Santry Model

Total Page:16

File Type:pdf, Size:1020Kb

Santry Model Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Eastern CFRAM Study HA09 Hydraulics Report Santry Model DOCUMENT CONTROL SHEET Client OPW Project Title Eastern CFRAM Study Document Title IBE0600Rp0027_HA09 Hydraulics Report Model Name HA09_Sant1 Rev. Status Author Reviewed By Approved By Office of Origin Issue Date D01 Draft M.Houston S. Cullen G. Glasgow Belfast 25/02/2014 D02 Draft M.Houston S. Cullen G. Glasgow Belfast 02/07/2014 F01 Draft A. Sloan S. Patterson G. Glasgow Belfast 25/02/2015 F02 Draft A. Sloan S. Patterson G. Glasgow Belfast 13/08/2015 F03 Draft Final A. Sloan S. Patterson G. Glasgow Belfast 05/08/2016 IBE0600Rp0027 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report - DRAFT FINAL Table of Reference Reports Report Issue Date Report Reference Relevant Section Eastern CFRAM Study Flood Risk December IBE0600Rp0001_Flood Risk 3.2.1 Review 2011 Review_F02 Eastern CFRAM Study Inception August 2012 IBE0600Rp0008_HA09 Inception 4.3.2 Report UoM09 Report_F02 Eastern CFRAM Study Hydrology September IBE0600Rp0016_HA09_Hydrology 7.2 Report UoM09 2013 Report_F01 Eastern CFRAM Study HA09 Liffey November 2001s4884- SC2 Survey Report v1 Various Survey Contract Report 2012 IBE0600Rp0027 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL 4 HYDRAULIC MODEL DETAILS 4.10 SANTRY MODEL 4.10.1 General Hydraulic Model Information (1) Introduction: The Eastern CFRAM Flood Risk Review (IBE0600Rp0001_Flood Risk Review) highlighted Santry as an AFA and the Santry River itself as a HPW for fluvial flood risk under the ECFRAM Study based on a review of historic flooding and the extents of flood risk determined during the Preliminary Flood Risk Assessment. The Santry watercourse is within HA09, but is independent from the main Liffey system and flows directly into Dublin Bay at Raheny, to the west of North Bull Island. The watercourse originates from the southern edge of Dublin Airport and drainage drawings supplied by Dublin Airport Authority indicate that the drainage system for the western portion of the southern runway and some car park hardstanding both discharge to the headwaters of the Santry through conventional piped drainage systems. The Santry watercourse has a narrow catchment and has no significant tributaries. The total catchment area of the model at the downstream extents (at Raheny) is 13.96km². The catchment is heavily urbanised (62%) and includes an attenuating structure and online storage pond at Santry Demesne to the south of Northwood Avenue. Dublin City Council has also recently installed a flow control structure at the Harmonstown Road bridge. The model can be considered to represent a gauged catchment with the Cadburys hydrometric gauging station (09102 – EPA) located approximately two thirds of the length of the river from Dublin Airport. The gauging station was not given a classification under FSU and the rating curve does not extend up to the range of the observed corresponding water level at Qmed. As such the gauging station cannot be 3 considered to have a high degree of certainty at flood flows. The observed Qmed of 3.37m /s is derived from only 11 complete hydrological years of data which again does not afford high statistical certainty. A rainfall run-off model has been developed of the contributing catchment to the Cadburys gauging station in order to simulate a longer AMAX series and increase confidence in the Cadburys gauged Qmed. The model was calibrated against the existing continuous flow record of the gauging station from 2001 to 2011 and utilises rainfall data from the hourly gauge at Dublin Airport as input data. The hourly rainfall gauge was used at Dublin Airport due to its location at the edge of the Santry catchment which is small and therefore has little spatial variation in meteorological conditions which would be captured by the rainfall radar also located at Dublin Airport. The rainfall run-off (NAM) model was calibrated to the period for which there is corresponding flow data and rainfall gauge data (2001 – 2010) and good calibration was achieved. Hourly rainfall information is available for the period of 1941 – 2010 and was input to the rainfall run-off IBE0600Rp00027 4.10 - 1 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL 3 model. Analysis of the simulated flow trace shows that the simulated Qmed from this period is 3.25m /s. This compares to values derived from catchment descriptor based methods at the gauge of 4.55m3/s and 2.53m3/s using IH124 and FSU methods respectively. Due to the catchment sizes the IH124 values have been retained and adjusted downwards based on the relationship between the NAM simulated and IH124 derived index flood flow values at the Cadburys gauging station. The entire length of the Santry model is a HPW and was modelled as 1D-2D using the Infoworks ICM flexible mesh software. A number of catchments in the Greater Dublin area