2.1.1 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

NEW LINES (CONSTRUCTION) A - Works in Progress 1 Lakshmikantapur-Namkhana-Chandanagar with new material Cap. 546,78,00* 142,55,24 1,00,00 403,22,76

modification for Kakadwip-Budakhali (5 km) & Chandanagar-Bakhali (17.2 km)

2 Deogarh-Dumka (72.25 km) Cap. 373,57,09* 133,81,17 2,00,00 237,75,92 EBR 233,75,93 233,75,92 .. 1

3 Deoghar-Sultanganj incl. Banka to Barhat & Banka to Cap. 608,01,94 535,01,94 32,76,00 40,24,00 Bithia Road (147 km)

4 -Bishnupur with extension upto , Cap. 1522,48,00 642,89,83 5,00,00 874,58,17 Arambagh-Irphala and new material modification for Irphala-Ghatal (11.2 km), Arambagh- (23.3 km) & Bishnupur-Uparsol (31.8 km)

5 Rampurhat-Mandarhill via Dumka (130 km) with new Cap. 669,03,00 565,29,42 15,00,00 88,73,58 material modification for Rampurhat-Murarai (29.48 km) EBR 251,17,00 189,85,11 14,98,00 46,33,89 - 3rd line

6 Azimganj-Murshidabad (Jiaganj), incl. railway bridge Cap. 112,99,12* 96,99,12 15,00,00 1,00,00 over river Bhagirathi

7 Bariarpur-Mananpur via Kharagpur, Lachimpur-Barhat Cap. 250,55,00 11,65,89 2,00,00 236,89,11 (67.78 km)

8 Sultanganj-Katuria via Asarganj, Tarapur & Belhar (74.8 Cap. 288,85,00 9,77,92 50,00 278,57,08 km)

9 Tarkeshwar-Magra (51.95 km); incl material modification Cap. 365,17,00 3,28,11 20,00 361,68,89 for Tarkeshwar- (21.75 km) - New Line

10 Hasnabad-Hingalganj (17.37 km) Cap. 260,10,00 2,10,07 50,00 257,49,93

11# Hansdiha-Godda (30 km) Cap. 133,54,50 1,34,59 2,00,00 130,19,91 EBR 133,54,50 5,00 2,00,00 131,49,50

12 Pirpainti - Jasidih (97 km) Cap. 915,98,00 10,00 2,00,00 913,88,00

TOTAL-WORKS IN PROGRESS Cap. .. .. 77,96,00 .. EBR .. .. 16,98,00 .. TOTAL-New Lines (Construction) Cap. .. .. 77,96,00 .. EBR .. .. 16,98,00 .. GAUGE CONVERSION A - Works in Progress 13 - (51.52 km) with new material Cap. 966,28,50 218,31,62 .. 747,96,88 modification for Katwa-Bazarsau (30.59 km) - doubling, EBR 122,57,50 11,01,32 62,49,98 49,06,20 Katwa ()-Mateswar (34.4 km), Negun - Mangalkot (8.60 km) & Mateswar - (35.6 km) - NL

TOTAL-WORKS IN PROGRESS EBR .. .. 62,49,98 .. TOTAL-Gauge Conversion EBR .. .. 62,49,98 .. 2.1.2 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

DOUBLING A - Works in Progress 14 Sainthia-Tarapith - 3rd line Cap. 186,64,00 9,30,22 51,33,86 125,99,92

15 Plassey-Jiaganj (54.29 km) Cap. 234,41,00 29,67,39 35,00,00 169,73,61

16 -Shaktigarh - 3rd line (25.83 km) Cap. 173,91,00 1,72,15 1,00,00 171,18,85

17 -Boinchi - 3rd line (30.53 km) Cap. 238,36,00 2,62,69 2,00,00 233,73,31

18 Princepghat-Majherhat - Doubling of Circular Railway Cap. 279,60,50 76,25 50,00 278,34,25 (4.98 km)

19 Pirpainti-Bhagalpur (59.06 km) Cap. 332,14,00 16,89,55 15,00,00 300,24,45

20 Bazar Sau-Azimganj Jn (42.15 km) Cap. 255,64,00 50,00 50,00 254,64,00

21 Monigram-Nimtita (34.30 km) Cap. 250,93,00 50,00 50,00 249,93,00

22 New Alipore-Akra & Budge Budge-Pujali with new material Cap. 125,05,14 31,37,08 50,00 93,18,06 modification for Pujali- (Birshivpur)(10.25 km) EBR 1,11,86 1,11,86 .. .. & Pujali-Bahrahat(9.75 km)- new lines

23 Habra-Bongaon Phase-I (Habra-Chandpara) & Cap. 144,41,95 75,26,95 50,00 68,65,00 Machlandapur-Swarupnagar EBR 70,77 70,77 .. ..

24 Sonarpur-Canning (14.96 km) with new material Cap. 174,47,00* 51,26,00 .. 123,21,00 modification for Kalikapur-Minakhan via Ghatakpur (38 EBR 100,00,00 54,16 1,00,00 98,45,84 km) - new line

25 Kalinarayanpur-Krishnanagar with Cap. 917,98,92 184,68,35 2,00,00 731,30,57 Krishnanagar-Shantipur-Nabadwipghat - GC & EBR 27,30,08 27,30,08 .. .. Krishnanagar-Chartala & new material modification for Krishnanagar-Chapra - NL, Naihati-Ranaghat - 3rd line & Nabadwipghat-Nabadwipdham with extension to BB loop (9.58 km)

26 Barasat-Hasnabad (12.12 km) Cap. 58,14,50 57,34,47 80,00 3 EBR 3,34,94 3,34,94 .. ..

27 Bandel- of Bandel-Katwa section Cap. 109,21,70* 108,61,70 40,00 20,00 EBR 1,03,04 1,03,04 .. ..

28 Baruipur-Magrahat (15 km) Cap. 50,20,50 46,95,46 1,25,00 2,00,04 EBR 2,49,55 2,49,55 .. ..

29 Kajra-Kiul (15.85 km) Cap. 33,70,91 30,95,15 .. 2,75,76 EBR 12,97,20 1,29,72 1,00,00 10,67,48

30 Chandpara-Bongaon with extension to Chandabazar and new Cap. 182,64,09 54,87,24 50,00 127,26,85

material modification for Bongaon-Poramaheshtala (20 EBR 4,24,88 4,24,88 .. .. km) & Chandabazar-Bagdah (13.86 km) - new lines 2.1.3 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

DOUBLING 31 Barharwa-Tinpahar (16.49 km) Cap. 79,01,00 74,50,44 1,00,00 3,50,56

32 Pandabeswar-Chinpai (21.41 km) with new material Cap. 287,91,67 138,69,52 50,00 148,72,15 modification between Barbani-Churulia (9 km) - new line EBR 5,82,33 5,82,33 .. ..

33 Chinpai-Sainthia & New Lines - Prantik-Siuri and new Cap. 485,76,06 88,23,82 .. 397,52,24 material modification for Chowrigachha - Sainthia via C.Fund 65,15,00 .. .. 65,15,00 Kandi EBR 40,00,00 6,46,24 1,00,00 32,53,76

34 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling Cap. 177,08,32 75,69,94 40,00,00 61,38,38 of Tinpahar-Bhagalpur EBR 5,47,68 5,47,68 .. ..

35 Ghutiari Sharif-Canning with extension upto Bangankhali Cap. 168,53,68 108,00,52 1,00,00 59,53,16 & new material modification for Bangankhali-Basanti EBR 21,43,32 21,43,32 .. .. (14.3 km) & Basanti-Jharkhali (23 km) - new line

36 Dakshin Barasat-Lakshmikantapur (19.68 km), new line Cap. 259,51,00 103,91,56 2,00,00 153,59,44 from Joynagar to Raidighi (20 km) and new material modification for Joynagar-Durgapur (32 km)

37 Magrahat-Diamond Harbour (19.67 km) with material Cap. 150,13,40 92,15,27 1,00,00 56,98,13 modification for Sangrampur - Krishanchandpur (25 km), EBR 22,33,60 22,33,60 .. .. Diamond Harbour (Gurudasnagar) - Bahrahat (21 km) - new line & Daiamond Harbour (Gurudasnagar) - Kulpi (17.25 km) - new line

38 Jirat-Ambika Kalna (20.23 km) Cap. 139,51,36* 122,51,36 2,00,00 15,00,00

39 Nallikul-Tarakeshwar (17.18 km) Cap. 106,54,04 81,22,99 30,00 25,01,05 EBR 6,78,96 6,78,96 .. ..

40 Krishnanagar-Bethuadahari (27.92 km) Cap. 121,65,00 103,06,24 .. 18,58,76 EBR 30,00,00 15,45,30 11,69,22 2,85,48

41 - - 3rd line (10.13 km) with extension to Cap. 246,64,81 27,32,38 5,00,00 214,32,43 Furfura Sharif EBR 10,77,19 10,77,19 .. ..

42 Kalinarayanpur-Shantipur (15.85 km) with new material Cap. 91,21,51 32,72,45 5,00,00 53,49,06 modification for Ranaghat (Aranghata)-Duttapulia (8.17 EBR 13,58,58 13,58,58 .. .. km) - new line

43 Katwa- (17.7 km) with new material modification Cap. 479,03,00 94,38,56 .. 384,64,44 for Ahmedpur-Katwa (51.92 km) - gauge conversion EBR 100,00,00 6,48,84 90,00,00 3,51,16

44 Nalhati-Sagardighi (26.30 km) Cap. 132,01,59 47,65,21 27,00,00 57,36,38 EBR 2,84,41 .. 2,84,41 ..

45 Sondalia-Champapukur (23.64 km) with new material Cap. 129,67,50 45,71,25 5,00,00 78,96,25 modification for Bira-Chakla (11.5 km) EBR 6,87,50 6,87,50 .. .. 2.1.4 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

DOUBLING 46 Azimganj-Manigram (20.49 km) Cap. 114,71,60 65,38,23 5,00,00 44,33,37 EBR 9,33,34 9,33,34 .. ..

47 Lalgola-Jiaganj (22.95 km) Cap. 106,00,20 44,99,97 5,00,00 56,00,23 EBR 17,82,80 17,82,80 .. ..

48 Sealdah Division - 2nd passenger line between Mile 5-B Cap. 65,09,00 12,45 50,00 64,46,55 and New Alipore (1.67 km)

49 Bethudahari-Palassey (22.51 km) Cap. 124,60,68 54,99,46 5,00,00 64,61,22 EBR 7,70,32 7,70,32 .. ..

50 Sahibganj-Pirpanti (10.45 km) Cap. 124,93,62 64,08,10 5,00,00 55,85,52 EBR 4,51,38 4,51,38 .. ..

51 Nabadwip Dham-Patuli (22 km) Cap. 117,15,83 61,46,70 5,00,00 50,69,13 EBR 74,17 74,17 .. ..

52 Ambika Kalna-Nabadwipdham (23.29 km) Cap. 137,61,62 81,91,80 10,00,00 45,69,82 EBR 6,88,38 6,88,38 .. ..

53 Barharwa-Bonidanga (4.73 km) Cap. 20,41,00 15,58,11 4,80,00 2,89 EBR 31,63 31,63 .. ..

54 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of Cap. 198,88,00 3,16,82 50,00 195,21,18 Dankuni-Saktigarh 4th line with new material modification for -Furfura - new line

55 Dankuni- via CC line (west) - Doubling with Cap. 60,25,00 50,56 1,00,00 58,74,44 one additional loop at Bhattanagar

56 Tarapith-Rampurhat - 3rd line Cap. 56,29,74 5,17,13 3,00,00 48,12,61

57 Sagardighi-Azimganj Cabin (16.30 km) Cap. 77,98,80 50,50 50,00 76,98,30

TOTAL-WORKS IN PROGRESS Cap. .. .. 246,88,86 .. EBR .. .. 107,53,63 .. B - New Works 58 Lumpsum provision for New Works Cap. .. .. 33,00 .. DRF .. .. 4,13,25 ..

TOTAL-NEW WORKS Cap. .. .. 33,00 .. DRF .. .. 4,13,25 .. TOTAL-Doubling Cap. .. .. 247,21,86 .. DRF .. .. 4,13,25 .. EBR .. .. 107,53,63 .. 2.1.5 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 59 Sitarampur - Remodelling of Yard DF(3) 11,45,00 7,50 10,00 11,27,50

60 Dum Dum Jn. - Flyover to improve passage of goods & Cap. 231,46,19 1 30,00 231,16,18 mail/express trains EBR 3,50,00 .. .. 3,50,00

61 Barachak - Direct delivery line & goods shed Cap. 13,79,65 4,38,77 70,00 8,70,88

62 - - Removal of operational constraints DF(3) 17,18,00 3,10,75 10,00 13,97,25 by laying addl track below Chandmari bridge

63 Durgapur - Extension of up & down loops DF(3) 5,43,00 32,25 30,00 4,80,75

64 , & Liluah - Dismantling of DF(3) 8,70,00 66,40 20,00 7,83,60 diamond crossing, provision of new crossings and wiring of Bhadreswar Ghat siding

65 Howrah - Extension of platform No.10-11 & 12-13 for DF(3) 9,22,14 34,57 50,00 8,37,57 accommodating longer length train

66 Asansol Division - Electrification of 1st down colliery DF(3) 3,51,73 9,44 10,00 3,32,29 siding with down avoiding line

67 Barddhaman - Remodelling of yard (Phase-I) (Stage-II) Cap. 25,37,21 24,93,10 19,00 25,11

68 Chitpur - Addl. terminal Cap. 122,50,00 120,99,69 50,00 1,00,31

69 Sealdah-Bongaon-Ranaghat - Running of 12-coach DF(3) 27,35,72 18,56,69 10,00 8,69,03 electrical multiple unit trains

70 Belgharia-Naihati - Automatic signalling system of DF(3) 33,14,49 21,78,66 50,00 10,85,83 quadruple line (C-route)

71 Talit - Addl. movement facility DF(3) 3,25,07 2,35,77 20,00 69,30

72 Aranghata - Full rake capacity goods loop Cap. 6,53,92 6,33,92 15,00 5,00

73 Gede - 4th line having full rake capacity with platform Cap. 4,41,87 3,34,55 15,00 92,32

74 Nalhati-Azimganj - Rail infrastructure development to Cap. 2,43,78 1,49,55 5,00 89,23 serve Sagardighi thermal power station EBR 20,48 20,48 .. ..

