COMPANY OVERVIEW TECNOTask is an Italian Mechanical Private Company established at the end of 2011 specialized in “Project & Construction Management”. In 2015 TECNOTask started to operate as “Mechanical Contractor”, with direct manpower, equipment and tools allowing to its Clients to have a complete high quality service granting high standards in terms of safety, quality and scheduling.

TECNOTask performs and completes projects in the fields of Oil and Gas, Chemical, , Power Plants, respecting the Clients Schedule and budget and developing ever innovative and technological solutions, ensuring always the best result aimed to Client’s Satisfaction. Our mission statement is:

 To have the right number of employees in each Project satisfying Projects needs and reaching Client’s targets

 To create and maintain a Safe and Environmental Sound working condition for our own employees and third parties ones

Our Commitment is:

 Zero Risks and Zero Accidents

 Due Respect for existing Legal Requirements, Licenses and applicable Procedures Our vision is:

 To establish a long term and successful relationship with our Clients based on reliability and trust.

 To have a lean and flexible organization

 To have well trained and qualified personnel

 To assure the Costumer a flexible and professional approach We are specialized in:

→ PROJECT & CONSTRUCTION MANAGEMENT SERVICES • Planning & progress monitoring • Budgeting and cost control • Risk identification and mitigation • Contract & subcontract administration • Changes and claims management • Multidisciplinary site work supervision • Quality control activities → DETAILED ENGINEERING & PROCUREMENT COORD. • Spooling and cutting list preparation • Weld History Sheet preparation • As built and final dossiers (PED) • Coordination of all procurement phases

→ FABRICATION & INSTALLATION ACTIVITIES • Piping and supports fabrication and installation with relevant painting and NDE/PWHT coordination • Steam Tracing installation • Fabrication and Erection of steel structures • Skids pre assembly and relevant installation on site • Heaters & Steam reformers installation  EQUIPMENT & MACHINES

• Erection of Static Equipment

• Erection of Rotating Equipment

 REVAMPING  PRE-SHUTDOWN AND SHUTDOWN

• Study of SoW & scheduling issue and further revisions

• Dedicated HSE Plan issue and study of lifting plan

• Subcontracts issue

• Dedicated work instruction issue (Method Statement)

• Study of the work permit procedure

• Job card preparation for each item “cold and hot work”  PRE-SHUTDOWN AND SHUTDOWN

 PREPARATION & MANAGEMENT • Check and/or procurement per each Job Card • Issue of scaffolding request • Check of drainage plan for pipe and equipment • Monitoring the scaffolding tag procedure • Works Execution • Implementation of night shift “if required” • Completion, Testing and Box up • Final hand over • Cleaning • Scaffolding Removal  PRE-SHUTDOWN AND SHUTDOWN

 SHUT-DOWN PROJECT CONTROL

It is developed in two major phases:

 Phase 1: “PREPARATION”

 Phase 2: “EXECUTION”  PRE-SHUTDOWN AND SHUTDOWN

 SHUT-DOWN PROJECT CONTROL

 Phase 1: “PREPARATION” During this important phase we will coordinate with Client Planning Team:

o WBS (Work Breakdown Structure);

o OBS (Organization Breakdown Structure);

o Milestones;

o Scheduling;

o Reporting;  PRE-SHUTDOWN AND SHUTDOWN

 SHUT-DOWN PROJECT CONTROL

 Phase 2: “EXECUTION” This phase includes the following activities: o Daily Progress Meeting;

o Daily Schedule updating;

o Critical Path Monitoring;

o Daily Manpower Reporting;

o Weekly & Final Reports; Through its n. 2 fully WORKSHOP 1 WORKSHOP 2 equipped workshops located in the petrochemical area of Priolo Gargallo in the East Coast of Sicily, TECNOTask can comply with its Clients requirements / needs not only in terms of fabrication but also of transports since they face the sea. TECNOTask is at the forefront for modularized activities through its owned yard having a surface of 163.000 sqm located in Marina di Melilli, Syracuse. PIPING FABRICATION • Over than 260.000 welding inches

PIPING ERECTION • over than 850 tons

STEEL STRUCTURES ERECTION • over than 2.500 tons Our aim is working according to high standard of quality, safety and environment TECNOTask operates in accordance with the Italian standard UNI7249/2007 “Statistics on occupational injuries” that illustrates calculation methods for the hazard occurrence probability and consequences index.

