LOCAL COMMITTEE Divisional Highway Priority Works Programme 2019/2020 September 2019 Update

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Advisory sign to indicate for vehicles to turn left only at Design in consultation £1,000 09/09/2014 Newby Bridge near the Swan Inn onto the A590 - Signs with Highways

Doctors sign at Haverthwaite (Detail to be finalised) £1,000 22/03/2016 Completed

Dropped Kerb at Flookburgh near The Salon £1,000 29/09/2016 Completed

Allithwaite pedestrian improvement scheme initial staff £2,250 29/09/2016 Completed time

Cark improvement schemes - amendments to signing Cartmel QSLNPRN20 £2,500 24/01/2017 Completed over railway bridge and new bollard £6,000 -£2,500 Improvements to footway between Flookburgh to new Network Team playground on Moor Lane (additional contributions will be £6,000 25/07/2017 undertaking cost requried) estimate

Had a meeting with NT Traffic regulation Order on the A592 near Fell Foot park £4,000 19/07/2018 at Fell Foot - preparing for No Waiting at any time restrictions plans for costing / TRO £6,000 £0 Network Team Additional contribution to footway improvements (listed £2,000 19/07/2018 undertaking cost above) estimate

£6,000 £0 £6,000

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Lindale HGV ban scheme Staff time for design £500 29/09/2016 Design to be sent to HE

Pedestrian sign for path from The Crescent to Not all PROW therefore £1,000 29/09/2016 Meadowbank Lane (detail to be determined) not to be continued

Lining imporvements for Allithwiate Road, Risedale and £800 24/01/2017 Complete Windermere Road

Remove from list as Contribution to additional lighting column on Great Heads £0 24/01/2017 been delivered by Road Street Lighting

Improvements to road markings from to £1,000 25/07/2017 Complete Barber Green

Lindale Primary School - measures to assist pedestrians £6,000 £2,500 -£1,800 25/07/2017 Complete to include signage and a ghost footway

Road markings to reduce speeds on approach to Crown £1,500 25/07/2017 Complete Hill and on Windermere Road Grange QSLNPRN21

Mark out parking spaces on Fernleigh Road - consider £500 28/09/2017 Complete individual markings to maximise usage

Contribution to initial consultation for possible restricitons Initial consultaton to be on Cragg Drive and Windermere Road Grange. Additional £1,500 28/09/2017 progressed Autumn contribution required in future year 2019

1 Allocation to complete TROs for Windermere Road, Allocation to deliver Cragg Drive junction and No Loading on Kents Bank £2,500 19/07/2018 TRO after initial Road consultation

Drainage improvement at Strawberry Bank on Cartmel Peter Hosking to follow £6,000 £2,000£0 19/07/2018 Fell up

Improvements to signs and road markings £1,500 19/07/2018 Complete

ED owned SID (checking roads with Cllr and CRASH) - be Allithwaite Road , The esplanade and Windermere £4,000 New Request Road £6,000 £500

Problem of children crossing the road in Lindale near £1,500 New Request Bell Hill Park

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Water Yeat, Old Vicarage - meet with PC and resident to £6,000 £1,000 30/09/2015 Completed look at possible improvements; studs and lining

Broughton signing and lining improvements to follow a £3,500 24/01/2017 Completed walkaround

Match funding towards reloaciton of Cattle warning signs £500 28/09/2017 at Collinpit Farm for Colton Parish Council Not to be progressed funding to be reallocated to Future TRO for No Waiting (DYL's) at The Square Broughton 20mph Broughton and Kirkby-in-Furness to prevent obstructive £2,000 28/09/2017 scheme parking, possible restriciton at The Banks Coniston - initially for consultation £6,000 -£3,500 The Banks Coniston - advisory sign such as 'Not suitable for LGV's, Do not follow sat nav' to be discussed with the £1,000 28/09/2017 Completed Parish Council High Furness QSLNPRN22 Parking for residents' signs for cul-de-sacs in Coniston £1,500 28/09/2017 Completed through discussion with the Parish Council

Not to be progressed Station Road Broughton, long term possible restriction - funding to be assessment and some intial consultation with Parish £1,000 28/09/2017 reallocated to Council and residents Broughton 20mph scheme

Works tickets to be Improvements to signing and road markings as traffic £4,000 19/07/2018 prepared in December calming through Blawith / Water Yeat and Torver 2018 £6,000 £0 Works tickets to be Improvements to signing and road markings as traffic £2,000 19/07/2018 prepared in December calming for Coniston: Ship Inn to Adams Bridge 2018

Broughton 20mph scheme - reallocation from other £6,000 £3,500 £2,500 New Request scheme which are not to be progressed at this time

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Highlight the informal crossing from Oxenholme Road to Improved visibility Asda (detail to be agreed) Improved visibility currently £4,000 £0 29/09/2016 currently being pursued being pursued with ASDA with ASDA. On hold.

