Fax Cover Page (Oriel Design)

Total Page:16

File Type:pdf, Size:1020Kb

Fax Cover Page (Oriel Design) LA TEAM READY TO WORK LIST 1-800-338-4599 • If you are ready to work put yourself on the ready-to-work list of your choice by calling the toll-free number any time. • If you are ready to go to work call every week day between 7:00 am and 2:00 pm to put yourself on the daily dispatch list. This gives your priority during dispatching. • To retain your position on the ready to work list you must roll-call every week. You can do that using the 800 number anytime between 7:00 am Friday and Monday at noon. • A confirmation number is given out every time you place yourself on a list. Please ensure that your phone number is current. Contractor & Site Job & Contact Info Type of Work Site Start: 03/27/2020 LARGO CONCRETE INC Most Concrete Commercial / Structural 12/31/2021 11750 Wilshire Blvd. Recent: Concrete Commercial Parking 213_A Los Angeles, CA 90084 Agent: Structures Iliana Sanchez Contact: Site Start: SWINERTON BUILDERS Most 08/12/2020 Project: 9200 Wilshire Blvd Recent: 12/22/2021 Concrete Commercial / Structural 9200 Wilshire Blvd Agent: 213_A Beverly Hills, CA 90212 Contact: Site Start: MARTIN BROS/MARCOWALL INC 11/08/2018 Most Project: Pendry W, Hollywood Sunset 12/21/2021 Recent: Drywall Commercial 1326 N . Oliver Dr. 213_A Agent: West Hollywood , CA 90069 Cristina Contact: Site Start: SKANSKA-STACY AND WITBECK A JOINT VENTURE Most 12/05/2018 Project: 6th Street Viaduct Replacement (Day Shift) Recent: 12/17/2021 Concrete Commercial / Structural 585 S. Santa Fe Ave Agent: 213_A Los Angeles, CA 90013 Contact: Site Start: Linxs FLUOR FLATIRON BALFOUR BEATTY DRAGADOS 02/22/2019 Most Project: The LAX People Mover 11/19/2021 Recent: Concrete Commercial / Structural 9601 Airport Blvd, 213_A Agent: Los Angeles, CA 90045 Tenisha Fifita Contact: Site Start: LARGO CONCRETE INC 11/30/2020 Most Project: Berendo Sage 03/29/2021 Recent: Concrete Commercial / Structural 1035 S Berendo St 213_A Agent: Los Angeles, CA 90006 Bill Contact: Site Start: RAYMOND SOUTHERN CALIFORNIA INTERIORS Most 05/04/2020 Project: GRAND PARCEL Q Recent: 03/29/2021 Drywall Commercial 100 S. GRAND AVE. Agent: 213_A LOS ANGELES, CA 90012 Contact: Site Start: Webcor Craft L P Most 03/10/2020 Project: 960 W 7th Street Recent: 03/26/2021 Concrete Commercial / Structural 945 W 8th St Agent: 213_A Los Angeles, CA 90017 Contact: Site Start: TIS, INC Most 03/24/2021 Project: LACC - Health, Fitness, PE Building Recent: 03/25/2021 Drywall Commercial 855 N Vermont Ave Agent: 213_A Los Angeles, CA 90029 Contact: Site Start: BEST INTERIORS INC Most 10/05/2020 Project: Missouri Recent: 03/24/2021 Concrete Commercial / Structural 11998 Missouri Ave Agent: 213_A Los Angeles, CA 90025 Contact: Site Start: INFINITY DRYWALL CONTRACTING, INC. Most 06/25/2018 Project: OFFICE Drywall Commercial Recent: 03/24/2021 225 S LOARA ST Plaster Agent: 213_A ANAHEIM, CA 92802 Contact: Site Start: INFINITY DRYWALL CONTRACTING, INC. Most 03/22/2021 Project: North Hollywood Sewer Maintenance Yard Recent: 03/24/2021 Drywall Commercial 10801 W. Chandler Blvd Agent: 213_A North Hollywood, CA 91601 Contact: Site Start: JORDAN DRYWALL INC Most 11/13/2020 Project: Wilshire Federal Building Recent: 03/23/2021 Drywall