DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

"R.R. Seismundo Widening of Montevista-Compostela-New Montevista, Comval 85.30% 1 1 10961 L A MA GE1 08/14/13 1st/Final XI LF 22.917 180 01/30/13 07/28/13 0.00 C 0.353 0.200 0.300 - - - 85.30 ONS Construction & Supply" Bataan-Maragusan-Mati Bdry. Rd., Pob. Sect. Province Satisfactory Const./Widening/Upgrading/Rehab. of Del Pilar "R.R. Seismundo 2 10961 L A MA GE1 (San Juan)-New Cortez-San Jose Carcor Panas Davao Del Norte 08/12/13 2nd XI LF 45.784 205 01/23/13 08/15/13 6.35 O 0.245 0.300 0.150 0.030 0.050 0.033 80.80 AHD Construction & Supply" Rd. Prev. Maint. (Asphalt Overlay) of Manila East 90.00% 3 2 2H2L Construction 16293 L B MA GE1 Binangonan, Rizal 08/15/13 1st/Final IVA LF 3.926 121 01/29/13 05/29/13 4.00 C 0.461 0.139 0.300 - - - 90.00 AHD Rd., K0032+050-K0032+737 V. Satisfactory

3-L Construction/HGG Builders Prev. Maint. (Int. Sect. Arterial) Andaya 89.90% 4 3 JV-12-214 L A MA GE1 08/03/13 1st/Final V LF 17.721 60 01/21/13 03/21/13 1.67 C 0.401 0.198 0.300 - - - 89.90 AHD and Supply Joint Venture Highways, K0283+480-K0284+782 V. Satisfactory Prev. Maint. (MFO-1) (Int. Sect.) Overlay 87.30% 5 4 3RB Construction & Supply 19541 L A MA GE1 80mm of Mt. Makiling Eco-Garden Rd., Los Baños, Laguna 08/11/13 1st/Final IVA LF 19.100 75 02/15/13 04/30/13 81.33 C 0.377 0.196 0.300 - - - 87.30 AHD K0062+000-K0064+491 Satisfactory Const. of One (1) unit, Two (2) Storey, Six 6 3RB Construction & Supply 19541 L A MA GB1 Basey, Samar 08/16/13 1st VIII LF 6.496 183 03/21/13 09/19/13 -4.12 O 0.387 0.289 0.109 0.030 0.058 0.000 87.30 DEL (6) CL Basey NHS Prev. Maint. (Int. Sect.) Gapan-San Fernando- Olongapo Rd. a.K0121+300-K0121+693, 86.30% 7 5 4B Construction Corporation 23445 L AAA LA GE1 Olongapo City 08/05/13 1st/Final III LF 35.533 70 02/04/13 04/14/13 0.00 C 0.430 0.133 0.300 - - - 86.30 ONS b.K0121+832-K0122+889, c.K0123+922- Satisfactory K0125+080) Const. of 2-Storey 2-Cl, Sch. Bldg. 88.20% 8 6 525 Construction 28532 L B SB GB1 Baliuag, Bulacan 08/13/13 1st/Final III LF 2.111 90 03/28/13 06/25/13 0.00 C 0.449 0.133 0.300 - - - 88.20 ONS Teodoro Evangelista Memorial Sch. Satisfactory

91.70% 9 7 628 Construction Enterprises 30049 L D SB GE2 Dredging of Ingalera River, Ican Sect. Malasiqui, Pangasinan 08/03/13 1st/Final I LF 4.486 75 03/18/13 05/31/13 0.00 C 0.417 - 0.500 - - - 91.70 ONS V. Satisfactory

722 Construction, Inc. Prev. Maint. along Bigaa-Plaridel via Bulacan & 87.00% 10 8 21923 L A SB GE1 Plaridel, Bulacan 08/14/13 1st/Final III LF 12.559 90 02/22/13 05/22/13 0.00 C 0.437 0.133 0.300 - - - 87.00 ONS (Formerly: 722 Construction) Malolos Rd. Km.50+053-Km.51+840 Satisfactory

Repair of Concrete Slope Protection & Lined 85.80% 11 9 8 R's Construction 22997 L B MA GE2 Boac, Marinduque 08/07/13 1st/Final IVB LF 4.919 101 04/09/13 07/18/13 0.00 C 0.392 0.166 0.300 - - - 85.80 ONS Canal along Dr. Damian Reyes Rd., (Boac Side) Satisfactory

86.00% 12 10 808 Construction and Supply 18711 L D SB GE1 Rehab. of Naguituban-Lubing Rd. San Juan, La Union 07/29/13 1st/Final I LF 1.952 40 06/19/13 07/29/13 0.00 C 0.427 0.133 0.300 - - - 86.00 ONS Satisfactory

13 11 888 ACY Enterprises 32898 L B SB GB1 Const. of Sogod NHS 6-CL Sch. Bldg. Sogod, Southern Leyte 08/06/13 1st VIII LF 6.579 180 03/25/13 09/20/13 0.00 O 0.370 0.240 0.150 0.015 0.047 0.050 87.20 ONS

Rd. Upgrading (Gravel to Paved) Abra- 92.80% 14 12 920 Factors & Enterprise 20387 L A MA GE1 Abra 08/14/13 1st/Final CAR LF 13.411 106 01/21/13 05/06/13 7.55 C 0.428 0.200 0.300 - - - 92.80 AHD Cervantes Rd., K0437+595-K0439+079 V. Satisfactory Rd. Upgrading (Gravel to Paved) Crossing Sta. 15 13 A C O Construction 13105 L B MA GE1 Clara-Sandayong Rd. Km.1808+925- Zamboanga Sibugay 08/10/13 1st IX LF 31.101 196 02/28/13 09/11/13 50.00 O 0.320 0.222 0.150 0.030 0.047 0.050 81.90 AHD Km.1810+355 Rd. Upgrading (Gravel to Paved) (Int. Sect.) along Ilagan-Delfin Albano-Mallig Rd. 83.08% 16 14 A. de Guia Construction 18228 L AAA MB GE1 Quirino, Isabela 08/08/13 Final II LF 22.070 149 01/22/13 06/19/13 0.00 C 0.372 0.133 0.300 - - - 80.50 ONS a)K0436+214-K0437+124 b)K0438+375- Satisfactory K0438+437 A. Sandoval Construction & Const. of Three (3) Storey, Four (4) Cl. 17 15 35991 L D SB GB1 Sto. Tomas, Batangas 08/01/13 1st IVA LF 4.719 150 03/27/13 08/23/13 2.92 O 0.338 0.240 0.150 0.030 0.035 0.050 84.30 AHD Supply Sch. Bldg. at Sta. Clara NHS Const./Widening/Upgrading/Rehab. Of Access A.B. Taylan Construction & Rd. to Declared Tourism Destination, 18 16 25273 L B MA GE1 Burgos, Ilocos Norte 08/15/13 1st I LF 54.981 210 03/12/13 10/07/13 -4.64 O 0.373 0.300 0.104 0.030 0.042 0.033 88.20 DEL Development Kapurpurawan Rock Formation Rd., Sta. 0+000- Sta. 3+466 Rehab./Reconst./Upgrading of Damaged Paved A.B. Taylan Construction & Nat'l Rd. Gen. from PMS/HDM-4, Int. Sect. 87.70% 19 17 25273 L A MA GE1 Ilocos Norte 08/15/13 1st/Final I LF 20.332 63 03/01/13 05/01/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Development Pias-Currimao-Paoay-Balacad Rd., Satisfactory K0460+(177)-K0462+883 A.B. Taylan Construction & Asset Preservation of Nat'l Rds., Prev. Maint. 82.04% 20 18 Development / L.S.D. JV-12-197 L AAA LB GE1 Batac-Espiritu (Banna) Rd., K0471+402- Ilocos Norte 08/15/13 Final I LF 11.730 46 02/28/13 04/14/13 6.52 C 0.489 0.200 0.300 - - - 98.90 AHD Construction & Supplies (JV) K0472+416 Satisfactory Rehab./Reconst./Replacement/Retrofitting of A.C. Rivero Development Existing Perm. Bridge & Approaches along Kabasalan, 21 19 Corporation (Formerly: A.C. 5122 L A MA GE1 08/09/13 1st IX LF 43.529 250 03/27/13 12/01/13 0.00 O 0.333 0.240 0.150 0.030 0.037 0.033 82.30 ONS Lanao-Pagadian City-Zamboanga City Rd. Rivero Construction) Zamboanga City Sect., Km.1781+760-Km.1782+000 A.C. Rivero Development Rd. Upgrading of San Ricardo-Bil-atan San Ricardo, Southern 22 Corporation (Formerly: A.C. 5122 L A MA GE1 08/05/13 1st VIII LF 40.937 233 01/18/13 09/07/13 1.00 O 0.357 0.238 0.150 0.030 0.038 0.033 84.60 AHD Rivero Construction) Rd., KM 1098+746-KM 1100+632 Leyte A.C. Rivero Development Rehab./Strengthening of Divisoria Bridge along 23 Corporation (Formerly: A.C. 5122 L A MA GE1 Bdry. Southern Leyte - Maasin Macrohon - Bontoc, Southern Leyte 08/10/13 2nd VIII LF 14.853 204 01/18/13 08/09/13 2.00 O 0.367 0.240 0.150 0.006 0.046 0.033 84.20 AHD Rivero Construction) Sogod - Daang Maharlika Road, Divisoria A.C. Soliven Construction & Add'l Pvmt. Width along Capas-Concepcion Rd. 85.90% 24 20 19278 L B SB GE1 Concepcion, Tarlac 08/07/13 1st/Final III LF 4.829 32 03/27/13 04/27/13 0.00 C 0.426 0.133 0.300 - - - 85.90 ONS General Merchandise (Concepcion Sect.) Satisfactory Rd. Upgrading (Gravel to Paved) along Davao- 25 21 A.D.P. Const. & Supply 3466 L A MB GE1 Sarangani Coastal Rd., Km.1671+600- Davao del Sur 08/06/13 1st XI LF 40.082 179 03/07/13 09/01/13 -19.55 O 0.322 0.248 0.000 0.030 0.033 0.033 66.60 DEL Km.1673+060, Biton-Lanao Sect. Const. of Slope Protection along Jct. Bancal- 90.44% 26 A.D.P. Const. & Supply 3466 L A MA GE2 Leon-Antique Bdry. Rd., K0031+722- Leon, Iloilo 08/22/13 Final VI LF 13.801 203 11/05/12 05/26/13 0.00 C 0.457 0.133 0.300 - - - 89.00 ONS K0031+891 V. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 1 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Rd. Upgrading (Gravel to Paved) of San 90.40% 27 A.D.P. Const. & Supply 3466 L A MB GE1 Dionisio-Capinang Rd. K0198+(-640)- San Dionisio, Iloilo 08/21/13 1st/Final VI LF 21.258 131 02/01/13 06/11/13 3.05 C 0.471 0.133 0.300 - - - 90.40 AHD K0198+460 w/ exceptions V. Satisfactory Const.n/Repair/Rehab. of Educational 89.70% 28 A.D.P. Const. & Supply 3466 L A MA GB1 Facilities/Sch. Bldgs., Jordan NHS (Const. of Jordan, Guimaras 08/05/13 1st/Final VI LF 4.507 120 12/04/12 04/02/13 0.83 C 0.464 0.133 0.300 - - - 89.70 AHD Covered Gym-18.00m x 30.00m) V. Satisfactory A.F.G. Construction and Replacement/Const. of Tubog Bridge, 87.84% 29 22 17161 L A MA GE1 Hamtic, Antique 08/15/13 Final VI LF 7.886 210 02/29/12 09/25/12 0.00 C 0.496 0.155 0.300 - - - 95.10 ONS Construction Supply Brgy. Tubog Satisfactory Rehab./Reconst./Upgrading of Damaged Paved A.F.G. Construction and Nat'l Rds. along Bacolod North Rd.; Cadiz City, Negros 85.80% 30 17161 L A MA GE1 08/12/13 1st/Final VI LF 21.830 179 02/04/13 08/01/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Construction Supply a)K0056+100-K0057+000; b)K0057+000- Occidental Satisfactory K0057+338 (Cluster VIII) A.F.G. Construction and Rehab. of Binalbagan Bridge along Binalbagan, Negros 84.20% 31 17161 L A MA GE1 08/10/13 1st/Final VI LF 11.563 117 02/22/13 06/18/13 2.00 C 0.409 0.133 0.300 - - - 84.20 AHD Construction Supply Bacolod South Rd. Occidental Satisfactory Odiong-Sibalom-San Remegio-Leon Rd. A.F.G. Construction and 32 17161 L A MA GE1 Upgrading (Gravel to Paved), Km. 129+328- San Remigio, Antique 08/15/13 1st VI LF 40.453 179 02/22/13 08/19/13 15.36 O 0.336 0.240 0.150 0.030 0.037 0.033 82.60 AHD Construction Supply Km. 131+275

A.F.G. Construction and Const. of Two (2) Storey, Eight (8) Cl Sch. 33 17161 L A MA GB1 San Miguel, Iloilo 08/22/13 1st VI LF 8.949 150 04/03/13 08/30/13 -4.25 O 0.347 0.200 0.108 0.030 0.032 0.033 75.00 DEL Construction Supply Bldg., Leonora Salapantan NHS

Impv't of Flood Control & Drainage System 86.60% 34 23 A.J. Lava Builders 22265 L B MA GE1 along San Mateo-Rodriguez Rd., K0021+(-493)- San Mateo, Rizal 08/16/13 1st/Final IVA LF 11.283 180 11/09/12 05/07/13 26.60 C 0.433 0.133 0.300 - - - 86.60 AHD K0025+800, Int. Sect. Satisfactory Repair & Maint. of Flood Control & Drainage 86.22% 35 A.J. Lava Builders 22265 L B MA GE2 Structures along Rodriguez-San Jose- Rodriguez, Rizal 08/16/13 Final IVA LF 2.449 90 09/11/12 12/09/12 28.33 C 0.410 0.133 0.300 - - - 84.30 AHD City Rd. Satisfactory Repair/Rehab./Impv't. (Asphalt Overlay) of 86.10% 36 A.J. Lava Builders 22265 L B MA GE1 Angono Diversion Rd., Km.28+400- Binangonan, Rizal 08/15/13 1st/Final IVA LF 9.900 60 03/27/13 05/25/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Satisfactory Km.28+905 (w/ exceptions) Widening of Tanay-Sampaloc Rd., K0057+(- 85.00% 37 A.J. Lava Builders 22265 L B MA GE1 Tanay, Rizal 08/17/13 1st/Final IVA LF 19.642 158 02/11/13 07/18/13 0.00 C 0.373 0.177 0.300 - - - 85.00 ONS 685)-K0071+510.93 (Int. Sect.) Satisfactory Rehab./Reconst./Upgrading of Damaged Paved 38 24 A.L. Dare Construction 11932 L B MA GE1 Nat'l Rd. (Int. Sect.) at Candaba-San Miguel Candaba, Pampanga 07/29/13 1st III LF 11.909 139 03/25/13 08/10/13 -1.40 O 0.319 0.240 0.136 0.030 0.055 0.033 81.30 DEL Rd., K0070+290-K0071+184 A.M. Chua Jr. Engineering & Proposed Drainage Impv't. along Roxas Blvd. 88.20% 39 25 33734 L C SB GE1 Pasay City 08/01/13 1st/Final NCR LF 1.350 60 02/28/13 04/28/13 100.00 C 0.449 0.133 0.300 - - - 88.20 AHD Construction North & South Bound at EDSA Flyover Satisfactory A.P. Consebido Construction Const. of Two (2) Classroom Elem. Sch. Barotuan, El Nido, 89.70% 40 26 33618 L D SB GB1 08/10/13 1st/Final IVB LF 1.192 120 03/26/13 07/23/13 10.00 C 0.464 0.133 0.300 - - - 89.70 AHD and Trading Bldg. Palawan V. Satisfactory Repair/Rehab. 0f Drainage Protection Works 90.30% 41 27 A.P.B. Construction 17055 L B MA GE1 along Kennon Rd. K0242+000-K0243+000 w/ Baguio City 08/17/13 1st/Final CAR LF 5.423 90 02/18/13 05/18/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS exception V. Satisfactory Rd. Upgrading (Gravel to Paved) Int. Sect., 42 28 A.P.O. General Construction 7010 L B MA GE1 Acop-Kapangan-Kibungan-Bakun Rd., Benguet 08/01/13 1st CAR LF 23.654 207 02/05/13 08/30/13 0.91 O 0.356 0.239 0.150 0.023 0.048 0.050 86.60 AHD K0348+000-K0349+000 Rd. Upgrading (Gravel to Conc.) along Acop- Kapangan-Kibungan-Bakun Rd., K0285+444- 85.74% 43 A.P.O. General Construction 7010 L B MA GE1 K0286+840 v.s. (K0285+423-K0286+836 as Benguet 07/31/13 Final CAR LF 57.280 285 04/26/12 02/04/13 0.00 C 0.391 0.200 0.300 - - - 89.10 ONS Satisfactory per RBIA) & K0345+470-K0348+000 v.s. (K0345+500-K0348+000 as per RBIA) Const. of 1-Storey, 1-CL & 1-Storey, 1-CL 44 29 A.R. & Mark Builders 31673 L D SB GB1 Maramag, Bukidnon 08/08/13 1st X LF 1.448 187 03/25/13 09/27/13 -2.86 O 0.393 0.235 0.120 0.030 0.023 0.033 83.40 DEL Kinder at Maramag South PS, Pob.

Const. of Taguliat Bridge along PPSR-JCT- 45 30 A.R. Lustre, Jr. Construction 7680 L AAA MB GE1 Puerto Princesa City 08/15/13 1st IVB LF 18.839 515 05/17/12 10/14/13 -10.34 O 0.373 0.300 0.047 0.030 0.042 0.033 82.50 DEL Napsan-Apurawan Rd., K0037+675

A.T. Dumlao Construction, Inc. Rehab./Strengthening of Agong-Ongan Bridge Mainit, Surigao del 88.30% 46 31 (Formerly: Andoni T. Dumlao, 34028 L B MA GE1 08/08/13 1st/Final XIII LF 2.820 75 02/18/13 05/03/13 0.00 C 0.450 0.133 0.300 - - - 88.30 ONS along Magpayang-Mainit Rd., Brgy. Roxas Civil Engineer-Contractor) Norte Satisfactory A.T. Dumlao Construction, Inc. Replacement of San Pedro Bridge along Daang Alegria, Surigao del 85.84% 47 (Formerly: Andoni T. Dumlao, 34028 L B MA GE1 Maharlika (Surigao-Agusan Rd.) Brgy. San 08/07/13 Final XIII LF 15.781 435 01/13/12 03/23/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Civil Engineer-Contractor) Pedro Norte Satisfactory

A.T. Dumlao Construction, Inc. Reconst. of Timamana Bridge along Daang Tubod, Surigao del 83.50% 48 (Formerly: Andoni T. Dumlao, 34028 L B MA GE1 Maharlika Highway (Surigao-Agusan Rd.) 08/07/13 Final XIII LF 24.213 496 12/16/11 04/24/13 0.00 C 0.390 0.133 0.300 - - - 82.30 ONS Civil Engineer-Contractor) Brgy. Timamana Norte Satisfactory

A.T. Dumlao Construction, Inc. Rehab./Reconst. of Hubang Bridge along Daang San Francisco, Agusan 81.90% 49 (Formerly: Andoni T. Dumlao, 34028 L B MA GE1 08/19/13 Final XIII LF 19.141 445 01/27/12 04/15/13 0.00 C 0.476 0.133 0.300 - - - 90.90 ONS Maharlika (Agusan-Davao Rd.) Civil Engineer-Contractor) del Sur Unsatisfactory

A.Y.U. Engineering and Package 5 - Conc. of FMR at Balengaeng, 84.40% 50 32 25632 L B MA GE1 Davao City 08/07/13 1st/Final XI LF 4.975 80 03/27/13 06/14/13 0.00 C 0.344 0.200 0.300 - - - 84.40 ONS Construction Tugbok Rd. Satisfactory Rd. Upgrading of Tigbao-Sta. Fe-San Miguel 51 33 Acme Builders Corporation 6442 L A MA GE1 Rd., K0910+000-K0911+500 & K0913+000- Tacloban City 08/22/13 1st VIII LF 55.416 270 02/27/13 11/23/13 2.49 O 0.383 0.240 0.150 0.012 0.042 0.050 87.70 AHD K0913+900 Rehab./Strengthening of Rosales Bridge along 52 Acme Builders Corporation 6442 L A MA GE1 Daang Maharlika (SM) (San Isidro-San Juanico Calbayog City, Samar 08/14/13 1st VIII LF 25.251 165 02/06/13 08/16/13 3.00 O 0.393 0.242 0.150 0.030 0.060 0.033 90.80 AHD Bridge) Widening/Conc. of Add'l. Lane along Daang Adfil Corporation (Formerly: Cabadbaran, Agusan 91.20% 53 34 14437 L AAA MB GE1 Maharlika (Agusan-Surigao Rd.) Cabadbaran 08/15/13 Final XIII LF 29.059 142 02/08/13 06/29/13 14.41 C 0.458 0.130 0.300 - - - 88.80 AHD Adfil Construction) del Norte V. Satisfactory City Sect., Sta.1213+540-Sta.1215+520

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 2 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Adfil Corporation (Formerly: Completion of Maraput Bridge along Daang Tubay, Agusan del 90.44% 54 14437 L AAA MB GE1 08/05/13 Final XIII LF 9.113 120 12/26/12 04/24/13 15.74 C 0.481 0.133 0.300 - - - 91.40 AHD Adfil Construction) Maharlika (Surigao-Agusan Rd.) Km.1207+192 Norte V.Satisfactory

Adfil Corporation (Formerly: Rehab./Reconst. of Ampayon Bridge along 55 14437 L AAA MB GE1 Butuan City 08/23/13 2nd XIII LF 19.207 219 1/30/2013 09/05/13 1.87 O 0.397 0.240 0.150 0.018 0.040 0.050 89.50 AHD Adfil Construction) Daang Maharlika Widening/Conc. of Add'l. Lane Both Directions Adfil Corporation (Formerly: Buenavista, Agusan 56 14437 L AAA MB GE1 along Butuan City-Cagayan de Oro-Iligan Rd., 08/06/13 1st XIII LF 86.661 240 03/25/13 11/19/13 14.58 O 0.390 0.238 0.150 0.030 0.035 0.050 89.30 AHD Adfil Construction) K1249+461-K1253+310.50 del Norte Adfil Corporation (Formerly: Const. of Rd. to Support River Rhine 88.40% 57 14437 L AAA MB GE1 Butuan City 08/23/13 Final XIII LF 30.629 185 01/30/13 08/02/13 7.62 C 0.457 0.133 0.300 - - - 89.00 AHD Adfil Construction) Cruise, Banza Ruins Satisfactory

Adfil Corporation (Formerly: Completion of La Union Bridge along Cabadbaran, Agusan 86.64% 58 14437 L AAA MB GE1 08/05/13 Final XIII LF 15.886 150 01/23/13 06/21/13 28.89 C 0.440 0.133 0.300 - - - 87.30 AHD Adfil Construction) Pandanon-Magallanes Rd. del Norte Satisfactory Rehab./Reconst./Upgrading of Butuan City- Cagayan de Oro-Iligan City Rd., a)K1494+049- Adfil Corporation (Formerly: 88.06% 59 14437 L AA MB GE1 K1495+240; b)K1499+692-K1499+712; Misamis Oriental 08/19/13 Final X LF 48.167 285 06/13/12 03/24/13 0.35 C 0.474 0.133 0.300 - - - 90.70 AHD Adfil Construction) c)K1500+678-K1500+902; d)K1501+905- Satisfactory K1507+000; e)K1508+000-K1508+919 Const. of Three Storey Six CL Sch. Bldg. 60 35 Adimre Construction 25534 L B MA GB1 Bustos, Bulacan 08/14/13 1st III LF 7.027 180 04/02/13 09/28/13 3.82 O 0.326 0.240 0.150 0.030 0.047 0.033 82.60 AHD Tibagan NHS Repair/Rehab./Impv't. of San Jose-Lupao Rd., San Jose City, Nueva 84.50% 61 36 Adroit Construction 11169 L B SB GE1 08/13/13 1st/Final III LF 9.305 35 04/01/13 05/05/13 20.00 C 0.412 0.133 0.300 - - - 84.50 AHD K0160+464.10-K0162+356.80 Ecija Satisfactory

Advanced Foundation Lucban Bridge & Approaches Phase I 62 37 15449 L AAA LB GE1 Abulug, Cagayan 08/01/13 1st II LF 153.067 450 03/26/13 06/18/14 23.14 O 0.328 0.300 0.150 0.030 0.056 0.033 89.70 AHD Construction System, Corp. along Manila North Rd. Repair/Rehab. of Licomo Failed Rd. Shoulder AEJ Hardware Construction & 84.30% 63 38 34740 L D SB GE1 along Maria Clara Lobregat H-way (Pagadian Zamboanga City 08/06/13 Final IX LF 1.883 60 02/26/13 04/25/13 0.00 C 0.370 0.200 0.300 - - - 87.00 ONS Enterprises ZC Rd.), Km.1851+500-Km.1851+600 Satisfactory Ahnex Builders & Ready Widening of Cavite-Batangas Rd., 85.42% 64 39 32296 L AAA MA GE1 Imus, Cavite 08/14/13 Final IVA LF 30.797 369 02/07/12 02/09/13 0.00 C 0.341 0.200 0.300 - - - 84.10 ONS Mix Corporation Km.22+000-Km.23+653 Satisfactory Completion of Pili Bridge along DM Jct. Ajan Jeada, Inc. (Formerly: 85.90% 65 40 17869 L A MA GE1 Legazpi-Sto-Domingo-Tabaco-Camarnes Sur Legazpi City 08/10/13 1st/Final V LF 15.215 180 03/01/13 08/27/13 66.11 C 0.426 0.133 0.300 - - - 85.90 AHD Jeada Construction) Satisfactory Bdry. Rd. Completion of Drainage Canal along Dulawan- Tacurong City, Sultan 85.68% 66 41 AJYSC Marketing 26924 L A MA GE2 08/17/13 Final XII LF 17.419 256 05/29/12 02/08/13 0.16 C 0.391 0.200 0.300 - - - 89.10 AHD Marbel Rd. (New Carmen Sect.) Kudrat Satisfactory

Alberto Uy Construction & Pinamalayan, Oriental 88.60% 67 42 20924 L C SB GE2 Const. of Quinabigan Flood Control 07/31/13 1st/Final IVB LF 9.099 165 01/28/13 07/11/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Development Mindoro Satisfactory Asphalt Overlay along Kennon Rd. 89.20% 68 43 Alcel Construction 15129 L A MA GE1 Tuba, Benguet 07/30/13 1st/Final CAR LF 3.737 16 03/08/13 03/23/13 0.00 C 0.459 0.133 0.300 - - - 89.20 ONS K0227+458-K0228+081 V. Satisfactory Prev. Maint. of Pangasinan-La Union Rd. Dagupan City, 92.60% 69 Alcel Construction 15129 L A MA GE1 08/06/13 1st/Final I LF 17.301 120 01/17/13 05/16/13 0.00 C 0.493 0.133 0.300 - - - 92.60 ONS K0379+615-K0381+030 Pangasinan V. Satisfactory Const. of Access Rd. to Airport, Alaminos 91.12% 70 Alcel Construction 15129 L A MA GE1 Alaminos, Pangasinan 08/07/13 Final I LF 1.821 45 02/22/13 04/07/13 4.44 C 0.486 0.133 0.300 - - - 91.90 AHD City Airport V. Satisfactory Alcel Construction/Oriental Prev. Maint. of Manila North Rd. K0169+700- Carmen, Rosales, 71 44 Sales Center and Contractor JV-12-432 L A MA GE1 08/09/13 1st I LF 34.285 150 03/27/13 08/23/13 0.44 O 0.345 0.300 0.150 0.030 0.047 0.033 90.50 AHD K0172+105 w/ exception w/n the District (J.V.) Pangasinan Alebon Genuine Widening of Carmen-Patag-Bulua Rd., Bulua- 86.12% 72 45 26300 L B MA GE1 Patag Sect., Km.1443+550.49- Cagayan de Oro City 08/11/13 Final X LF 4.201 67 01/15/13 03/22/13 0.00 C 0.427 0.133 0.300 - - - 86.00 ONS Merchandising Satisfactory Km.1443+810.85 w/ exception Alfie's Construction & Const. Const. of Access Rd. for Himoga-an Bridge, Supply, Inc. (Formerly: Alfie's Sagay City, Negros 73 46 17162 L A MB GE1 Bacolod North Rd., Sta. 71+035.20-Sta. 08/12/13 1st VI LF 109.290 310 01/15/13 11/20/13 10.51 O 0.342 0.240 0.150 0.030 0.042 0.050 85.40 AHD Construction & Construction 74+557.20 Occidental Supply) Alfie's Construction & Const. Supply, Inc. (Formerly: Alfie's Road Upgrading of Villahermoso-Canla-on City- La Castellana, Negros 74 17162 L A MB GE1 08/10/13 1st VI LF 23.131 182 01/28/13 07/28/13 -3.18 O 0.356 0.206 0.047 0.030 0.035 0.033 70.70 DEL Construction & Construction La Castellana Road, K0074+205-K0074+995 Occidental Supply)

Alfie's Construction & Construction Supply, Inc. Const. of the Remaining Structures: Himogaan Sagay City, Negros 75 17162 L A MB GE1 08/12/13 1st VI LF 116.246 505 05/14/12 09/30/13 0.66 O 0.376 0.240 0.150 0.030 0.042 0.050 88.80 AHD (Formerly: Alfie's Construction Bridge, Sta. 71+035.20-Sta. 74+557.20 Occidental & Construction Supply)

Conc. of Parpagoha (Marigondon)-Binoog Rd., Tablas Island, 86.60% 76 47 Algimar Construction 15232 L A MA GE1 K0017+(-200)-K0017+689, K0018+324- 08/06/13 1st/Final IVB LF 34.422 93 01/25/13 04/27/13 0.00 C 0.366 0.200 0.300 - - - 86.60 ONS K0019+261 Romblon Satisfactory Repair of Damaged Rd. Sect. along Looc- Tablas Island, 86.24% 77 Algimar Construction 15232 L A MA GE1 Odiongan-San Andres Rd., Km.104+400- 08/05/13 Final IVB LF 15.860 210 09/20/12 04/17/13 4.29 C 0.381 0.200 0.300 - - - 88.10 AHD Km.122+400 (Int. Sect.) Romblon Satisfactory Prev. Maint. (Int. Sect.) along Pres. Diosdado P. Algon Engineering Macapagal National Highways a)Km.1712+000- 88.16% 78 48 270 L AAA LB GE1 Davao Oriental 08/16/13 Final XI LF 24.973 52 01/25/13 06/21/13 0.40 C 0.439 0.133 0.300 - - - 87.20 AHD Construction Corporation Km.1712+802.90 b)Km.1714+016.50- Satisfactory Km.1714+356.82 Widening of Davao-Bukidnon Rd., Davao City, Algon Engineering 79 270 L AAA LB GE1 Tugbok-Mintal Sect., Km.1693+400- Davao City 08/07/13 1st XI LF 46.965 209 02/26/13 09/22/13 -0.69 O 0.352 0.298 0.143 0.030 0.025 0.033 88.10 DEL Construction Corporation Km.1697+335.40

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 3 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Prev. Maint. Asphalt Overlay along Davao- Cotabato Rd. (Davao City-Junction Digos Sect.) Algon Engineering K1554+075-K1554+1010 realigned to Prev. Sta. Cruz, Davao del 84.40% 80 270 L AAA LB GE1 08/10/13 1st/Final XI LF 14.222 55 03/18/13 05/11/13 0.00 C 0.411 0.133 0.300 - - - 84.40 ONS Construction Corporation Maint. Asphalt Overlay along Davao-Cotabato Sur Satisfactory Rd. (Davao City-Jct. Digos Sect.), Sta. Cruz, K1541+175-K1542+000 Algon Engineering Prev. Maint. (Int. Sect.), ABS-CBN Quimpo 84.30% 81 270 L AAA LB GE1 Davao City 08/19/13 1st/Final XI LF 28.470 64 03/08/13 05/10/13 72.98 C 0.343 0.200 0.300 - - - 84.30 AHD Construction Corporation Blvd. Diversion Rd., K1512+807-K1513+591 Satisfactory Alinab Construction & Jimenez, Misamis 92.00% 82 49 29901 L D SB GB1 Const. of Sch. Bldg. Taboo ES 08/14/13 1st/Final X LF 1.132 90 04/02/13 06/30/13 7.75 C 0.487 0.133 0.300 - - - 92.00 AHD Supplies Occidental V. Satisfactory Alinab Construction & Sapang Dalaga, 91.60% 83 29901 L D SB GB1 Const. of Sch. Bldg., Dalumpinas ES 08/14/13 1st/Final X LF 1.137 90 04/02/13 06/30/13 20.00 C 0.483 0.133 0.300 - - - 91.60 AHD Supplies Misamis Occidental V. Satisfactory

Alinab Construction & Const. of Flood Control Dike, Sitio Lapucon Plaridel, Misamis 87.10% 84 29901 L D SB GE2 08/14/13 1st/Final X LF 1.845 105 03/07/13 06/19/13 13.33 C 0.438 0.133 0.300 - - - 87.10 AHD Supplies Southern Pob. Occidental Satisfactory 88.80% 85 50 Aljon Construction & Supply 34481 L D SB GE2 Guinobatan Flood Control & Drainage Bato, Catanduanes 07/30/13 1st/Final V LF 2.628 79 02/13/13 05/02/13 0.00 C 0.388 0.200 0.300 - - - 88.80 ONS Satisfactory

Rehab./Reconst./Upgrading of Damaged Paved 86.40% 86 51 Allen Construction 12584 L B MA GE1 Nat'l. Rd., Nueva Ecija-Pangasinan Rd., Nueva Ecija 08/13/13 1st/Final III LF 12.483 60 02/04/13 04/04/13 5.00 C 0.431 0.133 0.300 - - - 86.40 AHD K0166+799-K0167+827 Satisfactory Allencon Development Repair & Maint.of Balasan-Carles Rd., 91.90% 87 52 12302 L D SB GE1 Balasan, Iloilo 08/21/13 1st/Final VI LF 9.348 45 03/15/13 04/28/13 0.00 C 0.486 0.133 0.300 - - - 91.90 ONS Corporation K0174+(099)-K0174+841 V. Satisfactory Allencon Development Completion of Cabasi Bridge Approaches 86.10% 88 12302 L D SB GE1 Guimbal, Iloilo 08/14/13 1st/Final VI LF 1.895 21 01/31/13 02/20/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Corporation K0030+534 Satisfactory

Allencon Development Const. of Coastal Protection Works along Iloilo- 89 12302 L D SB GE2 Guimbal, Iloilo 08/14/13 1st VI LF 7.301 244 12/28/12 08/28/13 0.48 O 0.269 0.300 0.150 0.030 0.037 0.050 83.60 AHD Corporation Antique Rd. K0026+700-K0027+151 Almakar Builders and Metal 89.29% 90 53 21929 L C SB GB1 Const. of MPB in Poblacion I-A Imus, Cavite 08/14/13 Final IVA LF 0.681 135 07/18/12 11/29/12 0.00 C 0.476 0.133 0.300 - - - 90.90 ONS Works V. Satisfactory

Alpha Ryder Construction Rehab./Reconst. of Damaged Paved Nat'l Rds. 90.00% 91 54 12197 L A MA GE1 (Int. Sect.) along Bacon-Sawanga-Prieto Diaz Sorsogon City 08/02/13 1st/Final V LF 24.937 155 01/30/13 07/03/13 5.17 C 0.445 0.155 0.300 - - - 90.00 AHD and Supplies V. Satisfactory Rd. Alpha Ryder Construction Rehab./Reconst. of Damaged Paved Nat.l Rds. 88.40% 92 12197 L A MA GE1 of Bacon-Sawanga-Pto. Diaz Rd., Pto Diaz Sorsogon 08/15/13 1st/Final V LF 6.207 73 02/11/13 04/24/13 0.00 C 0.400 0.184 0.300 - - - 88.40 ONS and Supplies Satisfactory (K0603+927.5-K0614+251) Settled/Collapsed PCCP along Maria Clara L. Alraf Construction & 87.02% 93 55 17297 L AAA MB GE1 Lobregat Highway (Pagadian ZC Rd.) w/n Zamboanga City 08/06/13 Final IX LF 2.494 93 02/22/13 05/27/13 0.00 C 0.383 0.165 0.300 - - - 84.80 ONS Enterprises Km.1867+000-Km.1868+000, Mangusu Sect. Satisfactory Upgrading/Concrete Paving of Nat'l Rd. along Alraf Construction & 82.42% 94 17297 L AAA MB GE1 Liloy-Siocon Rd., Kipit-La Libertad-Loay- Zamboanga del Norte 08/12/13 Final IX LF 64.478 285 04/10/12 01/19/13 0.00 C 0.314 0.200 0.300 - - - 81.40 ONS Enterprises Imelda-San Roque Sect. Satisfactory Alro Construction & Guicadale Rd. Network to Int'l Airport, Albay 95 56 18361 L A MA GE1 Camalig, Albay 08/11/13 1st V LF 46.044 215 02/06/13 09/08/13 4.90 O 0.362 0.245 0.150 0.030 0.052 0.033 87.20 AHD Development Corporation (Comun-Cotmon-Del Rosario Rd. Sect.) Rd. Upgrading (Gravel/Asphalt to Concrete) of 96 57 Alzam Enterprises 19113 L A MA GE1 Mintal (Davao-Bukidnon Rd.) Bago Oshiro- Davao City 08/21/13 1st XI LF 72.933 210 03/06/13 11/29/13 -2.68 O 0.374 0.300 0.123 0.030 0.025 0.030 88.20 DEL Bago Gallera (Old Davao-Cotabato Rd.)

Widening of Davao-Cotabato Rd., Davao City, Toril District, Davao 97 Alzam Enterprises 19113 L A MA GE1 08/05/13 1st XI LF 37.443 179 02/26/13 08/23/13 -0.29 O 0.343 0.292 0.147 0.030 0.025 0.033 87.00 DEL Lizada Sect., Km.1525+920-Km.1527+800 City

85.20% 98 Alzam Enterprises 19113 L A MA GE2 Const. of Davao River Flood Control Proj. Davao City 08/20/13 1st/Final XI LF 24.180 251 12/02/12 08/09/13 0.00 C 0.419 0.133 0.300 - - - 85.20 ONS Satisfactory

Rd. Upgrading (Gravel to Paved) of Inawayan- Toril District, Davao 84.42% 99 Alzam Enterprises 19113 L A MA GE1 08/15/13 Final XI LF 6.854 85 01/22/13 04/16/13 0.00 C 0.442 0.200 0.300 - - - 94.20 ONS Baracatan Rd. Km.1538+770-Km.1539+110 City Satisfactory

Ameg Construction & Rehab. of Flood Control along Bulawan 89.60% 100 58 21556 L A SB GE2 Malilipot, Albay 08/12/13 1st/Final V LF 4.667 100 02/12/13 05/22/13 12.00 C 0.463 0.133 0.300 - - - 89.60 AHD Supply River, San Jose Sect. V. Satisfactory

Cluster 2012-20; Const. of 2-CL Sch. Bldg. Angel & Sam Construction a)Initao CS, Initao, b)Laguindingan CS, El Salvador, Misamis 89.20% 101 59 19968 L B MB GB1 08/19/13 1st/Final X LF 4.593 60 03/27/13 05/25/13 0.00 C 0.459 0.133 0.300 - - - 89.20 ONS and General Merchandise Laguindingan, c)Const. of 2-CL Sch. Bldg., Oriental V. Satisfactory Tangkub ES, Libertad, d)Taytay ES

Annasor Construction & Repair/Rehab./Impv't. of North Diversion Rd. 85.80% 102 60 30825 L C SB GE1 City of San Fernando 07/30/13 1st/Final III LF 4.806 30 04/03/13 05/02/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Trading Km.68+377.60-Km.68+672.80 Satisfactory Antonio V. Nidea Construction, Const./Repair/Rehab. of MPB, Albay III 103 61 Inc. (Formerly: Antonio V. 6382 L A MA GB1 Paulog, Ligao City 08/09/13 1st V LF 3.679 90 06/25/13 09/22/13 6.65 O 0.334 0.286 0.150 0.030 0.040 0.033 87.30 AHD Nidea Construction) DEO Antonio V. Nidea Construction, Guicadale Platform Rd., Cotmon-Maninila- 104 Inc. (Formerly: Antonio V. 6382 L A MB GE1 Camalig, Albay 08/10/13 1st V LF 22.843 206 02/01/13 08/25/13 -3.26 O 0.366 0.241 0.117 0.030 0.041 0.033 82.80 DEL Taplacon-Taloto Rd., (Cotmon-Maninila Sect.) Nidea Construction) 86.40% 105 62 APD Construction 17467 L AA MA GE1 Impv't. of Road, Mangadingay Cabarroguis, Quirino 08/13/13 1st/Final II LF 1.750 45 04/10/13 05/24/13 22.22 C 0.431 0.133 0.300 - - - 86.40 AHD Satisfactory Aqua Dragon Construction Const. of DepEd Standard Type Sch. Bldg. Kabankalan City, 83.20% 106 63 36405 L C SB GB1 08/08/13 1st/Final VI LF 1.904 60 05/24/13 07/22/13 0.00 C 0.399 0.133 0.300 - - - 83.20 ONS & Supply @ Carol-an NHS Negros Occidental Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 4 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Widening of Pangasinan-Nueva Ecija Rd. Aquino-Dela Cruz Eng'g & 86.58% 107 64 16751 L B MA GE1 (PNVR) Km. 171+138-Km. 204+500 w/ Pangasinan 08/09/13 Final I LF 19.351 104 01/11/13 04/24/13 0.00 C 0.479 0.133 0.300 - - - 91.20 ONS Construction exception Satisfactory Replacement/Rehab./Strengthening of Quintans Aquino-Dela Cruz Eng'g & 108 16751 L D MA GE1 Bridge along Camiling-Wawa-Bayambang- Malasiqui, Pangasinan 08/03/13 1st I LF 11.081 225 01/16/13 08/28/13 13.67 O 0.400 0.200 0.150 0.030 0.047 0.033 86.00 AHD Construction Malasiqui-Sta. Barbara Rd.

Aquino-Dela Cruz Eng'g & Prev. Maint. along Calasiao Old Rd., K0204+(- 85.48% 109 16751 L B MA GE1 Calasiao, Pangasinan 08/02/13 Final I LF 40.758 75 01/16/13 03/31/13 6.67 C 0.377 0.200 0.300 - - - 87.70 AHD Construction 030)-K0206+305 w/ exception Satisfactory Aquino-Dela Cruz Eng'g & Widening/Rehab./Reconst./Upgrading of 110 16751 L B MA GE1 Urdaneta, Pangasinan 08/09/13 1st I LF 36.320 242 03/27/13 11/23/13 -10.42 O 0.390 0.300 0.046 0.030 0.042 0.033 84.10 DEL Construction MNR Rehab./Reconst./Upgrading of Damaged Paved 87.30% 111 65 AR Adlawan Construction 13108 L A MA GE1 Nat'l Rd. along Natalio Bacalso Ave. (Cebu Oslob, Cebu 08/09/13 1st/Final VII LF 16.856 110 01/25/13 05/14/13 45.45 C 0.373 0.200 0.300 - - - 87.30 AHD South Rd.), K0108+200-K0109+000 Satisfactory Const./Impv't. of Drainage System along 88.78% 112 66 Arca Builders 34537 L D SB GE2 Palompon-Isabel-Merida-Ormoc Rd., Leyte 08/10/13 Final VIII LF 1.512 105 08/22/12 12/04/12 0.00 C 0.486 0.133 0.300 - - - 91.90 ONS Km.1132+700-Km.1133+763 w/ exceptions Satisfactory

Installation/Application/Const. of Rd. Safety 84.10% 113 67 Arcinue Commercial 6746 L A MA GE1 Devices, Km.1500+513-Km.1525+116, Babak- Davao del Norte 08/13/13 1st/Final XI LF 4.930 35 03/27/13 04/30/13 3.00 C 0.408 0.133 0.300 - - - 84.10 AHD Samal Kaputian w/ exception Satisfactory Widening of San Fernando By Pass Rd. San Fernando, La 87.84% 114 68 Arcinue Commercial 6746 L A MA GE1 07/30/13 Final I LF 19.068 148 01/10/13 06/06/13 0.00 C 0.437 0.133 0.300 - - - 87.00 ONS inc. Rd. Righ-of-Way Union Satisfactory

Rehab./Reconst./Upgrading of Damaged Paved Bayambang, 86.70% 115 Arcinue Commercial 6746 L A MA GE1 Nat'l Rd. along Camiling-Wawa-Bayambang- 08/03/13 Final I LF 10.031 105 01/16/13 04/30/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Sta. Barbara Rd., K0172+(-006)-K0172+594 Pangasinan Satisfactory Prev. Maint. along Bacnotan-Luna Balaoan Rd. 84.60% 116 Arcinue Commercial 6746 L A MA GE1 (Clustered) K0286+000-K0287+498 w/ La Union 07/29/13 Final I LF 6.729 113 01/10/13 05/02/13 0.88 C 0.470 0.133 0.300 - - - 90.30 AHD Satisfactory exception Rehab. of Nat'l Rd. along Bacolod South Rd., Cauayan, Negros 93.10% 117 Arcinue Commercial 6746 L A MA GE1 08/09/13 1st/Final VI LF 9.306 67 06/03/13 08/08/13 3.00 C 0.498 0.133 0.300 - - - 93.10 AHD K0122+830-K0123+549, Brgy. Masaling Occidental V. Satisfactory Armando U. Khong Hun Proposed Rehab/Reconst/Upgrading of General Contractor, Inc. Damaged Paved Nat'l Rd. (Int. Sect.) Bonifacio Bonifacio Drive, Port 86.50% 118 69 16163 L AAA MB GE1 07/31/13 1st/Final NCR LF 10.620 60 01/25/13 03/25/13 0.00 C 0.365 0.200 0.300 - - - 86.50 ONS (Formerly: Armando U Khong Drive, Port Area, Manila from 25th St. to Area, Manila Satisfactory Hun General Contractor) Katigbak Drive, L=204.30 L.M. Armando U. Khong Hun General Contractor, Inc. 85.30% 119 16163 L AAA MB GE1 Prev. Maint. of Del Monte Ave. Quezon City 08/02/13 1st/Final NCR LF 19.670 150 03/24/13 08/20/13 16.54 C 0.420 0.133 0.300 - - - 85.30 AHD (Formerly: Armando U Khong Satisfactory Hun General Contractor) Armando U. Khong Hun Prev. Maint. (Int. Sect.) San Marcelino St. 5th General Contractor, Inc. 85.26% 120 16163 L AAA MB GE1 District, Manila K0003+000-K0003+783 b) City of Manila 07/31/13 Final NCR LF 14.516 149 02/19/13 07/17/13 0.00 C 0.364 0.200 0.300 - - - 86.40 ONS (Formerly: Armando U Khong K0003+783-K0003+836 Satisfactory Hun General Contractor) Armando U. Khong Hun General Contractor, Inc. Const./Widening of Pres. Garcia Ave. (C- 121 16163 L AAA MB GE1 Taguig City 07/27/13 1st NCR LF 33.084 120 05/22/13 09/18/13 0.10 O 0.329 0.240 0.150 0.030 0.050 0.050 84.90 AHD (Formerly: Armando U Khong 5), Sta. 0+000-Sta. 2+897.20 Hun General Contractor) Armando U. Khong Hun General Contractor, Inc. Const. of Four (4) Storey, Twelve (12) 122 16163 L AAA LB GB1 Taguig City 08/07/13 1st NCR LF 21.781 178 03/26/13 09/19/13 9.31 O 0.326 0.240 0.150 0.030 0.047 0.050 84.30 AHD (Formerly: Armando U Khong Cl. at R.P. Cruz Elem. Sch. Hun General Contractor) Armando U. Khong Hun General Contractor, Inc. Const. of Four (4) storey, Twenty (20) Cl. Parañaque City, Metro 123 16163 L AAA LB GB1 08/08/13 1st NCR LF 36.242 233 03/27/13 11/14/13 10.50 O 0.332 0.240 0.150 0.030 0.058 0.033 84.30 AHD (Formerly: Armando U Khong Bldg. at San Antonio Elem. Sch. Manila Hun General Contractor) Const. of Lugusan Bridge & Approaches along 124 70 Arn Builders 18930 L AAA LB GE1 Surigao del Sur Bdry., Davao Oriental Coastal Davao Oriental 08/16/13 2nd XI LF 27.687 351 05/11/12 04/26/13 -8.47 O 0.376 0.259 0.000 0.030 0.025 0.033 72.30 DEL Rd. Jose Dalman, 87.42% 125 Arn Builders 18930 L AAA LB GE2 Const. of Flood Control Disakan Bridge 08/22/13 Final IX LF 6.549 146 01/08/13 06/02/13 0.00 C 0.449 0.133 0.300 - - - 88.20 ONS Zamboanga del Norte Satisfactory Const. of Flood Control along Left Bank of 126 Arn Builders 18930 L AAA LB GE2 Estaka, Dipolog City 08/22/13 3rd IX LF 62.300 437 07/31/12 10/10/13 0.00 O 0.191 0.300 0.150 0.020 0.042 0.050 75.30 ONS Dipolog River Looc

Floridablanca, 87.90% 127 71 Arrow Construction 32834 L B SB GE1 Conc. of Brgy. Road, Purok 1, Mabical 08/01/13 1st/Final III LF 1.931 60 03/07/13 05/05/13 16.67 C 0.446 0.133 0.300 - - - 87.90 AHD Pampanga Satisfactory ASC Construction and Const. of Cataggaman River Control Cataggaman, 128 72 26788 L A MA GE2 07/29/13 1st II LF 47.042 245 03/27/13 11/26/13 -7.29 O 0.383 0.300 0.077 0.030 0.055 0.050 89.50 DEL Concrete Products System Tuguegarao City ASC Construction and Concrete Rd. Upgrading (Gravel to Paved) K0548+500- 129 73 Products / D.J.D. Construction JV-12-522 L A MA GE1 K0551+271, Baybayog-San Jose-Dalin-Abusag- Baggao, Cagayan 07/30/13 1st II LF 46.277 179 02/22/13 08/19/13 -11.88 O 0.372 0.300 0.031 0.030 0.055 0.050 83.80 DEL (JV) Sta. Margarita-Bolos Point Rd. Asia Konstrakt Philippines, 84.18% 130 74 32706 L A SB GE2 Const. of Talomo Flood Control Proj. Talomo, Davao City 08/20/13 Final XI LF 6.353 170 10/26/12 04/14/13 0.00 C 0.407 0.133 0.300 - - - 84.00 ONS Inc. Satisfactory Const. of Flood Control Structure (Drainage System) at a)Sta.0+148-Sta.0+250 (Stretch 1) 78.70% 131 75 Atlantic Construction 24232 L D SB GE2 Sta. Maria, Isabela 08/05/13 1st/Final II LF 1.904 90 03/25/13 06/22/13 1.94 C 0.354 0.133 0.300 - - - 78.70 AHD b)Sta.0+000-Sta.0+085, c)Sta.0+000- Unsatisfactory Sta.0+270.65 (Stretch 3), Pob.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 5 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Rehab./Reconst./Upgrading of Damage Paved Atlas Gen. Const. & Enterprises Nat'l. Rd. (Int. Sect.) Sta. Rosa - Tarlac Rd., 87.28% 132 76 Corp. / VRF Construction Joint JV-12-330 L A MA GE1 Nueva Ecija 08/12/13 Final III LF 38.997 150 02/04/13 07/03/13 0.00 C 0.441 0.133 0.300 - - - 87.40 ONS K0120+000-K0121+000; K0122+000- Venture Satisfactory K0122+944; K0123+720-K0124+000 Replacement/Rehab./Strengthening of Adunot 90.40% 133 77 Atolba Construction 33768 L C SB GE1 Bokod, Benguet 07/30/13 1st/Final CAR LF 4.563 120 02/09/13 06/08/13 0.00 C 0.471 0.133 0.300 - - - 90.40 ONS Bridge, K0275+350, Brgy. Ambuclao V. Satisfactory

Aylan Construction and Const. of Two (2) Sch. Bldg. Four (4) 134 78 11884 L A SB GB1 Caloocan City 08/13/13 1st NCR LF 46.300 330 03/27/13 02/19/14 1.20 O 0.298 0.221 0.150 0.030 0.046 0.050 79.50 AHD Trading Storey Sixteen (16) Cl. at Amparao H/S

B. Valencerina Trading & Repair and Rehab. of Sch. Bldg. at 93.60% 135 79 22147 L D SB GB1 Bambang, Pasig City 08/06/13 1st/Final NCR LF 2.413 60 06/10/13 08/09/13 23.33 C 0.436 0.200 0.300 - - - 93.60 AHD Construction Bambang E/S V. Satisfactory

Const. of River Control at Poblacion 83.70% 136 80 B. Vicencio Construction 9687 L A MA GE2 Dumarao, Capiz 08/19/13 1st/Final VI LF 13.875 215 12/22/12 07/25/13 0.00 C 0.337 0.200 0.300 - - - 83.70 ONS Ilawod Satisfactory

Rehab.Strengthening of Malago Bridge along 89.20% 137 B. Vicencio Construction 9687 L A MB GE1 Daang Maharlika (SM) San Isidro-San Juanico Calbayog City, Samar 08/13/13 1st/Final VIII LF 19.187 150 02/06/13 07/05/13 1.00 C 0.421 0.171 0.300 - - - 89.20 AHD Bridge V. Satisfactory Replacement of Bugtong Bridge along Daang 138 B. Vicencio Construction 9687 L A MB GE1 Maharlika (SM) (San Isidro-San Juanico Calbayog City, Samar 08/13/13 2nd VIII LF 32.855 205 02/06/13 09/28/13 2.44 O 0.345 0.258 0.150 0.030 0.060 0.033 87.60 AHD Bridge)

B. Vicencio Construction / Const./Extension of Catarman River Catarman, Northern 88.92% 139 81 JV-11-120 L A MA GE2 08/08/13 Final VIII LF 85.828 290 07/17/12 05/03/13 0.34 C 0.376 0.200 0.300 - - - 87.60 AHD Ezjones Construction Inc. (JV) Control Samar Satisfactory

B. Vicencio Construction / Jet Conc. of Guimaras Circ. Rd., K067+380- Nueva Valencia, 89.42% 140 82 JV-11-186 L A MB GE1 08/05/13 Final VI LF 102.300 450 03/05/12 05/28/13 12.89 C 0.466 0.133 0.300 - - - 89.90 AHD Construction Supply (JV) K073+100 w/ exceptions Guimaras V. Satisfactory B. Vicencio Construction / Const. of 2-Storey, 2-CL Catbalogan 141 83 Victoria Development and L GB1 Catbalogan City 08/15/13 1st VIII LF 2.104 168 03/21/13 09/04/13 3.96 O 0.324 0.226 0.150 0.030 0.058 0.033 82.10 AHD Construction Supply (JV) NCHS B.G. Giron Construction & Const. of FMR at Brgys. Sta. Rita-Estrada, 85.70% 142 84 15197 L B MA GE1 Capas, Tarlac 08/07/13 1st/Final III LF 4.790 32 03/27/13 04/27/13 0.00 C 0.424 0.133 0.300 - - - 85.70 ONS Supply Sta.0+000-Sta.0+713 Satisfactory Concrete Paving of Biliran Circ. Rd., 92.70% 143 85 B.M. Marketing 9852 L AAA MB GE1 Km.1061+100-Km.1061+800 (Acaban-Bool Biliran Province 08/15/13 1st/Final VIII LF 15.901 160 02/07/13 07/16/13 0.00 C 0.494 0.133 0.300 - - - 92.70 ONS Rd. Sect.) V. Satisfactory Rehab./Repair/Improvement of Baras-Candahug- 144 B.M. Marketing 9852 L AAA MB GE1 Palo, Leyte 08/20/13 1st VIII LF 19.009 130 05/20/13 09/26/13 36.17 O 0.377 0.209 0.150 0.030 0.047 0.033 84.60 AHD Manlurip-DZR Airport Rd.