Raised zebra crossing on Aynam Road to highlight £10,500 £0 29/09/2016 Completed crossing and slow approach of vehicles

Dropped kerbs / disability group improvements division £3,000 25/07/2017 Completed wide including Valley Drive

2 Road markings indicating keep clear for junctions to include Howe Bank Close and Howe Gardens off £6,000£1,500 £0 25/07/2017 Unknown Hayclose Road and Helm Drive Kendal QSLNPRN23 Castle Detail and additional Contribution to traffic calming measures for Castle Estate funding to be £1,500 31/01/2018 entrances - more funding required in a future year. determined with Member

Additional contribution to Castle Estate entrance £6,000 £6,000 £0 In progress improvement works and also to TRO for 20mph scheme

Additional contribution to Castle Estate entrance improvement works and also to TRO for 20mph £5,500 New request scheme £6,000 £0

Re-locate children crossing warning sign by shop to £500 New request better location.

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Kirkbarrow Bus Stop - allocation to markings £1,000 29/09/2016 Completed

Junction improvements - road markings £1,000 29/09/2016 Completed

£6,000 £1,000 TRO contribution to undertake with K.L. Hazelwood / Underwood and Howard Street & Ford Terrace / Romney £2,500 29/09/2016 Completed Road

Consideration of improvements on Greenside at Sunny Initial plan drawn to £500 29/09/2016 Brow Nursery access -initially staff time discuss with Member

Dowkers Lane - consideration of existing restricitons £500 24/01/2017 Completed following SLDC works. Kendal QSLNPRN24 Highgate Consideration of possible measures with regard to speed £6,000 £500 -£1,000 24/01/2017 Completed issues on Captain French Lane

Allocation of funding to support measures identified from 2016/2017 assessments including Chapel Lane and £6,000 25/07/2017 Completed Cross Lane parking

TROs - allocation of funding to complete issues identified Progressing sign and £6,000 £6,000 £0 19/07/2018 in previous years lines

TROs - Allocation of funding to complete issues £4,000 02/09/2019 New request identified in previous years £6,000 £0

TROs - Consideration of traffic calming or other £2,000 02/09/2019 New request speed reduction measures on Gillinggate

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Contribution to a TRO for Appleby Road, Kendal in Draft designs for initial conjunction with Shap Road. Additional contribution £3,000 22/03/2016 consultation Spring needed) 2019 £6,000 £0 Funding not used on Improvements to pavements / dropped kerbs, Appleby staff time to be de- £3,000 22/03/2016 Road between Sandgate and QKS committed and used for TRO (£2,000)

Determination of barrier Assessment / consultation of existing barrier on Sandgate £2,000 24/01/2017 to be completed to order replacement

3 Castle Crescent - Grass crete to improve parking for £6,000 £4,000 £4,000 21/03/2017 Cancelled residents Job Cancelled

Warning signs and road markings on Sedbergh Road to £3,500 30/11/2017 In progress encompass both Eller Raise and Sandylands junctions Kendal QSLNPRN25 Nether

Appleby Road Bus Stop Clearway and sign £1,500 26/03/2018 Completed

Stock Beck Cottages footpath - possible warning signs / £6,000 £1,000 -£1,500 26/03/2018 Cancelled measures for safety of pedestrians Job Cancelled

Draft designs for initial TRO - for Appleby Road / Shap Road area and £6,000 19/07/2018 consultation Autumn surrounding side roads 2019

TROs - Allocation of funding to complete Appleby £3,000 02/09/2019 New request Road and Shap Road parking scheme £6,000 £0

TRO - Speed review on A684 Singleton Road junction £3,000 02/09/2019 New request with Castle Green

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Sedgwick Aquaduct pedestrian / cyclist improvements £4,000 30/09/2015 Completed