Commercial 11000 Wilshire Blvd Agent: 213_A Los Angeles, CA 90024 Contact: Site Start: MIRAGE BUILDERS, INC. Most 08/03/2020 Project: UCLA SCA SW APARTMENTS-16B Recent: 03/23/2021 Drywall Commercial 456 Landfair Ave Agent: 213_A Los Angeles, CA 90024 Contact: Site Start: MIRAGE BUILDERS, INC. Most 08/21/2019 Project: RIO HONDO COLLEGE Recent: 03/23/2021 Drywall Commercial 3600 Workman Mill Road Agent: 213_A Whittier , CA 90601 Contact: Site Start: PERFORMANCE CONTRACTING INC Most 02/09/2021 Project: One Westside Acoustical Ceilings Recent: 03/23/2021 10800 W Pico Blvd Drywall Commercial Agent: 213_A Los Angeles, CA 90064 Contact: Site Start: SAN MAR CONSTR CO INC Most 12/04/2020 Project: Jefferson Recent: 03/23/2021 Concrete Commercial / Structural 5950 W Jefferson Blvd Agent: 213_A Los Angeles, CA 90016 Contact: 2 | P a g e Site Start: STANDARD DRYWALL INC Most 02/19/2019 Project: C6881 Equinox Recent: 03/23/2021 Drywall Commercial 100 S. Grand Ave Agent: 213_A Los Angeles, CA 90012 Contact: Site Start: ELLIOTT / DRINKWARD CONSTRUCTION, INC. Most 03/01/2021 Project: Jordan Downs S3 project Recent: 03/22/2021 Concrete Commercial / Structural E Century Blvd Agent: 213_A Los Angeles, CA 90002 Contact: Site Start: KARCHER INTERIOR SYSTEMS, INC. Most 02/11/2021 Project: LAX Recent: 03/22/2021 Insulation Commercial 5251 W 98th St Agent: 213_A Los Angeles, CA 90045 Contact: Site Start: 01/28/2020 KEENAN HOPKINS, SUDER & STOWEL Most 03/22/2021 Project: UCLA LE CONTE APARTMENT PROJECT Recent: 213_A Millwright 10995 LE CONTE AVE Agent: DANIELLE LOS ANGELES, CA 90024 Contact: HOPKINS Site Start: KREATIVE INSTALLATIONS Most 03/15/2021 Project: Grand Avenue Recent: 03/22/2021 Concrete Commercial / Structural 100 S Grand Ave Agent: 213_A Los Angeles, CA 90012 Contact: Site Start: MARTIN BROS/MARCOWALL INC Most 06/15/2020 Project: Grand Avenue Recent: 03/22/2021 Drywall Commercial 100 S Grand ave Agent: 213_A Los Angeles, CA 90012 Contact: Site Start: MARTIN BROS/MARCOWALL INC Most 01/11/2021 Project: Lucas Museum of Narrative Art Recent: 03/22/2021 Drywall Commercial 3975 S. Bill Robertson Lane Agent: 213_A Los Angeles, CA 90037 Contact: Site Start: MIRAGE BUILDERS, INC. Most 03/22/2021 Project: Wilshire La Jolla Recent: 03/22/2021 Drywall Commercial 6411 W Wilshire Blvd Agent: 213_A Los Angeles , CA 90048 Contact: Site Start: NEVELL-STANDARD JV LLC Most 07/24/2019 Project: C1010 NCP - New Century Plaza Recent: 03/22/2021 Drywall Commercial 2021 Avenue of the Stars Agent: 213_A Los Angeles, CA 90067 Contact: Site Start: PEREZ CONSTRUCTION GROUP INC. Most 06/25/2020 Project: The Grand Recent: 03/22/2021 Concrete Commercial / Structural 100 S. Grand Avenue Agent: 213_A Los Angeles, CA 90012 Contact: 3 | P a g e Site Start: PIONEER DOORS FRAMES HARDWARE INC Most 07/01/2020 Project: McCadden Senior Recent: 03/22/2021 Doors/Hardware Commercial 1127 N. Las Palmas Ave. Agent: 213_A Los Angeles, CA 90038 Contact: Site Start: QUALITY PRODUCTION SERVICES, INC. Most 03/23/2021 Project: Disney Fox NE & O Recent: 03/22/2021 Drywall Commercial 10201 Pico Boulevard Agent: 213_A Los Angeles , CA 90064 Contact: Site Start: RAYMOND SOUTHERN CALIFORNIA INTERIORS Most 01/24/2020 Project: PERFORMANCE VENUE Recent: 03/22/2021 Drywall Commercial 1050 S. PRAIRE AVE. Agent: 213_A INGLEWOOD, CA 