Rebuild Texas Requests by County Updated December 20, 2017 All Counties Rebuild Texas Coast‐wide Critical Infrastructure Construct flood control and other mitigation projects to protect critical public $2,000,000,000 Protection infrastructure such as power plants, communication networks, prison systems, etc. from damage by future storms. Coast‐wide Electric Power Grid and Restore critical electric public utility distribution, transmission and generation $500,000,000 System Mitigation infrastructure. Healthcare Losses and Assistance Provide financial assistance to the hospitals impacted by Hurricane Harvey for $420,000,000 increased costs related to capital and operational losses, emergency work and uncompensated care costs. Coast‐wide Agriculture Mitigation Provide assistance to agriculture related businesses impacted by the storm through $201,000,000 loss of livestock or crops, and damage to supporting production properties and assets. State of Texas Higher Education Recovery Project The project will affect repairs on These institutions were damaged during Hurricane Harvey limiting their ability to $220,068,866 damaged facilities at 31 institutes of function as educational institutions. This funding will allow them to regain their ability higher education in 12 counties to return to normal operations. throughout Texas affected by Hurricane Harvey and the subsequent flooding. Texas Hospital Association Relief Package Recommendation o $205 million in capital costso $145 million in operang costso $25 million in $460,000,000 emergency worko $5 million in other costs TXDOT TXDOT Roadway and Evacuation Route This project will make significant improvements to multiple districts that were $4,753,000,000 Repairs damaged by Hurricane Harvey. Aransas County Wednesday, December 20, 2017 Page 1 of 153 Aransas County Houses to reconstruct 3539 Houses need reconstruction $67,910/ unit $240,336,623 Houses to rehabilitate 12715 Houses need rehabilitation $16,428/unit $209,576,038 Repair /Replace Buildings, Equipment, This project will include new construction to replace essential buildings and equipment $30,708,000 & Contents that were destroyed by flood and wind damage. Debris Removal Approx 3,000,000 cubic yards of mixed waste collection and disposal $30,000,000 Aransas County Parks, Recreational Repair and clean up of all area parks, recreational areas and other facilities damaged $20,420,000 Areas and other Facilities. due to storm winds and flood waters. Aransas County Road Project Repair roads, culverts, asphalt, and signage in Aransas County, City of Rockport and $13,090,000 Town of Fulton Other Public Safety Public safety communications tower $2,000,000 Tourism Facilities Aquarium, Maritime Museum, Bay Education Center, Eco Pathways, historic markers $1,712,000 Public Road/ROW/Asphalt, Signs X miles of roadway reconstruction due damage plus mitigation for 3 roads $1,336,875 Vehicles & Equipment Public safety vehicles and roller $911,000 Drainage/Culverts Drainage work and materials $500,000 Aransas County Buildings and Repair and replacement of all buildings and equipment, to include contents and $370,000 Equipment government vehicles damaged or lost in storm in Aransas County. Parks Buildings, lighting and Equipment Flood and wind damaged; Destroyed beyond repair $340,000 Disaster Prep & Emergency Protective Disaster Prep & Emergency Protective Measures $330,000 Measures Aransas County ISD Aransas County ISD School Rebuilding Rebuild and or repair all of the district's facilities that were damaged in the storm to $54,257,000 fully operable conditions for returning teachers and students. Aransas County ISD Classroom and Replace all instructional materials, equipment, library books, classroom furniture, and $1,500,000 Instructional Supplies other supplies that were damaged or lost during Hurricane Harvey. housing for community members, This is a community wide need that is not an ACISD expense but a huge concern $1,000,000 ACISD student families and ACISD staff Wednesday, December 20, 2017 Page 2 of 153 Aransas County Navigation District Seawall/Harbor/Channel Repair This project will reconstruct jetties damaged during the storm and dredge the channel. $20,500,000 Cove Harbor Bulkheads bulkheads in our industrial harbour $7,000,000 Bulkhead Rockport harborfront bulkheads on west side of Rockport harbor $4,000,000 Marina docks/ Facilities marina on west side of Rockport harbor $2,500,000 City of Fulton Fulton City Community Infrastructure This project will construct new community infrastructure in order to replace items $9,091,000 destroyed by the flooding. This will reduce the overall hazardous structures throughout the community and reduce further issues within Fulton City. Fulton Beach Road Street rehabilitation $4,505,000 