75 Sonarpur-Canning, Ballygunj-Budge Budge & DF(3) 13,46,27 12,83,04 20,00 43,23 Baruipur-Namkhana - Extension of platform for running of 12-coach electrical multiple unit trains

76 Sealdah-Kalinarayanpur-Santipur, Kalyani-Kalyani DF(3) 23,07,24 20,82,24 1,00,00 1,25,00 Simanta - Extension of platforms for running 12-coach electrical multiple unit trains 2.1.6 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 77 Belur-Dankuni-Bardhaman, Bandel-Naihati & Bandel-Katwa DF(3) 17,19,98 16,07,48 50,00 62,50 - Running of 12-coach electrical multiple unit trains

78 Kajoragram-Andal Jn. Cabin - Bypass line to Sendha Road Cap. 10,61,93 9,81,93 40,00 40,00 with electrification

79 Bandel-Katwa-Azimganj - Extension of loops DF(3) 20,33,22 11,34,31 3,00,00 5,98,91

80 Murahara - Conversion of halt station to B-class DF(3) 10,26,69 7,81,13 1,00,00 1,45,56

81 Pakur, Tilvita & Kotalpukur - Development of freight & DF(3) 12,29,00 1,56,81 2,00,00 8,72,19 passenger train handling facilities

82 Topsi & Sonachara - Panel interlocking building DRF 3,14,74 1,89,00 1,25,74 ..

83 Asansol - Stabling line for main line electrical DF(3) 4,98,69 1,32,21 20,00 3,46,48 multiple unit rakes

84 Durgapur - Development of 3rd direct delivery line with DF(3) 10,57,59 2,65,70 70,00 7,21,89 world class freight terminal

85 Dankuni - Development of freight terminal DF(3) 22,17,08 19,38,86 1,00,00 1,78,22

86 Madhupur - Development of direct despatch line for DF(3) 2,77,00 2,32,61 10,00 34,39 goods traffic

87 Katwa-Azimganj - Tokenless block instrument DRF 7,71,54 2,98,70 2,50,00 2,22,84

88 Kankinara-Naihati - 4th passenger line by conversion of DF(3) 11,49,29 1,52,35 2,00,00 7,96,94 1 up goods line with platform facilities at Kakinara

89 Jamalpur - Remodelling of yard and extension of DRF 5,50,59 1,20,01 2,50,00 1,80,58 platform No.2 & 3 for 24 coaches

90 Malda Division - 1st foot over bridge (5 stations) DF(4) 4,47,33 1,36,46 30,00 2,80,87

91 Dum Dum-Barasat - Automatic signalling system DF(3) 17,67,65 5,64,72 80,00 11,22,93

92 Nalhati-Azimganj - Development of section Cap. 5,95,39 3,37,70 10,00 2,47,69

93 Sealdah Division - Running of 12-coach electrical DF(3) 7,71,02 7,50 40,00 7,23,52 multiple unit trains on circular railway

94 Ranaghat-Gede - Running of 12-coach electrical multiple DF(3) 3,94,00 1,62,20 50,00 1,81,80 unit trains

95 Tilbihta, Kotalpukur, Gumani & Tarapith Road - Addl DF(3) 19,00,00 87,30 50,00 17,62,70 loops 2.1.7 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 96 Howrah Division - Through renewal of turnouts on main DF(3) 18,33,67 9,05,24 20,00 9,08,43 line & loop line (12 stations)

97 - Addl. loop Cap. 2,36,00 22,49 40,00 1,73,51 EBR 35,00 .. .. 35,00

98 Bypass line avoiding Naihati-Bandel DF(3) 30,00,00 76,19 2,50,00 26,73,81

99 Sealdah - Addl platform No.9-C with ancillary works DF(1) 4,99,93 1,45,81 60,00 2,94,12

100 Belur - Bybass connection for direct movement of DF(3) 17,21,77 6,06,89 50,00 10,64,88 electrical multiple unit trains from Bardhman / Bandel to

101 Chittaranjan - Conversion of down loop into common loop DF(3) 2,84,00 67,10 40,00 1,76,90

102 New Garia - New rail terminal station between Sealdah & DF(3) 19,71,00 22,78 1,50,00 17,98,22 Sonarpur

103 Sabour - Goods shed DF(3) 12,00,00 1,50,00 40,00 10,10,00

104 Andal-Sainthia - Broad gauge bypass line with direct Cap. 57,19,00 7,50 8,00 57,03,50 connection from quadruple line to branch line (2.565 km)

105 Barrakpore - Development of terminal station (Phase-II) DF(3) 65,90,00 7,50 40,00 65,42,50 and Kakinara Yard - development of coach maintenance facilities with ancillary works

106 Kalipahari - Rearrangement of up loops to accommodate DF(3) 3,35,17 1,12,50 10,00 2,12,67 full-length trains

107 Nathnagar - Addl shunting & holding capacity and DF(3) 3,00,00 75,00 20,00 2,05,00 Akbarnagar, Bariarpur - Shunt signals

108 Andal - Conversion of down line No.2 into common loop DF(3) 8,50,00 75,00 50,00 7,25,00

109 Topsi - Full length direct delivery line at south side DF(3) 11,00,00 15,00 1,50,00 9,35,00 of existing line

110 Works costing below Rs.2.5 crore each Cap. .. .. 1,50,00 .. DRF .. .. 1,50,00 .. DF(1) .. .. 30,00 .. DF(2) .. .. 45,00 .. DF(3) .. .. 4,65,00 .. DF(4) .. .. 60 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 4,52,00 .. DRF .. .. 7,75,74 .. DF(1) .. .. 90,00 .. DF(2) .. .. 45,00 .. DF(3) .. .. 28,85,00 .. DF(4) .. .. 30,60 .. 2.1.8 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS B - New Works 111 Lumpsum provision for New Works Cap. .. .. 25,00 .. DRF .. .. 50,00 .. DF(1) .. .. 10,00 .. DF(2) .. .. 5,00 .. DF(3) .. .. 20,00 ..

TOTAL-NEW WORKS Cap. .. .. 25,00 .. DRF .. .. 50,00 .. DF(1) .. .. 10,00 .. DF(2) .. .. 5,00 .. DF(3) .. .. 20,00 .. TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. .. .. 4,77,00 .. DRF .. .. 8,25,74 .. DF(1) .. .. 1,00,00 .. DF(2) .. .. 50,00 .. DF(3) .. .. 29,05,00 .. DF(4) .. .. 30,60 .. COMPUTERISATION A - Works in Progress 112 Eastern Railway - Unreserved ticketing system (under DF(1) 9,39,64 8,24,67 1,00 1,13,97 Railway Board)

113 Eastern Railway - Extension of RDBMS DF(3) 3,39,00 2,72,26 1 66,73

114 Eastern Railway - Extension of unreserved ticketing DF(1) 24,21,57 16,04,60 2,00 8,14,97 system to balance A, B, C & D category stations

115 Provision of automatic ticket vending machines for Cap. 5,05,00 3,49,57 50,00 1,05,43 Eastern & South Eastern Railways

116 Eastern Railway - Extension of unreserved ticketing DF(1) 11,78,38 9,27,95 1,00,00 1,50,43 system to E-category stations

117 Eastern Railway - Extension of automatic ticket vending Cap. 24,70,19 1 9,00,00 15,70,18 machines

118 Works costing below Rs.2.5 crore each Cap. .. .. 1,00 .. DRF .. .. 3,00,00 .. DF(1) .. .. 35,00 .. DF(3) .. .. 69,99 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 9,51,00 .. DRF .. .. 3,00,00 .. DF(1) .. .. 1,38,00 .. DF(3) .. .. 70,00 .. 2.1.9 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

COMPUTERISATION B - New Works 119 Lumpsum provision for New Works DRF .. .. 1,00,00 .. DF(1) .. .. 10,00 .. DF(3) .. .. 10,00 ..

TOTAL-NEW WORKS DRF .. .. 1,00,00 .. DF(1) .. .. 10,00 .. DF(3) .. .. 10,00 .. TOTAL-Computerisation Cap. .. .. 9,51,00 .. DRF .. .. 4,00,00 .. DF(1) .. .. 1,48,00 .. DF(3) .. .. 80,00 .. LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT A - Works in Progress 120 Leased Assets - Payment of Capital component of lease Cap. 135,10,00 .. 135,10,00 .. charges to Indian Railway Finance Corporation C.Fund 273,09,00 .. 273,09,00 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 135,10,00 .. C.Fund .. .. 273,09,00 .. TOTAL-Leased Assets - Payment of Capital Component Cap. .. .. 135,10,00 .. C.Fund .. .. 273,09,00 .. ROAD SAFETY WORKS-LEVEL CROSSINGS. A - Works in Progress 121 Sealdah Division - Interlocking of level crossing gates S.Fund 47,10,21 18,06,23 7,00,00 22,03,98 (58 Nos) (suburban section)

122 Howrah Division - Elimination of unmanned level S.Fund 6,89,28 10,00 10,00 6,69,28 crossing gates by merging with adjacent ones (16 Nos)

123 Howrah Division - Upgradation with interlocking to S.Fund 3,95,10 1,64,88 1,00 2,29,22 Spl-class (4 level crossing gates) (multi aspect colour light signalling section)

124 Sealdah Division - Repl. of swing gates by lifting S.Fund 2,62,44 2,49,52 10,00 2,92 barriers (73 level crossings)

125 Sealdah Division - Upgradation of level crossing gates Cap. 3,00,00 50,00 .. 2,50,00 into special class in suburban section (20 Nos) S.Fund 1,88,79 1,59,68 2,00 27,11

126 Malda Division - Hexagonal block at all level crossing Cap. 1,20,00 1,15,00 .. 5,00 gates S.Fund 2,99,52 2,65,74 30,00 3,78

127 Howrah Division - Improvement of level crossing gates, S.Fund 5,60,49 3,69,17 1,75,00 16,32 road surfaces, removal of infrastructural deficiencies, repl of swing gates etc

128 Sealdah Division - Upgradation of level crossing gates S.Fund 4,92,80 1,34,82 1,00,00 2,57,98 (10 Nos) 2.1.10 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

ROAD SAFETY WORKS-LEVEL CROSSINGS. 129 Asansol Division - Shifting of level crossing gate S.Fund 3,63,09 2,60,68 42,16 60,25 lodges for minimum clearance from road (25 Nos), height gauges in electrified section (main line)

130 Eastern Railway - Manning of unmanned level crossings S.Fund 16,00,00 8,00,00 2,00,00 6,00,00 (80 Nos)

131 Howrah Division - Upgradation of level crossing gates S.Fund 2,79,83 2,33,43 40,00 6,40 (Nos 4, 10, 12, 16-A, 19, 23-A & 24)

132 Eastern Railway - Manning of unmanned level crossing S.Fund 4,60,00 1,52,00 90,00 2,18,00 gates (23 Nos)

133 Howrah Division - Interlocking of level crossing gates S.Fund 19,92,00 6,00,01 2,75,00 11,16,99 on suburban & automatic section (36 Nos)

134 Works costing below Rs.2.5 crore each S.Fund .. .. 9,00,00 ..

TOTAL-WORKS IN PROGRESS S.Fund .. .. 25,75,16 .. B - New Works 135 Lumpsum provision for New Works S.Fund .. .. 1,00,00 ..

TOTAL-NEW WORKS S.Fund .. .. 1,00,00 .. TOTAL-Road Safety Works-Level Crossings. S.Fund .. .. 26,75,16 .. ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. A - Works in Progress 136 Ambika Kalna- - Road over bridge in lieu of S.Fund 17,92,00 13,43 1,00,00 16,78,57 level crossing No.12 EBR 19,03,00 1,00,16 .. 18,02,84

137 Andal-Sainthia - Road over bridge in lieu of level S.Fund 14,63,00 36,84 1,00,00 13,26,16 crossing No.22-B/T on Seuri west end EBR 15,37,00 80,89 .. 14,56,11

138 -Bandel - Road over bridge in lieu of level S.Fund 17,76,00 7,37 10,00 17,58,63 crossing No.1 EBR 18,87,00 99,32 .. 17,87,68

139 Adisaptagram-Magra - Road over bridge in lieu of level S.Fund 17,46,00 7,37 10,00 17,28,63 crossing No.13 EBR 18,45,00 97,11 .. 17,47,89

140 Bandel-Adisaptagram - Road over bridge in lieu of level S.Fund 17,37,00 7,37 10,00 17,19,63 crossing No.12 EBR 18,55,00 97,63 .. 17,57,37

141 -Pichkurirdhal - Road over bridge in lieu of S.Fund 17,34,00 36,84 10,00 16,87,16 level crossing No.4 EBR 18,46,00 97,16 .. 17,48,84

142 Murarai-Nalhati - Road over bridge in lieu of level S.Fund 17,33,00 36,84 10,00 16,86,16 crossing No.32 EBR 18,47,00 97,21 .. 17,49,79

143 Nalhatil-Rampurhat - Road over bridge in lieu of level S.Fund 17,22,00 61,48 10,00 16,50,52 crossing No.26/AE and foot over bridge with ramp at EBR 18,24,00 96,00 .. 17,28,00 level crossing No.27/Spl 2.1.11 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 144 Sheoraphuli-Diara - Road over bridge in lieu of level S.Fund 17,29,00 36,84 10,00 16,82,16 crossing No.4 on Grand Trunk Road EBR 18,31,00 96,37 .. 17,34,63

145 Bahirkhand-Tarakeswar - Road over bridge in lieu of S.Fund 17,37,00 37,17 10,00 16,89,83 level crossing No.23-A EBR 18,43,00 97,00 .. 17,46,00

146 Bolpur - 2-lane road over bridge in lieu of road over S.Fund 5,07,94 43,61 1,50,00 3,14,33 bridge No.71 (Lalpul) EBR 7,07,93 37,26 .. 6,70,67

147 Krishnanagar - Road over bridge in lieu of level S.Fund 45,81,00 36,84 10,00 45,34,16 crossing No.68/T in station limit EBR 41,81,54 2,20,08 .. 39,61,46

148 Kumardhubi-Mugma - 2-lane road over bridge in lieu of S.Fund 12,98,00 36,84 10,00 12,51,16 existing 2-lane road under bridge No.20 EBR 14,99,00 78,89 .. 14,20,11

149 Habra - Road over bridge and limited use road under S.Fund 16,50,00 73,68 10,00 15,66,32 bridge in lieu of level crossing gate No.28-A/T EBR 16,50,00 86,84 .. 15,63,16

150 Belanagar-Dankuni - Limited height subway on S.Fund 3,76,45 67,37 10,00 2,99,08 Howrah-Bardhman chord

151 - Limited use subway in lieu of level crossing S.Fund 16,54,00 33,37 1,00,00 15,20,63 No.3

152 Sonarpur - Limited use road under bridge in lieu of S.Fund 7,15,00 37,84 10 6,77,06 level crossing No.13 EBR 7,15,00 37,63 .. 6,77,37

153 Baruipur - Limited use road under bridge in lieu of S.Fund 6,57,00 1,53 10 6,55,37 level crossing No.21/S/T EBR 6,57,00 34,58 .. 6,22,42

154 Madhupur-Joramow - Road over bridge in lieu of road S.Fund 16,04,62 17,37 10,00 15,77,25 under bridge No.618 EBR 16,04,63 84,45 .. 15,20,18

155 Madhupur-Nawapatra - Road over bridge in lieu level S.Fund 15,71,46 7,37 10,00 15,54,09 crossing gate No.20 EBR 15,71,46 82,71 .. 14,88,75

156 Berhampur Court - Road over bridge & limited use subway S.Fund 20,10,65* 73,92 4,00,00 15,36,73 in lieu of level crossing gate No.131/T EBR 17,72,65 93,30 .. 16,79,35

157 Sealdah Division - 2-lane road over bridge in lieu of S.Fund 22,17,01 36,84 10,00 21,70,17 road over bridge No.66-A (Baroda Bridge) EBR 24,17,02 1,27,21 .. 22,89,81

158 Habra - Road over bridge & limited use subway in lieu S.Fund 18,44,48 36,84 10,00 17,97,64 of level crossing gate No.27/A/T EBR 20,44,49 1,07,60 .. 19,36,89

159 Jamtara-Bodma - Road over bridge in lieu of level S.Fund 15,73,68 7,37 1,00 15,65,31 crossing gate No.9-B EBR 15,73,68 82,83 .. 14,90,85

160 Bhyabla - Road over bridge and limited use road under S.Fund 15,76,59 7,37 10,00 15,59,22 bridge in lieu of level crossing gate No.39-B/E EBR 17,76,59 93,50 .. 16,83,09 2.1.12 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 161 Chittaranjan-Bodma - Road over bridge in lieu of level S.Fund 15,73,68 7,37 1,00 15,65,31 crossing gate No.7-A/T EBR 15,73,68 82,83 .. 14,90,85

