Gorst Road Park Royal London Sat Nav: Nw10 6Ls

Total Page:16

File Type:pdf, Size:1020Kb

Gorst Road Park Royal London Sat Nav: Nw10 6Ls THE HUB@55 GORST ROAD PARK ROYAL LONDON SAT NAV: NW10 6LS To Let Brand New Warehouse Units 5,589 - 16,771 sq ft (519 - 1,558 sq m) Newly Built Units • Contemporary Estate • Dedicated Loading & Parking • Direct Access to A40 Western Ave THE HUB@55 PARK ROYAL LOCATION The Hub @ 55 is situated on Gorst Road which is accessed via Park Royal Road, in close proximity to North Acton tube station (Central Line). Gorst Road is located a short distance from the A40, which affords easy access to the West End and also to the A406 via Hanger Lane. Park Royal itself has long been established as one of the major industrial centres in the London area. Stonebridge Park A 4 0 7 6 4 HIL 0 0 LS 4 4 ID A A E STONEBRIDGE 404 A D CR A AV EN O PA R R K R RD LA U A B A404 C IR B H C E I G H Y H T R R 9 M O O 44 2 S A N A B T N HARLESDEN D O A C R T Harlesden O N P L A A R 6 NE K 0 R 4 D A 0 0 E 0 N 4 A A L N O CT AB A Willesden BEY Junction R O A D A D O 2 R 9 4 PARK ROYAL A B4 I R O T A P IC 4 AD A V 0 RO ON R ONATI COR K R O THE HUB@55 W Y PARK ROYAL 0 E A S 0 E TE L 0 RN AV N ENUE 4 R A A O L A N D O A 4 M 0 M B North O C 4 Acton 4 9 K 2 A D O R D N NORTH M L R O C A A ACTON F I 4 R S 0 E C L A U W L A R R AD O RO W OEL A N E D S IVE ’S DR T QUEEN E Acton Main Line R N A V E N O E L A TWAY R 40 WES O A D EAST ACTON DESCRIPTION Three modern steel portal frame units privately situated with securely gated contemporary grounds. The THE HUB@55 ground floor warehouse is of an open-plan PARK ROYAL layout with first floor spaces available for further storage or office accommodation. Access to the units is via full height loading doors serviced by dedicated ACCOMMODATION loading bays. Allocated parking Area sq ft sq m is also available with the estate. Unit 1 - GF 4,233 393.26 Unit 1 - FF 1,356 125.98 Unit 1 Total 5,589 519.24 Unit 2 – GF 4,237 393.63 Unit 2 – FF 1,356 125.98 Unit 2 Total 5,593 519.61 Unit 3 – GF 4,233 393.26 Unit 3 – FF 1,356 125.94 Unit 3 Total 5,589 519.17 Overall Total 16,771 1,558.08 All measurements are based on an approximate gross internal area. SPECIFICATION 6 METRE FULL HEIGHT ELECTRIC CONCRETE TRANSLUCENT 3 PHASE MALE / FEMALE & DEDICATED FIRST FLOOR STORAGE OR CLEAR EAVES HEIGHT ROLLER SHUTTER DOORS FLOOR ROOF PANELS POWER DISABLED WC’S PARKING OFFICE ACCOMMODATION 3.5M (W) X 4M (H) B4492 PARK ROYAL ROAD GORST THE HUB@55 ROAD PARK ROYAL THE HUB@55 TENURE PARK ROYAL The premises are available by way of a CHASE new full repairing and insuring lease for ROAD a term of years to be negotiated subject to periodic rent reviews. The lease will be contracted outside the provisions of the 1954 Landlord & Tenant Act (part II as amended). A40 PRICING WESTERN AVENUE Rent upon application. BUSINESS RATES NORTH ACTON Interested parties are advised to contact the London Borough of Ealing to obtain this figure. LEGAL COSTS Each party to bear their own legal costs. VIEWING Dipesh Patel David O’Donovan [email protected] [email protected] Strictly by appointment with 07906 696 666 07775 562 484 EPC the joint agents. For further information or to arrange a Amar Picha Marco Baio Available upon request. viewing please contact:- [email protected] [email protected] 07426 474 470 07808 640 462 MISREPRESENTATION ACT: Telsar and Doherty Baines for themselves and for the Vendors or Lessors of the property whose agents they are give notice that; i) these particulars are given without responsibility of Telsar and Doherty Baines or the Vendors or Lessors as a general outline only, for the guidance of prospective purchasers or tenants, and do not constitute the whole or any part of an offer or contract; ii) Telsar and Doherty Baines and the Vendors cannot guarantee the accuracy of any description, dimensions, references to condition, necessary permissions for use and occupation and other details contained herein and any prospective purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves by inspection or otherwise as to the accuracy of each of them; iii) no employee of Telsar and Doherty Baines or the Vendors has any authority to make or give any representation or warranty or enter into any contract whatsoever in relation to the property; iv) VAT may be payable on the purchase price and/or rent, all figures are quoted exclusive of VAT, intending purchasers or lessees must satisfy themselves as to the applicable VAT position, if necessary by taking appropriate professional advice; v) Telsar and Doherty Baines or the Vendors will not be liable, in negligence or otherwise, for any loss arising from the use of these particulars. January 2020. Designed and produced by Creativeworld Tel: 01282 858200. thehub55london.com Satellite image courtesy of Google Earth.