Helmside Road Oxenholme Pedestrian Crossing £4,000 24/01/2017 Completed Improvements

Funding not sufficient, Design, cost and feasbility for a pedestrian crossing £2,000 25/07/2017 therefore pursuing other options on A65 Burton Road near Helmside Road junction funding options £6,000 -£4,500

Works to harden area to improve access to bus stop £3,000 28/09/2017 Completed opposite Oxenholme Lane

Pedestrian in the road signs between Force Bridge up to £1,500 28/09/2017 Completed A590 Kendal South QSLNPRN26

TRO - Oxenenholme B6254 reduction is speed limit £2,000 18/07/2018 Completed

£6,000 £0 Funding not sufficient, Additional allocation to a pedestrian crossing on the A65 £4,000 19/07/2018 therefore pursuing other Burton Road near Helmside Road junction funding options

A6 Milnthorp Road access improvement to Drover New £1,000 Croft request

Additional allocation to a pedestrian crossing on the £6,000 £5,000 £0 New request A65 Burton Road near Helmside Road junction

New request- Funding not sufficient, TRO- A65 Barrows Green, Kendal- Speed review £0 therefore pursuing other funding options

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Improved 'Give Way' signange for Garth Brow / Hallgarth £750 30/09/2015 Complete circle

4 Windermere Road Roundels - road markings at 30mph £750 30/09/2015 Complete speed signs

Grit bins on Greenside and The Green on Underbarrow £500 30/09/2015 Complete Road

Contribution to Footpath Erosion FP 536013 - with PROW £2,500 30/09/2015 Complete Team

Windermere Road bus stop markings £300 29/09/2016 Complete

£6,000 £3,700

Windermere Road gateway after reloaction of 30mph limit £2,000 29/09/2016 Complete - coloured surfacing and road markings only

3 Bollards on High Tenterfell near a raised table £1,500 24/01/2017 Complete

3 Bollards opposite Green Hill to prevent erosion £1,500 21/03/2017 Complete

£6,000 -£2,200 Kendal Speed Indication device on Windermere Road to Strickland QSLNPRN27 £4,200 21/03/2017 Complete accompany change of speed lilmit and new signs and Fell

Junction improvement consideration for Horncop Lane / Design work to be £1,000 21/03/2017 Sparrowmire Lane progressed

Initial consultaiton for possible Residents parking for no.s Proposals for initial 1-6 Kendal Green and restricitons for parking at £800 31/01/2018 consultation to be Burneside Road / Sparrowmire Lane completed

Parking scheme for Wainwright Court - additional TRO Statutory consultation in £2,000 19/07/2018 with Kendal Green Autumn 2019 £6,000 -£800

Assessed as not Bus stop build out at Greenside £3,000 19/07/2018 feasible

Cycle Barriers on Fellside / rail on High Garth footpath £1,000 19/07/2018 Order to be progressed

New request-Funding not sufficient, therefore Green Hill, white lines to protect garages £1,000 pursuing other funding options

Kendal Green stones or bollards £6,000 £2,000 -£1,500 New request

SID on Greenside £4,500 New request

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Ghost footway scheme for Silverdale Road £6,000 £1,500 £4,500 19/07/2017 Completed

TRO-Traffic Calming and speed related measures for Initial consultation due £6,000 £6,000 £0 19/07/2018 Arnside Autumn 2019

TRO - Additional allocation to Speed related measures for Initial consultation due £5,000 Arnside Autumn 2019 Kent Estuary New request Beetham Unsuitable for caravans sign for Beetham village £500 PC to pay for (need to arrange this) £6,000 -£1,000 5 £6,000 -£1,000 New request -Funding TRO - Measures to address speeding and large vehicles using not sufficient, therefore £2,000 Guard Hill Lane at Carr Bank pursuing other funding options

New request PC to pay TRO - Measures to stop motorhome parking in Arnside £500 for (need to arrange this)

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Possible measures for Greenbank Road (further allocation from LMS or future year requried if TRO £1,750 22/03/2016 Completed agreed)

Guy Lane Troutbeck - Unsuitable for vehicles after 1/4 £900 19/07/2016 Completed mile sign £6,000 -£1,750

TRO to include Greenbank Road, Red Bank Road, £4,100 29/09/2016 Complete Grasmere, Under Loughrigg Road nr Ambleside