90301 Contact: Site Start: SAN MAR CONSTR CO INC Most 03/23/2021 Project: Colorado East Recent: 03/22/2021 Concrete Commercial / Structural 2451 Colorado Blvd Agent: 213_A Los Angeles, CA 90041 Contact: Site Start: STANDARD DRYWALL INC Most 01/20/2021 Project: C7420 LAC/USC Recent: 03/22/2021 Drywall Commercial 1774 Zonal Ave Agent: 213_A Los Angeles, CA 90033 Contact: Site Start: SUPERIOR WALL SYSTEMS INC Most 11/03/2020 Project: 500 BROADWAY Recent: 03/22/2021 Drywall Commercial 500 BROADWAY Agent: 213_A SANTA MONICA, CA 90401 Contact: Site Start: BAYSIDE INTERIORS INC Most 03/23/2021 Project: Lucas Museum Recent: 03/19/2021 Drywall Commercial 3800 South Vermont Avenue Agent: 213_A Los Angeles , CA 90017 Contact: Site Start: COOPER ENGINEERING, INC. Most 11/05/2020 Project: I-10 West Covina and Baldwin Park Recent: 03/19/2021 Concrete Commercial / Structural Contract # 07-1170U4 Agent: 213_A Los Angeles, CA Contact: Site Start: NEVELL GROUP, INC. 10/30/2017 Most Project: New Century Plaza 03/19/2021 Recent: Drywall Commercial 2025 Avenue of the Stars 213_A Agent: Los Angeles, CA 90067 Lacy Contact: Site Start: NEVELL GROUP, INC. Most 03/18/2021 Project: City of Hope Irvine Cancer Hospital Recent: 03/18/2021 Drywall Commercial 15161 Alton Parkway, Agent: 213_A Irvine, CA 92618 Contact: 4 | P a g e Site Start: SPRING VALLEY INSULATION CONTRACTORS INC Most 01/27/2021 Project: 12003 S Main St Recent: 03/18/2021 Concrete Commercial / Structural 12003 S Main St Agent: 213_A Los Angeles, CA 90061 Contact: Site Start: VALVERDE CONSTR INC Most 02/25/2021 Project: Purple Line Extension Recent: 03/18/2021 Concrete Commercial / Structural 11500 Wilshire Blvd Agent: 213_A Los Angeles, CA 90025 Contact: Site Start: RAMIREZ COMPANY dba RCCI Most 02/02/2021 Project: 6th Avenue ES Recent: 03/17/2021 Concrete Commercial / Structural 3109 6th Ave Agent: 213_A Los Angeles, CA 90018 Contact: Site Start: TUTOR PERINI/O & G A JOINT VENTURE Most 11/05/2019 Project: Century Park East Recent: 03/17/2021 Concrete Commercial / Structural 2040 Century Park East Agent: 213_A Los Angeles, CA 90067 Contact: Site Start: A2 RAILLA DEVELOPMENT INC Most 12/18/2020 Project: WASHINGTON VIEW APARTMENTS Recent: 03/16/2021 Concrete Commercial / Structural 720 W. Washington BLVD Agent: 213_A Los Angeles, CA 90015 Contact: Site Start: INDUSTRY DRYWALL Most 03/17/2021 Project: Oak View Group Recent: 03/16/2021 Concrete Commercial / Structural 11755 Wilshire Blvd Agent: 213_A Los Angeles, CA 90025 Contact: Site Start: KEENAN HOPKINS, SUDER & STOWEL Most 03/09/2021 1550 Euclid St Recent: 03/16/2021 Drywall Commercial Santa Monica, CA 90404 Agent: 213_A Contact: Site Start: LARGO CONCRETE INC Most 06/19/2020 Project: West Edge Recent: 03/16/2021 Concrete Commercial / Structural 12101 W. Olympic Blvd Agent: 213_A Los Angeles, CA 90064 Contact: Site Start: PERFORMANCE CONTRACTING INC 04/10/2020 Most Project: Hollywood Presbyterian 03/16/2021 Recent: Drywall Commercial 1300 N. Vermont Ave. 213_A Agent: Los Angeles, CA 90027 Christopher Mata Contact: Site Start: WESTPACC INC. Most 01/16/2020 Project: The Grand Avenue Project Recent: 03/16/2021 Drywall Commercial 100 South Grand Avenue Agent: 213_A Los Angeles, CA 90012 Contact: 5 | P a g e Site Start: DIVERSIFIED PRODUCTION SERVICES INC.