Recommended publications
  • A31 Note: Gunnersbury Station Does Not Have OWER H91 E D
    C R S D E A U T S A VE N E R A N B B D L W Based on Bartholomews mapping. Reproduced by permission of S R E i N U st A R O HarperCollins Publishers Ltd., Bishopbriggs, Glasgow. 2013Y ri E E A Y c W R A t D A AD www.bartholomewmaps.com N C R 272 O Y V L D R i TO T AM 272 OL E H D BB N n A O CAN CO By Train e N Digital Cartography by Pindar Creative N U L E n w i a L Getting to BSI m lk 5 i AVE 1 ng N A Acton0- t V 1 im • The London Overground runs between E t e e LD ROAD B491 D N a SOUTHFIE E Y Town fr R Address: Chiswick Tower, U imR B o B E U O 440 m Richmond and Stratford stopping at Travel to E x L D B A R o S L AD R r O E RO O s 389 Chiswick High Road, London, W4 4AL Y R G R E p EY L i SPELDHUR Gunnersbury. ID ST R A R R t RO M p NR B E A O N e D NU O H L A A UB E LL C D GS BO T Y British Standards 1 R E RSET E E 9 N L SOM T N All visitors must enter the building through F 44 U N H • The ‘Hounslow Loop’ has stations at G SOUTH ROAD BEDFORD B E3 E B E R the main entrance on Chiswick High Road O Kew Bridge, Richmond, Weybridge, N O L PARK D Institution S ACTON L A A A D N E O R E O D and report to Reception on arrival.
    [Show full text]
  • Planning Committee 23/05/2018 Schedule Item No. 03
    Planning Committee 23/05/2018 Schedule Item No. 03 Ref : 181062OPDFUL Address: 140 Wales Farm Road, Acton W3 6UG Ward: East Acton Proposal: Demolition of existing buildings and redevelopment of site to provide 3 No. residential buildings between 12 and 25 storeys in height to provide 380 residential units (comprising 66 No. studios, 190 No. 1 bed, 104 No. 2 bed and 20 No. 3 bed flats) and 1,403 sq.m of flexible A1/A2/A3/A4/A5/B1/D1/D2 floor space; the provision of public open space, roof top amenity space, landscaping, car and cycle parking, and refuse storage (Full Planning Application accompanied by an Environmental Impact Assessment: Resubmission). Drawing numbers/plans: Drawing numbers for Job Number 16043: (01)-E-100 Revision PL; (01)-E-001 Revision PL; (01)-E-002 Revision PL; (01)-E- 003 Revision PL; (01)-E-004 Revision PL; (03)-P-S000 Revision PL; (01)-P-S001 Revision PL; (01)-P-S002 Revision PL; (03)-E-200 Revision PL; (03)-E-201 Revision A; (03)-E-202 Revision PL; (03)-E-203 Revision PL; (03)-E-204 Revision PL; (03)-E-205 Revision PL; (03)-E-206 Revision PL; (03)-E-207 Revision PL; (03)-E-220 Revision A; (03)-E-221 Revision PL; (03)-P-0B0 Revision PL; (03)-P-0G0 Revision PL; (03)-P-0M0 Revision PL; (03)-P-001 Revision A; (03)-P-002 Revision A; (03)-P-011 Revision A; (03)-P-012 Revision A; (03)-P-013 Revision PL; (03)-P-015 Revision PL; (03)-P-016 Revision PL; (03)-P-022 Revision PL; (03)-P-023 Revision PL; (03)-P-0R0 Revision PL; (03)-X-100 Revision PL; (03)-X-101 Revision PL; (03)-X-102 Revision PL; (03)-X-103 Revision PL; (03)-E-250
    [Show full text]
  • Park Royal Workforce Skills Analysis Employer Skills Demand and Training Supply on London’S Largest Industrial Estate May 2016
    Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate May 2016 Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate Contents 1. Introduction ..................................................................................................................... 1 2. Employer skills demand ................................................................................................. 4 3. Training supply ............................................................................................................. 13 4. Conclusion .................................................................................................................... 19 Annex A: Survey analysis................................................................................................. 21 Annex B: Secondary analysis .......................................................................................... 32 Contact: Chris Gibbon Tel: 020 7391 4100 email: [email protected] Approved by: Michael Frearson Date: 20 May 2016 Director www.sqw.co.uk Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate 1. Introduction The brief 1.1 Park Royal is the largest industrial estate in London. It covers around 500 hectares of land stretching across three local authorities (Brent, Ealing, and Hammersmith and Fulham), making it equivalent in size to the City of London. Its fortunes have