Widening of Pangasinan-Nueva Ecija Rd., 91.40% 145 86 B.M.K. Construction 8291 L AAA LA GE1 K0181+749-K0184+000 (w/ exception), Bakit- Rosales, Pangasinan 08/09/13 1st/Final I LF 26.768 250 03/26/13 11/30/13 48.51 C 0.481 0.133 0.300 - - - 91.40 AHD Bakit V. Satisfactory Const./Continuation/Completion of 91.34% 146 B.M.K. Construction 8291 L AAA LA GE1 Bagulin, La Union 07/31/13 Final I LF 109.073 645 08/23/11 06/17/12 0.00 C 0.481 0.133 0.300 - - - 91.40 ONS Bagulin Bridge (Phase III) V. Satisfactory

Const. of Shore Protection/Flood Control in La 87.04% 147 B.M.K. Construction 8292 L AAA MB GE2 Union 2nd District-Groins & Extension of Caba, La Union 07/31/13 Final I LF 27.358 240 01/16/13 09/12/13 65.83 C 0.429 0.133 0.300 - - - 86.20 AHD Groins, Brgy. San Carlos Satisfactory Restoration of Collapsed Retaining Wall & Damaged PCCP along Baguio-Bontoc Rd., 86.24% 148 B.M.K. Construction 8292 L AAA LA GE1 Benguet 08/01/13 Final CAR FA 87.101 345 11/15/11 10/25/12 0.00 C 0.475 0.133 0.300 - - - 90.80 ONS Km.267+700-Km.279+830 (POPSTIRP), Satisfactory Roads & Bridges Component, Cluster RB4 B.M.K. Construction / R.N.G.M. Const./Widening/Upgrading of Access Rd. 149 87 JV-12-655 L AAA LA GE1 Baler, Aurora 08/10/13 1st III LF 43.292 214 03/27/13 10/26/13 0.31 O 0.309 0.240 0.150 0.030 0.050 0.050 82.90 AHD Construction Joint Venture Leading to Tourist Destination, Sabang

B.M.K. Construction / Viking Repair/Rehab./Const. of Flood Control 150 88 JV-12-294 L AAA MB GE2 Bangued, Abra 08/14/13 1st CAR LF 37.853 260 12/11/12 08/28/13 0.21 O 0.333 0.300 0.150 0.030 0.053 0.033 89.90 AHD Construction and Supplies (JV) Structure, Banbangar

B.M.K. Construction / Viking 151 89 JV-12-296 L AAA LA GE1 Replacement of Bimmeclat, KO436-386 Cabugao, Ilocos Sur 08/13/13 2nd I LF 27.325 202 02/11/13 08/31/13 -8.55 O 0.394 0.300 0.065 0.030 0.047 0.033 86.90 DEL Construction and Supplies (JV)

B.P. Cruz Builders and Rechanneling of River, Abacan River 87.50% 152 90 33272 L A MA GE2 Angeles City 08/06/13 1st/Final III LF 16.588 120 04/01/13 07/29/13 0.00 C 0.375 - 0.500 - - - 87.50 ONS Trading along Angeles-Mexico Sect. Satisfactory Repair/Rehab. (incl. facilities) Phase II of Jose B.P. Cruz Builders and 85.82% 153 33272 L A MA GB1 S. Lapid District Hospital (formerly Porac Porac, Pampanga 07/31/13 Final III LF 18.594 75 01/07/13 03/23/13 0.00 C 0.491 0.133 0.300 - - - 92.40 ONS Trading District Hospital), Babo Sacan Satisfactory

Flood Control & Drainage Project along Manila B.P. Cruz Builders and 154 33272 L A MA GE2 North Road (MNR) @ K082+(-750)-K094+000 Pampanga 08/06/13 1st III LF 22.797 180 03/05/13 08/31/13 0.96 O 0.343 0.240 0.150 0.030 0.051 0.033 84.70 AHD Trading (w/ exception) Angeles City to Mabalacat

B.P. Cruz Builders and 83.30% 155 33272 L A MA GE2 Rechanneling of Taug River Angeles City 08/06/13 1st/Final III LF 14.714 110 03/07/13 06/24/13 0.00 C 0.333 - 0.500 - - - 83.30 ONS Trading Satisfactory Prev. Maint. of Angeles-Porac-Floridablanca- B-12 Construction and 84.66% 156 91 31997 L A MA GE1 Dinalupihan Rd. (Int. Sect.) 1.K0093+000- Porac, Pampanga 08/01/13 Final III LF 12.371 58 02/06/13 04/04/13 0.00 C 0.427 0.200 0.300 - - - 92.70 ONS Trading Corporation K0094+000 2.K0096+761-K0097+844 Satisfactory Nat'l Rds. to other Strategic Tourist Destinations B2K Lumber, Construction 88.20% 157 92 33069 L B MA GE1 Pres. Cory Aquino Blvd. (Bagasbas to Mercedes Daet, 08/08/13 1st/Final V LF 47.775 210 12/07/12 07/04/13 1.43 C 0.382 0.200 0.300 - - - 88.20 AHD Supplies and Services Sect.), Brgy. Bagasbas Satisfactory Badoc Builders & Supply Rd. Upgrading (Gravel to Paved), Batac-Pinili 85.66% 158 93 31564 L B MA GE1 Ilocos Norte 08/14/13 Final I LF 9.309 80 01/30/13 04/19/13 0.00 C 0.439 0.174 0.300 - - - 91.30 ONS (Formerly: Badoc Builders) via Maipalig Rd., K01480+112-K0481+104 Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 6 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Repair/Rehab. of DPWH, Cebu 6th DEO (Phase 92.14% 159 94 Bantay Construction 35290 L D SB GB1 II) Bldg. a)C. Cortes Ave. b)Repair/Maint. of Mandaue City, Cebu 08/13/13 Final VII LF 1.163 89 01/08/13 04/06/13 13.33 C 0.480 0.133 0.300 - - - 91.30 AHD DENR 7 Information Center Bldg. V. Satisfactory

BCT Trading and Conc. of Puerto Princesa North Rd. (PPNR) 89.64% 160 95 15199 L AAA MB GE1 Taytay (Pancol)-El Nido Rd. (Km.222+700- Taytay, Palawan 08/09/13 Final IVB LF 49.791 270 03/28/12 12/22/12 0.00 C 0.445 0.197 0.300 - - - 94.20 ONS Construction V. Satisfactory Km.225+000 w/ E) Bench Construction and 91.20% 161 96 35899 L D SB GB1 Const. of MPB in Brgy. Mantang Taft, Eastern Samar 08/19/13 1st/Final VIII LF 2.460 90 06/11/13 09/08/13 58.89 C 0.479 0.133 0.300 - - - 91.20 AHD Supply V. Satisfactory Upgrading of Zamboanga City-Labuan- Bendimil Construction & Limpapa Rd (Gravel to Concrete) K1975+000- 162 97 6135 L AA MB Zamboanga City 08/05/13 4th IX LF 43.655 435 05/17/12 07/25/13 - O 0.130 0.240 0.000 0.020 0.047 0.033 47.00 DEL Development Corporation K1977+100 w/ RCDG Bridge Const. (Latap Bridge) Prev. Maint. along Alaminos-Lucap Rd., Berson's Construction & 91.26% 163 98 31181 L B MA GE1 K0321+(-107)-K0321+00 w/ exception; Alaminos, Pangasinan 08/08/13 Final I LF 14.318 71 01/28/13 04/08/13 0.00 C 0.479 0.133 0.300 - - - 91.20 ONS Trading K0321+000-K0322+446 w/ exception V. Satisfactory Prev. Maint. (Int. Sect.) along Pangasinan- Berson's Construction & Zambales Rd. K0318+000 w/ exception, 89.10% 164 31181 L B MA MA Pangasinan 08/08/13 1st/Final I LF 28.664 100 01/28/13 05/07/13 0.00 C 0.458 0.133 0.300 - - - 89.10 ONS Trading K0318+1000-K0319+734 w/ exception V. Satisfactory K0320+742-K0322+451 w/ exception Berson's Construction & Widening of Urdaneta Jct.-Dagupan Rd., Sta. Barbara, 165 31181 L B MA GE1 08/02/13 2nd I LF 16.512 210 01/16/13 08/13/13 3.34 S 0.331 0.233 0.150 0.030 0.042 0.050 83.60 AHD Trading K0190+734-K0192+096 w/ exception Pangasinan

Berson's Construction & Widening of San Carlos-Calasiao Rd. (San San Carlos City, 166 31181 L B MA GE1 08/03/13 1st I LF 8.539 183 01/16/13 07/17/13 - O 0.350 0.300 0.018 0.030 0.051 0.033 78.20 DEL Trading Carlos Sect.) Km.203+960-Km.204+330 Pangasinan Rehab./Reconst./Upgrading of Paved Nat'l Rd., Mangaldan, 91.30% 167 99 Bet Construction & Supply 31764 L B MA GE1 Widening of Mangaldan-Manaoag-Binalonan 08/05/13 1st/Final I LF 18.528 195 01/17/13 07/30/13 0.00 C 0.480 0.133 0.300 - - - 91.30 ONS Rd. Pangasinan V. Satisfactory Prev. Maint. of Pangasinan-La Union Inter- San Fabian, 168 Bet Construction & Supply 71764 L B MA GE1 Prov. Rd., K0399+495-K0403+025 w/ 08/06/13 1st I LF 44.119 180 03/27/13 09/22/13 9.21 O 0.382 0.217 0.150 0.030 0.042 0.033 85.40 AHD exception Pangasinan Rehab./Reconst./Upgrading of Damaged Paved Nat' Rd. (Pangasinan-Zambales Rd.) Jct. Dagupan City, 169 Bet Construction & Supply 31764 L B MA GE1 08/05/13 1st I LF 45.764 180 03/27/13 09/23/13 15.16 O 0.355 0.240 0.150 0.030 0.042 0.033 85.00 AHD Lingayen Rd. (K0377+612-K0378+700 A.B. Pangasinan Fernandez Ave.) River Bank Protection along 170 Bet Construction & Supply 31764 L B MA GE1 Binloc, Dagupan City 08/06/13 1st I LF 28.040 180 03/26/13 09/21/13 13.72 O 0.350 0.240 0.150 0.030 0.042 0.033 84.50 AHD Mangueragtay River (Phase II), Bonoan Replacement/Rehab./Strengthening of Permanent Bridges Gen. from Bridge Mgt. Malapatan, Sarangani 89.10% 171 100 Better Work Construction 24432 L B MA GE1 08/20/13 1st/Final XII LF 4.514 130 01/31/13 06/09/13 0.00 C 0.391 0.200 0.300 - - - 89.10 ONS System (BMS), Sapu-Masla Bridge along Province V. Satisfactory Sarangani-Davao del Sur Coastal Rd. Bicol Goldrock Construction Rd. Upgrading (Gravel to Paved), 85.30% 172 101 Corp./GCI. Construction and JV-11-625 L B MA GE1 Catanduanes 07/30/13 1st/Final V LF 52.691 282 10/09/12 07/18/13 6.25 C 0.420 0.133 0.300 - - - 85.30 AHD Development Corp. (JV) Catanduanes Circ. Rd. Satisfactory Bicol Goldrock Construction Contract Package XIX (B)-Drainage Protecton 88.20% 173 102 32376 L B MA GE2 Iriga City 08/01/13 1st/Final V LF 5.393 239 10/02/12 05/28/13 6.19 C 0.462 0.120 0.300 - - - 88.20 AHD Corporation Woks along National Rds., Sta. Maria Sect. Satisfactory Bicol Goldrock Construction Rehab. of Cagayan-Apayao (CAR), Fugu 92.66% 174 103 Corporation / EGB Construction JV-11-574 L B MA GE1 Tuao, Cagayan 08/04/13 Final II LF 48.694 360 06/04/12 05/29/13 0.00 C 0.426 0.200 0.300 - - - 92.60 ONS (JV) Sect. V. Satisfactory Bicol Goldrock Construction Road Upgrading (Gravel to Paved), CCR San Andres, 175 104 Corporation/GCI. Construction JV-12-286 L B MA GE1 07/30/13 1st V LF 48.247 184 02/15/13 08/17/13 -6.49 O 0.361 0.283 0.085 0.030 0.058 0.033 85.00 DEL Cabungahan Sect, (K0156+850 - K0159+000) and Development Corp. (JV) Catanduanes Bicol Goldrock Construction Prev. Maint. Asphalt Overlay along Naga- 82.50% 176 105 Corporation/GCI. Construction JV-12-173 L A MA GE1 Calabanga-Balongay Road (Int. Sect.), Bombon Camarines Sur 08/06/13 1st/Final V LF 18.266 54 01/31/13 03/25/13 24.08 C 0.325 0.200 0.300 - - - 82.50 AHD and Development Corp. (JV) & Calabanga Satisfactory

Reconst. of Nat'l Sec. Rd. along Binalbagan- Binalbagan, Negros 177 106 Big Joe's Enterprises 33601 L B MA GE1 Isabela Rd., a)K0065+004-K0065+146, 08/10/13 2nd VI LF 11.438 179 01/28/13 07/26/13 -4.99 O 0.350 0.300 0.017 0.030 0.042 0.050 78.90 DEL b)K0067+200-K0067+866 Occidental Billfinger Builders Impv't./Riprapping along Don Jose Creek P. Tuazon, Quezon 89.10% 178 107 35802 L D SB GE2 08/02/13 1st/Final NCR LF 1.338 60 02/15/13 04/15/13 0.00 C 0.458 0.133 0.300 - - - 89.10 ONS Development Corporation (P. Tuazon-Evangelista Creek) City V. Satisfactory Billhill Construction and Mainit, Surigao del 86.00% 179 108 18046 L B MA GE1 Conc. of Road, Brgy. Tolingon 08/08/13 1st/Final XIII LF 1.934 84 04/09/13 07/02/13 0.00 C 0.427 0.133 0.300 - - - 86.00 ONS Supply Norte Satisfactory

BLC Construction & Upgrading of Dantay-Sagada Rd. (K0391+000- 180 109 16424 L B MA GE1 Bontoc, Mt. Province 08/03/13 1st CAR LF 30.600 159 04/02/13 09/07/13 0.20 O 0.365 0.240 0.150 0.023 0.040 0.033 85.10 AHD Aggregates K0391+677 & K0392+603-K0393+048.2) Repair/Restoration of Damaged Slope Protection Blimex Construction and & Slope Line Canal along Santander-Barili- Alegria to Dumanjug, 181 110 27259 L B SB GE2 08/09/13 1st VII LF 9.733 140 05/13/13 09/29/13 22.86 O 0.310 0.248 0.150 0.030 0.055 0.050 84.30 AHD Supply Toledo Rd., K0170+250-K0221+869 (Int. Cebu Sect.) Rd. Upgrading (Gravel to Concrete) along Blimex Construction and Awang-Upi-Lebak-Kalamansig-Palimbang- Palimbang, Sultan 182 27259 L B MA GE1 08/18/13 1st XII LF 39.234 172 04/02/13 09/20/13 0.63 O 0.339 0.236 0.150 0.023 0.051 0.050 84.90 AHD Supply Sarangani Rd. (Km.2036+896-Km.2038+728 Kudarat w/ exception) Const. of Flood Control Structure (Slope 87.40% 183 111 BNL Construction 15725 L D SB GE1 Protection) along Nat'l Rd. (Almeria to Biliran Province 08/15/13 1st/Final VIII LF 5.463 75 04/03/13 06/17/13 1.33 C 0.441 0.133 0.300 - - - 87.40 AHD Kawayan Rd. Sect.) Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 7 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Widening of Nat'l Rd. at Cebu North Hagnaya Wharf Rd., K0013+560-K0014+505 (Proposed BNR Construction & 184 112 12903 L AAA MB GE1 for Realignment/Modification to Impv't. of Nat'l Consolacion, Cebu 08/12/13 1st VII LF 25.800 300 03/27/13 01/20/14 1.93 O 0.356 0.232 0.150 0.030 0.055 0.050 87.30 AHD Development Corporation Rd. at Cebu North Hagnaya Wharf Road, K0013+560-K0014+505 Prev. Maint. (Int. Sect.), Arterial Rd., N. BNR Construction & 84.10% 185 12903 L AAA MB GE1 Bacalso Ave. (Cebu South), K0007+000- Cebu City 08/24/13 1st/Final VII LF 39.479 95 02/05/13 05/10/13 3.16 C 0.405 0.136 0.300 - - - 84.10 AHD Development Corporation K0008+390 Satisfactory Rehab./Reconst./Upgrading of Damaged Paved BNR Construction & 83.40% 186 12903 L AAA MB GE1 Nat'l Rd. at Pajo-Basak-Marigondon Rd., Lapu- Lapu-Lapu City, Cebu 08/12/13 1st/Final VII LF 21.066 179 01/23/13 07/20/13 0.56 C 0.334 0.200 0.300 - - - 83.40 AHD Development Corporation Lapu City, K0011+(-624)- K0011+457 Satisfactory BNYU Enterprises and Rd. Upgrading (Gravel to Paved) Jct. (TNR) 187 113 27725 L B MA GE1 Cortes-Balilihan-Catigbian-Macaas Rd., Tubigon, Bohol 08/17/13 1st VII LF 18.966 245 1/31/2013 10/02/13 4.80 O 0.380 0.260 0.150 0.030 0.065 0.050 93.50 AHD Construction Km.46+045-Km.46+575 Boado Engineering Design 86.00% 188 114 25913 L D SB GE1 Const. of FMR, Sta. Maria Agoo, La Union 08/01/13 1st/Final I LF 6.825 120 03/05/13 07/02/13 58.33 C 0.427 0.133 0.300 - - - 86.00 AHD and Construction Satisfactory 82.30% 189 115 Bomel Construction 32878 L C SB GE1 Conc. of FMR, Brgy. Lusacan Tiaong, Quezon 08/03/13 1st/Final IVA LF 2.340 30 04/05/13 05/04/13 6.67 C 0.323 0.200 0.300 - - - 82.30 AHD Satisfactory Bonifacio M. Carlos Trading Rd. Upgrading (Gravel to Paved) of PPSR Jct.- 190 116 Corp. (Formerly: Bonifacio M. 3303 L A MA GE1 Napsan-Apurawan Rd., K0041+100- Puerto Princesa City 08/15/13 1st IVB LF 33.940 201 04/02/13 10/22/13 0.01 O 0.355 0.091 0.150 0.030 0.042 0.050 71.80 AHD Carlos Construction) K0042+138 & K0042+138-K0042+588 Const. of Classrooms in Areas Experiencing Acute Classroom Shortage Cluster I: Elem. & 88.80% 191 117 Borobudur Construction 21497 L C SB GB1 Camarines Sur 08/05/13 1st/Final V LF 1.092 120 04/03/13 07/31/13 16.67 C 0.455 0.133 0.300 - - - 88.80 AHD Sec. Sch. at Milaor-Gainza, Pamplona San Satisfactory Fernando & Minalabac Const. of Slope Protection Works along Awang- Upi-Lebak-Kalamansig Rd. (Awang Jct.-DOS- North Upi, 192 118 Bre Construction 32605 L B SB GE1 08/13/13 1st XII LF 9.397 220 07/01/13 02/05/14 0.11 O 0.335 0.240 0.150 0.020 0.043 0.033 82.10 AHD Nuro) Km.1844+970-Km.1875+148.20 w/ Maguindanao exception Brostan Construction & Const. of Flood Control & Water Impounding 82.50% 193 119 12360 L AAA LB GE2 Infanta, Quezon 08/08/13 1st/Final IVA LF 10.726 160 04/17/13 09/23/13 28.75 C 0.325 0.200 0.300 - - - 82.50 AHD Development Structures Agos River Basin Satisfactory Rehab./Reconst./Upgrading of Paved Nat'l Rd. Busilac Builders, 90.20% 194 120 7701 L B MA GE1 Gen. from PMS/HDM-4 Int. Sect., Ilocos Norte- Ilocos Norte 08/14/13 1st/Final I LF 11.372 90 02/28/13 05/28/13 0.00 C 0.469 0.133 0.300 - - - 90.20 ONS Incorporated Abra Rd., K0503+(-078)-K0504+850 V. Satisfactory

C & F Construction & Impv't./Asphalt Overlay of Ermin Garcia St., 195 121 3509 L A MA GE1 Quezon City 08/05/13 1st NCR LF 19.831 150 03/25/13 08/21/13 0.95 O 0.347 0.206 0.150 0.030 0.050 0.050 83.30 AHD Development Corporation K0011+(-240)-K0011+000-K0012+677

Conc. of Pangpang-Palapag-Mapanas-Gamay- Palapag, Northern 90.00% 196 122 C D U Construction 13915 L B MA GE1 Lapinig Rd., Cabatuan-Magtaon Bridge Sect., 08/06/13 1st/Final VIII LF 7.920 48 02/06/13 03/25/13 6.05 C 0.467 0.133 0.300 - - - 90.00 AHD Samar V. Satisfactory K0822+(366)-K0822+(029)

Const. of Flood Control (Drainage Canal) along Palapag, Northern 197 C D U Construction 13915 L B SB GE2 Palapag-Mapanas-Gamay-Lapinig Rd., Mapno- 08/06/13 1st VIII LF 9.141 180 03/27/13 09/23/13 -5.44 O 0.332 0.300 0.096 0.030 0.060 0.050 86.80 DEL Cabatuan Sect., K0805+300-K0817+800 Samar

Const. of Sch. Bldg., Calbayog City Night 198 C D U Construction 13915 L B MA GB1 Calbayog City, Samar 08/14/13 1st VIII LF 4.994 150 04/03/13 08/30/13 2.33 O 0.343 0.240 0.150 0.030 0.047 0.025 83.50 AHD High Sch.

Rehab. of Rd. Slip along Tacloban-Ormoc- 88.72% 199 123 C N E Construction 22148 L B SB GE1 Baybay-Maasin Road, along Baybay-Matalom Leyte 08/08/13 Final VIII LF 6.495 100 01/25/13 05/04/13 0.00 C 0.435 0.133 0.300 - - - 86.80 ONS Rd. Satisfactory Const. of 1 unit 2 storey 8-CL & 1 unit - 2 storey 6 CL Sch. Bldg., Tanauan Sch. of 200 C N E Construction 22148 L B MA GB1 Tanauan, Leyte 08/19/13 1st VIII LF 16.594 240 03/19/13 11/13/13 16.00 O 0.400 0.237 0.150 0.020 0.019 0.050 87.60 AHD Craftsman & Home Industries (LIT Tanauan Campus) C.A. Betalac Construction & Tacurong City, Sultan 92.50% 201 124 28222 L A SB GB1 Completion of MPB at Brgy. New Isabela 08/17/13 1st/Final XII LF 1.976 120 04/03/13 07/31/13 0.00 C 0.492 0.133 0.300 - - - 92.50 ONS Gen. Mdse. Kudarat V. Satisfactory

C.B. Tampengco Const. of Three (3) Storey, Nine (9) Cl Sch. Tinajeros, Malabon 202 125 18505 L B MA GB1 08/12/13 1st NCR LF 5.784 150 03/27/13 08/23/13 2.44 O 0.303 0.240 0.150 0.030 0.035 0.033 79.10 AHD Construction & Supply Bldg. Tinajeros NHS(Phase II)-Acacia Annex City

Conc./Widening of Dauis-Panglao Island 82.52% 203 126 C.C.M. Construction 11043 L B MA GE1 Dauis-Panglao, Bohol 08/17/13 Final VII LF 48.619 431 01/24/12 03/29/13 0.00 C 0.450 0.200 0.300 - - - 95.00 ONS Center Rd. Satisfactory C.F. Trinidad Construction and Prev. Maint. (Asphalt Overlay) of Imelda Ave. 91.96% 204 127 Supplies Corp. (Formerly: C.F. 9199 L B MA GE1 1.K0018+(-232)-K0018+808; 2.K0018+(-010)- Cainta, Rizal 08/15/13 Final IVA LF 44.628 179 01/29/13 07/26/13 8.00 C 0.447 0.133 0.300 - - - 88.00 AHD Trinidad Construction) K0020+732 (Int. Sect.) V. Satisfactory Const. of Dalton Pass Nueva Vizcaya (New C.M. Pancho Construction, 205 128 183 L AAA LB GE1 Alignment) San Jose-Aritao Rd., Segment 5, Nueva Vizcaya 08/15/13 1st II LF 351.745 720 11/13/12 11/02/14 44.76 O 0.334 0.300 0.150 0.030 0.061 0.050 92.50 AHD Incorporated Dalton Pass Sect. Eastern Alternate Route

C.R. Domingo Construction, Inc. 92.00% 206 129 2992 L A MA GE1 Road Const. of Dolowog Road Alfonso Lista, Ifugao 08/07/13 1st/Final CAR LF 0.481 80 02/08/13 04/28/13 72.50 C 0.420 0.200 0.300 - - - 92.00 AHD (Formerly: CR Domingo Const.) V. Satisfactory

C.R. Domingo Construction, Inc. Prev. Maint. along Nueva Vizcaya-Ifugao-Mt. 88.40% 207 2992 L A MA GE1 Kiangan, Ifugao 08/05/13 1st/Final CAR LF 17.982 99 01/31/13 05/09/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS (Formerly: CR Domingo Const.) Province Bdry. Rd. (Asphalt Overlay) Satisfactory Rd. Upgrading (Gravel to Paved) along Ubao- C.R. Domingo Construction, Inc. 208 2992 L A MA GE1 Taang Rd., K0422+300-K0425+765 (w/ Aguinaldo, Ifugao 08/07/13 1st CAR LF 44.268 215 02/21/13 09/23/13 -4.67 O 0.341 0.300 0.103 0.030 0.050 0.017 84.10 DEL (Formerly: CR Domingo Const.) exceptions) Rd. Upgrading (Gravel to Paved) along Alfonso C.R. Domingo Construction, Inc. 209 2992 L A MA GE1 Lista-Aurora Bdry. Rd. K0442+124.5- Alfonso Lista, Ifugao 08/07/13 1st CAR LF 38.538 230 02/21/13 10/08/13 -4.67 O 0.317 0.300 0.103 0.030 0.050 0.033 83.30 DEL (Formerly: CR Domingo Const.) K0445+540

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 8 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

C.S. Rayos Construction & Const./Rehab. of Drainage System & Outfall General Services Inc. (Formerly: Batangas City, 84.56% 210 130 9790 L A MA GE2 along Batangas-Tabangao-Lobo Rd., Gulod- 08/01/13 Final IVA LF 12.860 166 10/24/12 04/07/13 0.00 C 0.409 0.133 0.300 - - - 84.20 ONS C.S. Rayos Construction and Labac Sect. Batangas Satisfactory General Services)

C.T. Leoncio Construction & Widening of Old Cagayan Valley Rd., 211 131 17371 L A MB GE1 Baliuag, Bulacan 08/13/13 1st III LF 33.978 165 06/04/13 11/15/13 0.59 O 0.335 0.240 0.150 0.023 0.045 0.033 82.60 AHD Trading Km.45+388-Km.52+985 (Baliuag Sect.) C.T. Leoncio Construction & Reconst. of Siniloan Bridge II along Paete- 74.72% 212 17371 L A MB GE1 Siniloan, Laguna 08/09/13 Final IVA LF 26.331 230 07/02/12 02/17/13 0.00 C 0.438 0.200 0.000 - - - 63.80 DEL Trading Pakil Pob. Rd. Poor Rd. Upgrading (Gravel to Paved), Conc, of C.T. Leoncio Construction & 213 17371 L A MB GE1 Cabatuan-New Lucena-Banga Bante Rd., Cabatuan, Iloilo City 08/20/13 1st VI LF 26.461 135 06/03/13 10/15/13 -3.03 O 0.377 0.240 0.120 0.023 0.040 0.033 83.30 DEL Trading K0028+677-K0030+208.80 Carrascal Integrated Rehab./Reconst./Replacement/Retrofitting of Lanuza, Surigao del 86.34% 214 132 4764 L A MB GE1 Existing Permanent Bridges, Macapagal Bridge 08/14/13 Final XIII LF 5.990 98 02/04/13 05/12/13 0.00 C 0.500 0.133 0.300 - - - 93.30 ONS Enterprises Sur Satisfactory along SDCR Carrascal Integrated Rd. Upgrading (Gravel to Paved) Int. Sect. Carrascal, Surigao del 83.80% 215 4764 L A MB GE1 along Surigao-Davao Coastal Rd., 08/14/13 1st/Final XIII LF 9.332 86 02/20/13 05/16/13 0.00 C 0.407 0.131 0.300 - - - 83.80 ONS Enterprises Sur Satisfactory (K1218+169.93-K1218+825) Prev. Maint. (Int. Sect.) along Santiago- Cauayan United Enterprises and 90.40% 216 133 8816 L B MA GE1 Tuguegarao Rd. @ K0374+417-K0375+083, San Manuel, Isabela 08/08/13 1st/Final II LF 39.059 179 01/21/13 07/18/13 0.33 C 0.471 0.133 0.300 - - - 90.40 AHD Construction Builders V. Satisfactory K0375+083-K0375+500 Repair/Rehab./Impv't. along Naguilian-San Cauayan United Enterprises and 89.50% 217 8816 L B MA GE1 Mariano Rd. (Asphalt Overlay) K0388+600- Benito Soliven, Isabela 08/08/13 1st/Final II LF 5.000 40 03/25/13 05/04/13 0.00 C 0.462 0.133 0.300 - - - 89.50 ONS Construction Builders K0397+737.92 V. Satisfactory Prev. Maint. (Int. Sect.) along Gamu-Roxas Rd., 1)K0396+995-K0397+990; 2)K0403+000- Cauayan United Enterprises and 88.40% 218 8816 L B MA GE1 K0400+000; 3)K0412+299-K0413+419; Isabela 08/06/13 1st/Final II LF 22.672 115 01/21/13 05/15/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS Construction Builders Satisfactory 4)K0413+613-K0413+686; 5)K0413+730- K0413+832, Gamu & Roxas Cauayan United Enterprises and 86.90% 219 8816 L B MA GE1 Conc. of FMR at Fugaru-Centro 2 Angandangan, Isabela 08/06/13 1st/Final II LF 9.749 66 02/25/13 05/01/13 1.52 C 0.436 0.133 0.300 - - - 86.90 AHD Construction Builders Satisfactory Prev. Maint.along Daang Maharlika, Cauayan United Enterprises and 86.36% 220 8816 L B MA GE1 K0370+840-K0373+178 (GAA) K0370+840- Cauayan City, Isabela 08/06/13 Final II LF 25.373 131 01/25/13 06/04/13 0.05 C 0.442 0.133 0.300 - - - 87.50 AHD Construction Builders K0372+933.77, Tagaran Satisfactory Prev. Maint. along Daang Maharlika (LZ) Cauayan United Enterprises and 86.26% 221 8816 L B MA GE1 K0361+820-K0363+899 (GAA) K0361+793- Cauayan City, Isabela 08/06/13 Final II LF 22.574 131 01/25/13 06/04/13 0.92 C 0.429 0.133 0.300 - - - 86.20 AHD Construction Builders K0363+667.12 (POW) Nungnungan II Satisfactory Asphalt Overlay along Daang Maharlika w/ Cauayan United Enterprises and 85.40% 222 8816 L B MA GE1 Corrections (Reblocking) K0395+659- Ilagan, Isabela 08/05/13 Final II LF 22.180 65 01/28/13 04/02/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS Construction Builders Satisfactory K0396+1050.70, Baligatan Const./Widening/Upgrading/Rehab. of Access CDC Construction and Rd. to Airport/Major Sea Ports & Declared 88.30% 223 134 28275 L B MA GE1 Subic, Zambales 08/05/13 1st/Final III LF 18.236 120 02/16/13 06/15/13 0.00 C 0.450 0.133 0.300 - - - 88.30 ONS Supplies Tourism Destinations Subic-Cawag-Balaybay Satisfactory Rd. (IS) Cawag CDC Construction and Repair/Rehab./Impvt. of Alaminos-Bolinao Rd., 90.34% 224 28275 L B MA GE1 Alaminos, Pangasinan 08/07/13 Final I LF 9.850 60 02/07/13 04/07/13 15.00 C 0.480 0.133 0.300 - - - 91.30 AHD Supplies K0355+500-K0356+470 V. Satisfactory Const. of Sch. Bldg. (Two Storey) College of Catarman, Northern 225 135 CDU Construction 13915 L B MA GB1 08/09/13 1st VIII LF 5.675 180 03/27/13 09/22/13 6.38 O 0.392 0.240 0.150 0.030 0.052 0.050 91.40 AHD Law, University of Eastern Phil. (Main Campus) Samar Cebu 7H Technochem Asphalt Overlay of Tagbilaran East Rd., San Pascual, Ubay, 89.78% 226 136 31578 L B MA GE1 08/19/13 Final VII LF 11.528 93 01/30/13 05/02/13 56.99 C 0.417 0.200 0.300 - - - 91.70 AHD Industries Inc. K0149+000-K0149+990 Bohol V. Satisfactory Rd. Upgrading of Antequerra-San Isidro- Cebu 7H Technochem Industries Libertad (Tubigon) Rd., 1)K0026+(-714.00)- 85.70% 227 137 Inc. / Uy Construction & JV-11-316 L A MB GE1 San Isidro, Bohol 08/15/13 1st/Final VII LF 121.232 300 05/28/12 03/23/13 0.00 C 0.409 0.148 0.300 - - - 85.70 ONS K0028+500.00; 2)K0032+301.00- Development (JV) Satisfactory K0033+670.00 Impv't. of Tagbilaran North Rd. (Tagbilaran- Cebu 7H Technochem Industries Cortes-Tubigon, w/ Int. Sect.) Sec. 228 138 Inc. / Uy Construction and JV-12-136 L A MB GE1 1:K0008+904-K0009+795; Sec. 2:K0038+818- Bohol Province 08/15/13 1st VII LF 70.221 270 02/07/13 11/03/13 0.72 O 0.364 0.292 0.150 0.030 0.040 0.033 90.90 AHD Development (JV) K0041+012; Sec. 3:K0047+108-K0047+551; Sec. 4:K0051+470-K0052+942 Rehab. of Regalado Ave., North (Mindanao 82.80% 229 139 Cedar Construction 24865 L C SB GE1 Quezon City 08/02/13 1st/Final NCR LF 9.552 214 03/27/13 07/14/13 1.62 C 0.395 0.133 0.300 - - - 82.80 AHD Ave., Ext. to Regalado Ave., North Bridge) Satisfactory Central Mindanao Construction Const. of Two (2) Storey, Four (4) Cl Sch. 230 140 23697 L B SB GB1 Antipas, Cotabato 08/09/13 1st XII LF 4.958 120 06/07/13 10/05/13 0.25 O 0.351 0.240 0.150 0.010 0.052 0.050 85.30 AHD Multi-Purpose Cooperative Bldg., at Antipas NHS 87.50% 231 141 Cha Construction & Supply 28420 L B MA GE1 Const. of Concrete Rd., Zone 8, San Jose Pili, Camarines Sur 08/06/13 1st/Final V LF 3.880 45 05/28/13 07/11/13 20.00 C 0.442 0.133 0.300 - - - 87.50 AHD Satisfactory

Rd. Upgrading (Gravel to Paved) of Jct. S.H. 82.12% 232 142 Charlz Construction 8709 L AA MB GE1 Manolo Fortich-Libona-Indahag Rd. (Gango Bukidnon 08/07/13 Final X LF 25.514 120 01/23/13 05/22/13 1.51 C 0.479 0.200 0.300 - - - 97.90 AHD Sect.) (K1492+845-K1494+000) Pob. Libona Satisfactory Chedmaryl Construction & Const. of Lambunao NHS, Two (2) Storey 233 143 27073 L B SB GB1 Lambunao, Iloilo 08/20/13 1st VI LF 6.432 90 06/24/13 09/21/13 6.11 O 0.370 0.226 0.150 0.030 0.048 0.033 85.70 AHD Supplies 6 Classrooms Bldg. Landslide Risk Mitigation: Digos-Gen. Santos City Rd. & Davao-Calinan-Buda Rd., Mindanao NRIM- 234 144 China Henan Shuili Yiju FC-10-003 F AAA LB GE1 Region XI and XII 08/10/13 2nd FA 535.161 731 08/16/11 08/15/13 -7.30 O 0.390 0.300 0.077 0.030 0.047 0.050 89.40 DEL Nat'l Rds. Impv't & Mgt. Program Phase II PMO (NRIMP) Address Critical Bottlenecks, Traffic CHL Construction and 86.20% 235 145 15001 L A MA GE1 Decongestion, Conc./Widening of Marbel- South Cotabato 08/23/13 1st/Final XII LF 44.991 170 02/24/13 08/12/13 0.00 C 0.367 0.195 0.300 - - - 86.20 ONS Development Enterprises, Inc. Makar Rd., Polomolok Sect. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 9 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Upgrading (Gravel to Paved) of Pangpang- 236 146 Chris-James Construction 11202 L B MA GE1 Palapag-Mapanas-Gamay-Lapinig Rd., Northern Samar 08/08/13 1st VIII LF 41.807 180 03/27/13 09/22/13 -4.22 O 0.344 0.300 0.108 0.030 0.065 0.017 86.40 DEL K0813+464-K0815+194 Rd. Upgrading (Gravel to Paved) Conc. of Mapanas, Northern 83.42% 237 Chris-James Construction 11202 L B MA GE1 Pangpang-Palapag-Mapanas-Gamay-Lapinig 08/06/13 Final VIII LF 31.280 237 02/01/12 09/24/12 11.81 C 0.418 0.133 0.300 - - - 85.10 AHD Samar Satisfactory Rd., Km.824+000-Km.825+494 Chrisman Construction and 88.90% 238 147 33274 L D SB GE2 Viga Pilot Channel Flood Control Viga, Catanduanes 07/30/13 1st/Final V LF 4.825 64 02/15/13 04/19/13 0.00 C 0.456 0.133 0.300 - - - 88.90 ONS Supplies Satisfactory

Const./Widening of/Upgrading/Rehab. of Christian Ian Construction 239 148 8191 L AAA LA GE1 Access Rd. to Declared Tourism Destinations, Bani, Pangasinan 08/07/13 1st I LF 61.527 244 04/03/13 12/02/13 0.64 C 0.370 0.300 0.150 0.030 0.042 0.033 92.50 AHD Corporation Bangarin Mangrove Rd., Sta. 0+000-Sta. 4+490

Rd. Upgrading for Kiling-Tanauan-Tabontabon- 85.02% 240 149 Chu Construction 33747 L B MA GE1 Tabontabon, Leyte 08/17/13 Final VIII LF 8.592 195 01/15/13 07/28/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Julita Road, K0934+128-K0935+(-429) Satisfactory Rehab./Reconst. Along Jct.-Taft-Oras-San-San 241 Chu Construction 33747 L B MA GE1 Policarpio-Arteche Rd., K0908+385- Eastern Samar 08/19/13 1st VIII LF 11.690 114 01/30/13 05/23/13 -5.32 O 0.330 0.300 0.000 0.030 0.060 0.033 75.30 DEL K0908+211 Rehab./Reconst./Upgrading of Damaged Paved Chu Construction / Jelm Nat'l Rd. along Naga-Naga Anibong Rd., 242 150 JV-12-301 L B MA GE1 Tacloban City 08/22/13 1st VIII LF 30.164 258 01/29/13 10/13/13 4.90 O 0.356 0.240 0.150 0.030 0.060 0.050 88.60 AHD Construction (JV) Km.0906+(-858)-K0906+(-405); K0906+103- K0906+1950 & K0906+039-K0906+439

Const. of Pasugui Flood Control (Pasugui Sablayan, Occidental 243 151 Citystar Construction 32774 L D SB GE2 07/30/13 1st IVB LF 8.380 204 03/21/13 10/10/13 -2.61 O 0.310 0.300 0.124 0.030 0.030 0.033 82.70 DEL Sect. Phase 2) Mindoro Rehab./Reconst./Replacement/Retrofitting of Clifford Construction 244 152 3724 L B MA GE1 Existing Bridge along Nat'l Rds., Catipayan Pontevedra, Capiz 08/18/13 1st VI LF 5.980 170 02/06/13 07/26/13 - O 0.366 0.240 0.000 0.030 0.042 0.033 71.10 DEL Corporation Bridge along Iloilo East Coast Capiz Bridge Rehab./Reconst./Upgrading along Digos-Makar Rd., Balutakay-Guihing Sect., Km.1568+718- Hagonoy, Davao del 87.70% 245 153 CLTG Builders 16852 L B MA GE1 08/09/13 1st/Final XI LF 19.425 70 03/18/13 05/26/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Km.1568+1003.4; Km.1572+004.50- Sur Satisfactory Km.1572+706.25 Const. of Calinan-Toril Rd., incl. ROW, 246 CLTG Builders 16852 L B MA GE1 Tagakpan Sect., Km.1695+247.93- Davao City 08/06/13 1st XI LF 46.053 209 03/27/13 10/21/13 -4.80 O 0.316 0.300 0.102 0.030 0.036 0.033 81.70 DEL Km.1698+750 CLTG Builders / Square Widening of Tagum-Panabo Circ. Rd., 1st 73.80% 247 154 JV-11-294 L B MA GE1 Davao del Norte 08/01/13 Final XI LF 40.803 272 01/31/12 10/30/12 -16.18 C 0.364 0.200 0.000 - - - 56.40 DEL Cube Construction (JV) District, Pob. Kapalong Sect. Poor Widening of Pres. Diosdado P. Macapagal Coastland Construction and Highway (Pob. Lupon Sect.) 85.96% 248 155 11487 L A MA GE1 Lupon, Davao Oriental 08/15/13 Final XI LF 46.479 190 01/25/13 08/02/13 0.00 C 0.401 0.200 0.300 - - - 90.10 ONS Development Corporation a)Km.1751+046.67-Km.1752+797.67; Satisfactory b)Km.1753+673.86-Km.1754+880 Widening of Pres. Diosdado P. Macapagal Coastland Construction and San Isidro, Davao 84.04% 249 11487 L A MA GE1 Highway (Manikling Sect.) Km.1742+889- 08/15/13 Final XI LF 15.461 99 01/25/13 05/03/13 0.00 C 0.441 0.133 0.300 - - - 87.40 ONS Development Corporation Km.1743+586 Oriental Satisfactory Widening of Pres. Diosdado P. Macapagal Coastland Construction and Banaybanay, Davao 84.04% 250 11487 L A MA GE1 Highway (Caganganan Sect.) Km.1757+440- 08/15/13 Final XI LF 23.855 130 01/25/13 06/03/13 0.00 C 0.365 0.200 0.300 - - - 86.50 ONS Development Corporation Oriental Satisfactory Km.1759+000 Rehab. of Rd. Slip along Daang 92.30% 251 156 Collera's Construction 11246 L B MA GE1 Leyte 08/09/13 1st/Final VIII LF 7.223 100 01/25/13 05/04/13 0.00 C 0.490 0.133 0.300 - - - 92.30 ONS Maharlika, Abuyog & Mahaplag V. Satisfactory Prev. Maint. along Ormoc-Baybay-Southern Leyte Bdry. Rd., (K1087+000-K1088+000; 88.70% 252 Collera's Construction 11246 L B MA GE1 Hindang, Leyte 08/08/13 1st/Final VIII LF 5.014 75 03/11/13 05/24/13 0.00 C 0.454 0.133 0.300 - - - 88.70 ONS K1089+000-K1092+000; K1092+000- Satisfactory K1093+000) Prev. Maint. (Asphalt Overlay, 80mm Thick), Cagayan Valley Rd., K0462+914-K0463+469, 87.70% 253 157 Crest Construction 15240 L A MB GE1 Cagayan Valley 07/29/13 1st/Final II LF 29.542 105 03/05/13 06/17/13 4.32 C 0.444 0.133 0.300 - - - 87.70 AHD K0464+000-K0465+000, K0466+000- Satisfactory K0467+000

Prev. Maint. (Asphalt Overlay 50mm Thick) Tuguegarao City, 86.30% 254 Crest Construction 15240 L A MB GE1 07/29/13 1st/Final II LF 23.988 95 03/05/13 06/07/13 0.44 C 0.430 0.133 0.300 - - - 86.30 AHD Cagayan Valley Rd., K0470+857-K0474+000 Cagayan Satisfactory Rd. Upgrading (Gravel to Conc.), Int. Sect., Crizel Construction & Dipolg-Punta-Dansullan-Sergio Osmeña, Polanco, Zamboanga 73.34% 255 158 20835 L C SB GE1 08/20/13 Final IX LF 4.399 53 02/01/13 03/25/13 2.86 C 0.339 0.185 0.300 - - - 82.40 AHD Concrete Products Zamboanga del Norte/Sur Bdry., K1866+000- del Norte Poor K1866+635 CTC Builder & Supplies Const. of Macawayan River Flood Control Macawayan, Irosin, 88.02% 256 159 Incorporated (Formerly: CTC 12088 L A MA GE2 08/14/13 Final V LF 13.958 131 01/22/13 06/01/13 5.34 C 0.455 0.175 0.300 - - - 93.00 AHD Builder) Structures Sorsogon Satisfactory

CTC Builders & Supplies Const. of Bacolod River Flood Control 85.46% 257 Incorporated (Formerly: CTC 12088 L A MA GE2 Irosin, Sorsogon 08/14/13 Final V LF 13.960 123 02/04/13 06/06/13 5.69 C 0.375 0.200 0.300 - - - 87.50 AHD Builder) Structures, Brgy. Bacolod Satisfactory CTC Construction & Repair/Rehab. of Mapuyo Bridge, Brgy. Kawayan, Biliran 93.30% 258 160 33039 L C SB GE1 08/15/13 1st/Final VIII LF 9.332 90 04/02/13 07/01/13 6.67 C 0.500 0.133 0.300 - - - 93.30 AHD Supplies Mapuyo Province V. Satisfactory

CTC Construction & Almeria, Biliran 90.20% 259 33039 L C SB GE2 Repair & Maint. of Almeria Flood Control 08/14/13 1st/Final VIII LF 1.940 90 07/11/13 10/09/13 71.11 C 0.469 0.133 0.300 - - - 90.20 AHD Supplies Province V. Satisfactory

Culasi General Merchandising Const. of Two (2) CL Sch. Bldg., Sta. Barbara 91.60% 260 161 22157 L B SB GB1 Sta. Barbara, Iloilo 08/22/13 1st/Final VI LF 0.969 60 04/03/13 06/01/13 0.00 C 0.483 0.133 0.300 - - - 91.60 ONS and Construction Services Nat'l Comprehensive High Sch. V. Satisfactory

Culasi General Merchandising Const. of Two (2) CL Sch. Bldg, 261 22157 L B SB GB1 Belison, Antique 08/15/13 1st VI LF 1.486 60 03/13/13 05/11/13 - O 0.360 0.240 0.000 0.030 0.027 0.033 69.00 DEL and Construction Services Buenavista Elem. Sch.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 10 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION 83.20% 262 162 D.C.E. Construction 29347 L B MA GE2 Const. of Ili Flood Control Conner, Apayao 08/10/13 Final CAR LF 12.905 255 09/24/12 06/05/13 0.00 C 0.464 0.200 0.300 - - - 96.40 ONS Satisfactory Widening of Cavite-Batangas Rd., 78.56% 263 163 D.C.R. Construction 5040 L A MA GE1 Imus, Cavite 08/14/13 Final IVA LF 31.628 271 02/07/12 11/03/12 0.00 C 0.460 0.133 0.000 - - - 59.30 DEL Km.23+653-Km.25+306 Unsatisfactory D.G. Chico Trading & Proposed Const. of MPB, Jose Rizal Elem. 92.30% 264 164 8748 L A MB GB1 Pasay City 08/01/13 1st/Final NCR LF 4.055 120 12/12/12 04/10/13 0.00 C 0.423 0.200 0.300 - - - 92.30 ONS Construction Corporation Sch. V. Satisfactory Repair/Rehab./Impvt. of Valdefuente-Fortaleza 86.30% 265 165 D.G. Sarmenta Construction 13024 L B MA GE1 Cabanatuan City 08/12/13 1st/Final III LF 4.754 20 03/22/13 04/10/13 0.00 C 0.430 0.133 0.300 - - - 86.30 ONS Rd., Km.120+310-Km.121+000 w/ exception Satisfactory Repair/Rehab. along Baguio-Bauang Rd., 89.46% 266 166 D.G.O. Construction 6788 L D SB GE1 Sablan, Benguet 07/29/13 Final CAR LF 9.167 170 11/17/12 05/05/13 0.00 C 0.482 0.133 0.300 - - - 91.50 ONS K0281+800-K0285+400 w/ exceptions V. Satisfactory Rehab./Reconst./Upgrading of Kennon Rd., 86.70% 267 D.G.O. Construction 6788 L D SB GE1 Tuba, Benguet 07/29/13 1st/Final CAR LF 5.598 90 03/23/13 06/20/13 0.00 C 0.434 0.133 0.300 - - - 86.70 ONS K0226+604-K0227+122 Satisfactory Conc. of Nat'l Rd. along Bacolod South Rd. Hinoba-an, Negros 87.18% 268 167 D.K. Jocson Construction 6896 L A MA GE1 08/09/13 Final VI LF 34.447 295 06/11/12 04/01/13 0.00 C 0.446 0.133 0.300 - - - 87.90 ONS (K0207+900-K0208+356) Occidental Satisfactory Rehab./Reconst./Strengthening of Banao Bridge 87.50% 269 D.K. Jocson Construction 6896 L A MA GE1 along Daang Maharlika Rd., K0506+126.00- Albay 08/09/13 1st/Final V LF 13.490 110 03/28/13 07/15/13 0.00 C 0.375 0.200 0.300 - - - 87.50 ONS K0506+194.00 Satisfactory D.K. Jocson Construction / TSD Rehab./Reconst. of Malogo Bridge along Victorias City, Negros 83.30% 270 168 Builders Construction and JV-12-178 L A MB GE1 08/13/13 Final VI LF 13.625 121 02/04/13 06/04/13 0.00 C 0.403 0.133 0.300 - - - 83.60 ONS Supply (JV) Bacolod North Rd. Occidental Satisfactory Const. 1-unit 2 Storey 6 CL Sch. Bldg., 92.60% 271 169 D.L. Aureo Construction 24894 L D SB GB1 Tanauan, Leyte 08/19/13 1st/Final VIII LF 7.015 120 03/09/13 07/16/13 0.00 C 0.493 0.133 0.300 - - - 92.60 ONS Tanauan NHS (San Roque NHS) V. Satisfactory

Drainage System at Tanghas-Lirang Creek 88.40% 272 D.L. Aureo Construction 24894 L D SB GE2 Tacloban City 08/22/13 1st/Final VIII LF 4.286 107 04/18/13 08/02/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS along Picas San Jose DZR Airport Rd. Satisfactory D.T. Estaron Engineering Const. of 1-Unit, 2-Storey, 6-Cl Sch. Bldg. Borongan City, 273 170 5082 L C SB GB1 08/20/13 1st VIII LF 6.301 250 03/27/13 12/01/13 14.70 O 0.391 0.258 0.150 0.030 0.053 0.033 91.50 AHD and Construction at Maypangadan NHS Eastern Samar D.T. Estaron Engineering Completion of MPB in ESSU (Main Borongan City, 77.40% 274 5082 L C SB GB1 08/20/13 1st/Final VIII LF 2.392 90 03/26/13 06/23/13 65.56 C 0.299 0.175 0.300 - - - 77.40 AHD and Construction Campus) Eastern Samar Unsatisfactory Repair/Rehab./Impvt. of Pedestrian Overpass 275 171 D.V. Salud Construction 6564 L AA MB GE1 along Old Manila South Rd., Sta. Rosa-Dila Sta. Rosa City, Laguna 08/10/13 1st IVA LF 9.752 120 04/05/13 08/02/13 -24.50 O 0.339 0.071 0.000 0.022 0.023 0.017 47.20 DEL Sect., K0039+900 Road Upgrading (Gravel to Paved) along Awang-Upi-Lebak-Kalamansig-Palimbang- Dalanon Construction Sarangani Rd. (Km.1963+471-Km.1977+121) Palimbang, Sultan 89.60% 276 172 11205 L B MA GE1 08/18/13 1st/Final XII LF 47.765 357 07/06/12 06/27/13 19.44 C 0.396 0.200 0.300 - - - 89.60 AHD Refregiration Suppply & Service Realign to Rd. Upgrading (Gravel to Paved) Kudarat V. Satisfactory along Awang-Upi-Lebak-Kalamasig-Palimbang- Sarangani Rd. (Km.2034+798-Km.2036+898) Rd. Upgrading (Gravel to Paved) along Awang- Dalanon Construction Upi-Lebak-Kalamansig-Palimbang-Sarangani Palimbang, Sultan 277 11205 L B MA GE1 08/18/13 1st XII LF 45.366 196 04/02/13 10/14/13 -1.17 O 0.340 0.300 0.138 0.024 0.051 0.033 88.60 DEL Refregiration Suppply & Service Rd. (Km.2010+661-Km.2012+961 w/ Kudarat exception) Repair/Rehab./Impv't. of Damaged Paved Nat'l 278 173 Damico Builders & Supplies 30355 L B MA GE1 Rd. along Tibag-Burgos Rd., K0137+600- Tarlac City 08/08/13 1st III LF 9.601 120 06/02/13 09/29/13 1.01 O 0.343 0.238 0.150 0.030 0.043 0.033 83.70 AHD K0147+570, w/ exception Rds. to Address Critical Bottlenecks, Nat'l Rd. 84.48% 279 174 Danvic Construction 24439 L B MA GE1 Traffic Decongestion-Widening of ABS-CBN Davao City 08/19/13 Final XI LF 19.629 132 01/23/13 06/03/13 0.00 C 0.404 0.133 0.300 - - - 83.70 ONS Quimpo Blvd. Diversion Rd. Satisfactory 85.06% 280 175 Danysons Construction 25452 L A MA GE1 Conc. of Dummon-Turod FMR Quezon, Isabela 08/08/13 Final II LF 4.600 85 01/28/13 04/21/13 0.00 C 0.345 0.133 0.300 - - - 77.80 ONS Satisfactory Rehab./Reconst./Upgrading (Int. Sect.) along 78.60% 281 Danysons Construction 25452 L A MA GE1 Ilagan-Delfin Albano-Mallig Rd. K0448+484- Mallig, Isabela 08/08/13 1st/Final II LF 3.923 75 01/22/13 04/06/13 0.00 C 0.286 0.200 0.300 - - - 78.60 ONS K0449+390 Unsatisfactory

Const. of Revetment, Saug River Flood Control, Asuncion, Davao del 89.08% 282 176 Davao Concrete Products 12090 L A MA GE2 08/12/13 Final XI LF 18.589 243 08/07/12 04/06/13 0.00 C 0.465 0.133 0.300 - - - 89.80 ONS Cambanogoy (Tagum Panabo Circ. Rd.) Norte V. Satisfactory

Embankment of Maniki Jumbo Bridge 80.84% 283 Davao Concrete Products 12090 L A MA GE1 Approach "B" (Upstream R/S) Tagum Panabo Davao del Norte 08/13/13 Final XI LF 1.985 135 11/06/12 03/20/13 0.00 C 0.400 0.133 0.300 - - - 83.30 ONS Circ. Rd. Unsatisfactory Rehab./Reconst./Upgrading of Damaged Paved 83.20% 284 Davao Concrete Products 12090 L A MA GE1 Nat'l Rds., SDCR K1439+000-K1439+470 Surigao del Sur 08/16/13 1st/Final XIII LF 12.282 166 02/04/13 07/19/13 0.00 C 0.404 0.128 0.300 - - - 83.20 ONS (1439+150-K1439+647.70) Satisfactory Davhez Trading and Const. of Sch. Bldg., Pilar Elem. Sch. at 85.90% 285 177 9833 L A MA GB1 Las Piñas City 08/15/13 1st/Final NCR LF 2.890 75 04/08/13 06/21/13 5.33 C 0.370 0.189 0.300 - - - 85.90 AHD Construction Pilar Satisfactory

Dellosa Design-Build Impv't. of Jct. GSC Circ. Rd. Makar-Tupi- 81.38% 286 178 11533 L A MA GE1 General Santos City 08/23/13 Final XII LF 13.750 125 01/14/13 05/18/13 0.00 C 0.409 0.133 0.300 - - - 84.20 ONS Services Marbel Rd. (Geometric Control) Unsatisfactory Const. of 2-Storey, 4-CL Sch. Bldg. at Sta. Felomina, Iligan 91.70% 287 179 Dicon Builders Corp. 33181 L A MA GB1 08/17/13 1st/Final X LF 4.417 150 03/28/13 08/24/13 3.33 C 0.484 0.133 0.300 - - - 91.70 AHD Northeast 1-A CES City V. Satisfactory Const./Conc. of Rds. Brgy. Tablon & 88.60% 288 Dicon Builders Corp. 33181 L A SB GE1 Cagayan de Oro City 08/27/13 1st/Final X LF 1.149 52 06/03/13 07/24/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Cugman Satisfactory Digos Tesston Construction & Completion of Coronon Bridge I along Davao- Sta. Cruz, Davao del 82.38% 289 180 Supplies (Formerly: Act 8021 L A MA GE1 Cotabato Rd., (Davao City-Jct. Digos Sect.), 08/09/13 Final XI LF 14.670 104 01/28/13 05/11/13 0.00 C 0.322 0.200 0.300 - - - 82.20 ONS Construction) K1542+612.696-K1543+291.112 Sur Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 11 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Dipolog Top Construction and Const./Concrete Paving of Dipolog By Pass Rd. 85.32% 290 181 6678 L A MA GE1 Dipolog City 08/22/13 Final IX LF 34.592 394 05/30/12 06/27/13 0.22 C 0.361 0.200 0.300 - - - 86.10 AHD Development Corporation (Phase II) Turno-Galas-Sinamon Rd. Satisfactory

Dipolog Top Construction and 291 6678 L A MA GE2 Const. of Flood Control, Bolicon Turno, Dipolog City 08/22/13 2nd IX LF 29.844 255 07/31/12 04/10/13 - O 0.329 0.300 0.000 0.020 0.042 0.033 72.40 DEL Development Corporation

Repair/Rehab./Impv't. of Kabugao-Pudtol-Luna 89.40% 292 182 DJCM Construction 27678 L C SB GE1 Pudtol, Apayao 08/13/13 1st/Final CAR LF 9.872 121 03/27/13 07/25/13 3.00 C 0.461 0.133 0.300 - - - 89.40 AHD Rd., K0662+000 - K0065+350 w/ exception V. Satisfactory

293 DJCM Construction 27678 L C SB GB1 Const. of Hall of Justice Luna, Apayao 08/12/13 1st CAR LF 4.606 170 03/27/13 09/12/13 0.20 O 0.380 0.240 0.150 0.015 0.047 0.050 88.20 AHD

Repair/Rehab./Impv't. of Kabugao-Pudtol-Luna 86.70% 294 DJCM Construction 27678 L C SB GE1 Luna, Apayao 08/13/13 1st/Final CAR LF 9.900 150 03/27/13 08/23/13 8.00 C 0.434 0.133 0.300 - - - 86.70 AHD rd., K0678+000-K0681+000 w/ exception Satisfactory DJY Construction / E.K.C. Impv't. of Bengaw-ngaw Caves Road, 87.60% 295 183 Construction and Aggregates JV-12-089 L B MA GE1 Tublay, Benguet 07/31/13 Final CAR LF 18.984 190 11/10/12 05/18/13 4.40 C 0.422 0.133 0.300 - - - 85.50 AHD Sta.0+000-Sta.2+500 (v.s.) Ambongdolan (JV) Satisfactory Const. of Iponan River Control (Upstream of 89.20% 296 184 DL Enterprises 18155 L A SB GE2 Cagayan de Oro City 08/11/13 1st/Final X LF 5.512 80 11/27/12 02/14/13 1.89 C 0.459 0.133 0.300 - - - 89.20 AHD Iponan Bridge I & II), Bulua Side V. Satisfactory Const. of DepEd Standard Type Sch. Bldg. Cauayan, Negros 297 185 Double MM Builders 33758 L D SB GB1 08/09/13 1st VI LF 2.283 95 05/24/13 08/26/13 -1.78 O 0.357 0.212 0.132 0.030 0.043 0.050 82.40 DEL @ Cauayan NHS Occidental 1. Assets Preservation of Nat'l Rds., Int. Sect.; DQT Builders Corporation A. Prev. Maint.; 1. Nat'l. Arterial (Prev. Maint.); 85.68% 298 186 7950 L A MA GE1 Quezon 08/05/13 Final IVA LF 36.599 175 02/12/13 08/05/13 1.14 C 0.443 0.133 0.300 - - - 87.60 AHD (Formerly: DQT Builders) 1. Daang Maharlika; D. K0182+500- Satisfactory K0185+481 DQT Builders Corporation Rd. Upgrading (Concrete Paving) of Mulanay- 299 7950 L A MA GE1 Quezon 08/07/13 1st IVA LF 20.000 180 03/11/13 09/06/13 0.07 O 0.303 0.284 0.150 0.030 0.030 0.033 83.00 AHD (Formerly: DQT Builders) San Francisco Rd., K0287+115-K0288+000

DQT Builders Corporation Rd. Upgrading (Concrete Paving) Mulanay-San 300 7950 L A MA GE1 Quezon 08/07/13 1st IVA LF 24.847 180 03/11/13 09/06/13 0.08 O 0.283 0.300 0.150 0.030 0.030 0.033 82.60 AHD (Formerly: DQT Builders) Francisco Rd., K0288+000-K0289+102 Rehab./Reconst./Upgrading of MCR DQT Builders Corporation 301 7950 L A MA GE1 (Km.101+000-Km.103+814 & Km.99+741- Gasan, Marinduque 08/08/13 2nd IVB LF 46.713 213 01/25/13 08/25/13 -0.97 O 0.339 0.291 0.140 0.015 0.030 0.033 84.80 DEL (Formerly: DQT Builders) Km.100+072) (Gasan Sect.)