Recommended publications
  • Minutes of the Regular Meeting of the Cra/La, A
    MINUTES OF THE REGULAR MEETING OF THE CRA/LA, A DESIGNATED LOCAL AUTHORITY (SUCCESSOR TO THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA) HELD ON AUGUST 2, 2018 The Regular Meeting of the CRA/LA, a Designated Local Authority and Successor to the Community Redevelopment Agency of the City of Los Angeles, California was held at the Kenneth Hahn Hall of Administration, 500 West Temple Street, Room B-22, Los Angeles, California, at 9:30 a.m. on August 2, 2018. The meeting was called to order at 9:36 a.m. by Chair Semcken. As Recording Secretary, Angela M. Coleman recorded the minutes of the meeting. Copies of meeting materials are available upon request and payment of nominal copying charges. Tapes of the meeting are available from CRA/LA for one year from the date of adoption of the minutes for the meeting. ROLL CALL Angela M. Coleman, Recording Secretary, took the roll and noted the following present: Mee Semcken, Chair Ed P. Reyes, Vice Chair Recording Secretary declared a quorum in attendance. Also in attendance were: Steve Valenzuela, Chief Executive Officer, CRA/LA Daniel Kahn, Sr. Real Estate Development Agent, CRA/LA Tom Webber, CRA/LA Legal Counsel (Goldfarb & Lipman) CONSENT ITEMS 1. APPROVAL OF JUNE 25, 2018 SPECIAL MEETING MINUTES. 2. LAND USE APPROVAL. REVIEW AND CONSIDER THE PROPOSED PROJECT’S MITIGATED NEGATIVE DECLARATION, ADOPT LAND USE FINDINGS, AND AUTHORIZE EXECUTION OF A LAND USE OWNER PARTICIPATION AGREEMENT WITH R.D. OLSON DEVELOPMENT, ALLOWING A 6:1 FLOOR AREA RATIO FOR DEVELOPMENT OF A HOTEL AT 6407 S.
    [Show full text]
  • Iii. Environmental Setting
    III. ENVIRONMENTAL SETTING A. OVERVIEW OF ENVIRONMENTAL SETTING i) Regional Setting The Reef Project Site is located in Los Angeles County, within greater downtown Los Angeles (see Section II [Project Description], Figure II-1 [Regional and Project Vicinity Map]). The Project Site is located in the Southeast Los Angeles Community Plan Area of the City of Los Angeles. The Project Site is located within the Council District 9 Redevelopment Project area, the Central City Parking area, the Downtown Housing Incentive area, the Central City Revitalization Zone, the Los Angeles State Enterprise Zone, and the Conditional use Approval for Sale of Alcoholic Beverages Specific Plan area. The northern section of the Southeast Los Angeles Community Plan Area was within the original Los Angeles city boundary (incorporated in 1850). The remainder of the Community Plan Area was consolidated or annexed into the City of Los Angeles between 1859 and 1944. The Community Plan Area includes the neighborhoods of Historic South Central, West Adams, University Park, South Park, Central Alameda, Florence, Green Meadows, Broadway-Manchester, and Watts. The Southeast Los Angeles Community Plan area is surrounded by the City of Los Angeles community plan areas of Central City to the north; Central City North to the northeast; and South Los Angeles to the west. The Cities of Vernon and Huntington Park and the Florence community in unincorporated Los Angeles County border the Southeast Los Angeles Community Plan area on the east. The Willowbrook community in unincorporated Los Angeles County borders the Southeast Los Angeles Community Plan area on the south. Southeast Los Angeles largely comprises single-family neighborhoods, which followed a typical development pattern with commercial corridors along larger streets and single-family residential development along smaller, gridded streets in between.