    [Show full text]
  • West London Employment Land Evidence 2019
    West London Employment Land Evidence West London Alliance May 2019 Prepared by GL Hearn 65 Gresham St London EC2V 7NQ T +44 (0)20 7851 4900 glhearn.com West London Employment Land Evidence, May 2019 Contents Section Page 1 INTRODUCTION 4 2 REVIEWING EXISTING EVIDENCE AND POLICY 9 3 INDUSTRIAL SUPPLY AND MARKET POSITION: STUDY AREA OVERVIEW 26 4 INDUSTRIAL SUPPLY AND MARKET POSITION: BARNET 34 5 INDUSTRIAL SUPPLY AND MARKET POSITION: BRENT 48 6 INDUSTRIAL SUPPLY AND MARKET POSITION: EALING 63 7 INDUSTRIAL SUPPLY AND MARKET POSITION: HARROW 80 8 WAREHOUSING, LOGISTICS AND FUTURE LOGISTICS 92 9 SCENARIOS FOR FLOORSPACE DEMAND 107 10 SUBSTITUTION 120 11 REPURPOSING SITES 123 12 INTENSIFICATION AND CO-LOCATION: VIABILITY 126 13 ECONOMIC AND POLICY INCENTIVES 139 14 SUMMARY, CONCLUSIONS AND FURTHER AREAS OF RESEARCH 142 GL Hearn Page 2 of 158 J:\Planning\Job Files\J040053 - West London Employment Land Study\Reports\West London Evidence_ Final Report 31.07.2019.docx West London Employment Land Evidence, May 2019 Quality Standards Control The signatories below verify that this document has been prepared in accordance with our quality control requirements. These procedures do not affect the content and views expressed by the originator. This document must only be treated as a draft unless it is has been signed by the Originators and approved by a Business or Associate Director. DATE ORIGINATORS APPROVED July 2019 David Leyden Matt Kinghan Planner Planning Director Limitations This document has been prepared for the stated objective and should not be used for any other purpose without the prior written authority of GL Hearn; we accept no responsibility or liability for the consequences of this document being used for a purpose other than for which it was commissioned.
    [Show full text]
  • Old Oak and Park Royal Development Corporation Strategic Plan 2016 to 2019
    Old Oak and Park Royal Development Corporation Strategic Plan 2016 to 2019 May 2016 OPDC Strategic Plan 2016-2019 Page 1 Foreword by Chief Executive of the Old Oak and Park Royal Development Corporation Old Oak and Park Royal is London’s largest Opportunity Area and the UK’s largest regeneration scheme. It is the site of the second Mayoral Development Corporation, has the potential to be the biggest regeneration project since the 2012 Olympic and Paralympic Games, and will play a key role in delivering the Mayor’s manifesto priorities. There is a golden opportunity to deliver thousands of new homes and jobs in one of London’s largest brownfield sites over 30-40 years. Straddling three London boroughs - Ealing, Brent, and Hammersmith and Fulham - the regeneration will create a vibrant new area of North West London in Zone 2/3 with capacity for 25,500 new homes and 65,000 new jobs. The High Speed 2 station, due to open in 2026, is the only place HS2 connects with Crossrail. Old Oak is set to become one of the most connected parts of the capital. Much of the land surrounding the superhub station site is brownfield and the lynchpin of the regeneration will be the massive, vibrant new commercial centre around the superhub station which will catalyse new jobs and homes across the wider development area, West London and beyond. The site presents a unique opportunity for the new Mayor to use his/her strategic oversight and planning powers to provide the vision, direction and leadership to deliver on the ambitions for Old Oak and Park Royal.