have legacy drainage network models constructed in InfoWorks CS. Survey data gathered as part of the CFRAM study has been augmented with culvert and manhole information from these GDSDS models to allow a more accurate line and gradient of pipe networks to be represented in the model. Comprehensive data collection of existing sewer network records and survey of culverted reaches was undertaken for the GDSDS in order to capture detail in complex drainage networks i.e. changes to internal diameter and gradient. Therefore OPW and RPS selected ICM use to allow better representation of culverted river networks and enable better utilisation of, and future integration with, the existing sewer network models. ICM also provides a very stable 2D modelling regime for coastal inundation modelling, therefore ICM models (driven by a MIKE21 coastal model) were used for Dublin Bay coastal AFAs, including Raheny AFA, to provide a consistent approach throughout the Greater Dublin area, facilitating integration with existing models. (2) Model Reference: HA09_SANT1 (3) AFAs included in the model: Santry (flows through Raheny AFA where coastal flood risk is addressed by a separate model) (4) Primary Watercourses / Water Bodies (including local names): SANTRY (5) Software Type (and version): (a) 1D Domain: (b) 2D Domain: (c) Other model elements: Infoworks ICM Infoworks ICM v5 Flexible Mesh N/A 4.10.2 Hydraulic Model Schematisation (1) Map of Model Extents: Figure 4.10.1 illustrates the extent of the modelled catchment, river centre lines, HEP locations and AFA extents as applicable. The Santry modelled watercourse lies within the Dublin AFA and includes 1 Upstream Limit HEP, 1 Downstream Limit HEP, 1 Intermediate HEP and 1 Gauging Station HEP. There are no Tributary HEPs along this watercourse. IBE0600Rp00027 4.10 - 2 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Figure 4.10.1: Santry HPW/AFA Modelled Catchment and HEPs (2) x-y Coordinates of River (Upstream extent): River Name x y SANTRY 313968 242314 (3) Total Modelled Watercourse Length: 11.1 km (4) 1D Domain only Watercourse Length: N/A (5) 1D-2D Domain 11.1 km Watercourse Length: (6) 2D Domain Mesh Type / Resolution / Area: Flexible Mesh / 1-25 m2 / 13.7 km2 (7) 2D Domain Model Extent: Figure 42 shows the modelled extents and the general topography of the catchment within the 2D model domain. The river centre-line is shown in blue, changes in the vertical elevation of this map are outlined by the legend, all levels have been set to OD Malin (metres). The ground elevation (based on LiDAR data used to generate a 2D flexible mesh) is shown to provide an overview of the modelled area topography. IBE0600Rp00027 4.10 - 3 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Figure 4.10.2: 2D Domain Model Extent IBE0600Rp00027 4.10 - 4 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Figure 4.10.3 is an overview of the model schematisation. Figure 4.10.4-4.10.6 show detailed views. The overview diagram covers the model extents, showing the cross-section locations, AFA boundary and river centre line. It also shows the area covered by the 2D model domain. The detailed areas are provided where there is the most significant risk of flooding. These diagrams include the surveyed cross-section locations, AFA boundary and river centre. They also show the location of the critical structures as discussed in Section 4.10.3, along with the location and extent of the links between the 1D and 2D models. Figure 4.10.3: Overview of Model Schematisation IBE0600Rp00027 4.10 - 5 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Figure 4.10.4: Model Schematisation in the vicinity of Harmonstown Road Flow Control Structure IBE0600Rp00027 4.10 - 6 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Figure 4.10.5: Model Schematisation in the vicinity of Cadbury's Gauging Station Figure 4.10.6: Model Schematisation in the vicinity of Santry Attenuation Ponds (8) Survey Information (a) Survey Folder Structure: First Level Folder Second Level Folder Third Level Folder Murphy_E09_M01_WP2_120622_Santry_A GIS and Floodplain Structure Register Where: Photos Murphy – Surveyor Name Surveyed Cross Section Lines E09 – Eastern CFRAM Study Area, Photos Hydrometric Area 09 M01 – Model Number 1 Videos WP2 – Work Package 2 120622 – Date Issued (22nd June 2012) Ascii Santry_A – River Reference Drawings and PDFs (b) Survey Folder References: SANTRY Murphy_E09_M01_WP1_120504_SANT_Santry Gauge Murphy_E09_M01_WP2_120622_Santry_A Murphy_E09_M01_WP2_120622_Santry_B 2m resolution LiDAR of the entire modelled area was used to generate the 2D domain computational IBE0600Rp00027 4.10 - 7 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL flexible mesh. The vertical accuracy of the LiDAR is quoted as 0.2m RMSE which was considered satisfactory for model application. A comparison of topographical survey levels along James Larkin Road and the LiDAR data for the same area was undertaken.
