Government of India Ministry of Environment & Forests IA-I Division ......

TENTATIVE AGENDA FOR 65th MEETING OF EXPERT APPRAISAL COMMITTEE FOR RIVER VALLEY AND HYDROELECTRIC POWER PROJECTS

Date : 22-23rd March, 2013 Venue: Annexee Conference Room Time : 10.00 a.m SCOPE Complex Opp. Jawaharlal Nehru Stadium Lodhi Road, New Delhi -110003

1st Day – (22nd March, 2013)

1. Welcome by Chairman and Confirmation of Minutes of 64th Meeting held on 1-2nd February, 2013.

2. Consideration of Project Proposals for Scoping and Environment Clearance

2.1 Papu HEP (90 MW) Project in East Kameng of Arunachal Pradesh by M/s Papu Hydropower Projects Ltd – for Consideration TOR.

2.2 Revision of Capacity of Sawalkote HEP from 1200 MW to 1856 MW in Ramban District of Jammu & Kashmir by M/S. J&K Power Development Corporation

2.3 New Ganderbal HEP (93 MW) in Ganderbal District of Jammu & Kashmir by M/s. J&K Power Development Corporation – For Reconsideration for Environmental Clearance

2.4 Lower Kopili HEP (150 MW) project in Karbi Anglong & North Cachar Hill of Assam by M/s. Assam Power Generation Corporation Ltd – for Reconsideration TOR

2.5 Discussion of Basin Study for Lohit River Basin in Arunachal Pradesh by M/s. WAPCOS

2.6 Jelam Tamak HEP (108 MW) Project in Chamoli District of Uttarakhand by M/s. THDC India Ltd – for Environmental Clearance

2nd Day – (23rd March, 2013)

2.7 Mawphu HEP (85 MW) Project in East Khasi Hills District of Meghalaya by M/s NEEPCO Ltd – for Consideration TOR

2.8 Tuivawl HEP (42 MW) Project in Aizwal District of Mizoram by M/s SPML Energy Ltd – for Consideration TOR

2.9 Ar-kacheri Larger Minor Irrigation Project in Buldana District of by M/s Minor Irrigation Division, Irrigation Development Corporation, Government of Maharashtra – for Consideration TOR

2.10 Alewadi Larger Minor Irrigation Project in Buldana District of Maharashtra by M/s Minor Irrigation Division, Vidarbha Irrigation Development Corporation, Government of Maharashtra – for Consideration TOR

2.11 Revision of capacity of Yamne Stage-I HEP from 60 MW to 135 MW Project in Upper Siang District of Arunachal Pradesh by M/s SS Yamne Power Pvt. Ltd – for revision of TOR.

2.12 Lendi Major Irrigation Project (Interstate) in District of Maharashtra and Nizamabad District of by M/s. Godavari Development Corporation, Government of Maharashtra – For Reconsideration for Environmental Clearance

2.13 Lower Orr Project in Shivpuri District of by M/s. National Water Development Agency (NWDA) – For Reconsideration of TOR.

3. Any other Item with the permission of Chair

Note: 1. Project Proponents are requested to attend the meeting and give a presentation on their proposal/request. For Non Government Organizations, Director or above level and for proposals from the Government, the Chief Engineer concerned or above level should lead the team. 2. The project proponent may kindly that this as official communication and may not wait for separate letter from MoEF. For any clarification please contact to Mr. B. B. Barman at 24363007 and / or Dr. P. V. Subba Rao 24361669/Extn-555.

3. Videography of the project area should be carried out and presented before the EAC.

 Mobile Phone should be kept on silent mode during the meeting.  Please avoid distribution of writing pads, pens, plastic folders and unnecessary stationery items during the meeting.  Please use both sides of papers, to the extent possible, for presentation material.