    [Show full text]
  • Planning Committee 09/11/2011 Schedule Item 04
    Planning Committee 09/11/2011 Schedule Item 04 Ref: P/2011/2338 Ward: East Acton Address: Portal Way, North Acton, W3 6UU Proposal: Redevelopment to provide two mixed-use buildings with roof level amenity space (seven-storeys and eight-storeys) to provide 184 student units on upper floors and 382m2 on ground floor for use as student lounge and lobby, and uses within Retail (Use Class A1), Financial and Professional (Use Class A2), Restaurants and Cafes (Use Class A3), Business (Use Class B1) or Non-residential Institutions (Use Class D1); creation of biodiversity park and community pocket park; provision of four parking spaces and 132 cycle parking spaces Drawing Nos: JKK6263 1 REVC and JKK6263 2 REVC. 5303/P/5.00A, 5303/P/5.01A, 5303/P/5.02B, 5303/P/5.03B, 5303/P/5.04B, 5303/P/5.05B, 5303/P/5.06, 5303/P/5.07, 5303/P/5.08, 5303/P/5.09, 5303/P/5.010, 5303/P/5.013, 5303/P/5.014, 5303/P/5.015, 5303/P/5.016, 5303/P/5.017, 5303/P/5.018 and 5303/P/5.019. 1302/01 REVC, 1302/02 REVB, 1302/03 REVB and 1302/04 REVA. Accompanying documents Planning Statement (prepared by CGMS) Air Quality Assessment (prepared by RPS) BREEAM Assessment (prepared by Eight Associates) Building for Life Assessment (prepared by AR Urbanism) Ecology Report (prepared by Thomson Ecology) Energy and Sustainability Assessment (prepared by Flatt Consulting) Flood Risk Assessment (prepared by RPS) Fire Safety Review (prepared by International Fire Safety Consultants Ltd) Landscape Scheme (prepared by Liz Lake) Noise Assessments (prepared by MoirHands) Site Investigation Report
    [Show full text]
  • Fedex UK Locations Fedex UK Locations
    FedEx UK Locations FedEx UK Locations FedEx UK stations Location Opening hours 09:00-19:00 Mon-Fri Aberdeen Unit 1, Aberdeen One Logistics Park, Crawpeel Road, Altens Industrial Estate, Aberdeen, AB12 3LG 09:00-12:00 Sat 09:00-19:00 Mon-Fri Alton Plot 3 Caker Stream Road, Mill Lane Industrial Estate, Alton, Hampshire, GU34 2QA 09:00-12:00 Sat 09:00-19:00 Mon-Fri Holly Lane Industrial Estate, Atherstone, CV9 2RY Atherstone 09:00-12:00 Sat Unit 1000 Westcott Venture Park, Westcott, Aylesbury, 09:00-19:00 Mon-Fri Aylesbury Buckinghamshire, HP18 0XB 09:00-12:00 Sat Unit A, St Michaels Close, Maidstone, Kent, 09:00-19:00 Mon-Fri Aylesford ME20 7BU 09:00-12:00 Sat 2 Thames Road, Barking, Essex 09:00-19:00 Mon-Fri Barking IG11 0HZ 09:00-12:00 Sat 1B Whitings Way, London Industrial Park, London, 09:00-19:00 Mon-Fri Beckton E6 6LR 09:00-12:00 Sat 22A Kilroot Business Park, Carrickfergus, Belfast, 09:00-19:00 Mon-Fri Belfast BT38 7PR 09:00-12:00 Sat 09:00-19:00 Mon-Fri Unit 8 The Hub, Nobel Way, Witton, Birmingham B6 7EU Birmingham 09:00-12:00 Sat 15 Lysander Road, Cribbs Causeway, Bristol, Avon, 09:00-19:00 Mon-Fri Bristol BS10 7UB 09:00-12:00 Sat 09:00-19:00 Mon-Fri Abbot Close, Byfleet, KT14 7JT Byfleet 09:00-12:00 Sat For help and support: Visit: https://www.fedex.com/en-gb/customer-support.html And chat with our support team 2 FedEx UK Locations FedEx UK stations Location Opening hours 3 Watchmoor Point, Watchmoor Road, Camberley, Surrey, 09:00-19:00 Mon-Fri Camberley GU15 3AD 09:00-12:00 Sat 09:00-19:00 Mon-Fri Cambridge 43 St Peters Road,
    [Show full text]
  • Chiswick Park Leaflet