DQT Builders Corpration Const. of Lucban Overpass SLSU along Lucena- 302 7950 L A MA GE1 Lucban, Quezon 08/08/13 1st IVA LF 8.932 150 02/26/13 07/25/13 20.37 O 0.357 0.212 0.150 0.030 0.023 0.050 82.20 AHD (Formerly: DQT Builders) Tayabas-Lucban-Sampaloc-Mauban Port Rd.

DSB Construction & Supply, 88.86% 303 187 Inc. (Formerly: DSB 16126 L AA MB GE1 Const. of Sta. Misericordia Bridge No. 1 Sto. Domingo, Albay 08/12/13 Final V LF 5.106 385 05/14/12 07/02/13 12.21 C 0.464 0.133 0.300 - - - 89.70 AHD Construction & Supply) Satisfactory Repair of Collapse Pvmt. & Const. of Drainage DSB Construction & Supply, System, Slope Protection & Concrete Guardrails 87.80% 304 Inc. (Formerly: DSB 16126 L AA MB GE1 Sto. Domingo, Albay 08/12/13 1st/Final V LF 10.217 120 12/10/12 04/08/13 0.00 C 0.446 0.132 0.300 - - - 87.80 ONS along Sto. Domingo Pob. Rd., K0541+000- Construction & Supply) Satisfactory K0545+150 w/ exceptions Package I, Repair/Rehab./Impvt. of Daan DSB Construction & Supply, Maharlika Nat'l Rd., San Rafael, Castilla & 305 Inc. (Formerly: DSB 16126 L AA MB GE1 Castilla, Sorsogon 08/14/13 1st V LF 23.554 180 03/25/13 09/20/13 3.05 O 0.353 0.276 0.150 0.030 0.035 0.033 87.70 AHD Repair/Rehab./Impvt. of Daang Maharlika Nati'l Construction & Supply) Rd., San Vicente DSB Construction & Supply, Cluster 1- Prev. Maint. (Asphalt Overlay) along 85.20% 306 Inc. (Formerly: DSB 16126 L AA MB GE1 Daang Maharlika Jct. Legazpi Sto. Domingo- Legazpi City 08/10/13 1st/Final V LF 31.485 142 03/10/13 07/29/13 2.11 C 0.352 0.200 0.300 - - - 85.20 AHD Construction & Supply) Tabaco- Camarines Sur Bdry. Rd. Satisfactory DSB Construction & Supply, Const./Rehab./Impv't. of Basud River 307 Inc. (Formerly: DSB 16126 L AA MA GE2 Bacacay, Albay 08/12/13 1st V LF 18.139 200 02/12/13 08/30/13 -9.89 O 0.368 0.300 0.051 0.030 0.055 0.033 83.70 DEL Construction & Supply) Control, Brgy, Basud Prev. Maint. (MFO-1) Daang Maharlika Km. 83.30% 308 188 DSO Enterprises 10733 L B MA GE1 Laguna 08/12/13 1st/Final IVA LF 7.582 25 02/19/13 03/15/13 0.00 C 0.333 0.200 0.300 - - - 83.30 ONS 0075+072.50-Km.0076+045 Satisfactory

Dungan Constructors & Trading Rehab. & Impv't. of C-5 Rd. (K0017+600- 84.90% 309 189 Corp. (Formerly: Dungan 19301 L B MA GE1 Makati City 08/09/13 1st/Final NCR LF 10.364 60 03/26/13 05/24/13 0.00 C 0.349 0.200 0.300 - - - 84.90 ONS Construction and Trading) K0018+600) (Int. Sect.) Satisfactory

Rd. Upgrading of Nat'l Rds. (Int. Sect.) along Sogod-Tabuelan Rd: 1)K0110+490-K0111+(- 88.50% 310 190 Duros Development Corp. 22729 L AAA LA GE1 Cebu 08/10/13 1st/Final VII LF 12.040 166 02/13/13 07/28/13 0.00 C 0.434 0.151 0.300 - - - 88.50 ONS 422); 2)K0114+867-K0115+520; Satisfactory 3)K0110+414-K0110+466 Const./Widening/Upgrading of Access Maya, Daanbantayan, 87.40% 311 Duros Development Corp. 22729 L AAA LA GE1 08/09/13 1st/Final VII LF 27.645 179 01/23/13 07/20/13 10.22 C 0.441 0.133 0.300 - - - 87.40 AHD Rd. to RORO, Daanbantayan Port Cebu Satisfactory Guiwanon Revetment along Toledo- 85.84% 312 Duros Development Corp. 22729 L AAA SB GE2 Tabuelan, Cebu 08/10/13 Final VII LF 1.476 63 10/25/12 12/26/12 6.35 C 0.416 0.200 0.300 - - - 91.60 AHD Tabuelan Rd., K0106+179 Satisfactory Impv't of Bacolod-Murcia-D.S. Benedicto-San Dynamic Builders & Carlos City Rd. & Slope Protection, Km. 86.42% 313 191 24712 L AAA LA GE1 Negros Occidental 08/13/13 Final VI LF 94.398 360 04/23/12 04/15/13 0.56 C 0.457 0.133 0.300 - - - 89.00 AHD Construction Co. (Phil.), Inc. 42+400-Km. 52+760 (Rd.), Km. 71+933-Km. Satisfactory 75.855 (Coconet) D.S. Benedicto Impv't./Widening of Bacolod-Murcia-D.S. Dynamic Builders & Murcia, Negros 314 24712 L AAA LA GE1 Benedicto-San Carlos City Rd., (Murcia Sect.), 08/13/13 3rd VI LF 189.980 525 07/09/12 12/15/13 1.70 O 0.335 0.237 0.150 0.030 0.047 0.050 84.90 AHD Construction Co. (Phil.), Inc. Km.17+260-Km.029+860 (w/ exceptions) Occidental

Const. of Four (4) Storey, Sixteen (16) CL Sch. 315 192 E F C Enterprises 11795 L AA MA GB1 Muntinlupa City 08/14/13 1st NCR LF 28.943 240 05/31/13 01/25/14 14.22 O 0.305 0.240 0.150 0.030 0.041 0.033 79.90 AHD Bldg. at Muntinlupa NHS, Brgy. Pob.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 12 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. along Baliuag-Candaba Rd. Km.51+(- E M L Construction & 87.70% 316 193 10151 L A MA GE1 1570)-Km52+(-630) w/ exception, Km.52+(- Baliuag, Bulacan 08/14/13 1st/Final III LF 15.517 105 04/02/13 07/15/13 0.00 C 0.377 0.200 0.300 - - - 87.70 ONS Trading 630)-Km.54+000 w/ exception & Km.55+1080 Satisfactory to Km.55+1323 Widening/Conc. of McArthur Highway MNR E M L Construction & 317 10151 L A MA GE1 inc. Drainage and Traffic Mgt. @ K083+580- Angeles City 08/06/13 1st III LF 44.024 214 03/05/13 10/04/13 43.99 O 0.358 0.240 0.150 0.030 0.051 0.033 86.20 AHD Trading K0094+000 (w/ exceptions) E M L Construction & Const. and Repair of Drainage System 318 10151 L A MA GE1 Balanga City, Bataan 08/07/13 1st III LF 22.501 180 02/26/13 08/24/13 0.73 O 0.354 0.240 0.150 0.030 0.051 0.033 85.80 AHD Trading along Old Manila North Rd. (OMNR) E M L Construction & 84.40% 319 10151 L A MA GE1 Rehab./Const. of FMR @ Brgy. Dangcol Balanga City, Bataan 08/03/13 1st/Final III LF 9.297 120 03/18/13 07/15/13 0.00 C 0.411 0.133 0.300 - - - 84.40 ONS Trading Satisfactory E S De Guzman Bambang, Nueva 320 194 17494 L B SB GB1 Const. of Classroom, Bambang NHS 08/13/13 1st II LF 4.590 150 04/10/13 09/16/13 0.55 O 0.367 0.240 0.150 0.030 0.052 0.033 87.20 AHD Construction Vizcaya

Nat'l Rds. to other Strategic Tourist Destinations 85.36% 321 195 E U S Construction 21878 L B MA GE1 Pres. Cory Aquino Blvd. (Bagasbas-Talisay Daet, Camarines Norte 08/08/13 Final V LF 47.775 210 12/01/12 07/04/13 0.00 C 0.398 0.200 0.300 - - - 89.80 ONS Sect.), Brgy. Bagasbas Satisfactory E. Garcia Construction, Corp. (Formerly: E. Garcia Const. of Slope Protection & Safety Devices Libmanan, Camarines 86.30% 322 196 7243 L AA MA GE2 08/05/13 1st/Final V LF 6.524 117 11/05/12 03/01/13 0.00 C 0.430 0.133 0.300 - - - 86.30 ONS Construction & E. Garcia along Daang Maharlika, Brgy. Sigamot Sur Satisfactory Gravel & Sand) Prev. Maint. along Manila North Rd. 84.16% 323 197 E. Guadiz Construction 27172 L B SB GE1 Abulug, Cagayan 08/02/13 Final II LF 6.245 45 02/27/13 04/12/13 5.85 C 0.438 0.133 0.300 - - - 87.10 AHD K0676+000-K0676+900 Satisfactory Const./Impv't. of Bagac-Mariveles Rd., 87.00% 324 198 E. Lapus Enterprises 10813 L B MA GE1 Mariveles, Bataan 08/02/13 1st/Final III LF 4.792 30 03/15/13 04/13/13 3.33 C 0.437 0.133 0.300 - - - 87.00 AHD Mariveles Sect. Satisfactory

Const./Cons./Impvt. Of Bagac-Mariveles Rd. 86.70% 325 E. Lapus Enterprises 10813 L B MA GE1 Km.182+348-Km.188+351 w/ exception Mariveles, Bataan 08/02/13 1st/Final III LF 14.097 75 03/15/13 05/28/13 0.00 C 0.434 0.133 0.300 - - - 86.70 ONS (Mariveles Sect.) Brgy. Biaan Satisfactory Repair/Rehab./Impvt. of Bagac-Mariveles 86.40% 326 E. Lapus Enterprises 10813 L B MA GE1 Mariveles, Bataan 08/02/13 1st/Final III LF 9.581 90 03/12/13 06/09/13 2.22 C 0.431 0.133 0.300 - - - 86.40 AHD Rd., Mariveles Sect. Satisfactory E.A. Sancho Construction Inc. CP-II(1-2) Rd. Upgrading (Gravel to Paved) 327 199 (Formerly: E.A. Sancho 5648 L AA LA GE1 Iriga City 08/01/13 1st V LF 11.654 178 02/22/13 08/18/13 2.00 O 0.345 0.243 0.150 0.030 0.055 0.033 85.60 AHD along Iriga City-San Isidro-Hanawan Rd. Construction) 84.08% 328 200 E.A. Unabia Construction 29305 L B MA GE1 Conc. of Sta. Filomena FMR Calanasan, Apayao 08/12/13 Final CAR LF 9.319 180 12/20/12 06/17/13 7.23 C 0.400 0.133 0.300 - - - 83.30 AHD Satisfactory Maint. of Nat'l Rd. (Item 200-Aggregate Base Course a)Abbut-Conner Rd., K0542+370- K0562+000 (w/ exceptions); b)Conner- 329 201 E.B.J.R. Construction 19780 L C SB GE1 Kabugao Rd., K0577+369- K0602+792; c) Apayao 08/10/13 1st CAR LF 2.998 90 06/28/13 09/25/13 -3.87 O 0.333 0.300 0.111 0.030 0.050 0.017 84.10 DEL Kabugao-Pudtol-Luna Rd., K0591+413- K0603+000 (w/ exceptions); d)Abbut-Conner Rd., K0548+500-K0550+500 w/ exception Const. of 6-Cl, 2-Storey Bldg. at San Fernando City, La 330 202 E.E. Madayag Construction 25029 L D SB GB1 07/30/13 1st I LF 5.584 200 03/27/13 10/12/13 0.14 C 0.371 0.240 0.150 0.030 0.033 0.033 85.70 AHD Catbangen Elem. Sch. Union Maint., Rehab. & Impv't. of Nat'l Arterial & Sec. Rds. of Biliran Circ. Road (Slope Protection) 88.40% 331 203 E.G. Canabe Construction 27358 L C SB GE1 Biliran Province 08/14/13 1st/Final VIII LF 9.750 145 03/06/13 07/29/13 9.66 C 0.451 0.133 0.300 - - - 88.40 AHD Km.1037+000-Km.1054+000 w/ exceptions Satisfactory along Almeria-Kawayan-Culaba Rd. Const. of River Control Proj. along Magat 88.90% 332 204 E.M. Bayatan Construction 21332 L D SB GE2 Solano, Nueva Vizcaya 08/13/13 1st/Final II LF 4.550 75 04/03/13 06/16/13 0.00 C 0.456 0.133 0.300 - - - 88.90 ONS River, Dadap Sect. Satisfactory Bambang, Nueva 88.14% 333 E.M. Bayatan Construction 21332 L D SB GE2 Cupas River Control, Sto. Domingo Sect. 08/13/13 Final II LF 16.166 105 02/23/13 06/06/13 6.33 C 0.446 0.133 0.300 - - - 87.90 AHD Vizcaya Satisfactory E.R. Dela Cruz Construction Const. of Maloma Dike (Upstream Sect.) 85.10% 334 205 32158 L B MA GE2 Cabangan, Zambales 08/03/13 1st/Final III LF 17.738 135 01/23/13 06/06/13 28.89 C 0.418 0.133 0.300 - - - 85.10 AHD & Supply Cabangan Side Satisfactory E.R. Dela Cruz Construction 84.00% 335 32158 L B MA GE2 Raising of Grade Vega-Maculcol Dike San Narciso, Zambales 08/03/13 1st/Final III LF 13.304 120 01/23/13 05/22/13 20.00 C 0.407 0.133 0.300 - - - 84.00 AHD & Supply Satisfactory E.R. Dela Cruz Construction Const. of Slope Protection/Flood Control, 83.90% 336 32158 L B MA GE2 San Felipe, Zambales 08/03/13 1st/Final III LF 17.737 120 01/23/13 05/22/13 1.67 C 0.406 0.133 0.300 - - - 83.90 AHD & Supply Maculcol Dike (Downstream) San Felipe Side Satisfactory Panganiban, 337 206 E.R. Rodriguez Construction 12596 L A MB GE2 Const. of Flood Control & Drainage 07/30/13 1st V LF 18.983 252 02/13/13 10/22/13 1.00 O 0.339 0.300 0.150 0.030 0.058 0.033 91.00 AHD Catanduanes Bayombong, Nueva 338 207 E.S. Almuete Construction 5131 L C SB GB1 Const. of Classroom, Bonfal NHS 08/13/13 1st II LF 6.084 180 04/10/13 10/06/13 -8.44 O 0.385 0.240 0.066 0.033 0.029 0.033 78.60 DEL Vizcaya Prev. Maint., Iloilo-Antique Rd.; a)K0001+(- 325)-K0001+977; b)K0003+(-969)-K0003+(- 87.60% 339 208 East Asia Construction, Inc. 1904 L A MA GE1 Iloilo City 08/23/13 1st/Final VI LF 36.209 60 02/04/13 04/04/13 0.00 C 0.443 0.133 0.300 - - - 87.60 ONS 627); c)K0006+100-K0006+782; d)Chainage Satisfactory 0942-Chainage 2012 Rd. Upgrading (Gravel to Paved) Int. Sect., 340 209 EC Samonte Construction 31019 L B MA GE1 Zamboanga del Norte 08/12/13 2nd IX LF 27.747 118 02/04/13 06/01/13 -49.41 O 0.303 0.300 0.000 0.012 0.033 0.033 68.10 DEL Liloy-Siocon Rd., K1982+124-K1983+130

Eddmari Construction and Tulaoc-Sto. Domingo Rd. (Prev. Maint.-Nep- 87.00% 341 210 20301 L AAA MA GE1 San Simon, Pampanga 07/29/13 1st/Final III LF 2.665 15 03/25/13 04/08/13 6.67 C 0.437 0.133 0.300 - - - 87.00 AHD Trading Int. Sect.) Km.0061+545-Km.0061+830.9 Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 13 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Eddmari Construction and Repair/Rehab. of Slope Protection along 342 20301 L AAA MA GE2 Angeles City 08/06/13 1st III LF 13.622 150 04/01/13 08/28/13 3.33 O 0.369 0.240 0.150 0.030 0.047 0.033 86.90 AHD Trading Sapangbalen @ P. Bulu Edmond Ray Construction & Const. of Sch. Bldg., Canibungan Proper Tudela, Misamis 88.20% 343 211 33167 L C SB GB1 08/16/13 1st/Final X LF 1.144 84 03/27/13 06/18/13 0.00 C 0.449 0.133 0.300 - - - 88.20 ONS Supply ES Occidental Satisfactory Edmond Ray Construction 344 33167 L C SB GB1 Const. of Sch. Bldg., Montol NHS Ozamis City 08/16/13 1st X LF 2.195 137 03/27/13 08/10/13 -5.00 O 0.376 0.300 0.056 0.030 0.050 0.033 84.50 DEL and Supply

Widening along Daang Maharlika K0396+000- 90.40% 345 212 EGB Construction 13722 L A MA GE1 Ilagan City, Isabela 08/05/13 1st/Final II LF 9.518 113 03/20/13 07/10/13 0.00 C 0.404 0.200 0.300 - - - 90.40 ONS K0397+214.36 w/ exception, Baligatan V. Satisfactory 89.30% 346 EGB Construction 13722 L A MA GE2 Const. of Pamplona Flood Control Proj. Pamplona, Cagayan 08/02/13 1st/Final II LF 19.396 180 12/06/12 06/05/13 2.58 C 0.460 0.133 0.300 - - - 89.30 AHD V. Satisfactory

Rehab./Reconst./Upgrading of Damaged Paved 88.10% 347 EGB Construction 13722 L A MA GE1 Nat'l Rds., Cagayan-Apayao Rd. (Maddarulug- Apayao, Cagayan 07/29/13 1st/Final II LF 15.716 195 02/14/13 08/27/13 1.27 C 0.448 0.133 0.300 - - - 88.10 AHD Solana Sect.n) K0488+024-K0488+922 Satisfactory Rehab./Strengthening of Minanga Bridge, 86.54% 348 EGB Construction 13722 L A MA GE1 Tumauini, Isabela 08/05/13 Final II LF 9.133 123 01/28/13 05/30/13 0.00 C 0.414 0.200 0.300 - - - 91.40 ONS Minanga Satisfactory Enliven Construction and Const. of Sch. Bldg. Standard Modified 93.00% 349 213 34230 L D SB GB1 Tacloban City 08/22/13 1st/Final VIII LF 1.204 60 05/31/13 07/29/13 23.33 C 0.497 0.133 0.300 - - - 93.00 AHD Enterprises (7.0 x 9.0m) at Leyte NHS V. Satisfactory Enliven Construction and Const. of Sch. Bldg. Standard Modified 92.80% 350 34230 L D SB GB1 Tacloban City 08/22/13 1st/Final VIII LF 1.204 60 05/31/13 07/29/13 23.33 C 0.495 0.133 0.300 - - - 92.80 AHD Enterprises (7.0 x 9.0m) at San Jose Central Sch. V. Satisfactory Restoration of Damaged Box Culvert & Slope Enrique A. Flores, Jr. 92.30% 351 214 2421 L A MA GE1 Protection along Kennon Rd., K0241+780- Baguio City 08/17/13 1st/Final CAR LF 7.522 130 03/27/13 08/03/13 0.00 C 0.490 0.133 0.300 - - - 92.30 ONS Contractor K0241+830 V. Satisfactory 92.20% 352 215 EPN Builders & Developers 30341 L C SA GB1 Const. of MPB, Nagtipunan Central Sch. Nagtipunan, Quirino 08/12/13 1st/Final II LF 2.700 75 4/10/2013 06/23/13 0.00 C 0.489 0.133 0.300 - - - 92.20 ONS V. Satisfactory Repair/Rehab./Impvt. of Surigao-Davao Coastal Equi-Parco Construction Lingig, Surigao del 90.30% 353 216 14332 L AAA LB GE1 Rd,. Mangagoy-Lingig Sect., Km.1468+831- 08/17/13 1st/Final XIII LF 9.900 105 04/23/13 08/05/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS Company Km.1469+344 Sur V. Satisfactory Equi-Parco Construction Impvt. of Drainage Facilities along Butuan City- 354 14332 L AAA LB GE2 Butuan City 08/23/13 1st XIII LF 16.739 220 03/28/13 11/02/13 2.63 O 0.392 0.240 0.150 0.030 0.040 0.050 90.20 AHD Company Malaybalay Rd. Montilla Blvd. Sect. Equi-Parco Construction Repair/Rehab./Impv't. of Daang Maharlika Kitcharao, Agusan del 86.30% 355 14332 L AAA LB GE1 (Surigao-Agusan Rd.) along Pob. Sect., 08/06/13 1st/Final XIII LF 9.605 45 03/26/13 05/09/13 6.01 C 0.430 0.133 0.300 - - - 86.30 AHD Company Norte Satisfactory Km.1167+977-Km.1168+777 w/ exception Widening of Butuan-Cagayan de Oro-Iligan- Equi-Parco Construction 85.78% 356 14332 L AAA LB GE1 Agusan-Misamis Oriental Rd., Agusan del Butuan City 08/23/13 Final XIII LF 28.850 209 01/30/13 08/26/13 0.46 C 0.429 0.133 0.300 - - - 86.20 AHD Company Norte Dumalagan Bdry. Sect. Satisfactory

Equi-Parco Construction Rehab./Reconst./Strengthening of Bridges along Gingoog City, 92.05% 357 14332 L AAA LB GE1 08/20/13 Final X LF 25.112 330 03/09/12 02/01/13 0.00 C 0.482 0.200 0.300 - - - 98.20 ONS Company Nat'l Rds., Kibaluyot Bridge along BCIR Misamis Oriental V. Satisfactory

Widening/Concr. of Butuan City-CDOC-Iligan Equi-Parco Construction Laguindingan, 89.47% 358 14332 L AAA LB GE1 City Rd. (Opol-Laguindingan Airport Sect.), 08/19/13 Final X LF 83.789 360 07/11/12 07/05/13 15.00 C 0.398 0.200 0.300 - - - 89.80 AHD Company Km.1466+282.80-Km.1467+282.80 Misamis Oriental V. Satisfactory Const. of Slope Protection at Iponan River Equi-Parco Construction 86.35% 359 14332 L AAA LB GE2 (Downstream of Iponan Bridge I & II) Bulua Cagayan de Oro City 08/11/13 Final X LF 15.412 183 09/21/12 03/22/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Company Dise along BCIR, Phase I Satisfactory Equi-Parco Construction 84.82% 360 14332 L AAA LB GE2 Cagayan de Oro Basin Cagayan de Oro City 08/22/13 Final X LF 46.562 255 07/27/12 04/07/13 0.00 C 0.407 0.200 0.300 - - - 90.70 ONS Company Satisfactory

Equi-Parco Construction Const. of Cagayan de Oro Coastal Rd. (By-Pass 361 14332 L AAA LB GE2 Cagayan de Oro City 08/16/13 2nd X LF 137.944 328 09/24/12 08/16/13 -3.42 O 0.314 0.300 0.116 0.030 0.053 0.033 84.60 DEL Company Rd.) inc. ROW, K1434+820-K01436+180.00

Eric Van P. Sesbreno Const. of Sta. Fe Flood Control along Nueva Sta. Fe, Nueva 82.40% 362 217 26243 L A SB GE2 Vizcaya-Pangasinan Rd., K0216+980- 09/26/13 1st/Final II LF 9.506 120 10/15/12 02/11/13 0.00 C 0.402 0.122 0.300 - - - 82.40 ONS Construction Vizcaya Satisfactory K0217+300, Baracbac Sect. Eric Van P. Sesbreno Replacement/Const. of Burnay Bridge & 363 218 Construction / C.T. Leoncio JV-11-340 L A MB GE1 Lagawe, Ifugao 08/05/13 2nd CAR LF 19.910 253 07/17/12 03/26/13 -25.74 O 0.330 0.300 0.000 0.030 0.050 0.033 74.30 DEL Approaches inc. Const. of Detour Bridge Construction and Trading (JV) ESR Construction and Rd. Upgrading (Gravel to Paved) Crossing Sta. 364 219 10451 L AA LA GE1 Clara-Sandayong Rd., Km.1800+920- Zamboanga Sibugay 08/09/13 1st IX LF 24.653 170 03/01/13 08/17/13 0.49 O 0.371 0.300 0.150 0.020 0.033 0.033 90.70 AHD Supplies Km.1802+000 ESR Construction and Impv't./Concrete Paving of Shoulders, Guipos, Zamboanga 89.72% 365 10451 L AA LA GE1 08/16/13 Final IX LF 135.589 402 02/23/12 03/30/13 - C 0.382 0.200 0.278 - - - 86.00 DEL Supplies Dumalinao-Margosatubig Rd. del Sur V. Satisfactory Rehab./Reconst./Strengthening of Bridges along ESR Construction and Nat'l Rds. Guintoloan Bridge along Nat'l Rds' 366 10451 L AA LA GE1 Zamboanga Sibugay 08/09/13 2nd IX LF 21.915 510 04/02/12 08/24/13 0.91 O 0.357 0.268 0.150 0.024 0.033 0.033 86.50 AHD Supplies Guintoloan Bridge Crossing Sta. Clara- Sandayong Rd., Km.1782+017-Km.1782+047 Rd pgrading (Gravel to Paved) Int. Sect., ESR Construction and 367 10451 L AA LA GE1 Sindangan-Siayan-Dumingag-Mahayag Rd., Zamboanga del Sur 08/17/13 2nd IX LF 35.886 259 02/25/13 11/10/13 26.95 O 0.323 0.300 0.150 0.018 0.037 0.033 86.10 AHD Supplies K1683+500-K1685+000 Reconst./Upgrading of Damaged Paved Nat'l ESR Construction and 85.70% 368 10451 L AA LA GE1 Rds. Int. Sect., Liloy-Ipil Rd., K1991+020- Zamboanga del Norte 08/12/13 Final IX LF 23.175 179 02/04/13 08/01/13 0.00 C 0.327 0.200 0.300 - - - 82.70 ONS Supplies K1992+397 Satisfactory ESR Construction and Rd. Upgrading (Gravel to Paved) Int. Sect. 369 10451 L AA LA GE1 Sindangan-Siayan-Dumingag-Mahayag Rd., Zamboanga del Sur 08/17/13 2nd IX LF 46.795 186 02/15/13 08/29/13 7.27 O 0.353 0.254 0.150 0.012 0.033 0.050 85.20 AHD Supplies K1678+150-K1679+817

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 14 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

ESR Construction and Upgrading/Concrete Paving of Sindangan- Siayan, Zamboanga 84.42% 370 10451 L AA LA GE1 08/23/13 Final IX LF 127.987 349 02/14/12 01/27/13 0.00 C 0.283 0.200 0.300 - - - 78.30 ONS Supplies Siayan-Dumingag-Mahayag Rd. del Norte Satisfactory Prev. Maint./Asphalt Overlay of Lanao- ESR Construction and Bulug, Zamboanga 84.38% 371 10451 L AA LA GE1 Pagadian-Zamboanga City Rd., (Basalem-Pob. 08/14/13 Final IX LF 28.261 80 02/22/13 05/12/13 2.35 C 0.400 0.133 0.300 - - - 83.30 AHD Supplies Bulig Sect.), Km.1726+308.65-Km.1729+170 Sibugay Satisfactory Impv't./Upgrading (Gravel to Paved) of Rizal to ESR Construction and Dapitan City, 83.22% 372 10451 L AA LA GE1 Dipolog Loop Rd. Guimputlan-Tag-ulo Sect. 08/21/13 Final IX LF 62.890 330 05/23/12 04/17/13 0.55 C 0.295 0.200 0.300 - - - 79.50 AHD Supplies Sta.1852+377-Sta.1853+960 w/ exceptions Zamboanga del Norte Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. Int. Sect. Sindangan-Liloy Rd. ESR Construction and Liloy, Zamboanga del 373 10451 L AA LA GE1 Km.1958+750-Km.1960+503 Re: Upgrading 08/12/13 1st IX LF 29.101 179 02/21/13 08/19/13 -3.87 O 0.325 0.289 0.111 0.030 0.042 0.033 83.00 DEL Supplies (Asphalt Paved to Concrete Paved) along Liloy- Norte Ipil Rd. Km.1988+000-Km.1991+020 85.70% 374 220 ETM Construction 16285 L C SB GE1 Const. of Rd. @ Sitio Daing, Duale Limay, Bataan 08/02/13 1st/Final III LF 2.906 129 03/21/13 07/27/13 0.00 C 0.424 0.133 0.300 - - - 85.70 ONS Satisfactory

Euluz Construction and Prev. Maint. Pulilan Railroad Station Km.44+(- 61.10% 375 221 32080 L D SB GE1 Pulilan, Bulacan 08/14/13 1st/Final III LF 2.686 23 03/28/13 04/19/13 - C 0.478 0.133 0.000 - - - 61.10 DEL Supply 121)-Km.44+840 & Km.44+840-Km.44+970 Poor

Const. of Multi-Purpose Pvmt. @ Brgy. 376 222 Everlast Construction 2364 L A MA GE1 Zamboanga Sibugay 08/06/13 4th IX LF 9.175 570 01/18/12 08/09/13 -4.00 O 0.355 0.300 0.110 0.020 0.037 0.033 85.50 DEL Pasonanca (Mayor C. Climaco Park) Lavezares, Northern 377 223 Ezjones Construction Inc. 34462 L D SB GB1 Const. of 2-Storey, 2-CL SB San Jose ES 08/10/13 1st VIII LF 2.428 180 03/27/13 09/22/13 -5.46 O 0.380 0.300 0.095 0.030 0.058 0.000 86.30 DEL Samar Bobon, Northern 378 Ezjones Construction Inc. 34462 L D SB GB1 Const. of 2-Storey, 2-CL SB San Isidro ES 08/10/13 1st VIII LF 2.299 170 03/27/13 09/12/13 -9.11 O 0.372 0.300 0.059 0.030 0.064 0.025 85.00 DEL Samar F. Casalme Construction & Const. of 2-Storey, 2-Classroom @ 90.90% 379 224 33657 L D SB GB1 Lemery, Batangas 07/30/13 1st/Final IVA LF 2.237 120 04/09/13 08/06/13 11.67 C 0.476 0.133 0.300 - - - 90.90 AHD Supply Lemery E/S V. Satisfactory F. Gurrea Construction, Reconst. of Embarcadero Bridge, Km. 89.30% 380 225 6995 L AAA MB GE1 Barotac Viejo, Iloilo 08/21/13 1st/Final VI LF 46.445 270 03/08/12 12/03/12 0.00 C 0.460 0.133 0.300 - - - 89.30 ONS Incorporated 0247+160.00 V. Satisfactory

F. Jimenez Construction and Replacement/Rehab./Strengthening of Overhead 93.30% 381 226 34796 L D SB GE1 Lopez, Quezon 08/06/13 1st/Final IVA LF 4.555 90 02/22/13 05/22/13 0.00 C 0.500 0.133 0.300 - - - 93.30 ONS Supply Bridge along Daang Maharlika V. Satisfactory Rd. Upgrading (Concrete Paving) of Mulanay- F.F. Rosales General 382 227 8814 L B MA GE1 San Francisco Road, K0297+082 - K0298+082, Mulanay, Quezon 08/06/13 1st IVA LF 22.043 180 03/11/13 09/06/13 0.12 O 0.316 0.253 0.150 0.030 0.040 0.033 82.20 AHD Contractor Brgy. Ilayang Yuni Const. of Slope Protection for Marikina River F.P. De Guzman 90.00% 383 228 10296 L A MA GE2 along Brgy. Tumana, Eastbank Marikina City, Marikina City 08/06/13 1st/Final NCR LF 43.822 214 03/06/13 10/05/13 33.18 C 0.467 0.133 0.300 - - - 90.00 AHD Construction Inc. 2nd District Sta. 6+120-Sta.6+987.70 V. Satisfactory F.P. De Guzman Const. of MPB, Brgy. 91, Zone 8, Franco 88.40% 384 10296 L A MA GB1 Tondo, Manila 07/29/13 1st/Final NCR LF 3.796 194 02/18/13 05/18/13 0.00 C 0.384 0.200 0.300 - - - 88.40 ONS Construction Inc. St. Satisfactory Feaj Construction and Repair/Rehab./Impv't. of Puerto Galera Puerto Galera, Oriental 86.20% 385 229 13609 L B SB GE2 08/02/13 Final IVB LF 9.893 160 08/30/12 03/27/13 0.00 C 0.405 0.178 0.300 - - - 88.30 ONS General Services Drainage, Calapan North Rd. Mindoro Satisfactory Ferdstar Builders Repair/Maint. of Gumain Porac Diversion 87.70% 386 230 4965 L B MA GE2 Lubao, Pampanga 07/31/13 1st/Final III LF 6.422 75 12/26/12 03/10/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Contractors Channel Satisfactory Ferdstar Builders Drainage Impv't. along Mexico 87.20% 387 4965 L B MA GE2 Mexico, Pampanga 07/29/13 Final III LF 6.586 120 12/26/12 04/24/13 0.00 C 0.463 0.133 0.300 - - - 89.60 ONS Contractors Km.71+000-Km.71+630 Satisfactory Repair/Rehab./Const. of Drainage System along Ferdstar Builders Gov't. Center Rd. Network, Maharlika Highway 388 4965 L B MA GE1 Palo, Leyte 08/22/13 1st VIII LF 37.215 300 02/20/13 12/16/13 10.76 O 0.400 0.240 0.150 0.012 0.045 0.050 89.70 AHD Contractors & Pawing-Campetic Rd., Brgy. Candahug to Brgy. Pawing

Ferdstar Builders Rehab./Reconst. of Biliran Circ. Rd., Esperanza- 87.34% 389 4965 L B MA GE1 Biliran Province 08/14/13 Final VIII LF 9.259 78 01/04/13 03/23/13 1.54 C 0.441 0.133 0.300 - - - 87.40 AHD Contractors Looc Rd. Sect., Km.1104+000-Km.1104+520 Satisfactory

Const./Widening/Upgrading/Rehab. of Access 390 231 FFJJ Construction 16712 L AAA LB GE1 Rd. to declare Tourism Destination, Brgy. Malita, Davao del Sur 08/10/13 2nd XI LF 45.264 227 01/14/13 08/28/13 -1.94 O 0.397 0.292 0.131 0.010 0.023 0.033 88.60 DEL Lacaron Const. of Bank Protection along Hijo River Tagum City, Davao del 85.10% 391 FFJJ Construction 16712 L AAA MA GE2 08/12/13 Final XI LF 18.731 180 07/30/12 01/26/13 0.00 C 0.383 0.147 0.300 - - - 83.00 ONS Apokon Sect. (Surigao-Davao Coastal Rd.) Norte Satisfactory Repair/Rehab. of Protection Works, 84.32% 392 FFJJ Construction 16712 L AAA MA GE2 Malita, Davao del Sur 08/07/13 Final XI LF 9.250 159 07/31/12 01/05/13 0.00 C 0.397 0.133 0.300 - - - 83.00 ONS Pamana Satisfactory Widening of Surigao-Davao Coastal Rd., Maco, Comval 82.90% 393 FFJJ Construction 16712 L AAA LB GE1 08/14/13 1st/Final XI LF 20.314 180 01/28/13 07/26/13 25.80 C 0.396 0.133 0.300 - - - 82.90 AHD Hijo Sect. Province Satisfactory Const. of Caraga River Protection, San Caraga, Davao 394 FFJJ Construction 16712 L AAA MA GE2 08/17/13 1st XI LF 14.405 247 01/29/13 10/02/13 -8.50 O 0.347 0.300 0.065 0.030 0.020 0.033 79.50 DEL Jose Oriental Rd. Upgrading (gravel to paved) along Davao- Sarangani Coastal Rd., (Malalag-Malita-JAS 395 FFJJ Construction 16712 L AAA LB GE1 Davao del Sur 08/07/13 1st XI LF 42.724 179 03/07/13 09/01/13 2.87 O 0.315 0.150 0.150 0.030 0.023 0.033 70.10 AHD Rd.), Km.1678+776-Km.1679+860, Calian Sect. Rds. to Address Critical Bottlenecks Nat'l Bridges, Widening/Rehab./Strengthening of 396 FFJJ Construction 16712 L AAA LB GE1 South Cotabato 08/05/13 1st XII LF 4.854 190 02/05/13 08/13/13 1.11 O 0.369 0.240 0.150 0.020 0.037 0.033 84.90 AHD Permanent Bridges, Luayan Bridge along Midsayap-Marbel Rd.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 15 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Replacement of (Temporary to Permanent) NIA 71.78% 397 FFJJ Construction 16712 L AAA LB GE1 Bridge (15 LM FSB) along Kidapawan- M'lang, Cotabato 08/09/13 Final XII LF 11.439 316 02/06/12 12/17/12 - C 0.405 0.200 0.000 - - - 60.50 DEL Calunasan-M'lang Rd., CO21+958-CO22+438 Poor FGM Builders Resources & Const. of 2-Storey, 2-Cl @ V. Corcuera 398 232 31807 L C SB GB1 Davao City 08/19/13 1st XI LF 2.215 240 03/27/13 11/21/13 3.12 O 0.358 0.285 0.150 0.030 0.038 0.050 91.10 AHD Development Corporation ES, Package Z FGM Builders Resources & Const. of MPBs at Guihing Central E/S, Hagonoy, Davao del 88.80% 399 31807 L C SB GB1 08/09/13 1st/Final XI LF 2.925 90 04/02/13 06/30/13 6.65 C 0.455 0.133 0.300 - - - 88.80 AHD Development Corporation Brgy. Guihing Sur Satisfactory Rd. Upgrading (Gravel to Paved) of Tabango- 400 233 Fiat Construction Services 5463 L AAA LB GE1 Catmon-La Fortuna-Manlawaan-Gimarco Rd., Tabango, Leyte 08/12/13 2nd VIII LF 44.040 223 01/07/13 08/17/13 -4.48 O 0.362 0.240 0.105 0.018 0.042 0.017 78.40 DEL Km.1040+297-Km.1042+307 Rd. Upgrading (Gravel to Paved) (Int. Sect.) inc. Drainage & Rd. Facilities along Bacolod- Munai, Lanao del 82.90% 401 Fiat Construction Services 5463 L AAA LB GE1 08/12/13 1st/Final X LF 25.961 164 01/18/13 07/30/13 18.26 C 0.396 0.133 0.300 - - - 82.90 AHD Madalum Highway, Km.1567+000- Norte Satisfactory Km.1567+1469, Km.1571+405-Km.1571+995 Fiat Construction Services / Const. of Cupas River Control Caloocan- Bambang, Nueva 90.70% 402 234 Jann-Norris Construction JV-12-403 L AAA MA GE2 08/13/13 1st/Final II LF 15.898 120 02/23/13 06/22/13 0.84 C 0.474 0.133 0.300 - - - 90.70 AHD Supplies (JV) Macate Sect. Vizcaya V. Satisfactory Fiat Construction Services / Rehab./Reconst./Upgrading along Bacolod Calatrava, Negros 88.00% 403 235 Kenneth Construction and JV-12-271 L AAA LB GE1 08/13/13 1st/Final VI LF 33.122 193 02/07/13 08/20/13 3.59 C 0.447 0.133 0.300 - - - 88.00 AHD North R.d, K0138+713-K0140+757 General Merchandise (JV) Occidental Satisfactory Rd. Upgrading (Gravel to Conc.) of Mt. Fiat Construction Services / MG 86.53% 404 236 JV-11-321 L AAA LB GE1 Province-Ilocos Sur via Kayan Rd., K0385+995- Tadian, Mt. Province 08/02/13 Final CAR LF 83.201 327 03/12/12 02/01/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS Samidan Construction (JV) K0391+000, Bunga Satisfactory Rehab./Reconst./Upgrading of Damaged Nat'l Rd., (Int. Sect.) Jct. MWCR (Bagong Silang)- Abra de Ilog, Occidental 405 237 Firmabuilt Construction 30175 L B MA GE1 07/29/13 1st IVB LF 6.960 138 02/11/13 06/28/13 - O 0.332 0.300 0.000 0.015 0.025 0.000 67.20 DEL Cabacao, Diversion Rd., K0424+(-)399 to Mindoro K0424+(-)029, Brgy. Cabagao Firmabuilt Construction / Replacement/Reconst. of Mangat Bridge along Rizal, Occidental 406 238 Performance Builders & JV-12-257 L B MA GE1 07/30/13 1st IVB LF 6.736 220 12/09/12 07/16/13 -4.00 O 0.355 0.300 0.046 0.030 0.037 0.033 80.10 DEL Mindoro West Coastal Rd., Brgy. San Pedro Developers Corporation (JV) Mindoro Rehab./Reconst./Upgrading of Damage Paved Nat'l Rd. Jct. Santiago Banayo-Lidlidda-San First Northway Development 407 239 11645 L B MA GE1 Emilio-Quirino Rd. a)K0369+129-K0370+242 Ilocos Sur 08/12/13 1st I LF 36.423 203 02/22/13 09/12/13 -3.97 O 0.335 0.300 0.110 0.030 0.037 0.033 84.50 DEL and Construction Corporation b)K0270+477-K0370+587, c)K0370+745- K0371+726 Flordes Construction & Porposed Impv't. of Drainage System along P. 89.10% 408 240 16916 L B MA GE1 Pandacan, Manila 08/31/13 1st/Final NCR LF 4.491 147 02/20/13 07/16/13 24.49 C 0.458 0.133 0.300 - - - 89.10 AHD Trading Quirino Ave., near Nagtahan Link Rd. V. Satisfactory Flordes Construction & Repair/Rehab./Impv't. of Palumpong St., 86.20% 409 16916 L B MA GE1 Pandacan, Manila 08/01/13 1st/Final NCR LF 9.702 150 12/28/12 04/26/13 0.83 C 0.429 0.133 0.300 - - - 86.20 AHD Trading w/ exception Satisfactory Flordes Construction & Reconst. of Rizal Ave., w/ Drainage 84.50% 410 16916 L B MA GE1 Sta. Cruz, Manila 07/29/13 1st/Final NCR LF 13.019 180 01/31/13 07/29/13 5.56 C 0.412 0.133 0.300 - - - 84.50 AHD Trading Impv't. Satisfactory Flordes Construction & Rd. Upgrading (Gravel to Paved) of Eastern Doña Remedios 86.34% 411 16916 L B MA GE1 08/15/13 Final III LF 45.888 210 01/31/13 08/28/13 1.49 C 0.422 0.133 0.300 - - - 85.50 AHD Trading Bulacan Rd. K098+000-K0100+000 Trinidad, Bulacan Satisfactory

Flordes Construction & Rd. Upgrading (Gravel to Paved) of Eastern Doña Remedios 85.80% 412 16916 L B MA GE1 08/15/13 1st/Final III LF 23.881 150 01/31/13 06/29/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Trading Bulacan Rd. K0104+000-K0105+000 Trinidad, Bulacan Satisfactory Rehab. of Drainage System, Camp 89.30% 413 241 FLT Enterprises 23039 L A SB GE2 Iloilo City 08/23/13 1st/Final VI LF 3.395 60 04/03/13 06/01/13 0.00 C 0.460 0.133 0.300 - - - 89.30 ONS Delgado, Fort San Pedro V. Satisfactory Const. of Sch. Bldg. a. 1-storey 1-CL @ Fortstone Construction 414 242 31668 L B SB GB1 Migdolog ES; b. 1-storey 2-CL @ John Martin Davao del Sur 08/17/13 1st XI LF 1.019 135 03/29/13 08/10/13 0.59 O 0.375 0.300 0.150 0.030 0.025 0.033 91.30 AHD Enterprises Johnson HS, Don Marcelino Rehab. & Impv't. of Antonio Arnaiz Ave., (Int. 88.50% 415 243 Framecon Builders 22482 L B MA GE1 Sect.) (Km 5+911-Km 6+411/Km7+458- Makati City 08/09/13 1st/Final NCR LF 13.145 60 03/06/13 05/04/13 0.00 C 0.452 0.133 0.300 - - - 88.50 ONS Satisfactory Km8+021) Prev. Maint. along Pulilan-Calumpit Rd. 87.20% 416 Framecon Builders 22482 L B MA GE1 Pulilan, Bulacan 08/14/13 1st/Final III LF 5.223 44 03/02/13 04/14/13 0.00 C 0.439 0.133 0.300 - - - 87.20 ONS Km.49+300-Km.50+232 Satisfactory Const. of Two-Storey Four CL Sch. Bldg. 417 Framecon Builders 22482 L B SB GB1 Calumpit, Bulacan 08/14/13 1st III LF 4.592 150 05/15/13 10/11/13 2.10 O 0.342 0.240 0.150 0.020 0.047 0.033 83.20 AHD at Northville 9 Elem. Sch. Framecon Builders / Jerry R. Const. of Digmala River Control Vega Sect., Bongabon, Nueva 87.60% 418 244 Santiago Construction Joint JV-12-602 L B MA GE2 Sta. 0+000-Sta.0+859.40 w/ exception (847.55 08/10/13 1st/Final III LF 19.091 120 03/17/13 07/14/13 8.00 C 0.443 0.133 0.300 - - - 87.60 AHD Venture LM) Ecija Satisfactory Reconst. of Critical Sect. along Nat'l. Rds. such as Slips Emergencies/Protection Works, Rd. Slip 91.70% 419 245 Freden Construction 22665 L B SB GE2 along Digos-Makar Rd., Brgy. Batomelong General Santos City 08/22/13 1st/Final XII LF 9.350 165 02/24/13 08/07/13 0.00 C 0.484 0.133 0.300 - - - 91.70 ONS Sect., K1634+431-K1634+453, Brgy. V. Satisfactory Batomelong G.F. Falcis Construction and Const. of MPB at Bacauan-Mambatad 85.30% 420 246 26147 L B SB GB1 Miag-ao, Iloilo 08/14/13 Final VI LF 3.799 150 01/19/13 05/18/13 25.78 C 0.476 0.133 0.300 - - - 90.90 AHD Supply Elem. Sch. Satisfactory Widening of Aklan East Road (Kalibo 83.78% 421 247 G.F. Rovero Merchandising 27268 L B MA GE1 Kalibo, Aklan 08/17/13 Final VI LF 9.834 170 01/15/13 07/03/13 1.92 C 0.391 0.133 0.300 - - - 82.40 AHD Sect.) Satisfactory G.O. Marron General 422 248 6844 L D SB GB1 Const. of MPB Alcala, Pangasinan 07/29/13 1st I LF 1.940 100 06/25/13 10/02/13 48.18 O 0.333 0.240 0.150 0.030 0.037 0.050 84.00 AHD Contractor Replacement of Alimango Bridge II along Binalbagan, Negros 423 249 Galeno Construction, Inc. 3427 L A MA GE1 08/10/13 1st VI LF 13.327 209 02/01/13 08/28/13 0.54 O 0.346 0.240 0.150 0.030 0.051 0.050 86.70 AHD Bacolod South Rd. Occidental

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 16 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Rehab./Reconst. along Guimbal-Tubungan Rd., 85.56% 424 250 Galeno Construction, Inc. 3427 L A MA GE1 Guimbal, Iloilo 08/14/13 Final VI LF 7.167 77 01/31/13 04/17/13 0.00 C 0.362 0.133 0.300 - - - 79.50 ONS Km 34+790-Km 35+290 Satisfactory Conc. of Brgy. Rd. (Agpo-Camagong Lagonoy, Camarines 89.70% 425 Gane Tekno Builders 19528 L B MA GE1 08/02/13 1st/Final V LF 0.934 20 03/01/13 03/20/13 0.00 C 0.397 0.200 0.300 - - - 89.70 ONS Sect.) Sur V. Satisfactory Gaver General 426 251 24186 L C SB GE1 Conc. of FMR, Estancia Kalibo, Aklan 08/17/13 1st VI LF 4.859 135 04/06/13 08/18/13 1.62 O 0.346 0.200 0.150 0.030 0.035 0.033 79.40 AHD Merchandising Rehab. of Sta. Margarita River Control along GCI Construction and Taguntungan River Jct. Gattaran-Cumao- 427 252 Development Corp. (Formerly: 11346 L AAA MB GE2 Baggao, Cagayan 07/30/13 1st II LF 13.567 169 04/03/13 09/18/13 11.69 O 0.397 0.240 0.150 0.030 0.043 0.033 89.30 AHD Capissayan-Sta. Margarita Bolos Point Rd. G.C.I. Construction) (JGCCS-MBPR) Const. of Tuguegarao City By-Pass inc. RROW, GCI Construction and Sta.477+363.9-Sta.479+182.3 / Tuguegarao City, 87.92% 428 Development Corp. (Formerly: 11346 L AAA MB GE1 08/02/13 Final II LF 79.052 425 02/27/12 04/26/13 0.00 C 0.463 0.133 0.300 - - - 89.60 ONS Sta.484+248.833 (EQ): Sta.483+232- G.C.I. Construction) Cagayan Satisfactory Sta.484+541.59 GCI. Construction and Rehab./Reconst. of Damaged Nat'l Rd. (Int. 89.60% 429 Development Corp. (Formerly: 11346 L AAA MB GE1 Sect.-Secondary), -Cabusao Rd. Camarines Sur 08/03/13 1st/Final V LF 11.619 119 01/21/13 05/19/13 1.68 C 0.398 0.198 0.300 - - - 89.60 AHD G.C.I. Construction) K0400+800-K0401+385 V. Satisfactory GCI. Construction and Conc. of Naga-Milaor Circ. & Rd. Right- 88.28% 430 Development Corp. (Formerly: 11346 L AAA MB GE1 Milaor, Camarines Sur 08/05/13 Final V LF 47.043 240 05/18/12 01/12/13 3.00 C 0.436 0.133 0.300 - - - 86.90 AHD G.C.I. Construction) of-Way Activities Satisfactory GCI. Construction and Prev. Maint.: Asphalt Overlay w/ Reblocking 86.20% 431 Development Corp. (Formerly: 11346 L AAA MB GE1 Pili, Camarines Sur 08/06/13 1st/Final V LF 9.228 54 01/30/13 03/25/13 0.00 C 0.362 0.200 0.300 - - - 86.20 ONS along Pili Diversion Rd. (Int. Sect.) G.C.I. Construction) Satisfactory GCI. Construction and Rehab./Impvt. of Pili-Tigaon-Albay-Bdry. 432 Development Corp. (Formerly: 11346 L AAA MB GE1 Camarines Sur 08/04/13 1st V LF 73.338 293 04/01/13 01/18/14 5.95 O 0.350 0.240 0.150 0.030 0.055 0.033 85.80 AHD G.C.I. Construction) Rd., Pili-Ocampo Sect. Camarines Sur/Albay Diversion Road (San Fernnado-Oas Sect. of the Pan Phil. Highway GCI. Construction and (PPH), Camarines Sur/Albay inc. Bridges 85.00% 433 Development Corp. (Formerly: 11346 L AAA MB GE1 (Camarines Sur Sect.), Impv't./Upgrading of Camarines Sur 08/07/13 1st/Final V LF 47.199 220 09/20/12 04/27/13 0.00 C 0.395 0.155 0.300 - - - 85.00 ONS G.C.I. Construction) Salvacion Cristo Rey-Goyudan Rd. inc. Repair Satisfactory of Goyudan Bridge Approaches & Slope Protection Works Geety Realty & Development Rd. Upgrading (Gravel to Paved) (Int. Sect.) 434 253 30447 L B MA GE2 Carcar City 08/05/13 1st VII LF 17.643 209 01/18/13 08/14/13 11.25 O 0.349 0.236 0.150 0.030 0.045 0.050 86.00 AHD Corporation Diversion Rd., Carcar Rotunda Heritage Area Geety Realty & Development Const. of Flood Control at Aloguinsan 435 30447 L B MA GE2 Aloguinsan, Cebu 08/07/13 1st VII LF 22.410 194 02/18/13 08/30/13 0.70 O 0.295 0.300 0.150 0.030 0.050 0.033 85.80 AHD Corporation Bridge Gemma Construction Supply Rd. Upgrading (Gravel to Paved) along 436 254 Inc. (Formerly: Gemma 5044 L AA MB GE1 Demoloc-Little Baguio-Alabel Rd., Malita, Davao del Sur 08/07/13 2nd XI LF 44.040 179 03/07/13 09/01/13 9.22 O 0.333 0.300 0.150 0.030 0.030 0.033 87.60 AHD Construction Supply) Km.1649+800-Km.1650+920, Tayudan Sect. Asphalt Overlay of Cotabato-Lanao Rd. (Gang- Gemma Construction Supply Landasan-Parang Sect./Lamsan - Simuay Jct. Sultan Kudarat, 91.70% 437 255 Inc. (Formerly: Gemma 5044 L AA MB GE1 08/14/13 1st/Final XII LF 44.735 100 03/20/13 07/13/13 0.00 C 0.417 0.200 0.300 - - - 91.70 ONS Sect.) K1856+500-K1858+859; K1862+750- Construction Supply) Maguindanao V. Satisfactory K1863+148 Gemma Construction Supply Const. of Turn-Outs (Loading/Unloading Bay) Tacurong City, Sultan 90.10% 438 Inc. (Formerly: Gemma 5044 L AA MB GE1 along Kidapawan-Ala Jct. Rd., Bo. 2 08/17/13 Final XII LF 5.822 95 12/17/12 03/21/13 0.00 C 0.443 0.176 0.300 - - - 91.90 ONS Kudarat V. Satisfactory Construction Supply) Km.1677+525-Km.1677+925 Repair/Rehab./Impv't. along Kidapawan-Ala Jct. Gemma Construction Supply Road (EJC Montilla Sect.), Km.1677+525- Tacurong City, Sultan 89.12% 439 Inc. (Formerly: Gemma 5044 L AA MB GE1 08/17/13 Final XII LF 4.990 52 02/25/13 05/02/13 0.00 C 0.402 0.197 0.300 - - - 89.90 ONS Km.1677+785 (right side) & Km.1677+665- Construction Supply) Kudarat V. Satisfactory Km.1677+925 (left side) Prev. Maint. (Int. Sect.); Nat'l. Arterial Rd., Gemma Construction Supply Marbel-Makar Rd., K1699+000-K1700+019, 87.78% 440 Inc. (Formerly: Gemma 5044 L AA MB GE1 South Cotabato 08/06/13 Final XII LF 41.435 166 01/30/13 07/14/13 4.22 C 0.400 0.200 0.300 - - - 90.00 AHD K1700+019-K1701+007, K1703+1013- Construction Supply) Satisfactory K1704+994 Gemma Construction Supply Prev. Maint. (Int. Sect.): Nat'l. Secondary Rd.: 85.12% 441 Inc. (Formerly: Gemma 5044 L AA MB GE1 Midsayap-Marbel Rd., K1785+997-K1786+992 South Cotabato 08/05/13 Final XII LF 27.897 115 01/30/13 05/24/13 6.09 C 0.360 0.196 0.300 - - - 85.60 AHD Construction Supply) & K1786+992-K1789+028 Satisfactory Rehab./Reconst./Upgrading of Int. Sect., Jct. Aurora-Monte-Jct. Labangan Rd., K1650+923- Labangan, Zamboanga 442 256 Genetian Builders 18052 L A MA GE1 08/17/13 2nd IX LF 36.408 196 02/25/13 09/09/13 0.38 O 0.314 0.300 0.150 0.022 0.033 0.033 85.20 AHD K1650+993; K1651+000- K1652+290 & del Sur K1652+790-K1654+000 Const./Rehab./Impv't. of Lower Sibuguey Flood Protection along Lanao-Pagadian-ZC Rd. 81.62% 443 Genetian Builders 18052 L A MA GE1 Zamboanga Sibugay 08/08/13 Final IX LF 28.290 275 07/23/12 04/23/13 0.00 C 0.306 0.200 0.300 - - - 80.60 ONS Balucanan-Salinding Sect., Phase II Km.2+240- Unsatisfactory Km.4+080 Rehab./Const./Upgrading of Damaged Paved Jimenez, Misamis 39.56% 444 Genetian Builders 18052 L A MA GE1 Nat'l Rds., Jimenez Old Route, Km.1724+1046- 08/14/13 Final X LF 2.715 75 02/02/12 04/16/12 - C 0.043 0.133 0.000 - - - 17.60 DEL Km.1724+1287 Occidental Poor Rd. Upgrading (Gravel to Paved) along Quezon- Gicar Construction Inc. 445 257 12624 L A MB GE1 Mapawa-Capalayan-Espina-Navarro Rd. (Int. Surigao del Norte 08/08/13 1st XIII LF 23.548 180 02/12/13 09/10/13 1.83 O 0.357 0.240 0.150 0.030 0.035 0.050 86.20 AHD (Formerly: Gicar Construction) Sect.) Km.1133+652-Km.1134+585 Gicar Construction Inc. Flood Control Protection Works, Mainit Mainit, Surigao del 83.00% 446 12624 L A MA GE2 08/08/13 1st/Final XIII LF 16.849 150 02/18/13 07/17/13 1.50 C 0.397 0.133 0.300 - - - 83.00 AHD (Formerly: Gicar Construction) Lakewall Norte Satisfactory Rd. Upgrading (Gravel to Paved) Gingoog- Gicar Construction, Inc. Claveria-Villanueva Rd. K0133+520- 84.63% 447 12624 L A MB GE1 Misamis Oriental 08/22/13 Final X LF 134.939 380 05/29/13 06/12/13 0.00 C 0.364 0.191 0.300 - - - 85.50 ONS (Formerly: Gicar Construction) K01334+315, K01334+336-K01337+096, Satisfactory K01337+311-K01338+500

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 17 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Impv't./Upgrading (Gravel to Concrete) of NRJ Gicar Construction, Inc. / Surigao City, Surigao 448 258 JV-12-391 L A MB GE1 Lipata-Punta Bilar & Mabua Rd., K1+620- 08/08/13 1st XIII LF 80.617 235 03/19/13 11/08/13 0.03 O 0.358 0.265 0.150 0.030 0.035 0.050 88.80 AHD Santech Builders (J.V.) K4+295.75 del Norte Rd. Upgrading from Gravel to Concrete along Talacogon, Agusan del 82.88% 449 259 Giovanni Construction 12168 L B MA GE1 Butuan City-Talacogon, Loreto-Veruela-Sta. 08/21/13 Final XIII LF 24.002 461 01/31/12 05/05/13 0.00 C 0.394 0.133 0.300 - - - 82.70 ONS Josefa Rd. (K1332+897-K1333+869) Sur Satisfactory GLS Construction and Aloran, Misamis 92.00% 450 260 34233 L D SB GB1 Const. of Sch. Bldg., Mitazan IS 08/14/13 1st/Final X LF 0.641 105 04/02/13 07/15/13 25.00 C 0.487 0.133 0.300 - - - 92.00 AHD General Merchandise Occidental V. Satisfactory GLS Construction and Aloran, Misamis 92.00% 451 34233 L D SB GB1 Const. of Sch. Bldg., Banisilon PS 08/14/13 1st/Final X LF 0.628 105 04/02/13 07/15/13 25.00 C 0.487 0.133 0.300 - - - 92.00 AHD General Merchandise Occidental V. Satisfactory Replacement of Bridges along Nat'l Rds. GLS Construction and 87.30% 452 34233 L D SB GE1 (Temporary to Permanent) Bagacay Bridge Misamis Occidental 08/16/13 1st/Final X LF 3.440 120 03/07/13 07/04/13 3.33 C 0.440 0.133 0.300 - - - 87.30 AHD General Merchandise along Bagacay Cadre Rd. Satisfactory Golden Construction and Paracale, Camarines 88.00% 453 261 35001 L D SB GE1 Conc. of FMR, Brgy. Bagumbayan 08/08/13 1st/Final V LF 0.987 30 05/17/13 06/16/13 0.00 C 0.380 0.200 0.300 - - - 88.00 ONS Supply Norte Satisfactory

Golden Roadrunner Maint./Repair/Rehab. of Flood Control along 93.00% 454 262 10177 L D SB GE2 Dumarao, Capiz 08/19/13 1st/Final VI LF 10.698 107 03/01/13 06/15/13 4.67 C 0.497 0.133 0.300 - - - 93.00 AHD International Corporation Ayuyan-Tinaytayan Rd., Dangula Sect. V. Satisfactory Replacement/Rehab./Strengthening of Goldrich Construction & Permanent Bridges along Nat'l Rds. Ferguson 89.60% 455 263 Trading (Formerly: Gold Rich 16489 L AAA MB GE1 Bridge 2 along Ferguson Rd. & Baguio City 08/16/13 1st/Final CAR LF 8.695 190 03/01/13 09/06/13 28.76 C 0.463 0.133 0.300 - - - 89.60 AHD Construction) Rehab./Reconst./Conc. of its Approaches, V. Satisfactory K0306+1257-K0305+1510 Opening/Impv't. of Baguio Circ. Rd. (Western Link) Sect. 1:Kennon Rd. Jct.-Montecillo, K0245+440-K0245+957, Sect. 2:Ciudad Goldrich Construction & Grande-St. Louis University, K0245+1748- 89.12% 456 Trading (Formerly: Gold Rich 16489 L AAA MB GE1 K0245+1910, Sect. 3:Bukakeng-Balacbac, Baguio City 08/16/13 Final CAR LF 38.762 431 02/24/12 04/29/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS Construction) K0247+766-K0248+223.61, Sect. 4:Balacbac V. Satisfactory to Marcos Highway, (248+1875-248+2347) & Sect. 5:Happy Hallow (246+1690-246+3860) Eastern Link Goldrich Construction & Prev. Maint. (Int. Sect.) along Loakan Rd., 88.60% 457 Trading (Formerly: Gold Rich 16489 L AAA MB GE1 Baguio City 08/16/13 1st/Final CAR LF 15.818 132 05/24/13 10/02/13 45.27 C 0.453 0.133 0.300 - - - 88.60 AHD K0245+1227-K0245+1665 Construction) Satisfactory Goldrock Construction & Rd. Upgrading (Gravel to Paved) Jct. New 458 264 5389 L AAA LB GE1 El Nido, Palawan 08/10/13 1st IVB LF 41.168 271 01/22/13 10/19/13 0.86 O 0.360 0.235 0.150 0.030 0.060 0.050 88.50 AHD Development Corp. Ibajay Rd. K0281+756 to K0284+810 Goldrock Construction & Rehab./Upgrading (Conc.) of Taytay-El Nido 88.18% 459 5389 L AAA LB GE1 El Nido, Palawan 08/09/13 Final IVB LF 107.307 479 11/16/11 03/08/13 0.00 C 0.424 0.133 0.300 - - - 85.70 ONS Development Corp. Rd. (Km.210+557-Km.215+406) Satisfactory Const./Widening/Upgrading/Rehab. of Access Goldrock Construction & Rd. Conc. of Taytay (Pancol)-El Nido Rd. 460 5389 L AAA LB GE1 Taytay, Palawan 08/09/13 4th IVB LF 90.224 479 04/30/12 08/21/13 -5.80 O 0.372 0.300 0.092 0.030 0.051 0.017 86.20 DEL Development Corp. (Km.215+900-Km.217+240; Km.217+540- Km.220+881) w/ exception Taytay Sect. Goldrock Construction & Rd. Upgrading (gravel to paved) El Nido Jct., 461 5389 L AAA LB GE1 El Nido, Palawan 08/10/13 1st IVB LF 10.465 271 01/22/13 10/19/13 6.96 O 0.341 0.234 0.150 0.030 0.051 0.050 85.60 AHD Development Corp. New Ibajay Rd., K0328+268-K0328+810.50 Const./Widening /Upgrading/Rehab. of Access Goldrock Construction & 462 5389 L AAA LB GE1 Rd. Conc. of Taytay-El Nido Rd. (Km.254+910- El Nido, Palawan 08/09/13 2nd IVB LF 93.176 509 05/10/12 09/30/13 -12.28 O 0.372 0.300 0.027 0.030 0.051 0.017 79.70 DEL Development Corp. Km.259+000 w/ exception) Upgrading/Impv't. along Ambiong-Lubas Rd., 463 265 Gonzalo Construction 1826 L A MB GE1 La Trinidad, Benguet 07/29/13 1st CAR LF 45.596 209 02/08/13 09/04/13 -6.98 O 0.379 0.300 0.080 0.030 0.055 0.033 87.70 DEL (Benguet Sect.) K0253+560-K0259+035 (v.s.)