    [Show full text]
  • Grand Avenue, Frank Gehry and a 314-Room Equinox Hotel a Peek at Related’S $950 Million 1-Million-Square-Foot Grand Plans for Downtown LA
    Grand Avenue, Frank Gehry and a 314-Room Equinox Hotel A peek at Related’s $950 million 1-million-square-foot grand plans for Downtown LA May 21, 2018 | By Rebekah Sager At the end of this year the Grand Avenue Project, a.k.a. the Grand, will break ground in the Bunker Hill neighborhood of Downtown Los Angeles. The mixed-use project is slated to open in the fall of 2021 with famed Canadian-born American architect Frank Gehry designing the space. The Grand was initially announced during the Great Recession in 2008. Related Urban, the proj- ect’s developer, has spent the years since, lining up financing, including a $290 million investment from the Chinese entity CORE. Coming in at $950 million, the 1-million-square-foot landmark mixed-use project will comprise 30 percent retail shops, a 450-seat luxury movie theater with in-seat dining, a 39-story tower with 113 condos and 323 rentals and a 314-room Equinox Hotel. According to Richard Vogel, a senior vice president at Related, the project will open all at once, without phasing, and all the elements will be up and operational at the same time around fall 2021. Gehry, 89, has said he’s anticipating that the Grand will spawn other projects in the neighborhood. “We hope that the Grand can help restore Downtown L.A. as a cultural epicenter of Los Angeles,” Vogel told Commercial Observer. “Mixed-use development has been a specialty for Related for decades, and we always endeavor to ensure we create unique and contextual places and spaces that reflect the local residents’ aspirations and that of the cities in which we build.” The center will also feature a public art piece designed by Gehry, and projectors will be permanent- ly housed in the complex to project images on Disney Hall for those at the Grand to see from the restaurants, hotel and residences.
    [Show full text]
  • Ground Floor Retail Space Available for Lease ±1,100
    201 - 213 S BROADWAY 316 W. 2ND STREET LOS ANGELES, CA 90071 ±1,100 - 5,600 SF GROUND FLOOR RETAIL SPACE AVAILABLE FOR LEASE The Broadway Media Center is situated at the center of the growing Civic Center neighborhood, which PROJECT has the designation of having the largest concentration of government employees in the country outside of Washington DC. Many new exciting mixed-use projects are planned within blocks of this OVERVIEW site, including The Onni Group’s 1,100 residential unit redevelopment of the Times Mirror campus, and “The Grand”, which will feature the city’s first Equinox Hotel, along with residential units and retail. The Broadway Media Center is home to creative businesses such as Civic Center Studios and Section HIGHLIGHTS Studios, as well as retailers such as Birds & Bees, a new specialty cocktail bar and lounge concept. Approximately 8,400 SF of ground level space is available for a variety of uses, including restaurants Prominent Broadway Signage Opportunity and neighborhood-serving retail. 9 Existing Conditional Use Permits 3,500 SF corner, 5,600 SF inline (Broadway), and 4,100 SF inline (2nd Street) spaces available immediately (divisible). Including a ±2,600 SF 2nd generation fitness space Adjacent parking lot under same ownership High Ceilings 2 RETAIL SITE PLAN: GROUND FLOOR Suite 112 2ND ST. Available ± 1,100 SF SUITE 201-203 Available ±3,500 SF Building Lobby SUITE 209 Available ±2,600 SF SUITE 211-213 Available ±3,000 SF PUBLIC RIGHT OF WAY S.AVE BROADWAY 18'-0" 3 10 0 10 20 N SITE PLAN Superior location within
    [Show full text]
  • Amrit Kulkarni
    AMRIT S. KULKARNI Amrit Kulkarni is a member of the Executive Committee and chairs the Land Use, Environmental Law, and Transportation & Infrastructure Practice Groups, reflecting the reality that these Practices are highly integrated, the respective laws and regulations often overlap and clients depend on his strategic insight at the intersection of the three areas. Amrit’s specialty is providing transaction and litigation counsel on high-profile, complex and often controversial transportation infrastructure and commercial and urban development projects. He also has experience advising on the unique issues involved in public-private Amrit S. Kulkarni partnerships. Principal 707 Wilshire Boulevard, 24th Floor Amrit’s project experience includes serving local, state and Los Angeles, CA 90017 national clients that are involved in airports, passenger transit systems, freight rail networks, ports, harbors, T: 213.626.2906 F: 213.626.0215 highways, water resources, office buildings, mixed-use [email protected] residential developments, university campus expansions, and a wide range of commercial and industrial facilities. He Practice Groups advises on an extensive scope of laws, including the Climate Change and Green Initiatives Environmental Law California Environmental Quality Act (CEQA), National Land Use Environmental Policy Act (NEPA), State Planning and Transportation and Infrastructure Zoning Law, Coastal Act, Tidelands Trust, Subdivision Map Writs and Appeals Act, Cortese-Knox-Hertzberg Act, Mitigation Fee Act and California Bar Number Clean Water Act, among others. 202786 Amrit provides transactional counsel during a project’s Education Northwestern School of Law of Lewis and planning, development and implementation phases, Clark College, JD, 1998 particularly relating to the entitlement process, as well as litigation expertise when clients need to defend or challenge University of California at Santa Cruz, BA Environmental Studies / Policy and a project.