Recommended publications
  • Social Infrastructure Audit
    Client Platinum Land Limited Project Title Former Chivers Factory Document Title Social Infrastructure Audit Document No. “SIA 01” OSI Licence No EN0005415 Document DCS TOC Text Appendices Comprises 1 1 7 2 Prepared by Nathan Smith Checked by Nathan Smith Rev. Status Issue Date B ISSUED 23.04.19 1.1 This Social Infrastructure Audit has been prepared by McCutcheon Halley Planning Consultants on behalf of Platinum Land Limited in respect of the proposed Built to Rent residential development proposal at the Former Chivers Factory Site, Coolock Drive, Coolock, Dublin. 1.2 This report is produced as an assessment of social infrastructure in the Coolock area in relation to development at Former Chivers Factory Site, Coolock Drive. It provides a contextual overview of the area surrounding the site, a review of the social infrastructure within its catchment and identifies possible future needs in the area. 1.3 Social Infrastructure covers many diverse services and facilities. In this instance this SIA has categorised as follows; • Education & Childcare- Childcare, Primary, Post Primary or Further education & Training; • Sports & Recreation- Parks, Playgrounds, Sports Clubs, Fitness Facilities and Recreation; • Health & Wellbeing- Hospital & Specialist Care, GP & Medical Centres, Dental, Pharmacy’s or physiotherapy; • Community Services- Social Service or Information Centre, Family Service, Employment Support, Parish or Community Centre, Youth Club, Retirement Club, Specialist Club or Library; • Faith- Churches and Cemeteries; • Other- Post Offices, Credit Unions, Banks, Recycling Bring Centres and key retail locations; and • Emergency Services- Fire Brigade and Garda Station. 1.4 The report is structured as follows; • Site Context; • Policy Context; • Profile of the area; • Existing Facilities; • Assessment of needs; • Conclusion; and • Appendix.
    [Show full text]
  • Hydrology Report Date
    Fingal East Meath Flood Risk Assessment and Management Study PROJECT: Fingal East Meath Flood Risk Assessment and Management Study DOCUMENT: HYDROLOGY REPORT DATE: January 2010 Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report Checking and Approval Prepared by: Keshav Bhattarai December 2009 Senior Hydrologist Checked by: Scott Baigent December 2009 Associate / Senior Hydrologist Checked by: Jenny Pickles December 2009 Principal Water Management Consultant Approved by: Anne-Marie Conibear January 2010 Project Manager Contents amendment record Issue Revision Description Date Signed 1 0 1st draft for review Oct ‘09 2 1 Final Jan ‘10 3 2 Final Report Apr ‘10 (additional text in response to OPW comments) Halcrow Barry has prepared this report in accordance with the instructions of Fingal County Council, Meath County and the OPW for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. Halcrow Barry Tramway House, 32 Dartry Road, Dublin 6, Ireland Tel +353 1 4975716, Fax +353 1 4975716 www.halcrow.com www.jbbarry.ie © Halcrow Barry, Fingal County Council, Meath County Council & Office of Public Works, 2010 i Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report ii Fingal East Meath Flood Risk Assessment and Management Study Hydrology Report Executive Summary Fingal County Council (FCC), in conjunction with Meath County Council (MCC) and the Office of Public Works (OPW), are undertaking a flood risk assessment and management study in Fingal and East Meath – the Fingal East Meath Flood Risk Assessment and Management Study (FEM FRAMS). Halcrow Barry (HB) was commissioned to carry out the work on behalf of FCC/MCC/OPW.
