SILCHAR TEZPUR BIHAR BARAUNI NSH – BIHAR MUZAFFARPUR NSH – BIHAR PATNA NSH CHHAPRA KIUL BHAGALPUR BIHAR GAYA NSH – CHATTISGARH RAIPUR NSH BILASPUR RAIGARH DURG JAGDALPUR ICH DELHI DELHI NSH – GUJRAT AHMEDABAD NSH HIMATNAGAR MEHSANA PALANPUR BHAVNAGAR BHUJ Dhola ICH GUJRAT RAJKOT NSH JAMNAGAR JUNAGADH SURENDRANAGAR GUJRAT SURAT NSH VALSAD GUJRAT VADODARA NSH BHARUCH GODHARA ANAND HARYANA GURGAON NSH FARIDABAD ICH REWARI ICH HARYANA KARNAL NSH – HARYANA ROHTAK NSH HISAR ICH HARYANA AMBALA NSH SOLAN MANDI HIMACHAL PRADESH SHIMLA NSH SOLAN ICH HIMACHAL PRADESH PATHANKOT NSH KANGRA HAMIRPUR JAMMUKASHMIR JAMMU NSH – JAMMUKASHMIR SRINAGAR NSH – JHARKHAND JAMSHEDPUR NSH JHARKHAND RANCHI NSH DALTONGANJ HAZARIBAGH ROAD JHARKHAND DHANBAD NSH B. DEOGHAR KARNATAKA BENGALURU NSH BALLARI ICH TUMAKURU ICH KARNATAKA BELAGAVI NSH – KARNATAKA KALABURAGI NSH RAICHUR ICH KARNATAKA HUBBALLI-DHARWAD NSH BAGALKOT ICH KUMTA ICH VIJAYAPURA ICH KARNATAKA MANGALURU NSH – KARNATAKA MYSURU NSH – KARNATAKA ARSIKERE NSH – KERALA KOCHI NSH Kottayam ICH KERALA THRISSUR PALAKKAD ICH KERALA TRIVANDRUM
    [Show full text]
  • DENA BANK.Pdf
    STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE South ANDAMAN Andaman,Village &P.O AND -BambooFlat(Near bambooflat NICOBAR Rehmania Masjid) BAMBOO @denaban ISLAND ANDAMAN Bambooflat ,Andaman-744103 FLAT BKDN0911514 k.co.in 03192-2521512 non-MICR Port Blair,Village &P.O- ANDAMAN Garacharma(Near AND Susan garacharm NICOBAR Roses,Opp.PHC)Port GARACHAR a@denaba ISLAND ANDAMAN Garacharma Blair-744103 AMA BKDN0911513 nk.co.in (03192)252050 non-MICR Boddapalem, Boddapalem Village, Anandapuram Mandal, ANDHRA Vishakapatnam ANANTAPU 888642344 PRADESH ANANTAPUR BODDAPALEM District.PIN 531163 R BKDN0631686 7 D.NO. 9/246, DMM GATE ANDHRA ROAD,GUNTAKAL – 08552- guntak@denaba PRADESH ANANTAPUR GUNTAKAL 515801 GUNTAKAL BKDN0611479 220552 nk.co.in 515018302 Door No. 18 slash 991 and 992, Prakasam ANDHRA High Road,Chittoor 888642344 PRADESH CHITTOOR Chittoor 517001, Chittoor Dist CHITTOOR BKDN0631683 2 ANDHRA 66, G.CAR STREET, 0877- TIRUPA@DENA PRADESH CHITTOOR TIRUPATHI TIRUPATHI - 517 501 TIRUPATI BKDN0610604 2220146 BANK.CO.IN 25-6-35, OPP LALITA PHARMA,GANJAMVA ANDHRA EAST RI STREET,ANDHRA 939474722 KAKINA@DENA PRADESH GODAVARI KAKINADA PRADESH-533001, KAKINADA BKDN0611302 2 BANK.CO.IN 1ST FLOOR, DOOR- 46-12-21-B, TTD ROAD, DANVAIPET, RAJAHMUNDR ANDHRA EAST RAJAMUNDRY- RAJAHMUN 0883- Y@DENABANK. PRADESH GODAVARI RAJAHMUNDRY 533103 DRY BKDN0611174 2433866 CO.IN D.NO. 4-322, GAIGOLUPADU CENTER,SARPAVAR AM ROAD,RAMANAYYA ANDHRA EAST RAMANAYYAPE PETA,KAKINADA- 0884- ramanai@denab PRADESH GODAVARI TA 533005 KAKINADA BKDN0611480 2355455 ank.co.in 533018003 D.NO.7-18, CHOWTRA CENTRE,GABBITAVA RI STREET, HERO HONDA SHOWROOM LINE, ANDHRA CHILAKALURIPE CHILAKALURIPET – CHILAKALU 08647- chilak@denaban PRADESH GUNTUR TA 522616, RIPET BKDN0611460 258444 k.co.in 522018402 23/5/34 SHIVAJI BLDG., PATNAM 0836- ANDHRA BAZAR, P.B.