Road markings scheme within Langdale Valley including £1,000 29/09/2016 Completed Keep Clear markings to reduce obstructive parking

Red Bank Road Grasmere warning signs - match funding £800 25/07/2017 Complete Grasmere Civic Society

Easdale Road - amendment of supplementary sign plates £0 On hold (£500)

Two sections of dropped kerb for Castle Field / High £6,000 £0 £0 On hold Castle Field Ambleside (£1,500)

Lakes QSLNPRN29 Implementation of Under Loughrigg Road TRO measures £2,650 30/11/2017 Complete

TRO consultation for removal of parking spaces outside Croft House Bakery and introduction of additional parking TRO pending decision £2,550 30/11/2017 on Broadgate (additional funding would be requried to in January 2019 implement)

Allocation to TRO for Croft House and Broadgate plus TRO pending decision £2,000 19/07/2018 measures if approved in January 2019

Consideration of concerns raised at Chapel Hill for initial Designs to be prepared consutlation and a possible future TRO (any TRO will £6,000 £1,000£0 19/07/2018 for draft consultation requrie funding in a future year) Spring 2019

Waterhead / Romney Grange - TRO for 'no left turn' to £3,000 19/07/2018 Completed allow for crossing improvements

Wansfell Road Rothay Road signage for the filter lane £1,000 New Request

Rydal welcome sign replacment £6,000 £700 £3,300 New Request

TRO - Consideration of concerns raised at Kirkfield and St Anne's Close, for initial consutlation (TRO will New request requrie funding in a future year) £1,000

Divisional Estimate Cost Remaining Local Committee Division Project Code Description Total for Status (£) Balance (£) Approval Date works (£)

Gleaston schemes for Ulverston Rd and Mill Lane / £3,000 £0 22/03/2016 Completed Stainton roundels at Quarry end

6 Ghost footway markings and warning signs - Leece £2,000 24/01/2017 Completed

Visibility improvements at Greenodd £2,000 21/03/2017 Completed

Left Turn Only sign and left arrow on lane to Plumpton £6,000 £1,000 -£4,000 25/07/2017 Completed Cottages

Road markings to slow approaching drivers on Main Road £1,000 25/07/2017 Completed Swartmoor

Drainage improvements and investigations for Aldingham £4,000 25/07/2017 Completed outfall Low Furness QSLNPRN30

Scales 20mph speed limit extension - additional funding 19/07/2018 requried to be implemented Requires additional funding or to be £2,000 progressed with A5092 40mph extension - Farmers Arms through to another speed limit Penny Bridge - additional funding requried to be 19/07/2018 TRO implemented

Cumbria Way sign 'Pedestrians in the road' Broughton £6,000 £1,000£0 19/07/2018 To be ordered Beck

Loppergarth reflector posts £500 19/07/2018 To be ordered

Great Urswick - Signing and markings for informal No signs, installing £2,500 19/07/2018 crossing point near school / playground lines Summer 2019

TRO - Measures to reduce speeding in Spark Bridge New request via £6,000 £3,000 £3,000 part funded by Cllr Breteton Victoria

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Burton-in-Kendal Improvement Scheme outside the Kings £3,500 30/09/2015 Complete Arms

Unsuitable for Large vehicles' sign Deepthwaite to £900 29/09/2016 Completed Woodhouse Lane Crooklands

Improvements to road marking in Endmoor Woodside £2,000 24/01/2017 Complete Road and Gatebeck

Unsuitable for Large Vehicles sign for Neddy Hill and £1,800 21/03/2017 Completed Ewan Mill

Nutting Hall Lane, Endmoor New Grit Bin £6,000 £300 -£2,100 21/03/2017 Ordered

Lower QSLNPRN31 Heversham sign restoration £1,000 25/07/2017 Completed Kentdale

Nutting Hall Lane, Endmoor extension of speed limit £3,000 25/07/2017 Completed

Unsuitable for large vehicles - Milton Lane Preston £900 31/01/2018 Completed Richard

Network Team ordered Tanpits Lane Burton - Kerbing works £6,000 £1,100 £1,000 26/03/2018 works

7 Heversham double yellow lines - TRO required £3,000 19/07/2018 Completed

£6,000 £6,000

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Levens Primary School - Flashing Lights £6,000 £0 09/09/2014 On hold