    [Show full text]
  • GRAND AVENUE PROJECT – Non-Monetary Action
    CRA/LA, A DESIGNATED LOCAL AUTHORITY (Successor Agency to the Community Redevelopment Agency of the City of Los Angeles, CA) M E M O R A N D U M DATE: DECEMBER 12, 2016 5 TO: GOVERNING BOARD FROM: STEVE VALENZUELA, CHIEF EXECUTIVE OFFICER SUBJECT: GRAND AVENUE PROJECT – Non-monetary Action. Various actions to implement the development of Phase I of the Grand Avenue Project on County- owned Parcel Q (APN 5149-010-949) located at 100 South Grand Avenue in the Bunker Hill Redevelopment Project Area RECOMMENDATIONS That the Governing Board: 1. Acting as a responsible agency for purposes of the California Environmental Quality Act (“CEQA”), find that the recommended actions are within the scope of the previously certified Final Environmental Impact Report and the First and Second Addenda to the Final Environmental Impact Report; 2. Approve the proposed revision to the Phase I Scope of Development on Parcel Q to allow for adjustments to the prior approvals consistent with the revised concept design and Project description previously approved by CRA/LA to facilitate the design and refinement of terms relative to a mixed-use development featuring a residential tower (including affordable housing), a hotel tower, public plaza, parking, retail/commercial spaces, streetscape and site landscaping by the Phase I Developer; 3. Authorize the Chief Executive Officer (“CEO”) to consent to the Fifth Amendment to the Disposition and Development Agreement (“DDA”) among the Los Angeles Grand Avenue Authority (“Authority”), Grand Avenue L.A., LLC (“GALA”), and the Phase I Developer to implement the Phase I development; 4. Authorize the CEO to execute an update to the Subordination/Non-Disturbance and Attornment Agreement among the County of Los Angeles, CRA/LA, and the Phase I Developer; 5.
    [Show full text]
  • The City Is Divided Into Many Neighborhoods, Many of Which Were Towns That Were Annexed by the Growing City
    The city is divided into many neighborhoods, many of which were towns that were annexed by the growing city. There are also several independent cities in and around Los Angeles, but they are popularly grouped with the city of Los Angeles, either due to being completely engulfed as enclaves by Los Angeles, or lying within its immediate vicinity. Generally, the city is divided into the following areas: Downtown Los Angeles, Northeast - including Highland Park and Eagle Rock areas, the Eastside, South Los Angeles (still often colloquially referred to as South Central by locals), the Harbor Area, Hollywood, Wilshire, the Westside, and the San Fernando and Crescenta Valleys. Some well-known communities of Los Angeles include West Adams, Watts, Venice Beach, the Downtown Financial District, Los Feliz, Silver Lake, Hollywood, Hancock Park, Koreatown, Westwood and the more affluent areas of Bel Air, Benedict Canyon, Hollywood Hills, Pacific Palisades, and Brentwood. [edit] Landmarks Important landmarks in Los Angeles include Chinatown, Koreatown, Little Tokyo, Walt Disney Concert Hall, Kodak Theatre, Griffith Observatory, Getty Center, Los Angeles Memorial Coliseum, Los Angeles County Museum of Art, Grauman's Chinese Theatre, Hollywood Sign, Hollywood Boulevard, Capitol Records Tower, Los Angeles City Hall, Hollywood Bowl, Watts Towers, Staples Center, Dodger Stadium and La Placita Olvera/Olvera Street. Downtown Los Angeles Skyline of downtown Los Angeles Downtown Los Angeles is the central business district of Los Angeles, California, United States, located close to the geographic center of the metropolitan area. The area features many of the city's major arts institutions and sports facilities, a variety of skyscrapers and associated large multinational corporations and an array of public art, unique shopping opportunities and the hub of the city's freeway and public transportation networks.