    [Show full text]
  • District Census Handbook, 9 Sabarkantha
    CENSUS 1961 GUJARAT DISTRICT CENSUS HANDBOOK 9 SA.BARKANTBA DISTRICT R. K. TRIVEDI Superintende_nl of .. Census Operations, Gujarat PRICE: Rs. 8.55 nP. DISTRICT: SABARKANTHA DISTRICT SABARKANTHA. GUJARAT, BANASKANTHA DISTRICT REFERENCES • DrdTRICT ~ Q • TALUKA H Q - O,STRICT &OU"DAR'I' ....... " r"'LUKIo 8o~OA.RY _ 61l0AD GAUGE ~ MEf~" GAIJtll __.,. CA"~~ '_~l\I'ElI ® R£$i HOYU ~ P~leE 5'!'ATION o U~I!IIH"'ItIn:D • "ILt.AGE~ • VILI..AG£a""-8~o'" • Vrll.~GE..... seo­ e TOW,. ~ MUNIClPALlfY -* NATIONAl HIGHwAY' ~ STATE MIG"'W~ ~-. - Loe,lL ROAn PO POST' OFFICi PT Po:n I TELEGRAPH I AHft1EOABAD DISTRICT ,. ,m : lSi f'lt~U. CENSUS OF INDIA 1961 LIST OF PUBLICATIONS CENTRAL GOVERNMENT PuBLICATIONS Census of India, 1961 Volume V-Gujarat is being published in the follo\ving parts I-A General Report I-B Report on Vital Statistics and Fertility Survey I .. e Subsidiary Tables II-A General Population Tables IJ-B (1) General Economic Tables (Tables B-1 to B-IV -C) 1I-8 (2) General Economic Tables (Tables B.. V to B.. IX) II-C Cultural and M,igration Tables III Household Economic Tables (Tables B-X to B-XVII) IV-A Report on Housing and Establishments IV-B Housing and Establishment Tables V-A Tables on Scheduled Castes and Scheduled Tribes V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes (including reprints) ... -,-'. ,. VI Village Survey Monographs (25 Monog~Pfis) Vll-A Selected Crafts of Gujarat VII-B Fairs and Festivals , VIII-A Administration Report - Enumeration VIII.. B Administration Report - Tabulation IX Atlas Volume X Special Report on Cities STATE GOVERNMENT PUBLICATIONS 17 District Census Handbooks in English 17 District Census Handbooks in Gujarati CONTENTS PAGBS ,.
    [Show full text]
  • Project Details-Riverbed Sand Mining Project
    Optimize Developers 5.00.00 Hec. SrNo.BlockNo. K-1 , Vi.- Kasindra Ta.-Daskroi , Dist.- Ahmedabad. Project Details-Riverbed Sand Mining Project Sr. Details Particulars No. ABOUT THE PROPOSAL 1. Name of Lease Holder Optimize Developers 2. Location address Sur.No. Block no.K -1 Vi.-Kasindra, Ta.-Daskroi, Dist.- Ahmedabad. 3. Applicabil ity of the CRZ Not Applicable Notification, 2011 4. Lease Area (Hectares) 5.00.00 5. Co -ordinates of the Lease Sr. No. LATITUDE LONGITUDE area Boundary Pillar 1 23° 31' 28.4891" N 72° 49' 17.4539" E Boundary Pillar 2 23° 31' 26.7294" N 72° 49' 23.2138" E Boundary Pillar 3 23° 31' 30.7300" N 72° 49' 26.8126" E Boundary Pillar 4 23° 31' 33.2609" N 72° 49' 21.6841" E 6. Ownership of the Land Govt. Land (Govt./Private Land) 7. Status of Operation (New Existing project Project or Existing project operating since_______) 8. Status of Lease (Lease no., Lease No - MBA/QL/B LOCK/KASINDRA/127 date of issue, lease period, Date of Issue- 27/4/2015 date of application for lease Lease Period- 3 Years. renewal, etc.) 9. Sand reserve (MT) 81,000 10. Rate of Mining of sand 6750 (MT/Month) ENVIRONMENT SETTINGS 11. If located within 10 km, aerial Name Distance (Km) distance of the lease area from the nearest: i. National Park/Wildlife None None Sanctuary/ Biosphere Reserve: ii. Reserve Forest/protected None None forest: iii. Huma n Habitation: Distance District Taluka Village (km) AHMEDABAD idar Kasindra 2.00 AHMEDABAD DASKROI Sadoliya 8.60 AHMEDABAD DASKROI Daskroi (M) 7.44 Page 1 of 4 Optimize Developers 5.00.00 Hec.