162 Rupnarayanpur-Chittaranjan - Road over bridge in lieu S.Fund 15,66,00 7,37 1,00 15,57,63 of level crossing gate No.5/Spl EBR 15,66,01 82,42 .. 14,83,59

163 Katwa-Azimganj - Elimination of level crossing by S.Fund 5,52,62 2,21,05 1,00,00 2,31,57 limited height subways (6 Nos)

164 Malda Division - Normal height subway in lieu of level S.Fund 12,19,07 1,84 10 12,17,13 crossing gate No.82-B/T near Sahibganj

165 Malda Division - Elimination of level crossings by S.Fund 27,56,54 4,46,37 1,00,00 22,10,17 limited height subways (32 Nos)

166 Road under bridge near level crossing gate No.26/B (BB S.Fund 4,85,78 1,00 1,00,00 3,84,78 Loop), Howrah Division

167 Dankuni-Khana - Elimination of level crossings on S.Fund 382,83,58 1,47,37 50,00 380,86,21 dedicated freight corridor route (40 Nos) EBR 709,62,14 .. .. 709,62,14

168 Berhampur Court - Road over bridge in lieu of level S.Fund 15,07,78* 7,61 1,00,00 14,00,17 crossing gate No.132/T at Lalgola end EBR 10,63,53 .. .. 10,63,53

169 Satsang Nagar-Baidyanath Dham - Road over bridge in S.Fund 17,54,00 10,00 10,00 17,34,00 lieu of level crossing No.4-B/T EBR 20,54,00 .. .. 20,54,00

170 Road under bridge in lieu of level crossing No. 111/T, S.Fund 10,87,00 1,00 1,00,00 9,86,00 Beldanga

171 Khana-Pradhankanta - Elimination of level crossings on S.Fund 472,29,39 1,47,37 50,00 470,32,02 dedicated freight corridor route (48 Nos) EBR 856,71,53 .. .. 856,71,53

172 Sankarpur-Jasidih - Road over bridge in lieu of level S.Fund 21,56,56 7,37 10,00 21,39,19 crossing No.27/C EBR 23,56,56 .. .. 23,56,56

173 Park Circus-Sir Gurudas Banerjee Halt - Regirdering of S.Fund 3,69,00 4,74 10,00 3,54,26 road under bridge No.X/25

174 Jamalpur Yard - Repl. of road over bridge No.215 with S.Fund 29,99,17 7,37 10,00 29,81,80 approach road

175 Ichhapur-Shyamnagar - Regirdering of road under bridge S.Fund 2,92,92 36,84 10,00 2,46,08 No.56

176 Baghajatin - Road over bridge in lieu of level crossing S.Fund 15,36,75 5,79,21 1,00,00 8,57,54 No.9/A/E EBR 22,64,22 .. .. 22,64,22

177 Barrackpore - Road over bridge in lieu of level S.Fund 2,81,56 2,68,40 13,15 1 crossing No.15/A/3T EBR 4,99,58 .. .. 4,99,58 2.1.13 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 178 Barddhaman-Kalna Road - Road over bridge in lieu of S.Fund 8,77,00 8,45 5,00 8,63,55 level crossing No.50 EBR 12,27,00 .. .. 12,27,00

179 Baruipur - Road over bridge in lieu of level crossing S.Fund 5,92,85 4,42,46 1,00,00 50,39 No.21 B/T EBR 14,30,23 .. .. 14,30,23

180 Durgapur - Road over bridge in lieu of level crossing S.Fund 9,97,07 4,87,31 4,00,00 1,09,76 No.113 B/T EBR 12,85,34 .. .. 12,85,34

181 Memari - Road over bridge in lieu of level crossing S.Fund 5,10,00 1,84,21 10,00 3,15,79 No.33 EBR 4,64,70 .. .. 4,64,70

182 Nalikul - Road over bridge in lieu of level crossing S.Fund 5,05,00 1,84,21 10,00 3,10,79 No.14

183 Ballyganj-Jadavpur - Road over bridge in lieu of level S.Fund 4,90,18 22,57 10,00 4,57,61 crossing No.7-A/E EBR 8,75,18 .. .. 8,75,18

184 Belgharia-Agarpara - Road over bridge in lieu of level S.Fund 4,15,93 7,40 10,00 3,98,53 crossing No.2-B/2-T EBR 6,35,93 .. .. 6,35,93

185 Rishra-Srirampur - Road over bridge in lieu of level S.Fund 4,15,93 7,56 5,00 4,03,37 crossing No.4 EBR 6,35,93 .. .. 6,35,93

186 Baruipara-Kamarkundu - Road over bridge in lieu of S.Fund 4,15,93 7,37 10,00 3,98,56 level crossing No.27 EBR 6,35,93 .. .. 6,35,93

187 Dankuni - Road over bridge in lieu of level crossing S.Fund 15,42,21* 7,23,85 2,00,00 6,18,36 No.8 EBR 7,91,00 .. .. 7,91,00

188 Jaugram-Masagram - Road over bridge in lieu of level S.Fund 3,33,43 7,70 10,00 3,15,73 crossing No.59 EBR 4,98,43 .. .. 4,98,43

189 -Nabadwipdham - Road over bridge in lieu of S.Fund 3,33,43 7,37 5,00 3,21,06 level crossing No.14 EBR 4,98,43 .. .. 4,98,43

190 Bariyarpur - Road over bridge in lieu of level crossing S.Fund 13,84,94 12,76,04 50,00 58,90 No 15/BT EBR 13,75,00 .. 3,30,00 10,45,00

191 Mianpur Railway Crossing - Road over bridge in lieu of S.Fund 7,39,15 4,39,94 1,00,00 1,99,21 level crossing No.23/B/T near Jangipur Road EBR 6,55,18 .. 3,30,00 3,25,18

192 Howrah Division - Limited use subways in lieu of level S.Fund 25,46,55 4,54,63 5,00,00 15,91,92 crossings (20 Nos) EBR ......

193 Barddhaman Yard - 4-lane road over bridge in lieu of S.Fund 60,35,00 29,07,37 1,50,00 29,77,63 2-lane road over bridge No.213 EBR 96,33,00 .. .. 96,33,00

194 Howrah - Repl.of Chandmari road over bridge S.Fund 56,65,00 18,62 10,00 56,36,38 2.1.14 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES. 195 Howrah Division - Limited use subways for manned level S.Fund 3,68,96 73,86 50,00 2,45,10 crossing gates (Nos. 36 & 44)

196 Katwa-Azimganj - Limited height subways in lieu of S.Fund 11,45,43 1,72,02 2,00,00 7,73,41 level crossing (Nos.24/2, 24/7, 24/8, 24/9, 24/10, 24/A/13, 26/A/3 & 26/A/4)

197 Howrah Division - Repl. of Benaras road over bridge by S.Fund 32,53,00 38,39 10,00 32,04,61 cable-stayed bridge

198 Sealdah Division - 2-lane road over bridge in lieu of S.Fund 16,16,00 7,37 10,00 15,98,63 level crossing No.6/A/E in Dhakuria station limit EBR 18,16,00 .. .. 18,16,00

199 Brace Bridge-Santoshpur - Road over bridge in lieu of S.Fund 23,98,00 7,37 10,00 23,80,63 level crossing No.5/A/T in Sealdah South section EBR 25,98,00 .. .. 25,98,00

200 Dum Dum Cantt - Road over bridge and subway in lieu of S.Fund 21,10,00 7,38 5,00 20,97,62 level crossing No.T/2 EBR 21,10,00 1,11,05 .. 19,98,95

201 Chandmari, Mahuadanga, Asansol - Road under bridge S.Fund 17,82,64 46,84 10,00 17,25,80 adjacent to bridge No.529

202 Pakur - Limited use subway in lieu of manned level S.Fund 3,06,19 40,08 10,00 2,56,11 crossing No.38

203 Shyamnagar-Kankinara - 2-lane road over bridge in lieu S.Fund 17,93,21 7,37 10,00 17,75,84 of level crossing No.27/T EBR 17,93,21 94,38 .. 16,98,83

204 Shyamnagar-Kankinara - 2-lane road over bridge in lieu S.Fund 19,15,54 74 10,00 19,04,80 of level crossing No.28/T EBR 19,15,54 1,00,82 .. 18,14,72

205 Shyamnagar-Kankinara - 2-lane road over bridge in lieu S.Fund 19,14,70 74 10,00 19,03,96 of level crossing No.29/T EBR 19,14,70 1,00,77 .. 18,13,93

206 Works costing below Rs.2.5 crore each S.Fund .. .. 15,00,00 ..

TOTAL-WORKS IN PROGRESS S.Fund .. .. 52,06,45 .. EBR .. .. 6,60,00 .. B - New Works 207 Lumpsum provision for New Works S.Fund .. .. 4,00,00 ..

TOTAL-NEW WORKS S.Fund .. .. 4,00,00 .. TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund .. .. 56,06,45 .. EBR .. .. 6,60,00 .. TRACK RENEWALS A - Works in Progress 208 Barharwa-Sahibgang & New Farakka-Malda - CTR (P) - 10 DRF 12,53,80 11,30,14 1,23,66 .. km R. 28,26 2.1.15 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 209 Andal-Sainthia - TRR(P) - 4.26 km DRF 3,57,40 1,46,98 2,10,42 ..

210 Sealdah Division - TFR - 71.60 km DRF 4,74,17 80,48 2,50,00 1,43,69

211 Howrah-Bandel - CTR(P) - 7 km DRF 9,37,51 40,00 1,00,00 7,97,51 R. 21,88

212 Sealdah Division - Through Rail Renewal (Primary) on DRF 24,47,74 12,36,45 1,00,00 11,11,29 various sections - 33.5 km

213 Kiul - Barharwa - Complete Track Renewal (Primary) on DRF 20,63,49 6,04,76 3,70,00 10,88,73 up & down lines on Malda Division -15.73 km

214 New Farakka - Malda Town - Complete Track Renewal DRF 19,71,66 11,38,81 1,00,00 7,32,85 (Primary) on Up and Down lines on Malda Division - 15.03 km

Complete Track Renewal 215 Sitarampur-Chhota - CTR(P) - 11.71 km DRF 15,01,53 9,72,00 3,00,00 2,29,53 R. 33,10

216 Khana-Durgapur - CTR(P) - 16.3 km DRF 20,56,50 12,36,58 1,00,00 7,19,92 R. 46,07

217 Lilluah Workshop - CTR(S) - 8 km DRF 5,67,91 3,21,65 2,00,00 46,26 R. 10,78

218 Bandel-Shaktigarh - CTR(P) - 7.15 km DRF 9,02,32 7,59,67 1,40,00 2,65 R. 20,16

219 Belur-Bandel - CTR(P) - 6 km DRF 7,56,37 4,68,91 2,80,00 7,46 R. 16,92

220 Kanchrapara Workshop - CTR(S) - 5 km & TTR - 10 sets DRF 5,17,45 1,35,95 2,00,00 1,81,50 R. 12,01

221 Kahlgaon-Bhagalpur - CTR(P) - 16.4 km DRF 20,56,23 7,21,95 3,34,28 10,00,00 R. 46,35

222 Barharwa-Kahlgaon - CTR(P) - 12 km DRF 15,04,55 13,36,90 1,67,65 .. R. 33,92

223 Belur-Bandel - CTR(P) - 5 km DRF 6,58,56 4,31,55 2,00,00 27,01

224 Kiul-Barharwa - CTR(P) - 7.69 km DRF 6,17,57 1,81,43 1,36,14 3,00,00

225 Sealdah Division - CTR(S) - 11.25 km (loop/yard lines) DRF 7,97,70 3,12,38 2,50,00 2,35,32

226 Khana-Sitarampur-Jhajha - CTR(P) - 1.29 km & TRR(P) - DRF 10,00,86 1,55,00 2,00,00 6,45,86 10 km 2.1.16 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 227 Dum Dum-Bongaon & Sealdah-Gede - CTR(P) - 4.70 km DRF 5,85,87 2,31,43 2,40,00 1,14,44

228 Sealdah-Gede - CTR(P) - 3.40 km DRF 4,26,70 1,70,95 1,60,00 95,75

229 Sainthia-Pakur - CTR(P) - 10 km DRF 12,61,26 8,69,28 1,50,00 2,41,98

230 Sitarampur-Jhajha - CTR(P) - 6.95 km DRF 8,72,23 1,35,05 2,50,00 4,87,18

231 Sealdah-Baruipur - CTR(P) - 2 km DRF 2,51,00 70,48 1,50,00 30,52

232 Sealdah-Baruipur - CTR(P) - 2.65 km DRF 3,30,32 1,30,95 1,50,00 49,37

233 Sainthia-Pakur - CTR(P) - 27 km DRF 34,90,25 14,21,92 3,00,00 17,68,33

234 Andal & Asasol Yards - CTR(S) - 16.30 km DRF 11,55,78 1,93,07 2,00,00 7,62,71

235 Sitarampur-Jhajha - CTR(P) - 4 km DRF 5,02,00 1,23,27 1,00,00 2,78,73

236 Dum Dum-Dankuni, Ranaghat-Lalgola, Sealdah-Gede & DRF 4,95,62 2,31,43 2,00,00 64,19 Ballygunge-Budge Budge - CTR(P) - 3.04 km & TRR(P) - 1.36 km

237 Rampurhat - Gumani - CTR(P) - 13.4 km with TTR - 17 Nos DRF 19,90,69 4,50,00 2,00,00 13,40,69 R. 52,21

238 Rampurhat - Pakur - CTR(P) - 22.5 km with TTR - 8 Nos DRF 31,10,77 3,50,00 2,00,00 25,60,77 R. 75,14

239 Sainthia-Rampurhat - CTR(P) - 26.2 km with TTR - 27 Nos DRF 38,26,48 5,00,00 2,00,00 31,26,48 R. 98,02

240 New Farakka-Malda Town - CTR(P) - 2 km DRF 2,70,93 14,10 1,00,00 1,56,83 R. 6,25

241 Barrackpore-Naihati-Ranaghat - CTR(P) - 19.5 km DRF 25,83,06 1,36,93 1,00,00 23,46,13 R. 60,95

242 Howrah Yard - CTR(S) - 4.7 km DRF 3,58,43 1,00,00 1,00,00 1,58,43 R. 5,25

243 Ballygunge-Sonarpur - CTR(P) - 5 km DRF 6,62,32 35,11 1,00,00 5,27,21 R. 15,63

244 Ballygunge Jn - Mile5b, Dumdum Jn-Bangaon Jn & Sealdah DRF 7,31,21 38,76 2,50,00 4,42,45 - Barrakpore - CTR(P) - 5.52 km R. 17,25

245 Andal-Sainthia - CTR(S) - 23.95 km DRF 18,13,61 1,00 1,00,00 17,12,61 R. 26,74 2.1.17 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 246 Khana-Jhajha - CTR(S) - 8 km DRF 6,05,89 1,00 1,00,00 5,04,89 R. 8,93