    [Show full text]
  • The Grand Avenue Project
    SECONDADDENDUM To THE CERTIFIED EIR The Grand Avenue Project Los Angeles, California State Clearinghouse No. 2005091041 Prepared/or: Grand Avenue Authority c/o County of Los Angeles 745 Kenneth Hahn Hall of Administration 500 West Temple Street Los Angeles, CA 90012 Prepared By: CAJA Environmental Services, LLC April 2014 I. INTRODUCTION Project Information Project Title: Second Addendum to Final Environmental Impact Report for The Grand Avenue Project Project Location: The portion of the downtown area, in which the Grand Avenue Project is located, is generally bounded by Cesar E. Chavez Avenue on the north, Spring Street on the east, Fifth Street on the south, and Hope Street to the West Project Applicant: Grand Avenue L.A., LLC Pursuant to the California Environmental Quality Act (CEQA), a Final Environmental Impact Report (EIR) was prepared and certified for The Grand Avenue Project in November 2006 (SCH No. 2005091041). The Final EIR document is hereinafter referred to as the Certified EIR. This document is an addendum to the Final EIR and has been prepared to evaluate potential environmental effects that may be associated with proposed changes in the previously-approved The Grand Avenue Project (or "Approved Project"). These modifications are related to potential changes in development plans for Parcel Q (described in full in Section IV., Environmental Impact Analysis, below). Final EIR The Final EJR for the Approved Project analyzed the following three components to be located in downtown Los Angeles: (1) The now completed 16-acre Civic Park (renamed Grand Park) that expands upon the existing Civic Center Mall that connects Los Angeles' City Hall to Grand Avenue; (2) Streetscape improvements along Grand Avenue between Fifth Street and Cesar E.
    [Show full text]
  • The Grand Avenue Project Addendum No. 3
    I. INTRODUCTION Project Information Project Title: Third Addendum to Final Environmental Impact Report for The Grand Avenue Project Project Location: The portion of the downtown area, in which Parcel Q of the Grand Avenue Project is located, is generally bounded by Grand Avenue on the west, First Street on the north, Second Street on the south, and Olive Street to the west. Project Applicant: Grand Avenue L.A., LLC Lead Agency: Los Angeles Grand Avenue Authority Pursuant to the California Environmental Quality Act (CEQA), a Final Environmental Impact Report (EIR) was prepared and certified for The Grand Avenue Project in November 2006 (SCH No. 2005091041). The Final EIR document is hereinafter referred to as the Certified EIR. This document is an addendum to the Final EIR and has been prepared to evaluate potential environmental effects that may be associated with proposed changes in the previously-approved The Grand Avenue Project (or “Approved Project”). These modifications are related to tree removal and replacement, and a requested Haul Route application (described in full in Section IV., Environmental Impact Analysis, below). Final EIR The Final EIR for the Approved Project analyzed the following three components to be located in downtown Los Angeles: (1) The now completed 16-acre County owned Grand Park (formerly Civic Park) that expands the existing Civic Center Mall that connects Los Angeles’ City Hall to Grand Avenue; (2) Streetscape improvements along Grand Avenue between Fifth Street and Cesar E. Chavez Avenue. Grand Avenue Improvements between 2nd Street and 3rd Street will be completed with development of Parcels L and M-2, which are currently under construction.; and (3) Development of five parcels, which are referred to as Parcels Q, W-1, W-2, L, and M-2.