Fulton Beach Park Buildings, lighting, playground, pier $3,000,000 Paws and Taws Conference Center $1,400,000 Generator Generator for lift station $50,000 Traffic control device Destroyed / replacement $40,000 Light poles Light poles destroyed $28,000 Pump Destroyed $25,000 Pump Pump replacement $25,000 Fencing and electrical Fencing and electric service replacement $12,000 Building damage Building damage $6,000 City of Rockport City of Rockport Repairs This project will make much needed repairs to the city's buildings and equipment. $17,450,000 Austin County Austin County Wednesday, December 20, 2017 Page 3 of 153 Lazy River Subdivision Buyout Buyout homes in the Lazy River Subdivision located in Austin County that were $5,500,000 substantially damaged during Hurricane Harvey. County Roads Various Roads throughout the County $1,000,000 Debris Clean up Debris Clean up $100,000 Bastrop County Bastrop County Damage to County Drainage Structures Approximately 200 sites in Precincts 2 & 3. Damage includes bridge & culvert damage, $1,250,000 & Systems erosion, undermining, wash out, etc. Damage to County Buildings/Facilities 41 sites throughout the County. Damage includes damage to historic structures. $750,000 Damage is related to high winds and rain. Bastrop County Bridge Project Repair to Hector Road Bridge that runs over the Gravelly Creek, which is currently $500,000 closed and structurally deficient following Hurricane Harvey. Damage to County Roads Approximately 75 sites in Precincts 2 & 3. Damage includes pavement damage, $450,000 erosion, loss of roadway material due to wash out, etc. Debris Approximately 100 debris sites in county ROW in Precincts 1, 2, & 3 $250,000 Bell County Richard Milburn Alter HS Killeen (014‐801) Student Displacement The damage suffered in the Houston, Texas area caused the displacement of numerous $250,000 RMA TX ‐ Houston campus, 014‐801‐005, students and families. The campus staff made exhausted efforts to locate students who did not return after the hurricane. Brazoria County Angleton ISD Angleton Jr. High Roof Roof damage due to volume of water from Hurricane Harvey $1,780,787 Angleton High Roof Roof damage due to volume of water from Hurricane Harvey $1,371,457 Wednesday, December 20, 2017 Page 4 of 153 Westside Elementary Roof Roof damage due to volume of water from Hurricane Harvey $1,298,565 Central Elementary Roof Roof damage due to volume of water from Hurricane Harvey $676,103 Northside Elementary Roof Roof damage due to volume of water from Hurricane Harvey $512,720 Authorized Construction Pursuing Appropriation List Freeport Harbor Channel Improvement Freeport Harbor Channel will determine the feasibility of providing navigational $369,000,000 Project improvements to the Freeport Harbor Channel and maintain, protect and/or restore the quality of terrestrial, cultural, coastal natural resources. BCDD#1 Bastrop Bayou Dredging Dredging of Bastrop Bayou due to silting to relieve upstream flooding. This includes $100,000,000 environmental studies, engineering studies, permits, labor, equipment and material. Austin and Flores Bayous Dredging Dredging of Austin and Flores Bayou due to silting to relieve upstream flooding. This $100,000,000 includes environmental studies, engineering studies, permits, labor, equipment and material. Bastrop Bayou Bridge @ CR 288 Widening of bridge to relieve flooding along the watershed between 288 Freeway and $2,000,000 CR 288. This includes environmental studies, engineering studies, permits, labor, equipment and material Bastrop Bayou Regional Detention Bastrop Bayou Regional Detention in the upstream Bastrop Bayou watershed to relieve $2,000,000 flooding. This includes environmental studies, engineering studies, acquisition of property, permits, labor, equipment and material. Brushy Bayou Regional Detention Regional detention in the downstream Brushy Bayou Watershed to relieve flooding $1,000,000 from large rain events. This includes environmental studies, engineering studies, acquisition of property, permits, labor, equipment and material. BCDD#11 West Columbia area Drainage Study‐$200,000; Levee Study‐$200,000; N. 17th Outfall ditch improvements‐ $750,000 $50,000; Development of Northeast Outfall Ditch along the HL&P power easement‐ $300,000 Varner Creek‐Remove obstructions Obstruction removal $500,000 Highway 36 project Retention pond, drainage ditches $500,000 Bell Creek Cleaning, mowing‐excavate $400,000 Wednesday, December 20, 2017 Page 5 of 153 Cow Creek Channelizing Channelizing and dredging $200,000 Cucuber Slough‐Drainage Plan CR 391, CR 700, CR 461, FM 521 $130,000 J Bar B Ranch‐Drainage Plan Major Drainage Ditch Drainage FM 524, CR 489 to the Bernard River $120,000 Magnolia Area‐Drainage Plan CR 809, FM 521, Cr 426, FM 2611,