247 Sitarampur-Jhajha - CTR(P) - 3.7 km DRF 4,93,10 1,00 1,00,00 3,92,10 R. 8,93

248 Tapasi - Barabani - CTR - 7.24 km (S) DRF 3,77,85 2,23,27 75,00 79,58 R. 9,93

249 Quarry - CTR - 5.5 km (S) DRF 3,27,45 3,16,59 10,00 86 R. 6,23

250 Howrah - Khana - CTR - 9 km (S) DRF 5,73,08 5,63,97 9,11 .. R. 10,19

251 Andal - Sainthia - CTR - 9.94 km (S) DRF 5,96,15 5,36,15 7,25 52,75 R. 11,53

252 Andal Yard - CTR - 8.2 km (S) DRF 4,92,83 4,28,36 60,68 3,79 R. 9,51

253 Bamangachhi Yard - CTR - 7.5 km (S) DRF 4,63,22 3,78,09 80,00 5,13 R. 9,63

254 Khana - Durgapur - CTR- 17 km (P) (down) DRF 18,52,29 14,98,31 2,10,00 1,43,98 R. 42,90

255 Howrah - Bandel - Khana - CTR - 3.62 km & TRR - 13.06 DRF 12,43,80 9,70,99 1,21,51 1,51,30 km (P) R. 9,14

256 Rajla-Barachak - CTR - 3.06 km & TRR - 1 km (P) DRF 4,19,60 3,21,52 50,00 48,08 R. 7,71

257 Andal-Sainthia - CTR - 2.38 km & TRR - 2.53 km (P) DRF 5,09,84 3,21,86 1,00,00 87,98 R. 6,38

258 Howrah - Khana - CTR - 2.3 km (P) DRF 2,93,87 2,92,87 1,00 .. R. 6,07

259 Gumani - Khana - CTR - 12.52 km (P) DRF 15,74,00 11,23,71 1,00,29 3,50,00 R. 33,07

260 Bandel Yard - CTR - 8.7 km (S) DRF 6,20,80 4,73,68 1,30,00 17,12 R. 12,12

261 Andal -Tapsi - Barabani - CTR - 6.5 km (S) DRF 4,08,80 1,12,71 1,50,00 1,46,09 R. 7,91

262 Azimganj Yard - CTR - 6 km (S) DRF 4,26,57 4,16,67 6,90 3,00 R. 8,37 2.1.18 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 263 Kiul - Barharwa - Malda - CTR - 17.8 km & TRR - 4 km DRF 25,52,19 20,15,24 1,40,00 3,96,95 (P) R. 47,74

264 Kiul-Barharwa-Malda - CTR - 9 km & TRR - 5.95 km (P) DRF 15,75,94 12,01,19 75,00 2,99,75 R. 23,98

265 Ballygunge Jn-Bidhannagar Road (Kankurgachi Chord) - DRF 6,66,20 6,37,51 6,93 21,76 CTR (P) - 5.2 km R. 10,00

266 - CTR (P) - 9.05 km DRF 11,70,34 7,98,94 1,00,00 2,71,40 R. 10,00

267 Khana-Asansol - CTR (P) - 16.9 km DRF 21,33,00 14,99,46 1,00,00 5,33,54

Through Rail Renewal 268 Khana-Durgapur - TRR(P) - 13.2 km DRF 11,13,60 7,10,14 1,50,00 2,53,46

269 Durgapur-Andal - TRR(P) - 3.49 km DRF 2,94,45 1,75,83 70,00 48,62

270 Asansol, Sitarampur, Kalubathan & Suri (Yard Lines) - DRF 12,61,20 5,51,79 1,00,00 6,09,41 CTR(S) - 17.77 km R. 23,79

271 Andal (Yard Lines) - CTR(S) - 29.2 km DRF 20,72,42 5,01,68 1,00,00 14,70,74 R. 39,09

272 Barasat-Bangaon - TRR(P) - 3.7 km DRF 2,70,35 2,37,85 1,63 30,87

273 Naihati-Gede (Loop Lines) - TRR(S) - 12.73 km DRF 6,40,92 5,83,23 50,00 7,69

274 Bandel-Saktigarh - TRR(P) - 18 km DRF 15,17,65 8,03,08 1,00,00 6,14,57

275 Azimgang-Nalhati - TRR(P) - 11.05 km DRF 8,05,43 3,95,90 1,00,00 3,09,53

276 New Farakka-Malda - TRR(P)- 13.25 km & TRR(S) - 3.5 km DRF 9,79,84 9,70,48 9,00 36

277 Barharwa-Kahlgaon (Passenger Loops) - TRR(S) & TSR(P) - DRF 7,17,77 4,05,95 2,00,00 1,11,82 8 km each R. 22,44

278 Sheoraphuli-Tarkeswar - TRR(P) - 29.41 km DRF 25,09,94 14,41,73 2,00,00 8,68,21 R. 31,99

279 Bandel-Saktigarh - TRR(P) - 5.20 km DRF 4,36,26 2,27,11 2,00,00 9,15

280 Kiul-Barharwa - TRR(P) - 6.02 km DRF 5,03,50 1,20,95 3,00,00 82,55

281 Sealdah Division - TRR(S) - 10.80 km (loop/yard lines) DRF 5,44,23 2,01,43 1,00,00 2,42,80

282 Dum Dum-Bongaon - TRR(P) - 5 km DRF 4,19,48 2,20,95 1,00,00 98,53 2.1.19 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 283 Khana-Asansol - TRR(S) - 7.44 km DRF 3,74,91 1,00,07 1,00,00 1,74,84

284 Bandel-Saktigarh - TRR(P) - 11.38 km DRF 9,54,74 6,35,47 3,00,00 19,27

285 Khana-Sitarampur - TRR(P) - 10.36 km DRF 8,69,17 5,21,82 1,00,00 2,47,35

286 Khana-Asansol - TRR(P) - 10.55 km DRF 8,89,26 1,00 50,00 8,38,26

287 Sitarampur-Pradhankanta - TRR(P) - 4 km DRF 3,37,16 1,00 50,00 2,86,16

288 Dankuni-Shaktigarh - TRR(P) - 3 km DRF 2,53,58 1,00 1,00,00 1,52,58

289 Dankuni-Shaktigarh - TRR(P) - 4 km DRF 3,38,10 50,00 1,00,00 1,88,10

290 Bandel-Shaktigarh - TRR(P) - 6 km DRF 5,05,74 60,00 50,00 3,95,74

291 New Farakka - Azimganj Jn. & Sahibganj - Bhagalpur - DRF 3,21,77 15,97 50,00 2,55,80 TRR(S) - 6 km (passenger loops)

292 Tinpahar- - TRR(S) - 5 km DRF 2,57,76 13,31 1,00,00 1,44,45

293 Bhagalpur-Mandarhill - TRR(P) - 8 km DRF 6,75,26 35,64 1,00,60 5,39,02

294 Bandel-Shaktigarh - TRR(P) - 13.3 km DRF 11,21,06 80,00 2,00,00 8,41,06

295 Chhota Ambana - Khana - TRR - 4 km (P) DRF 2,99,92 1,09,36 1,15,00 75,56

296 Jasidih - Jhajha - TRR - 3.75 km (P) DRF 2,72,14 1,81,23 67,62 23,29

297 Dum Dum - Dankuni -TRR - 5.66 km (P) DRF 3,58,96 3,52,21 6,75 ..

298 Gumani-Khana - TRR - 5.55 km (P) DRF 7,54,10 2,11,05 2,42,00 3,01,05

299 Chhota Ambona-Khana - TRR - 40.65 km (P) DRF 33,94,45 26,71,04 2,13,00 5,10,41

300 Sitarampur-Khana - TRR - 10.5 km (P) DRF 8,69,36 7,26,49 1,00,00 42,87

301 Howrah-Khana - TRR - 11.1 km (P) DRF 9,48,04 9,13,82 25,00 9,22

302 Howrah-Khana - TRR - 7.47 km (P) DRF 6,43,93 5,80,93 20,00 43,00

303 Howrah Division - TRR - 6.5 km (S) DRF 3,24,82 2,48,94 70,00 5,88

304 Azimganj-Nalhati - TRR - 9.46 km (P) DRF 6,80,52 3,44,91 70,00 2,65,61

305 Bhagalpur-Mandar Hill - TRR - 22 km (P) DRF 18,21,52 11,92,38 1,00,00 5,29,14

306 Ballyganj-Budge Budge - TRR - 3.15 km (P) & 2.8 km (S) DRF 3,98,32 2,94,26 90,00 14,06 2.1.20 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 307 Ranaghat-Lalgola - TRR - 18.8 km (P) DRF 15,56,57 14,54,65 2,69 99,23

308 Sitarampur-Jhajha - TRR (P) - 9 km DRF 6,45,00 5,29,65 80,00 35,35

309 Circular Railway - TRR (P) - 4.7 km DRF 3,36,80 2,86,48 50,00 32

310 Sahibganj Loop - TRR (P) - 16.6 km DRF 11,94,54 5,46,04 1,00,00 5,48,50

Through Sleeper Renewal 311 Sealdah Division - TBTR (4640 Nos) DRF 5,28,95 5,18,95 10,00 .. R. 47,29

312 Tinpahar - Rajmahal -TSR(P) with TRR(S) - 6.34 km DRF 4,55,69 3,36,66 1,19,03 .. R. 15,14

313 Chitpur Yard - TSR(P) with TRR(S) - 4.68 km DRF 3,78,24 3,66,46 10,00 1,78 R. 11,37

314 Budge Budge Yard - TSR - 3.52 km (P) &TRR - 4.07 km (S) DRF 4,58,74 4,58,73 1 .. R. 8,55

315 Andal-Tapasi-Barabani - TSR (P) & TRR (S) - 6.5 km each DRF 5,95,54 4,34,67 1,25,00 35,87 R. 15,79

316 Yard - TSR (P) & TRR (S) - 5.4 km each DRF 4,36,32 3,63,46 40,00 32,86 R. 13,12

317 Andal Yard - TSR(P) with TRR(S) - 9.7 km DRF 8,68,84 5,76,28 2,00,00 92,56 R. 25,10

318 Kiul - Barharwa - Malda - TSR(P) with TRR(S) - 6.35 km DRF 5,51,83 2,55,48 2,00,00 96,35 R. 17,04

319 Kiul-Barharwa-Malda - TSR(P) with TRR(S) - 3 km DRF 2,61,00 1,55,48 1,00,00 5,52 R. 7,76

320 Chitpur Yard - TSR(P) with TRR(S) - 10 km DRF 8,95,71 8,94,97 74 .. R. 25,88

321 Sealdah Yard - TSR(P) with TRR(S) - 5.18 km DRF 4,63,98 3,79,88 65,00 19,10 R. 13,40

322 Kalyani & Naihati Yards - TSR(P) with TRR(S) - 7.12 km DRF 6,37,74 5,99,03 8,34 30,37 R. 18,42

Ballast 323 Khana-Pradhankhunta & Srirampur-Jhajha - TBR - 52.24 km DRF 6,26,05 3,26,48 2,00,00 99,57 R. 66,01 2.1.21 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 324 Pandabeswar-Sainthia - TBR - 48.52 km DRF 5,81,47 2,50,10 2,00,00 1,31,37 R. 61,31

325 Sealdah Division - TBR - 59.8 km DRF 7,16,65 5,38,76 1,50,00 27,89 R. 75,56

326 Howrah Division - TBR - 32.48 km DRF 3,90,05 2,82,17 1,07,88 .. R. 41,00

327 Howrah Division - TTR - 97 sets DRF 15,11,98 8,06,66 2,00,00 5,05,32 R. 47,69

328 Bandel-Khana - TBR - 49.71 km DRF 5,94,74 3,00,00 1,00,00 1,94,74

329 Khana-Pradhankhunta - TBR - 102.70 km DRF 12,22,85 2,89,68 1,50,00 7,83,17

330 Sealdah Division - TBR - 50.68 km DRF 6,03,45 2,01,43 1,50,00 2,52,02

331 Khana-Jhajha - TBR - 67.54 km DRF 7,46,07 1,00 1,00,00 6,45,07 R. 2,11,10

332 Asansol Division - Through ballast renewal - 67.12 km DRF 4,14,50 3,86,54 25,00 2,96 R. 61,75

333 Chhota Ambana - Rajla -Through ballast renewal - 79 km DRF 8,88,44 8,13,86 50,00 24,58 R. 84,53

334 Howrah Division - TBR - 146.56 km (main line, Sahibganj DRF 16,56,43 12,91,21 1,20,00 2,45,22 loop, BB loop & Tarakeshwar branch) R. 1,52,82

335 Sealdah Division - Through ballast renewal - 44.2 km DRF 4,99,55 4,78,64 20,91 .. R. 47,29

336 Gumani - Khana - TBR - 42 km DRF 4,76,21 4,18,55 57,66 .. R. 43,42

337 Asansol Division - Through ballast renewal - 66.3 km DRF 7,89,08 6,58,61 1,00,00 30,47 R. 70,94

338 Howrah Division - Through ballast renewal - 149 km DRF 17,76,27 9,86,01 2,75,00 5,15,26 R. 1,56,51

339 Malda Division - Through ballast renewal - 42.3 km DRF 5,09,64 4,81,18 28,46 .. R. 45,26

340 Sealdah Division - Through ballast renewal - 118.24 km DRF 15,33,77 10,26,83 3,50,00 1,56,94 R. 1,26,52

Points & Crossings 341 Khana-Pradhankhunta (Yard Lines) - TTR - 70 sets DRF 12,28,40 6,10,30 2,00,00 4,18,10 R. 37,21 2.1.22 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 342 Undal-Tapsi-Barabani - TTR - 23 sets DRF 4,03,70 3,05,05 50,00 48,65 R. 12,23

343 Sealdah Division - TTR - 70 sets DRF 14,59,50 5,69,38 1,00,00 7,90,12 R. 38,38

344 Malda Division - TTR - 66 Nos DRF 11,41,36 7,22,52 2,00,00 2,18,84 R. 35,08

345 Sealdah Division - Switches, crossings, rails & DRF 8,26,09 2,91,90 1,00,00 4,34,19 fittings of points & crossings - 50 sets

346 Barddhaman-Khana - Renewal of points & crossings - 23 DRF 3,70,15 1,60,00 2,00,00 10,15 sets

347 Sealdah Division - Renewal of points & crossings - 50 DRF 7,83,56 2,91,90 1,00,00 3,91,66 sets

348 Howrah-Khana - Renewal of switches, crossings, rails & DRF 8,26,00 4,87,66 1,00,00 2,38,34 fittings - 50 sets

349 Asansol Division - Renewal of switches, crossings, DRF 8,26,09 3,32,68 20,00 4,73,41 rails & fittings - 50 sets

350 Andal Yard - Renewal of points & crossings - 40 sets DRF 6,26,85 2,79,61 1,50,00 1,97,24

351 Andal Down Yard - TTR (50 Nos) DRF 8,11,63 1,00 1,50,00 6,60,63 R. 35,72

352 Sealdah Division - TTR 180 sets DRF 32,40,22 1,71,77 1,00,00 29,68,45 R. 1,28,59

353 Bandel - Katwa & Bandel - Barddhaman -TTR (25 sets &39 DRF 9,80,83 5,77,55 4,00,00 3,28 sets) diamond crossing (12 sets) R. 33,39

354 Howrah Yard Complex - TTR (67 sets) DRF 7,97,75 4,44,41 1,50,62 2,02,72 R. 29,77

355 Andal - Sainthia - TTR (74 sets) DRF 9,72,94 8,97,90 5,94 69,10 R. 34,80

356 Sealdah Yard - TTR (40 sets) DRF 5,00,57 4,36,80 63,77 .. R. 18,40

357 Chitpur Yard - TTR (23 sets) DRF 3,18,45 3,15,45 3,00 .. R. 10,72

358 Howrah, Asansol & Sealdah Divisions - Complete renewal DRF 12,90,12 11,64,86 1,00 1,24,26 of points & crossings with thick web switches & R. 23,92 weldable CMS (16, 16 & 20 sets) 2.1.23 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 359 Howrah, Asansol, Sealdah & Malda Divisions - Complete DRF 40,11,00 33,48,49 1,53,10 5,09,41 renewal of points & crossings with thick web switches R. 92,00 (74, 40, 40 & 30 sets)