    [Show full text]
  • MEHSANA – HIMATNAGAR) Public Disclosure Authorized Public Disclosure Authorized May 2013
    ROADS AND BUILDINGS DEPARTMENT GOVERNMENT OF GUJARAT Public Disclosure Authorized Public Disclosure Authorized Volume-IV: Environmental Management Plan (EMP) (MEHSANA – HIMATNAGAR) Public Disclosure Authorized Public Disclosure Authorized May 2013 LEA Associates South Asia Pvt. Ltd. LEAdership in engineering & planning solutions Project Preparatory Works Consultancy Services for Roads & Buildings Department, GoG Gujarat State Highway P r o j e c t - II VOLUME-IV ENVIRONMENT MANAGEMENT PLAN CONTENTS 1. INTRODUCTION ....................................................................................................................... 1 1.1 BACKGROUND............................................................................................................. 1 1.2 CONTEXT FOR THE EMP ............................................................................................ 1 1.3 BRIEF DESCRIPTION OF THE PROJECT ROAD ........................................................ 1 1.4 CLEARANCE REQUIREMENTS .................................................................................. 2 1.5 STRUCTURE OF THE REPORT .................................................................................... 4 2. ENVIRONMENTAL ISSUES .................................................................................................... 5 2.1 SUMMARY OF IMPACTS............................................................................................. 5 2.2 SPECIFIC MEASURES .................................................................................................
    [Show full text]
  • Detials of Working Kaushalya Vardhan Kendra Sr.No
    Detials of Working Kaushalya Vardhan Kendra Sr.No. Name of Region District Taluka Name of KVK Name of Attached ITI 1 AHMEDABAD AHMEDABAD DHOLKA GANGAD DHOLKA 2 AHMEDABAD AHMEDABAD DHOLKA KOTH DHOLKA 3 AHMEDABAD AHMEDABAD MANDAL TRENT MANDAL 4 AHMEDABAD AHMEDABAD A'BAD CITY BAPUNAGAR MANINAGAR 5 AHMEDABAD AHMEDABAD DASCROI BAREJA SARASPUR 6 AHMEDABAD AHMEDABAD A'BAD CITY VASTRAPUR(PH) SARASPUR 7 AHMEDABAD AHMEDABAD DHOLKA BADARKHA THALTEJ(M) 8 AHMEDABAD ARAVALLI BAYAD AMBALIYARA BAYAD 9 AHMEDABAD ARAVALLI BAYAD DEMAI BAYAD 10 AHMEDABAD ARAVALLI BHILODA KISHANGADH BHILODA 11 AHMEDABAD ARAVALLI BHILODA SHAMLAJI KUTIR BHILODA 12 AHMEDABAD ARAVALLI MODASA MUSLIM GHANCHI SAMAJ MODASA 13 AHMEDABAD ARAVALLI DHANSURA AKRUND DHANSURA 14 AHMEDABAD ARAVALLI MALPUR ANIYOR MALPUR 15 AHMEDABAD ARAVALLI MALPUR UBHRAN MALPUR 16 AHMEDABAD ARAVALLI MEGHARJ PANCHAL MEGHRAJ 17 AHMEDABAD ARAVALLI MODASA LIMBHOI MODASA 18 AHMEDABAD ARAVALLI MODASA TINTOI MODASA 19 AHMEDABAD BANASKANTHA AMIRGADH VIRAMPUR AMIRGADH 20 AHMEDABAD BANASKANTHA BHABHAR KUVALA BHABHAR 21 AHMEDABAD BANASKANTHA BHABHAR MITHA BHABHAR 22 AHMEDABAD BANASKANTHA KANKREJ THARA BHABHAR 23 AHMEDABAD BANASKANTHA DEESA ASEDA(LAKHANI) DEESA 24 AHMEDABAD BANASKANTHA DEESA BHILADI(MALAGADH) DEESA 25 AHMEDABAD BANASKANTHA DEESA JHERDA DEESA 26 AHMEDABAD BANASKANTHA DEODAR CHIBHADA DEODAR 27 AHMEDABAD BANASKANTHA DEODAR RANTILA DEODAR 28 AHMEDABAD BANASKANTHA KANKREJ KAMBOI HARIJ 29 AHMEDABAD BANASKANTHA DANTA HADAD KUMBHARIYA 30 AHMEDABAD BANASKANTHA DANTA NAVAVAS KUMBHARIYA 31 AHMEDABAD BANASKANTHA
    [Show full text]