    [Show full text]
  • Dublin 9, Ireland
    DAIICHI SANKYO IRELAND LTD. TEL: 00 353 (0) 1 4893000 Unit 29, Block 3 FAX: 00 353 (0) 1 4893033 Northwood Court, www.daiichi-sankyo.ie Santry, Dublin 9, Ireland Travel Information M1 From the city centre Follow the signs for Dublin Airport/M1. Once you join the dual carriageway at Whitehall, proceed N1 towards the airport. From this road take the second exit, signed for Santry/Coolock/Beaumont. N3 Once at the top of the exit ramp take a left towards Santry. Continue to the t-junction and once Dublin Airport there, you will see a public park ahead. Take a right-hand turn and proceed past the National We Are Running (Morton) Stadium. The Swords Road entrance for Northwood Business Campus is on your left-hand side. Proceed to the first roundabout and take first exit and take first right. Take second Here M1 left for our car park. R104 From other parts of Dublin Leixlip M50 R807 Follow the signs for the M50. If coming from the south or west, take the northbound route M4 towards the airport. Proceed towards Exit 4, signposted as Ballymun/Naul. Follow signs from the N4 Dublin motorway for Ballymun. Once at the bottom of the exit ramp you will see a slip road to your left, with the Northwood Business Campus entrance directly ahead. Enter the business campus and go Irish Sea straight through the first roundabout (a retail park will be on your left). Take the first right. M50 Entrance to the car park is on the third right. N11 Dalkey Clane N7 N81 By Air R119 Dublin Airport is just 2km from Northwood Business Campus.
    [Show full text]
  • Appendix A16.8 Townland Boundaries to Be Crossed by the Proposed Project
    Environmental Impact Assessment Report: Volume 3 Part B of 6 Appendix A16.8 Townland Boundaries to be Crossed by the Proposed Project TB No.: 1 Townlands: Abbotstown/ Dunsink Parish: Castleknock Barony: Castleknock NGR: 309268, 238784 Description: This townland boundary is marked at the same location on all the OS map editions. It is formed by a road, which today have been truncated by the M50 to the south-east. The tarmac surface of the road is still present at this location, although overgrown. The road also separated the demesne associated with Abbotstown House and Hillbrook (DL 1, DL 2). Reference: OS mapping, field inspection TB No.: 2 Townlands: Dunsink/ Sheephill Parish: Castleknock Barony: Castleknock NGR: 309327, 238835 Description: This townland boundary is marked at the same location on all the OS map editions. It is formed by a road, which today have been truncated by the M50 to the south-east. The tarmac surface of the road is still present at this location, although overgrown. The road also separated the demesne associated with Abbotstown House (within the townland of Sheephill) and Hillbrook (DL 1, DL 2). The remains of a stone demesne wall associated with Abbotstown are located along the northern side of the road (UBH 2). Reference: OS mapping, field inspection 32102902/EIAR/3B Environmental Impact Assessment Report: Volume 3 Part B of 6 TB No.: 3 Townlands: Sheephill/ Dunsink Parish: Castleknock Barony: Castleknock NGR: 310153, 239339 Description: This townland boundary is marked at the same location on all the OS map editions. It is formed by a road, which today have been truncated by the M50 to the south.