Rehab./Reconst./Upgrading of Damaged Paved 464 Gonzalo Construction 1826 L A MB GE1 Kapangan, Benguet 07/31/13 1st CAR LF 8.461 201 02/11/13 08/29/13 -0.27 O 0.360 0.239 0.147 0.015 0.045 0.033 83.90 DEL Nat'l Rds. (Int. Sect.) (Package XIV-2012)

Replacement of Bolo Bridge along Gurel-Bokod- 465 Gonzalo Construction 1826 L A MB GE1 Bokod, Benguet 07/30/13 1st CAR LF 22.037 225 02/09/13 09/21/13 -10.50 O 0.377 0.240 0.045 0.023 0.050 0.017 75.20 DEL Kabayan-Buguias-Abatan Rd., K0300+569

Conc. of Rd. at Brgy. Opao, Mandaue City, Cebu (Proposed for Modification to Asphalting 87.60% 466 266 Gonzalodo Enterprises 30681 L B MA GE1 Mandaue City, Cebu 08/12/13 1st/Final VII LF 3.181 60 03/27/13 05/25/13 1.67 C 0.443 0.133 0.300 - - - 87.60 AHD of Rd. at Brgy. Opao, Mandaue City w/ Satisfactory Drainage Facilities) Const. of Three (3) Storey, Nine (9) Cl Sch. 467 Gonzalodo Enterprises 30681 L B SB GB1 Lapu-Lapu City, Cebu 08/12/13 1st VII LF 10.775 180 03/27/13 09/22/13 0.36 O 0.360 0.240 0.150 0.030 0.055 0.033 86.80 AHD Bldg. at Basak Elem. Sch. Rd. Upgrading (Gravel to Paved) of Nat'l Sec. Good Fortune International, Rd., Guimbal-Igbaras-Tubungan-Leon Rd., 86.20% 468 267 9246 L B MA GE1 Leon, Iloilo 08/22/13 1st/Final VI LF 13.806 105 02/04/13 05/19/13 14.29 C 0.429 0.133 0.300 - - - 86.20 AHD Incorporated K0066+727-K0067+460 (K0066+727- Satisfactory K0067+591) 87.26% 469 268 Goodvibe Builders, Inc. 32686 L D SB GE1 Const. of Brgy. Rd. at La Paz Villasis, Pangasinan 08/09/13 Final I LF 3.994 84 01/11/13 04/04/13 0.00 C 0.490 0.133 0.300 - - - 92.30 ONS Satisfactory Const. of Geometric Alignment of Roadway along Cebu-Balamban Transcentral Highway, 470 269 Gowil Builders 18733 L B MA GE1 Balamban, Cebu 08/08/13 2nd VII LF 42.110 275 01/24/13 1025/13 2.82 O 0.378 0.274 0.150 0.030 0.055 0.050 93.70 AHD K0038+(-47)-K0039+950, Int. Sect. (w/ exception) Const. of Storm Drainage & Canal along Toledo- 83.65% 471 Gowil Builders 18733 L B SB GE2 Tabuelan-San Remegio Rd., K0062+000- Cebu 08/07/13 Final VII LF 7.071 185 09/21/12 03/24/13 2.41 C 0.440 0.200 0.300 - - - 94.00 AHD K0068+700 (Int. Sect.) Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 18 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Maint., Rehab. & Impv't. of Nat'l Rds. along Grace Construction 83.40% 472 270 3771 L AAA LB GE1 Oroquieta City-Calamba Mt. Rd., K1753+275- Oroquieta City 08/14/13 1st/Final X LF 9.356 45 04/29/13 06/12/13 30.00 C 0.401 0.133 0.300 - - - 83.40 AHD Corporation K1754+610 w/ exceptions Satisfactory Grace Construction Const. of Cagayan de Oro Coastal Rd., (By- 473 3771 L AAA LB GE1 Cagayan de Oro City 08/11/13 1st X LF 46.974 209 02/14/13 09/10/13 -3.14 O 0.312 0.300 0.119 0.030 0.037 0.033 83.10 DEL Corporation Pass Rd.) inc. ROW First District Grace Construction Const. of Upper Manakulil Bridge (Phase 1) 87.30% 474 3771 L AAA LB GE1 Cotabato City 08/13/13 Final XII LF 24.906 329 11/28/11 1022/12 21.58 C 0.443 0.133 0.300 - - - 87.60 AHD Corporation along Cotabato City Circ. Rd. Satisfactory Rehab./Const.Upgrading of Damaged Paved Nat'l Rds. (Int. Sect.) BCIR, Sugbongcogon- Binuangan-Ampenican-Lagonglong Sect., 70.96% 475 271 Grand Builders 6845 L A MA GE1 Misamis Oriental 08/21/13 Final X LF 51.907 225 04/02/12 11/12/12 - C 0.374 0.200 0.000 - - - 57.40 DEL Misamis Oriental, K01364+299-K01365+000, Poor K01368+798-K01370+000, K01372+000- K01373+000, K01379+798-K01380+000 Replacement/Rehab./Strengthening of Greco Construction and Permanent Bridges Gen. from Bridge Mgt. Kiamba, Sarangani 89.84% 476 272 21884 L D SB GE1 08/19/13 Final XII LF 4.520 100 01/31/13 05/10/13 1.38 C 0.429 0.200 0.300 - - - 92.90 AHD Supply System (BMS) of Tambilil Bridge along Province V. Satisfactory Sarangani-Sultan Kudarat Coastal Rd. GVDPM Construction Corp. Rehab. of Existing Dike Paite-Maculcol, 84.90% 477 273 9052 L AA LA GE2 San Felipe, Zambales 08/03/13 1st/Final III LF 17.726 120 01/23/13 05/22/13 0.00 C 0.416 0.133 0.300 - - - 84.90 ONS (Formerly: ZM Construction) San Felipe Side Satisfactory

GVDPM Construction Corp. Const. of Slope Protection/Flood Control, 82.10% 478 9052 L AA LA GE2 San Felipe, Zambales 08/03/13 1st/Final III LF 35.298 120 01/23/13 05/22/13 0.83 C 0.388 0.133 0.300 - - - 82.10 AHD (Formerly: ZM Construction) Maloma Dike (Upstream Sect.) Satisfactory Const./Widening of Pres. C.P. Garcia Ave. (C- H C M Construction 88.44% 479 274 19382 L A MB GE1 5) Ext., SLEX to Coastal Sect., Sta. 0+354.106- Las Piñas City 08/17/13 Final NCR LF 100.458 341 05/02/12 04/07/13 0.64 C 0.453 0.133 0.300 - - - 88.60 AHD Corporation Sta. 0+660 Satisfactory Prev. Maint. along San Fernando Port Rd., 90.08% 480 275 H.G. Lopez Construction 17691 L B MA GE1 La, Union 07/29/13 Final I LF 12.534 54 01/21/13 03/15/13 0.00 C 0.475 0.133 0.300 - - - 90.80 ONS K0267+000-K0268+717 V. Satisfactory Const. of 9-Cl, 3-Storey Bldg. at La Union San Fernando City, La 481 H.G. Lopez Construction 17691 L B MA GB1 07/30/13 1st I LF 10.418 270 03/27/13 12/21/13 0.30 O 0.368 0.240 0.150 0.030 0.042 0.050 88.00 AHD NHS Union H.L.J. Construction & Repair/Rehab./Impv't. of Binalbagan-Isabela Rd. Isabela, Negros 92.70% 482 276 18080 L A MA GE1 08/10/13 1st/Final VI LF 4.792 28 04/04/13 05/01/13 39.29 C 0.494 0.133 0.300 - - - 92.70 AHD Enterprises K0073+800-K0073+1023 Occidental V. Satisfactory H.L.J. Construction & Repair/Rehab./Impv't. of Hinigaran-Isabela Rd. Hinigaran, Negros 92.10% 483 18080 L A MA GE1 08/10/13 1st/Final VI LF 9.537 49 03/14/13 05/01/13 5.41 C 0.488 0.133 0.300 - - - 92.10 AHD Enterprises K0067+459-K0068+513 w/ exception Occidental V. Satisfactory H.L.J. Construction & Const. of DepEd Standard Type Sch. Bldg. Hinoba-an, Negros 484 18080 L A MA GB1 08/09/13 1st VI LF 2.842 90 05/24/13 08/21/13 12.04 O 0.388 0.240 0.150 0.030 0.032 0.033 87.30 AHD Enterprises @ Bulwangan NHS Occidental H.L.J. Construction & Const./Widening/Upgrading/Rehab. of Access Bacolod City, Negros 485 18080 L A MA GE1 Rd. to Declared Tourism Destinations, Brgy. 08/06/13 1st VI LF 45.541 180 02/19/13 08/17/13 7.56 O 0.369 0.200 0.150 0.030 0.037 0.050 83.60 AHD Enterprises Occidental Punta-Taytay H.L.J. Construction & La Libertad, Negros 486 18080 L A MA GE1 Reconst. of Martilo Bridge 08/22/13 1st VII LF 11.731 192 04/03/13 10/11/13 -1.32 O 0.347 0.300 0.137 0.023 0.045 0.017 86.90 DEL Enterprises Oriental H.L.J. Construction & La Libertad, Negros 487 18080 L A MA GE1 Reconst. of Habag Bridge 08/22/13 1st VII LF 11.354 222 02/09/13 09/18/13 -6.62 O 0.388 0.300 0.084 0.023 0.045 0.017 85.70 DEL Enterprises Oriental H.L.J. Construction & Upgrading (Gravel to Concrete) Conc. of Hanay- San Jose, Negros 488 18080 L A MA GE1 08/21/13 1st VII LF 14.472 115 03/18/13 07/11/13 -2.00 O 0.326 0.300 0.000 0.030 0.055 0.050 76.10 DEL Enterprises Hanay Rd. leading to Twin Lake Oriental Rd. Upgrading (Gravel to Paved) along Davao- H.L.J. Construction & Sarangani Coastal Rd., (Malalag-Malita-JAS), 489 18080 L A MA GE1 Davao del Sur 08/08/13 1st XI LF 37.204 179 03/07/13 09/01/13 -1.23 O 0.314 0.298 0.138 0.030 0.023 0.033 83.60 DEL Enterprises km. 1689+648.732-km. 1691+217.302, Lanipao Sect., Don Marcelino Rd. Upgrading (Gravel to Paved) along Mati- H2 Landmark Builders, Inc. 91.30% 490 277 7400 L A MA GE1 Maragusan Rd., Bactinan, Km.1518+641- Davao Oriental 08/16/13 1st/Final XI LF 42.041 204 01/25/13 08/16/13 0.00 C 0.447 0.166 0.300 - - - 91.30 ONS (Formerly: Landmark Builders) Km.1520+025.50 w/ exception, Bactinan Sect. V. Satisfactory Road Upgrading (Gravel to Paved) along Mati- Maragusan Rd. a)Km.1518+200- H2 Landmark Builders, Inc. 84.70% 491 7400 L A MA GE1 Km.1518+552; b)Km.1531+209- Davao Oriental 08/16/13 Final XI LF 33.116 149 01/25/13 06/22/13 0.00 C 0.344 0.200 0.300 - - - 84.40 ONS (Formerly: Landmark Builders) Satisfactory Km.1532+850, Bactinan-Buso-Caguisokan Sect. Haidee Construction and Const. of Tagumbao Bridge & Approaches 492 278 10365 L AAA LB GE1 Gerona, Tarlac 08/08/13 1st III LF 226.266 480 02/22/13 06/16/14 5.89 O 0.387 0.240 0.150 0.030 0.051 0.050 90.80 AHD Development Corp. along Gerona-Sta. Ignacia Rd. Hakkatan Konstruk & Const. of DepEd Standard Type Sch. Bldg. Ilog, Negros 493 279 31610 L B SB GB1 08/09/13 1st VI LF 3.331 95 05/24/13 08/26/13 3.67 O 0.326 0.240 0.150 0.030 0.032 0.033 81.10 AHD General Merchandise @ Tabu NHS Occidental Rd. Upgrading (Gravel to Paved) of Eastern 85.86% 494 280 Halrey Construction, Inc. 2267 L AAA MB GE1 Bulacan Rd., K0080+200-K0094+809 Doña Trinidad, Bulacan 08/15/13 Final III LF 19.706 150 02/04/13 07/04/13 10.14 C 0.410 0.133 0.300 - - - 84.30 AHD Remedios Satisfactory

Hanjin Heavy Industries & Const. of Bacolod-Silay Airport Access Bacolod-Silay, Negros KEDCF- 495 281 FC-11-008 F AAA LB GE1 08/12/13 3rd FA 415.893 572 02/14/12 09/06/13 -1.55 O 0.392 0.200 0.134 0.030 0.044 0.033 83.30 DEL Construction, Co. Ltd. (Korean) Rd. (BSAAR) Proj. Occidental PMO

Asphalt Overlay w/ correction along 87.60% 496 282 HB Construction 32855 L D SB GE1 Sampaloc, Manila 07/29/13 1st/Final NCR LF 3.755 30 04/03/13 05/02/13 80.00 C 0.443 0.133 0.300 - - - 87.60 AHD Retiro Street, District IV Satisfactory

Cluster: Prev. Maint. (Int. Sect. Arterial) along 87.20% 497 283 HGG Builders and Supply 17824 L A MA GE1 Rolando R. Andaya Highway 1) K0291+000- Camarines Sur 08/03/13 1st/Final V LF 17.794 120 01/21/13 05/20/13 20.83 C 0.439 0.133 0.300 - - - 87.20 AHD K0293+647 2) K02293+647-K0295+542 Satisfactory

Cluster: Rehab./Reconst. of Damaged Nat'l Rd. 87.20% 498 HGG Builders and Supply 17824 L A MA GE1 (Int. Sect.-Arterial), Andaya Highway, Camarines Sur 08/03/13 1st/Final V LF 5.542 120 01/21/13 05/21/13 0.00 C 0.372 0.200 0.300 - - - 87.20 ONS 1)K0300+500-K0 300+750 2) K0 302+000 Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 19 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Const. of Line Canal w/ Slope Protection along 499 HGG Builders and Supply 17824 L A MA GE2 Rolando R. Andaya Highway Zone 2, Brgy. , Camarines Sur 08/03/13 1st V LF 1.458 119 05/17/13 09/12/13 1.52 O 0.375 0.240 0.150 0.030 0.035 0.033 86.30 AHD Lower Sta. Cruz HGG Builders and Supply / Rehab./Reconst./Strengthening of Bridge along Libmanan, Camarines 89.70% 500 284 Partido Construction and Supply JV-12-243 L A MA GE1 08/05/13 1st/Final V LF 11.839 150 03/01/13 07/28/13 7.62 C 0.440 0.157 0.300 - - - 89.70 AHD Nat'l Rds., Aslong Bridge (JV) Sur V. Satisfactory Hi-Tone Construction and Development Corporation Rehab. of Flood Control System along 89.10% 501 285 23385 L AAA MA GE2 Sto. Domingo, Albay 08/12/13 1st/Final V LF 14.089 105 03/04/13 06/16/13 4.77 C 0.458 0.133 0.300 - - - 89.10 AHD (Formerly: Lo-Tone Basud River V. Satisfactory Construction & Supply) Hi-Tone Construction and Development Corporation Rehab. of Flood Control System along 87.90% 502 23385 L AAA MA GE2 Bacacay, Albay 08/12/13 1st/Final V LF 14.232 143 05/23/13 10/12/13 59.45 C 0.379 0.200 0.300 - - - 87.90 AHD (Formerly: Lo-Tone Igang-Baclayon River Satisfactory Construction & Supply) Hi-Tone Construction and Development Corporation Rehab. of Flood Control System along 87.00% 503 23385 L AAA MA GE2 Bacacay, Albay 08/12/13 1st/Final V LF 15.207 110 02/11/13 05/31/13 19.03 C 0.370 0.200 0.300 - - - 87.00 AHD (Formerly: Lo-Tone Panarayon River, Brgy Panarayon Satisfactory Construction & Supply) Hi-Tone Construction and Development Corporation Rehab./Repair of Flood Control System Yawa 86.14% 504 23385 L AAA MA GE2 Legazpi City 08/10/13 Final V LF 9.682 90 01/09/13 04/08/13 0.00 C 0.462 0.133 0.300 - - - 89.50 ONS (Formerly: Lo-Tone River, Bogtong Sect., Bogtong Satisfactory Construction & Supply) Hi-Tone Construction and Prev. Maint. (Int. Sect.) Asphalt Overlay, Development Corporation 85.50% 505 23385 L AAA MB GE1 Guinobatan Pob. Rd., K0511+(-978)- Guinobatan, Albay 08/09/13 1st/Final V LF 10.720 146 02/01/13 06/26/13 0.00 C 0.355 0.200 0.300 - - - 85.50 ONS (Formerly: Lo-Tone K0511+740 Satisfactory Construction & Supply) Reconst. of Critical Sect. along Nat'l Rd., Road Hi-Tone Construction and Slip along Catanduanes Circ. Rd. Development Corporation San Miguel & Viga, 85.50% 506 23385 L AAA MB GE1 (Km.0014+960-Km.015+080.06, Km. 07/30/13 1st/Final V LF 13.807 182 01/11/13 07/11/13 0.00 C 0.355 0.200 0.300 - - - 85.50 ONS (Formerly: Lo-Tone 017+710, Km.020+350, Km.020+400, Catanduanes Satisfactory Construction & Supply) Km.033+200, Km.033+600) Hi-Tone Construction and Cluster 12:Rehab/Impv't. of Mapulang Daga- Development Corporation/ Cagbulacao Rd. & Const. of Sula Bridge 87.60% 507 JV-12-452 L AAA MB GE1 Albay 08/12/13 1st/Final V LF 14.386 110 01/14/13 05/03/13 2.73 C 0.376 0.200 0.300 - - - 87.60 AHD Lanuzo's Construction & Supply Approach 'B" Brgy. Sula & Mapulang Daga, Satisfactory (JV) Bacacay Const. of Flood Control/Drainage Structures Hi-Tri Development along Bogo-Curva-Medellin-Daanbantayan Rd., 85.94% 508 286 1758 L AAA LA GE2 Cebu 08/10/13 Final VII LF 8.645 120 09/28/12 01/25/13 37.50 C 0.375 0.200 0.300 - - - 87.50 AHD Corporation Paypay & Bitoon Sect., Daanbantayan & San Satisfactory Remegio Rehab./Reconst./Upgrading Int. Sect. along Hi-Tri Development 83.62% 509 1758 L AAA LB GE1 Biliran-Cagayan de Oro-Iligan Rd. (BCIR) Misamis Oriental 08/21/13 Final X LF 100.248 420 12/22/11 02/13/13 10.48 C 0.361 0.133 0.300 - - - 79.40 AHD Corporation Sugbongcogon Sect. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Hi-Tri Development Nat'l Rd. (In. Sect.): Butuan City-Cagayan de 83.32% 510 1758 L AAA LB GE1 Misamis Oriental 08/21/13 Final X LF 79.201 300 04/03/12 01/27/13 9.00 C 0.392 0.133 0.300 - - - 82.50 AHD Corporation Oro City-Iligan City Rd., Tagbocboc-Balingoan- Satisfactory Esperanza Sect. Repair/Maint. (Existing Drainage/Flume) of San Fernando City, La 511 287 Homefixmix Builders Center 29997 L D SB GE2 Concrete Flume along MNR, K0269+000- 07/29/13 1st I LF 3.764 120 04/19/13 08/16/13 2.00 O 0.389 0.240 0.150 0.030 0.037 0.033 87.90 AHD K0270+700 w/ exception Union Conc. of Roads, Hillcrest St., Brgy. 83.80% 512 288 Homera Construction 33102 L D SB GE1 Quezon City 08/05/13 1st/Final NCR LF 2.455 88 03/25/13 06/20/13 0.00 C 0.405 0.133 0.300 - - - 83.80 ONS Immaculate Concepcion Satisfactory Prev. Maint. (Int. Sect.) along Binalbagan- Homeworld Construction Corp. Isabela Rd. a)K0064+000-K0064+511, Binalbagan, Negros 85.90% 513 289 (Formerly: Homeworld 14725 L A MA GE1 b)K0064+866-K0064+1250, c)K0067+034- 08/10/13 Final VI LF 17.850 115 01/28/13 05/22/13 0.00 C 0.471 0.133 0.300 - - - 90.40 ONS Occidental Satisfactory Engineering) K0067+200, d)K0068+342-K0068+426, e)K0072+000-K0072+695 Homeworld Construction Prev. Maint. of Nat'l Arterial Rd. along Bacolod Bacolod City, Negros 92.60% 514 Corporation (Formerly: 14725 L A MA GE1 North Rd. K0003+017-K0003+260 & 08/07/13 1st/Final VI LF 16.401 40 03/04/13 04/12/13 0.00 C 0.493 0.133 0.300 - - - 92.60 ONS Homeworld Engineering) K0000+460 to K0001+000 Occidental V. Satisfactory Impvt./Const. of Gravity Wall along Taytay IROWR- 84.40% 515 290 Honeyville Construction 32160 L B MA GE2 Taytay, Rizal 08/17/13 1st/Final LF 44.846 175 01/14/13 07/07/13 0.00 C 0.344 0.200 0.300 - - - 84.40 ONS River at Int. Sect. from Sta.0+520-Sta.6+040 PMO Satisfactory

Naga City Flood Control: Repair/Maint. of Naga 88.60% 516 Honeyville Construction 32160 L B MA GE2 River Revetment, Sta. 0+000-Sta. 0+047, Brgy. Naga City 08/06/13 1st/Final V LF 1.960 75 02/07/13 04/22/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Dinaga Satisfactory

Const./Repair/Impv't. of Drainage System along 87.70% 517 Honeyville Construction 32160 L B MA GE2 Tigaon, Camarines Sur 08/02/13 1st/Final V LF 9.244 150 11/12/12 04/10/13 1.34 C 0.444 0.133 0.300 - - - 87.70 AHD Tigaon-Goa-San Jose-Lagonoy Rd. Satisfactory

Widening of Saguing Bridge along Gapan- 85.70% 518 291 Horamabi Builders 24129 L AAA LB GE1 Dinalupihan, Bataan 07/31/13 1st/Final III LF 6.800 120 02/14/13 06/13/13 2.22 C 0.424 0.133 0.300 - - - 85.70 AHD San Fernando-Olongapo Rd. Satisfactory

Houserock Builders & Drainage Impv't. along Jose Abad Santos Ave. 88.60% 519 292 18822 L C SB GE2 Tondo, Manila 07/29/13 1st/Final NCR LF 4.765 120 02/01/13 05/31/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Trading (Yuseco to Tayuman), Dist II Satisfactory Houserock Builders & Raising of Grade with Drainage Impv't. of 87.30% 520 18822 L C SB GE1 Sampaloc, Manila 07/29/13 1st/Final NCR LF 4.277 120 02/28/13 06/27/13 1.67 C 0.440 0.133 0.300 - - - 87.30 AHD Trading F. Cayco St. Satisfactory Const. of Chico River Flood Control Proj. 85.10% 521 293 HPL General Construction 22289 L B MA GE2 Piat, Cagayan 08/02/13 Final II LF 18.794 240 09/14/12 05/11/13 - C 0.450 0.133 0.262 - - - 84.50 DEL along Cagayan-Apayao Rd. Satisfactory 84.70% 522 HPL General Construction 22289 L B MA GE1 Widening/Impv't. of Port Irene Access Rd. Sta. Ana, Cagayan 07/31/13 1st/Final II LF 15.348 151 01/22/13 06/21/13 5.15 C 0.414 0.133 0.300 - - - 84.70 AHD Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 20 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Replacement of Naddungan Bridge No.2 along 523 HPL General Construction 22289 L B MA GE1 Gattaran, Cagayan 07/30/13 3rd II LF 20.018 292 03/10/12 12/20/12 -4.15 O 0.332 0.300 0.000 0.030 0.054 0.033 74.90 DEL Magapit-Capissayan Rd., Gattaran Sect.

Rd. Upgrading (Gravel to Paved) Jct. Magapit- 524 HPL General Construction 22289 L B MA GE1 Capissayan Rd., Sta.557+932-Sta.561+616 Lal-lo, Cagayan 07/31/13 1st II LF 43.874 179 02/22/13 08/19/13 -15.70 O 0.369 0.236 0.000 0.030 0.055 0.033 72.30 DEL (K0558+000-K0561+880) w/ exception Widening/Impv't. of Dugo-San Vicente 525 HPL General Construction 22289 L B MA GE1 Sta. Ana, Cagayan 07/31/13 3rd II LF 46.241 179 10/22/12 04/18/13 -10.00 O 0.323 0.300 0.000 0.030 0.038 0.017 70.80 DEL Rd. (Mission-Sta. Ana Sect.) Widening/Impv't. of DSVR (Mission-Sta. 526 HPL General Construction 22289 L B MA GE1 Sta. Ana, Cagayan 07/31/13 3rd II LF 44.694 179 10/22/12 04/18/13 -31.57 O 0.359 0.239 0.000 0.030 0.047 0.033 70.80 DEL Ana Sect.) Rd. Upgrading (Gravel to Paved) Sta.564+520- 527 HPL General Construction 22289 L B MA GE1 Sta.568+435 (K0565+059-K0569+226) Jct. Gattaran, Cagayan 07/31/13 1st II LF 33.674 179 02/22/13 08/19/13 -45.15 O 0.349 0.240 0.000 0.030 0.049 0.033 70.10 DEL Magapit-Capissayan Rd. w/ exception Widening/Impv't. of Dugo-San Vicente 528 HPL General Construction 22289 L B MA GE1 Buguey, Cagayan 07/31/13 1st II LF 33.045 179 03/01/13 08/27/13 -50.26 O 0.356 0.237 0.000 0.030 0.045 0.017 68.50 DEL Rd. Rd. Upgrading (Gravel to Paved), K0582+085- 529 HPL General Construction 22289 L B MA GE1 K0584+200, Jct. Gattaran-Cumao-Capissayan- Baggao, Cagayan 07/30/13 1st II LF 30.035 179 02/22/13 08/19/13 -54.16 O 0.331 0.240 0.000 0.030 0.054 0.017 67.20 DEL Sta. Margarita, Bolos Point Rd. Repair/Rehab. of Baculud Bridge & 66.54% 530 HPL General Construction 22289 L B MA GE1 Alcala, Cagayan 07/30/13 Final II LF 48.327 210 11/03/11 05/30/12 - C 0.457 0.091 0.000 - - - 54.80 DEL Approaches along CVR Poor Humming Bird Construction Const. of Three (3) Units-One (1) Storey Three Cadiz City, Negros 91.00% 531 294 33810 L D SB GB1 (3) Cl Bldg. (Type 1) at Dr. VFGMNHS-Daga 08/12/13 1st/Final VI LF 5.464 120 03/28/13 07/25/13 5.12 C 0.477 0.133 0.300 - - - 91.00 AHD & Supply Occidental V. Satisfactory Ext. High Sch. Rd. Upgrading (Gravel to Paved) Bagac- 532 295 I&E Construction 10410 L AA MA GE1 Mariveles, Bataan 08/02/13 1st III LF 45.112 175 03/20/13 09/10/13 0.12 O 0.377 0.240 0.150 0.023 0.045 0.033 86.80 AHD Mariveles Rd. K0183+788-K0185+624 Widening/Impv't. along Maharlika Highway, Km.935+634-Km.945+500 (w/ exceptions) & 533 I&E Construction 10410 L AA MA GE1 Leyte 08/19/13 1st VIII LF 23.300 120 05/24/13 09/20/13 1.06 O 0.386 0.240 0.150 0.010 0.047 0.050 88.30 AHD Km.951+800.00-Km.958+804.00 (w/ exceptions) I.A. Bosque Construction Conc.g of Unisan-Jct.-Panaon Rd. (Balanacan 86.32% 534 296 12597 L B MA GE1 Quezon 08/06/13 Final IVA LF 32.984 180 12/03/12 05/31/13 0.00 C 0.350 0.200 0.300 - - - 85.00 ONS Corp. Sect.), K0197+045-K0198+545 Satisfactory Prev. Maint. (MFO-1) (Int. Sect.), Nat'l Arterial I.A. Bosque Construction Rd. (Prev. Maint.); 1. Daang Maharlika (LZ) E. 535 12597 L B MA GE1 Quezon 08/06/13 2nd IVA LF 35.424 144 02/22/13 07/15/13 -16.97 O 0.349 0.296 0.000 0.030 0.025 0.017 71.70 DEL Corp. K0205+319-K0207+319; K0207+319- K0208+000 Repair/Rehab/Impv't of Mendez Rd., 85.20% 536 297 I.D.R. Construction 33559 L B SB GE1 Quezon City 08/02/13 1st/Final NCR LF 3.840 60 03/27/13 05/25/13 1.67 C 0.419 0.133 0.300 - - - 85.20 AHD Brgy. Baesa Satisfactory IA Ferrer Construction & Const. of Flood Control San Roque, 89.50% 537 298 34709 L D SB GE2 Camarines Sur 08/02/13 1st/Final V LF 0.938 90 02/28/13 05/28/13 3.33 C 0.462 0.133 0.300 - - - 89.50 AHD Supply Lagonoy V. Satisfactory IBC International Builders Prev. Maint. of Sara-Concepcion Rd., Sara and Concepcion, 87.84% 538 299 Corporation (Formerly: IBC 8576 L AAA LB GE1 08/21/13 Final VI LF 20.300 91 02/01/13 05/02/13 0.00 C 0.482 0.133 0.300 - - - 91.50 ONS K0209+266-K0215+816 w/ exceptions Iloilo Builders Corp.) Iloilo Satisfactory IBC International Builders Conc. of Buruanga-Libertad Rd. (Jct. Nabas- 539 Corporation (Formerly: IBC 8576 L AAA LB GE1 Buruanga, Aklan 08/16/13 2nd VI LF 136.800 600 07/18/12 03/09/14 -2.65 O 0.369 0.240 0.124 0.030 0.037 0.033 83.30 DEL Buruanga/Libertan Rd. Sect.) inc. 3 bridges Iloilo Builders Corp.) IBC International Builders Prev. Maint. (Int. Sect.) Jct. Bagonawa-La La Carlota City, 87.22% 540 Corporation (Formerly: IBC 8576 L AAA LB GE1 Carlota-Isabela Rd., Haguimit-La Granja Sect., 08/11/13 Final VI LF 17.000 65 01/24/13 03/29/13 0.00 C 0.465 0.133 0.300 - - - 89.80 ONS Iloilo Builders) K0051+713-K0054+204 w/ exception Negros Occidental Satisfactory IBC International Builders Impv't./Rehab. of Aklan West Rd. (Kalibo- 86.10% 541 Corporation (Formerly: IBC 8576 L AAA LB GE1 Caticlan) Phase II, Numancia, Aklan Rd. Sect., Numancia, Aklan 08/17/13 1st/Final VI LF 17.023 149 10/01/12 02/27/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Iloilo Builders) Sta. 272+200-Sta. 272+860 Satisfactory IBC International Builders Const. of Jaro Floodway Bridge along Metro 85.78% 542 Corporation (Formerly: IBC 8576 L AAA LB GE1 Iloilo Radial Rd., R-4 By Pass, Over Jaro Jaro, Iloilo City 08/23/13 Final VI LF 45.870 415 02/06/12 03/26/13 2.40 C 0.468 0.133 0.300 - - - 90.10 AHD Iloilo Builders) Floodway Satisfactory Prev. Maint. (MFO-1) of Pagsanjan- 91.20% 543 300 IM Construction 20074 L A MB GE1 Laguna 08/09/13 1st/Final IVA LF 13.439 60 01/28/13 03/28/13 18.33 C 0.479 0.133 0.300 - - - 91.20 AHD Lucban Rd., K0096+230-K0097+558 V. Satisfactory Completion of MPB, Conner Legislative 91.50% 544 301 Isaga Builders 8652 L C SB GB1 Conner, Apayao 08/10/13 1st/Final CAR LF 1.945 105 03/21/13 07/03/13 0.00 C 0.415 0.200 0.300 - - - 91.50 ONS MPB V. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved ITP Construction, Inc. / R.C. Nat'l Rd., Puerto Princesa South Rd. (Caramay- 86.80% 545 302 JV-11-133 L AAA LA GE1 Española, Palawan 08/14/13 Final IVB LF 98.613 387 03/20/12 04/10/13 0.00 C 0.392 0.200 0.300 - - - 89.20 ONS Tagala Construction (JV) Aplian-Calasaguen Sect.) K0164+024- Satisfactory K0168+587.25 w/ exceptions

Prev. Maint. (Int. Sect.) of South Superhighway 82.40% 546 303 Ivahrick Contractors 13688 L B MA GE1 Pasay City 08/01/13 1st/Final NCR LF 4.046 30 05/28/13 06/26/13 30.00 C 0.324 0.200 0.300 - - - 82.40 AHD West Service Rd. (K0012+864-K0013+285) Satisfactory Rd. Upgrading (Gravel to Concrete) of Puerto Ivy Michelle Trading & Princesa South Rd. Sta. 147+568-Sta.149+800- 547 304 24093 L A MB GE1 Sofronio, Palawan 08/13/13 1st IVB LF 84.474 153 06/11/13 11/10/13 1.58 O 0.351 0.240 0.150 0.030 0.047 0.050 86.80 AHD Construction Sta.150+350-Sta.150+850, Sta.151+035- Sta.151+635.50 & Sta.151+672-Sta.158+368 J. Cordon Construction & 89.30% 548 305 32982 L D SB GE1 Concrete Paving of Liningwan Rd. Sect. Sibunag, Guimaras 08/05/13 1st/Final VI LF 4.087 60 02/18/13 04/18/13 13.33 C 0.393 0.200 0.300 - - - 89.30 AHD Supply V. Satisfactory Mondragon, Northern 90.20% 549 306 J. Custorio Construction 16237 L D SB GB1 Const. of 2-CL SB, San Agustin PS 08/10/13 1st/Final VIII LF 2.584 150 03/27/13 08/23/13 14.00 C 0.493 0.109 0.300 - - - 90.20 AHD Samar V. Satisfactory Const. of One (1) Unit, 2-Storey, 6-Cl, 550 307 J.C. Ferrer Construction 11657 L B SB GB1 Bugallon, Pangasinan 08/06/13 1st I LF 6.408 139 03/23/13 08/12/13 0.06 O 0.384 0.229 0.150 0.030 0.042 0.033 86.80 AHD Bugallon IS

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 21 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION J.E. Tico Construction, Inc. Upgrading (Gravel to Paved) of Tapaz- 88.40% 551 308 (Formerly: Jet Construction 7063 L A MA GE1 Jamindan-Altavaz Rd., Km. 115+031-Km. Jamindan, Capiz 08/19/13 1st/Final VI LF 10.698 121 02/03/13 06/03/13 63.39 C 0.451 0.133 0.300 - - - 88.40 AHD Supply) 115+670 w/ exception Satisfactory J.E. Tico Construction, Inc. 552 (Formerly: Jet Construction 7063 L A MA GB1 Const. of Estancia NHS Estancia, Iloilo 08/21/13 1st VI LF 26.812 180 04/16/13 10/12/13 1.15 O 0.333 0.240 0.150 0.030 0.038 0.050 84.10 AHD Supply)

J.E. Tico Construction, Inc. Rehab./Reconst./Upgrading of Damaged Paved Jordan & Buenavista, 83.64% 553 (Formerly: Jet Construction 7063 L A MA GE1 Nat'l Rds. (Int. Sect.)(Nat'l Arterial Rd.) 08/05/13 Final VI LF 38.631 187 01/22/13 07/27/13 41.71 C 0.340 0.200 0.300 - - - 84.00 AHD Supply) Guimaras Circ. Rd. K002+040-K0010+233 Guimaras Satisfactory

Const./Impvt./Rehab. of FMR, Brgy. 85.96% 554 309 J.G. Garcia Construction 21054 L B MA GE1 Pangasinan 08/05/13 Final I LF 1.965 60 02/07/13 04/07/13 20.00 C 0.474 0.133 0.300 - - - 90.70 AHD Babasit Satisfactory

J.I. Etac Construction & Rehab./Conc. of Calbayog-Catarman Rd. via 83.70% 555 310 32722 L D SB GE1 Calbayog City, Samar 08/14/13 1st/Final VIII LF 5.039 95 03/18/13 06/20/13 9.47 C 0.337 0.200 0.300 - - - 83.70 AHD Supply Lope de Vega K0789+220-K0806+100 Satisfactory J.M. Luciano Construction, Inc. Road Upgrading (Gravel to Concrete) of Jct. Bisilig, Surigao del 86.46% 556 311 (Formerly: Luciano 2083 L AAA LB GE1 Lingig-Trento Rd., Pagmam-an to Boundary 08/18/13 Final XIII LF 113.785 359 04/27/12 06/19/13 0.00 C 0.458 0.142 0.300 - - - 90.00 ONS Construction) Cuevas Sect. w/ Bridge Sur Satisfactory

Const. of Reinforced Concrete Slope Protection 85.60% 557 312 J.Q.G. Construction 10530 L A MA GE2 along Concepcion-La Paz Rd. (Concepcion Concepcion, Tarlac 08/07/13 1st/Final III LF 7.418 120 01/11/13 05/10/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS Sect.), K0123+200-K0124+831.50 w/ exception Satisfactory

Reconst. of Convento Bridge along Naic 91.14% 558 313 J.S. General Contractor 15258 L B MA GE1 Naic, Cavite 08/13/13 Final IVA LF 14.332 179 07/24/12 01/18/13 0.00 C 0.479 0.133 0.300 - - - 91.20 ONS Jct. Caylabne Rd. V. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (MFO-2) along Maragondon- 83.90% 559 J.S. General Contractor 15258 L B MA GE1 Cavite 08/13/13 1st/Final IVA LF 16.917 136 02/27/13 07/12/13 0.00 C 0.339 0.200 0.300 - - - 83.90 ONS Magallanes-Amuyong Rd., K0059+(-060)- Satisfactory K0060+246 Cluster II - Const. of 2-Storey 4-CL of Old 560 314 J.T. Gamolo Construction 15759 L B MA GB1 Don Carlos, Bukidnon 08/08/13 1st X LF 4.420 214 03/25/13 10/24/13 2.44 O 0.371 0.279 0.150 0.030 0.041 0.033 90.40 AHD Nongnongan NHS Old Nongnongan Cluster II - Const. of 2-Storey 4-CL of New 561 J.T. Gamolo Construction 15759 L B MA GB1 Nongnongan NHS (San Nicolas Annex) San Don Carlos, Bukidnon 08/08/13 1st X LF 4.803 214 03/25/13 10/24/13 2.44 O 0.369 0.240 0.150 0.030 0.041 0.033 86.30 AHD Nicolas Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. Int. Sect. Sayre Highway Impalutao and Patpat Sect., K1485+230-K1486+000; 85.26% 562 J.T. Gamolo Construction 15759 L B MA GE1 Bukidnon 08/10/13 Final X LF 24.019 135 01/18/13 06/01/13 0.74 C 0.379 0.200 0.300 - - - 87.90 AHD K1496+000-K1496+290; K1496+700- Satisfactory K1497+000 w/ exception, Impasugong & Malaybalay City Malaybalay City, 563 J.T. Gamolo Construction 15759 L B MA GB1 Const. of Classroom at Aglayan ES 08/09/13 1st X LF 4.185 210 03/22/13 10/17/13 7.58 O 0.324 0.240 0.150 0.030 0.052 0.050 84.60 AHD Bukidnon Const. of Slope Protection (Upstream of 564 J.T. Gamolo Construction 15759 L B SB GE2 Maramag, Bukidnon 08/08/13 1st X LF 4.940 60 06/28/13 08/26/13 0.52 O 0.320 0.240 0.150 0.030 0.052 0.050 84.20 AHD Musuan Bridge) along Sayre Highway, Musuan Road Upgrading (Gravel to Paved) Int. Sec. inc. Drainage & Rd. Facilities along Don Carlos- 83.94% 565 J.T. Gamolo Construction 15759 L B MA GE1 Don Carlos, Bukidnon 08/08/13 Final X LF 14.376 142 01/24/13 06/15/13 0.00 C 0.375 0.183 0.300 - - - 85.80 ONS Kadilingan Rd. a)K158+(-107)-K158+329; Satisfactory b)K1587+(-323)-K1587+(-128) Rehab./Reconst./Upgrading (Asphalt to 83.08% 566 J.T. Gamolo Construction 15759 L B MA GE1 concrete) of S.H. Alae-Kisolon Rd., K1474+000- Sumilao, Bukidnon 08/06/13 Final X LF 8.534 113 01/23/13 05/15/13 23.21 C 0.390 0.133 0.300 - - - 82.30 AHD K1474+500, Kisolon Satisfactory Rehab./Reconst./Upgrading of Int. Sect., Jct. SH Malaybalay City, 82.78% 567 J.T. Gamolo Construction 15759 L B SB GE2 Impalambong-Old Casisang Rd. K1507+(-829)- 08/09/13 Final X LF 13.658 124 01/18/13 05/21/13 0.00 C 0.332 0.200 0.300 - - - 83.20 ONS Bukidnon Satisfactory K1507+153 Jagonbuild Construction Corp. ( Const. of Flood Control Wall along 84.40% 568 315 24748 L B MA GE2 Valenzuela City 08/13/13 Final NCR LF 7.051 120 01/24/13 05/23/13 22.50 C 0.444 0.133 0.300 - - - 87.70 AHD Formerly: Jagon Builders) Meycauyan River, Brgy. Pangkera Satisfactory Const. of Bridge, Brgy. Sta. Angel Central- 90.80% 569 316 Jaime B. Ching Enterprises 4256 L A MB GE1 Sta. Cruz, Laguna 08/09/13 1st/Final IVA LF 4.925 219 08/24/12 03/31/13 0.00 C 0.475 0.133 0.300 - - - 90.80 ONS Pob., V Bridge V. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds., (Int. Sect.) Nat'l Arterial Rd., Cauayan, Negros 570 Jaime B. Ching Enterprises 4256 L A MB GE1 Bacolod South Rd. (Kabankalan-Hinoba-an 08/09/13 2nd VI LF 36.412 209 02/07/13 09/03/13 10.83 O 0.342 0.240 0.150 0.030 0.042 0.033 83.70 AHD Sect.) Brgy. Masaling & Brgy. Caliling Sect., Occidental K0123+550-K0125+539 Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int. Sect.) along Bacolod South Rd., Himamaylan City, 571 Jaime B. Ching Enterprises 4256 L A MB GE1 08/10/13 2nd VI LF 21.032 201 01/28/13 08/16/13 -1.08 O 0.332 0.240 0.139 0.030 0.035 0.050 82.60 DEL a)K0065+635-K0067+003, b)K0072+000- Negros Occidental K0072+020 Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd., Dumaguete North Rd. (DNR) K0097+042.20-K0097+385.14, K0097+801.64- 572 Jaime B. Ching Enterprises 4256 L A MB GE1 Negros Oriental 08/22/13 1st VII LF 41.119 200 02/09/13 08/27/13 -5.69 O 0.315 0.300 0.093 0.030 0.055 0.033 82.60 DEL K0097+980.14, K0098+038.14- K0099+680.40, K0110+076.4-K0110+225.90, K0110+239.40-K0110+475.84 Rd. Upgrading (Gravel to Paved) Int. Sect. at Mabina -Ayongon Rd. (MAR) 573 Jaime B. Ching Enterprises 4256 L A MB GE1 Negros Oriental 08/22/13 1st VII LF 44.888 205 02/09/13 09/01/13 -9.65 O 0.333 0.300 0.054 0.030 0.050 0.033 80.00 DEL Sec.1:K0126+764-K0128+385; Sec.2;K0131+862-K0132+282

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 22 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Jann-Norris Construction Const. of Bakir Flood Control along Bagabag, Nueva 574 317 35880 L A SB GE2 08/13/13 1st II LF 6.944 75 06/06/13 08/19/13 -5.56 O 0.362 0.300 0.094 0.030 0.055 0.033 87.40 DEL and Supplies Nueva Vizcaya-Ifugao Rd. Vizcaya Repair/Restoration of Damaged Rd. Slope along Jct. Dumalinao-Margosatubig Rd. Jargon Construction & Guipos, Zamboanga 83.80% 575 318 23474 L B SB GE2 (SO1170MN), Guipos Sect., Km.1689+130- 08/16/13 1st/Final IX LF 4.767 113 03/27/13 07/17/13 0.00 C 0.383 0.155 0.300 - - - 83.80 ONS Supply Km.1689+257 R/S & Km.1689+408.78- del Sur Satisfactory Km.1689+478.80 L/S Jargon Construction & Const. of MPB at Phil. Science High Sch., Koronadal City, South 85.82% 576 23474 L B MA GB1 08/06/13 Final XII LF 4.933 190 10/23/12 04/30/13 0.55 C 0.430 0.133 0.300 - - - 86.30 AHD Supply Paraiso Cotabato Satisfactory Jaro Builders & Rd. Upgrading (Gravel to Paved) CSR Jct. Victoria, Oriental 87.84% 577 319 25560 L B MA GE1 08/01/13 Final IVB LF 9.450 90 01/28/13 04/27/13 1.11 C 0.367 0.200 0.300 - - - 86.70 AHD Construction Supply Minas Rd., K0050+(-610)-K0050+228 Mindoro Satisfactory Widening of Urdaneta Jct.-Dagupan Rd. 578 320 Jasa Builders 31330 L B MA GE1 (Calasiao Sect.) Km. 205+522-Km. 206+161 w/ Calasiao, Pangasinan 08/02/13 2nd I LF 16.211 201 01/16/13 08/04/13 2.43 O 0.347 0.300 0.150 0.030 0.047 0.050 92.40 AHD exception Rehab./Reconst./Upgrading of Damaged Paved 86.38% 579 Jasa Builders 31330 L A MA GE1 Nat'l Rd. along Pangasinan-Zambales Rd., Pangasinan 08/08/13 Final I LF 17.674 126 01/28/13 06/02/13 1.59 C 0.489 0.133 0.300 - - - 92.20 AHD K0333+500-K0335+000 Satisfactory Jasa Builders / EJR Builders and Impvt./Const. of Brgy. Bario to Brgy. 87.20% 580 321 Construction Supply Joint JV-12-034 L B MA GE1 Mabini, Pangasinan 10/25/13 1st/Final I LF 23.065 210 08/28/12 03/25/13 0.00 C 0.439 0.133 0.300 - - - 87.20 ONS Venture Malimpin Rd., Bario ARC Satisfactory Prev. Maint. (MFO-I) Int. Sect. of Secondary Batangas City, 91.06% 581 322 Jasmig Construction Supply 26069 L B MA GE1 Rd., Batanagas-Lobo Rd. from K0117+258- 08/16/13 Final IVA LF 5.082 60 02/12/13 04/12/13 30.00 C 0.467 0.200 0.300 - - - 96.70 AHD Batangas V. Satisfactory K0105+(-459)-K0105+000 Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (MFO-2) (Int. Sect.) Sec. Rd. along 85.88% 582 Jasmig Construction Supply 26069 L B MA GE1 Batangas City 07/31/13 Final IVA LF 11.699 90 02/12/13 05/12/13 53.33 C 0.279 0.200 0.300 - - - 77.90 AHD Batangas-Quezon Rd., K0134+(-651)- Satisfactory K0134+000 Const./Rehab. Of Flood Control System along Tuy & Balayan, 583 Jasmig Construction Supply 26069 L B MA GE1 Palico-Balayan-Batangas City Rd. (Int.) Tuy & 07/31/13 2nd IVA LF 7.050 279 12/10/12 09/04/13 -1.50 O 0.347 0.256 0.135 0.030 0.040 0.033 84.10 DEL Balayan Sect. Batangas Widening of Tagaytay-Nasugbu Rd., 84.00% 584 Jasmig Construction Supply 26069 L B MA GE1 Batangas City 07/31/13 1st/Final IVA LF 23.520 225 03/12/13 10/22/13 37.33 C 0.340 0.200 0.300 - - - 84.00 AHD K0091+303-K0092+750 w/ exceptions Satisfactory JCO Construction and Const. of 2 Cl Modified Sch. Bldg., Nabua 89.80% 585 323 32576 L B SB GB1 Nabua, Camarines Sur 07/31/13 1st/Final V LF 0.951 64 04/15/13 06/17/13 14.06 C 0.488 0.110 0.300 - - - 89.80 AHD Supply West Elem. Sch. V. Satisfactory Rehab./Reconst. of Damaged Paved Nat'l Rds. Jegma Construction and 84.64% 586 324 14775 L A MB GE1 along Cebu North Hagnaya Wharf Rd. (Int. Catmon, Cebu 08/13/13 Final VII LF 7.635 54 02/08/13 04/02/13 0.00 C 0.468 0.133 0.300 - - - 90.10 ONS Development Corporation Sect.) K0050+000-K0050+448 Satisfactory Rd. Upgrading of Nat'l Rds. (Int. Sect.) at Toledo-Tabuelan-San Remigio Rd.: Jegma Construction and 1)K0105+138-K0105+338; 2)K0105+500- 88.10% 587 14775 L A MB GE1 Cebu 08/10/13 1st/Final VII LF 10.164 121 02/13/13 06/13/13 0.00 C 0.381 0.200 0.300 - - - 88.10 ONS Development Corporation K0107+000; 3)K0105+338-K0105+408; Satisfactory 4)K0105+408-K0105+418; 5)K0105+120- K0105+138 Rehab./Reconst./Upgrading (Asphalt to Jejor's Construction Concrete) of Jct. S.H.-Manolo Fortich-Libona- Manolo Fortich, 86.58% 588 325 5143 L A MA GE1 08/06/13 Final X LF 29.261 133 01/23/13 06/04/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Corporation Indahag Rd. (Agusan Canyon Sect.) Bukidnon Satisfactory K1458+649-K1460+635 Const. of Slope Protection along Linamon- Zamboanga Road (Bulod River), Jejor's Construction Tubod, Lanao del 82.11% 589 5143 L A MA GE2 Km.1586+596.90, Const. of 154.20m Flood 08/17/13 Final X LF 12.806 255 07/19/12 03/30/13 0.39 C 0.451 0.200 0.300 - - - 95.10 AHD Corporation Control using Pre-Cast Concrete Sheet Piles & Norte Satisfactory Class A Grouted Riprap Conc. of Bagahupi-Babatngon-Sta. Cruz- Jelm Construction / Chu 86.48% 590 326 JV-12-198 L B MA GE1 Barugo-Carigara Rd., Brgy. Bacong, Babatngon, Leyte 08/20/13 Final VIII LF 19.599 173 01/14/13 07/05/13 0.67 C 0.445 0.133 0.300 - - - 87.80 AHD Construction (JV) K0925+029.08-K0926+009.08 Satisfactory Jemak Construction & Asphalt Overlay of Quezon-Batangas Rd., 90.30% 591 327 32056 L B MA GE1 San Antonio, Quezon 08/03/13 1st/Final IVA LF 3.848 28 02/06/13 03/05/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS Supply K0100+460-K0100+1000 V. Satisfactory Jemak Construction & 83.10% 592 32056 L B MA GE1 Conc. of FMR, Brgy. Mangilag Norte Candelaria, Quezon 08/03/13 1st/Final IVA LF 2.348 36 04/05/13 05/10/13 0.00 C 0.331 0.200 0.300 - - - 83.10 ONS Supply Satisfactory Prev. Maint. (w/ correction Rehab./Reconst./ Jerry R. Santiago Upgrading of Damaged Paved Nat'l Rds. & 87.90% 593 328 18453 L B MA GE1 Sta. Rosa, Nueva Ecija 08/12/13 1st/Final III LF 25.291 120 02/21/13 06/20/13 1.50 C 0.446 0.133 0.300 - - - 87.90 AHD Construction Paving of Shoulder along Daang Maharlika Rd., Satisfactory Km.104+242-Km.107+110 (2,875.00 LM) Rehab./Reconst./Upgrading of Damaged Paved JGC Construction & Nat'l Rd. along Ipil-Liloy Sindangan Rd., Titay, Zamboanga 594 329 30305 L D SB GE1 08/08/13 1st IX LF 7.064 185 03/01/13 09/01/13 0.00 O 0.348 0.241 0.150 0.020 0.047 0.050 85.60 ONS Enterprises Km.1998+208-Km.1998+622, Namnama Rd. Sibugay Sect. Proposed Drainage/Protection at Cocob Sect. JH Pameron Construction & Gutalac, Zamboanga 87.30% 595 330 18792 L B SB GE2 along Gutalac-Baliguian Rd., Km.2012+850- 08/13/13 Final IX LF 3.595 200 10/15/12 05/02/13 2.00 C 0.404 0.184 0.300 - - - 88.80 AHD Enterprises Km.2015+900 del Norte Satisfactory Const./Widening/Upgrading/Rehab. of Access Rds. Declared Tourism Destination, Upgrading Nueva Valencia, 92.20% 596 331 JHJ Construction 3781 L A MA GE1 08/05/13 1st/Final VI LF 9.700 65 02/08/13 04/13/13 50.77 C 0.489 0.133 0.300 - - - 92.20 AHD (Asphalt to Concrete) Guimaras Circ. Rd., Guimaras V. Satisfactory K0091+649-K0092+866