    1. About the proposed changes Route 27 We propose to extend route 27 from Turnham Green to continue along Chiswick High Road and terminate within Chiswick Office Park. The route would no longer serve the stop in Heathfield Terrace. No changes to the frequency or timetable are proposed. Proposed extension 27 of existing route Chiswick Gunnersbury Chiswick Turnham Green (to and from Office Park High Road Church Heathfield TerraceChalk Farm) (withdrawn PDF PROOF section) 9 Proof Number: Date: 3rd June 2008 87055 Job Number: NOTE: this PDF is provided as a proof and is not suitable for lithographic printing; we cannot accept liability for its use other than for checking purposes. Route E10 We propose to extend route E10 beyond Ealing Broadway Station to Chiswick Office Park using the roads shown in the diagram below. Buses would pass Haven Green in both directions to stop near Ealing Broadway Station. Key features of the proposal • New links from Ealing to South Acton and Chiswick Office Park • A bus service along parts of Gunnersbury Avenue and Bollo Lane for the first time • Buses would run every 15 minutes during Monday to Saturday daytimes; every 20 minutes during Sunday shopping hours; every 30 minutes on all evenings and Sunday mornings Proposed extension of existing route Ealing The Broa The Mall Gunnersbury Gunnersbury Bollo Lane Chiswick E10 Avenue Lane (to and from Northolt) Broadway Office Park dway Route H91 We propose to change route H91 so that it runs directly along Chiswick High Road between Turnham Green and Chiswick Roundabout. The route would no longer serve Town Hall Avenue, Heathfield Terrace, Wellesley Road and Oxford Road North.
    [Show full text]
  • Kendal Avenue London W3 0TP 285525
    103 Loading Doors^ 175 Parking Spaces^ Up to 16.5m eaves height^ Direct Access to A40 Western Avenue^ Kendal Avenue ^ London ^ W3 0TP Kendal Avenue TO LET Strategically Located 40 Detached Distribution Warehouse A 285,525 sq ft (26,526 sq m) DESCRIPTION The property comprises a high bay detached distribution warehouse constructed in the late 1980’s and benefits ACCOMMODATION from having loading doors on all four elevations. There is a separately accessed car park to the south, which provides approximately 175 parking spaces. The property is predominantly constructed with a concrete frame The property has been measured in accordance with the RICS Code of Measuring Practice (6th and flat floor slabs surmounted by a metal profiled sheet roof. Internally the building comprises a warehouse Edition) and provides a total of 26,526.1 sq m (285,525 sq ft). The area has been broken down as with a maximum eaves height of 16.5m and surrounding warehouse with two and three upper floors respectively. follows: Also inclusive are well specified offices, staff canteen, separate vehicle maintenance building and a security hut. Area Sq Ft Sq M tERMS Ground Floor 138,041 12,824.40 The property is available on a 10 year full repairing and insuring lease with periodic rent reviews, contracted First Floor 95,823 8,902.30 outside the provisions of the 1954 Landlord & Tenant Act (part II as amended). Second Floor 43,943 4,082.4 Rent Ancillary Buildings 717 7,718 Price on application TOTAL 285,525 26,526.10 Approx Site Area 11.051 acres 4.472 hectares EPC Energy Performance Asset Rating C - 66 40 • Secure site with gatehouse • 103 loading doors on all 4 elevations • 175 parking spaces A • Up to approx 16.5 metres height RENT • Offices and canteen at upper floors • Separate vehicle maintenance building • Heating, lighting and sprinkler system throughout • Commercial vehicle wash LOCATION SITUATION Park Royal is Europe’s largest industrial estate and is the landmark industrial area in inner London.