    [Show full text]
  • Inspectors Report (302/R302039.Pdf, .PDF Format 2249KB)
    Inspector’s Report ABP301908-18 / ABP302039-18. Development Greater Dublin Drainage Project incorporating a Regional Biosolids Storage Facility. Location Dublin City and Dublin County. Applicant Irish Water Planning Authorities Fingal County Council and Dublin City Council. Prescribed Bodies 10 prescribed bodies - Listed in Appendix Observers to Planning Application 152 observations - Listed in Appendix Objectors to CPO 14 objectors - Listed in Appendix Types of Applications Application under the provisions of S37 of the Planning and Development Act and Compulsory Purchase of Lands under the Housing Act 1966.. ABP301908-18 / ABP302039-18 Inspector’s Report Page 1 of 399 Dates of Site Inspections 8th August 2018, 3rd September 2018, 7th September 2018, 6th March 2019, 9th March 2019, 15th March 2019, 24th March 2019 . Inspector Mairead Kenny. ABP301908-18 / ABP302039-18 Inspector’s Report Page 2 of 399 Contents 1.0 Introduction .......................................................................................................... 6 2.0 Site Location and Description .............................................................................. 8 3.0 Proposed Development ..................................................................................... 12 Overview ..................................................................................................... 12 Regional Biosolids Storage Facility ............................................................. 13 Orbital pipeline route - Blanchardstown to N2 (Ch 0,000-CH 5,500)
    [Show full text]
  • Dublin Bay North
    Dublin Bay North Constituency of Dublin Bay North 2019/20 Polling Place Polling Polling District PD Voters Voters Table Polling Station Code From To Totals District Totals St. Fiacras Senior N.S. 75 Beaumont B NB 1 516 516 2874 Montrose Park 76 517 1282 766 Dublin 5 77 1283 2044 762 78 2045 2874 830 St. John Vianney Parish Hall 79 Beaumont C NC 1 718 718 2295 Ardlea Road 80 719 1480 762 Artane 81 1481 2295 815 Dublin 5 Gaelscoil Cholmcille 82 Kilmore A pt. NE 1 445 706 1495 Coolock Lane ( 1198 1204 behind Astro Park ( 1271 1524 Dublin 17 83 1525 2313 789 Scoil Fhursa N.S. 84 Kilmore B NH 1 514 514 1961 Cromcastle Green 85 515 1178 664 Dublin 5 86 1179 1961 783 87 Kilmore A pt. NE 446 1197 818 818 ( 1205 1270 Northside Civic Centre 88 Kilmore C NJ 1 454 454 1011 Bunratty Road 89 455 1011 557 Dublin 17 St Brendans Parish Hall 90 Kilmore D NK 1 508 508 1704 Coolock Village 91 509 1062 554 Dublin 5 92 1063 1704 642 St Davids BNS 93 Beaumont F pt RC 1 332 531 1622 Kilmore Road ( 1186 1384 Artane Dublin 5 94 1385 2042 658 95 2043 2475 735 ( Beaumont D RA 1 302 1750 96 303 1005 703 97 1006 1750 745 St Brendan's N S 98 Harmonstown A TJ 1 714 714 2207 Mc Auley Road 99 715 1422 708 Artane 100 1423 2207 785 Dublin 5 101 Harmonstown B TK 1 610 610 2018 102 611 1275 665 103 1276 2018 743 St.