Helsington Church corner visibility improvements (pending Landowner permission £6,000 21/03/2017 landowner permission NT) requried

Ash Street Bowness - Initial consultation for revised £6,000 £250 -£750 25/07/2017 Letter sent Dec 17 pedestrian scheme

Levens turning circle staff time for initial design £500 28/09/2017 Completed

Lyth Valley QSLNPRN32

Post for speed indication sign at Brigsteer - liaise with PC £200 31/01/2018 Completed

Assessment of footpath at Crosthwaite between School £6,000 £500 £750 31/01/2018 Completed and village

Additional funding for improvements to Helsington Church Landowner permission £4,550 31/01/2018 Corner requried

Assessment of speeds on A592 for consideration of £6,000 £6,000 £0 New request speed limit review and future TRO

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Kirkby Lonsdale TRO - Binfold Croft, Horse Market and £3,500 29/09/2016 Completed Lunefield

Dent - Dragons Croft signing improvements scheme for £500 29/09/2016 Completed Parish Council

Contribution to modustar zebra crossing beacons £1,000 24/01/2017 Completed

Contribution to drainage Improvements to drainage with 2 new gullies in £2,000 25/07/2017 scheme with Network Kearstwick Team in 18/19

Feasibility, costing and designs for a traffic Island / safe Design work to be £6,000 £1,000-£1,000 25/07/2017 crossing on A65 Biggins Road / Biggins Lane junction progressed

Sedbergh & Feasibility, costing and designs for a new crossing of Design work to be Kirkby QSLNPRN33 £1,000 25/07/2017 Dodgson Croft adjacent to Booths progressed Lonsdale

Make official shared use cycleway / footway A65 / Main Design work to be £2,000 25/07/2017 Street Kirkby Lonsdale progressed

Allocation to a footway improvement through the £5,000 19/07/2018 Transfer funding Countryside Access Team £6,000 £0 8 £6,000 £0

Contribution to Dent Parish Council for Flood warning flap £1,000 19/07/2018 Completed signs (4 no. TBC with Parish Council)

Market Sq, Kirkby Lonsdal- Review of Road Marking £1,500 New request and Sinage £6,000 TROA new cyclepath just to the north of Levens Hall in a field owned by the estate, to get cyclists off the New request A6, in Lyth ED working with Cllr Bland. £4,500 £0

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Courtesy Parking Signs - temporary signs in corex to go on street furniture with parking info, "don’t park on DYL's £1,000 30/09/2015 Completed and f/ways"

Speed Monitoring Report - Ulverston Town Centre (incl. £1,000 30/09/2015 Completed tube for North Lonsdale Road)

Bus Stop Clearway / Bus Stand Victoria Road, Ulverston £1,000 29/09/2016 Completed

Network Team ordered Surface improvement (Rear of Victoria Road residences £2,500 24/01/2017 works for completion opposite Ambulance Station) within next quarter

Curtosy parking sign 'Parking for residents please park £1,000 25/07/2017 Completed elsewhere'

Conishead Road amendments to road markings including £6,000 £2,000 -£2,500 28/09/2017 Completed hatching at the junction

Investigation into issues on North Lonsdale Road near £1,500 28/09/2017 Plan completed Ainsworths garage - possible road markings Ulverston QSLNPRN34 East Bollards on Cavendish Street to prevent vehicles £1,500 28/09/2017 Completed mounting/parking on the pavament

Surface improvement for rear of North Lonsdale Road Network team preparing from E. end to Hoad View and Steel St to junction (details £6,000 £6,000 £0 19/07/2018 works order to confirm with Member)

Bus Stop Clear way marking on Oakwood Drive at £1,000 New request number 4

Ulverston Market Street- No Entry Sign to be £500 New request improved at Co-op shop £6,000

Ainsworth Garage -line to assist their vehicles in and out on NLR. £500 £2,000 New request

Conishead Road. Yellow lining to be undertaken a s a p on Railway side £2,000 New request

TRO-Ainsworths Transport services at NLRoad. Funded by Ainsworth Establishment of a safety zone near to playground. Private Works Transport Ainsworths agreed to pay towards scheme.