    [Show full text]
  • Fiscal Impact Analysis (FIA) 1300 El Camino Real Project
    PROPOSAL Fiscal Impact Analysis (FIA) 1300 El Camino Real Project Prepared for: City of Menlo Park April 2008 Table of Contents I. Detailed Firm Qualifications ............................................................1 II. Proposed Work Program..................................................................5 A. Project Understanding .............................................................................................................................5 B. Detailed Work Program...........................................................................................................................5 C. Data Needs.............................................................................................................................................13 D. Schedule.................................................................................................................................................14 E. Budget and Fees.....................................................................................................................................15 III. Key Personnel..................................................................................17 IV. Project List ......................................................................................19 V. References........................................................................................23 VI. Disclosure Statement.......................................................................24 VII. Appendix A: Other Professional Staff ...........................................25
    [Show full text]
  • 2Nd & Broadway
    FOR LEASE 2nd & Broadway 209-213 S BROADWAY, LOS ANGELES, CA FINANCIAL DISTRICT BUNKER HILL 2ND & BROADWAY HISTORIC CORE LITTLE TOKYO CONTACT US Bill Durslag Quinn Edwards Senior Vice President Associate +1 213 613 3106 +1 213 613 3229 [email protected] [email protected] Lic. 00498427 Lic. 02058634 www.propertyurl.com FOR LEASE 2nd & Broadway 209-213 S BROADWAY, LOS ANGELES, CA 1ST STREET TIMES MIRROR SQUARE: Renovation of both art deco buildings to 1 bring to creative office layouts and new retail on the ground floor. In addition one 37-story and another 53-story residential tower will be constructed on 2nd Street. The two new towers will bring 1,126 residential units to the corner of 2nd and Broadway 8 TRIBUNE MEDIA DTLA TOWER: 30-Story Building. 107 2ND STREET 2 condominums, 534,000 SF of creative office. 7,200 SF of retail. 6 FEDERAL COURT HOUSE: Recently completed. 24 Courtrooms. 32 3 Judicial Chambers HILL STREET 3 REGIONAL CONNECTOR: Daily ridership forcasted at 90,000 2ND & 4 passangers per day. 17,000 will be new riders. Will connect to S BROADWAY1 STREET Little Tokyo and 2nd & Hope stations LA STREET CAR: 3.8 mile loop through the hear of DTLA. S OLIVE STREETBROADWAY 5 Connecting LA Live, the Historic Core, Bunker Hill and the Financial District to 2nd and Broadway. 4 S SPRING STREET 1ST & BROADWAY PARK: 2 Acre green space conversion. $28 5 2 6 million budget. Adjacent to Grand Park. ANGEL’S LANDING: The City of LA has began soliciting offers for 7 the 2.26 acre development site.
    [Show full text]
  • The Broad Foundations Thebroad Foundations
    years 5 yea10rs science education years 25 2009|2010 the arts ENTREPRENEURSHIP FOR THE PUBLIC GOOD IN EDUCATION, SCIENCE AND THE ARTS THE BROAD FOUNDATIONS THEBROAD FOUNDATIONS The Eli and Edythe Broad Foundation The Broad Art Foundation The Mission ofThe Broad Foundations Transforming K-12 urban public education through better governance, management, labor relations and competition Making significant contributions to advance major scientific and medical research Fostering public appreciation of contemporary art by increasing access for audiences worldwide Leading and contributing to major civic projects in Los Angeles TABLE OF C ONTENTS Letterfrom theDirectors 2 Education 8 Scientific | Medical Research 28 Arts, Culture and Civic Initiatives 54 Financial Statement 76 Board of Governors 77 TheBroad Team 78 LETTER FROMTHE DIRECTORS In some ways, it seems like we’ve spent a lifetime as philanthropists. 3 At other moments, this experience feels brand new. This year marks the fifth anniversary of the founding of the Broad Institute, the 10th anniversary of our entry into education reform, and the 25th anniversary of The Broad Art Foundation. Anniversaries or milestones, whatever you choose to call them, are significant. To us, they are a reason to pause and reflect on how far we’ve come, what we’ve accomplished, and what we have left to do. While it is often tempting to view milestones like these as a self- congratulatory exercise, we prefer to see them as an opportunity to turn a critical eye on our work. Yes, what have been our most successful investments, but also, what were the risks we took that didn’t pay off? What work do we still have to do? How has the landscape changed, how has our approach evolved, and what have we learned over these past five, 10, 25 years? Scientific and medical research is our newest area of philanthropy, but it is the one in which we have made the greatest progress in the short- est amount of time.
    [Show full text]