Appendix H Cycling Schemes 2021-2026 2021/22 Cycling Schemes Estimated Scheme Ward(s) Details Comments Cost (£) Ad hoc works, including parking and signing, completion of General Works Various 20,000 previous years schemes and work arising out RSA's /Wigm Road Cyclists being 'squeezed' at junction with Lalleford Road 30,000 ore Improve cycling routes in and around the town centre, access to Match fund from Active Travel Active Travel Schemes Various 120,000 L&D, Busway, Station, A505 and Kimpton Road Fund tranche 2 allocation Annual Total 170,000

2022/23 Cycling Schemes Estimated Scheme Ward(s) Details Comments Cost (£) Ad hoc works, including parking and signing, completion of General Works Various 20,000 previous years schemes and work arising out RSA's Requested by Sustrans. Review Re-sign shared used path between Kimpton Road and Eaton Green Vauxhall Way Crawley in conjunction with the East of 15,000 Road Junctions review Scheme to be developed when Improve connectivity from the Airport and Napier Park to Parkway work starts on site at Napier Park, Napier Park connectivity South and the Town Centre to encourage cycling and walking for those 65,000 therefore this may need to slip to working and living in the vicinity future years Bridge and first roundabout in Capability Green South Investigate bridge parapets for safety for cyclists Capability Green are public 130,000 highway Annual Total 230,000

2023/24 Cycling Schemes Estimated Scheme Ward(s) Details Comments Cost (£) Ad hoc works, including parking and signing, completion of General Works Various 20,000 previous years schemes and work arising out RSA's Follows on from Napier Park Airport to Town Centre TBC Cycling infrastructure from LLA to the town centre 75,000 Connectivity in 2021/22 to Butterfield TBC Access from Bushmead to Inspire and Butterfield Consultation by Active Luton 65,000 /L Preliminary design on P1565. Convert footway to shared use and build new cycle path. From Way/Bramingham Rd imbury/ Continuatiuonof work 100,000 Wauluds Bank Drive to Newbold Road Icknield undertaken in 2020/21 Annual Total 260,000

2024/25 Cycling Schemes Estimated Scheme Ward(s) Details Comments Cost (£) Ad hoc works, including parking and signing, completion of General Works Various 20,000 previous years schemes and work arising out RSA's Review cycle route through Toddington Road to Leagrave Station Design at the same time as the Toddington Road Leagrave with a view to extending to industrial areas and new developments crossing nr Sedgwick Rd (Ped 55,000 north of Luton, including Sundon RFI schemes) Scheme to be confirmed TBC Scheme to be confirmed TBC Annual Total 75,000

2025/26 Cycling Schemes Estimated Scheme Ward(s) Details Comments Cost (£) Ad hoc works, including parking and signing, completion of General Works Various 20,000 previous years schemes and work arising out RSA's Scheme to be confirmed TBC Scheme to be confirmed TBC Scheme to be confirmed TBC Annual Total 20,000