  • List of 500 KAUSHALYA VARDHAN KENDRA Started in State No
    DIRECTORATE OF EMPLOYMENT AND TRAINING , GANDHINAGAR (ISO 9001:2008 CERTIFIED ORGANISATION) List OF 500 KAUSHALYA VARDHAN KENDRA Started in state No. of Region District Taluka No. Name of KVK Attached ITI Dist 1 Ahmedabad Ahmedabad Ahmedabad City 1 Ghatlodiya (P.H) Kubernagar Ahmedabad Ahmedabad Ahmedabad City 2 Vastrapur (P.H) Saraspur Ahmedabad Ahmedabad Daskroi 3 Bopal (Godhavi) Sarkhej Ahmedabad Ahmedabad Daskroi 4 Bareja Saraspur Ahmedabad Ahmedabad Daskroi 5 Kuha Maninagr Ahmedabad Ahmedabad Dholka 6 Koth Thaltej (Women) Ahmedabad Ahmedabad Dholka 7 Badarkha Dholka Ahmedabad Ahmedabad Bavala 8 Kavitha Bavala Ahmedabad Ahmedabad Bavala 9 Durgi Bavala Ahmedabad Ahmedabad Bavala 10 Shiyal Bavala Ahmedabad Ahmedabad Bavala 11 Gangad Bavala Ahmedabad Ahmedabad Bavala 12 Bagodara Bavala Ahmedabad Ahmedabad Sanad 13 Virochannagar Sanad Ahmedabad Ahmedabad Sanad 14 Mankol Sanad Ahmedabad Ahmedabad Viramgam 15 Shahpur Viramgam Ahmedabad Ahmedabad Detroj DetrojRampura 16 Rampura Detroj DetrojRampura Ahmedabad Ahmedabad Dhandhuka 17 Rojka Dhandhuka Ahmedabad Ahmedabad Mandal 18 Trent Mandal 2 Ahmedabad Sabarkantha Himatnagar 19 Illol Himatnagar Ahmedabad Sabarkantha Himatnagar 20 Akodara Himatnagar Ahmedabad Sabarkantha Prantij 21 Moyad Talod (Woman) Ahmedabad Sabarkantha Khedbrambha 22 Matoda Khedbrambha Ahmedabad Sabarkantha Khedbrambha 23 Lambadiya Khedbrambha Ahmedabad Sabarkantha Poshina 24 Poshina Vadali Ahmedabad Sabarkantha Vijaynagar 25 Parosada Vijaynagar Ahmedabad Sabarkantha Idar 26 Badoli Idar Ahmedabad Sabarkantha Idar 27 Jadar
    [Show full text]
  • CIN Company Name
    CINL92199MH1995PLC084610 Company Name HINDUJA GLOBAL SOLUTIONS LIMITED Date Of AGM(DD‐MON‐YYYY) 10‐AUG‐2013 Sum of unpaid and unclaimed dividend 2113395 Sum of interest on unpaid and unclaimed dividend 0 Sum of matured deposit 0 Sum of interest on matured deposit 0 Sum of matured debentures 0 Sum of interest on matured debentures 0 Sum of application money due for refund 0 Sum of interest on application money due for refund 0 First Name Middle Name Last Name Father/Husb Father/Husba Father/Husband Address Country State District PINCode Folio Number of Investment Type Amount Proposed Date of and First nd Middle Last Name Securities Due(in Rs.) transfer to IEPF Name Name (DD‐MON‐YYYY) KUNDUKURI LASHMI LASHMI 864 18TH MAIN INDIA Tamil Nadu Chennai 600000 000218 Amount for unclaimed 500.00 02‐NOV‐2015 ROAD ANNA NAGAR and unpaid dividend MADRAS UMIL LEASE FINANCECOMP LEASE FINANCECOMPAN MANGAL KALASH INDIA West Bengal Kolkata 700071 00103021 Amount for unclaimed 500.00 02‐NOV‐2015 ANYLTD YLTD 2A SHAKESPEARE and unpaid dividend SARANI 5TH FLOOR CALCUTTA HANSRAJ CHHOGAJI JAIN CHHOGAJI JAIN 19/20 MAHAJAN INDIA Maharashtra Mumbai City 400002 00103501 Amount for unclaimed 1000.00 02‐NOV‐2015 GALI 1ST FLR R NO and unpaid dividend 17 ZAVERI BAZAR BOMBAY AVINASH SURESH RAHEJA SURESH RAHEJA 401 PICASSO 4TH INDIA Maharashtra Mumbai Suburban 400054 00106330 Amount for unclaimed 500.00 02‐NOV‐2015 FLOOR 94 C OFF and unpaid dividend INDRANARAYAN RD SANTACRUZ (W) MUMBAI BRIJESH JHURANI KHANCHAND 27/81 JHULELAL INDIA Rajasthan Bhilwara 311001 00109754 Amount
    [Show full text]
  • SATSANGI JEEVAN ^ ^ ^ ^ ^ ^ PUBLISHED UNDER the ORDERS ^ ^ ^ ^ of ^ ^ H.H
    ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ JJ Ÿ¢è S±¢ç}¢Ý¢Ú¢²‡¢¢ï ç±Á¢²¼ï¼Ú¢}¢ì JJ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ SATSANGI JEEVAN ^ ^ ^ ^ ^ ^ PUBLISHED UNDER THE ORDERS ^ ^ ^ ^ of ^ ^ H.H. Acharya Maharaj 1008 ^ ^ Shri Koshalendraprasadji Maharaj ^ ^ ^ ^ Shri Narnarayandev Desh Peeth ^ ^ Kalupur, Ahmedabad. ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ Translated in to English ^ ^ Shri Jethalal Dhanji Savani (Kera-Kutch & London) ^ ^ ^ ^ ^ ^ First English Edition ^ ^ 22th July, 2013 (Gurupurnima) ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ Publishers ^ ^ Shri Swaminarayan Temple ^ ^ Kalupur, Ahmedabad-380 001. ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ • • • • • ^ ^ ^ ^ Kalupur, Ahmedabad-380001. Shri SwaminarayanTemple Shri SwaminarayanMudranalaya PRINTER : Kalupur, Ahmedabad-1. Shri SwaminarayanTemple Book Designing: Rs. :150/-(ConcessionalRate) Copies :1,000 ^ First EnglishEdition:22 All PublishingRightsReserved Kalupur, Ahmedabad. Shri SwaminarayanTemple, Mahant Swami Shastri SwamiHarikrishnadasji PUBLISHERS ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ th ^ July,2013(Gurupurnima) ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ S¢yS¢æx¢è Á¢è±Ý S¢yS¢æx¢è Á¢è±Ý S¢yS¢æx¢è Á¢è±Ý ^ S¢yS¢æx¢è Á¢è±Ý S¢yS¢æx¢è Á¢è±Ý ^ ^ ^ ^ says (Vachnamrut58,Gadhadamiddlechapter) thatascripturedescribing salvation (Moksha)inthisKaliYug.Moreover, SwaminarayanBhagwan Leelas ofAlmightyGodisthesure,straight andshortestpathfor thousands ofYagnasinpresenttimes.To singandlistentothedivine the lineageofAcharyaswithinHisown family. Shikshapatri
    [Show full text]
  • B R Corporation 06 Nov 2019
    Rating Rationale B R Corporation 06 Nov 2019 Brickwork Ratings has reaffirmed the Rating for the Bank Loan facilities of 10.00 Crore ​₹ of B R Corporation based on best available information, as the issuer did not cooperate. ​ ​ Particulars Amount (₹ Cr) Rating# Facility Presen Tenure Previous Previous Present t (June-2018) BWR B+ BWR B+ Long ( Stable) ( Stable) Fund based 10.00 10.00 Term (Reaffirmed) Issuer not Cooperating* Total 10.00 10.00 ₹ Ten Crores Only #Please refer to BWR website www.brickworkratings.com/ for definition of the ratings ​ ​ *Issuer did not cooperate; based on best available information RATING ACTION/ NATURE OF NON COOPERATION: The rating of the said entity was due for a review. BWR took up with the issuer to provide required information over emails and through telephone calls. Despite the best efforts of BWR to get at least the minimum required information for a review, the entity has not provided the same. In the absence of adequate information from the Company, BWR is unable to assess the Company’s financial performance and its ability to service its debt and maintain a valid rating. Hence, based on the best available information, Brickwork Ratings has reaffirmed the rating and migrated the rating to the ISSUER NOT COOPERATING* category. LIMITATIONS OF THE RATING : Information availability risk is a key factor in the assessment of credit risk as generally non-cooperation by the rated entities to provide required information for a review of the assigned rating may also be accompanied by financial stress. Users of the credit rating should therefore take into account the possible deterioration in the credit quality of the rated entity arising from its non-transparency and withholding of information required for a review of the rating.