    [Show full text]
  • Greater Dublin Strategic Drainage Study Final Strategy Report ______
    Greater Dublin Strategic Drainage Study Final Strategy Report __________________________________________________________________________________________ Greater Dublin Strategic Drainage Study Final Strategy Report Document Title Final Strategy Report Volume 1 – Main Report Volume 2 – Appendices Document Ref (s): GDSDS/NE02057/035C Date Edition/Rev Status Originator Checked Approved 28/05/04 A Draft N Fleming J Grant M Hand M Edger C O’Keeffe 06/08/2004 B Draft N Fleming J Grant M Hand M Edger C O’Keeffe 27/04/2005 C Final N Fleming J Grant M Hand M Edger C O’Keeffe Contracting Authority (CA) Personnel Council Area Council Name Operations Manager Office Location Project Engineer Name Telephone No. Operations Manager Name Telephone No. This report has been prepared for the Contracting Authority in accordance with the terms and conditions of appointment for the Greater Dublin Strategic Drainage Study dated 23rd May 2001. The McCarthy Hyder MCOS Joint Venture cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. _________________________________________________________________________________________________________________ GDSDS/NEO2057/035C April 2005 Greater Dublin Strategic Drainage Study Final Strategy Report __________________________________________________________________________________________ TABLE OF CONTENTS VOLUME 1 1. EXECUTIVE SUMMARY.................................................................................................................6 1.1 INTRODUCTION ............................................................................................................................................6
    [Show full text]
  • Distribution and Sources of Pahs and Trace Metals in Bull Island, Dublin Bay Aisling Cunningham Bsc
    Distribution and sources of PAHs and trace metals in Bull Island, Dublin Bay Aisling Cunningham BSc Thesis submitted for the award of MSc Dublin City University Supervisor: Brian Kelleher School of Chemical Sciences September 2018 Aisling Cunningham 10/04/2018 Table of Contents Acknowledgements ................................................................................................................................. 3 Abbreviations of key terms ..................................................................................................................... 4 Abstract ................................................................................................................................................... 5 1. Introduction ..................................................................................................................................... 6 2. Materials and Methods ...................................................................................................................... 18 2.1 Study area ................................................................................................................................ 18 2.2 Sample locations ..................................................................................................................... 19 2.3 Sampling ................................................................................................................................. 20 2.4 Sample Preparation prior to extraction for PAH analysis ......................................................
    [Show full text]
  • Migration Patterns in Dublin County Borough
    Migration Patterns in Dublin County Borough N. JOHNSON N the last 15 years Dublin has undergone a dramatic change, from the fairly sleepy introverted capital of the 26 counties, it has been transformed into a relatively I sophisticated and increasingly cosmopolitan financial and commercial centre. The large demand for office space has led to a change in function of an ever-growing number of buildings in the central city area, while the steadily increasing population is being housed and rehoused in new suburban estates around and beyond the city perimeter. Change has been rapid and this study, limited to that area included in the County Borough due to lack of adequate data, concentrates on certain facets of the city in explanation of the continuous movements of its population. It will show how, as in the majority of cities in the Western Hemisphere, the ecological process of invasion and succession determined the present composition of Dublin and it will outline along what path, without official intervention, its future pattern of growth may proceed. The Growth of Modern Dublin Urban ecologists1 describe the usual process of a city's growth in terms of a centrifugal process. The continuous pressure of migrant population on central city accommodation causes the residents to move to the periphery of the city in order to escape the encroach­ ing slums. This process of invasion and succession continues with the areas of over- *I wish to thank Professor B. Hutchinson, Dr R. C. Geary and Dr Brendan M. Walsh for their valuable criticisms and Peter Neary for conducting the statistical analysis in this paper.
    [Show full text]
  • Oscar Traynor Road, Coolock, Dublin 17 Key Features
    FOR SALE On the instructions of Mondelez Approx. 2.57 Ha (6.36 Acres) Oscar Traynor Road, Coolock, Dublin 17 Key Features • Approx. 2.57 Ha (6.36 Acres) of Z6 zoned land superbly located on Oscar Traynor Road (frontage approx. 120 m) • Greenfield site strategically situated alongside Northside Retail Park • Title: Freehold • Approx. 7 km north east of Dublin City centre and 4 km south east of Dublin Airport and M50 • Adjacent to quality bus corridor • Suitable for a wide range of commercial and residential uses subject to planning permission • Zoned Z6 Location The subject property occupies a prominent site to the west of the landmark Cadburys factory (Mondelez own Cadburys) at Oscar Traynor Road. It lies approximately 7 km north east of Dublin City centre and approximately 4 km south east of Dublin Airport. The surrounding area has high-density public and private residential housing along with a vast array of commercial amenities with notable nearby occupiers including Aldi, a Tesco Superstore, Bank of Ireland, Odeon Coolock, Leisureplex Coolock and Burger King. The area has strong transport links with the M50/N1 junction and Dublin Port Tunnel situated approx. 2.5 km to the north west. Numerous Dublin Bus routes also pass through Oscar Traynor Road and Old Malahide Road including bus no.’s 17A, 15, 42 and 43. The subject property is also located approx. 1.7 km north east of Harmonstown train station which provides easy access to Howth, Bray, Malahide and Greystones. Local amenities within Coolock include Parnells GAA Club, St. Malachys Football Club, Scoil Chaitriona Cailini, Mercy College and Beaumont Hospital to name a few.