597 JHJ Construction 3781 L A SB GB1 Const. of MPB at Kirayan NHS Miag-ao, Iloilo City 08/14/13 1st VI LF 3.319 130 03/02/13 06/09/13 - O 0.361 0.230 0.000 0.030 0.027 0.033 68.10 DEL

598 332 Jirk Construction 29918 L C SB GB1 Const. of TESDA MPB, San Isidro Luna, Apayao 08/12/13 1st CAR LF 3.909 120 07/17/13 11/14/13 18.50 O 0.370 0.240 0.150 0.015 0.047 0.033 85.50 AHD

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 23 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

599 Jirk Construction 29918 L C SB GB1 Const. of San Juan PS Sta. Marcela, Apayao 08/12/13 1st CAR LF 2.553 120 05/27/13 09/24/13 1.84 O 0.366 0.240 0.150 0.015 0.047 0.033 85.10 AHD

JJ & J Construction and Conc./Rehab. of Barangay Rd. at Brgy. 85.60% 600 333 30234 L B MA GE1 Lapu-Lapu City, Cebu 08/13/13 1st/Final VII LF 11.174 110 03/27/13 07/14/13 1.82 C 0.356 0.200 0.300 - - - 85.60 AHD General Supply Basak Satisfactory

601 334 JJJARNS Construction 35952 L D SB GE1 Conc. of Lucban FMR Abulug, Cagayan 08/02/13 1st II LF 4.819 90 05/27/13 08/24/13 6.66 O 0.350 0.225 0.150 0.030 0.045 0.033 83.30 AHD

Rehab./Impv't. of Drainage Structure along Manila North Rd. (Clustered) 1)K0269+170- San Fernando City, La 92.20% 602 335 JJM Commercial Inc. 32752 L D SB GE2 K0270+000 w/ exception, L=102.00m, 2) 07/29/13 1st/Final I LF 2.346 114 03/27/13 07/18/13 0.00 C 0.489 0.133 0.300 - - - 92.20 ONS K0272+350-K0273+650 w/ exception, Union V. Satisfactory L=97.00m 3) K0275 w/ exception L=170.00m JLA Construction and 83.10% 603 336 24503 L B SB GE1 Const. of FMR at Brgy. Matina Biao Davao City 08/06/13 1st/Final XI LF 1.468 40 02/14/13 03/25/13 0.00 C 0.398 0.133 0.300 - - - 83.10 ONS Supplies Satisfactory

Rehab./Reconst./Strengthening of Hinatigan Placer, Surigao del 86.94% 604 337 JMT Construction 14186 L B MA GE1 Bridge along Surigao-Davao Coastal Rd., Brgy. 08/08/13 Final XIII LF 20.721 442 01/13/12 03/29/13 0.25 C 0.491 0.133 0.300 - - - 92.40 AHD Hinatigan Norte Satisfactory Reconst. of SDCR (Placer-Bacuag Rd. Sect.) Placer, Surigao del 605 JMT Construction 14186 L B MA GE1 08/08/13 1st XIII LF 50.940 237 03/19/13 11/10/13 1.06 O 0.361 0.233 0.150 0.030 0.035 0.050 85.90 AHD along SDCR, K1152+903.30-K1160+940 Norte John Dee B. Bustamante Conc. of Road, Salay-Mucdol Road with 86.10% 606 338 30458 L D SB GE1 Dipaculao, Aurora 08/10/13 1st/Final III LF 2.761 107 03/21/13 07/05/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Construction Box Culvert Satisfactory Repair/Rehab./Impv't. along Banisilan-Guiling- Alamada-Libungan Rd., Km.1699+639- 88.40% 607 339 J-One Builders 32509 L B SB GE1 Cotabato 08/12/13 1st/Final XII LF 9.583 157 03/06/13 08/09/13 0.79 C 0.451 0.133 0.300 - - - 88.40 AHD Km.1700+098 w/ exception (0.310 Km.) (both Satisfactory side), Pob/ Libungan Const. of 1 unit - 2 storey 8CL Sch. Bldg., 93.00% 608 340 Joni Construction 26023 L D SB GB1 Alangalang, Leyte 08/19/13 1st/Final VIII LF 9.853 120 03/19/13 07/16/13 0.83 C 0.497 0.133 0.300 - - - 93.00 AHD Alangalang NHS V. Satisfactory Jonik Trading & 85.60% 609 341 20612 L D SB GE1 Conc. of Rd. at Germinal Rd. Bonilao, Pangasinan 08/07/13 1st/Final I LF 1.000 22 06/27/13 07/18/13 4.55 C 0.423 0.133 0.300 - - - 85.60 ONS Construction Satisfactory JQD Construction and Libagon, Southern 85.14% 610 342 18852 L B SB GB1 Const. of Tigbao E/S, 2-CL 08/05/13 Final VIII LF 1.142 90 01/03/13 04/02/13 0.00 C 0.389 0.133 0.300 - - - 82.20 ONS General Services Leyte Satisfactory Jrald Construction and 87.90% 611 343 33079 L D SB GE1 Conc. of Brgy. Rd., Babo Sacan Porac, Pampanga 07/31/13 1st/Final III LF 1.919 35 03/09/13 04/12/13 0.00 C 0.446 0.133 0.300 - - - 87.90 ONS Trading Satisfactory Asphalt Overlay of Calamba-Sta. Cruz-Famy 87.20% 612 344 JTC Construction Co., Inc. 32479 L C SB GE1 Laguna 08/09/13 1st/Final IVA LF 7.472 30 02/07/13 03/09/13 23.33 C 0.439 0.133 0.300 - - - 87.20 AHD Jct. Rd., K0080+862-K0081+452 Satisfactory Rehab./Reconst. along Jct. Taft-Oras-San Jucons Construction & 94.20% 613 345 32051 L B SB GE1 Policarpio-Arteche Rd., K0960+000- Eastern Samar 08/19/13 1st/Final VIII LF 5.176 58 01/29/13 03/27/13 0.00 C 0.442 0.200 0.300 - - - 94.20 ONS Supply K0960+1040 V. Satisfactory Const. of 1-Unit, 1-Storey, 2-CL Rm. 7.0m x Jucons Construction & San Policarpio, Eastern 90.50% 614 32051 L B SB GB1 18.0m Sch. Bldg. w/ two seater-CR attached & 08/19/13 1st/Final VIII LF 1.626 127 03/27/13 07/31/13 7.09 C 0.472 0.133 0.300 - - - 90.50 AHD Supply septic vault at ANSCHI Samar V. Satisfactory Rehab./Impv't. of Flood Control along 615 346 JUF Construction 17987 L A SB GE2 Calbayog City, Samar 08/13/13 1st VIII LF 7.785 89 04/19/13 07/16/13 -35.00 O 0.386 0.300 0.000 0.030 0.050 0.033 79.90 DEL Catarman-Calbayog Rd., Brgy. Oquendo Const. of Sch. Bldg., Ozamiz City Sch. of 616 347 Junjing Construction 32636 L D SB GB1 Ozamis City 08/16/13 1st X LF 4.842 137 03/27/13 08/10/13 -5.16 O 0.399 0.203 0.055 0.030 0.059 0.033 77.90 DEL Arts and Trades Rd. Widening of Nat'l Rd. along Catarman San Roque, Northern 617 348 Jupa Construction 23577 L B MA GE1 (Boundary) Rawis Rd. Sect., K0771+000- 08/06/13 1st VIII LF 6.279 150 03/25/13 08/21/13 8.20 O 0.366 0.240 0.150 0.030 0.055 0.033 87.40 AHD K0773+000 w/ exception Samar Conc. of Pangpang-Palapag-Mapanas-Gamay- Mapanas, Northern 86.20% 618 Jupa Construction 23577 L B MA GE1 Lapinig Rd., Magtaon-Mapanas Sect., K0823+(- 08/06/13 1st/Final VIII LF 18.826 176 02/06/13 07/31/13 0.57 C 0.438 0.124 0.300 - - - 86.20 AHD 172)-K0823+730 Samar Satisfactory 87.24% 619 349 JYM Construction & Supply 34595 L C SB GE2 Ibong Sapa Flood Control Virac, Catanduanes 07/30/13 Final V LF 4.845 64 02/15/13 04/19/13 0.00 C 0.409 0.200 0.300 - - - 90.90 ONS Satisfactory

Kejamarenik Construction Mamburao, Occidental 620 350 33742 L D SB GB1 Const. of MPB at Brgy. 7 07/29/13 1st IVB LF 9.699 210 12/16/12 07/13/13 -2.47 O 0.349 0.300 0.049 0.030 0.038 0.033 79.90 DEL & Construction Supplies Mindoro

Kenwood Construction Const. of 1-Storey 2-CL Sch. Bldg. at Jose San Carlos City, 91.50% 621 351 22186 L B SB GB1 08/03/13 1st/Final I LF 1.167 90 03/25/13 06/22/13 0.00 C 0.482 0.133 0.300 - - - 91.50 ONS Enterprises Maram Paningbatan Sr. E/S Pangasinan V. Satisfactory

Kevin Yoshi Builders Const. of Flood Control/Drainage along Digos- 88.50% 622 352 32216 L D SB GE2 General Santos City 08/23/13 1st/Final XII LF 6.705 128 04/16/13 08/21/13 0.78 C 0.452 0.133 0.300 - - - 88.50 AHD (Formerly: Con Builders) Makar Rd. (Apopong Sect.), Brgy. Apopong Satisfactory Repair & Impv't. of Flood Control & 623 353 KGD Builders 21960 L B SB GE2 General Santos City 08/22/13 1st XII LF 7.656 120 06/09/13 10/06/13 11.84 O 0.376 0.240 0.150 0.020 0.033 0.033 85.20 AHD Drainage Structure in Brgy. Tinagacan Kilusang Magkaibigan M.P. Rehab./Reconst./Upgrading of Sumulong 624 354 31666 L A MA GE1 Antipolo City 08/15/13 2nd IVA LF 22.522 223 01/29/13 09/08/13 -14.23 O 0.333 0.240 0.000 0.030 0.040 0.000 64.30 DEL Cooperative (KMMPC) Highway Kilusang Magkaibigan M.P. Widening of Surigao-Davao Coastal Rd., Maco, Comval 91.60% 625 31666 L A MA GE1 08/14/13 1st/Final XI LF 13.767 122 01/28/13 05/29/13 0.00 C 0.416 0.200 0.300 - - - 91.60 ONS Cooperative (KMMPC) Maco Sect. Province V. Satisfactory Repair/Maint. of Puerto Princesa-Malvar Rd., Kim Harold Trading, 67.64% 626 355 28019 L B SB GE2 Drainage Canal Km.02+189-Km.02+434 Puerto Princesa City 08/15/13 Final IVB LF 2.766 150 11/16/12 04/15/13 - C 0.480 0.200 0.000 - - - 68.00 DEL Manufacturing & Construction Malvar Rd. Poor

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 24 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Prev. Maint. (Int. Sect.) Nat'l Arterial Rd. 88.40% 627 356 Kirskat Venture 13361 L A MB GE1 (Iloilo East Coast-Capiz Rd., Brgy. Sta. Fe, Pilar, Capiz 08/18/13 1st/Final VI LF 19.980 140 02/06/13 06/26/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS K0.169+279-K0.170+323 Satisfactory Prev. Maint. (MFO-1) (Int. Sect.), Asphalt KLDS Trading & 90.00% 628 357 28091 L C SB GE1 Overlay along Crisanto M. Delos Reyes Ave., Amadeo, Cavite 08/13/13 1st/Final IVA LF 6.120 50 02/27/13 04/17/13 0.00 C 0.467 0.133 0.300 - - - 90.00 ONS Construction K0054+(-306)-K0054+267 V. Satisfactory Rd. Upgrading (Gravel to Paved) Abra- Kuatako Construction Building 629 358 11224 L B MA GE1 Cervantes Rd., K0449+415-K0456+346, Pob. Abra 08/14/13 1st CAR LF 41.273 179 01/21/13 07/19/13 -17.00 O 0.329 0.300 0.000 0.030 0.050 0.033 74.20 DEL and General Contractor Sallapadan Impvt./Riprapping along Duyan-Duyan Creek 83.64% 630 359 Kumi Construction 34969 L D SB GE2 Quezon City 08/09/13 Final NCR LF 4.652 90 01/21/13 04/20/13 0.00 C 0.457 0.200 0.300 - - - 95.70 ONS (Mirriam College-Lagarian Creek) Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (Int. Sect.), Bacolod South Rd. Sipalay City, Negros 631 360 Kuntel Construction 10234 L A MA GE1 (Kabankalan-Hinoba-an Sect.) A.K0166+944- 08/09/13 1st VI LF 35.320 179 03/22/13 09/16/13 -3.25 O 0.346 0.240 0.118 0.030 0.040 0.033 80.70 DEL K0167+932 & B.K0169+000-K0170+012, Occidental Brgy. Maricalum 74.64% 632 361 KVC Construction 28959 L B MA GE1 Rehab. of Moatong Bridge, K0301+743 Bokod, Benguet 07/30/13 Final CAR LF 7.866 150 02/09/13 07/08/13 0.00 C 0.467 0.133 0.000 - - - 60.00 DEL Poor L.B. Leoncio Trading & 633 362 31587 L B SB GB1 Const. of 2 Storey 6 CL San Jose NHS Puerto Princesa City 08/16/13 1st IVB LF 6.286 260 04/02/13 12/18/13 34.20 O 0.381 0.228 0.150 0.020 0.033 0.050 86.20 AHD Construction Road Slip/Protection along Surigao-Davao Lingig, Surigao del 634 363 L.C. Ting Construction 23666 L AAA MA GE1 Coastal Rd., Mahayahay, K1477+533.10- 08/16/13 1st XIII LF 19.826 190 02/25/13 09/02/13 2.46 O 0.372 0.240 0.150 0.030 0.035 0.050 87.70 AHD Sur K1477+606.10 Rehab./Strengthening of Sumo-Sumo Bridge 84.60% 635 L.C. Ting Construction 23666 L AAA MA GE1 Tago, Surigao del Sur 08/15/13 1st/Final XIII LF 13.801 154 02/14/13 07/17/13 0.62 C 0.413 0.133 0.300 - - - 84.60 AHD along Surigao-Davao Coastal Rd. Satisfactory Repair/Rehab./Impv't. of Nueva Ecija-Aurora 636 364 L.M.G. Construction 5719 L B MA GE1 Aurora 08/10/13 1st III LF 9.900 46 03/27/13 06/10/13 -1.17 O 0.362 0.200 0.000 0.030 0.050 0.033 67.50 DEL Rd., K0214+918-K0216+329 w/ exceptions Asset Preservation of Nat'l Rd. Gen. from Pvmt. Mgt. System/Highway Dev. & Mgt. System L.M.G. Construction / Z F 637 365 JV-12-343 L B MA GE1 (HDM-4), Nueva Ecija-Aurora Rd., Baler, Aurora 08/10/13 1st III LF 13.927 150 03/26/13 08/22/13 23.33 O 0.366 0.200 0.150 0.030 0.050 0.033 82.90 AHD Construction Joint Venture a)K0212+265-K0214+000; b)K0220+000- K0221+000; c)K0229+000-K0230+698 Widening of Sta. Cruz Pob. Rd. inc. 83.10% 638 366 L.P.O. Enterprises 20730 L B SB GE1 Sta. Cruz, Laguna 08/09/13 1st/Final IVA LF 10.836 91 02/11/13 05/12/13 0.00 C 0.398 0.133 0.300 - - - 83.10 ONS Drainage Satisfactory

Const. of Slope Protection for Marikina River 88.44% 639 367 L.R. Tiqui Builders, Inc. 13810 L AAA MB GE2 along Brgy. Tumana, Eastbank Marikina City, Marikina City 08/06/13 Final NCR LF 43.770 214 01/09/13 08/10/13 38.79 C 0.452 0.133 0.300 - - - 88.50 AHD 2nd District Sta. 6+120-Sta.6+621.10 Satisfactory Widening of Daang Maharlika (Doña Remedios 640 L.R. Tiqui Builders, Inc. 13810 L AAA LB GE1 Trinidad Sect.) Km.45+452-Km.52+722 w/ Baliuag, Bulacan 08/13/13 1st III LF 36.062 240 02/22/13 10/19/13 1.46 O 0.375 0.240 0.150 0.030 0.055 0.033 88.30 AHD exceptions Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. (Int. Sect.) Gen. Alejo Santos Plaridel & Bustos, 641 L.R. Tiqui Builders, Inc. 13810 L AAA LB GE1 08/14/13 1st III LF 21.570 161 03/23/13 08/30/13 -1.66 O 0.373 0.240 0.133 0.020 0.050 0.050 86.60 DEL Highway Km.45+000-Km.55+671, Km.55+671- Bulacan Km.56+102 & Km.56+102-Km.56+948

85.32% 642 L.R. Tiqui Builders, Inc. 13810 L AAA LB GE1 Const. of Tartaro Bridge San Miguel, Bulacan 08/15/13 Final III LF 24.892 210 12/17/12 07/14/13 0.00 C 0.449 0.133 0.300 - - - 88.20 ONS Satisfactory Dredging/Deepening w/ Channel Impv't. 643 L.R. Tiqui Builders, Inc. 13810 L AAA MB GE2 Bustos, Bulacan 08/14/13 1st III LF 13.893 135 03/28/13 08/09/13 -1.61 O 0.353 0.265 0.134 0.023 0.045 0.033 85.30 DEL along Angat River Rd. Upgrading along Capas-San Jose-Mayantoc- L.S.D. Construction & 644 368 8980 L AAA LB GE1 Malacampa Rd., K0145+283-K0147+-476, Camiling, Tarlac 08/08/13 1st III LF 35.686 182 02/22/13 08/22/13 0.50 O 0.382 0.254 0.150 0.030 0.059 0.050 92.50 AHD Supplies Mayantoc L.S.D. Construction & Const. of Drainage System along Baguio-Bua- 645 8980 L AAA LB GE1 Itogon, Benguet 07/29/13 1st CAR LF 18.556 150 03/23/13 08/19/13 1.83 O 0.357 0.240 0.150 0.015 0.045 0.050 85.70 AHD Supplies Itogon Rd., K0254+(-655)-K0268+055 (V.S.) Rd. Upgrading (Gravel to Conc.) along Gurel- L.S.D. Construction & 84.19% 646 8980 L AAA LB GE1 Bokod-Kabayan-Buguias-Abatan Rd., Kabayan, Benguet 07/30/13 Final CAR LF 95.365 455 09/05/11 12/02/12 0.00 C 0.435 0.133 0.300 - - - 86.80 ONS Supplies K0322+491-K0338+760 (IS) Kabayan Sect. Satisfactory

Const. of Typical Cross Drainage Structure (Dome/Cathedral Type) of various sect. along MNR w/n the district 1)Pob. Villasis Sect.; L.S.D. Construction & 2)Bacag Villasis Sect.; 3)Nancayasan, Urdaneta 647 8980 L AAA MB GE2 Pangasinan 08/09/13 1st I LF 30.303 247 03/27/13 11/28/13 -3.93 O 0.378 0.300 0.111 0.030 0.037 0.033 88.90 DEL Supplies Sect.; 4)Anonas, Urdaneta Sect.; 5)Sumabot, Binalonan Sect.; 6)Pob. Binalonan Sect.; 7)Alipangpang, Pozorrubio Sect.; 8)Pob. Sision Sect.; 9)Paldit Sision Sect.; 10)Pob. Sision Sect.

Access Rd. to declared Tourism Destination (Rd. Upgrading-Gravel to Paved) @ Jct. (TNR) 648 369 Labb Construction 13524 L B MA GE1 Antequera, Bohol 08/17/13 1st VII LF 21.596 210 02/04/13 09/01/13 5.28 O 0.387 0.257 0.150 0.030 0.065 0.050 93.90 AHD Maribojoc-Antequera-Catagbacan (Loon) Rd., Km.23+057-Km.23+993 Const./Impv't. of Concepcion, Danao- 93.30% 649 Labb Construction 13524 L B MA GE1 Buenavista, Carmen Rd., K0071+820- Bohol Province 08/16/13 1st/Final VII LF 62.582 277 07/27/12 04/29/13 24.55 C 0.433 - 0.500 - - - 93.30 AHD V. Satisfactory K0073+170 Lady of Assumption Maasin City, Southern 87.02% 650 370 25360 L B MA GE1 Rd. Leading to Danao Camp Tree Park 08/05/13 Final VIII LF 33.334 188 01/18/13 07/24/13 0.74 C 0.460 0.133 0.300 - - - 89.30 AHD Enterprises Leyte Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 25 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Road Upgrading (Gravel to Paved) Int. Sect. inc. Drainage & Rd. Facilities Tubod-Ganassi Rd., Lanao Builder and 82.50% 651 371 15982 L A MA GE1 K1600+535-K1601+125; K1601+08- Lanao del Norte 08/17/13 1st/Final X LF 42.128 195 02/03/13 08/16/13 2.50 C 0.392 0.133 0.300 - - - 82.50 AHD Enterprises K1601+874; K1603+(-104 -K1601+874.93; Satisfactory K1603+(042.50)-K1603+758.97 Lanao Builder and Rehab./Reconst./Upgrading along Dobleston- Kapatagan, Lanao del 652 15982 L A MA GE1 08/12/13 2nd X LF 37.678 213 01/18/13 08/18/13 0.24 O 0.289 0.238 0.150 0.010 0.045 0.033 76.50 AHD Enterprises Butadon Rd., Km.2004+098-Km.2006+336 Norte

Lea & Sons Trading and Repair/Maint. of DPWH Bldg. Office 78.55% 653 371 34959 L D SB GB1 Roxas, Palawan 08/10/13 Final IVB LF 0.550 76 02/06/13 04/22/13 0.00 C 0.438 0.156 0.300 - - - 89.40 ONS Construction Quarter (PJHL Bldg.) Unsatisfactory

Leamor Construction and Magsaysay, Davao del 93.00% 654 372 34928 L D SB GB1 Const. of MPBs at Brgy. Barayong 08/09/13 1st/Final XI LF 1.216 90 04/02/13 06/30/13 6.84 C 0.497 0.133 0.300 - - - 93.00 AHD Supply Sur V. Satisfactory Leamor Construction and Const. of Bridge at Dahlia Street, Bansalan, Davao del 87.50% 655 34928 L D SB GE1 08/09/13 Final XI LF 1.944 60 01/21/13 03/21/13 0.00 C 0.442 0.133 0.300 - - - 87.50 ONS Supply Poblacion I Sur Satisfactory Conc./Impv't. of Sagbayan-Danao Rd., a)Sta.78+910.20-Sta.80+016.50; b)Sta.94.+720- Leda Construction Incorporated 88.00% 656 373 12229 L B MA GE1 Sta.95+306.25; c)Sta.95+477.85- Bohol Province 08/15/13 1st/Final VII LF 48.744 288 07/27/12 05/10/13 0.00 C 0.447 0.133 0.300 - - - 88.00 ONS (Formerly: Leda Construction) Sta.95+509.90; d)Sta.95+565.70- Satisfactory Sta.96+141.10 Const./Impv't. of Concepcion-Danao- Leda Construction Incorporated 657 12229 L B MA GE1 Buenavista, Carmen Rd., K0071+820- Bohol Province 08/16/13 1st VII LF 62.464 270 04/22/13 01/16/14 8.03 O 0.337 0.264 0.150 0.030 0.046 0.050 87.70 AHD (Formerly: Leda Construction) K0073+806.93 Rd. Upgrading of Jaro-Dagami-Burauen-La Paz Leda Construction Incorporated Rd., Km.0955+000-Km.0955+527; 89.36% 658 12229 L B MA GE1 Dagami, Leyte 08/17/13 Final VIII LF 12.141 205 01/15/13 08/07/13 0.00 C 0.454 0.133 0.300 - - - 88.70 ONS (Formerly: Leda Construction) Km.0955+611-Km.0955+970; Km.0952+589- V. Satisfactory Km.0952+855; Km.0952+000-Km.0952+091 Rehab./Reconst. of Damaged Paved Nat'l Rd. Leda Construction Incorporated along Biliran Circ. Rd., Km.1100+000- 89.50% 659 12229 L B MA GE1 Biliran Province 08/14/13 1st/Final VIII LF 36.293 178 02/07/13 08/04/13 0.83 C 0.462 0.133 0.300 - - - 89.50 AHD (Formerly: Leda Construction) Km.1102+000 w/ exceptions (Bunga- V. Satisfactory Magbangon Rd. Sect.)

Leda Construction Incorporated Rehab./Impv't. of Sawa Bridge and Approaches 86.40% 660 12229 L B MA GE1 Basey, Samar 08/16/13 1st/Final VIII LF 29.937 360 07/20/12 07/14/13 0.00 C 0.431 0.133 0.300 - - - 86.40 ONS (Formerly: Leda Construction) along West Samar Coastal Rd. Satisfactory

Rd. Upgrading (Gravel to Paved), Conc. of 661 374 Legacy Construction 22465 L A MA GE1 Janiuay-Badiangan-Tina Rd., K0040+151.50- Badiangan, Iloilo City 08/20/13 1st VI LF 17.920 201 02/06/13 08/26/13 0.14 O 0.364 0.203 0.150 0.030 0.037 0.033 81.70 AHD K0041+400 (K0040+151.50-K0041+376) Cluster 16: Repair/Rehab./Impvt. of Legazpi- Punta de Jesus Rd. (S05860LZ) a)Repair/Rehab.Impvt. of Legazpi-Punta De Legazpi Premium Development Jesus Rd. ((Taysan Sect.) K0530+597- 88.86% 662 375 20701 L AA MB GE1 Legazpi City 08/11/13 Final V LF 19.446 56 01/29/13 03/25/13 25.00 C 0.392 0.196 0.300 - - - 88.80 AHD Corporation K0532+300 w/ exceptions; Satisfactory b)Repair/Rehab.Impvt. of Legazpi-Punta De Jesus Rd. (Taysan-Homapon Sect.) K0535+200- K0536+00 w/ exception Legazpi Premium Development Rehab./Reconst. Of Damaged Paved Nat'l Rds. 88.06% 663 20701 L AA MB GE1 Sorsogon 08/13/13 Final V LF 70.792 290 06/28/12 04/13/13 0.00 C 0.323 0.200 0.300 - - - 82.30 ONS Corporation (Int.Sect.) Bacon-Sawanga-Prieto Diaz Rd. Satisfactory Replacement (Temp. to Perm.) of Bridges along Legazpi Premium Panganiban, 664 20701 L AA MB GE1 Nat'l Rds., Haya Bridge Jct. CCR-Panganiban- 07/30/13 1st V LF 11.928 154 02/15/13 08/22/13 -3.83 O 0.341 0.300 0.112 0.030 0.035 0.033 85.10 DEL Development Corporation Sabloyon Rd. (K0074+830.05-K0074+851.05) Catanduanes Rd. Upgrading of (Gravel to Paved) Bagahupi- Babatngon-Sta. Cruz-Barugo-Carigara Rd., 665 376 Lehci Construction 24196 L B MA GE1 Leyte 08/17/13 1st VIII LF 39.330 221 01/28/13 09/05/13 1.90 O 0.385 0.178 0.150 0.023 0.035 0.050 82.10 AHD K0934+049-K0935+267.60; K0930+639- K0931+420 Replacement/Rehab./Strengthening of Librius Construction & Supply Permanent Bridges Gen. from Bridge Mgt. 85.80% 666 377 Corporation (Formerly: Librius 23580 L A SB GE1 Talisay, Batangas 08/02/13 1st/Final IVA LF 4.168 60 01/25/13 03/25/13 1.67 C 0.402 0.156 0.300 - - - 85.80 AHD System (BMS) Angasin Bridge along Tanauan- Construction & Supply) Satisfactory Talisay-Tagaytay Rd.

Librius Construction & Supply Const. of Two (2) Storey, (6) Cl. RGR Type 667 Corporation (Formerly: Librius 23580 L A MA GB1 Sch. Bldg., Jacobo Zobel Memorial Elem. Sch. Calatagan, Batangas 07/31/13 1st IVA LF 13.711 180 04/17/13 10/13/13 6.28 O 0.335 0.264 0.150 0.030 0.041 0.033 85.30 AHD Construction & Supply) Brgy. Pob.

Rd. Upgrading (Gravel to Paved) Int. Sect., Jct. Ramon Magsaysay, 668 378 LMD Construction 9410 L B MA GE1 Aurora-Ozamis City Rd., K1644+000- 08/17/13 2nd IX LF 44.369 206 02/18/13 09/11/13 11.70 O 0.326 0.296 0.150 0.012 0.033 0.033 85.00 AHD Zamboanga del Sur K1645+910 Rd. Upgrading (Gravel to Paved), Int. Sect., Jct. 669 LMD Construction 9410 L B MA GE1 Blancia-Molave-Josefina Rd., K1684+500- Zamboanga del Sur 08/17/13 2nd IX LF 34.846 255 02/18/13 10/30/13 13.78 O 0.302 0.254 0.150 0.030 0.028 0.033 79.70 AHD K1685+607 Road Upgrading (Gravel to Paved), Int. Sect., 670 LMD Construction 9410 L B MA GE1 Eastern Bobongan-Sominot Midsalip-Dumingag Zamboanga del Sur 08/17/13 2nd IX LF 34.732 165 02/18/13 08/01/13 - O 0.360 0.278 0.000 0.024 0.033 0.033 72.80 DEL Rd., K1649+549-K1651+049 Rd. Upgrading (Gravel to Paved) Imelda-Bayog- Kumalarang-Lapuyan-Margosatubig Rd., La Imelda, Zamboanga 671 LMD Construction 9410 L B MA GE1 08/14/13 2nd IX LF 24.635 174 02/22/13 08/14/13 -7.74 O 0.253 0.300 0.073 0.030 0.028 0.033 71.70 DEL Victoria Sect., K1755+075.00-K1756+000.00 Sibugay w/ equation Repair/Maint. of Rd. Slip along Pagadian City- Long Island Builders & 83.78% 672 379 31730 L C SB GE1 Zamboanga City Rd., K1722+276-K1722+430 Zamboanga City 08/16/13 Final IX LF 3.320 121 10/11/12 02/08/13 0.00 C 0.354 0.200 0.300 - - - 85.40 ONS Construction Kamarin Sect. Satisfactory Lotrim Construction, Widening of Calinan-Baguio-Cadalian Rd., 673 380 Incorporated (Formerly: Lotrim 12273 L A MA GE1 Davao City 08/06/13 1st XI LF 15.223 209 02/26/13 09/22/13 -0.10 O 0.322 0.300 0.149 0.030 0.023 0.033 85.70 DEL Baguio District Km.1688+302-Km.1689+465 Construction)

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 26 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Lotrim Construction, Impv't. of JNR Mabuhay-Mabunga-Union-JNR Bansalan, Davao del 674 Incorporated (Formerly: Lotrim 12273 L A MA GE1 08/09/13 1st XI LF 27.664 214 02/04/13 09/06/13 1.17 O 0.279 0.300 0.150 0.030 0.030 0.050 83.90 AHD Pob. Rd. MMURNEC ARC Construction) Sur Rd. Upgrading (Gravel to Paved) of 88.80% 675 381 LTM Builders 35247 L C SB GE1 Abucay, Bataan 07/31/13 1st/Final III LF 3.262 90 02/21/13 05/21/13 1.67 C 0.455 0.133 0.300 - - - 88.80 AHD Mabatang Vicinal Rd. Satisfactory LTS Builders and Const. of San Miguel Technical 676 382 33473 L D SB GB1 San Miguel, Bohol 08/19/13 1st VII LF 4.550 160 03/25/13 08/31/13 -14.77 O 0.397 0.300 0.002 0.030 0.047 0.033 80.90 DEL Construction Supply Vocational Sch. LVRO Construction and Impvt./Upgrading (Gravel to Concrete)- Carmen, Agusan del 677 383 18116 L B MA GE1 08/06/13 2nd XIII LF 27.927 200 01/24/13 08/11/13 -0.53 O 0.300 0.204 0.145 0.030 0.025 0.033 73.70 DEL Supply NRJ Tagcatong-Vinapor Rd. Sur

M M Construction Corporation Widening of Daang Maharlika, 85.20% 678 384 12012 L B MA GE1 Solano, Nueva Vizcaya 08/13/13 Final II LF 14.700 120 01/28/13 05/27/13 0.00 C 0.413 0.133 0.300 - - - 84.60 ONS (Formerly: MM Construction) K0270+755.40-K0271+736.40 Satisfactory

M M Construction Corporation Const. of Sta. Fe River Control Proj., Revetment Bambang, Nueva 83.90% 679 12012 L B MA GE2 08/13/13 1st/Final II LF 19.399 135 01/09/13 05/23/13 0.00 C 0.406 0.133 0.300 - - - 83.90 ONS (Formerly: MM Construction) Nos. 1, 2 & 3 (Indiana Elem. Sch.) Vizcaya Satisfactory Prev. Maint.e of Sayre Highway, Pob. M. Montesclaros Enterprises, Malaybalay & Casisang Sect., a)K1505+(-287)- Malaybalay City, 86.76% 680 385 Inc. (Formerly: Montesclaros 6506 L AA MB GE1 08/09/13 Final X LF 21.931 92 01/18/13 04/19/13 0.00 C 0.424 0.200 0.300 - - - 92.40 ONS K1505+818; b)K1508+224-K1508+504 (w/ Enterprises) Bukidnon Satisfactory exception) M. Montesclaros Enterprises, Prev. Maint. along Maramag-Maragdao Rd. 85.04% 681 386 Inc. (Formerly: Montesclaros 6506 L AA MB GE1 Bagontaas, Bukidnon 08/06/13 Final X LF 24.920 139 01/23/13 06/10/13 88.61 C 0.451 0.133 0.300 - - - 88.40 AHD (Adtuyon Sect.) K1577+(-042)-K1578+944 Enterprises) Satisfactory Road Upgrading (Gravel to Paved) (Int. Sect.) inc. Drainage & Rd. Facilities of Jct. S.H. M. Montesclaros Enterprises, Bangcud-Mailag Road (By-Pass Rd.) Malaybalay City, 82.20% 682 Inc. (Formerly: Montesclaros 6506 L AA MB GE1 08/09/13 1st X LF 36.329 189 01/18/13 07/25/13 5.45 O 0.306 0.236 0.150 0.030 0.050 0.050 82.20 AHD a)K1525+595-K1525+677; b)K1526+(-048)- Enterprises) Bukidnon Satisfactory K1526+747; c)K1528+231-K1530+(-385), Bangcud Road Upgrading (Gravel to Paved) (Int. Sect.) M. Montesclaros Enterprises, inc. Drainage & Rd. Facilities along Dologon- 683 Inc. (Formerly: Montesclaros 6506 L AA MB GE1 Bukidnon 08/08/13 1st X LF 41.336 198 01/24/13 08/10/13 1.75 O 0.310 0.215 0.150 0.030 0.045 0.033 78.30 AHD Kisanday-Guinorayan Rd. c)K1546+(-035)- Enterprises) K0547+000; d)K1547+000-K1547+693 M.C.B. Zamora Const. of Slope Protection along Porac 85.60% 684 387 32006 L D SB GE2 Porac, Pampanga 07/31/13 1st/Final III LF 5.580 104 03/14/13 06/25/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS Construction & Supplies River, Brgy. Jalung Satisfactory

M.C.B. Zamora Const. of Slope Protection/Flood Control, Bucao 83.60% 685 32006 L D SB GE2 Botolan, Zambales 08/03/13 1st/Final III LF 8.866 70 01/23/13 04/02/13 2.86 C 0.403 0.133 0.300 - - - 83.60 AHD Construction & Supplies Dike (Downstream Sect.) Satisfactory

M.G. Salazar Construction 686 388 4072 L A MA GE2 Const. of Coastal Dike Navotas City 08/12/13 1st NCR LF 45.296 219 03/27/13 10/31/13 18.79 O 0.341 0.240 0.150 0.030 0.050 0.050 86.10 AHD Corporation Const. of 1 Storey 3-Cl. Sch. Buildings, Buyo, Goa, Camarines 687 389 M.J. Apin Builders 12179 L B SB GB1 08/02/13 1st V LF 1.602 120 06/10/13 10/07/13 0.85 O 0.365 0.240 0.150 0.030 0.047 0.033 86.50 AHD Buyo Impact Elem. Sch. Sur Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. San Miguel-Sibul Rd. a)K0082+537- M.S. Ramos Construction / Le K0083+236; b)K0078+(-400)- K0078+000; 87.80% 688 390 JV-12-320 L A MA GE1 San Miguel, Bulacan 08/15/13 1st/Final III LF 27.591 180 02/04/13 08/02/13 0.00 C 0.445 0.133 0.300 - - - 87.80 ONS Reve Builders Joint Venture c)K0083+236-K0083+366; d)K0078+(-476)- Satisfactory K0078+(-400); e)K0086+000-K0086+231; f)K0086+908-K0087+621 M.V. Caldo Engineering Reconst. of C. Palanca St., w/ Drainage 86.44% 689 391 16938 L B MA GE1 Quiapo, Manila 07/29/13 Final NCR LF 3.837 90 01/31/13 04/30/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Construction and Supplies Impv't. Satisfactory

M.V. Caldo Engineering Prev. Maint. (Int. Sect.) Beata St.- 84.80% 690 16938 L B MA GE1 Manila 08/01/13 1st/Final NCR LF 1.677 54 02/20/13 04/14/13 64.82 C 0.415 0.133 0.300 - - - 84.80 AHD Construction and Supplies K0008+035-K0008+360, 5th District Satisfactory

M.V. Sabalburo Repair/Rehab./Impvt. along MNR Km. 331+000- 93.00% 691 392 32561 L B SB GE1 Sta. Cruz, Ilocos Sur 08/12/13 1st/Final I LF 9.849 104 05/20/13 08/23/13 10.58 C 0.497 0.133 0.300 - - - 93.00 AHD Construction and Supply Km. 333+000 w/ exceptions V. Satisfactory M.V. Sabalburo Rehab. of Drainage Canal along MNR, 92.88% 692 32561 L B SB GE1 Bantay, Ilocos Sur 08/13/13 Final I LF 9.690 128 12/19/12 04/25/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS Construction and Supply Km. 405+500-Km. 406+715 V. Satisfactory M.V. Sabalburo Repair/Rehab./Impv't. Along Sta. Lucia-Salcedo 84.10% 693 32561 L B SB GE1 Sta. Lucia, Ilocos Sur 08/12/13 1st/Final I LF 4.851 80 06/20/13 09/07/13 32.50 C 0.408 0.133 0.300 - - - 84.10 AHD Construction and Supply Rd., Km. 343+000-Km. 346+000 w/ exception Satisfactory

Rd. Opening of San Jose East-San Jose Canaman, Camarines 79.30% 694 393 M3A Construction 32123 L B MA GE1 08/06/13 1st/Final V LF 1.940 90 02/06/13 05/06/13 0.00 C 0.426 0.200 0.167 - - - 79.30 DEL West Rd. Sur Unsatisfactory Rd. Upgrading (Gravel to Pave) Merida-Lundag- 695 394 Mac Builders 7249 L AAA LB GE1 Puting Bato-Consolacion-Isabel Rd., Leyte 08/10/13 1st VIII LF 30.615 234 01/28/13 09/19/13 0.49 O 0.382 0.240 0.150 0.018 0.056 0.050 89.60 AHD K1121+162-K1122+255

Prev. Maint. of Jaro-Dagami-Burauen-La Paz 85.78% 696 Mac Builders 7249 L AAA LB GE1 Dagami, Leyte 08/17/13 Final VIII LF 30.857 174 01/15/13 07/07/13 1.15 C 0.477 0.133 0.300 - - - 91.00 AHD Rd., Km.0964+500-Km.0969+000 Satisfactory

Rehab. & Impv't. of Naval-Caibiran, Cross 85.82% 697 Mac Builders 7249 L AAA LB GE1 Country Rd. (Major Rd. Slip), Km.1035+000- Biliran Province 08/15/13 Final VIII LF 8.921 208 12/14/12 07/10/13 0.67 C 0.478 0.133 0.300 - - - 91.10 AHD Satisfactory Km.1044+000 w/ exceptions Road Upgrading from Gravel to Paved along Madyaw Construction & Talacogon, Agusan del 698 395 29598 L A MA GE1 Butuan City-Talacogon-Loreto-Veruela-Sta. 08/21/13 1st XIII LF 44.760 209 03/05/13 09/29/13 1.45 O 0.355 0.222 0.150 0.030 0.035 0.033 82.50 AHD Dev. Corporation Josefa Rd, (K1345+625-K1349+326) Sur Road Upgrading (Gravel to Paved) Tibanban- Maer Summit Konstrukt Co. 699 396 25262 L A MA GE1 Lavigan Rd. (Brgy. Tagabebe - Brgy. Davao Oriental 08/14/13 1st XI LF 47.787 203 03/06/13 09/24/13 -7.09 O 0.385 0.300 0.079 0.030 0.045 0.017 85.60 DEL (Formerly: Summit Konstrukt) Pundaguitan Sect.)

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 27 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Rd. Upgrading (Gravel to Paved) Tibanban- Maer Summit Konstrukt Co. Governor Generoso, 84.82% 700 25262 L A MA GE1 Lavigan Rd., Km.1803+281-Km.1804+840 08/14/13 Final XI LF 42.924 199 01/25/13 08/11/13 0.00 C 0.404 0.200 0.300 - - - 90.40 ONS (Formerly: Summit Konstrukt) Nangan Sect. Davao Oriental Satisfactory Road Upgrading (Gravel to Paved) Tibanban- Maer Summit Konstrukt Co. Governor Generoso, 83.54% 701 25262 L A MA GE1 Lavigan Rd.; a)Km. 1795+399.2-Km. 08/15/13 Final XI LF 38.594 190 01/25/13 08/02/13 0.00 C 0.418 0.133 0.300 - - - 85.10 ONS (Formerly: Summit Konstrukt) 1796+171; b)Km. 1797+142-Km1798+525 Davao Oriental Satisfactory Maer Summit Konstrukt Co. Replacement of Camogna Bridge & Approaches Governor Generoso, 702 25262 L A MA GE1 08/15/13 1st XI LF 21.782 224 01/25/13 09/05/13 -9.25 O 0.303 0.300 0.058 0.030 0.028 0.033 75.20 DEL (Formerly: Summit Konstrukt) along Tibanban-Lavigan Rd. Davao Oriental

Repair/Rehab./Impv't. of Acop-Kapangan- 77.40% 703 397 Mak-Jay Construction 19057 L B SB GE1 Tublay, Benguet 07/31/13 1st/Final CAR LF 9.848 157 11/08/12 04/13/13 0.00 C 0.398 0.133 0.243 - - - 77.40 DEL Kibungan-Bakun Rd. K0263+000-K0265+800 Unsatisfactory

Mamsar Construction and Const. of Iligan City Circ. Rd. (Phase II) incl. Industrial Corporation Protection Works Iligan City Circ. Road (C-3), 704 398 15885 L AA LA GE1 Iligan City 08/17/13 1st X LF 42.240 179 01/28/13 07/25/13 16.97 O 0.313 0.240 0.150 0.030 0.047 0.050 83.00 AHD (Formerly: Mamsar Enterprises K0+202-K0+640 (Sect. I-Scion), K0+300- Agro-Industrial Corporation) K01+600 (Sect. 2 Ubaldo Sect. w/ exception) Mamsar Construction and Industrial Corpration Reconst. of Nat'l Arterial Rd. (Int. Sect.), Placer, Surigao del 83.92% 705 15885 L AA LA GE1 08/08/13 Final XIII LF 6.741 45 02/18/13 04/03/13 1.80 C 0.390 0.133 0.300 - - - 82.30 AHD (Formerly: Mamsar Enterprises Surigao-Davao Coastal Rd., Brgy. Pananay-an Norte Satisfactory Agro-Industrial Corporation) Const. of Reinforced Concrete Box Culvert Rd.- 90.30% 706 399 Marbel Dynamic Builders 6150 L D SB GE1 Banga, South Cotabato 08/06/13 Final XII LF 4.290 120 12/04/12 04/02/13 0.62 C 0.434 0.133 0.300 - - - 86.70 AHD CLS Rd., Brgy. Cabuling V. Satisfactory Asphalt Overlay of Lucena-Tayabas-Mauban 89.88% 707 400 Marcbilt Construction, Inc. 21844 L AAA LB GE1 Lucena City 08/03/13 Final IVA LF 6.492 140 02/06/13 06/25/13 0.00 C 0.467 0.133 0.300 - - - 90.00 ONS Port Rd., K0128+(-972)-K0128+000 V. Satisfactory

Prev. Maint. (MFO-1) Asphalt Overlay w/ 89.50% 708 Marcbilt Construction, Inc. 21844 L AAA LB GE1 Corrections along Silang Bypass Rd., Cavite 08/13/13 1st/Final IVA LF 23.359 90 02/28/13 05/28/13 0.00 C 0.462 0.133 0.300 - - - 89.50 ONS K0042+000-K0042+929 V. Satisfactory 88.74% 709 401 Marcons Builder 8044 L A MB GB1 Const. of MPB, Caba NHS, Pob. Norte Caba, La Union 08/01/13 Final I LF 4.914 238 09/18/12 05/14/13 22.27 C 0.474 0.133 0.300 - - - 90.70 AHD Satisfactory Mar-Deb Construction & Repair/Impv't. of Cagayan River Control, 710 402 6715 L A MA GE2 Cauayan City, Isabela 08/07/13 1st II LF 28.850 200 02/28/13 09/15/13 0.78 O 0.355 0.240 0.150 0.030 0.045 0.033 85.30 AHD Development Dabburab Replacement/Rehab./Strengthening of 83.20% 711 403 Margarita Construction 20201 L A SB GE1 Valenzuela City 08/13/13 1st/Final NCR LF 4.914 150 03/27/13 08/22/13 9.17 C 0.399 0.133 0.300 - - - 83.20 AHD Viente Reales Bridge Satisfactory

Marie-Kris Construction & Conc./Drainage Impv't. of Rds., Alleys & 85.30% 712 404 32418 L B SB GE1 Quezon City 08/05/13 1st/Final NCR LF 5.123 105 03/25/13 07/06/13 1.33 C 0.420 0.133 0.300 - - - 85.30 AHD Trading Pathwalks, Maaralin St., Brgy Central Satisfactory Replacement/Rehab./Strengthening of Permanent Bridge Mgt. System (BMS), Const. Masbate-Iloilo Construction & 713 405 26579 L D SB GE1 of Siwalo Bridge along Mandurriao-San Miguel- Maasin, Iloilo City 08/20/13 1st VI LF 4.957 170 04/01/13 09/18/13 3.61 O 0.347 0.238 0.150 0.030 0.042 0.033 84.00 AHD Trading Corp. Alimodian-Maasin-Cabatuan Rd., Brgy. Siwalo, K030+001.6-K0030+013.6 Rd. Upgrading (Gravel to Paved) along Demoloc-Little Baguio-Alabel Rd., 714 406 Masulot Construction 10716 L A MB GE1 Malita, Davao del Sur 08/08/13 2nd XI LF 30.966 179 03/07/13 09/01/13 2.02 O 0.073 0.300 0.150 0.030 0.030 0.033 61.60 AHD Km.1636+043.582-Km.1637+113.30 Abbes- San Roque Sect.

Maverick Builders Incorporated Widening of Pres. Diosdado P. Macapagal 86.34% 715 407 14466 L AA MB GE1 Davao Oriental 08/18/13 Final XI LF 89.304 515 03/27/13 08/23/13 16.89 C 0.394 0.200 0.300 - - - 89.40 AHD (Formerly: Maverick Builders) Highway Satisfactory Widening of Digos-Makar Rd. (Balutakay-Jct. Hagonoy Sect.) K1569+000-K1569+882 Maverick Builders Incorporated Hagonoy, Davao del 84.70% 716 14466 L AA MB GE1 realigned to Widening of Digos-Makar Rd. 08/09/13 1st/Final XI LF 18.992 93 03/18/13 06/18/13 20.45 C 0.414 0.133 0.300 - - - 84.70 AHD (Formerly: Maverick Builders) (Balutakay-Junction Hagonoy Sect.) Sur Satisfactory K1569+000-K1569+807 Impv't./Upgrading (Gravel to Concrete) along Maverick Builders Incorporated 83.12% 717 14466 L AA MB GE1 Jct. Menzi-Dahican-Lawigan Rd. (Dahican- Mati, Davao Oriental 08/18/13 Final XI LF 93.624 297 10/25/12 08/17/13 0.00 C 0.357 0.200 0.300 - - - 85.70 ONS (Formerly: Maverick Builders) Lawigan Sect.) Satisfactory Completion of Eng'g Bldg. at University of 718 408 Maxnell Enterprises 7170 L B MA GB1 Sibalom, Antique 08/15/13 1st VI LF 4.984 60 07/01/13 08/29/13 0.37 O 0.295 0.240 0.150 0.030 0.027 0.033 77.50 AHD Antique, (Main Campus) Const. of Shore Protection/Flood Control in La MB Eclar Trading & 88.28% 719 409 32118 L A MB GE2 Union 2nd District Rock Bulkhead & Slope Agoo, La Union 07/31/13 Final I LF 16.878 180 01/16/13 07/14/13 41.67 C 0.400 0.133 0.300 - - - 83.30 AHD Construction Protection, Brgy. San Nicolas West Satisfactory MB Eclar Trading & Const. of 3-Storey, 9-Cl and 2-Storey, 4-Cl Sch. 720 32118 L A MA GB1 Naguilian, La Union 08/01/13 1st I LF 14.599 210 03/25/13 10/21/13 0.30 O 0.370 0.240 0.150 0.030 0.033 0.033 85.60 AHD Construction Bldg., Naguilian NHS Rehab./Reconst./Upgrading of Quirino-Pandan Bantay, Vigan City, 721 410 MBB Construction 11363 L B MA GE1 Rd. a)K0407+(-480)- K0407+845, 08/13/13 1st I LF 31.337 176 02/26/13 08/20/13 -5.24 O 0.380 0.300 0.098 0.030 0.047 0.033 88.80 DEL Ilocos Sur b)K0408+776-K0409+225

722 MBB Construction 11363 L B MA GE2 Santa Flood Control along MNR Santa, Ilocos Sur 08/12/13 2nd I LF 17.106 383 01/17/13 02/03/13 -14.70 O 0.394 0.300 0.003 0.030 0.051 0.033 81.10 DEL

Const. of Ozamiz City Coastal By-Pass 75.07% 723 411 MBD General Construction 9991 L A MB GE1 Misamis Occidental 08/16/13 Final X LF 51.314 270 11/15/11 08/10/12 - C 0.495 0.133 0.000 - - - 62.80 ONS Rd. Unsatisfactory Repair/Rehab./Impv't. of Daang Maharlika San Pablo City, 91.10% 724 412 Mega M Builders 20515 L B MA GE1 (SO1681LZ), K0089+500-K0091+518, w/ 08/12/13 1st/Final IVA LF 9.880 15 04/15/13 04/29/13 13.33 C 0.478 0.133 0.300 - - - 91.10 AHD exceptions Laguna V. Satisfactory 85.30% 725 Mega M Builders 20515 L B MA GE1 Repair/Rehab. of FMR at Brgy. San Isidro Lipa City, Batangas 07/29/13 1st/Final IVA LF 0.964 120 04/17/13 08/14/13 13.17 C 0.353 0.200 0.300 - - - 85.30 AHD Satisfactory Bansud, Oriental 89.00% 726 413 Megaconstruct Group Inc. 33871 L D SB GE2 Const. of Bansud Drainage System 07/31/13 1st/Final IVB LF 4.655 150 01/28/13 06/26/13 0.50 C 0.449 0.141 0.300 - - - 89.00 AHD Mindoro Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 28 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Megay Construction and Tuguegarao City, 86.40% 727 414 34354 L A SB GE1 Conc. of Roads, Bagay 07/29/13 1st/Final II LF 0.499 60 11/20/12 01/18/13 67.92 C 0.431 0.133 0.300 - - - 86.40 AHD Supply Cagayan Satisfactory Megay Construction and Tuguegarao City, 86.20% 728 34354 L A SB GE1 Conc. of Road, Atulayan Norte 07/29/13 1st/Final II LF 0.499 60 11/20/12 01/18/13 0.27 C 0.429 0.133 0.300 - - - 86.20 AHD Supply Cagayan Satisfactory Megila Construction Dev't Const. of 1-Storey, 4-Cl Sch. Bldg. Mabini 91.30% 729 415 19262 L B MA GB1 Davao City 08/19/13 1st/Final XI LF 2.008 150 03/27/13 08/23/13 1.21 C 0.480 0.133 0.300 - - - 91.30 AHD and Supply NHS, Catalunan Grande NHS Annex V. Satisfactory Mel-Jean Construction Widening of Manila-Batangas Road inc. 84.84% 730 416 Corporation (Formerly: Mel- 16344 L A MA GE1 Drainage Structure Bugtong-Maraouy Sect., Lipa City, Batangas 07/29/13 Final IVA LF 19.098 180 01/14/13 07/12/13 18.02 C 0.437 0.133 0.300 - - - 87.00 AHD Jean Enterprises) Km.72+300 - Km.73+330 (Int. Sect.) Satisfactory Metalite Builders Const./Conc. of Rds. Brgy. Macadandig & 82.60% 731 417 31004 L AAA SB GE1 Cagayan de Oro City 08/22/13 1st/Final X LF 2.233 82 06/03/13 08/23/13 3.66 C 0.393 0.133 0.300 - - - 82.60 AHD Development Inc. Gusa Satisfactory Metrics Construction and Const. of Three (3) Storey, Six (6) Cl Sch. 86.80% 732 418 18223 L B SB GB1 Quezon City 08/05/13 1st/Final NCR LF 6.407 120 03/27/13 07/20/13 16.67 C 0.435 0.133 0.300 - - - 86.80 AHD Trading Bldg., Pura Kalaw E/S Satisfactory Prev. Maint. Nat'l Arterial (Prev. Maint.), South MGBJ Rising Construction & Cotabato Sub-DEO, Digos-Makar Rd., 90.10% 733 419 18656 L B MA GE1 General Santos City 08/23/13 1st/Final XII LF 2.170 21 02/24/13 03/16/13 2.56 C 0.468 0.133 0.300 - - - 90.10 AHD Land Developer Chainage 0000-Chainage 0175 (S00230MN) V. Satisfactory Int. Sect. MGBJ Rising Construction & Rehab./Impv't. of Filipino-American 86.20% 734 18656 L B MA GE1 General Santos City 08/23/13 1st/Final XII LF 14.086 50 04/16/13 06/04/13 0.77 C 0.429 0.133 0.300 - - - 86.20 AHD Land Developer Friendship Ave. Satisfactory