360 Andal Yard - TTR (83 sets) DRF 10,72,77 7,42,86 1,40,00 1,89,91 R. 38,18

361 Howrah Division - Thick web switches & weldable CMS DRF 4,03,70 90,91 1,00,00 2,12,79 crossings (17 sets) R. 8,50

362 Tikiapara & Jheel Siding - TTR (60 sets) DRF 8,36,18 4,99,31 1,10,00 2,26,87 R. 26,66

363 Malda Yard - Thick web switches & weldable CMS DRF 3,79,95 1,52,45 1,00,00 1,27,50 crossings (16 sets) R. 8,00

364 Sahibganj, Bhagalpur & Jamalpur Yards - TTR (60 sets) DRF 7,54,56 7,39,06 15,00 50 R. 27,60

365 Chitpur Yard - TTR (30 sets) DRF 3,91,87 3,77,28 14,59 .. R. 13,80

366 Pradhankhanta - Khana - TTR (75 sets) DRF 10,58,81 6,05,41 1,00,00 3,53,40 R. 37,20

367 Sitarampur - Khana - TTR (60 sets) DRF 9,51,94 6,28,13 1,10,00 2,13,81 R. 29,76

368 Tikiapara Yard - TTR (57 sets) DRF 8,11,35 7,06,23 85,00 20,12 R. 27,42

369 Howrah Division - TTR (54 sets) DRF 7,80,85 3,11,32 1,00,00 3,69,53 R. 25,96

370 Howrah - Khana - TTR (33 sets) DRF 6,18,42 5,52,19 28,62 37,61 R. 15,86

371 Kiul - Barharwa-Malda - TTR (35 sets) DRF 9,14,06 5,75,95 1,00,00 2,38,11 R. 19,07

372 Kiul - Barharwa - Malda - TTR (31 sets) DRF 4,29,71 3,25,48 72,26 31,97 R. 20,26

373 Sealdah South - TTR (28 sets) DRF 4,32,00 4,29,99 1 2,00 R. 14,07

374 Sealdah Yard - TTR (30 sets) DRF 4,53,13 4,04,30 19,00 29,83 R. 14,98 2.1.24 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACK RENEWALS 375 Chitpur Yard - TTR (21 sets) DRF 3,00,02 2,94,51 5,51 .. R. 10,46

Others 376 Sealdah Division - TWR - 47 km (1274 joints) DRF 3,77,02 2,75,75 70,00 31,27

377 Howrah Division - TFR - 183.88 km DRF 12,98,40 5,78,18 1,00,00 6,20,22

378 Sainthia-Barharwa - TWR - 44.5 km DRF 3,59,43 1,33,51 2,00,00 25,92

379 Khana-Sainthia - TFTR - 16.2 km DRF 10,14,83 5,41,98 1,00,00 3,72,85

380 Malda Town-New Farakka-Azimganj - TFTR - 11.53 km DRF 8,48,60 2,91,90 1,00,00 4,56,70

381 Malda Division - Strengthening of embankment at DRF 8,49,57 45,04 1,00,00 7,04,53 vulnerable locations - 16.17 km

382 Khana - Gumani - TFTR - 6.4 km (up & down) (Sahibganj DRF 2,67,52 1,08,68 1,30,00 28,84 loop)

383 Baltikuri - Dankuni - Addl berm & blanketing - 6.61 km DRF 3,23,00 1,10,37 2,10,00 2,63

384 Ballyghat-Dankuni - Strengthening of embankment by DRF 3,22,00 2,67,18 50,00 4,82 provision of sub-bank & blanketing - 4.67 km

385 Sahibganj Loop - Widening of cess & provision of DRF 9,75,00 2,18,12 1,00,00 6,56,88 sub-bank with boulder drains & filling up of borrow pits - 15.66 km

386 Howrah Division - TWR - 67.4 km DRF 5,16,77 1,79,83 1,00,46 2,36,48

387 Howrah Division - TFR - 59.82 km DRF 4,11,03 3,61,42 40,00 9,61

388 Malda Division - TWR - 37 km DRF 2,87,61 1,58,48 1,00,00 29,13

389 Works costing below Rs.2.5 crore each DRF .. .. 23,29,98 ..

TOTAL-WORKS IN PROGRESS DRF .. .. 235,20,00 .. B - New Works 390 Lumpsum provision for New Works DRF .. .. 29,80,00 ..

TOTAL-NEW WORKS DRF .. .. 29,80,00 .. TOTAL-Track Renewals DRF .. .. 265,00,00 .. BRIDGE WORKS A - Works in Progress 391 Barakar-Kumardhubi - Repl. of deck plates & inspection DRF 4,63,34 32,97 50,00 3,80,37 pathway (bridge No.18/down) 2.1.25 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

BRIDGE WORKS 392 Dhatrigram-Samudragarh - Repl. of girders (bridge DRF 3,70,54 2,00 30,00 3,38,54 No.83)

393 Howrah Division - Modification of MBG welded girders by DRF 3,20,56 5,00 30,00 2,85,56 replacing cross frame & stifners etc of different bridges

394 Tildanga-Barharwa - Reinforced concrete cement DRF 3,18,33 2,00 30,00 2,86,33 jacketting & repl. of early steel girders (bridge No.398) and New Farakka-Azimganj Jn - Protection works (bridge No.368)

395 Bhagalpur-Jamalpur - Reinforced concrete cement DRF 6,00,00 2,00 30,00 5,68,00 jacketting of piers & abutments (bridge No.184, 186, 195, 204 & 162)

396 Bhagalpur-Mandar Hill - Repl. of bridges by PSC/FC DRF 3,74,34 2,00 30,00 3,42,34 slabs with RCC jacketting of piers & abutments (bridge No.1, 24, 72-A, 88 & 74)

397 Gangpur-Barddhaman - Repl. & strengthening of bridge DRF 2,98,99 2,00 30,00 2,66,99 members (bridge No.209/up main & up HBC line)

398 Kuntighat-Dumurdaha - Repl. of girders (bridge No.20) DRF 3,12,91 2,00 30,00 2,80,91

399 Howrah Division - Strengthening of arches, piers & DRF 4,39,25 2,00 10,00 4,27,25 abutments by reinforced concrete cement jacketting (bridge Nos.19 & 20)

400 Bandel-Naihati - New rail bridge in repl.of Jubilee DRF 300,70,95* 188,70,95 70,00,00 42,00,00 Bridge No.8 across

401 Sealdah Division (ML Section) - Repl of girders (bridge DRF 1,75,96 61,84 1,00,00 14,12 No.1) SRSF 1,09,35 .. .. 1,09,35

402 Asansol Division (GC Section) - Repl of girders (bridge DRF 69,11,00 61,65,94 1,00,00 6,45,06 No.18)

403 Ranaghat-Lalgola - Repl of girders (bridge No.17/A) DRF 8,43,39 1,18,44 35,00 6,89,95

404 Asansol Division - Rebuilding of hume pipes / arches on DRF 3,93,65 70,00 1,50,00 1,73,65 Rajdhani route (26 Nos)

405 Howrah Division - Strengthening of arches, piers & DRF 6,03,00 5,67,87 29,50 5,63 abutments by reinforced concrete cement jacketing (32 bridges)

406 Kajra-Kiul - Conversion of minor masonry arch, shallow DRF 7,81,46 1,76,98 50,00 5,54,48 girder & FC slab bridges into reinforced concrete cement box (44 bridges) 2.1.26 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

BRIDGE WORKS 407 Andal-Durgapur - Strengthening of sub-structure & DRF 10,32,19 10,00 1,00,00 9,22,19 foundation (bridge No.436) incl. flooring, dropwall, curtain wall for 25 ton axle load

408 Howrah Division - Rebuilding by pre-stressed concrete DRF 53,83,00 41,71,59 2,00,00 10,11,41 box girder with reinforced concrete cement substructure etc (bridge No.172)

409 Sainthia-Pakur - Repl. of girders of down line by DRF 9,82,21 4,55,02 1,00,00 4,27,19 reinforced concrete cement box (5 bridges)

410 Howrah Division - Strengthening of sub-structure & DRF 3,95,70 3,75,02 20,68 .. foundation incl. flooring, dropwall & curtain wall for 25 ton axle load (bridge No.171 & 212)

411 Lailakhmamalkha-Sabour - Rebuilding of bridge No.144 DRF 37,55,25 27,75,23 1,00,00 8,80,02 with steel plate girders

412 Howrah Division - Rebuilding / rehabilitation with DRF 5,42,04 1,79,94 50,00 3,12,10 reinforced concrete cement box (bridge Nos.240, 258 & 261 down and 262 & 263 up / down)

413 Howrah Division - Strengthening of piers & abutments by DRF 4,97,18 95,87 50,00 3,51,31 reinforced concrete cement jacketing and protection of floor (bridge No.77 & 89 up)

414 Katwa- & Katwa-Ambalgram - Addl. openings DRF 10,56,09 49,37 50,00 9,56,72

415 Asansol Division - Strengthening of piers & abutments DRF 5,75,03 1,68,27 30,00 3,76,76 (bridge No.509)

416 Bhagalpur-Mandarhill - Repl. of small span steel girder DRF 4,81,63 3,48,86 52,77 80,00 bridges (bridge No.2, 3, 6, 15, 26, 27, 30, 33 & 100)

417 Malda Division - Reinforced concrete cement jacketing DRF 4,60,86 2,75,00 50,00 1,35,86 (bridge No.186 & 195), RCC box (bridge No.120, 102, 132 & 140), rebuilding (bridge No.279 & 304)

418 Ekchari-Ghoga - River training works (bridge No.133) DRF 4,08,50 24,77 50,00 3,33,73

419 Burnpur-Gede - Repl.of girders by reinforced concrete DRF 4,44,83 3,05,04 1,00 1,38,79 cement box (bridge No.141) & Gede-Darshana (bridge No.147)

420 Howrah Division - Rehabilitation (arch bridge No.208) DRF 2,57,00 60,00 50,00 1,47,00 (Phase-I) (20 spans)

421 Howrah Division - Rebuilding / rehabilitation of arch DRF 38,90,15 60,00 50,00 37,80,15 bridges with reinforced concrete cement box (15 Nos) & repair to substructure (2 bridges) 2.1.27 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

BRIDGE WORKS 422 Ranaghat-Gede - Repl. of steel girder by pre-stressed DRF 3,49,11 1,99,21 50,00 99,90 concrete slabs (bridge Nos.120 & 121)

423 Howrah Division - Reinforced concerte cement jacketting DRF 2,78,07 1,00 80,00 1,97,07 (arch bridge No.208) (20 spans) (Phase-II)

424 Nawapatra-Mathurapur - Reinforced concrete cement DRF 6,01,31 1,82,00 50,00 3,69,31 jacketing (bridge No.623)

425 Mugma-Thaparnagar - Reinforced concrete cement DRF 12,50,00 12,00 1,00,00 11,38,00 jacketting (bridge No.34)

426 Works costing below Rs.2.5 crore each DRF .. .. 8,00,00 ..

TOTAL-WORKS IN PROGRESS DRF .. .. 97,68,95 .. B - New Works 427 Lumpsum provision for New Works DRF .. .. 1,00,00 ..

TOTAL-NEW WORKS DRF .. .. 1,00,00 .. TOTAL-Bridge Works DRF .. .. 98,68,95 .. SIGNALLING AND TELECOMMUNICATION A - Works in Progress 428 Dhulianganga - Repl of semaphore signal by panel DRF 3,85,59 1,21,85 1,00,00 1,63,74 interlocking with colour light signal

429 Belanagar & Bhattanagar - Repl.of panel interlocking DRF 5,00,00 1,01,00 1,50,00 2,49,00

430 Sitarampur - Repl.of route relay interlocking DRF 7,03,49 1,00,00 1,50,00 4,53,49

431 Howrah Division - Repl of lever frames by electronic DRF 27,72,78 9,67,28 8,00,00 10,05,50 interlocking (7 stations) (E-route)

432 Sujnipara & Jangipur Road - Repl of lever frames / DRF 5,23,21 1,08,35 1,50,00 2,64,86 panel interlocking with semaphore signals by panel interlocking with colour light signals

433 Jamtara-Jhaja - Repl. of RE cables & quad cables (106 DRF 3,08,00 1,00 1,00,00 2,07,00 km)

434 Naihati-Ranaghat - Automatic signalling system DF(3) 27,02,34 1,70,19 2,00,00 23,32,15

435 Sealdah Division - Dual detection by digital axle DF(4) 5,44,00 1,00 2,00,00 3,43,00 counters (66 Nos)

436 Howrah Division - Repl. of quad cable by 6-quad cable DRF 3,62,00 1,00 1,50,00 2,11,00 (85 km)

437 Barddhaman - Repl. of indoor & outdoor signalling gears DRF 19,28,44 18,41,01 80,00 7,43 by route relay interlocking 2.1.28 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

SIGNALLING AND TELECOMMUNICATION 438 Malda Town - Repl. of lever frames by centralised DRF 10,91,00* 10,61,00 30,00 .. operation of points & signals DF(4) 5,00,00 4,25,52 70,00 4,48

439 Eastern Railway - Continuous track circuiting with DF(4) 71,00,00* 68,20,05 2,00,00 79,95 automatic block signalling (122.66 km) (A & C-routes) (Rajdhani & Shatabdi route)

440 Malda Division - Repl. of lever frames by centralised DRF 20,00,00* 19,92,21 7,00 79 operation of points & signals (10 stations) (B-route) DF(4) 7,70,00 6,21,99 1,00,00 48,01

441 Bonidanga-Barharwa-Kiul - Optic fibre cable with 6-quad DRF 22,70,00* 22,59,30 10,00 70 cable (B-route) (236 km)

442 Asansol Division - Track circuiting from fouling mark DF(4) 2,64,85 2,45,00 1 19,84 to block section limits (straight portion) (10 stations) and home to fouling mark (2 stations)

443 Sealdah South - Repl. of signalling gears with DRF 7,16,35 6,05,14 1,00,00 11,21 electronic interlocking

444 Bally-Shaktigarh - Mobile train radio communication DF(3) 5,20,16 1,18,77 1,00,00 3,01,39 system (90 km)

445 Kolkata Area - Public address system in suburban trains DF(1) 16,07,00 30,00 1 15,76,99 (141 rakes)

446 Bandel - Repl.of lever frames by electronic DRF 4,03,53 2,82,24 1,00,00 21,29 interlocking (C-route)

447 Chitpur (North Cabin) - Repl.of lever frames by panel DRF 8,36,20 6,91,11 1,00,00 45,09 interlocking

448 Salt Gola Cabin - Repl.of lever frames by panel / DRF 4,05,32 2,79,00 1,00,00 26,32 electronic interlocking

449 Howrah - True colour video train information display DF(3) 3,09,00 2,49,25 1 59,74 system (old complex)

450 Sealdah-Howrah-Khana & Automatic Section of Sealdah & DF(4) 179,96,07 5,32,63 1,00,00 173,63,44 Howrah Divisions - Train protection system (326 rkm)

451 Tikiapara & Howrah Goods Shed - Repl of lever frames by DRF 7,79,69 1,92,09 4,00,00 1,87,60 panel / electronic interlocking

452 Sealdah Division - Train management system (30 DF(3) 50,37,66 1,05,26 1 49,32,39 stations)

453 Howrah Division - Train management system (30 stations) DF(3) 50,50,92 3,56,90 8,00,00 38,94,02 2.1.29 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

SIGNALLING AND TELECOMMUNICATION 454 Sealdah-Dum Dum-Belgharia - Upgradation of automatic DF(4) 12,70,45 1,55,75 2,50,00 8,64,70 signalling from 3-aspect to 4-aspect

455 Howrah & Sealdah Divisions - Train protection & warning DF(4) 136,36,00 1,05,37 1,00,00 134,30,63 system on balance automatic signalling & important EMU routes (327 rkm)

456 Eastern Railway - Anti collision device on all broad DF(4) 54,70,00 1 1 54,69,98 gauge A & B-routes (828 rkm) (excluding Sealdah-Howrah-Khana) & modification to 1100 existing ACDs on Northeast Frontier Railway

457 Internet facility in New -Howrah DF(1) 6,30,00 4,60,68 50,00 1,19,32 (3 rakes) (pilot project)

458 Bashirhat - Isolation & upgradation / alteration of DF(4) 3,88,00 3,33 1,00,00 2,84,67 signalling

459 Nimtita - Repl.of semaphore signal by panel DRF 2,70,00 53,33 50,00 1,66,67 interlocking with colour light signalling

460 Works costing below Rs.2.5 crore each Cap. .. .. 3,00 .. DRF .. .. 7,00,00 .. DF(3) .. .. 1,00,00 .. DF(4) .. .. 5,00,00 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 3,00 .. DRF .. .. 32,77,00 .. DF(1) .. .. 50,01 .. DF(3) .. .. 12,00,02 .. DF(4) .. .. 16,20,02 .. B - New Works 461 Lumpsum provision for New Works DRF .. .. 1,00,00 .. DF(4) .. .. 1,00,00 ..