    [Show full text]
  • Company Name Site Address Registration No. Activity AV Pound & Co. Limited Goolds Hill House, Old Cork Road, Mallow, Cork
    Company Name Site Address Registration No. Activity A.V. Pound & Co. Limited Goolds Hill House, Old Cork Road, Mallow, Cork, P51 FK70, Ireland ASR12130/00001 Distributor AbbVie Ireland NL B.V Manorhamilton Road, Co. Sligo ASR11336/00001 Distributor Allergan Pharmaceuticals International Limited Longphort House, Earlsfort Centre, Earlsfort Terrace, Dublin 2, D02 WK40 ASR12018/00001 Distributor Amdipharm Limited Suite 17,Northwood House, Northwood Avenue, Santry, Dublin 9 ASR11918/00001 Distributor Astellas Ireland Co. Ltd Damastown Road, Damastown Industrial Estate, Mulhuddart, Dublin 15 ASR11341/00001 Distributor Athlone Laboratories Ballymurray, Co. Roscommon ASR11399/00001 Distributor Avara Shannon Pharmaceutical Services Limited Shannon Industrial Estate, Shannon, Co. Clare ASR11990/00001 Distributor BioMarin International Limited Shanbally, Ringaskiddy, Co. Cork, P43 R298 ASR11831/00001 Distributor BNL Sciences Limited Unit S, M7 Business Park, Naas, Kildare ASR11343/00001 Distributor Brenntag Chemicals Distribution (Ireland) Limited Unit 405, Grants Drive, Greenogue Business Park, Rathcoole, Dublin 24 ASR11387/00001 Distributor Bristol-Myers Squibb Swords Laboratories Cruiserath Road, Mulhuddart, Dublin 15 ASR11426/00002 Distributor Camida Ltd Tower House, New Quay, Clonmel, Co. Tipperary ASR11431/00001 Distributor Cara Partners Wallingstown, Little Island Industrial Estate, Co. Cork ASR11494/00001 Distributor Chanelle Medical Dublin Road, Loughrea, Galway ASR11380/00001 Distributor Clarochem Ireland Limited Damastown, Mulhuddart,
    [Show full text]
  • Central Statistics Office, Information Section, Skehard Road, Cork
    Published by the Stationery Office, Dublin, Ireland. To be purchased from the: Central Statistics Office, Information Section, Skehard Road, Cork. Government Publications Sales Office, Sun Alliance House, Molesworth Street, Dublin 2, or through any bookseller. Prn 443. Price 15.00. July 2003. © Government of Ireland 2003 Material compiled and presented by Central Statistics Office. Reproduction is authorised, except for commercial purposes, provided the source is acknowledged. ISBN 0-7557-1507-1 3 Table of Contents General Details Page Introduction 5 Coverage of the Census 5 Conduct of the Census 5 Production of Results 5 Publication of Results 6 Maps Percentage change in the population of Electoral Divisions, 1996-2002 8 Population density of Electoral Divisions, 2002 9 Tables Table No. 1 Population of each Province, County and City and actual and percentage change, 1996-2002 13 2 Population of each Province and County as constituted at each census since 1841 14 3 Persons, males and females in the Aggregate Town and Aggregate Rural Areas of each Province, County and City and percentage of population in the Aggregate Town Area, 2002 19 4 Persons, males and females in each Regional Authority Area, showing those in the Aggregate Town and Aggregate Rural Areas and percentage of total population in towns of various sizes, 2002 20 5 Population of Towns ordered by County and size, 1996 and 2002 21 6 Population and area of each Province, County, City, urban area, rural area and Electoral Division, 1996 and 2002 58 7 Persons in each town of 1,500 population and over, distinguishing those within legally defined boundaries and in suburbs or environs, 1996 and 2002 119 8 Persons, males and females in each Constituency, as defined in the Electoral (Amendment) (No.
    [Show full text]