Widening/Rehab. of Bridge from Two (2) Lanes 85.58% 735 420 MGDJ Construction 29352 L D SB GE1 to Four (4) Lanes along Batangas-Quezon Rd., Batangas 07/29/13 Final IVA LF 3.526 106 01/21/13 05/06/13 0.00 C 0.415 0.133 0.300 - - - 84.80 ONS Bawi Bridge, Padre Garcia Satisfactory Const. of DepEd Standard Type Sch. Bldg. Cauayan, Negros 736 421 Micro-asia Builders Corp. 26286 L B MA GB1 08/09/13 1st VI LF 2.302 85 05/24/13 08/16/13 30.81 O 0.334 0.240 0.150 0.030 0.038 0.033 82.50 AHD @ Tuyom ES Occidental Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int. Sect.) Ozamiz-Oroquieta Rd., 85.30% 737 422 Mindanao Rock 23479 L A MA GE1 K01707+205-K01708+201, K1709+389- Misamis Occidental 08/16/13 1st/Final X LF 87.400 180 06/25/12 12/21/12 23.89 C 0.420 0.133 0.300 - - - 85.30 AHD Satisfactory K1712+685, K01713+318-K01715+391, & K01715+968-K01716+820 Prev. Maint., Bagacay-Cadre Rd., Bagacay, Misamis 85.20% 738 Mindanao Rock 23479 L A MA GE1 08/16/13 1st/Final X LF 4.592 37 02/04/13 03/12/13 0.00 C 0.419 0.133 0.300 - - - 85.20 ONS K1698+265-K1698+685 Occidental Satisfactory Mindanao Rock / GLS Widening/Impv't. of Ozamiz-Oroquieta Rd. 739 423 Construction and General JV-12-510 L A MA GE1 (Clarin-Sinacaban) Km.1705+979- Misamis Occidental 08/16/13 1st X LF 25.944 140 03/27/13 08/13/13 5.67 O 0.320 0.200 0.072 0.030 0.025 0.033 68.00 AHD Merchandise Km.1721+184, w / exceptions Prev. Maint. (Int. Sect.) along Sta. Rosa-Tarlac Mivico Builders and Rd., Km.110+000-Km.110+687.99 (L=687.99 87.00% 740 424 20551 L B MA GE1 Nueva Ecija 08/09/13 1st/Final III LF 20.780 108 02/21/13 06/08/13 1.20 C 0.437 0.133 0.300 - - - 87.00 AHD Developers LM); Km.110+687.99-Km.111+1002.41 w/ Satisfactory exception (L=771.42 LM); Km.111+1002.41- Prev. Maint. along Mt. Province-Nueva Vizcaya Mivico Builders and 84.50% 741 20551 L B MA GE1 Road (Int. Sect.), K0383+070-K0364+000 & Bokod, Benguet 07/30/13 1st/Final CAR LF 9.986 72 03/13/13 05/23/13 0.00 C 0.412 0.133 0.300 - - - 84.50 ONS Developers K0384+153-K0384+471 Satisfactory Const. of 1-Storey, 2-CL at Kahayagan 85.70% 742 425 MN Bayalas Construction 34251 L D SB GB1 Tagbina, Surigao City 08/17/13 Final XIII LF 1.305 135 11/14/12 03/28/13 2.22 C 0.381 0.200 0.300 - - - 88.10 AHD NHS Satisfactory Impv't. of Manlawaan Bridge II Approaches & 79.54% 743 426 MN Macato Builders 33448 L D SB GE1 Other Bridges along Nat'l Rds & Grouted Tabango, Leyte 08/12/13 Final VIII LF 3.784 150 11/14/12 04/12/13 0.00 C 0.368 0.200 0.300 - - - 86.80 ONS Riprap, Districtwide Unsatisfactory Rd. Upgrading (Gravel to Paved) along Awang- Monolithic Const. & Upi-Lebak-Kalamansig-Palimbang-Sarangani Concrete Products Inc. / Rd. (Km.1963+471-Km.1977+121) Realign to 91.50% 744 427 JV-11-741 L AA MB GE1 Sultan Kudarat 08/18/13 1st/Final XII LF 45.861 344 07/06/12 06/15/13 0.00 C 0.415 0.200 0.300 - - - 91.50 ONS Cofejok Const. & Supply Rd Upgrading (Gravel to Paved) along Awang- V. Satisfactory Corp. (JV) Upi-Lebak-Kalamasig-Palimbang-Sarangani Rd. (Km.2021+151-Km.2023+241 w/ exception)

Rd. Upgrading (Gravel to Paved) along Awang- Monolithic Const. & Upi-Lebak-Kalamansig-Palimbang-Sarangani Concrete Products Inc. / Rd. (Km.1963+471-Km.1977+121) Realign to 91.00% 745 428 JV-11-740 L AA MB GE1 Sultan Kudartat 08/18/13 1st/Final XII LF 43.835 345 07/06/12 06/15/13 0.00 C 0.410 0.200 0.300 - - - 91.00 ONS Palmares General Rd. Upgrading (Gravel to Paved) along Awang- V. Satisfactory Merchandise (JV) Upi-Lebak-Kalamasig-Palimbang-Sarangani Rd. (Km.2017+229-Km.2019+229 w/ exception)

Monolithic Construction & 82.42% 746 429 5733 L AA MB GE3 Const. of Water Impounding at Poblacion Gen. Nakar, Quezon 08/08/13 Final IVA LF 30.070 389 03/20/12 04/12/13 0.00 C 0.296 0.200 0.300 - - - 79.60 ONS Concrete Products, Inc. Satisfactory

Monolithic Construction & Replacement of Bridges along Nat'l Rds. 90.10% 747 5733 L AA MB GE1 Davao City 08/20/13 1st/Final XI LF 21.360 328 01/24/12 01/15/13 0.00 C 0.401 0.200 0.300 - - - 90.10 ONS Concrete Products, Inc. crossing Malabog Bridge along Fatima-Malabog V. Satisfactory Const./Widening/Upgrading/Rehab. of Jct. Monolithic Construction & 748 5733 L AA MB GE1 Island Garden City of Samal Circ. Road, Babak- Davao del Norte 08/20/13 2nd XI LF 41.594 222 01/23/13 09/01/13 0.60 O 0.279 0.300 0.150 0.030 0.045 0.033 83.70 AHD Concrete Products, Inc. Tambo Island Garden City of Samal Monolithic Construction & Const. of Kasay Flood Control along Dr. 749 5733 L AA LA GE2 Boac, Marinduque 08/07/13 1st IVB LF 14.105 196 05/30/13 12/11/13 10.28 O 0.320 0.300 0.150 0.015 0.042 0.050 87.70 AHD Concrete Products, Inc. Damian Reyes Rd. (Boac Side)

Monolithic Construction & Replacement/Rehab. of Tiguisan Munti Bridge Bansud, Oriental 750 5733 L AA MB GE1 07/31/13 1st IVB LF 4.273 207 01/28/13 08/22/13 0.07 O 0.349 0.240 0.150 0.020 0.035 0.050 84.40 AHD Concrete Products, Inc. along Calapan South Rd. Mindoro

Reconst. of Rd. Slip along Mogpog-Balanacan Monolithic Construction & Balanacan, Mogpog, 751 5733 L AA MB GE1 Rd. (Mogpog-Balanacan Sect.) Km.11+000- 08/07/13 2nd IVB LF 15.915 236 01/25/13 09/17/13 18.49 O 0.328 0.241 0.150 0.030 0.032 0.050 83.10 AHD Marinduque Concrete Products, Inc. Km.16+937 w/ exceptions

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 29 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Impv't. of Drainage Structure at Sapang Creek Monolithic Construction & 752 5733 L AA MB GE1 along Butuan City-Cagayan de Oro City Rd. Cagayan de Oro City 08/11/13 1st X LF 40.871 239 02/22/13 10/18/13 -10.59 O 0.368 0.240 0.044 0.030 0.040 0.033 75.50 DEL Concrete Products, Inc. Phase II, Brgy. Bulua Montaño Construction & Restoration of Sanito Bridge Ipil, Zamboanga 753 430 19473 L AA MB GE1 08/09/13 3rd IX LF 32.178 554 03/19/12 09/23/13 1.50 O 0.262 0.300 0.150 0.030 0.033 0.050 82.50 AHD Development Corporation Sta.1800+731.60Sta.1800+764.40 Sibugay Const. of Salug-Daku Bridge & Approaches Montaño Construction & Mahayag, Zamboanga 754 19473 L AA MB GE1 along Sindangan-Siayan-Dumingag-Mahayag 08/17/13 4th IX LF 27.645 270 07/19/12 04/15/13 - O 0.306 0.300 0.000 0.022 0.042 0.033 70.30 DEL Development Corporation Rd. del Sur Rd. Upgrading (Gravel to Conc.), Int. Sect., Montaño Construction & along Dipolog-Punta-Dansullan-Sergio Osmeña, Development Corporation / 755 431 JV-12-346 L AA MB GE1 ZDN/SIJR. From K1880+4915-K1880+5146; Zamboanga del Norte 08/20/13 2nd IX LF 30.393 158 02/18/13 07/25/13 - O 0.314 0.296 0.000 0.030 0.042 0.033 71.50 DEL Westmin Enterprises and K1880+537 -K1885+120; K1888+096- Construction Services (JV) K1889+000 to K1888+(-133)-K1889+373 Repair/Impv't. of Baler-Casiguran Rd. 86.50% 756 432 Morning Steel Construction 30698 L C SB GE1 K0224+000-K0248+700 (Int. Sect.) modified to Aurora 08/10/13 1st/Final III LF 8.955 102 03/27/13 07/06/13 0.00 C 0.432 0.133 0.300 - - - 86.50 ONS K0244+000-K0248+700 (Int. Sect.) Satisfactory

Prev. Maint. (Int. Sect.), Arterial Rd., N. 83.50% 757 433 MPJR Builders Co. 20446 L B MA GE1 Bacalso Ave. (Osmeña Blvd. Sect.), Chainage Cebu City 08/24/13 1st/Final VII LF 15.741 65 05/21/13 07/25/13 7.69 C 0.399 0.136 0.300 - - - 83.50 AHD 0000-Chainage 0840 Satisfactory Const. of 2-Storey 4- Cl. Sch. Bldg. w/ CR, Dr. MRRM Trading & Sagnay, Camarines 758 434 19657 L B MA GB1 Rodolfo V. Pamor MHS (Sagnay Western 08/02/13 1st V LF 4.435 120 06/13/13 10/10/13 2.33 O 0.334 0.256 0.150 0.030 0.052 0.033 85.50 AHD Construction Annex HS) Sur MS Cruz Builders & 88.50% 759 435 33697 L C SB GE1 Conc. of Brgy. Road, Babo Pangulo Porac, Pampanga 07/31/13 1st/Final III LF 0.961 20 03/17/13 04/05/13 0.00 C 0.452 0.133 0.300 - - - 88.50 ONS Trading Satisfactory

MSE Construction & Asphalt Overlay w/ correction along 86.40% 760 436 133127 L D SB GE1 District III, Manila 07/29/13 1st/Final NCR LF 3.051 58 02/05/13 04/03/13 2.22 C 0.431 0.133 0.300 - - - 86.40 AHD Trading Corp. Quezon Blvd. Satisfactory Rd. Upgrading (Gravel to Concrete) along Must Enterprises / Rden 761 437 JV-12-235 L B MA GE1 Kapinpilan-Lumupog Rd., Km.1704+(-294)- Midsayap, Cotabato 08/12/13 1st XII LF 43.234 203 03/06/13 09/24/13 3.53 O 0.338 0.300 0.150 0.030 0.058 0.033 90.90 AHD Construction & Supply (JV) Km.1706+430.20 Kapinpilan Sect.

Const./Rehab./Conc. of Rd., San Rafael-San 92.90% 762 438 MWJ Construction 14882 L B MA GE1 Dulag, Leyte 08/17/13 1st/Final VIII LF 14.261 120 03/27/13 07/24/13 1.67 C 0.496 0.133 0.300 - - - 92.90 AHD Agustin-Magsaysay Jct. Calipayan-Del Pilar Rd. V. Satisfactory

Rd. Upgrading of Burauen-Mahagnao Rd., 82.40% 763 MWJ Construction 14882 L B MA GE1 Burauen, Leyte 08/17/13 1st/Final VIII LF 34.489 160 01/28/13 07/10/13 - C 0.466 0.133 0.225 - - - 82.40 DEL Km.0981+926.00-Km.0983+000 Satisfactory Replacement/Rehab./Strengthening of N. Congson Construction & Permanent Bridges Gen. from Bridge Mgt. Glan, Sarangani 90.50% 764 439 25695 L B MA GE1 08/20/13 1st/Final XII LF 3.600 127 01/31/13 06/06/13 18.18 C 0.472 0.133 0.300 - - - 90.50 AHD Supply System (BMS), Calabanit Bridge along Province V. Satisfactory Sarangani-Davao del Sur Coastal Rd. Upgrading (Gravel to Concrete) Jct. Nat'l N. Congson Construction & Glan, Sarangani 88.70% 765 25695 L B MA GE1 Highway (Sarangani-Davao del Sur Coastal Rd. 08/20/13 Final XII LF 17.772 150 01/31/13 06/29/13 0.00 C 0.411 0.197 0.300 - - - 90.80 ONS Supply to Gumasa White Beach Rd.), Gumasa Province Satisfactory Rd. Upgrading (Gravel to Paved) (Int. Sect.) inc. Drainage & Rd. Facilities along LDNICR (Balo- Balo-I, Lanao del 83.26% 766 440 N.B. Salbo Construction 6091 L B MA GE1 08/13/13 Final X LF 40.357 152 01/05/13 06/15/13 5.26 C 0.414 0.133 0.300 - - - 84.70 AHD i) to Pantao Ragat Rd., Km.1547+(-663)- Norte Satisfactory Km.1548+000; Km.1548+000-Km.1548+250 Widening of Daang Maharlika inc. Drainage N.D.M. Sanchez Builders & 767 441 35410 L A MA GE1 System, Sto. Tomas Sect., Sto. Tomas Sect., Sto. Tomas, Batangas 08/01/13 1st IVA LF 36.602 210 03/13/13 10/08/13 6.07 O 0.334 0.243 0.150 0.030 0.040 0.033 83.00 AHD Development Corporation K062+570-K063+509.50 Replacement/Const. of Ipil Bridge, Km. 768 442 N.K. Enterprise 29292 L B MA GE1 Barbaza, Antique 08/15/13 1st VI LF 16.381 210 02/12/13 09/09/13 1.82 O 0.362 0.300 0.150 0.030 0.042 0.033 91.70 AHD 160+947.97, Brgy. Ipil Const. of Drainage & Slope Protection Works Ilog, Negros 86.48% 769 N.K. Enterprise 29292 L B MA GE2 along Bacolod South Rd., K0099+100- 08/08/13 Final VI LF 9.603 188 10/31/13 05/06/13 0.00 C 0.430 0.133 0.300 - - - 86.30 ONS K0103+900 w/ exc. Occidental Satisfactory Repair/Rehab./Impv't of Manila-Batangas Rd., 90.10% 770 443 NBL Construction 30396 L AAA MA GE1 K0066+560-K0067+600 w/ exceptions Malvar Malvar, Batangas 08/01/13 1st/Final IVA LF 9.841 40 04/10/13 05/19/13 7.50 C 0.468 0.133 0.300 - - - 90.10 AHD V. Satisfactory Sect. Prev. Maint. (MFO-1) (Int. Sect.), Tanauan- 88.80% 771 NBL Construction 30396 L AAA MA GE1 Talisay, Batangas 08/02/13 1st/Final IVA LF 8.966 45 03/15/13 04/28/13 6.67 C 0.455 0.133 0.300 - - - 88.80 AHD Talisay-Tagaytay Rd., K0074+949-K0076+083 Satisfactory

Repair/Rehab./Impvt. of Angeles-Porac Rd., 89.50% 772 444 Nes-san Builders 25142 L B SB GE1 Angeles City Km.0084+000-Km.0084+700 w/ Pampanga 08/06/13 1st/Final III LF 9.504 15 03/15/13 03/29/13 0.00 C 0.462 0.133 0.300 - - - 89.50 ONS exception V. Satisfactory Repair/Rehab./Impv't. of San Fernando-Lubao 85.80% 773 Nes-san Builders 25142 L B SB GE1 Rd., San Pablo-San Antonio K0079+000- Pampanga 07/31/13 1st/Final III LF 9.380 60 03/25/13 05/23/13 0.00 C 0.425 0.133 0.300 - - - 85.80 ONS Satisfactory K0081+000 (w/ exception) New Arcond Builders Concrete Widening/Conc. Blocking w/ Drainage 774 445 Incorporated 9614 L A MA GE1 & Sidewalk Impv't. along Araneta Ave. Quezon City 08/05/13 1st NCR LF 31.295 249 03/25/13 11/28/13 -4.48 O 0.303 0.224 0.105 0.030 0.045 0.033 74.00 DEL (Formerly: Arcond Builders) K0009+646+(-033) Northbound New Mindoreños Lumber, Hardware and General Replacement/Reconst. of Orobugan Bridge 1 86.24% 775 446 Merchandise (Formerly: 31745 L A MA GE1 along Crossing MWCR (Pola) - Casague-Jct. Sta. Cruz, Mindoro 07/29/13 Final IVB LF 7.454 201 09/20/12 04/08/13 20.00 C 0.428 0.165 0.300 - - - 89.30 AHD Mercedita Benasas General Alacaak Rd. Satisfactory Merchandise) New Mindoreños Lumber, Hardware and General Replacement/Reconst. of Siburan Bridge along Sablayan, Occidental 85.96% 776 Merchandise (Formerly: 31745 L A MA GE1 Jct. MWCR (San Isidro)-Penal Colony-Jct. 07/30/13 Final IVB LF 9.443 219 09/20/12 04/26/13 0.00 C 0.396 0.196 0.300 - - - 89.20 ONS Mercedita Benasas General Yapang Rd. Mindoro Satisfactory Merchandise)

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 30 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION New Mindoreños Lumber, Hardware and General Replacement/Reconst. of San Isidro Bridge 2 Sablayan, Occidental 79.84% 777 Merchandise (Formerly: 31745 L A MA GE1 along Jct. MWCR (San Isidro)-Penal Colony- 07/30/13 Final IVB LF 7.475 215 09/20/12 04/22/13 -4.65 C 0.376 0.200 0.160 - - - 73.60 DEL Mindoro Unsatisfactory Mercedita Benasas General Jct. Yapang Rd., Brgy. Malisbong Merchandise) Newbig Four J Construction, Asphalt Overlay of Manila South Rd., Prev. 91.50% 778 447 Inc. (Formerly: Four J 15104 L AAA MB GE1 Laguna 09/20/13 1st/Final IVA LF 100.771 150 02/04/13 07/03/13 0.00 C 0.415 0.200 0.300 - - - 91.50 ONS Maint. (MFO-1), Int. Sect. Construction) V. Satisfactory Newbig Four J Construction, Asphalt Overlay of Mcdonald Jct.-Alido Bridge 86.74% 779 Inc. (Formerly: Four J 15104 L AAA MB GE1 (Chainage 0000-Chainage 0375) inc. Drainage Bacoor, Cavite 08/14/13 Final IVA LF 5.262 363 02/07/12 02/03/13 0.00 C 0.317 0.200 0.300 - - - 81.70 ONS Construction) System (0+000-0+048) Satisfactory Newbig Four J Construction, Impv't./Widening of Gen. Emilio Aguinaldo 84.88% 780 Inc. (Formerly: Four J 15104 L AAA MB GE1 Highway-Manila-Cavite Road, Int. Sect. inc. Bacoor, Cavite 08/14/13 Final IVA LF 47.395 381 11/29/11 12/13/12 0.00 C 0.344 0.200 0.300 - - - 84.40 ONS Construction) RROW, Km.17+512-Km.20+271 Satisfactory Newbig Four J Construction, Widening of Molino-Bacoor Rd., 83.96% 781 Inc. (Formerly: Four J 15104 L AAA MB GE1 Bacoor, Cavite 08/15/13 Final IVA LF 78.417 375 03/07/12 03/17/13 0.00 C 0.406 0.133 0.300 - - - 83.90 ONS Construction) K0014+800-K0016+986 Satisfactory Newington Builders, Inc. Const. of Lobo-Malabrigo-Laiya-San Juan 95.08% 782 448 (Formerly: E. Gardiola 17542 L AAA LB GE1 Lobo, Batangas 08/03/13 Final IVA LF 43.649 278 04/12/12 01/14/13 0.00 C 0.467 0.188 0.300 - - - 95.50 ONS Construction) Rd., Biga Sect. V. Satisfactory Newington Builders, Inc. Repair/Rehab. & Impv't of Rd. Maharlika San Pablo City, 86.80% 783 (Formerly: E. Gardiola 17542 L AAA LB GE1 08/12/13 1st/Final IVA LF 24.626 30 06/06/13 07/05/13 40.00 C 0.435 0.133 0.300 - - - 86.80 AHD Highway, K0081+400-K0083+000 (Int. Sect.) Construction) Laguna Satisfactory Newington Builders, Inc. Widening of Lipa-Rosario Rd., Lipa City Sect., 784 (Formerly: E. Gardiola 17542 L AAA LB GE1 Lipa City, Batangas 07/29/13 2nd IVA LF 19.144 210 01/21/13 08/18/13 -6.41 O 0.348 0.293 0.086 0.030 0.035 0.033 82.50 DEL (Km.81+500-Km.82+700 w/ exception) Construction) NFH Construction & Supply Prev. Maint.: Asphalt Overlay along Panganiban 87.90% 785 449 (Formerly: NFH Gravel and 16055 L AAA LB GE1 Naga City 08/06/13 1st/Final V LF 12.493 42 02/07/13 03/20/13 0.00 C 0.446 0.133 0.300 - - - 87.90 ONS Rd. (Int. Sect.) Sta. 0+975-Sta. 1+602 Sand) Satisfactory NFH Construction & Supply Prev. Maint./Asphalt Overlay along Daang 82.40% 786 (Formerly: NFH Gravel and 16055 L AAA LB GE1 Daraga, Albay 08/10/13 1st/Final V LF 15.400 60 01/31/13 03/31/13 0.00 C 0.389 0.135 0.300 - - - 82.40 ONS Maharlika, K0522+839-K0524+004 Sand) Satisfactory Norsam Builders & Conc./Upgrading of Gaps along Lapinig-Arteche Lapinig, Northern 787 450 21184 L B MA GE1 Rd., Lapinig-Imelda Sect., K0853+114.50- 08/06/13 1st VIII LF 25.566 262 02/06/13 10/25/13 52.39 O 0.339 0.239 0.150 0.030 0.060 0.033 85.10 AHD Construction Supply Samar K0854+210 Prev. Maint. (Int. Sect.) of Visayas Ave., 84.00% 788 451 Northern Builders 8780 L AAA LB GE1 Quezon City 08/02/13 1st/Final NCR LF 15.713 90 03/27/13 06/24/13 35.56 C 0.407 0.133 0.300 - - - 84.00 AHD (K0013+233-K0014+441) Satisfactory 90.60% 789 Northern Builders 8789 L AAA LB GE1 Prev. Maint. along Old Manila North Rd. Angeles City 08/07/13 1st/Final III LF 21.301 90 03/06/13 06/03/13 0.00 C 0.473 0.133 0.300 - - - 90.60 ONS V. Satisfactory Pinatubo Hazard Urgent Mitigation Proj., Phase III, CP No.5-Raising of Rds. & Const. of Side MPE- 88.60% 790 Northern Builders 8789 L AAA LB GE1 Guagua, Pampanga 07/31/13 1st/Final FA 44.964 211 11/06/12 06/04/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Drainage (Sta. 77+500-Sta. 77+760) & Sta. PMO Satisfactory 77+490-Sta.78+660 86.64% 791 Northern Builders 8789 L AAA LB GE1 Conc. of Baras-Baras-Mapalad Road Tarlac City 08/07/13 Final III LF 21.341 187 12/06/12 06/10/13 1.61 C 0.437 0.133 0.300 - - - 87.00 AHD Satisfactory

Repair/Rehab./Impv't. of Pinagpanaan-Rizal- 86.10% 792 Northern Builders 8789 L AAA LB GE1 Llanera, Nueva Ecija 08/13/13 1st/Final III LF 9.396 35 04/01/13 05/05/13 22.86 C 0.428 0.133 0.300 - - - 86.10 AHD Pantabangan Rd., K0139+547-K0141+565.70 Satisfactory

Widening/Impv't. of Bambang-Kasibu-Solano Bambang, Nueva 793 Northern Builders 8789 L AAA LB GE1 08/14/13 2nd II LF 41.677 209 02/04/13 08/31/13 0.97 O 0.353 0.240 0.150 0.030 0.055 0.033 86.10 AHD Rd. inc. Drainage (Bambang-Kasibu Sect.) Vizcaya Novanne Ventures Construction Const. of Slope Protection along Bacolod South Hinoba-an, Negros 794 452 Corporation (Formerly: 22107 L D SB GE2 Rd. Km.0182+618 (Bacuyangan Bridge 08/09/13 1st VI LF 2.831 60 06/13/13 08/11/13 -1.38 O 0.342 0.225 0.136 0.030 0.038 0.033 80.40 DEL Novanne Ventures Construction) Approaches), Brgy. Talacagay Occidental

795 453 NTL Builders and Developer 33450 L B SB GB1 Const. of MPB, Capitol Complex Cabarroguis, Quirino 08/11/13 1st II LF 8.783 150 04/10/13 09/06/13 3.66 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 AHD

Const. of 7m x 9m (modified) Crispin E. Rojas Baganga, Davao 92.00% 796 454 O.G. Santos Construction 2050 L A MA GB1 NHS (Lambajon) Annex of Baganga NHS (5 08/17/13 1st/Final XI LF 2.944 142 04/02/13 08/21/13 2.64 C 0.487 0.133 0.300 - - - 92.00 AHD Oriental V. Satisfactory CL) Road Upgrading (Gravel to Paved) Int. Sect., Fatima-Malabog Rd.: a)Km.1503+400- 797 O.G. Santos Construction 2050 L A MA GE1 Davao City 08/20/13 1st XI LF 34.731 140 03/18/13 08/04/13 0.69 O 0.377 0.271 0.150 0.030 0.035 0.050 91.30 AHD Km.1503+961 b)Km.1506+541- Km.1507+470.98 Caraga, Davao 88.70% 798 O.G. Santos Construction 2050 L A MA GB1 Constof 5-CL - 7m x 9m, San Luis NHS 08/17/13 1st/Final XI LF 2.944 142 04/02/13 08/21/13 3.97 C 0.454 0.133 0.300 - - - 88.70 AHD Oriental Satisfactory Const. of two (2) Storey Sixteen (16) Cl & one New Corella, Davao 799 O.G. Santos Construction 2050 L A MA GB1 (1) Storey Eight (8) Cl Sch. Bldg. @ New 08/12/13 1st XI LF 28.497 225 03/27/13 11/06/13 0.10 O 0.363 0.225 0.150 0.030 0.030 0.050 84.80 AHD Corella NHS del Norte Const. of Mahan-ub River Protection along Manay, Davao 800 O.G. Santos Construction 2050 L A SB GE2 08/17/13 1st XI LF 6.824 153 06/11/13 11/10/13 17.91 O 0.296 0.300 0.150 0.030 0.025 0.033 83.40 AHD Surigao-Davao Coastal Rd., Brgy. Central Oriental O.G. Santos Construction / Widening of Cotabato-Davao Nat'l Rd., Mindanao Construction Services 88.70% 801 455 JV-12-581 L A MA GE1 Km.1640+769-Km.1641+700 (Notre Dame Matalam, Cotabato 08/09/13 1st/Final XII LF 18.611 158 03/06/13 08/10/13 0.63 C 0.387 0.200 0.300 - - - 88.70 AHD & Land Development Sect.) Davao-Cotabato Rd. Satisfactory Corporation (JV) O.R. Sarmiento Construction / CP 2.1 Const. of Tangcul Bridge & Approaches 96.50% 802 456 Plerm Construction & JV-11-031 L AAA LB GE1 & CP 2.2 Const. of Sicalaco Bridge & Lasam, Cagayan 08/15/13 Final PMO-SBP LF 67.616 375 11/11/11 11/19/12 0.00 C 0.459 0.200 0.300 - - - 95.90 ONS Development Corporation (JV) Approaches Outstanding O.R. Sarmiento Construction / Reconst. of Longos Bridge, Calapan North Calapan City, Oriental 87.52% 803 457 Plerm Construction and JV-11-277 L AAA LB GE1 11/26/13 Final IVB LF 103.454 615 01/02/12 09/07/13 0.81 C 0.467 0.134 0.300 - - - 90.10 AHD Development Corporation (JV) Rd. Mindoro Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 31 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Rd. Upgrading (Gravel to Pave) Merida-Lundag- Puting Bato-Consolacion-Isabel Rd., 804 458 Octagon Concrete Solutions 34475 L A MB GE1 Leyte 08/10/13 1st VIII LF 34.745 260 01/28/13 10/14/13 0.86 O 0.393 0.240 0.150 0.015 0.050 0.050 89.80 AHD a.K1109+059-K1110+000, b.K1110+057- K1111+(-389) Rd. Upgrading (Gravel to Conc.) along Omengan Construction and 805 459 5119 L AA LA GE1 Kabugao, Apayao-Solsona-Ilocos Norte Rd., Apayao 08/10/13 2nd CAR LF 42.116 230 02/11/13 09/28/13 3.26 O 0.360 0.300 0.150 0.030 0.050 0.033 92.30 AHD Development Corporation Apayao Side, K0606+(-370)-K0607+376 86.46% 806 460 Omnicon Builders 22816 L B MA GB1 Const. of MPB at Patindig Araw Imus, Cavite 08/14/13 Final IVA LF 0.679 135 07/18/12 11/29/12 0.00 C 0.475 0.133 0.300 - - - 90.80 ONS Satisfactory Replacement/Rehab./Strengthening of Limay 807 461 Orani Builders Supply 5349 L B MA GE1 Bridge along Jct. Layac-Balanga-Mariveles Port Limay, Bataan 08/03/13 1st III LF 24.030 148 03/27/13 08/21/13 4.58 O 0.400 0.240 0.150 0.030 0.050 0.033 90.30 AHD Rd. Rehab./Reconst./Upgrading of Jct. Layac- 808 Orani Builders Supply 5349 L B MA GE1 Balanga-Mariveles Port Rd. (Mariveles Zigzag Mariveles, Bataan 08/02/13 1st III LF 46.523 148 04/01/13 08/26/13 2.00 O 0.379 0.240 0.150 0.030 0.045 0.033 87.70 AHD Rd.) K0158+398-K0160+120 Replacement/Rehab./Strengthening of 86.60% 809 Orani Builders Supply 5349 L B MA GE1 Pangulisan Bridge along Jct. Layac-Balanga- Balanga City, Bataan 08/03/13 1st/Final III LF 3.447 48 03/26/13 05/12/13 0.00 C 0.433 0.133 0.300 - - - 86.60 ONS Satisfactory Mariveles Port Rd. Orient Star Construction, Inc. / Const. of Bongabong Flood Control (Minscat Bongabong, Oriental 87.62% 810 462 JV-12-203 L A MA GE2 07/31/13 Final IVB LF 9.104 135 01/28/13 06/11/13 2.27 C 0.450 0.143 0.300 - - - 89.30 AHD Lumel Glenn Construction (JV) Sect.) Brgy. Labasan Mindoro Satisfactory Oscar R. Sarmiento Conc. of Panglao Island Circ. Rd. (Songculan 811 463 Construction, Inc. (Formerly: 1411 L AAA LB GE1 Sect.) Sec.1)K0004+002.98-K0005+774; Bohol Province 08/15/13 1st VII LF 140.475 405 07/05/12 09/02/13 2.58 O 0.288 0.300 0.150 0.030 0.060 0.050 87.80 AHD O.R. Sarmiento Construction) Sec.2)K0006+637-K00012+000 Oting Construction and Conc.g/Rehab. of Brgy. Tarong-Brgy. Cabilao 84.00% 812 464 32681 L D SB GE1 Carles, Iloilo 08/21/13 1st/Final VI LF 1.494 60 03/13/13 05/11/13 1.97 C 0.407 0.133 0.300 - - - 84.00 AHD Supply Rd., K000+000-K000+170 Satisfactory P. C. Panopio Construction 86.26% 813 465 32824 L D SB GE1 Upgrading/Conc. of FMR at Sta. Rita Minalin, Pampanga 07/29/13 Final III LF 1.866 30 02/19/13 03/20/13 0.00 C 0.396 0.133 0.300 - - - 82.90 ONS and Trading Satisfactory

Rehab./Reconst.n/Upgrading of Damaged Paved Nat'l Rds. at Mactan Circ. Rd.; a)K0031+000- K0031+221; b)K0031+655-K0032+000; c)K0032+155-K0033+983 (Proposed for 92.50% 814 466 P.B. Obial Construction 16784 L B MA GE1 Lapu-Lapu City, Cebu 08/13/13 1st/Final VII LF 38.448 130 03/27/13 08/03/13 6.15 C 0.425 0.200 0.300 - - - 92.50 AHD Realignment/Modification to Asphalt Overlay of V. Satisfactory Nat'l Rd. at Mactan Circ. Rd., a)K0031+000- K0031+221; b)K0031+655-K0032+000; c)K0032+155-K0033+983

P.J. Cruz Construction and Completion/Rehab. of MPB at Elias 85.30% 815 467 Trading (Formerly: P.J. Cruz 14223 L A MA GB1 Las Piñas City 08/15/13 1st/Final NCR LF 0.968 45 02/19/13 04/04/13 4.44 C 0.420 0.133 0.300 - - - 85.30 AHD Construction) Aldana Satisfactory Replacement of Tiblawan Bridge & Approaches Governor Generoso, 816 468 P.L. Sebastian Construction 35840 L AAA LB GE1 08/15/13 1st XI LF 61.263 210 04/01/13 10/27/13 -8.44 O 0.333 0.225 0.066 0.030 0.033 0.033 72.00 DEL along Tibanban-Lavigan Rd. Davao Oriental Const. of 1 unit-2 Storey 8 CL Sch. Bldg. & 1 Pablo S. Labasbas 817 469 6302 L B MA GB1 unit-1 Storey 3 CL Sch. Bldg,. Carigara School Carigara, Leyte 08/17/13 1st VIII LF 11.222 200 03/22/13 10/07/13 0.36 O 0.347 0.240 0.150 0.023 0.045 0.050 85.50 AHD Construction of Fisheries Pablo S. Labasbas Repair/Rehab./Impv't. of Malayog Flood 818 6302 L B MA GE2 Calbayog City, Samar 08/13/13 1st VIII LF 17.817 150 02/17/13 09/13/13 16.93 O 0.391 0.240 0.150 0.030 0.055 0.033 89.90 AHD Construction Control, Brgy. Malayog Const. of Retaining Wall and Line Ditch Canal Pablo S. Labasbas 819 6302 L B MA GE2 along Calbayog-Allen Rd., K0699+200- Calbayog City, Samar 08/13/13 1st VIII LF 19.300 150 04/17/13 09/13/13 6.77 O 0.335 0.240 0.150 0.030 0.055 0.033 84.30 AHD Construction K0713+000 w/ exceptions Raising of Grade & Drainage (Flooded Sect.) Pablo S. Labasbas Quinapondan, Eastern 820 6302 L B MA GE1 Jct. Buenavista-Lawaan-Marabut Rd., 08/19/13 1st VIII LF 21.361 148 01/30/13 06/26/13 -39.95 O 0.272 0.300 0.000 0.030 0.050 0.017 66.90 DEL Construction K0997+448.80-K0998+292 Samar Pacer Construction & Repair/Rehab. of Flood Control Structures 89.00% 821 470 4839 L B SB GE2 Tacloban City 08/22/13 1st/Final VIII LF 1.991 60 05/02/13 06/30/13 0.00 C 0.457 0.133 0.300 - - - 89.00 ONS Development Corporation at Abucay Creek Satisfactory Completion of Payanan MPB, San 91.80% 822 471 Pacific Star Erectors 14224 L B MA GB1 Luna, Apayao 08/12/13 1st/Final CAR LF 2.885 90 02/20/13 05/21/13 0.00 C 0.485 0.133 0.300 - - - 91.80 ONS Gregorio V. Satisfactory Palmares General Conc. Of Malvar St.-Roxas Ave., Brgy. Tantangan, South 89.60% 823 472 24657 L B MA GE1 08/05/13 1st/Final XII LF 9.504 115 03/04/13 06/26/13 2.23 C 0.396 0.200 0.300 - - - 89.60 AHD Merchandise Pob. Cotabato V. Satisfactory Repair/Rehab. of Banga River Flood Control & Palmares General Norala, South 824 24657 L B SB GE2 Drainage along Cotabato-Marbel Rd., Kibid- 08/06/13 1st XII LF 7.850 120 05/24/13 09/20/13 8.30 O 0.240 0.300 0.150 0.030 0.051 0.050 82.10 AHD Merchandise Dumaguil Sect. Cotabato Rd. Upgrading (Gravel to Paved) of Nat'l Panay East Coast Secondary Rd., Guimbal-Igbaras-Tubungan- 91.94% 825 473 26469 L D SB GE1 Leon, Iloilo 08/22/13 Final VI LF 6.129 90 01/21/13 04/20/13 0.00 C 0.463 0.133 0.300 - - - 89.60 ONS Construction and Supply Leon Rd., K0067+591-K0067+992.6 Brgy. V. Satisfactory Tina-an Sur Sect. Panay East Coast Const. of FMR, Brgy. Balantang Sitio 90.50% 826 26469 L D SB GE1 Jaro, Iloilo City 08/23/13 1st/Final VI LF 3.872 60 02/12/13 04/12/13 11.67 C 0.472 0.133 0.300 - - - 90.50 AHD Construction and Supply Bintud V. Satisfactory Widening of Camiling-Wawa-Bayambang- Pangasinan New Wilson Bayambang, 827 474 8313 L B MA GE1 Malasiqui-Sta. Barbara Rd. (Bayambang Sect.) 08/03/13 1st I LF 21.713 200 01/16/13 08/03/13 -10.61 O 0.343 0.300 0.044 0.030 0.042 0.050 80.90 DEL Lumber & Construction Km.180+500-Km. 181+120, (Phase II) Pangasinan Pangasinan New Wilson Widening of Camiling-Wawa-Bayambang- 828 8313 L B MA GE1 Malasiqui-Sta. Barbara Rd. (Malasiqui Sect.) Malasiqui, Pangasinan 08/02/13 2nd I LF 20.166 200 02/04/13 08/22/13 2.65 O 0.332 0.300 0.150 0.030 0.047 0.033 89.20 AHD Lumber & Construction Km. 193+490-Km. 194+120 Pangasinan New Wilson Lumber Repair/Rehab./Impv't. of Lingayen-Binmaley 89.68% 829 475 & Construction / Pas JV-12-463 L B MA GE1 Pangasinan 08/06/13 Final I LF 9.404 76 01/15/13 03/31/13 7.90 C 0.471 0.133 0.300 - - - 90.40 AHD Rd. K0363+(-762)-K0364+061 w/ exception Construction & Supplies (JV) V. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 32 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Partido Construction and 87.30% 830 476 20631 L B MA GE1 Conc. of Goa-Digdigon-San Isidro Rd. Goa, Camarines Sur 08/02/13 1st/Final V LF 19.552 147 02/01/13 06/27/13 0.00 C 0.438 0.135 0.300 - - - 87.30 ONS Supply Satisfactory Paula Mae Buhong Rd. Upgrading (Gravel to Conc.) of Banaue- 831 477 26128 L B MA GE1 Hungduan-Benguet Bdry. Rd., K0368+000- Hungduan, Ifugao 08/04/13 1st CAR LF 44.934 296 01/31/13 11/22/13 1.57 O 0.371 0.240 0.150 0.023 0.050 0.050 88.40 AHD Construction K0370+300 Pearl Construction and Norala, South 85.88% 832 478 34806 L D SB GE1 Conc. of Road, Brgy. Esperanza 08/06/13 Final XII LF 2.290 120 11/26/12 03/25/13 0.00 C 0.468 0.200 0.150 - - - 81.80 ONS Supply Cotabato Satisfactory

Persan Construction Inc. 83.20% 833 479 2852 L AAA LB GE1 Prev. Maint. (Int. Sect.) along R-10 Navotas City 08/12/13 1st/Final NCR LF 7.919 121 03/26/13 07/24/13 46.28 C 0.399 0.133 0.300 - - - 83.20 AHD (Formerly: Persan Construction) Satisfactory Repair/Rehab./Impv't. of Sta. Maria-Norzagaray Persan Construction, Inc. 85.60% 834 480 2852 L AAA LB GE1 Rd. (Norzagaray Sect.), K0043+300- Norzagaray, Bulacan 08/15/13 1st/Final III LF 9.643 30 05/17/13 06/15/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS (Formerly: Persan Construction) K0044+958 w/ exceptions Satisfactory Assets Preservation of Nat'l Rds., Prev. Maint. Persan Construction, Inc. (MFO-1) (Int. Sect.), Arterial Rd. Asphalt 89.40% 835 2852 L AAA LB GE1 Dasmariñas, Cavite 08/14/13 1st/Final IVA LF 6.925 120 02/15/13 06/14/13 66.67 C 0.394 0.200 0.300 - - - 89.40 AHD (Formerly: Persan Construction) Overlay of Dasmariñas-Carmona Rd., V. Satisfactory K00358+120-K0035+710 Petrina Construction & General Malaybalay City, 836 481 Merchandise (Formerly: Petrina 29695 L D SB GB1 Const. of Classroom at Bangcud NHS 08/10/13 1st X LF 6.509 180 03/22/13 09/17/13 0.58 O 0.360 0.205 0.150 0.030 0.029 0.033 80.70 AHD Grocers Marketing) Bukidnon

Philippine Chemsteel Repair/Rehab./Impv't. of Famy-Real-Infanta 90.70% 837 482 16965 L AA MA GE1 Quezon 08/08/13 1st/Final IVA LF 9.848 24 04/02/13 04/25/13 0.00 C 0.474 0.133 0.300 - - - 90.70 ONS Industries, Inc. Rd., K0130+383-K0132+000, w/ exception V. Satisfactory Philsouth Builders (Formerly: Rd. Upgrading (Gravel to Paved), Metro 838 483 21962 L A MA GE1 Negros Oriental 08/21/13 1st VII LF 45.570 179 03/26/13 09/21/13 2.12 O 0.375 0.238 0.150 0.030 0.050 0.033 87.60 AHD Lotiff Construction) Dumaguete Diversion Rd. Prev. Maint. of Jct. Murcia-Cansilayan-Damsite- Philsouth Builders (Formerly: Abuanan-Bago City Rd. (Asphalt Overlay), Murcia, Negros 87.30% 839 484 21962 L A MA GE1 08/13/13 1st/Final VI LF 18.405 80 02/25/13 05/15/13 0.00 C 0.440 0.133 0.300 - - - 87.30 ONS Lotiff Construction) a)K0022+000-K0022+423; b)K0023+(-67)- Occidental Satisfactory K0025+302 (Cluster X) Rehab./Restoration/Impv't. of Damaged Sect. Philworks Construction and 88.98% 840 485 32103 L AAA LB GE1 along Libon-Marocmoc-Pantao Rd. (Mararag Libon, Albay 08/09/13 Final V LF 19.402 240 06/29/12 02/23/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS Supply Sect.) Satisfactory Repair/Rehab. /Impv't. of Daang Maharlika, Philworks Construction and 88.20% 841 32103 L AAA LB GE1 Bato Sect., K0477+000-K0479+088 Bato, Camarines Sur 08/01/13 1st/Final V LF 9.646 90 03/18/13 06/15/13 1.10 C 0.390 0.192 0.300 - - - 88.20 AHD Supply w/exception Satisfactory Philworks Construction and Calabanga, Camarines 88.00% 842 32103 L AAA MB GE2 Const. of Water Impounding Proj., Belen 08/06/13 1st/Final V LF 10.532 240 11/09/12 07/06/13 12.92 C 0.443 0.137 0.300 - - - 88.00 AHD Supply Sur Satisfactory

Philworks Construction and Restoration/Impv't. of Damaged Sect. along 86.76% 843 32103 L AAA LB GE1 Libon, Albay 08/09/13 Final V LF 19.402 240 06/29/12 02/23/13 0.00 C 0.416 0.133 0.300 - - - 84.90 ONS Supply Libon-Marocmoc-Pantao Rd. Satisfactory Rehab./Reconst. of Damaged Paved Nat'l Rd. Philworks Construction and 844 32103 L AAA LB GE1 along Daang Maharlika Highway, K0397+354- Camarines Sur 08/07/13 1st V LF 122.677 249 12/20/12 08/25/13 0.01 O 0.269 0.300 0.150 0.030 0.065 0.050 86.40 AHD Supply K0433+964 w/exceptions Philworks Construction and 85.27% 845 32103 L AAA LB GE1 Const. of Martirez Bridge & Approaches Libon, Albay 08/07/13 Final V LF 72.409 541 11/21/11 05/14/13 0.00 C 0.435 0.133 0.300 - - - 86.80 ONS Supply Satisfactory Repair and Impv't. of Slope Protection & Philworks Construction and Drainage System along Rolando Andaya 846 32103 L AAA MB GE2 Camarines Sur 08/03/13 1st V LF 7.810 120 05/07/13 09/03/13 0.50 O 0.315 0.251 0.150 0.030 0.065 0.033 84.40 AHD Supply Highway, a) K0330+180-K0330+245; b) K0327+750-K0327+776, Brgy. Bulawan

Repair/Rehab./Impv't. along Nueva Vizcaya- 88.40% 847 486 Phranaret Construction 16878 L B MA GE1 Ifugao-Mt. Province Bdry. Rd., K0298+855- Kiangan, Ifugao 08/05/13 1st/Final CAR LF 9.459 119 02/15/13 06/13/13 3.00 C 0.451 0.133 0.300 - - - 88.40 AHD K0305+000, Lamut Satisfactory Rd. Upgrading (Gravel to Conc.) along Banaue- 848 Phranaret Construction 16878 L B MA GE1 Banaue, Ifugao 08/06/13 1st CAR LF 40.013 232 02/21/13 10/10/13 -8.30 O 0.347 0.300 0.067 0.030 0.050 0.033 82.70 DEL Hungduan-Benguet, K0348+380-K0353+205

Conc. of Brgy. Rd. along Upper Dumalinao to Dumalinao, 849 487 Pins Construction 13630 L D SB GE1 Brgy.Kalingayan Rd., Brgy. Upper Dumalinao 08/16/13 1st IX LF 6.450 155 04/08/13 09/09/13 0.20 O 0.305 0.278 0.150 0.030 0.028 0.033 82.40 AHD & Brgy. Kalingayan, Dumalinao (Phase IV) Zamboanga del Sur Asset Preservation of Nat'l Rd., (Int. Sect.) Prev. Maint., Overton-Buru-un Bdry. Rd., 82.60% 850 488 PLD Construction 1859 L A MA GE1 Iligan City 08/17/13 Final X LF 23.342 60 01/31/13 03/31/13 1.00 C 0.408 0.133 0.300 - - - 84.10 AHD Km.1532+(-831)-Km.1532+(-420)- Satisfactory Km.1532+124.50 Completion of Sch. Bldg. at Baclaran Parañaque City, Metro 83.80% 851 489 PM Pacia Construction 1913 L C SB GB1 08/08/13 Final NCR LF 3.447 120 01/16/13 05/15/13 21.67 C 0.391 0.133 0.300 - - - 82.40 AHD Elem. Sch. Central Manila Satisfactory Replacement/Rehab./Strengthening of Bantan 88.30% 852 490 Polymer-Vic Construction 6157 L B MA GE1 Bridge along Jct. Layac-Balanga-Mariveles Port Pilar, Bataan 08/02/13 1st/Final III LF 4.906 70 02/06/13 04/16/13 0.00 C 0.450 0.133 0.300 - - - 88.30 ONS Satisfactory Rd. 85.28% 853 491 Precious Construction 32995 L B MA GE3 Const. of Water Impounding at Anoling Gen. Nakar, Quezon 08/08/13 Final IVA LF 28.180 365 03/20/12 03/19/13 0.00 C 0.345 0.200 0.300 - - - 84.50 ONS Satisfactory Premium Megastructures Const. of Flood Control Structures Burauen- 93.30% 854 492 36079 L B SB GE2 Mahagnao Rd., Km.798+365.50-Km.982+000 Burauen, Leyte 08/17/13 1st/Final VIII LF 4.752 90 03/27/13 06/24/13 0.00 C 0.500 0.133 0.300 - - - 93.30 ONS Inc. V. Satisfactory (Left Side) Premium Megastructures Const. of Dungca-an Flood Control 91.70% 855 36079 L B SB GE2 Baybay City 08/08/13 1st/Final VIII LF 4.650 90 05/28/13 08/25/13 62.22 C 0.484 0.133 0.300 - - - 91.70 AHD Inc. Structure V. Satisfactory Rehab./Resurfacing of Cabungaan-Tabunok- Premium Megastructures 856 36079 L B SB GE1 Consuegra Rd., K1017+797-K1019+862.30 w/ Villaba, Leyte 08/12/13 1st VIII LF 4.758 90 06/19/13 09/16/13 32.23 O 0.387 0.225 0.150 0.012 0.050 0.050 87.40 AHD Inc. exceptions

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 33 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Const. of Gagabutan Bridge No.4 inc. 90.50% 857 493 Pulsar Construction 24422 L A MB GE1 Rizal, Cagayan 08/03/13 Final II LF 30.444 300 07/10/12 05/06/13 0.02 C 0.448 0.133 0.300 - - - 88.10 AHD PCCP along CAR V. Satisfactory Const. of Gagabutan Bridge No.1 inc. 86.60% 858 Pulsar Construction 24422 L A MB GE1 Rizal, Cagayan 08/03/13 Final II LF 12.620 180 07/10/12 03/29/13 0.76 C 0.442 0.133 0.300 - - - 87.50 AHD PCCP along CAR Satisfactory Const. of Gagabutan Bridge No.2 inc. 84.90% 859 Pulsar Construction 24422 L A MB GE1 Rizal, Cagayan 08/03/13 1st/Final II LF 23.938 240 07/09/12 04/04/13 0.00 C 0.416 0.133 0.300 - - - 84.90 ONS PCCP along Cagayan-Apayao Rd. Satisfactory Pulsar Construction / Deoj Const. of Illuru Bridge No.3 inc. PCCP 90.28% 860 494 JV-11-684 L A MB GE1 Rizal, Cagayan 08/03/13 Final II LF 19.879 270 07/09/12 04/04/13 0.00 C 0.474 0.133 0.300 - - - 90.70 ONS Construction (JV) along Cagayan-Apayao Rd. V. Satisfactory Puregold Construction & Const. of Classroom/Sch. Bldg. in Digos 92.00% 861 495 34258 L C SB GB1 Digos City 08/17/13 1st/Final XI LF 1.921 60 06/20/13 08/18/13 29.78 C 0.487 0.133 0.300 - - - 92.00 AHD Development Corp. City NHS, Rizal Ave. V. Satisfactory Pyramid Consolidated Builders Reconst./Upgrading (Asphalt to Concrete) of 87.60% 862 496 15599 L C SB GE1 Sumilao, Bukidnon 08/06/13 1st/Final X LF 5.911 44 04/08/13 05/21/13 2.51 C 0.443 0.133 0.300 - - - 87.60 AHD & Gen. Merchandise Sayre Highway (San Vicente-Kisolon Sect.) Satisfactory Rehab./Upgrading (Asphalt to Concrete) along Pyramid Consolidated Builders S.H. Alae-Kisolon Rd., Maluko-Kisolon Rd. 85.04% 863 15599 L C SB GE1 Sumilao, Bukidnon 08/06/13 Final X LF 10.909 127 12/21/12 04/26/13 45.33 C 0.406 0.133 0.300 - - - 83.90 AHD & Gen. Merchandise Sect., K1472+355.95-K1472+895.95, Manolo Satisfactory Fortich Impv't. of Digos-Cotabato Rd., CP-RI-2.7A: Qingjian Group Co., Ltd. NRIM- 864 497 FC-10-005 F AAA LB GE1 Digos-Kidapawan Sect. under the Nat'l Rds. Mindanao 08/22/13 1st FA 623.610 731 08/17/11 08/16/13 -1.79 O 0.378 0.300 0.132 0.030 0.051 0.033 92.40 DEL Philippine Branch Impv't. & Mgt. Program-Phase II (NRIMP-2) PMO CP-R1-2.4: Impv't. of Bacolod-Kabankalan Rd., Qingjian Group Co., Ltd. Bacolod-Bago Sect., under Nat'l Rds. Impv't. NRIM- 865 FC-11-011 L AAA LB GE1 Negros Occidental 08/07/13 1st FA 340.600 540 06/09/12 11/30/13 -9.94 O 0.394 0.300 0.051 0.030 0.051 0.050 87.60 DEL Philippine Branch Mgt. Program, Phase II (NRIMP-2), Bacolod- PMO Bago City Sect. Rd. Upgrading (Gravel to Paved) along Dalaguete-Mantalongon-Badian Rd., 866 498 QM Builders 30743 L B MA GE1 Dalaguete, Cebu 08/08/13 1st VII LF 59.050 351 02/22/13 02/07/14 25.21 O 0.396 0.288 0.150 0.030 0.056 0.033 95.30 AHD K0091+580-K0092+019 (Phase 1) & K0091+580-K0091+145 (Phase 2 & 3)

Repair/Rehab. of Toledo-Pinamungajan- 92.70% 867 QM Builders 30743 L B MA GE1 Aloguinsan Rd., K0054+407-K0055+825 (w/ Cebu 08/07/13 1st/Final VII LF 18.981 56 05/28/13 07/22/13 73.21 C 0.427 0.200 0.300 - - - 92.70 AHD exception) V. Satisfactory

Rd. Upgrading (Conc.) of Toledo-Pinamungajan- 90.86% 868 QM Builders 30743 L B MA GE1 Aloguinsan-Mantalongon Rd., K0081+160- Aloguinsan, Cebu 08/07/13 Final VII LF 10.787 103 01/24/13 05/06/13 8.11 C 0.439 0.178 0.300 - - - 91.70 AHD K0083+094 V. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. at Cebu-Toledo Wharf Rd., Talisay 89.30% 869 QM Builders 30743 L B MA GE1 City Sect., K0022+000-K0022+115, Talisay City, Cebu 08/05/13 1st/Final VII LF 12.680 121 01/18/13 05/18/13 0.83 C 0.442 0.151 0.300 - - - 89.30 AHD V. Satisfactory K0024+053-K0024+105, K0024+518- K0024+1060, K0025+470-K0025+672 Rehab./Reconst./Upgrading of Damaged Paved 87.30% 870 QM Builders 30743 L B MA GE1 Nat'l Rds., Cebu-Toledo Wharf Rd., Cebu 08/06/13 Final VII LF 16.266 210 07/02/12 01/27/13 0.96 C 0.436 0.155 0.300 - - - 89.10 AHD Km.11+216-Km.12+000 Satisfactory Repair/Maint. of Damaged Slope Protection 88.70% 871 499 R N V Construction 12570 L D SB GE2 alongh Pato-o East-West Rd., Km.7+390- Odiongan, Romblon 08/06/13 1st/Final IVB LF 3.941 90 12/12/12 03/11/13 0.00 C 0.452 0.135 0.300 - - - 88.70 ONS Km.7+444 Satisfactory Const. of Bachawan River Control along 86.58% 872 R N V Construction 12570 L D SB GE2 San Agustin, Romblon 08/05/13 Final IVB LF 1.616 85 09/19/12 12/13/12 0.00 C 0.373 0.200 0.300 - - - 87.30 ONS Tablas Circ. Rd. Satisfactory Const. of Line Canal along Tablas Circ. Tablas Island, 72.32% 873 R N V Construction 12570 L D SB GE2 08/05/13 Final IVB LF 3.080 65 10/19/12 12/22/12 4.00 C 0.000 0.200 0.300 - - - 50.00 AHD Rd., K039+550-K040+250 Romblon Poor Repair/Rehab. Along Santiago-Tuguegarao Rd., 874 500 R R C Construction 24369 L A MA GE1 K0419+259.21-K0421+000, K0425+695.50- Sta. Maria, Isabela 08/05/13 2nd II LF 34.673 209 01/28/13 08/24/13 0.65 O 0.357 0.300 0.150 0.030 0.055 0.033 92.50 AHD K0426+200 & K0426+200-K0427+000 Const./Rehab. of Mallig Flood Control 90.30% 875 R R C Construction 24369 L A MA GE2 Mallig, Isabela 08/08/13 1st/Final II LF 8.798 180 12/14/12 06/11/13 31.27 C 0.470 0.133 0.300 - - - 90.30 AHD Proj. (Rangayan Sect.) V. Satisfactory

R.A. Construction & General Const. of DepEd Standard Type Sch. Bldg. @ Sipalay City, Negros 876 501 33060 L B SB GB1 08/09/13 1st VI LF 3.338 90 05/24/13 08/21/13 12.93 O 0.339 0.240 0.150 0.030 0.043 0.033 83.50 AHD Merchandise Gil Montilla NHS Main, Sipalay City Occidental Rd. Upgrading of Isabela-Libas Negros R.A. Construction & General Isabela, Negros 877 33060 L B MA GE1 Occidental Bdry. Rd., a) K0086+250- 08/10/13 2nd VI LF 18.023 157 01/28/13 07/03/13 - O 0.380 0.202 0.000 0.030 0.037 0.033 68.20 DEL Merchandise K0087+000 Occidental Repair/Rehab./Impv't. of Cavite-Batangas Rd., 90.50% 878 502 R.A. Ignacio Construction 29977 L C SB GE1 Cavite 08/13/13 1st/Final IVA LF 9.388 40 03/27/13 05/05/13 0.00 C 0.472 0.133 0.300 - - - 90.50 ONS K0046+672-K0047+250 w/ exception V. Satisfactory R.A. Pahati Const. & Supply, Rehab. & Impv't. of Sagbat Pililia Diversion Rd. 91.00% 879 503 35843 L A MB GE1 Tanay & Pililia, Rizal 08/16/13 1st/Final IVA LF 9.528 46 04/11/13 05/26/13 19.50 C 0.477 0.133 0.300 - - - 91.00 AHD Inc. (K0053+000-K0059+029) w/ exception V. Satisfactory R.A. Pahati Const. & Supply, 87.12% 880 35843 L A MB GE1 Widening/Impv't. of Sumulong Highway Antipolo City 08/15/13 Final IVA LF 17.140 210 01/29/13 08/26/13 7.79 C 0.437 0.133 0.300 - - - 87.00 AHD Inc. Satisfactory CP-XXX(1-2) Rehab./Restoration along Nabua- R.A. Pahati Const. & Supply, Balatan, Camarines 88.60% 881 35843 L A MB GE1 Balatan Road K0489+690-K0 489+730 & 08/01/13 1st/Final V LF 2.730 120 12/12/12 04/10/13 0.00 C 0.453 0.133 0.300 - - - 88.60 ONS Inc. K0484+600-K0484+640 Sur Satisfactory Rehab./Strengthening of Babuyan Bridge 882 504 R.C. Tagala Construction 11597 L A MA GE1 Puerto Princesa City 08/15/13 1st IVB LF 11.720 225 02/06/13 09/19/13 -2.30 O 0.376 0.248 0.127 0.030 0.045 0.033 85.90 DEL PPNR Upgrading (Gravel to Concrete) Conc. of Luka Tanjay City, Negros 883 R.C. Tagala Construction 11597 L A MA GE1 08/21/13 1st VII LF 13.717 175 03/18/13 09/08/13 0.57 O 0.288 0.300 0.150 0.030 0.045 0.050 86.30 AHD Rd. leading to Tanjay Boardwalk Oriental