TOTAL-NEW WORKS DRF .. .. 1,00,00 .. DF(4) .. .. 1,00,00 .. TOTAL-Signalling and Telecommunication Cap. .. .. 3,00 .. DRF .. .. 33,77,00 .. DF(1) .. .. 50,01 .. DF(3) .. .. 12,00,02 .. DF(4) .. .. 17,20,02 .. OTHER ELECTRICAL WORKS EXCL TRD A - Works in Progress 462 Sealdah Division - Repl. of high tension sub-stations DRF 7,50,03 10,00 75,00 6,65,03 (35 year old) 2.1.30 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

OTHER ELECTRICAL WORKS EXCL TRD 463 Sahibganj - Upgradation of 11 kv sub-station to 33 kv DF(3) 4,51,68 5,00 75,00 3,71,68 and improvement of power house

464 Bhagalpur - Upgradation of 11 kv substation to 33 kv & DF(3) 3,29,62 2,99,36 30,26 .. improvement of power house

465 Howrah Division - Repl.of transformer, switchgear & DRF 8,71,80 6,38,38 1,00 2,32,42 cables etc with allied works

466 Sealdah Division - Repl.of high tension sub-stations (6 DRF 3,84,92 3,84,42 50 .. locations)

467 Howrah, Bandel, Bardhaman & Rampurhat - Repl.of oil DRF 3,64,29 49,46 1,50,00 1,64,83 type low tension circuit breaker & ICTPN switches with air circuit breakers & MCCBs

468 Works costing below Rs.2.5 crore each Cap. .. .. 20,00 .. DRF .. .. 2,10,00 .. DF(3) .. .. 40,00 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 20,00 .. DRF .. .. 4,36,50 .. DF(3) .. .. 1,45,26 .. B - New Works 469 Lumpsum provision for New Works Cap. .. .. 5,00 .. DRF .. .. 13,50 .. DF(3) .. .. 4,74 ..

TOTAL-NEW WORKS Cap. .. .. 5,00 .. DRF .. .. 13,50 .. DF(3) .. .. 4,74 .. TOTAL-Other Electrical Works excl TRD Cap. .. .. 25,00 .. DRF .. .. 4,50,00 .. DF(3) .. .. 1,50,00 .. TRACTION DISTRIBUTION WORKS A - Works in Progress 470 Howrah Division - Repl of winch type regulating DRF 5,50,04 1,27,12 1,00,00 3,22,92 equipment by 3-pulley type (Phase-II)

471 Asansol Divisiion - Repl.of masts at critical DRF 4,46,78 4,40,70 6,08 .. implantations (Phase-VII)

472 Sealdah Division - Repl. of catenary wire DRF 3,00,00 5,00 1,50,00 1,45,00

473 Bandel-Shaktigarh - Conversion of unregulated overhead DF(3) 21,06,00 5,50,03 1,30,00 14,25,97 equipment to regulated one (Phase-I) 2.1.31 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TRACTION DISTRIBUTION WORKS 474 Howrah-Bandel - Conversion of unregulated overhead DF(3) 20,53,26 5,66,04 1,30,00 13,57,22 equipment to regulated one (Phase-II)

475 Howrah Division - Augmentation of SCADA system for addl DRF 2,61,74 2,21,85 16,50 23,39 lines

476 Shaktigarh-Bardhaman - Conversion of unregulated DC DRF 12,93,67 1,55,75 1,00,00 10,37,92 system based overhead equipment to conventional regulated AC equipment in 4-line section

477 Asansol Division - Repl.of mast at critical DRF 8,22,53 4,74,71 2,00,00 1,47,82 implantation (Phase-VI) (300 Nos)

478 Howrah Division - Repl.of overhead equipment structures DRF 6,17,84 4,22,27 1,95,57 .. & removal of tight implanted masts / portals

479 Howrah Division - Repl.of cantilever in yard & branch DRF 3,70,30 99,23 1,00,00 1,71,07 lines

480 Sealdah Division - 132 kv / 25 kv single transformer DF(3) 34,95,50 19,00,00 2,40,22 13,55,28 traction sub-station behind Bidhannagar sub-sectioning post near Chitpur Terminal

481 Sealdah-Naihati - Repl. of overhead equipment in DRF 9,89,77 3,44,25 2,00,00 4,45,52 industrially polluted areas (20 tkm) (Phase-II)

482 Khana-Pradhankhunta - Repl of cantilever assemblies DRF 3,67,25 78,93 75,00 2,13,32 (Phase-IV)

483 Sealdah Division - Repl.of traction mast of tight DRF 4,57,76 1,33,00 1,00,00 2,24,76 implantation (Phase-IV)

484 Sealdah Division - Repl.of contact wire DRF 3,69,34 45,00 50,00 2,74,34

485 Works costing below Rs.2.5 crore each Cap. .. .. 1,01,00 .. DRF .. .. 2,10,00 .. DF(3) .. .. 1,95,00 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 1,01,00 .. DRF .. .. 15,03,15 .. DF(3) .. .. 6,95,22 .. B - New Works 486 Lumpsum provision for New Works DRF .. .. 6,85 .. DF(3) .. .. 5,00 ..

TOTAL-NEW WORKS DRF .. .. 6,85 .. DF(3) .. .. 5,00 .. TOTAL-Traction Distribution Works Cap. .. .. 1,01,00 .. DRF .. .. 15,10,00 .. DF(3) .. .. 7,00,22 .. 2.1.32 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

WORKSHOPS INCLUDING PRODUCTION UNITS A - Works in Progress 487 Howrah - Infrastructure development at sorting yard DF(3) 12,00,00 2,73,00 1,37,28 7,89,72 coaching complex (Phase-IV)

488 Sahibganj - New diesel electrical multiple unit Cap. 21,43,80 1,94,00 99,24 18,50,56 maintenance shed

489 Naihati - Extension of routine overhauling covered shed Cap. 4,76,00 97,00 1,48,86 2,30,14 with other associated facilities

490 Asansol- Addl pit line at east marshalling yard Cap. 9,71,16 1,94,00 46,92 7,30,24

491 Halisahar & Kanchrapara - Modernisation of stores Cap. 11,82,70 97,00 1,00 10,84,70 depots

492 Narkeldanga - Upgradation of infrastructural facilities Cap. 5,00,00 1,00,00 49,62 3,50,38 for maintenance of 12-car rakes at electrical multiple unit car shed (Phase-II)

493 Barasat (Car Shed) - Addl maintenance infrastructure to Cap. 10,14,18 97,00 49,62 8,67,56 enhance capacity from 24 to 36 rakes (Phase-II)

494 Bandel - Addl maintenance facilities at electrical Cap. 9,99,00 1,85,00 49,62 7,64,38 multiple unit car shed for running of 12-coach rakes (Phase-III)

495 Howrah - Capital store at electric loco shed DF(3) 3,13,62 60,00 20,00 2,33,62

496 Kolkata Terminal - Extension of coaching sick line DF(3) 5,00,00 40,50 1 4,59,49

497 Asansol (Electric Loco Shed) - Augmentation of shed to DF(3) 172,42,60 7,50 1,00 172,34,10 improve facilitiy for maintenance of locomotives

498 Kanchrapara - New central periodic overhauling depot DF(3) 25,50,81 40,50 9,15 25,01,16 for track machines

499 Ranaghat - Electrical multiple unit car shed Cap. 39,42,52 38,20,52 15,88 1,06,12

500 Kanchrapara Workshop - Enhancement of capacity to Cap. 11,85,49 6,49,50 99,24 4,36,75 undertake periodic overhauling of 26 motor & 52 trailer coaches

501 Jamalpur Workshop - Extension of GIF & SF towards North DF(3) 15,97,31 13,97,82 1,37,28 62,21 side

502 Chitpur - Upgradation of routine overhauling depot Cap. 16,75,23 16,43,90 1,18 30,15 relocated at Naihati

503 Liluah Workshop - Facilities for overhauling of new Cap. 14,25,94 10,18,91 1,00 4,06,03 generation coaches incl. upto 26 m long coaches DF(3) 5,73,69 1,79,35 1,00 3,93,34 2.1.33 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

WORKSHOPS INCLUDING PRODUCTION UNITS 504 Tikiapara - Remodelling of coaching yard DF(3) 25,92,78 24,74,39 1 1,18,38

505 Naihati - Upgradation of maintenance facilities in DF(3) 8,58,76 8,00,00 41,20 17,56 freight sick line to A-category

506 Malda (Coaching Depot) - Infrastructure development DF(3) 15,99,60 11,11,27 91,52 3,96,81

507 Asansol (Coaching Depot) - Infrastructure development DF(3) 9,03,75 8,43,26 1 60,48

508 Bardhaman - Development of infrastructure facilities DF(3) 5,00,67 3,27,92 45,80 1,26,95 for coach maintenance

509 Howrah & Bandel Car Sheds - Addl. maintenance Cap. 11,50,22 5,53,45 1 5,96,76 facilities for running of 12-coach electrical multiple unit trains

510 Narkeldanga Car Shed - Addl. pit on line No.4 & shed on DF(3) 7,28,00 81,33 1 6,46,66 line No.3 & 4 for 12-coach rakes formation

511 Sealdah (New Coaching Complex) - Improvement of sick DF(3) 6,92,93 1,78,39 9,15 5,05,39 line with provision of EOT crane, wheel lathe etc

512 Pakur - Infrastructure facilities to enhance intensive DF(3) 8,48,79 3,90,39 45,76 4,12,64 examination of CC rakes of freight trains

513 Malda - Upgradation of freight train examination yard & DF(3) 15,77,15 1,97,16 91,52 12,88,47 sick line facilities to A-category

514 Kanchrapara - Augmentation of capacity for periodical DF(3) 7,21,44 3,64,78 1,00 3,55,66 overhauling of electric locomotives from 72 to 96 per year

515 Andal (Durgapur Steel Exchange Yard) - Upgradation of DF(3) 6,18,55 1,93,32 9,15 4,16,08 infrastructural facilities for freight train examination to A-category

516 Liluah - Modernisation of workshop Cap. 26,68,52 5,36,35 99,23 20,32,94 DRF 51,75,58 4,80,15 1,00 46,94,43 DF(3) 43,63,45 4,83,39 2,74,57 36,05,49

517 Jamalpur - Modernisation of workshop Cap. 80,15,94 23,11,86 99,24 56,04,84 DRF 37,29,78 21,20,79 50,00 15,58,99

518 Sealdah (New Coaching Complex) - Upgradation & DF(3) 6,91,13 2,91,51 45,76 3,53,86 improvement of sick line

519 Andal - Extension for homing 120 diesel locomotives Cap. 3,09,63 1,44,65 49,62 1,15,36 with other infrastructural improvements 2.1.34 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

WORKSHOPS INCLUDING PRODUCTION UNITS 520 Kanchrapara Workshop - Augmentation of capacity for Cap. 80,85,74 9,64,78 99,24 70,21,72 periodical overhauling of 40 motor & 80 trailer coaches per month

521 Dankuni - Setting up of factory for manufacture of Cap. 265,95,00 188,02,25 33,92,35 44,00,40 components & sub assemblies for EMD locos and institute for training

522 Howrah - Remodelling of diesel shed DRF 26,51 9,75 1,00 15,76 DF(3) 2,56,00 51,64 45,76 1,58,60

523 Howrah & Bandel - Addl. maintenance facilities at car Cap. 10,80,18 3,14,80 1 7,65,37 sheds for running of 12-coach electrical multiple unit trains (Phase-II)

524 Barasat Car Shed - Extension of inspection pits & shed DF(3) 2,82,43 54,96 1 2,27,46 (line No.3 & 4) for maintenance of 12-coach electrical multiple unit rakes

525 Sonarpur Car Shed - Extension of shed over pit line Cap. 6,00,00 2,73,35 1 3,26,64 No.3, 4, 5 & 6; independent shunting neck, addl cat-walk, stabling line etc for 12 coach trains

526 Andal (Up Sick Line) - Extension of heavy duty covered DF(3) 4,74,30 3,43,76 9,15 1,21,39 shed with EOT crane gantry

527 Jamalpur (Diesel Shed) - Basic infrastructure for DF(3) 3,81,97 1,54,65 91,52 1,35,80 maintenance of diesel electrical multiple units

528 Beliaghata (Diesel Shed) - Upgradation of maintenance DF(3) 4,00,00 1,21,04 45,76 2,33,20 facilities for WDS6 / WDM2 locos

529 Tikiapara - Remodelling of coaching yard (Phase-II) DF(3) 45,04,40 2,63,02 1 42,41,37

530 Sealdah - Development of coaching maintenance DF(3) 74,63,88 6,49,46 45,76 67,68,66 infrastructure

531 Kanchrapara - New rail coach manufacturing unit Cap. 760,16,00 20,37,36 39,70 739,38,94 EBR 100,00,00 1,00,00 .. 99,00,00

532 Liluah - Augmentation of periodical / intermediate Cap. 5,27,00 97 1 5,26,02 overhauling of LHB coaches from 10 to 30 coaches per DRF 2,34,00 2,81 1 2,31,18 month DF(3) 2,37,00 40,50 1 1,96,49

533 Works costing below Rs.2.5 crore each Cap. .. .. 2,64,93 .. DRF .. .. 2,08,00 .. DF(3) .. .. 2,04,58 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 46,06,53 .. DRF .. .. 2,60,01 .. DF(3) .. .. 14,03,74 .. 2.1.35 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

WORKSHOPS INCLUDING PRODUCTION UNITS B - New Works 534 Lumpsum provision for New Works Cap. .. .. 7,70 .. DRF .. .. 5,00 .. DF(3) .. .. 5,00 ..