    [Show full text]
  • Contract Award Details - Civil Works - GSHP II
    Contract Award Details - Civil Works - GSHP II Duration of Sr. Bid price as read out at bid Name of the winning Final total contract price Package No. Name of work Name of the bidder who has submitted the bid Evaluated price of bid (INR) Name of the bidder whose bids are rejected/ non responsive with reasons contract Brief description of work No. opening (INR) bidder (INR) (months) 1 2 3 4 5 6 7 8 9 10 11 M/s Patel Infrastructure Ltd, Rajkot 1,360,278,260.24 1,360,267,593.44 The work includes widening and M/s Dineshchandra R Agraval Infracon pvt ltd, Ahmedabad 1,369,650,650.42 1,369,650,650.42 strengthening of existing road from 2L to 2L+PS+HS M/s Backbone Enterprize ltd. 1,275,153,003.90 1,275,040,555.20 configuration for Dabhoi- Bodeli Widening & strengthening M/s GHV (India) Pvt Ltd., Mumbai 1,263,528,102.65 1,263,528,102.65 Road and strengthening of Amod- of Dabhoi Bodeli road M/s Kalathia Eng. Ltd., Ahmedabad 1,248,115,753.94 1,248,207,180.32 Karjan-Dabhoi Road. Km.29.681 to M/s Valecha Eng. Ltd, Mumbai 1,809,161,519.00 18,091,621,233.42 NG Project Ltd Km.68.417(SH-11) & 1 GSHP- II/NCB/01 M/s Montecarlo Ltd., Ahmedabad 1,417,707,172.00 1,408,596,562.00 Himmatanagar JV Tarmat 119,30,52,605.94 24 Rehabilitation Of Amod - M/s Anish Infracon India Pvt.
    [Show full text]
  • Himatnagar Solid Waste Management” Nisha Pramanik 1, Abhishek Pindiwala2 1 P.G
    16th Esri India User Conference 2015 “Himatnagar Solid Waste Management” Nisha Pramanik 1, Abhishek Pindiwala2 1 P.G. Student (Geomatics), CEPT University Kasturbhai Lalbhai Campus University Road, Navrangpura 2 P.G. Student (Geomatics), CEPT University Kasturbhai Lalbhai Campus University Road, Navrangpura Abstract: About the Author: A city never grows in a single day but eventually sprawls day by day, as the decade’s passes by population increases rapidly. Urban Sprawling have had impact on the citizen, issues are directly proportional to population. More the population more will be the waste generation. As per the government norms, per person 0.3 kg waste generated per day. Managing such large quantity Ms. Nisha Pramanik every day is hectic issue. A 2nd year Post graduate student of Mtech Geomatics The case study of Himmatnagar city, Gujarat has in Center for Environmental Planning and Technology been included for the paper. Himmatnagar has a (CEPT) University, Ahmedabad. population of 81,176 coming under the category ‘B’ With a B.E (Civil) degree from Shantilal shah of municipality. A Municipality is usually an urban Engineering College, Bhavnagar, Gujarat. administrative division having corporate status and Interested in GIS and its application and using it for usually powers of self-government. “Municipal GIS”, better future. a GIS software which can be used to retrieve and utitlity information of municipality, keeping a wide E mail ID: [email protected] variety of data and record and helps to take Contact: +91 7622035813 decision. This paper deals with the integration of solid waste management with the help of geographical information system (GIS) and developing a smart way to handle all the waste by route planning of the waste collection van across the city and depositing in a new landfill site.
    [Show full text]