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 34 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION R.C. Tagala Construction / Rehab./Reconst./Strengthening of Bridges along 91.60% 884 505 Bemkar Construction Joint JV-11-337 L A MA GE1 Nat'l Rds., Guisican Bridge along Daang Labo, Camarines Norte 10/12/13 1st/Final V LF 25.049 419 02/17/12 04/10/13 0.00 C 0.483 0.133 0.300 - - - 91.60 ONS Venture Maharlika, Brgy. Guisican V. Satisfactory R.C. Tagala Construction / Rehab./Reconst./Strengthening of Bridges along 91.40% 885 506 Bemkar Construction Joint JV-11-336 L A MA GE1 Nat'l Rds., Anameam Bridge along Daang Labo, Camarines Norte 10/12/13 1st/Final V LF 20.300 420 02/17/12 04/11/13 0.00 C 0.481 0.133 0.300 - - - 91.40 ONS Venture Maharlika, Brgy. Anameam V. Satisfactory R.D. Interior Junior Rehab./Reconst./Upgrading of Damaged Paved 91.10% 886 507 6483 L AAA LB GE1 Cagayan Valley 07/29/13 1st/Final II LF 13.576 135 10/29/12 03/12/13 0.02 C 0.478 0.133 0.300 - - - 91.10 AHD Construction Nat'l Rd. Tuguegarao Sect. V. Satisfactory Prev. Maint. along Santiago-Baluarte-Quirino R.D. Interior Junior Bdry. Rd., K0331+063-K0332+066, 90.00% 887 6483 L AAA LB GE1 Santiago, Isabela 08/09/13 1st/Final II LF 19.441 80 03/03/13 05/21/13 0.00 C 0.467 0.133 0.300 - - - 90.00 ONS Construction K0332+066-K0333+097, K0333+097- V. Satisfactory K0334+281 Rehab./Reconst./Upgrading of Damaged Paved R.D. Interior Junior 87.80% 888 6483 L AAA LB GE1 Nat'l Rd., Lakambini-Sto. Domingo Sect., Cagayan Valley 08/04/13 1st/Final II LF 25.694 210 10/29/12 05/26/13 22.46 C 0.445 0.133 0.300 - - - 87.80 AHD Construction Cagayan-Apayao Rd. Satisfactory Rehab./Extension of San Pedro Bridge R.D. Interior Junior Approach "B" along NRJ Villa Sur-San Pedro - 87.40% 889 6483 L AAA LB GE1 Maddela, Quirino 08/12/13 1st/Final II LF 12.330 255 11/05/12 07/17/13 1.8/3 C 0.441 0.133 0.300 - - - 87.40 AHD Construction Cabuuan-Ysmael-Disimungal Rd., Satisfactory K0367+614.50-K0367+410 R.G. Florentino Construction & Trading-Sand Andres Romblon Const. of Parpagoha River Control along 85.64% 890 508 18301 L B SB GE2 San Andes, Romblon 08/05/13 Final IVB LF 4.574 90 09/19/12 12/17/12 2.22 C 0.336 0.200 0.300 - - - 83.60 AHD Branch (Formerly: R.G. Tablas Circ. Rd. Satisfactory Florentino Construction) Emergency Works on Collapsed Slope 84.70% 891 509 R.J. Ibarra Construction 23538 L B MA GE2 Protection & Cross-Drainage Structure along Subic, Zambales 08/05/13 1st/Final III LF 4.647 60 03/27/13 05/25/13 0.00 C 0.414 0.133 0.300 - - - 84.70 ONS Olongapo-Bugallon Rd., Mangan Vaca Satisfactory Impv't. of Pamatawan River, Brgy. Del 83.82% 892 R.J. Ibarra Construction 23538 L B MA GE2 Castillejos, Zambales 08/05/13 Final III LF 26.924 210 01/29/13 08/26/13 18.48 C 0.446 0.133 0.300 - - - 87.90 AHD Pilar Side Satisfactory Impv't. of Sacatihan River, Brgy. 82.30% 893 R.J. Ibarra Construction 23538 L B MA GE2 Subic, Zambales 08/05/13 Final III LF 11.853 120 01/29/13 05/28/13 3.33 C 0.408 0.133 0.300 - - - 84.10 AHD Sacatihan Satisfactory Conc. of Shoulder along Daang Maharlika & R.K.X. Odiamar 84.70% 894 510 16107 L A MA GE1 Baao-Iriga City-Nabua Rd., K0472+300- San Nicolas, Iriga City 07/31/13 1st/Final V LF 2.867 35 03/18/13 04/21/13 2.86 C 0.347 0.200 0.300 - - - 84.70 AHD Construction K0472+546 & K0471+000-K0471+131 Satisfactory Impv't. of Camachile River, Brgy. San Marcelino, 86.68% 895 511 R.M. Vitug Construction 9227 L B MA GE2 08/05/13 Final III LF 16.223 120 01/28/13 05/27/13 10.00 C 0.390 0.133 0.300 - - - 82.30 AHD Nagbunga Zambales Satisfactory

Const./Rehab. of Flood Control Structure of 83.00% 896 R.M. Vitug Construction 9227 L B MA GE2 Camachile River (Desilting and Slope Castillejos, Zambales 08/05/13 1st/Final III LF 8.838 90 04/04/13 07/02/13 23.33 C 0.397 0.133 0.300 - - - 83.00 AHD Protection) Nagbunga Satisfactory Replacement of Inatub Bridge along Quezon, Nueva 88.50% 897 512 R.O. Builders & Dev. Corp. 22393 L A MA GE1 08/13/13 1st/Final II LF 5.409 91 02/07/13 05/08/13 1.07 C 0.452 0.133 0.300 - - - 88.50 AHD Bambang-Kasibu-Quezon-Solano Rd. Vizcaya Satisfactory Replacement of Temporary to Permanent Bridges Gen. from Bridge Mgt. System (BMS), Sta. Fe, Nueva 84.20% 898 R.O. Builders & Dev. Corp. 22393 L A MA GE1 08/14/13 1st/Final II LF 7.028 192 01/21/13 07/31/13 0.24 C 0.409 0.133 0.300 - - - 84.20 AHD Imugan Bridge along Nueva Vizcaya- Vizcaya Satisfactory Pangasinan Rd. R.R. Encabo Constructors Rehab./Reconst./Strengthening of Bridges along Panganiban, 899 513 Incorporated / R.C. Tagala JV-12-366 L AAA MB GE1 Catanduanes Circ. Rd., Kanparel Bridge, 07/30/13 1st V LF 31.520 211 02/15/13 09/13/13 -1.91 O 0.342 0.272 0.131 0.030 0.040 0.033 84.80 DEL Construction (Joint Venture) (Km.0056+470) Catanduanes R.R. Ricafort Construction and Const. of Reinforced Concrete Slope Protection 85.90% 900 514 Supplies (Formerly: R.R. 14402 L A MA GE2 along Concepcion-Capas Rd. (Concepcion Concepcion, Tarlac 08/07/13 1st/Final III LF 4.108 90 01/11/13 04/10/13 0.00 C 0.426 0.133 0.300 - - - 85.90 ONS Ricafort Construction) Sect.), K0112+187-K0112+524 w/ exception Satisfactory

R.R. Ricafort Construction and Conc. of Rd. Cluster VIII at: a)Sinait-Sta. Maria 84.90% 901 Supplies (Formerly: R.R. 14402 L A MB GE1 Rd., Tarlac City; b)Brgy. Rd. Mangolago, Tarlac 08/07/13 1st/Final III LF 27.116 192 12/06/12 06/15/13 5.56 C 0.349 0.200 0.300 - - - 84.90 AHD Ricafort Construction) Victoria; c)Maluid-San Andres Rd. Victoria Satisfactory R.R. Ricafort Construction and Mogpog River Control along Marinduque Circ. 85.18% 902 Supplies (Formerly: R.R. 14402 L A MA GE2 Mogpog, Marinduque 08/07/13 Final IVB LF 12.701 200 10/22/12 05/09/13 0.00 C 0.386 0.200 0.300 - - - 88.60 ONS Rd. (Banto-Mogpog Sect.) Ricafort Construction) Satisfactory Drainage System at Abucay Daang 86.20% 903 515 R.T. Builders 33773 L D SB GE2 Tacloban City 08/22/13 Final VIII LF 4.009 107 10/12/12 01/26/13 40.00 C 0.459 0.133 0.300 - - - 89.20 AHD Maharlika, Brgy. Abucay Satisfactory Repair/Rehab./Conc. of Jct. Taft-Oras-San Arteche, Eastern 87.42% 904 516 R.T. Morabe Construction 11377 L B MA GE1 Policarpio-Arteche Nat'l Rd., Km.954.540- 08/19/13 Final VIII LF 28.950 357 10/27/11 10/18/12 5.20 C 0.447 0.186 0.300 - - - 93.30 AHD Km.956+020, Brgy. Carapdapan Samar Satisfactory Rehab./Reconst. along Taft-Oras-San-San 905 R.T. Morabe Construction 11377 L B MA GE1 Policarpio-Arteche Rd., K0890+400- Eastern Samar 08/19/13 1st VIII LF 22.547 155 01/30/13 07/03/13 -5.00 O 0.361 0.300 0.000 0.030 0.055 0.017 76.30 DEL K0895+177 Rehab./Reconst./Upgrading of Lucena-Tayabas- 84.54% 906 517 R.T.Y. Construction 10341 L B MA GE1 Mauban Port Rd. Jct. Km.128+282- Lucena City 08/03/13 Final IVA LF 42.817 245 03/09/12 11/08/12 1.22 C 0.301 0.200 0.300 - - - 80.10 AHD Satisfactory Km.132+070 w/ exception Rd. Upgrading (Concrete Paving) along Talaba- 907 R.T.Y. Construction 10341 L B MA GE1 Quezon 08/06/13 1st IVA LF 34.582 165 03/11/13 08/22/13 0.24 O 0.328 0.245 0.150 0.030 0.035 0.033 82.10 AHD Summit-Panaon Rd., K0195+533-K0197+045 Assets Preservation of Nat'l Roads Gen. from Pvmt. Mgt. System/Highway Dev't. Mgt.-4 (HDM-4) Int. Sect.; A. Prev. Maint.; 1. Nat'l 908 R.T.Y. Construction 10341 L B MA GE1 Quezon 08/05/13 2nd IVA LF 40.482 171 02/12/13 08/01/13 -32.00 O 0.395 0.225 0.000 0.030 0.028 0.017 69.50 DEL Arterial (Prev. Maint.); 1. Daang Maharlika; a.K0163+291 - K0164+100; b.K0164+100- K0164+1050; c.K0164+1050-K0166+171 Const. of Lucena Diversion Rd. Talao-Talao 909 518 R.V. Laborte Builders 20459 L A MB GE1 Lucena City 08/03/13 1st IVA LF 40.807 160 06/07/13 11/13/13 2.88 O 0.282 0.300 0.150 0.030 0.028 0.033 82.30 AHD Port Rd. inc.RROW, Mayao Crossing Sect.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 35 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Completion of Bangao Bridge along 82.10% 910 R.V. Laborte Builders 20459 L A MB GE1 Mulanay, Quezon 08/07/13 1st/Final IVA LF 15.230 118 03/11/13 07/06/13 1.00 C 0.321 0.200 0.300 - - - 82.10 AHD Mulanay-San Fernando Rd. Satisfactory Repair/Rehab./Impv't. of Cavite-Batangas Rd., R.V. Rieta Trading & Gen. 89.20% 911 519 28671 L C SB GE1 Silang Sect., K0052+535-K0053+763 w/ Cavite 08/13/13 1st/Final IVA LF 9.385 40 02/21/13 04/01/13 0.00 C 0.459 0.133 0.300 - - - 89.20 ONS Construction exceptions V. Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd.s along Nueva Ecija-Aurora Rd., Cabanatuan City & Palayan City Km.122+215- R.Z. Roncal Construction Km.122+423 w/ exception (159.18 LM); 87.20% 912 520 22219 L A MB GE1 Nueva Ecija 08/10/13 1st/Final III LF 21.560 140 02/21/13 07/10/13 1.43 C 0.439 0.133 0.300 - - - 87.20 AHD and Trading Km.125+106-Km.125+149.23; Satisfactory Km.125+149.23-Km.128+820 w/ exception (2,224.27 LM); Km.129+007-Km.130+000 w/ exception (711.46 LM) R.Z. Roncal Construction and Prev. Maint. (Int. Sect.) along Nueva Ecija- 83.60% 913 521 Trading / GVDPM Construction JV-12-331 L A MB GE1 Aurora Rd., Cabanatuan City Km.117+(-)799 - Nueva Ecija 08/09/13 1st/Final III LF 39.926 80 02/07/13 04/27/13 3.50 C 0.403 0.133 0.300 - - - 83.60 AHD Corp. Joint Venture Km.119+175 w/ exception L=2,925.17 LM Satisfactory Rabbit Construction & Prev. Maint. Zamboanga City-Labuan-Limpapa 88.00% 914 522 8545 L A MB GE1 Zamboanga City 08/05/13 1st/Final IX LF 8.057 136 02/18/13 07/03/13 12.42 C 0.380 0.200 0.300 - - - 88.00 AHD Development Corporation Rd., Km.1950+940-Km.1981+000 Satisfactory Rachki Enterprises (Formerly: Const. of Two (2) Storey, Four (4) Cl. Sch. 915 523 17689 L D SB GB1 Talisay, Batangas 08/02/13 1st IVA LF 4.719 150 03/27/13 08/23/13 7.02 O 0.333 0.268 0.150 0.030 0.023 0.033 83.70 AHD Geto Construction) Bldg. at Miranda Elem. Sch. Replacement of Bontoc-Cadre Bridge 65.30% 916 524 Raf General Construction 6699 L B MA GE1 Bontoc, Mt. Province 08/03/13 Final CAR LF 8.598 177 03/09/12 09/01/12 0.00 C 0.472 0.133 0.000 - - - 60.50 DEL along Bontoc-Cadre Rd. Poor Rehab. & Impv't. of Kalayaan Ave. (Int. Sect.) Rain Construction Corporation 83.70% 917 525 15959 L B MA GE1 K0005+819-K0005+2948 Makati City 08/09/13 1st/Final NCR LF 17.524 75 03/05/13 05/18/13 4.00 C 0.404 0.133 0.300 - - - 83.70 AHD (Formerly: Rain Construction) (S033681LZS03367LZ) Satisfactory Asphalt Overlay of Muntinlupa-Insular Prison Rain Construction Corporation 82.50% 918 15959 L B MA GE1 Rd. (K0029+287-K0029+417),(K0029+858- Muntinlupa City 08/14/13 1st/Final NCR LF 11.075 40 02/22/13 04/02/13 0.00 C 0.392 0.133 0.300 - - - 82.50 ONS (Formerly: Rain Construction) K0030+864), (K0032+191-K0032+671 ) Satisfactory Ramarplus Incorporated Repair/Rehab. of Kinale River Flood 87.50% 919 526 8092 L B MA GE2 Polangui, Albay 08/09/13 1st/Final V LF 9.153 120 03/21/13 07/18/13 0.00 C 0.375 0.200 0.300 - - - 87.50 ONS (Formerly: Ramar Enterprises) Control Satisfactory Ramona Construction & Const. of Sch. Bldg., Ozamis City NHS 89.10% 920 527 14661 L B SB GB1 Ozamis City 08/16/13 1st/Final X LF 2.258 84 03/27/13 06/18/13 0.00 C 0.458 0.133 0.300 - - - 89.10 ONS Enterprises (Malaubang Annex) V. Satisfactory Repair/Rehab./Impvt. of MNR Km. 426+800- 86.94% 921 528 Ramsa Construction 25580 L B SB GE1 Ilocos Sur 07/13/13 Final I LF 4.937 90 01/28/13 04/27/13 2.22 C 0.452 0.133 0.300 - - - 88.50 AHD Km. 429+058 w/ exceptions Satisfactory Replacement/Rehab./Strengthening of Permanent Bridges Gen. from Bridge Mgt. 85.54% 922 529 Rapid Foremost Const., Co. 32618 L C SB GE1 Quezon 08/05/13 Final IVA LF 4.585 170 02/22/13 08/10/13 3.00 C 0.456 0.133 0.300 - - - 88.90 AHD System (BMS) 2. Binahaan Bridge along Daang Satisfactory Maharlika RCDG Construction Const./Imprv't. of Lower Sibuguey Flood Corporation / Badsbro Protection along Lanao-Pagadian-Zamboanga 85.61% 923 530 JV-12-029 L AA MA GE1 Zamboanga Sibugay 08/08/13 Final IX LF 37.564 275 07/23/12 04/23/13 0.00 C 0.312 0.200 0.300 - - - 81.20 ONS Construction and General City Rd., Kimus-Balucanan Sect., Phase I, Satisfactory Merchandise (JV) Km.0+000-Km.2+240 Replacement/Rehab./Strengthening of R'Cel Gen. Contractor & Permanent Bridges Gen. from Bridge Mgt. 91.20% 924 531 13385 L B MA GE1 Quezon 08/05/13 1st/Final IVA LF 5.412 120 02/22/13 06/21/13 1.67 C 0.479 0.133 0.300 - - - 91.20 AHD Gen. Merchandise System (BMS), Iringan Bridge along Daang V. Satisfactory Maharlika Replacement/Rehab./Strengthening of R'Cel Gen. Contractor & Permanent Bridges Gen. from Bridge Mgt. 925 13385 L B MA GE1 Quezon 08/06/13 2nd IVA LF 14.380 220 02/12/13 09/19/13 0.43 O 0.260 0.292 0.150 0.030 0.040 0.033 80.50 AHD Gen. Merchandise System (BMS) 3. Gumihan Bridge along Const. of FMR, Lower Baguer, Impv't. of FMR, Libungan, Cotabato, K1705+176-K1706+340 87.10% 926 532 RDen Construction & Supply 33707 L D SB GE1 Libungan, Cotabato 08/13/13 Final XII LF 7.374 57 02/06/13 04/03/13 0.00 C 0.395 0.200 0.300 - - - 89.50 ONS end of Proj. K1705+176.50-K1706.50 (PCCP) Satisfactory (1.1635kms.) Redcar Trading & Reconst./Upgrading of Muntinlupa Insular 84.00% 927 533 27368 L B SB GE1 Muntinlupa City 08/14/13 1st/Final NCR LF 1.288 25 02/26/13 03/24/13 0.00 C 0.407 0.133 0.300 - - - 84.00 ONS Construction Prison Rd., (Int. Chainage 000+Chainage 0114) Satisfactory Regional Infrastructure Repair/Rehab. & Const. of FMR, Anakan- Gingoog City, 82.20% 928 534 Development Corp. / Ronwood JV-12-355 L A MA GE1 08/20/13 1st/Final X LF 39.391 208 12/25/12 06/22/13 0.00 C 0.322 0.200 0.300 - - - 82.20 ONS Minmbunga-Tinabalan-Mimbalagan Rd. Construction & Supply (JV) Misamis Oriental Satisfactory Regional Infrastructure Conc. of Tagbongabong Prov. Rd. Phase II, 86.10% 929 535 26373 L A MA GE1 Agusan del Norte 08/05/13 1st/Final XIII LF 9.451 103 03/27/13 07/07/13 1.48 C 0.435 0.126 0.300 - - - 86.10 AHD Development Corporation Tagbongabong Remedios T. Romualdez (RTR) Satisfactory Rely Construction and Impv't./Widening of Agusan-Davao Rd. (Daang 83.44% 930 536 10433 L AA MA GE1 Comval Province 08/14/13 Final XI LF 17.100 157 07/18/12 12/12/12 0.00 C 0.374 0.152 0.300 - - - 82.60 ONS Supply Maharlika), Pob. Nabunturan-Mawab Sect. Satisfactory Asphalt Overlay of Manila-Batangas Rd., Lipa Revere Construction and 90.70% 931 537 17426 L AAA LB GE1 City Sect. (K0079+091-K0080+249 w/ Batangas 07/29/13 Final IVA LF 17.854 95 01/21/13 04/25/13 0.00 C 0.447 0.133 0.300 - - - 88.00 ONS Supply exception) V. Satisfactory Revere Construction and Asphalt Overlay of Rosario-San Juan Rd., 90.48% 932 17426 L AAA LB GE1 Pinagsibaan-Puting Kahoy Sect., (K0106+174- Batangas 07/29/13 Final IVA LF 6.490 100 01/21/13 04/30/13 5.00 C 0.406 0.200 0.300 - - - 90.60 AHD Supply V. Satisfactory K0107+184) Replacement/Rehab./Strengthening of Revere Construction and Permanent Bridges Gen. from Bridge Mgt. 89.54% 933 17426 L AAA LB GE1 Talisay, Batangas 08/02/13 Final IVA LF 7.940 75 03/13/13 05/26/13 0.00 C 0.421 0.133 0.300 - - - 85.40 ONS Supply System (BMS) Bignay Bridge along Tanauan- V. Satisfactory Talisay-Tagaytay Rd. Rds. to Address Critical Bottlenecks Nat'l Rd. 934 538 Reydan Builders 13059 L A MA GE1 Traffic Decongestion, Widening of Marbel- South Cotabato 08/06/13 2nd XII LF 32.700 150 03/12/13 09/01/13 0.004 O 0.367 0.236 0.150 0.015 0.056 0.033 85.70 AHD Midsayap Rd.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 36 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Const. of Slope Protection along Butuan City- RG & K Construction and Cagayan de Oro City-Iligan City, Downstream Opol, Misamis 935 539 33021 L B SB GE2 08/19/13 2nd X LF 17.118 240 10/18/12 06/14/13 6.27 O 0.366 0.208 0.150 0.020 0.041 0.050 83.50 AHD General Merchandise of Iponan Bridge I and II, Misamis Oriental Oriental Side, Barra RG & K Construction and Const. of Misamis Oriental-Bukidnon By-Pass 936 33021 L B MA GE1 Misamis Oriental 08/19/13 1st X LF 45.294 179 03/05/13 08/30/13 2.28 O 0.329 0.240 0.150 0.030 0.040 0.033 82.20 AHD General Merchandise Rd. PHIVDEC-Alae Sect. Const. of Rds. from Marine Hatchery Proj. to 82.52% 937 540 RGP Builders 20680 L B MA GE1 Unisan, Quezon 08/06/13 Final IVA LF 23.275 161 10/26/12 04/04/13 2.00 C 0.252 0.200 0.300 - - - 75.20 AHD Nat'l. Highway, Brgy. Punta Satisfactory Widening of Pres. Diosdado P. Macapagal Rhodwill Parts and Banaybanay, Davao 86.44% 938 541 18871 L B MA GE1 Highway (Maputi Sect.) Km.1766+980- 08/16/13 Final XI LF 10.290 69 01/25/13 04/03/13 0.00 C 0.441 0.133 0.300 - - - 87.40 ONS Hardware Km.1767+633.40 w/ exception Oriental Satisfactory Rhyes Builders & Supply / Upgrading of Colab-og-Lungib- 85.52% 939 542 Norsam Builders & Construction JV-11-271 L B MA GE1 Northern Samar 08/10/13 Final VIII LF 46.345 270 02/06/12 11/02/12 0.37 C 0.369 0.188 0.300 - - - 85.70 AHD Supply (JV) Buenasuerte-Pasabuena-Maxvilla Rd. Satisfactory Conc. of Pangpang-Palapag-Mapanas-Gamay- Rhyes Builders / ESD Cruz Palapag, Northern 84.18% 940 543 JV-11-066 L B MA GE1 Lapinig Rd., Cabatuan-Magtaon Sect., 08/06/13 Final VIII LF 33.889 407 12/14/11 01/24/13 0.25 C 0.391 0.182 0.300 - - - 87.30 AHD Construction (JV) Km.820+000-Km.824+000 w/ exception Samar Satisfactory Const. of 2 Storey 6-CL SB at Bais City Bais City, Negros 941 544 Richfield Builders 24525 L D SB GB1 08/21/13 1st VII LF 6.555 153 03/27/13 08/27/13 -0.78 O 0.393 0.220 0.142 0.030 0.047 0.033 86.50 DEL Pilot Sch. Oriental Rehab./Reconst. Of the Upper Chico River 88.50% 942 545 Ris Construction 34126 L D SB GE2 Bauko, Mt. Province 08/02/13 1st/Final CAR LF 4.457 113 03/12/13 07/02/13 0.00 C 0.452 0.133 0.300 - - - 88.50 ONS Flood Control, Dawaan-Akiki Drainage Sect. Satisfactory Rism Designer's and General Const. of DepEd Standard Type Sch. Bldg. Kabankalan City, 943 546 Merchandise & Engineering 32830 L D SB GB1 08/08/13 1st VI LF 2.429 85 05/24/13 08/16/13 3.44 O 0.369 0.200 0.150 0.030 0.038 0.033 82.00 AHD Services @ Carol-an ES Negros Occidental Ritche-Nathalie Builders and Erosion Protection/Rehab. of Tudela River Tudela, Misamis 91.50% 944 547 27501 L B SB GE2 08/16/13 1st/Final X LF 4.999 130 05/14/13 09/20/13 0.00 C 0.482 0.133 0.300 - - - 91.50 ONS General Merchandise Brgy. Taguima Occidental V. Satisfactory Replacement/Rehab./Strengthening of 945 548 RKKI Construction 33492 L D SB GE1 Kapayawan Bridge along Mt. Province-Ilocos Bauko, Mt. Province 08/02/13 1st CAR LF 4.171 140 04/02/13 08/19/13 -5.15 O 0.367 0.240 0.099 0.015 0.048 0.033 80.20 DEL Sur via Tue Rd. Prev. Maint. RT Lim Blvd. (Dual) 946 549 RMS Builder and Supply 19490 L D SB GE1 Zamboanga City 08/05/13 1st IX LF 4.621 121 02/25/13 06/26/13 - O 0.363 0.294 0.000 0.030 0.047 0.033 76.70 DEL Chainage 0063-Chainage 0823 Installation/Application/Const. of Rd. Safety Road Edge Trading & Sta. Rosa & Cabanatuan 84.50% 947 550 33140 L A MA GE1 Devices along Maharlika Rd., Km.104+195- 08/09/13 1st/Final III LF 4.814 30 06/06/13 07/05/13 0.00 C 0.412 0.133 0.300 - - - 84.50 ONS City, Nueva Ecija Development Services Km.123+345 w/ exceptions Satisfactory Road Edge Trading & Repair/Rehab./Impv't. along Surigao-Agusan Timamana, Tubod, 948 33140 L A MB GE1 08/07/13 1st XIII LF 4.743 78 05/27/13 08/13/13 1.24 O 0.362 0.223 0.150 0.030 0.050 0.050 86.50 AHD Development Services Rd,. Sta.1150+37 -Sta.1146+800 w/ exceptions Surigao del Norte Rd. Upgrading (Gravel to Paved) along Awang- Upi-Lebak-Kalamansig-Palimbang-Sarangani Robeth Gen. Mdse. Const. & Road (Km.1963+471-Km.1977+121) Realign Supply (Formerly: Robeth Gen. 89.02% 949 551 23175 L B MA GE1 to Rd. Upgrading (Gravel to Paved) along Sultan Kudarat 08/15/13 Final XII LF 33.430 309 07/06/12 05/10/13 0.00 C 0.410 0.200 0.300 - - - 91.00 ONS Mdse. & Supplies - Isulan Awang-Upi-Lebak - Kalamasig-Palimbang- V. Satisfactory Branch) Sarangani Rd. (Km.1954+708-Km.1957+000 w/ exception), Kalamansig-Palimbang Robeth Gen. Mdse. Const. & Rd. Upgrading (Gravel to Paved) Int. Sect. Supply (Formerly: Robeth Gen. along Isulan Jct. Ninoy Rd., Km.1777+474- 950 23175 L B MA GE1 Isulan, Sultan Kudarat 08/17/13 1st XII LF 34.932 215 01/30/13 09/01/13 0.66 O 0.308 0.300 0.150 0.030 0.048 0.033 86.90 AHD Mdse. & Supplies - Isulan Km.1778+125, Km.1779+077-Km.1778+806, Branch) Km.1780+175, Km.1780+965-Km.1781+589

Roda Construction and Rehab./Reconst. of Damaged Paved Nat'l Rd., 90.20% 951 552 19674 L A MA GE1 Sorsogon 08/13/13 1st/Final V LF 11.084 105 01/30/13 05/15/13 0.00 C 0.402 0.200 0.300 - - - 90.20 ONS General Supply (Int. Sect.) Bacon District V. Satisfactory Const./Rehab. of Rd. Slip along NRJ-Bahbah- Talacogon Rd. (Sta.1305+350.00-Sta.1310.40 Roim Builders & 85.38% 952 553 20226 L B MA GE1 L/S (Slip 3); Sta.1305+803.60- Agusan del Sur 08/21/13 Final XIII LF 14.146 350 05/04/12 04/18/13 0.30 C 0.411 0.133 0.300 - - - 84.40 AHD Construction Supply Sta.1305+870.20 R/S (Slip 4) Prosperidad & Satisfactory Talacogon Road Upgrading from Gravel to Paved along Roim Builders & San Luis, Agusan del 953 20226 L B MA GE1 Butuan City-Talacogon-Loreto-Veruela-Sta. 08/21/13 1st XIII LF 45.086 209 03/16/13 10/10/13 2.46 O 0.267 0.300 0.150 0.015 0.040 0.050 82.20 AHD Construction Supply Josefa Rd. K1325+992-K1328+427 Sur Conc. of Pugay-Bongliw-Yade- San Jose , Camarines 954 554 Rola Construction 6813 L B MA GE1 08/02/13 1st V LF 2.779 60 06/10/13 08/08/13 0.47 O 0.363 0.240 0.150 0.030 0.045 0.033 86.10 AHD Tambangan Rd. Sur Capiz NHS, Roxas City (Capital), Capiz, (b) 955 Rola Construction 6813 L B SB GB1 Roxas City, Capiz 08/18/13 1st VI LF 4.493 210 04/18/13 11/13/13 1.75 O 0.317 0.240 0.150 0.030 0.054 0.050 84.10 AHD Const. of 2-Storey, 4 Cl Sch. Bldg. Rolco Construction & Rehab. of Flood Control System along 88.90% 956 555 29686 L B MA GE2 Malilipot, Albay 08/11/13 1st/Final V LF 18.228 180 12/21/12 06/18/13 21.07 C 0.456 0.133 0.300 - - - 88.90 AHD General Merchandise Bulawan River, San Roque Sect. Satisfactory Ronwood Construction & Widening of Butuan-Cagayan de Oro-Iligan Rd. Nasipit, Agusan del 957 556 25311 L AA MA GE1 (Agusan-Misamis Oriental Sect.) Nasipit Sect., 08/06/13 2nd XIII LF 34.547 251 02/08/13 09/16/13 2.01 O 0.363 0.234 0.150 0.030 0.027 0.050 85.40 AHD Supply Norte Sta.1259+480-Sta.1261+253 Ronwood Construction & Supply Const. of Jct. Osmeña-Pilar Rd. (San Roque- 958 557 / Regional Infrastructure JV-12-129 L A MA GE1 Pilar Sect.), K18+000-K19+000 & K20+500- Surigao del Norte 08/09/13 1st XIII LF 79.634 225 03/12/13 10/22/13 15.30 O 0.372 0.230 0.150 0.023 0.045 0.050 87.00 AHD Development Corporation (J.V.) K22+620, Pilar, Siargao Island 90.71% 959 558 Roprim Construction 8516 L A MA GB1 Const. of MPB at Trapiche Elem. Sch. Oton, Iloilo 08/14/13 Final VI LF 3.799 150 01/19/13 05/18/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS V. Satisfactory

960 Roprim Construction 8516 L A MA GB1 Const. of MPB at Oton Central Sch. Oton, Iloilo 08/14/13 1st VI LF 3.799 327 07/15/13 11/11/13 0.55 O 0.361 0.240 0.150 0.030 0.027 0.033 84.10 AHD

Roprim Construction / Jet Replacement/Const. of Linaban Bridge, 961 559 JV-11-266 L A MA GE1 Hamtic, Antique 08/15/13 1st VI LF 23.959 410 05/30/12 07/13/13 -4.54 O 0.356 0.300 0.024 0.030 0.033 0.033 77.60 DEL Construction Supply (JV) (Km. 83+017.60)

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 37 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Rostel Construction & Rd. Upgrading (Gravel to Paved) of Buenavista- Buenavista, Agusan 962 560 26934 L B MA GE1 08/06/13 2nd XIII LF 38.017 169 02/08/13 07/26/13 -12.86 O 0.341 0.252 0.021 0.030 0.035 0.017 69.60 DEL Supply Bunaguit Rd., Sta.1272+000-Sta.1273+500 del Norte

Const. of 2 Storey - 4 CL Sch. Bldg. at Santa Fe Santa Fe and San 90.80% 963 561 Rovilla Construction 19514 L B MA GB1 NHS, Santa Fe; & Const. of 2 Storey - 4 CL 08/10/13 1st/Final VII LF 9.392 140 03/20/13 08/06/13 0.00 C 0.475 0.133 0.300 - - - 90.80 ONS Sch. Bldg. at Lambusan NHS, San Remegio Remegio, Cebu V. Satisfactory Rd. Upgrading of Nat'l Rds. (Int. Sect.) at Bogo- Curva-Medellin-Daanbantayan-Maya Rd: 90.60% 964 Rovilla Construction 19514 L B MA GE1 Cebu 08/10/13 1st/Final VII LF 12.320 121 02/13/13 06/13/13 0.00 C 0.406 0.200 0.300 - - - 90.60 ONS 1)K0132+335-K0132+586; & 2)K0134+387- V. Satisfactory K0134+880 Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rds. Cluster III along: 1. Capas-San Jose- Mayantoc-Malacampa Rd. (2nd District) Royal Crown Monarch K0129+322-K0130+250 w/ exception, Construction & Supplies K0130+250-K0131+250 w/ exception, 87.70% 965 562 Corporation (Formerly: R.C. 9036 L AA MB GE1 K0131+250-K0132+000 w/ exception, Tarlac 08/08/13 1st/Final III LF 43.200 134 01/15/13 05/28/13 2.99 C 0.443 0.134 0.300 - - - 87.70 AHD Satisfactory Miranda Construction & K0133+000 - K0134+000 w/ exception; 2. Supplies) Rehab. of Capas-San Jose-Mayantoc- Malacampa Rd. (2nd District) K0128+250- K0134+600 w/ exception, K0132+000- K0133+000 Royal Crown Monarch Construction & Supplies Prev. Maint. of NE-Pangasinan Rd., 84.28% 966 Corporation (Formerly: R.C. 9036 L AA MB GE1 K0151+503-K0154+000; K0155+262- Nueva Ecija 08/13/13 Final III LF 26.657 60 02/07/13 04/07/13 5.00 C 0.393 0.133 0.300 - - - 82.60 AHD Miranda Construction & K0155+637; K0155+637-K0156+075 Satisfactory Supplies) Rudhil Construction & Rd. Upgrading (Gravel to Paved) Imelda-Bayog Diplahan, Zamboanga 967 563 Enterprises Inc. (Formerly: 22901 L A MA GE1 Kumalarang-Lapuyan-Margosatubig Rd., 08/14/13 1st IX LF 32.914 225 02/22/13 10/04/13 -2.55 O 0.310 0.248 0.124 0.030 0.028 0.033 77.30 DEL Rudhil Const.) Minsulao Sect., Km.1762+730-Km.1764+000 Sibugay Rudhil Construction & Const. of Slope Protection along Dipolog-Punta- Polanco, Zamboanga 968 Enterprises Inc. (Formerly: 22901 L A MA GE1 Dansullan-Sergio Osmeña Rd., Km.1875+490- 08/20/13 1st IX LF 8.324 90 03/21/13 06/18/13 - O 0.319 0.300 0.000 0.020 0.033 0.033 70.50 DEL Rudhil Const.) Km.1875+560 (due to Rd. Slip) del Norte Rusmen Builders & Development Prev. Maint. (MFO-1) (Int. Sect.) Banay-Banay- 88.48% 969 564 Corpration (Formerly: Rusmen 10674 L A MA GE1 Cuenca, Batangas 08/02/13 Final IVA LF 5.790 30 03/15/13 04/13/13 6.67 C 0.429 0.139 0.300 - - - 86.80 AHD Mojon-Cuenca Rd., K0090+849-K0091+370 Builders) Satisfactory Rehab./Reconst. of Damaged Nat'l Rds., 970 565 S and CU Construction 13128 L B MA GE1 Antequera-San Isidro-Libertad (Tubigon) Rd., San Isidro, Bohol 08/19/13 1st VII LF 16.793 212 01/30/13 08/29/13 0.00 O 0.352 0.251 0.150 0.030 0.055 0.033 87.10 ONS K0031+000-K0032+000 Drainage System at Mahayahay Creek, Brgy. 90.10% 971 566 S.T. Hidalgo Construction 22498 L B SB GE2 Tacloban City 08/22/13 1st/Final VIII LF 4.295 107 03/25/13 07/09/13 0.00 C 0.401 0.200 0.300 - - - 90.10 ONS Fatima along Picas, San Jose DZR Airport Rd. V. Satisfactory Const./Impv't./Rehab. Of FMR, Brgy. 86.76% 972 567 Safeway Construction 5842 L D SB GE1 Manaoag, Pangasinan 08/05/13 Final I LF 1.963 60 02/07/13 04/07/13 22.23 C 0.479 0.133 0.300 - - - 91.20 AHD Baritao Satisfactory Prev. Maint. Nat'l Arterial (Prev. Maint.), Makar- 86.20% 973 568 Sarangani Rockmixer 6549 L AA MB GE1 Kiamba Rd., K1660+467-K1662+000 (Int. General Santos City 08/23/13 1st/Final XII LF 23.343 70 02/24/13 05/04/13 0.70 C 0.429 0.133 0.300 - - - 86.20 AHD Satisfactory Sect.), Brgy. Tambler Conc./Widening of Digos-Makar Rd., Malungon, Sarangani 85.68% 974 Sarangani Rockmixer 6549 L AA MB GE1 08/22/13 Final XII LF 33.630 174 01/31/13 07/23/13 11.19 C 0.413 0.133 0.300 - - - 84.60 AHD Km.1624+750-Km.1626+250, Malandag Sect. Province Satisfactory Sarca Estate Development Widening of Lucena-Tayabas-Lucban Rd., 975 569 Corporation / Bomel JV-12-470 L A MA GE1 K0143+593.50-K0145+797, K0137+345- Tayabas, Quezon 08/08/13 1st IVA LF 41.812 120 03/14/13 07/11/13 -23.23 O 0.337 0.300 0.150 0.030 0.023 0.050 89.00 DEL Construction Joint Venture K0137+876 Replacement/Rehab./Strengthening of Permanent Bridges Gen. from Bridge Mgt. Glan, Sarangani 87.40% 976 570 Sarex Builders 23734 L B MA GE1 08/20/13 1st/Final XII LF 6.930 147 01/31/13 06/26/13 45.95 C 0.441 0.133 0.300 - - - 87.40 AHD System (BMS), Glan Bridge along Sarangani- Province Satisfactory Davao del Sur Coastal Rd. Rd. Upgrading (Gravel to Paved) Int. Sect. Glan, Sarangani 86.50% 977 Sarex Builders 23734 L B MA GE1 along Sarangani-Davao del Sur Coastal Rd., 08/20/13 1st/Final XII LF 8.571 122 01/31/13 06/01/13 0.00 C 0.432 0.133 0.300 - - - 86.50 ONS Km.1713+562-Km.1713+957 Province Satisfactory Rd. Upgrading (Gravel to Paved) Int. Sect. Sarex Builders / Greco Alabel, Sarangani 87.38% 978 571 JV-12-288 L B MA GE1 along Demoloc-Little Baguio-Alabel Rd., 08/21/13 Final XII LF 20.738 155 01/31/13 07/04/13 0.00 C 0.433 0.133 0.300 - - - 86.60 ONS Construction & Supply (JV) Province Satisfactory K1669+725-K1670+520 Const./Widening/Upgrading/Rehab. of Access Rd. to Airport, Major Seaports & Declared Satrap Construction 979 572 2526 L AAA LB GE1 Tourism Destination, Widening of Manila North Ilocos Sur 08/13/13 1st I LF 56.762 210 03/06/13 10/01/13 -1.42 O 0.336 0.300 0.136 0.030 0.047 0.033 88.20 DEL Company, Inc. Rd., K0406+300-K0406+000 & K0408+500- K0408+880, Bantay-San Ildefonso Sect.

Road Upgrading (Gravel to Paved) of Inawayan- Toril District, Davao 84.22% 980 573 SBB Construction & Supply 31238 L C SB GE1 08/05/13 Final XI LF 3.558 58 01/22/13 03/20/13 0.00 C 0.383 0.200 0.300 - - - 88.30 ONS Baracatan Road Km.1539+110-Km.1539+285 City Satisfactory

SBF Construction & Const. of 2-Storey 4-CL & 2-Storey 6-CL 981 574 11470 L A MA GB1 Oton, Iloilo 08/14/13 1st VI LF 11.246 180 03/27/13 09/23/13 -8.44 O 0.317 0.202 0.065 0.030 0.032 0.033 67.90 DEL Development Corporation Sch. Bldg. in Oton NHS Const. of MPB, Kinalaglagan Mataas na Mataas na Kahoy, 982 575 Scion Construction 33680 L B SB GB1 08/01/13 1st IVA LF 4.427 150 03/28/13 08/24/13 3.31 O 0.341 0.244 0.150 0.030 0.023 0.033 82.10 AHD Kahoy Batangas Replacement/Const. of Bongsod Bridge, Km. 983 576 Settlers Builder 21643 L B MA GE1 Sibalom, Antique 08/15/13 1st VI LF 11.889 178 02/12/13 08/08/13 -10.69 O 0.354 0.300 0.004 0.030 0.033 0.033 75.40 DEL 105+650.50, Brgy. Bongsod Const. of Shore Protection/Seawalls along Shak Construction and Guimaras Circ. Rd., Brgy. Canhawan- Nueva Valencia, 87.70% 984 577 28289 L B SB GE2 08/05/13 1st/Final VI LF 4.455 112 05/17/13 09/05/13 27.68 C 0.444 0.133 0.300 - - - 87.70 AHD Supply Cabalagnan, (K0077+100-K0077+280) w/ Guimaras Satisfactory exception

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 38 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Shak Construction and Const. of Sch. Bldg. at CapSU Burias 87.10% 985 28289 L B SB GB1 Jamindan, Capiz 08/19/13 1st/Final VI LF 4.850 90 12/17/12 03/16/13 0.00 C 0.438 0.133 0.300 - - - 87.10 ONS Supply Extension Satisfactory Impv't./Widening of Bacolod-Murcia-D.S. Silver Dragon Construction & Benedicto-San Carlos City Rd., K0053+860- 82.90% 986 578 30835 L A MA GE1 Negros Occidental 08/13/13 1st/Final VI LF 47.454 240 02/04/13 08/01/13 0.50 C 0.396 0.133 0.300 - - - 82.90 AHD Lumber & Glass Supply K0086+000 (K0052+735-K0056+583), Don Satisfactory Salvador Benedicto Rehab./Restoration/Upgrading of Damaged Silver Dragon Construction & 88.50% 987 30835 L A MA GE1 Paved Nat'l Rds., along Bacolod North Nat'l Negros Occidental 10/31/13 1st/Final VI LF 78.159 260 02/19/13 11/05/13 29.50 C 0.452 0.133 0.300 - - - 88.50 AHD Lumber & Glass Supply Rd., K0146+549 - K0157+500 (w/ exceptions) Satisfactory

Silver Dragon Construction & Repair/Rehab. of Orong Revetment Wall, Sta. Kabankalan City, 86.08% 988 30835 L A MA GE2 08/08/13 Final VI LF 2.982 102 12/26/12 04/06/13 1.39 C 0.414 0.133 0.300 - - - 84.70 AHD Lumber & Glass Supply 0+000-Sta. 0+072, Brgy. Orong Negros Occidental Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Silver Dragon Construction & Nat'l Rd. (Int. Sect.) Bacolod South Nat'l Bago City, Negros 85.92% 989 30835 L A MA GE1 08/11/13 Final VI LF 12.295 106 01/24/13 05/10/13 0.00 C 0.395 0.133 0.300 - - - 82.80 ONS Lumber & Glass Supply Arterial Rd. (By-Pass Rd.), K0020+029.50- Occidental Satisfactory K0020+685.50 Const. of Flood Control Structure along Bago Silver Dragon Construction & Bago City, Negros 990 30835 L A MA GE2 River Across Bacolod South Nat'l Arterial Rd., 08/11/13 1st VI LF 15.492 133 04/15/13 08/26/13 5.79 O 0.300 0.300 0.150 0.023 0.035 0.050 85.80 AHD Lumber & Glass Supply Sta. 0+136.12-Sta. 0+360, Bantayan Sect. Occidental Silver Dragon Construction & Const./Conc. of Bago-Ma-ao Pacol FMR, Sta. Bago City, Negros 85.60% 991 30835 L A MA GE1 08/11/13 1st/Final VI LF 12.570 70 03/27/13 06/05/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS Lumber & Glass Supply 0+873-01+680; Sta. 0+203-0+336 Occidental Satisfactory Repair/Rehab./Impv't. of Iloilo-Capiz Rd. (New Silver Dragon Construction & 992 30835 L A MA GE1 Route), Roxas Ave., Km.114+800-Km.115+535 Roxas City, Capiz 08/18/13 1st VI LF 9.132 75 07/08/13 09/21/13 22.74 O 0.339 0.240 0.150 0.030 0.050 0.033 84.20 AHD Lumber & Glass Supply w/ exception Road Upgrading (Gravel to Paved) (Int. Sect.) Silver Dragon Construction & Bago City, Negros 993 30835 L A MA GE1 Bago-Mambucal Nat'l Sec. Rd., K0058+688.00- 08/11/13 2nd VI LF 21.198 244 01/24/13 09/24/13 1.31 O 0.330 0.237 0.150 0.030 0.042 0.050 83.90 AHD Lumber & Glass Supply Occidental K0059+616 Silver Dragon Construction & Bacolod City, Negros 83.50% 994 30835 L A MA GE1 Conc. of Brgy. Cabug, FMR, Brgy. Cabug 08/06/13 1st/Final VI LF 8.060 60 04/29/13 06/27/13 0.00 C 0.402 0.133 0.300 - - - 83.50 ONS Lumber & Glass Supply Occidental Satisfactory Sixteen Enterprises - Const. of Bongabong Flood Control Bongabong, Oriental 86.92% 995 579 18187 L A MA GE2 07/31/13 Final IVB LF 18.189 174 01/28/13 07/19/13 1.20 C 0.439 0.147 0.300 - - - 88.60 AHD Calapan Branch (Aplaya Sect.) Mindoro Satisfactory Sixteen Enterprises - Const. of Bongabong Seawall (Aplaya Bongabong, Oriental 86.42% 996 18187 L A MA GE2 07/31/13 Final IVB LF 18.004 144 01/17/13 06/09/13 1.33 C 0.417 0.143 0.300 - - - 86.00 AHD Calapan Branch Sect.) Mindoro Satisfactory Sixteen Enterprises - Bansud, Oriental 85.30% 997 18187 L A MA GE2 Const. of Bansud River Control 07/31/13 Final IVB LF 9.098 150 01/28/13 06/26/13 25.00 C 0.380 0.200 0.300 - - - 88.00 AHD Calapan Branch Mindoro Satisfactory Replacement/Rehab./Strengthening of Sixteen Enterprises - Victoria, Oriental 998 18187 L A MA GE1 Babangonan Bridge, CSR Jct. Minas, 08/01/13 1st IVB LF 12.851 180 02/19/13 08/17/13 0.31 O 0.352 0.238 0.150 0.020 0.042 0.050 85.20 AHD Calapan Branch K0036+370 Mindoro Impv't./Conc. of Calapan South Rd., Maligaya- Sixteen Enterprises / Lumel Gloria, Oriental 87.05% 999 580 JV-12-086 L A MA GE1 Narra Sect. (K0075+849-K0079+233) (w/ 07/31/13 Final IVB LF 43.028 228 10/05/12 05/20/13 0.00 C 0.429 0.140 0.300 - - - 86.90 ONS Glenn Construction (JV) Mindoro Satisfactory exception) Prev. Maint. along Jct. Dumalinao- Margosatubig Nat'l Sec. Rd., ZDS (Asphalt 82.62% 1000 581 SJ Bonifacio Builders 32226 L D SB GE1 Overlay, 50mm) K1719+000-K1719+794 Zamboanga del Sur 08/16/13 Final IX LF 4.679 44 02/11/13 03/26/13 0.00 C 0.313 0.200 0.300 - - - 81.30 ONS Realigned to K1714+823-K1715+305, Satisfactory Lumbog, Vicencio Sagun Repair/Rehab./Impv't. of Nat'l Rd., Baler- 1001 582 So Construction 17714 L B MA GE1 Cemento Rd., K0231+500-K0238+000 w/ Dinalupihan, Bataan 08/10/13 1st III LF 10.000 152 03/27/13 08/25/13 10.00 O 0.354 0.240 0.150 0.030 0.050 0.033 85.70 AHD exceptions Rehab./Reconst./Upgrading of Damaged Paved Socor Construction Nat'l Rds. (Int. Sect.), Secondary Rd., Cebu 83.20% 1002 583 8020 L AAA LB GE1 Cebu City 08/24/13 1st/Final VII LF 27.983 75 04/01/13 06/15/13 0.00 C 0.395 0.137 0.300 - - - 83.20 ONS Corporation Circ. Rd. (Katipunan St.), Chainage 0000- Satisfactory Chainage 0995 Socor Construction Impv't. of Catarman Diversion Rd. K0742+(- Catarman, Northern 88.82% 1003 8020 L AAA LB GE1 08/10/13 Final VIII LF 15.123 61 02/05/13 04/06/13 0.00 C 0.396 0.200 0.300 - - - 89.60 ONS Corporation 360)-K0743+025 & K0743+025-K0743+085 Samar Satisfactory Prev. Maint. of Catarman-Laoang Rd., Socor Construction K0746+535-K0747+100, K0756+572- Catarman, Northern 1004 8020 L AAA LB GE1 08/10/13 1st VIII LF 38.704 200 02/05/13 08/24/13 -21.41 O 0.330 0.300 0.000 0.030 0.060 0.033 75.30 DEL Corporation K0756+1002; K0759+000-K0759+539; Samar K0759+728-K0764+530 Const. of Don Mariano Marcos Ave. Ext. Proj. URPO - 87.68% 1005 584 Solid Rock Construction 8958 L A MB GE1 under Metro Manila Urban Transport Quezon City 08/16/13 Final LF 69.995 542 05/14/10 11/07/11 0.00 C 0.346 0.133 0.300 - - - 77.90 ONS Integration Proj. (MMURTIP) PMO Satisfactory

Soy Eng Construction / L.C. Rd. Upgrading (Gravel to Conc.) Int. Sect. along 1006 585 JV-12-233 L B MA GE1 Zamboanga del Norte 08/20/13 2nd IX LF 9.498 121 01/25/13 05/25/13 - O 0.280 0.287 0.000 0.030 0.042 0.033 67.20 DEL Construction(JV) Piñan-Mutia Rd., K1824+(-458)-K1825+232

Spring Star Construction & Const. of MPB Annex 34, Brgy. Don Parañaque City, Metro 90.30% 1007 586 20240 L A MA GB1 08/09/13 1st/Final NCR LF 3.871 90 03/27/13 07/20/13 3.33 C 0.470 0.133 0.300 - - - 90.30 AHD Supply Bosco Manila V. Satisfactory

Square Cube Construction (Formerly: Square Cube 1008 587 25120 L A MA GE2 Const. of Flood Control at Barili Bridge Barili, Cebu 08/07/13 1st VII LF 16.296 203 02/04/13 08/25/13 6.33 O 0.373 0.241 0.150 0.030 0.050 0.033 87.70 AHD Trading Division & Construction Division-Mandaue Branch)

Square Cube Construction Const./Completion of On-going Bridges (inc. (Formerly: Square Cube 86.52% 1009 25120 L A MA GE1 approaches) at Lower Pakigne Bridge along Minglanilla, Cebu 08/05/13 Final VII LF 34.444 300 01/31/12 11/26/12 0.33 C 0.398 0.187 0.300 - - - 88.50 AHD Trading Division & Construction Natalio Bacalso Ave. Phase 8 Satisfactory Division-Mandaue Branch)

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 39 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Square Cube Construction (Formerly: Square Cube Maslog, Danao City, 1010 25120 L A SB GB1 Const. of 2 Storey 6CL SB at Maslog NHS 08/14/13 1st VII LF 6.457 159 06/10/13 11/15/13 0.93 O 0.359 0.240 0.150 0.030 0.047 0.033 85.90 AHD Trading Division & Construction Cebu Division-Mandaue Branch)

Square Cube Construction (Formerly: Square Cube 84.54% 1011 25120 L A MA GE2 Ubay Flood Control Ubay, Bohol 08/19/13 Final VII LF 3.667 157 12/12/12 05/18/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Trading Division & Construction Satisfactory Division-Mandaue Branch)

Square Cube Construction Rehab./Reconst./Upgrading of Damaged Paved (Formerly: Square Cube Nat'l Rds. at Canduman-Cebu North Rd. 84.20% 1012 25120 L A MA GE1 Mandaue City, Cebu 08/12/13 1st/Final VII LF 12.509 75 01/23/13 04/07/13 2.67 C 0.342 0.200 0.300 - - - 84.20 AHD Trading Division & Construction a)K0012+586-K0013+194; b)K0012+(-1250)- Satisfactory Division-Mandaue Branch) K0012+(-1141)

Square Cube Construction (Formerly: Square Cube Strengthening of Agas-Agas Bridge along 87.08% 1013 25120 L A MA GE1 Sogod, Southern Leyte 08/06/13 Final VIII LF 17.317 156 01/18/13 06/22/13 0.00 C 0.469 0.133 0.300 - - - 90.20 ONS Trading Division & Construction Daang Maharlika Satisfactory Division-Mandaue Branch)

Square Cube Construction (Formerly: Square Cube Const. of Maasin Flood Control along Maasin City, Southern 1014 25120 L A MA GE2 08/07/13 2nd VIII LF 39.502 270 01/18/13 10/14/13 12.43 O 0.371 0.240 0.150 0.006 0.047 0.050 86.40 AHD Trading Division & Construction Tomas Opus Street (Nat'l Rd.) Leyte Division-Mandaue Branch)

Square Cube Construction (Formerly: Square Cube Const. of Baybay Diversion Road, Sta. 1015 25120 L A MA GE1 Baybay City, Leyte 08/05/13 1st VIII LF 90.663 310 02/08/13 12/14/13 9.32 O 0.376 0.198 0.150 0.018 0.051 0.050 84.30 AHD Trading Division & Construction 0+000-Sta. 5+346.67, w/ exceptions Division-Mandaue Branch)

Square Cube Construction (Formerly: Square Cube Repair/Rehab. Of Slope/Seawall 85.26% 1016 25120 L A MA GE2 Motiong, Samar 08/16/13 Final VIII LF 15.146 90 11/22/12 02/19/13 4.45 C 0.391 0.200 0.300 - - - 89.10 AHD Trading Division & Construction Protection, Pob. Motiong Satisfactory Division-Mandaue Branch)

Square Cube Construction Rehab./Widening of Existing Pvmt. along (Formerly: Square Cube Dumalinao, 1017 25120 L A MA GE1 Pagadian City-Zamboanga City Rd. w/ 08/16/13 1st IX LF 37.801 255 02/11/13 10/23/13 3.00 O 0.325 0.288 0.150 0.018 0.033 0.033 84.70 AHD Trading Division & Construction exceptions K1675+(-031) Zamboanga del Sur Division-Mandaue Branch)

St. Bernardine Construction & Const. of Two (2) Cl One-Storey Sch. Sipocot, Camarines 1018 588 Enterprises (Formerly: St. 18474 L B MA GB1 08/03/13 1st V LF 1.141 150 05/17/13 10/13/13 3.67 O 0.344 0.300 0.150 0.030 0.055 0.033 91.20 AHD Bernardine Construction) Bldg., Sagrada Elem. Sch. Sur Steven Construction & Rd. Upgrading (Gravel to Paved) Banquerohan- 83.60% 1019 589 21987 L B MA GE1 Legazpi City 08/11/13 1st/Final V LF 9.485 111 01/31/13 05/21/13 0.00 C 0.384 0.152 0.300 - - - 83.60 ONS Supply Bariis-Sogoy-Sorsogon Bdry. Rd. Satisfactory Steven Construction & Cluster II Const. of Nine (9) Units One Storey, 82.50% 1020 21987 L B MA GB1 One (1) CL, Modified Type Sch. Bldg. (7 x 9), Marabut 08/16/13 1st/Final VIII LF 0.646 180 03/13/13 09/08/13 43.33 C 0.403 0.122 0.300 - - - 82.50 AHD Supply Satisfactory Brgy. Tinabanan PS Stronglane Construction & Repair of Cagnipa Flood Control 1021 590 32333 L C SB GE2 Calbayog City, Samar 08/13/13 1st VIII LF 2.996 75 07/07/13 08/20/13 0.74 O 0.380 0.235 0.150 0.030 0.060 0.033 88.80 AHD Trading Structure, Brgy. Canipa Stronglane Construction & Repair of Minlawaan Flood Control 1022 32333 L C SB GE2 Calbayog City, Samar 08/13/13 1st VIII LF 2.992 75 06/07/13 08/20/13 0.21 O 0.360 0.245 0.150 0.030 0.055 0.033 87.30 AHD Trading Structure, Brgy. San Policarpio Struktura Teknika Services Const. of Three (3) Storey, Six (6) Cl 1023 591 16646 L A MA GB1 San Juan City 08/06/13 1st NCR LF 8.243 270 05/21/13 02/14/14 8.89 O 0.362 0.240 0.150 0.030 0.041 0.033 85.60 AHD Company Sch. Bldg. at San Juan NHS Struktura Teknika Services Rehab. of Rds. along Union St., Brgy San 85.38% 1024 16646 L A MA GE1 Navotas City 08/12/13 Final NCR LF 6.205 138 12/18/12 05/04/13 3.31 C 0.455 0.133 0.300 - - - 88.80 AHD Company Jose (Pob) Satisfactory Struktura Teknika Services Const./Repair/Rehab. of MPB at EP Quarter, 92.50% 1025 16646 L A MA GB1 Lipa City, Batangas 07/29/13 1st/Final IVA LF 10.000 180 01/15/13 07/14/13 0.00 C 0.492 0.133 0.300 - - - 92.50 ONS Company Phil. Air Force San Fernando Air Base V. Satisfactory Prev. Maint. (Int. Sec.) CSR Jct. Pola, 83.90% 1026 592 STX Enterprises 24547 L AAA LB GE1 K0069+000-K0071+000, K0072+000- Pola, Oriental Mindoro 08/01/13 Final IVB LF 18.044 120 01/28/13 05/27/13 38.89 C 0.427 0.133 0.300 - - - 86.00 AHD Satisfactory K0072+895 Replacement/Rehab./Strengthening of Dawaic 1027 593 Sumag Builders Corporation 32894 L D SB GE1 Bridge along Mt. Province-Ilocos Sur via Tue Sabanga, Mt. Province 08/02/13 1st CAR LF 4.337 143 04/02/13 08/22/13 2.35 O 0.356 0.240 0.150 0.015 0.045 0.050 85.60 AHD Rd. Sunwest Construction and Development Corporation Legazpi Urban Drainage Impv't. Proj. 1028 594 15906 L AAA MB GE2 Legazpi City 08/14/13 1st V LF 141.207 334 01/14/13 12/13/13 -5.85 O 0.374 0.285 0.092 0.030 0.055 0.033 86.90 DEL (Formerly: Sunwest (Const./Impv. Of Dike @ Macabalo River) Construction and Supply) Rd. Upgrading (Gravel to Concrete) along Dualing-New Panay-Midsayap Rd., New Leon Supreme ABF Construction & 1029 595 25226 L A MB GE1 Sect., Cotabato a)Km.1701+(421)- Cotabato 08/12/13 1st XII LF 43.485 170 03/06/13 08/22/13 2.67 O 0.324 0.300 0.150 0.030 0.060 0.033 89.70 AHD Construction Supply Company Km.1702+527.50; b)Km.1704+292- Km.1704+540, New Leon Sect. Supreme ABF Construction and Const. of Revetment Wall along Aklan 88.10% 1030 25226 L A MA GE2 Banga, Aklan 08/17/13 1st/Final VI LF 16.254 180 12/19/12 06/16/13 1.11 C 0.381 0.200 0.300 - - - 88.10 AHD Construction Supply River, Taba-ao Satisfactory Completion of On-going Bridges (inc. Supreme ABF Construction and 1031 25226 L A MB GE1 Approaches) of Dungon Bridge along Jaro, Iloilo City 08/23/13 1st VI LF 14.865 210 02/01/13 08/30/13 12.54 O 0.389 0.240 0.150 0.030 0.037 0.033 87.90 AHD Construction Supply Mandurriao-Jaro Rd.