TOTAL-NEW WORKS Cap. .. .. 7,70 .. DRF .. .. 5,00 .. DF(3) .. .. 5,00 .. TOTAL-Workshops including Production Units Cap. .. .. 46,14,23 .. DRF .. .. 2,65,01 .. DF(3) .. .. 14,08,74 .. STAFF QUARTERS A - Works in Progress 535 Andal - Repl.of quarters, type-I - 28, type-II - 50, DRF 3,84,19 1,17,63 1,00,00 1,66,56 type-III - 8 & type-IV - 4 units

536 Sealdah Division - Repl. of quarters, type-I - 16, DRF 5,31,52 5,05,29 5,00 21,23 type-II - 42, type-III - 15 & type-IV - 2 units

537 Howrah Division - Repl.of quarters, type-II - 230, DRF 13,32,28 3,97,84 20,00 9,14,44 type-III - 35 & type-IV - 20 units

538 Howrah Division - Rebuilding of quarters, type-I - 100 DRF 4,20,42 80,83 20,00 3,19,59 units

539 Sealdah Division - Repl.of quarters, type-II - 58, DRF 3,70,43 1,90,68 20,00 1,59,75 type-III - 15 & type-IV - 2 units in Kaizer Street & Guard Colony

540 Andal - Repl.of quarters, type-II - 100 units in DRF 6,69,58 6,61,37 8,20 1 different colonies

541 Sealdah - Type-V - 16 units Cap. 3,16,50 2,57,32 10,00 49,18

542 Sealdah - Repl. of quarter, type-I - 152, type-II - 32, DRF 11,61,72 2,00,00 20,00 9,41,72 type-III - 12 & type-IV - 4 units by type-II - 184, type-III - 12 & type-IV - 4 units

543 Madhupur & Sitarampur - Repl of jack arch roof type DRF 2,79,38 1,33,78 50,00 95,60 quarters, type-II - 50 units

544 Works costing below Rs.2.5 crore each Cap. .. .. 1,57,68 .. DRF .. .. 3,80,69 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 1,67,68 .. DRF .. .. 6,23,89 .. B - New Works 545 Lumpsum provision for New Works Cap. .. .. 2,00 .. DRF .. .. 2,00 ..

TOTAL-NEW WORKS Cap. .. .. 2,00 .. DRF .. .. 2,00 .. 2.1.36 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TOTAL-Staff Quarters Cap. .. .. 1,69,68 .. DRF .. .. 6,25,89 .. AMENITIES FOR STAFF A - Works in Progress 546 Malda - Opening of nursing college DF(2) 10,31,00 1,00 1 10,29,99

547 BR Singh Hospital - Improvement DF(2) 24,23,00 4,99,86 3,00,00 16,23,14

548 Bamangachi - Design, construction & commissioning of DF(2) 4,00,00 1 1 3,99,98 effluent treatment plant with ancillary works at Railway colony

549 Malda - Upgradation / renovation of railway hospital DF(2) 3,75,67 1,75,45 1,00,00 1,00,22 with modern facilities

550 Howrah Division - Rewiring of quarters (type-I - 1200, DRF 3,96,18 3,76,46 1 19,71 type-II - 680, type-III - 100 & type-IV - 20 units)

551 Jamalpur - Improvement of Rampur & Daulatpur colonies DRF 4,08,69 2,15,61 95,02 98,06 as model colonies

552 Jamalpur - Improvement of staff quarters with treatment DF(2) 2,61,39 2,05,68 55,71 .. of leaky roofs (East & West colony)

553 Kanchrapara - Improvement to officers & foremen DF(2) 3,44,50 3,29,50 13,10 1,90 colonies and road

554 Howrah - Central air-conditioning plant at orthopaedic DF(2) 3,98,52 2,25,45 50,00 1,23,07 hospital

555 Bardhaman - Extensive repairs to staff quarters in DF(2) 4,04,32 1,75,39 34,60 1,94,33 railway colony

556 Asansol Division - Repl. of jack arch / asbestos roofs, DF(2) 3,00,00 1,22,86 1,00,00 77,14 doors, windows, water supply distribution pipes (type-I - 100 & type-II - 150 units)

557 Kolkata - Construction of auditorium at New Koilaghat DF(2) 5,11,00 1 1 5,10,98

558 Belur - Multi speciality hospital under Howrah division DF(2) 27,51,41 1,30 1 27,50,10

559 Majerhat - Construction of nursing college & hostel DF(2) 24,32,75 17,23,74 1 7,09,00

560 Krishnanagar Jn Railway Colony - Construction of DF(2) 2,57,00 3,86 1 2,53,13 Dwijendra Lal Roy auditorium (250 persons)

561 Kanchrapara - Repl.of pipeline at Dangapara colony, DRF 6,48,48 79,05 49,21 5,20,22 renovation of filter house, provision of boundary wall, renovation of roads etc

562 Works costing below Rs.2.5 crore each Cap. .. .. 33,00 .. DRF .. .. 8,36,43 .. DF(2) .. .. 5,98,99 .. DF(3) .. .. 21,09 .. 2.1.37 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TOTAL-WORKS IN PROGRESS Cap. .. .. 33,00 .. DRF .. .. 9,80,67 .. DF(2) .. .. 12,52,46 .. DF(3) .. .. 21,09 .. B - New Works 563 Lumpsum provision for New Works Cap. .. .. 2,00 .. DRF .. .. 1,00 .. DF(2) .. .. 1,00 ..

TOTAL-NEW WORKS Cap. .. .. 2,00 .. DRF .. .. 1,00 .. DF(2) .. .. 1,00 .. TOTAL-Amenities for Staff Cap. .. .. 35,00 .. DRF .. .. 9,81,67 .. DF(2) .. .. 12,53,46 .. DF(3) .. .. 21,09 .. PASSENGER AMENITIES A - Works in Progress 564 Howrah Division - Optic fibre cable connectivity to all DF(1) 5,77,36 50,00 50,00 4,77,36 flag stations (40 station)

565 Sealdah Division - Optic fibre cable connectivity to DF(1) 7,24,75 75,00 50,00 5,99,75 all flag stations (45 stations)

566 Howrah - Drinking water facilities for Pakur command DF(1) 31,82,00 2,30,00 1,00,00 28,52,00 area

567 Liluah - Augmentation of 1.4 mgd water treatment plant DF(1) 5,90,00 1,00,00 3,00,00 1,90,00

568 Howrah Division - Improvement to suburban stations on DF(1) 57,00,00 1 1,00,00 55,99,99 HBC section, Howrah-Bardhman main line & BB loop

569 Sealdah Division - Improvement of suburban stations on DF(1) 79,30,00 1,00,00 1,00,00 77,30,00 North, main & South sections

570 Agarpara - 3m wide pedestrian sub-way & foot over DF(1) 4,66,00 2,00,00 2,50,00 16,00 bridge

571 - Reinforced concrete cement box subway DF(1) 6,03,89 1,02,81 3,00,00 2,01,08

572 Howrah - 6.1 m wide foot over bridge connecting DF(1) 13,40,00 1,21,00 3,00,00 9,19,00 platform No.1 to 14 of old complex with provision of single way escalator

573 Dankuni - Improvement of circulating area & widening of DF(4) 2,75,00 2,33,46 40,00 1,54 approach road

574 Howrah Division - Improvement of suburban stations DF(1) 26,99,00 1 1,00,00 25,98,99 (main line, chord line & BB loop)

575 Majerhat - Balance work for station building as DF(1) 4,47,10 2,41,61 2,00,00 5,49 phase-II and other ancillary works 2.1.38 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

PASSENGER AMENITIES 576 Sealdah - Improvement & development of circular railway DF(1) 8,01,70 6,60,98 1,40,00 72

577 Eastern Railway - Improvement of model stations (19 DF(1) 6,57,00 5,37,00 1,00,00 20,00 Nos)

578 Howrah Division - Renovation of low level & rail level DF(1) 6,26,88 5,81,20 45,68 .. platforms (3 stations) and raising of platforms (19 stations)

579 Asansol Division - Making / extension & raising of DF(1) 3,88,80 3,78,80 10,00 .. platforms to rail level (10 stations)

580 Bandel-Katwa - Raising of platforms DF(1) 3,79,40 3,65,69 13,71 ..

581 Durgapur - Remodelling of station building DF(1) 2,89,67 1,82,53 1,00,00 7,14

582 Malda Division - High level platform, platform shed, DF(1) 9,25,52 8,98,56 26,50 46 foot over bridge, new station building, water supply & benches (6 stations)

583 Bhagalpur - Extension of platform No.2 & 3 for 24 DF(1) 6,13,85 5,13,85 84,00 16,00 coaches with yard remodelling, provision of addl shed, 3rd foot over bridge etc

584 Eastern Railway - Escalators at major stations (4 Nos) DF(1) 2,80,00 2,70,00 10,00 .. (2 stations)

585 Asansol Division - Extension of platforms to DF(1) 5,00,00 3,48,43 1,00,00 51,57 accommodate 16-coach trains, with foot over bridges (6 stations)

586 General improvement in passenger amenities at various DF(1) 50,00,00 38,00,00 1,00,00 11,00,00 important stations (incl. Majerhat)

587 Naihati - Pedestrian subway DF(1) 14,93,00 1,00,17 3,00,00 10,92,83

588 Ranaghat - Pedestrian subway DF(1) 19,39,00 2,82,51 4,00,00 12,56,49

589 Howrah Division - Raising of platforms from rail / low DF(1) 11,20,98 7,33,18 2,00,00 1,87,80 level to high level and improvement to platform surfaces (21 stations)

590 Howrah - Extension of shed (platform Nos.15, 17, 18, DF(1) 3,18,42 2,01,66 1,16,76 .. 19, 20, 21, 22 & 23)

591 Azimganj - Drinking water facilities DF(1) 4,78,38 77,79 2,50,00 1,50,59

592 Sainthia - Coach watering facilities DF(1) 6,27,79 1,65,54 3,00,00 1,62,25 2.1.39 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

PASSENGER AMENITIES 593 Jasidih - Water supply arrangement from Ajoy river DF(1) 2,51,00 2,42,00 9,00 ..

594 Sealdah Division - Digital public address & emergency DF(1) 4,17,00 2,90,00 1,25,00 2,00 sound system for centralised digital announcement system (18 stations)

595 Sealdah Division - Full shelter to cover 12/24-coach DF(1) 93,01,97 29,76,03 1,50,00 61,75,94 length at various stations

596 Naihati, Ranaghat, Krishnanagar & Behrampur Court - DF(1) 10,23,00 5,05,33 10,00 5,07,67 Foot over bridge (6 m wide)

597 Sealdah Division - Platform shelter (30 stations) DF(1) 77,81,74 31,12,92 1,00,00 45,68,82

598 Howrah Division - Platform shelter (40 C-class DF(1) 157,94,22 34,35,27 1,50,00 122,08,95 stations)

599 Sodepur - Pedestrian subway DF(1) 4,47,00 1,53,64 2,90,00 3,36

600 Durgapur - Improvement to platform shed roofing, DF(1) 2,53,62 1 1,00,00 1,53,61 reinforced concrete cement overhead tank etc for development as model station

601 Srirampur - Twin reinforced concrete cement box subway DF(1) 4,87,00 7,28 2,00,00 2,79,72

602 Sealdah - True colour display board for passenger DRF 5,50,00 2,60,00 1,00,00 1,90,00 information system by replacing text board

603 Kolkata Terminal - True colour display board for DRF 4,17,29 2,60,00 1,57,29 .. passenger information system by replacing text board

604 Sealdah Division - Repl. of dilapidated station DRF 2,90,00 1,30,00 1,50,00 10,00 buildings (6 stations)

605 Baranagar Road, Dakshineswar & Ballyghat - Repl. of DRF 5,41,56 1,70,00 3,71,56 .. standard platform

606 Behrampur Court, Lalgola, Krishnanagar City, Ranaghat & DF(1) 3,99,72 2,22,21 1,75,00 2,51 Gede - Piped water supply

607 Mathurapur Road, Gocharn, Majhdia & Joynagar Majilpur - DF(1) 2,72,65 10,00 50,00 2,12,65 2nd foot over bridge and Ranaghat - 3rd foot over bridge

608 Bardhaman - Extension of shed to cover entire platform DF(1) 2,65,23 2,02,42 62,81 .. area (platform No.1, 2/3, 4/5 & 6/7)

609 Krishnanagar City-Lalgola & Ranaghat-Shantipur - DF(1) 17,68,00 2,30,00 50,00 14,88,00 Platform shed for Adarsh stations Muragacha, Bethuadahari, Debgram, Pagla Chandi & Habibpur 2.1.40 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

PASSENGER AMENITIES 610 Howrah Division - Raising of platform from rail & low DF(1) 7,44,00 55,13 2,50,00 4,38,87 level to high level and extension of length with improvement to platform surface (13 stations)

611 Tikiapara - Water treatment plant (2.5 mgd capacity) DF(1) 14,03,16 3,02,97 40,00 10,60,19 incl. pipeline etc for water supply to coaching complex

612 Howrah Division - Piped water supply with deep tubewell DF(1) 4,99,66 1,92,35 2,00,00 1,07,31 (21 stations)

613 Asansol Division - Additional DI pipeline from Barakar DF(1) 11,99,00 3,00,00 1,00,00 7,99,00 pump house to Asansol filter house

614 Bolpur, Sainthia & Nalhati - Repl.of foot over bridges DRF 3,82,51 1,53,71 2,00,00 28,80

615 Asansol, Durgapur, Howrah, Bolpur, Rampurhat, Malda & DF(1) 14,17,00 2,21,01 1,00,00 10,95,99 Bhagalpur - Escalators (2 each) (14 Nos)

616 Belgharia - 6 m wide pedestrian subway & 3.65 m wide DF(1) 6,20,00 2,00,00 1,50,00 2,70,00 foot over bridge

617 Ballygunge - New station building DF(1) 19,63,00 1,00 10,00 19,52,00

618 Howrah Division - Train indication boards at all DF(1) 12,79,00 4,21,00 2,00,00 6,58,00 remaining suburban stations

619 Kolkata - New approach road from Belgachia road over DF(1) 10,59,68 3,00,02 2,00,00 5,59,66 bridge via Ultadanga railway colony

620 Howrah - Development of station incl. segregation of DF(1) 166,89,00 1,00,00 10,00 165,79,00 arrival / departure & other amenities

621 Howrah - 6.1 m wide foot over bridge connecting old & DF(1) 2,51,00 30,01 1 2,20,98 new complexes (platform No.14 & 17)

622 Eastern Railway - Escalators at various stations (16 DF(1) 10,08,00 1 1,00,00 9,07,99 Nos) (8 stations)

623 Sealdah Division - Raising of platform (36 stations) DF(1) 16,19,00 2,10,00 3,00,00 11,09,00

624 Tarapith & Tarakeshwar - Joint development of stations DF(1) 5,50,00 1,00,00 50,00 4,00,00 in association with Ministry of Tourism (PB EBR 5,50,00 .. 50,00 5,00,00 781/2012-13/NR)

625 Works costing below Rs.2.5 crore each DRF .. .. 3,18,32 .. DF(1) .. .. 21,88,10 .. DF(2) .. .. 4,00 .. DF(3) .. .. 13,37 .. 2.1.41 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TOTAL-WORKS IN PROGRESS DRF .. .. 12,97,17 .. DF(1) .. .. 95,16,57 .. DF(2) .. .. 4,00 .. DF(3) .. .. 13,37 .. DF(4) .. .. 40,00 .. EBR .. .. 50,00 .. B - New Works 626 Lumpsum provision for New Works DRF .. .. 2,50,00 .. DF(1) .. .. 2,00,00 ..