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Garden Terrace - assessment of parking options / £1,000 30/09/2015 Completed consultation

9 Prioriy Road / Oakwood Drive - Assessment of options to £1,000 30/09/2015 Completed assist crossing pedestrians (Leisure Centre)

Improvements to Old Hall Road cross roads £1,000 24/01/2017 Completed

Parking assessment and consultation for possible parking schemes on Garden Terrace and for Church Walk and £2,000 24/01/2017 Completed surrounding area

Sign at entrance to Springfield Park Road, 'Parking for £6,000 £1,200 -£2,400 30/11/2017 Completed residents, please park elsewhere'

Priory Road SLOW Road markings with warning signs to £2,200 30/11/2017 Completed indicate pedestrians crossing Ulverston QSLNPRN35 West Pedestrians in the road warning signs and some markings to highlight presence of ' Cow' Edge Hill Ice £2,000 30/11/2017 Completed Cream parlour

Further proposals being TRO - Church Walk consultation for residents parking £6,000 £3,000 £3,000 30/11/2018 prepared - consultaiton scheme autumn 2018

TRO - Residents parking Garden Terrace, one side only £2,000 New request and 1 permit per house.

TRO - DYL bu Bicca Café £2,000 New request

£6,000 £0

Bollards at to on left from Shop onwards at Upper Brook £1,000 New request St.

TRO - Allocation to Church Walk residents parking £1,000 New request scheme options for statutory consutlation

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Bonninggate Traffic Management Improvements £2,400 24/01/2017 Complete

Rock removal - Crook Road £2,500 24/01/2017 Complete

Contribution to kerb improvements at Barley Bridge £6,000 £1,100-£3,500 21/03/2017 Completed viewing point (Transfer funds to Parish Council)

New signage for Laverock Bridge / Mealbank to be £1,500 30/11/2017 Completed considered with the Parish Council

Design work to be Measures for Staveley - assessment of possible progressed for initial £2,000 30/11/2017 restricitons for parking consultaiton in Oct 2019 Assessment to be Assessment of road safety and pedestrian crossing undertaken after Bridge £500 31/01/2018 options near St Oswalds, Burneside reopens. Expected Sept 2019 Upper Kent QSLNPRN36 Allocation to highway Jack Castling corner works £2,000 26/03/2018 improvements with Parish Council

Firbank Parish - flap signs for diversion (detail to be £6,000 £3,000-£1,500 19/07/2018 To be progressed agreed with parish and Member)

High House Gill - Bridge strike signing - £1,000 19/07/2018 Completed

10 Lavrock Bridge - funding towards measures including £1,000 19/07/2018 Designs completed possible bollards to restrict bridge entry

TRO -Speed limit and introduction of Parking £5,000 19/07/2018 New request Restriction on Main Street, Staveley £6,000 £0

Additional sign / bollards for Back Lane Staveley to £1,000 19/07/2018 New request prevent vehicles especially HGVs

Divisional Total for Estimate Cost Remaining Local Committee Division Project Code Description Status new works (£) Balance (£) Approval Date (£)

Lickbarrow Road Unsuitable for HGV sign on new post. £500 30/09/2015 Completed

Assessment of concerns and options regarding £2,000 24/01/2017 Complete pedestrians crossing New Road, Windermere

St Mary's Bus Stop improvements £6,000 £1,000 £2,250 24/01/2017 Complete

Rayrigg Road assessment of speed reducing options - Speed monitoring to be £750 28/09/2017 road markings, changes to viewpoint access etc undertaken

St Mary's and St Martin's Schools Thornmbarrow Road - Assessment done, assessment of safety concerns and possible £750 26/03/2018 report to be prepared improvements for Councillor

Liaison with Network Drainage improvements - A591 Alice Howe £1,000 26/03/2018 Windermere QSLNPRN37 team

Assessment of concerns and options for consutlation and Initial consultation to possible future TRO on St Mary's Park, Spooner Vale and £3,500 26/03/2018 start Summer 2019 Lake Road

£6,000 -£5,250 Road closuires for Windermere Celebration £1,500 19/07/2018 Complete

Designs to be Bend warning signs and speed monitoring for A591 £1,500 19/07/2018 progressed Spring Elleray Rd - Cooks Hse Corner 2019

TRO for St Mary's Park, Lake Road and Craig Walk (future contribution needed for implementation if Initial consultation to approved) & Droomer Drive - residents parking proposal £3,000 19/07/2018 start Summer 2019 (future contribution needed for implementation if approved)

£6,000 £6,000

Remaining Budget Total to commit £108,000 £29,300

11