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 40 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Const./Impv't. of Rd. (Thermoplastic Pvmt. & Supreme ABF Construction and Pedestrian Crossing Markings), Bacolod-San Bacolod City, Negros 83.30% 1032 25226 L A MD GE1 08/07/13 1st/Final VI LF 9.118 35 06/11/13 07/15/13 0.00 C 0.333 0.200 0.300 - - - 83.30 ONS Construction Supply Carlos Rd., K0005+1083-K0013+580 w/ Occidental Satisfactory exceptions Supreme ABF Construction and Rd. Upgrading of Isabela-Libas Negros Isabela, Negros 1033 25226 L A MB GE1 08/10/13 2nd VI LF 33.414 203 01/28/13 08/18/13 -5.53 O 0.300 0.208 0.095 0.030 0.035 0.050 71.80 DEL Construction Supply Occidental Bdry. Rd., K0081+000-K0083+000 Occidental Const. of 2-Storey, 6-Cl RGR Type Sch. Bldg., 1034 596 T. Solomon Construction 10046 L B MA GB1 Sta. Anastacia-San Rafael NHS, Brgy. San Sto. Tomas, Batangas 08/01/13 1st IVA LF 13.643 210 04/10/13 11/05/13 3.01 O 0.333 0.300 0.150 0.030 0.018 0.033 86.40 AHD Rafael Assess Critical Bottlenecks, Traffic Decongestion, Widening of Digos-Makar Rd., 90.50% 1035 597 T. Square Builders 14268 L B MA GE1 General Santos City 08/22/13 1st/Final XII LF 46.576 170 02/24/13 08/12/13 0.00 C 0.410 0.195 0.300 - - - 90.50 ONS South Cotabato Sub-DEO, K1642+071- V. Satisfactory K1644+470 Rehab./Impv't. of Rd. Slip along Sarangani- Glan, Sarangani 88.22% 1036 T. Square Builders 14268 L B MA GE1 Davao del Sur Coastal Rd., Nacolyael-Small 08/20/13 Final XII LF 19.711 207 12/16/12 07/10/13 27.10 C 0.393 0.200 0.300 - - - 89.30 AHD Margus Sect., Km.1729+244-Km.1729+594 Province Satisfactory Const. of Lined Canal/Flood Control along 1037 T. Square Builders 14268 L B MA GE2 Marbel-Makar Rd., Apopong Sect., Brgy. General Santos City 08/23/13 1st XII LF 17.323 213 04/16/13 11/14/13 11.57 O 0.338 0.240 0.150 0.022 0.047 0.033 83.00 AHD Apopong Impv't. of Major Intersections along Manila T.J. Velasco Construction & 91.20% 1038 598 10560 L A MA GE1 North Rd., Binalonan-Asingan-Sta. Maria Rd., Binalonan, Pangasinan 08/09/13 Final I LF 6.717 110 01/31/13 05/20/13 0.00 C 0.488 0.133 0.300 - - - 92.10 ONS Supply K0190+(-247)-K0190+003, Binalonan Sect. V. Satisfactory Rd. Upgrading along Banaue-Hungduan- 88.94% 1039 599 T.N.J. Buhong Construction 19687 L B MA GE1 Benguet Bdry. Rd., K0364+365-K0367+980 Hungduan, Ifugao 08/04/13 Final CAR LF 40.770 344 01/19/12 12/27/12 0.00 C 0.454 0.133 0.300 - - - 88.70 ONS Satisfactory (w/ exceptions) Rd. Upgrading along Banaue-Hungduan- 82.04% 1040 T.N.J. Buhong Construction 19687 L B MA GE1 Tinoc, Ifugao 08/04/13 Final CAR LF 19.336 194 01/31/12 08/12/12 0.00 C 0.421 0.133 0.300 - - - 85.40 ONS Benguet, K0348+380-K0353+549 Satisfactory Tabada Construction & Santiago, Agusan del 83.50% 1041 600 35997 L D SB GE1 Conc. of Road Pob. II, Babag 3 Brgy. Rd. 08/06/13 1st/Final XIII LF 6.606 48 05/30/13 07/16/13 0.00 C 0.402 0.133 0.300 - - - 83.50 ONS Supplies Norte Satisfactory Installation of Curb & Gutter, Widening Blocks 90.00% 1042 601 Tadian General Construction 35339 L D SB GE1 & Safety Devices along Mt. Province-Ilocos Sur Mt. Province 08/02/13 1st/Final CAR LF 3.558 140 08/08/12 12/26/12 0.00 C 0.467 0.133 0.300 - - - 90.00 ONS V. Satisfactory via Kayan Rd., K0396+445-K0399+000 Tanon Construction & Rehab./Reconst./Replacement/Retroffiting of 86.20% 1043 602 32844 L D SB GE2 Tinahaban Bridge 1 along Bacolod North Rd. Negros Occidental 08/12/13 1st/Final VI LF 3.654 37 02/12/13 03/20/13 67.57 C 0.423 0.139 0.300 - - - 86.20 AHD Supplies Satisfactory E.B. Magalona Tantuco Construction & Const. of Eco-Tourism Rd. (LUC-BATCR) Trading Corporation (Formerly: 1044 603 7255 L A MA GE1 Phase III inc. RROW, Ilayang Talim-Isabang Lucena City 08/03/13 1st IVA LF 41.815 160 06/07/13 11/13/13 2.72 O 0.266 0.298 0.150 0.030 0.042 0.050 83.60 AHD Tantuco Lumber & Construction Sect. Supply) Tapnio and Tan Construction & Const. of Three (3) Sch. Bldgs., Nine (9) 1045 604 10798 L B MA GB1 Caloocan City 08/13/13 1st NCR LF 12.545 210 03/27/13 10/22/13 1.87 O 0.282 0.240 0.150 0.030 0.058 0.050 81.00 AHD Development Corporation Cl at Sampaguita ES Tapnio and Tan Construction & 1046 10798 L B MA GB1 Const. of 4 storey 12 Cl. at Toro Hills, E/S Quezon City 08/02/13 1st NCR LF 22.612 180 03/27/13 09/22/13 14.40 O 0.298 0.240 0.150 0.030 0.041 0.033 79.20 AHD Development Corporation Prev. Maint. of Dapitan St., Q.C. 89.40% 1047 605 The Steadfast Builders 8176 L A MA GE1 Quezon City 08/02/13 1st/Final NCR LF 6.989 90 03/25/13 06/22/13 4.44 C 0.394 0.200 0.300 - - - 89.40 AHD (K0005+568.80-K0008+174.30) Int. Sect. V. Satisfactory Road & Drainage Impv't. along P. 85.80% 1048 The Steadfast Builders 8176 L A MA GE1 Sta. Mesa, Manila 07/29/13 1st/Final NCR LF 6.365 147 01/31/13 06/26/13 12.24 C 0.425 0.133 0.300 - - - 85.80 AHD Sanchez St. Satisfactory Rd. Upgrading (Gravel to Concrete) along Three W Builders Inc. / Sophia Awang-Upi-Lebak-Kalamansig-Palimbang- Palimbang, Sultan 1049 606 JV-12-258 L AAA LB GE1 08/18/13 1st XII LF 46.021 181 04/02/13 09/29/13 13.77 O 0.384 0.236 0.150 0.024 0.051 0.033 87.80 AHD Construction and Supply (JV) Sarangani Rd., Km.2041+691-Km.2043+919 Kudarat w/ exception Installation/Application/Const. of Rd. Safety 91.60% 1050 607 Three W Builders, Inc. 10722 L AAA LB GE1 Devices at Old Manila South Rd., Calamba Calamba City, Laguna 08/10/13 1st/Final IVA LF 9.702 263 7/16/2012 04/04/13 13.69 C 0.483 0.133 0.300 - - - 91.60 AHD Sect. (Sta. 50+120) V. Satisfactory Repair/Rehab./Impv't. of Mayapa-Canlubang 89.60% 1051 Three W Builders, Inc. 10722 L AAA LB GE1 Calamba City, Laguna 08/10/13 1st/Final IVA LF 9.704 30 12/07/12 01/05/13 0.00 C 0.463 0.133 0.300 - - - 89.60 ONS Rd., K0050+(-750)-K0050+000 (w/ exceptions) V. Satisfactory Road Upgrading (Gravel to Paved) (Int. Sect.) inc. Drainage & Rd. Facilities Lumbia-Uquiaban 1052 Three W Builders, Inc. 10722 L AAA LB GE1 Cagayan de Oro City 08/11/13 2nd X LF 38.892 224 01/29/13 09/09/13 -1.80 O 0.351 0.300 0.132 0.007 0.050 0.050 89.00 DEL By Pass Rd. a)Km.1461+861-Km.1462+093; b)Km.1462+2950-Km.1463+760 Three W Builders, Inc. / Prev. Maint. (MFO-1), Asphalt Overlay along 90.50% 1053 608 Almakar Builders and Metal JV-12-266 L AAA MA GE1 Crisanto M. Delos Reyes Ave., K0060+143 Cavite 08/13/13 1st/Final IVA LF 19.954 60 02/28/13 04/28/13 0.00 C 0.472 0.133 0.300 - - - 90.50 ONS Works Joint Venture K0062+143 V. Satisfactory Repair/Maint. of Bucay Flood Control; 90.50% 1054 609 Thunder Construction 17247 L B SB GE2 Repair/Maint. of Sinalang Flood Control Abra 08/14/13 1st/Final CAR LF 2.224 36 12/12/12 01/17/13 0.00 C 0.472 0.133 0.300 - - - 90.50 ONS (Package), Bucay & Bangued V. Satisfactory Rd. Upgrading (Gravel to Conc.) FMR leading 86.20% 1055 Thunder Construction 17247 L B MA GE1 Bucay, Abra 08/15/13 1st/Final CAR LF 18.437 120 01/21/13 05/20/13 19.17 C 0.429 0.133 0.300 - - - 86.20 AHD to Borokibok Spring Resort Satisfactory Rd. Upgrading (Gravel to Conc.) along Kalinga- Abra Rd., K0476+000-K0479+697 w/ Tokwing Construction Corp. exception, (K0476+000-K0479+539 (w/ 1056 610 (Formerly: Tokwing 9650 L AAA LB GE1 exception) as per RBIA & K0480+300- Kalinga 08/08/13 3rd CAR LF 124.174 448 06/25/12 09/15/13 -7.05 O 0.333 0.300 0.150 0.030 0.050 0.033 89.60 DEL Construction) K0482+640, (K0480+342-K0482+081 as per RBIA) Balenciagao Norte, Pasil & Balbalan Proper Sect. Top Most Development and Const. of Drainage System, Arnaldo Blvd., Km. 85.10% 1057 611 13361 L B SB GE2 Roxas City, Capiz 08/18/13 1st/Final VI LF 9.034 115 11/23/12 03/18/13 0.00 C 0.351 0.200 0.300 - - - 85.10 ONS Marketing Corp. 116+400-Km. 118+100 Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 41 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Toptech Trading & Construction Rehab./Reconst./Upgrading of Damaged Paved 83.40% 1058 612 Co. Inc. (Formerly: Top Tech 25522 L A MA GE1 Nat'l. Rds. (MFO-2), (Int. Sect.) Banay-banay- Cuenca, Batangas 08/02/13 1st/Final IVA LF 7.737 45 03/13/13 04/26/13 4.44 C 0.395 0.139 0.300 - - - 83.40 AHD Trading and Construction) Mojon-Rd., K0090+229-K0090+849 Satisfactory

Toreja's Construction Supply Widening along Palico-Balayan-Batangas 90.06% 1059 613 15453 L AAA LA GE1 Lemery, Batangas 07/30/13 Final IVA LF 9.667 141 01/02/13 05/22/13 0.00 C 0.464 0.133 0.300 - - - 89.70 ONS Corporation Rd., Mahayhay Jct. V. Satisfactory Const. of Conner Central NHS Talifugu 1060 614 Tribu Design & Construction 12756 L A MA GB1 Conner, Apayao 08/10/13 1st CAR LF 5.379 120 04/01/13 07/29/13 -18.48 O 0.368 0.300 0.000 0.015 0.041 0.017 74.10 DEL Annex Rehab./Impv't. of Bacolod North Rd. at Sagay City, Negros 87.60% 1061 615 Trimluv Builders and Supply 33467 L A MA GE1 K0038+883-K0039+363 (Km. 76+620 w/ 08/12/13 1st/Final VI LF 8.927 84 01/18/13 04/12/13 0.00 C 0.443 0.133 0.300 - - - 87.60 ONS Occidental Satisfactory exception) Triparco Development Repair/Rehab./Impvt. of Surigao-Davao Coastal Lingig, Surigao del 88.90% 1062 616 23327 L A MA GE1 Rd., Mangagoy-Lingig Sect., Km.1469+344- 08/17/13 1st/Final XIII LF 9.900 105 04/23/13 08/05/13 0.00 C 0.456 0.133 0.300 - - - 88.90 ONS Corporation Sur Satisfatory Km.1469+985 Repair/Rehab./Impvt. of Daang Maharlika Triparco Development Kitcharao, Agusan del 86.70% 1063 23327 L A MA GE1 (Surigao-Agusan Rd.) along Pob. Sect., 08/08/13 1st/Final XIII LF 9.602 45 03/12/13 04/25/13 0.00 C 0.434 0.133 0.300 - - - 86.70 ONS Corporation K1167+177-K1167+997 w/ exception Norte Satisfactory Repair/Rehab./Impv't. of GCVR, Gingoog City Triparco Development Gingoog City, 92.80% 1064 23327 L A MA GE1 Sect., Km.1317+146-Km.1317+937 w/ 08/20/13 1st/Final X LF 9.402 38 03/18/13 04/24/13 0.00 C 0.428 0.200 0.300 - - - 92.80 ONS Corporation exception Misamis Oriental V. Satisfactory Triparco Development Repair/Rehab./Impv't. of GCVR, Gingoog City Gingoog City, 90.20% 1065 23327 L A MA GE1 Sect., Km.1316+354-Km.1317+146 w/ 08/20/13 1st/Final X LF 9.415 38 03/18/13 04/24/13 0.00 C 0.402 0.200 0.300 - - - 90.20 ONS Corporation Misamis Oriental V. Satisfactory exception Prev. Maint. (Asphalt Overlay) of Cainta- Triple 8 Construction & Kaytikling-Antipolo-Teresa Road, 1. 89.10% 1066 617 10684 L B MA GE1 Rizal 08/15/13 1st/Final IVA LF 7.162 179 01/29/13 07/26/13 0.00 C 0.458 0.133 0.300 - - - 89.10 ONS Supply K0018+(035)-K0018+655; K0020+000- V. Satisfactory K0021+300 (Int. Sect.) Triple 8 Construction & Widening of Cavite-Batangas Rd., 83.74% 1067 10684 L B MA GE1 Imus, Cavite 08/14/13 Final IVA LF 31.912 369 02/07/12 02/09/13 0.00 C 0.347 0.200 0.300 - - - 84.70 ONS Supply Km.25+306-Km.26+960 Satisfactory Const./Widening/Upgrading/Rehab. of Access TSD Builders Construction Bacolod City, Negros 1068 618 22129 L A MA GE1 Rd. to Declared Tourism Destination along 08/06/13 1st VI LF 23.350 218 02/26/13 10/01/13 -8.71 O 0.397 0.240 0.063 0.023 0.047 0.033 80.30 DEL and Supply Bacolod City Bdry. Rd. Occidental Rd. Upgrading (Gravel to Concrete) of Bansalan 1069 619 Ulticon Builders, Inc. 17267 L AAA LB GE1 Davao del Sur 08/06/13 1st XI LF 56.518 237 03/19/13 11/10/13 0.02 O 0.373 0.286 0.150 0.030 0.028 0.033 90.00 AHD Mt. Apo Nat'l Park Rd., Bansalan Repair/Rehab./Impv't. of Road along Sayre Malaybalay City, 90.10% 1070 Ulticon Builders, Inc. 17267 L AAA LB GE1 Highway, Laguitas, Km.1513+252 - 08/09/13 1st/Final X LF 9.496 137 03/08/13 07/22/13 0.00 C 0.468 0.133 0.300 - - - 90.10 ONS Km.1514+914 (Phase II) Bukidnon V. Satisfactory Repair/Rehab./Impv't. of Rd. along Sayre Malaybalay City, 85.60% 1071 Ulticon Builders, Inc. 17267 L AAA LB GE1 Highway, Laguitas, Km.1513+252- 08/09/13 1st/Final X LF 4.494 137 03/08/13 07/22/13 0.00 C 0.423 0.133 0.300 - - - 85.60 ONS Bukidnon Satisfactory Km.1514+914 Assets Preservation of Nat'l Rds. Int. Sect. Sayre Highway, a) K1555+270-K1556+000; b) 85.14% 1072 Ulticon Builders, Inc. 17267 L AAA LB GE1 Maramag, Bukidnon 08/08/13 Final X LF 22.857 75 01/24/13 04/08/13 0.00 C 0.401 0.133 0.300 - - - 83.40 ONS K1559+000-K1560+000; c)K1560+330- Satisfactory K1561+000 Widening of Sayre Highway, Lumbo-Musuan 83.12% 1073 Ulticon Builders, Inc. 17267 L AAA LB GE1 Maramag, Bukidnon 08/20/13 Final X LF 21.668 183 01/24/13 07/25/13 8.20 C 0.388 0.133 0.300 - - - 82.10 AHD Sect., K1540+249-K1540+344 Satisfactory

Rd. Upgrading (Gravel to Paved) Int. Sect., Zamboanga West Coast Rd., Limpapa-Sibuco Sibuco, Zamboanga 1074 620 Unitec Builder, Inc. 4803 L A MB GE1 08/05/13 1st IX LF 46.026 201 02/21/13 09/09/13 1.54 O 0.343 0.238 0.150 0.030 0.037 0.033 83.10 AHD Sect.) K1979+(-685)-K1980+000- K1981+980 del Norte Re: K1979+(-685)-K1981+980 w/ exceptions Rehab./Reconst./Strengthening of Bridges at 1075 Unitec Builder, Inc. 4803 L A MB GE1 Ayala Bridge #2 along Zamboanga City-Labuan- Zamboanga City 08/05/13 4th IX LF 30.963 375 06/28/12 07/07/13 -14.98 O 0.374 0.300 0.000 0.030 0.047 0.033 78.40 DEL Limpapa Rd. Impv't./Downgrading of Zamboanga City/Zamboanga del Norte Bdry. to Sibuco, 66.64% 1076 Unitec Builder, Inc. 4803 L A MB GE1 Zamboanga del Norte 08/05/13 Final IX LF 64.362 285 05/23/12 03/03/13 - C 0.452 0.014 0.000 - - - 46.60 DEL Limapa-Malayal Sect., Sta.1978+640- Poor Sta.1979+680 w/ exception Unitec Builder, Inc. / RNMK Rd. Upgrading (Gravel to Paved) of Bugko- Mondragon, Northern 1077 621 Construction and Development JV-12-315 L A MB GE1 Nenita-Mirador Cagpanitan-De Maria-San Jose 08/09/13 1st VIII LF 134.287 300 02/27/13 12/23/13 24.42 O 0.356 0.289 0.150 0.030 0.060 0.050 93.50 AHD (JV) Rd., Sta.6+141-Sta.11+091 w/ exceptions Samar

Uy Construction and Const. of Misamis Oriental-Bukidnon By-Pass Manolo Fortich, 1078 622 12336 L AA MB GE1 08/07/13 1st X LF 46.318 209 01/23/13 08/19/13 3.26 O 0.330 0.281 0.150 0.030 0.045 0.033 86.90 AHD Development Rd. PHIVEDEC-Alae Sect., Mantibugao Bukidnon Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. along Kalinga-Cagayan Rd. (Calanan- 1079 623 V U C Engineering 7918 L B MA GE1 Tabuk City, Kalinga 08/09/13 2nd CAR LF 32.811 196 02/04/13 08/18/13 3.97 O 0.350 0.300 0.150 0.030 0.040 0.033 90.30 AHD Enrile Sect.) K0398+366-K0499+000 & K0499+306-K0499+892 V.R. Patron Builders & Const. of Two (2) Pedestrian Overpass at 88.03% 1080 624 13487 L AAA MB GE1 Manila-Batangas Rd. Alangilan (BSU) & Batangas City 07/31/13 Final IVA LF 27.936 420 02/14/12 04/08/13 3.33 C 0.462 0.133 0.300 - - - 89.50 AHD Developers Satisfactory Kumintang Ibaba Sect. V.R. Patron Builders & Const./Replacement of Doña Alicia Bridge 1081 13487 L AAA MA GE2 Taysan, Batangas 07/29/13 1st IVA LF 38.800 405 01/11/12 02/18/13 -5.04 O 0.347 0.300 0.100 0.030 0.047 0.025 84.90 DEL Developers at Batangas-Lobo Rd. Widening of Manila-Batangas Road inc. V.R. Patron Builders & Drainage Structure, Banay-Banay-San Jose 84.46% 1082 13487 L AAA MB GE1 Lipa City, Batangas 07/29/13 Final IVA LF 19.159 180 01/14/13 07/12/13 24.08 C 0.373 0.165 0.300 - - - 83.80 AHD Developers Sect. Km.85+200-Km.86+400 (One Side Only) Satisfactory w/ exception Rehab./Reconst./Upgrading of Damaged Paved Bacolod City, Negros 90.40% 1083 625 V3 Industrial Corporation 31403 L C SB GE1 Nat'l Secondary Rd. along Bacolod Circ. Rd. 08/06/13 1st/Final VI LF 8.514 91 02/19/13 05/20/13 0.00 C 0.471 0.133 0.300 - - - 90.40 ONS (S), K0009+424-K0009+844 Occidental V. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 42 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Velonta Construction & Prev. Maint. (Int. Sect.), Arterial Rd., N. 63.20% 1084 626 32346 L D SB GE1 Bacalso Ave. (Cebu South), Chainage 0810- Cebu City 08/24/13 Final VII LF 0.969 29 02/05/13 03/05/13 - C 0.486 0.200 0.000 - - - 68.60 DEL Supply Poor Chainage 0850 Conc. of Unisan-Jct.-Panaon Rd. (Poctol Sect.), 84.52% 1085 627 Ven Ray Construction 18310 L AA MB GE1 Quezon 08/08/13 Final IVA LF 38.151 180 12/03/12 05/31/13 0.00 C 0.395 0.144 0.300 - - - 83.90 ONS K0192+262-K0194+045 Satisfactory

Prev. Maint.(Int. Sect.), Arterial Rd., N. Bacalso 1086 Ven Ray Construction 18310 L AA MB GE1 Ave. (Osmeña Blvd. Sect.); a)K0001+000- Cebu City 08/24/13 1st VII LF 22.202 108 05/21/13 09/06/13 9.91 O 0.327 0.300 0.150 0.030 0.055 0.050 91.20 AHD K0001+726 & b)K0001+(-105)-K0001+000

Repair/Rehab./Impv't. of Natalio Bacalso Ave., 90.90% 1087 Ven Ray Construction 18310 L AA MB GE1 Carcar Sect., Km.39+999-Km.0040+592 w/ Carcar City, Cebu 08/06/13 1st/Final VII LF 9.381 45 06/17/13 07/31/13 64.45 C 0.476 0.133 0.300 - - - 90.90 AHD V. Satisfactory exceptions Repair/Rehab. of Terminal Bldg. Access Rd., 90.10% 1088 Ven Ray Construction 18310 L AA MB GE1 Lapu-Lapu City, Chainage 0000-Chainage 0989 Lapu-Lapu City, Cebu 08/12/13 1st/Final VII LF 28.638 82 01/24/13 04/15/13 3.66 C 0.401 0.200 0.300 - - - 90.10 AHD (Prev. Maint.) V. Satisfactory Const./Replacement of Cabitoonan Bridge & 1089 Ven Ray Construction 18310 L AA MB GE1 Approaches along Toledo-Pinamungajan- Toledo City, Cebu 08/07/13 1st VII LF 25.628 174 04/02/13 09/22/13 1.94 O 0.384 0.240 0.150 0.030 0.047 0.033 88.40 AHD Aloguinsan-Mantalongon Rd., K0052+(-20) Repair/Rehab./Impv't. along Santander-Barili- 87.80% 1090 Ven Ray Construction 18310 L AA MB GE1 Malabutok, Cebu 08/09/13 1st/Final VII LF 9.595 60 04/03/13 06/01/13 78.33 C 0.441 0.137 0.300 - - - 87.80 AHD Toledo Rd., K0160+036-K0161+636 Satisfactory Conc. of Balilihan-Hanopol-Batuan Rd., Balilihan, Bohol 87.00% 1091 Ven Ray Construction 18310 L AA MB GE1 08/15/13 1st/Final VII LF 37.644 320 07/07/12 05/22/13 0.31 C 0.419 0.151 0.300 - - - 87.00 AHD K0023+(-263)-K0024+863 Province Satisfactory Rd. Upgrading (Conc.) of Tapal (Carcar)- 1092 Ven Ray Construction 18310 L AA MB GE1 Zaragosa-Olango-Aloguinsan Rd., K0080+065- Aloguinsan, Cebu 08/07/13 1st VII LF 43.174 219 01/24/13 08/30/13 0.12 O 0.337 0.263 0.150 0.030 0.055 0.033 86.80 AHD K0081+622 Repair/Rehab./Impv't. along Santander-Barili- 85.50% 1093 Ven Ray Construction 18310 L AA MB GE1 Ginatilan, Cebu 08/09/13 1st/Final VII LF 9.589 60 04/03/13 06/01/13 78.33 C 0.418 0.137 0.300 - - - 85.50 AHD Toledo Rd., K0156+890-K0157+740 Satisfactory

Prev. Maint. (Asphalt Overlay) along North Hagnaya Wharf Rd. (Int. Sect.), Sect. 1- K0045+800-K0046+000; Sect. 2- K0046+000- K0046+170; Sect. 3- K0046+918-K0047+154; 85.50% 1094 Ven Ray Construction 18310 L AA MB GE1 Catmon, Cebu 08/13/13 1st/Final VII LF 42.263 110 02/19/13 06/08/13 0.91 C 0.422 0.133 0.300 - - - 85.50 AHD Sect. 4- K0047+596-K0047+736; Sect. 5- Satisfactory K0048+583-K0049+200; Sect. 6- K0049+200- K0050+000; Sect. 7- K0051+400-K0051+700; Sect. 8- K0051+700-K0052+058

Prev. Maint. (Asphalt Overlay) along Cebu North Hagnaya Wharf Rd (Int. Sect.) Sect. 1 - K0061+399-K0062+691; Section 2- 84.90% 1095 Ven Ray Construction 18310 L AA MB GE1 Sogod, Cebu 08/13/13 1st/Final VII LF 41.402 84 02/19/13 05/13/13 1.19 C 0.416 0.133 0.300 - - - 84.90 AHD K0069+149-K0070+009; Section 3- Satisfactory K0070+009-K0070+159; Section 4- K0070+159-K0070+567 84.46% 1096 Ven Ray Construction 18310 L AA MB GE1 Rehab. of Cebu North Hagnaya Wharf Rd. Cebu 08/13/13 Final VII LF 124.975 270 06/05/12 03/01/13 7.00 C 0.377 0.200 0.300 - - - 87.70 AHD Satisfactory Asphalt Overlay (Prev.) of Toledo- 82.76% 1097 Ven Ray Construction 18310 L AA MB GE1 Pinamungajan-Aloguinsan-Mantalongon Rd., Toledo City, Cebu 08/07/13 Final VII LF 13.163 30 01/24/13 02/22/13 30.00 C 0.459 0.200 0.300 - - - 95.90 AHD K0055+033-K0057+000, Brgy. Bato Satisfactory 86.40% 1098 Ven Ray Construction 18310 L AA MB GE1 Repair/Asphalt Overlay of Rd., Cugman Cagayan de Oro City 08/22/13 1st/Final X LF 9.493 45 05/21/13 07/04/13 0.00 C 0.431 0.133 0.300 - - - 86.40 ONS Satisfactory Conc. of Shoulders w/ Provisions of Turn-Outs & Lined Canal along Butuan City-Cagayan de 82.16% 1099 Ven Ray Construction 18310 L AA MB GE1 Misamis Occidental 08/21/13 Final X LF 5.702 75 10/03/12 12/16/12 0.00 C 0.414 0.200 0.300 - - - 91.40 ONS Oro-Iligan City Rd. (BCIR), Tagbocboc- Satisfactory Balingoan-Esperanza Sect. Conc. of Shoulders along Suggbongcogon- 82.04% 1100 Ven Ray Construction 18310 L AA MB GE1 Misamis Oriental 08/21/13 Final X LF 5.116 75 10/03/12 12/16/12 0.00 C 0.411 0.200 0.300 - - - 91.10 ONS Binuangan-Ampenican-Lagonglong Sect. Satisfactory Venus Engineering & Rehab. of Brgy. Rd., Brgys. Anahawan- 90.40% 1101 628 33614 L D SB GE1 Bato, Leyte 08/08/13 1st/Final VIII LF 4.805 90 04/01/13 06/29/13 0.00 C 0.471 0.133 0.300 - - - 90.40 ONS Construction Himama-a Baliw V. Satisfactory Conc./Widening of Marbel-Makar Rd., Polonuling, South 89.60% 1102 629 Vertical Builders 14029 L A MA GE1 08/23/13 Final XII LF 18.962 185 01/14/13 07/17/13 1.08 C 0.428 0.195 0.300 - - - 92.30 AHD Polonuling/Simbo Sect. Cotabato V. Satisfactory Widening of Jct. Digos-Makar-Buayan Rd., 87.80% 1103 Vertical Builders 14029 L A MA GE1 General Santos City 08/23/13 1st/Final XII LF 23.121 125 04/14/13 08/16/13 0.00 C 0.387 0.191 0.300 - - - 87.80 ONS Gen. Santos City, K1649+095-K1650+425 Satisfactory Address Critical Bottlenecks, Traffic Decongestion, Conc./Widening of Marbel- 86.42% 1104 Vertical Builders 14029 L A MA GE1 Tupi, South Cotabato 08/23/13 Final XII LF 18.818 107 02/21/13 06/07/13 - C 0.444 0.200 0.216 - - - 86.00 DEL Makar Rd., South Cotabato, Sub-DEO, Simbo Satisfactory Sect. Widening/Reconst. along Davao-Cotabato 1105 630 Vicente T. Lao Construction 7040 L AAA LB GE1 Davao City 08/21/13 1st XI LF 50.141 243 03/25/13 11/22/13 -2.45 O 0.346 0.300 0.126 0.030 0.030 0.033 86.50 DEL Rd. (Davao City-Jct. Digos) Asphalt Overlay/Repair & Rehab. of Nabunturan, Comval 82.30% 1106 Vicente T. Lao Construction 7040 L AAA LB GE1 Nabunturan-Mainit Park Rd., Pob. Sect., 08/14/13 1st/Final XI LF 9.588 53 06/20/13 08/11/13 0.00 C 0.390 0.133 0.300 - - - 82.30 ONS Province Satisfactory Km.1425+723-Km.1426+174 Impv't. of Bacolod South Rd., Recreo-Tuguis Pontevedra, Negros 92.40% 1107 Vicente T. Lao Construction 7040 L AAA LB GE1 08/11/13 1st/Final VI LF 8.013 83 03/06/13 05/27/13 3.00 C 0.491 0.133 0.300 - - - 92.40 AHD Sect., K0043+967-K0044+308 Occidental V. Satisfactory Prev. Maint. (Int. Sect.), Bacolod South Rd. Kabankalan City & Ilog, 1108 Vicente T. Lao Construction 7040 L AAA LB GE1 08/08/13 1st VI LF 17.286 150 03/22/13 08/18/13 -7.89 O 0.363 0.300 0.071 0.030 0.056 0.033 85.30 DEL (Kabankalan-Hinoba-an Sect.) Negros Occidental

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 43 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION

Prev. Maint. along Dipolog-Polanco-Piñan Jct.- 86.32% 1109 Vicente T. Lao Construction 7040 L AAA LB GE1 Oroquieta Rd., 1)Km.1833+834-Km.1834+600; Dipolog City 08/22/13 Final IX LF 6.996 46 02/26/13 04/12/13 0.00 C 0.399 0.133 0.300 - - - 83.20 ONS 2)Km.1834+600-Km.1834+700 Satisfactory Prev. Maint. (Int. Sect.) Zamboanga City- 1110 Vicente T. Lao Construction 7040 L AAA LB GE1 Labuan-Limpapa Rd., Sta.1938+141- Zamboanga City 08/05/13 2nd IX LF 95.845 300 10/04/12 07/31/13 -5.12 O 0.346 0.300 0.099 0.030 0.037 0.033 84.50 DEL Sta.1945+490 Rd. Upgrading (Gravel to Paved) of Sindangan- Siayan, Zamboanga 1111 Vicente T. Lao Construction 7040 L AAA LB GE1 Siayan-Dumingag-Mahayag Rd., Sta.1942+320- 08/23/13 2nd IX LF 184.569 484 05/14/12 09/09/13 0.58 O 0.274 0.278 0.150 0.023 0.059 0.050 83.40 AHD Sta.1948+380 w/ exceptions del Norte Const. of Flood Control System along Palico- 88.32% 1112 631 Vicmar Construction, Inc. 28997 L AAA SB GE2 Balayan-Lemery Diversion Rd., K0129+560- Taal, Batangas 07/30/13 Final IVA LF 9.695 150 02/21/13 07/20/13 6.00 C 0.382 0.200 0.300 - - - 88.20 AHD Satisfactory K0131+700 (Int. Sect.) Widening of Manila North Rd.: a) K0405+000- 1113 632 Vigan Fortune Construction 3887 L A MA GE1 K0407+880; b)K0409+583-K0412+500- Ilocos Sur 08/13/13 2nd I LF 8.178 213 01/24/13 08/24/13 2.04 O 0.319 0.285 0.150 0.030 0.042 0.050 87.60 AHD K0415+080 Replacement/Rehab./Strengthening of 1114 Vigan Fortune Construction 3887 L A MA GE1 Permanent Bridge, Sta. Lucia Bridge along Ilocos Sur 08/13/13 2nd I LF 11.047 201 01/28/13 08/16/13 1.22 O 0.371 0.200 0.150 0.030 0.042 0.033 82.60 AHD MNR Viguz Construction Corporation Const. of Busay Bridge, along Barugo- 1115 632 8178 L B MA GE1 Barugo, Leyte 08/17/13 1st VIII LF 17.689 190 02/28/13 09/05/13 3.79 O 0.377 0.231 0.150 0.015 0.047 0.050 87.00 AHD (Formerly: Viguz Construction) Babatngon Rd. Rehab./Reconst. of Damaged Paved Nat'l Rds., Viguz Construction Corporation 86.88% 1116 8178 L B MA GE1 Dulag-Julita-Burauen Rd., K0954+000- Leyte 08/17/13 Final VIII LF 21.985 160 01/15/13 06/23/13 0.00 C 0.461 0.133 0.300 - - - 89.40 ONS (Formerly: Viguz Construction) K0955+162; K0952+794-K0953+000 Satisfactory Prev. Maint. (Int. Sect.) Nat'l Arterial Rd., Viking Construction and 89.50% 1117 633 18129 L A MB GE1 K0490+(-839)-K0490+074, Ilocos Norte- Ilocos Norte 08/16/13 Final I LF 12.067 74 01/24/13 04/07/13 0.00 C 0.411 0.133 0.300 - - - 84.40 ONS Supplies Apayao Rd. V. Satisfactory Const. of Slope Protection (Upstream) Viking Construction and Installation of Rd. Signs & Pvmt. Studs/Impv't. 86.10% 1118 18129 L A MB GE1 Bangui, Ilocos Norte 08/16/13 1st/Final I LF 1.732 22 06/03/13 06/24/13 0.00 C 0.428 0.133 0.300 - - - 86.10 ONS Supplies of Masonry Walls of Bungao Bridge along Satisfactory MNR Viking Construction and Rehab./Impv't. of MNR, K0412+000- Sto. Domingo, Ilocos 1119 18129 L A MB GE1 08/13/13 2nd I LF 32.307 209 02/14/13 09/10/13 7.81 O 0.326 0.264 0.150 0.030 0.047 0.033 85.00 AHD Supplies K0416+000 w/ exceptions Sur Const./Widening/Upgrading/Rehab.of Acess Rds. to Declared Tourism destinations Maoini Viking Construction and Pagudpud, Ilocos 1120 18129 L A MB GE1 Baduang-Saud Rd., a)Sta. 0+00 equivalent to 08/15/13 1st I LF 88.609 180 03/12/13 09/07/13 -4.59 O 0.369 0.300 0.104 0.030 0.047 0.033 88.30 DEL Supply Sta. 558+000-Sta. 5+021.90 (Sect. 1) b)Sta. Norte 3+282.52-Sta. 0+000 (w/ exceptions) Impvt./Upgrading of Flood Control & Drainage Villar General Construction 1121 634 22540 L D SB GE2 Structures along Manila North Rd., Km. Agoo, La Union 08/01/13 1st I LF 13.539 180 03/26/13 09/21/13 23.45 O 0.358 0.300 0.150 0.030 0.037 0.033 90.80 AHD and Supplies 239+000-Km.250+500 w/ exception Const. of MPB, Isaac Lopez Integrated 1122 635 Virac NRC Construction 11369 L B SB GB1 Mandaluyong City 08/06/13 1st NCR LF 9.659 120 05/31/13 09/27/13 21.05 O 0.326 0.240 0.150 0.030 0.041 0.050 83.70 AHD Sch., Brgy. Vergasa Rehab./Reconst./Upgrading of Damaged Paved 89.90% 1123 636 VRF Construction 15301 L A MA GE1 Daang Maharlika Rd., Nueva Ecija 2nd Nueva Ecija 08/09/13 1st/Final III LF 91.277 335 06/29/12 05/30/13 0.00 C 0.466 0.133 0.300 - - - 89.90 ONS Congressional V. Satisfactory Asset Preservation of Nat'l Rd. Generated from Pvmt. Mgt. System/Highway Dev. & Mgt. 86.00% 1124 VRF Construction 15301 L A MA GE1 Aurora 08/10/13 1st/Final III LF 19.475 79 03/11/13 05/28/13 0.00 C 0.427 0.133 0.300 - - - 86.00 ONS System (HDM-4), Dingalan-Gabaldon Rd., Satisfactory K0177+801-K0179+000 VRF Construction / Allen Const. of Flood Control Project along 82.10% 1125 637 JV-12-544 L A MA GE2 Talavera, Nueva Ecija 08/13/13 1st/Final III LF 13.750 90 02/27/13 05/27/13 0.00 C 0.388 0.133 0.300 - - - 82.10 ONS Construction Joint Venture Talavera River, Basang Hamog Satisfactory VRF Construction / D.G. Const. of Digmala River Control Calaanan Sect., Bongabon, Nueva 85.80% 1126 638 Sarmenta Construction Joint JV-12-598 L A MA GE2 08/10/13 1st/Final III LF 19.117 120 03/17/13 07/14/13 8.00 C 0.425 0.133 0.300 - - - 85.80 AHD Sta. 0+279.97-Sta. 0+994.01 (714.04 LM) Venture Ecija Satisfactory W.D. Navarro Construction Const./Widening//Upgrading/Rehab. of Access 1127 639 14327 L A MA GE1 Aparri, Cagayan 07/30/13 2nd II LF 27.645 179 01/22/13 07/19/13 -1.74 O 0.384 0.200 0.071 0.030 0.060 0.050 79.50 DEL Co. Rd. at Aparri Airport, Maura W.D. Navarro Construction Widening/Impv't. of Dugo-San Vicente 1128 14327 L A MA GE1 Sta. Teresita, Cagayan 07/31/13 1st II LF 12.980 121 03/01/13 06/29/13 -20.00 O 0.353 0.238 0.000 0.030 0.055 0.017 69.30 DEL Co. Rd. Rd. Upgrading (Gravel to Paved) of Bacon- Waterton Construction & Sawanga-Prieto Diaz Rd., (Sect. A - K0618+(- 85.00% 1129 640 32492 L D SB GE1 Prieto Diaz, Sorsogon 08/15/13 1st/Final V LF 6.825 58 02/04/13 04/02/13 0.00 C 0.417 0.133 0.300 - - - 85.00 ONS Realty Development Corporation 035)-K0618+457); (Sect. B - K0618+484- Satisfactory K0618+655) Const. of Sch. Bldg. (1 unit - 1 storey 3CL & 1 1130 641 Wawot Builders 33592 L D SB GB1 Babatngon, Leyte 08/30/13 1st VIII LF 2.963 165 03/19/13 08/30/13 -6.00 O 0.357 0.300 0.090 0.012 0.051 0.033 84.30 DEL unit - 1 storey 2 CL, Juan Tismo NHS Replacement of Bonga Bridge #2 along DM Jct. WCS Construction Inc. 89.70% 1131 642 6516 L AAA LA GE1 Legazpi-Sto. Domingo-Tabaco-Cam Sur Bdry. Bacacay, Albay 08/12/13 1st/Final V LF 5.156 163 02/12/13 07/24/13 0.00 C 0.464 0.133 0.300 - - - 89.70 ONS (Formerly: WCS Construction) Rd, K0547+132 V. Satisfactory WCS Construction Inc. Const./Impv't. of Yawa River Control, 1132 6516 L AAA MB GE2 Legazpi City 08/10/13 1st V LF 46.077 214 01/30/13 08/31/13 4.51 O 0.332 0.265 0.150 0.030 0.051 0.033 86.10 AHD (Formerly: WCS Construction) Bogtong-Rawis Sect. Wearr Enterprises & Const./Ext. of Sch. Bldg. inc. Fence, 87.00% 1133 643 14123 L A SB GB1 Bacacay, Albay 08/12/13 1st/Final V LF 1.404 120 03/05/13 07/02/13 12.50 C 0.437 0.133 0.300 - - - 87.00 AHD Development Corp. Sogod NHS Satisfactory Wearr Enterprises & Const. of Carriedo River Control w/ Carriedo, Irosin, 84.90% 1134 14123 L A MA GE2 08/14/13 Final V LF 18.889 195 10/23/12 05/05/13 1.03 C 0.443 0.133 0.300 - - - 87.60 AHD Development Corp. Floodway Clearing Sorsogon Satisfactory Completion of on-going Bridges (inc. 1135 644 Wee Eng Construction, Inc. 16380 L AAA LB GE1 Approaches) of Lipadas Bridge II along Davao- Davao City 08/07/13 1st XI LF 42.346 209 02/26/13 09/22/13 0.11 O 0.359 0.294 0.150 0.030 0.033 0.033 89.90 AHD Cotabato Rd. 85.70% 1136 Wee Eng Construction, Inc. 16380 L AAA LB GE1 Widening of Davao-Bukidnon Rd. Davao City 08/19/13 Final XI LF 27.929 72 01/23/13 04/04/13 0.00 C 0.348 0.200 0.300 - - - 84.80 ONS Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 44 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION 83.84% 1137 Wee Eng Construction, Inc. 16380 L AAA LB GE2 Const. of Lasang River Flood Control Lasang, Davao City 08/22/13 Final XI LF 65.421 302 09/10/12 07/08/13 0.00 C 0.400 0.133 0.300 - - - 83.30 ONS Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Nat'l Rd. (Int.Sect.) along Baguio-Bontoc Rd., K0269+000-K0275+000 (v.s.), K0286+000- 89.40% 1138 645 Werr Corp. (International) 14133 L AA LA GE1 K0289+000 (v.s.), K0299+000-K0300+900 Benguet 08/01/13 Final CAR LF 94.803 390 05/18/12 06/11/13 0.00 C 0.437 0.133 0.300 - - - 87.00 ONS (v.s.), K0305+000-K0308+500 (v.s.), V. Satisfactory K0309+000-K0311+000 (v.s.), K0323+000- K0328+000 (v.s.) Const. Impv't. of Flood Control & 1139 Werr Corp. (International) 14133 L AA LA GE2 Puerto Princesa City 08/16/13 1st IVB LF 13.788 270 04/02/13 12/28/13 21.30 O 0.387 0.206 0.150 0.024 0.042 0.033 84.20 AHD Drainage Structure Werr Corp. (International) / Const. of Guihob Bridge & Approaches, Phase 86.82% 1140 646 JV-12-375 L AA LA GE1 Banaue, Ifugao 08/04/13 Final CAR LF 16.343 165 12/26/12 06/08/13 0.00 C 0.470 0.133 0.300 - - - 90.30 ONS Alfalfa Construction (JV) II, K0345+169-K0345+240 Satisfactory Rd. Upgrading (Gravel to Conc.) of Banaue- Werr Corp. International / 1141 647 JV-12-314 L AA LA GE1 Hungduan-Benguet Bdry. Rd. K0374+000- Hungduan, Ifugao 08/04/13 1st CAR LF 43.787 296 01/31/13 11/22/13 17.67 O 0.328 0.240 0.150 0.023 0.055 0.050 84.60 AHD Alfalfa Construction (JV) K0376+300 Werr Corp.. (International) / Reconst./Replacement of Sum-ag Bridge 1 along Bacolod City, Negros 1142 648 JV-12-499 L AA LA GE1 08/07/13 1st VI LF 34.401 252 04/01/13 12/08/13 4.97 O 0.376 0.240 0.150 0.030 0.037 0.033 86.60 AHD Galeno Construction, Inc. (JV) Bacolod South Rd., Brgy. Sum-ag Occidental Rehab. of Magbaboy Bridge along San Carlos City, 88.69% 1143 649 Wilkinson Construction 21422 L A MA GE1 08/12/13 Final VI LF 14.033 330 03/07/12 01/30/13 0.00 C 0.482 0.200 0.300 - - - 98.20 ONS Bacolod North Rd. Negros Occidental Satisfactory Rehab./Reconst./Upgrading of Damaged Paved Bacolod City, Negros 1144 Wilkinson Construction 21422 L A MA GE1 Nat'l Sec. Rd. along Bacolod Circ. Rd. (S), 08/06/13 1st VI LF 26.955 204 04/01/13 10/21/13 -9.99 O 0.377 0.300 0.050 0.030 0.045 0.050 85.20 DEL Occidental K003+700-K004+851 Rehab.n/Strengthening (Reconst.) of Bridges at Murcia, Negros 1145 Wilkinson Construction 21422 L A MA GE1 Poncian Bridge along Bacolod-Murcia-DS 08/12/13 3rd VI LF 25.631 343 03/07/12 02/13/13 - O 0.376 0.300 0.000 0.030 0.040 0.033 77.90 DEL Occidental Benedicto-San Carlos City Rd. Wind River Court Construction Rehab./Reconst./Strengthening of Tobgon 87.50% 1146 650 36144 L D SB GE1 Ligao City, Albay 08/09/13 1st/Final V LF 5.695 120 01/25/13 05/24/13 25.84 C 0.375 0.200 0.300 - - - 87.50 AHD and Development Bridge along Ligao-Tabaco Rd., Brgy. Batang Satisfactory Wismon Construction & 86.00% 1147 651 Development Corp. (Formerly: 33087 L B MA GE1 Const. of Brgy. Road, Pob. South Lupao, Nueva Ecija 08/12/13 1st/Final III LF 2.850 60 04/02/13 05/31/13 0.00 C 0.427 0.133 0.300 - - - 86.00 ONS Wismon Construction) Satisfactory Wizard Trading and Rehab./Reconst./Upgrading of Damaged Paved 88.86% 1148 652 21921 L A MB GE1 Nueva Ecija 08/09/13 Final III LF 77.161 315 06/01/12 04/11/13 0.00 C 0.461 0.133 0.300 - - - 89.40 ONS Construction Nat'l Rds, Daang Maharlika Rd. Satisfactory Wizard Trading and Rehab./Reconst./Upgrading of San Jose City- 87.70% 1149 21921 L A MB GE1 Rizal Rd., via Pinili-Porais-Villa Joson Rd., Nueva Ecija 08/13/13 1st/Final III LF 17.867 90 02/07/13 05/07/13 0.00 C 0.444 0.133 0.300 - - - 87.70 ONS Construction Satisfactory K0164+000-K0165+109 Prev. Maint. (Int. Sect.), Secondary Rd., Imus 84.70% 1150 653 WT Construction, Inc. 5490 L AAA LB GE1 Rd; a)Chainage 0000-Chainage 0825 & Cebu City 08/24/13 1st/Final VII LF 22.897 100 04/03/13 07/11/13 3.00 C 0.411 0.136 0.300 - - - 84.70 AHD Satisfactory b)Chainage 0865-Chainage 1070 Widening of San Isidro Bridge & Approaches, WT Construction, Inc. / A.M. Sta.27+100 inc. the Impv't. of Cross-Drainage 1151 654 JV-12-230 L AAA LB GE1 Cebu 08/05/13 1st VII LF 25.878 378 02/13/13 02/25/14 5.35 O 0.339 0.281 0.150 0.030 0.045 0.033 87.80 AHD Oreta & Company, Inc. (JV) from Sta.27+083-Sta.28+470 along Natalio Bacalso Ave. WT Construction, Inc. / A.M. Impv't. of Natalio Bacalso Ave., Carcar-Sibonga 1152 655 JV-12-229 L AAA LB GE1 Cebu 08/05/13 1st VII LF 16.248 360 02/13/13 02/07/14 44.49 O 0.274 0.300 0.150 0.030 0.049 0.050 85.30 AHD Oreta & Company, Inc. (JV) Sect., Cebu Province, Km.47+000-K0048+297 WTG Construction and Development Corporation Const. of Flood Control at Sapangdaku 1153 656 7494 L AAA LA GE2 Toledo City, Cebu 08/06/13 2nd VII LF 28.485 210 01/28/13 08/25/13 0.01 O 0.320 0.300 0.150 0.030 0.055 0.050 90.50 AHD (Formerly: W.T.G. River Construction) Poblacion Cuartero, 1154 657 Yakal Construction 28289 L AAA MA GE2 Const. of River Control 08/19/13 1st VI LF 27.593 312 11/18/12 09/25/13 -4.91 O 0.392 0.231 0.101 0.030 0.037 0.033 82.40 DEL Capiz Restoration & Const. of Flood Control 85.28% 1155 Yakal Construction 9685 L AAA MA GE2 Palo, Leyte 08/20/13 Final VIII LF 45.859 395 04/01/12 04/30/13 0.00 C 0.451 0.133 0.300 - - - 88.40 ONS Structure, Sitio Purisima, Brgy. Guindapunan Satisfactory Completion for Repair/rehab. Of Layog San Julian, Eastern 1156 Yakal Construction 9685 L AAA LB GE1 08/19/13 1st VIII LF 15.316 714 10/17/11 09/30/13 8.13 O 0.390 0.240 0.150 0.030 0.055 0.033 89.80 AHD Bridge along Taft-Borongan Samar Rehab./Impv't. of Drainage System & Slope YSA Construction and Capalonga, Camarines 91.00% 1157 658 33968 L B SB GE2 Protection Works along Bagong Silang- 08/08/13 1st/Final V LF 5.523 60 01/10/13 03/11/13 0.00 C 0.410 0.200 0.300 - - - 91.00 ONS Supply Capalonga Nat'l Secondary Rds. (Phase 2) Norte V. Satisfactory Upgrading (Gravel to Concrete) of 1158 659 Yu Construction 10470 L A MA GE1 Batuan, Bohol 08/20/13 1st VII LF 40.386 209 03/04/13 09/28/13 1.01 O 0.349 0.257 0.150 0.030 0.065 0.050 90.10 AHD Balilihan-Hanopol-Batuan Rd. Yu Construction / SCP Upgrading of Jct., Dat-an, Carmen-Sierra 1159 660 JV-12-152 L AA LA GE1 Bullones-Pilar, Alicia Rd., K0084+272.04- Bohol Province 08/15/13 1st VII LF 60.752 316 03/22/13 01/31/14 0.11 O 0.374 0.251 0.150 0.030 0.055 0.033 89.30 AHD Construction (JV) K0088+724.4 Conc./Drainage Impv't. of Rds., Alleys & 84.10% 1160 661 Zact Builders 33702 L D SB GE1 Quezon City 08/05/13 1st/Final NCR LF 5.862 111 03/25/13 07/13/13 9.76 C 0.408 0.133 0.300 - - - 84.10 AHD Pathwalks, Masigla St., Brgy. Central Satisfactory Rehab./Impv't. of MNR, Pagudpud, Ilocos Norte 86.70% 1161 662 Zedik Builders 33330 L D SB GE1 Ilocos Norte 10/20/13 1st/Final I LF 3.841 85 06/27/13 09/19/13 0.00 C 0.434 0.133 0.300 - - - 86.70 ONS Sect., K0558+049-K0558+622 Satisfactory

Zion Construction (Formerly: Repair/Restoration of Damaged Slope Protection Argao to Santander, 1162 663 Masterpiece Construction and 14881 L B MA GE2 & Slope Line Canal along Natalio Bacalso Ave., 08/09/13 1st VII LF 18.085 195 05/17/13 11/27/13 37.44 O 0.356 0.300 0.150 0.030 0.050 0.050 93.60 AHD Supply) K0059+500-K0140+200 (Int. Sect.) Cebu

Zion Construction (Formerly: Repair/Maint. of Suba River Control, Brgy. 92.90% 1163 Masterpiece Construction and 14881 L B MA GE2 Suba, K0152+588 Upstream A & Downstream Samboan, Cebu 08/09/13 1st/Final VII LF 4.889 107 05/17/13 08/31/13 67.29 C 0.482 0.147 0.300 - - - 92.90 AHD Supply) B V. Satisfactory Zion Construction (Formerly: Rehab./Reconst./Upgrading of Damaged Paved 91.90% 1164 Masterpiece Construction and 14881 L B MA GE1 Nat'l Rd. along Natalio Bacalso Ave. (Cebu Santander, Cebu 08/09/13 1st/Final VII LF 44.218 172 01/25/13 07/15/13 81.56 C 0.419 0.200 0.300 - - - 91.90 AHD Supply) South Rd.), K0132+028-K0134+000 V. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 45 of 46 DPWH CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Qarter CY 2013

CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL No. of No. of LICENSE DATE OF NO. OF IMPL. FUNDING SLIPPAGE CPES RATING/ NAME OF CONSTRUCTOR L/F STATUS REMARKS Project Constructor NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR (%) RATING QUALITY PCAB ARC TYPE NAME LOCATION STARTED COMP 0.40/0.50 0.30/.20 0.15/0.30 0.030 0.070 0.050 (Php, M) (C.D.) DESCRIPTION Zion Construction (Formerly: Const. of 2-Storey 4-CL Sch. Bldg. at 1165 Masterpiece Construction and 14881 L B MA GB1 Argao, Cebu 08/08/13 1st VII LF 4.730 150 04/03/13 08/30/13 0.26 O 0.355 0.270 0.150 0.030 0.053 0.050 90.80 AHD Supply) Argao NHS ZM Construction/R.Z. Roncal Rd. Upgrading (Gravel to Paved) of Nueva 92.02% 1166 661 JV-11-036 L AA MB GE1 Nueva Ecija 08/10/13 Final III LF 98.572 540 11/17/11 05/08/13 0.00 C 0.438 0.133 0.300 - - - 87.10 ONS Construction and Trading (JV) Ecija-Aurora Rd. V. Satisfactory Zota Trading & Const./Impv't./Rehab. of FMR @ Lucao Dagupan City, 89.90% 1167 662 32641 L D SB GE1 08/06/13 1st/Final I LF 0.980 45 02/18/13 04/03/13 0.00 C 0.466 0.133 0.300 - - - 89.90 ONS Construction & Bonuan Boquig Pangasinan V. Satisfactory

2/5/2014 / 8:41 AM CPES Reports 3rd quarter 2013 MIS.xls / Masterlist Page 46 of 46