TOTAL-NEW WORKS DRF .. .. 2,50,00 .. DF(1) .. .. 2,00,00 .. TOTAL-Passenger Amenities DRF .. .. 15,47,17 .. DF(1) .. .. 97,16,57 .. DF(2) .. .. 4,00 .. DF(3) .. .. 13,37 .. DF(4) .. .. 40,00 .. EBR .. .. 50,00 .. OTHER SPECIFIED WORKS A - Works in Progress 627 Howrah - Setting up of Archery academy at Eastern side DF(3) 15,06,39 1,47 26,12 14,78,80 of electrical multiple unit car shed

628 Howrah - Development of Eco Part at Ramkrishtopur Ghat DF(3) 10,23,57 1,00 52 10,22,05

629 Howrah - Repl of tilted retaining wall at riverside of DF(1) 4,87,93 71,00 52 4,16,41 Riviera

630 Howrah - 75-bedded barrack at Golmohor barrack complex DF(3) 3,57,92 10,00 52,23 2,95,69

631 Jamalpur (IRIMEE) - Improvement for training of DF(3) 2,53,07 2,52,07 1,00 .. in-service officers

632 Bhuli - Upgradation of training facilities at zonal DF(3) 2,18,25 1,88,25 30,00 .. railway training institute SRSF 63,75 63,75 .. ..

633 Jamalpur (IRIMEE) - New auditorium DF(3) 3,23,51 2,27,04 10,45 86,02

634 Malda Division - Flood protection work DF(3) 9,83,95 2,42,00 5,22 7,36,73

635 Jamalpur (IRIMEE) - Comprehensive plan for upgradation DRF 1,76,62 1,72,24 4,38 .. of infrastructure and training facilties DF(3) 4,48,23 2,71,30 26,12 1,50,81

636 Jamalpur - Improvement / augmentation of Pilot training DF(3) 5,71,11 1,84,11 1,00,00 2,87,00 school

637 Kolkata (East) - Development of rail museum (Phase-II) DF(3) 3,49,64 2,51,84 5,22 92,58

638 Howrah (Rail Museum) - New auditorium DF(3) 4,98,80 90,01 1 4,08,78

639 Sealdah - Bank protection / treatment with side slopes DF(3) 6,53,69 77,50 2,08,92 3,67,27 by rail piling, bullah piling, reinforced concrete cement retaining wall, boulder pitching etc 2.1.42 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

OTHER SPECIFIED WORKS 640 Reginagar-Beldanga - Bad bank treatment with slopes DF(3) 7,15,24 1,07,50 1,56,69 4,51,05

641 Kolkata Area - Integrated security system (7 stations) Cap. 21,55,05 5,95,71 5,40,59 10,18,75

642 Eastern Railway - Integrated security system (4 Cap. 10,65,24 3,41,02 2,60,24 4,63,98 stations)

643 Bongaon - New indoor stadium DF(3) 15,88,00 1 1 15,87,98

644 Gholshapur (Behala) - New indoor sports complex DF(3) 56,45,00 2,75,00 1,82,81 51,87,19

645 Howrah - Running room for drivers, guards, motormen, DF(3) 3,26,08 1,14,33 88,66 1,23,09 travelling ticket examiners etc

646 Howrah - New divisional railway manager's office DRF 14,20,00 78,63 1,00,00 12,41,37 building

647 Asansol Division - Track drain on cutting, dwarf wall DF(4) 2,50,46 73,98 52,23 1,24,25 at pedestrian crossing locations

648 Asansol - Development of campus for raising of Railway DF(3) 16,05,82 6,62,09 26,12 9,17,61 Protection Special Force ladies battalion

649 Canning - Raising of Railway Protection Force commando DF(3) 26,70,00 6,23 52,23 26,11,54 training centre

650 Kolkata - Development of headquarters offices at DF(3) 6,41,67 2,21,06 1,56,69 2,63,92 Fairlie Place

651 Bolpur - Construction of rail museum DF(3) 8,21,40 6,52,34 23,50 1,45,56

652 Sealdah - Improvement to Netaji Subhash Institute DRF 12,64,00 10 49,26 12,14,64 auditorium

653 Sealdah - Improvement of Dr. B.C. Roy institute DRF 7,28,00 96,77 1,48,17 4,83,06 auditorium

654 Howrah - Development of Rabindra rail museum in front DF(3) 12,20,00 3,00,73 1,04,46 8,14,81 of new station complex

655 Beliaghata - Advanced track training centre DF(3) 10,00,00 1,00,05 50,00 8,49,95

656 Malda - Multi-disciplinary training centre DF(3) 11,04,85 2,00,00 10,00 8,94,85

657 Howrah - Sambhu Mitra cultural complex DF(3) 30,28,00 50,01 1 29,77,98

658 Gholsapur - Full covered shed with gallery, balance DF(3) 10,27,00 3,01 1 10,23,98 works, warm up pool and 1.5 m deep swimming pool 2.1.43 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

OTHER SPECIFIED WORKS 659 Gholsapur - Provision of 60-bed 4-storied sports hostel DF(3) 2,73,00 1 1 2,72,98 with lift

660 Kanchrapara - Provision of gallary, roofing etc. incl. DF(3) 14,83,39 5,38,90 1,56,69 7,87,80 development of playground at railway sports complex

661 Sealdah Division - Reconstruction of divisional railway DRF 29,48,00 2,50,25 1,99,41 24,98,34 manager office building

662 Howrah Division - Improvement of drainage system of DF(3) 7,87,00 98,52 5 6,88,43 Howrah car shed, Jheel siding & Golmohor railway colony

663 Dankuni - Setting up of skill development instutute DF(3) 37,70,00 1,26,00 10,00 36,34,00

664 Eastern Railway - Boundary wall / fencing to prevent DF(3) 4,00,00 27,00 26,12 3,46,88 encroachment on railway land (PB 821/2012-13/NR)

665 Sealdah Division - Railway protection force office cum DF(3) 4,50,00 46,00 1,20,54 2,83,46 barracks

666 Works costing below Rs.2.5 crore each Cap. .. .. 23,96 .. DRF .. .. 2,81,47 .. DF(2) .. .. 94,01 .. DF(3) .. .. 7,18,72 .. DF(4) .. .. 7,73 ..

TOTAL-WORKS IN PROGRESS Cap. .. .. 8,24,79 .. DRF .. .. 7,82,69 .. DF(1) .. .. 52 .. DF(2) .. .. 94,01 .. DF(3) .. .. 23,49,13 .. DF(4) .. .. 59,96 .. B - New Works 667 Lumpsum provision for New Works Cap. .. .. 10,00 .. DRF .. .. 10,00 .. DF(3) .. .. 30,00 ..

TOTAL-NEW WORKS Cap. .. .. 10,00 .. DRF .. .. 10,00 .. DF(3) .. .. 30,00 .. TOTAL-Other Specified Works Cap. .. .. 8,34,79 .. DRF .. .. 7,92,69 .. DF(1) .. .. 52 .. DF(2) .. .. 94,01 .. DF(3) .. .. 23,79,13 .. DF(4) .. .. 59,96 .. 2.1.44 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

TOTAL-WORKS IN PROGRESS Cap. .. .. 531,53,86 .. C.Fund .. .. 273,09,00 .. DRF .. .. 435,25,77 .. DF(1) .. .. 97,95,10 .. DF(2) .. .. 13,95,47 .. DF(3) .. .. 87,82,83 .. DF(4) .. .. 17,50,58 .. S.Fund .. .. 77,81,61 .. EBR .. .. 194,11,61 .. TOTAL - NEW WORKS Cap. .. .. 84,70 .. DRF .. .. 40,31,60 .. DF(1) .. .. 2,20,00 .. DF(2) .. .. 6,00 .. DF(3) .. .. 74,74 .. DF(4) .. .. 1,00,00 .. S.Fund .. .. 5,00,00 .. GRAND TOTAL Cap. .. .. 532,38,56 .. C.Fund .. .. 273,09,00 .. DRF .. .. 475,57,37 .. DF(1) .. .. 100,15,10 .. DF(2) .. .. 14,01,47 .. DF(3) .. .. 88,57,57 .. DF(4) .. .. 18,50,58 .. S.Fund .. .. 82,81,61 .. EBR .. .. 194,11,61 .. 2.2.1 EASTERN RAILWAY MACHINERY AND PLANT PROGRAM FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

A - PROGRAMMED DELIVERIES

668 Asansol - Simulator (electric - EMU / MEMU) Cap. 8,75,00 1,39 1 8,73,60

669 Sealdah- Under-floor wheel lathes (broad gauge) DRF 5,09,86 3,38,93 90,25 80,68

670 Digitised flat detector angio cath system with DF(2) 4,24,46 3,82,01 42,40 5 accessories

671 Sealdah/Tarsarai - Underfloor wheel lathes (broad & Cap. 5,21,20 3,36,78 73,81 1,10,61 metre gauge)

672 System of Online Monitoring of Rolling Stock (OMRS) (2 DF(3) 7,70,00 .. 1 7,69,99 nos)

673 Liluah - CNC hydraulic press brake (capacity 400 ton) Cap. 2,84,13 2,09,18 1 74,94

674 Asansol - CNC under floor wheel lathe DRF 6,38,22 4,48,94 1 1,89,27

675 Andal Diesel Shed - CNC under floor wheel lathe Cap. 6,64,41 4,51,68 1 2,12,72

676 Howrah - Underfloor wheel lathe (broad gauge) DRF 6,55,02 4,48,94 1 2,06,07 (electrical)

677 Asansol - CNC surface wheel lathe DRF 8,09,77 .. 1 8,09,76

678 Burdwan - CNC underfloor wheel lathe (broad gauge) DRF 6,57,39 3,63,69 60,00 2,33,70

679 Kacharapada - CNC surface wheel lathe (broad gauge) DRF 8,55,78 .. 5,01,63 3,54,15

680 Modernisation of general printing press DRF 23,38,37 11,26,37 1 12,11,99

681 Asansol - Upgradation of loco simulator with additional DF(3) 4,35,77 .. 1 4,35,76 features

682 Sealdah - Reconditioning of underfloor wheel lathe DRF 2,58,28 .. 1 2,58,27 (broad gauge)

683 Jamalpur - Diesel generator set (2400 kw) DRF 9,94,50 .. 1 9,94,49

684 Kacharapada Workshop - Wheel press (capacity 500 ton) DRF 4,89,01 3,28,60 1 1,60,40 (broad gauge)

685 Liluah Workshop - Wheel press (capacity 500 ton) (broad DRF 4,90,09 .. 1 4,90,08 & metre gauge)

686 Liluah - CNC Surface Wheel Lathe(BG) DRF 9,31,49 .. 1 9,31,48

687 Jamalpur - Bearing Cleaning Plant Cap. 3,64,00 .. 1 3,63,99 2.2.2 EASTERN RAILWAY MACHINERY AND PLANT PROGRAM FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

A - PROGRAMMED DELIVERIES 688 Jamalpur - Diesel Hydraulic Bulldozer-75T Cap. 4,15,76 1 1,75,00 2,40,75

689 Jamalpur - Diesel Hyd. Road Mobile Crane-40T(Full slew) Cap. 2,85,09 .. 1 2,85,08

690 CNC Vertical Turret Lathe, Table dia 1200mm for Wheel Cap. 3,43,88 .. 1 3,43,87

691 CNC Surface Wheel Lathe DRF 6,14,66 1 1 6,14,64

692 Tup Hammer Blow Energy-7300Kg Cap. 2,60,88 .. 1 2,60,87

693 CNC Bed Type Milling Machine (Travelling Type Column Cap. 6,85,13 .. 1 6,85,12 Work Table-1000x 4500mm Long Travel 4000 MM)

694 Works costing below Rs.2.5 crore each Cap. .. .. 4,29,00 .. DRF .. .. 2,98,00 .. DF(2) .. .. 1,23,00 .. DF(3) .. .. 2,23,00 ..

TOTAL-PROGRAMMED DELIVERIES Cap. .. .. 6,77,89 .. DRF .. .. 9,49,98 .. DF(2) .. .. 1,65,40 .. DF(3) .. .. 2,23,02 .. B - NEW ACQUISITION

695 Lumpsum provision for New Works Cap. .. .. 4,00 .. DRF .. .. 2,20 .. DF(2) .. .. 2,00 .. DF(3) .. .. 1,50 ..

TOTAL-NEW ACQUISITION Cap. .. .. 4,00 .. DRF .. .. 2,20 .. DF(2) .. .. 2,00 .. DF(3) .. .. 1,50 .. TOTAL-Machinery & Plant Cap. .. .. 6,81,89 .. DRF .. .. 9,52,18 .. DF(2) .. .. 1,67,40 .. DF(3) .. .. 2,24,52 .. 2.3.1 EASTERN RAILWAY ROLLING STOCK PROGRAMME FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

A - PROGRAMMED DELIVERIES

Locomotives 696 Hitachi traction motors HS 15250A (12 Nos) @ Rs.21 lakh Cap. 2,57,66 1,67,49 80,00 10,17 each

697 Smaller size rectifier block in electric locos (40 DRF 3,85,20 3,11,52 70,00 3,68 sets) @ Rs. 8.07 lakh

698 Kanchrapara (Electric Loco Works) - Repl of BA panel on DRF 5,76,64 1,96,00 3,00,00 80,64 electric locos, 24 Nos. @ Rs. 18.45 lakh

699 Kanchrapara (Electric Loco Works) - Repl of hitachi DRF 3,48,80 2,56,85 90,00 1,95 traction motor HS 15250 A on electric locos, 17 Nos @ Rs 20 lakh each

700 Works costing below Rs.2.5 crore each Cap. .. .. 5,22,85 .. DRF .. .. 12,85,77 ..

TOTAL-Locomotives Cap. .. .. 6,02,85 .. DRF .. .. 17,45,77 .. Carriages 701 Recabling of EMU M/C (40 Nos) @ Rs. 9 lakh (515/04-05) DRF 3,60,00 2,17,96 1 1,42,03

702 Kancharapara workshop - Motorised bogie complete for Cap. 3,83,84 1,74,73 2,00,00 9,11 EMU motor coaches (10 nos.)

703 Kanchrapara (Electric Loco Works) - Repl of traction DRF 3,67,65 3,52,45 10,00 5,20 motor complete for BHEL EMU type (20 Nos)

704 Liluah Workshop - Repl of 18 kw alternators by 25 kw DRF 3,02,38 2,70,00 1,00 31,38 alternators (138 Nos)

705 Works costing below Rs.2.5 crore each Cap. .. .. 3,78,16 .. DRF .. .. 5,02,10 ..

TOTAL-Carriages Cap. .. .. 5,78,16 .. DRF .. .. 5,13,11 .. Cranes 706 Bogie complete with axle for 140 ton crane (1 set) Cap. 4,55,33 1,55,28 1 3,00,04 (463/98-99, 625/00-01, 545/02-03)

707 140 ton diesel crane with match truck (21 Nos) Cap. 161,28,00 155,67,09 1 5,60,90 (97/96-97, 545/99-00, 617/00-01, 550/02-03)

708 Jamalpur - Manufacture of 140 ton Gottwald cranes (12 Cap. 92,16,00 87,24,10 10 4,91,80 Nos) @ Rs.7.68 crores

709 Jamalpur - Manufacture of 140T Gottwald crane - 5 Nos. Cap. 55,50,97 48,67,63 1 6,83,33 @ Rs.7.27 Cr. 2.3.2 EASTERN RAILWAY ROLLING STOCK PROGRAMME FOR 2014-15 ( INTERIM BUDGET ) (Figures in thousand of Rupees) Item Particulars Alloca- Latest Outlay Outlay Balance to No. -tion Anticipated expected to proposed for complete Cost end of 2013- 2014-15 work 14

A - PROGRAMMED DELIVERIES 710 Works costing below Rs.2.5 crore each Cap. .. .. 1 .. DRF .. .. 2,74,50 ..

TOTAL-Cranes Cap. .. .. 14 .. DRF .. .. 2,74,50 .. TOTAL-PROGRAMMED DELIVERIES Cap. .. .. 11,81,15 .. DRF .. .. 25,33,38 .. TOTAL-Rolling Stock Cap. .. .. 11,81,15 .. DRF .. .. 25,33,38 ..