0 3 Fatalities HOURS WORKED 200.000 n.0 Injuries NUMBER Lost Time 2 150.000 Case Rate Lineare (Injuries NUMBER) Frequency Rate n.1 N° of Accidents x 10^6 100.000 hours spent Total Recordable Incident Rate infortuni infortuni anno 1 °

N 50.000 n.32 Near Miss

0 0 0 Fatalities 2015 2016 2017 Hours Man Spent n.0

0,100 Lost Time Case Rate Saverity Rate n.2 0,075 Lineare (Saverity Rate) Total Recordable Incident Rate

0,050 Severity Rate: n. 36 Near Miss N°days lost x 10^3 hours spent 0,025

Year 0,000 2015 2016 2017 Project Name Main Contractor – Client - Country Year ManHours

DAV2 Heaters Revamping Kraftanlagen Romania / OMV 2018 - ongoing 23.000 Turnaround 2018 DCUS piping & support erection KT – Lotos – Poland 2017 - ongoing 225.000

Anwerup EPC 2 JV Ponticelli – Sices / Amec FW / 2017 9.770 Exxon Mobil- Belgium Rainbow Project Geldof / LBC - Holland 2017 36.000

Keegan Stork/ Inovyn-Belgium 2017 27.000

Biogen next generation Jacobs – Valtube Ponticelli / Biogen 2017 98.000 manufacturing SBC006/009- Switzerland CUBS - BMC Buildings Pump station, New EAF & WHR Primetals – Ferretti / Arvedi 2016-2017 25.000 New Delimara Power Station Siemens – OMA / ENE Malta 2015-2016 89.000 Malta ZADCO UPPER ZAKUM G.E. OMA / Petrofac Emirates 2015-2016 51.000 Italy SRU Project KT-OMA / / Bulgaria 2013-2015 70.000 Project Name Main Contractor – Client - Country Year

Onshore Plant – POLYETHYLENE Unit Ferretti International / - Unipetrol 2016 Litvinow Czech Republic Onshore Plant – Steel Plant Ferretti International / Arcelor Mittal / Poland 2016

OnshorePlant–BIO Tfuel Sudelettra/ TOTAL / France 2016

DelimaraNew Power Station O.M.A / ENEMALTA / Malta 2016

Onshoreplant-ZadgoProject O.M.A. / GE NP / Italy 2015-2016

OnshorePlant-GeothermicalBiomass DEMI / Sibrecsa/ France 2015

Offshore Plant–FPF1 Project GIS / Petrofac/ Poland 2015

Onshore Plant Tempa Rossa New oil Centre Tecnomec Engineering / Tecnomont – TOTAL / Italy 2014-2015

OnshorePlant- Power station O.M.A EestiFiliaal/ ALSTOM / Estonia 2014

OnshorePlant–MTBE SIMECO / Versalis/ Italy 2014

OnshorePlantIRMA R2 Project Jacobs Italia/ELI LILLY / Italy 2013-2014

Onshore Plant – SULPHUR Recovery Unit O.M.A. Brench Bulgaria / Lukoil / Bulgaria 2013-2014

Onshore Plant – Riassetto Cracking Technip Italy / Versalis / Italy 2013 Project Name Main Contractor – Client - Country Year

OnshorePlant–MTBE Sices/ Versalis/ Italy 2013

Onshore Plant – Riassetto cracking ATI CIPIS/Versalis / Italy 2013

OnshorePlant–Marte Project JacobosItalia / Huntsman/ Italy 2013

Onshore Plant – Fermata impianti Nord SICES / ERG / Italy 2013

OnshorePlant–Sulphurerecovery unit O.M.A –KTI / Lukoil / Bulgaria 2013-2014

OnshorePlant–MTBE Sices/ Versalis/ Italy 2013

Onshore Plant – NEW Hydrocracking complex SICES / Lukoil / Bulgaria 2012

OnshorePlant–Sannazzaro Est SICES / / Italy 2012

OnshorePlant–New LoadingFacilities SICES/TAMOIL / Switzerland 2012

OnshorePlant–SHAS GAS Project / ADNOC / UAE 2012-2013-2014

Pipeline -SOC SICIM / SOC / Italy 2012

Pipeline - LOM PANGAR SICIM / COTCO EXXONMOBILE / Italy 2012

Onshore Plant – GENERAL Maintenance SICIM / CHEVRON / Kazakistan 2011 Our Expertise is extended also in IT field:

• Primavera P3/P6

• Spoolgen

• Inhouse software for construction management

• B.Point administration and human resources management

www.tecnotask.com Registered Office: Piazza Appio Claudio 8, 20124 Milano – ITALY Operative Headquarters: Via San Giovanni alle Catacombe, 7 Siracusa - ITALY