    [Show full text]
  • Buses from Alperton
    Buses from Alperton 483 79 towards Harrow Bus Station towards Edgware Preston Road from stops B, F, G, S from stops B, K, S Buses fromUniversity of Westminster Alperton Forty Lane Lycee International/ Blackbird Preston Road 487 East Lane East Lane Kings Drive Cross towards South Harrow Pembroke Road Rosslyn Crescent Forty Avenue 245 from stops D, F, G, P Northwick Park Hospital 483 83 297 Wembley Hill79 Road East Lane 483 245 North Wembley East Lane Wembley Wembley N83 83 towards Harrow Bus Station towards Edgware Wembley Hill Road Wembley Park 79Preston Road Hill Road Park Drive towards Golders Green from stops B, F, G, S from stopsPark B Lane, K, S 297 East Lane Manor Drive East Lane from stops B, S Whitton Watford Road Wembley Hill Road Wembley Park Drive The Green/ Sudbury Court Sports Club Wembley Park Drive Empire Way Avenue Balmoral Court Wembley Carlton Avenue WestUniversity of Westminster Wembley High Road 245 West East Lane 83 Hill Road 483 Wembley Arena Forty Lane Park Lane Manor Drive towards Golders Green Watford Road 483 N83 Lycee International/ Blackbird Preston Road Kings Drive 487 Sudbury Court Road Watford Road East Lane East Lane Empire Way Cross from stops D, K, P towards South Harrow Perrin Road Pembroke Road Rosslyn Crescent Forty Avenue 245 Lakeside Way Northwick Park Wembley Wembley Wembley 297 from stops D, F, G, P Watford Road Wembley Central High Road Triangle Stadium Hospital 83 297 towards Willesden Bus Garage 487 483 Wembley Hill RoadArkelvin Academy/ 245 North Wembley East Lane Wembley Wembley N83 from stops
    [Show full text]
  • Travel to British Standards Institution
    L D A V E C R S D E A T E S R A N Based on Bartholomews mapping. ReproducedB by permissionB Di L W S R E NEWTON AV U R st A Y O of HarperCollins Publishers Ltd., Bishopbriggs, Glasgow.Y 2012 r E A ic 272 D R A D A t R A RO V N C M 272 LD www.bartholomewmaps.com Y E L T HA Route27 until NovBBO 2012 in AN D O N A O C V C By Train e U L N E Digital Cartography by Pindar Creative n w L Getting to BSI mi alk 15 ing N A Acton0- t Route27 from Nov 2012 E V 1 imE Q • The London Overground runs between L e B491 D E ROAD N t e SOUTHFIELD E Ya Town f R U mR B 440 r B E i O o (subject to confirmation) Address: Chiswick Tower, Richmond and Stratford stopping at Travel to E U x L AD mD R o B L A R S O RO O r E Y R R G R s SPELDHUR E p EY L ID i ST R 389 Chiswick High Road, London W4 4AL. Gunnersbury. A R R O M NR B E t AD O p NU N H e A B E LLO C L A SU O T Y British Standards D RG B E T E ERSE 91 N L SOM T N F BEDFORD U N SOUTH H All visitors must enter the building through • The ‘Hounslow Loop’ has stations at E3 G ROAD B44 E B O R PARK the main entrance on Chiswick High Road Kew Bridge, Richmond, Weybridge, NE O Institution A ACTON L D L S A A D A R N E O E O 272 fields E U D EL A E V R E T U 94 and report to Reception on arrival.
    [Show full text]
  • Autumn 2000 Newsletter
    Autumn 2000 Newsletter Message from the Chairman Please note that the newsletters contain un-edited extracts which have not been updated DESIGN AWARDS 2000 Members and guests of the society gathered on the evening of Wednesday 11 October in Ealing Town Hall to see the presentation of this years awards by Mr. Geoffrey Crispin, Deputy Vice-Chancellor, Thames Valley University. The awards this year were made to the following schemes: Willow Tree Primary School, Northolt (Unicorn Architects for London Borough of Ealing) Ealing Abbey (Cloisters), W5 (Sir William Whitfield & Partners, for the St Benedicts Trust) [left] The Japanese Garden, Ellen Wilkinson Foundation School, W3 (commendation) (staff and students of the school, for the school) [right] The short-listed schemes were: 300-320 Acton Lane, W3 [warehouse conversion] [image] Coopergate, High Street, W3 [shops/flats development] Ealing Abbey Extension, W5 [new church addition] [image] Ellen Wilkinson High School, W3 [Japanese Garden & Arts Block] [image] Pitshanger Manor, W5 [archway restoration] St. Aidan's Court, W13 [church to flats conversion] [image] St. Barnabas Millennium Hall, W5 [new church hall] [image] 1 St. Mary's Road/77 Webster Gardens, W5 [new housing] [image] Smith's Farm Bridge, Northolt/Greenford Park [new bridge] [image] Willow Tree Primary School, Northolt [new school] ANNUAL AWARDS SCHEME The Society introduced its Annual Awards in 1989, for development projects within the London Borough of Ealing which the Society believes to be of noteworthy quality. These have
    [Show full text]