Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Fiscal Year Proposed Assembly Senate County Project Type Title Description Location Components Est Start Est Completion Est Useful Life Initially Proposed Project Status Districts Districts

Alameda 20/21 New Complete Streets Components Anita Avenue Sidewalk Construction Project This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design Anita Avenue from Castro to Somerset Avenue Pre-Construction 07/2019 09/2022 40-50 20 10

Foothill Boulevard Pavement Rehabilitation Alameda 20/21 New Road Maintenance & Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) John Drive to 164th Avenue Construction 05/2021 10/2021 15-20 20 10 Project

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 East County Overlay This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Altamont Pass Road (I-580 to Landfill) Construction 05/2021 11/2021 15-20 16 7

Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Pedestrian Ramp Project This project will include: Maintenance Program Plan Development | Locations to be determined Various Locations Pre-Construction 04/2020 09/2021 15-50 20 10

Barrett Ct - Lake Chabot Rd To E To End; Chloe Ct - Jennifer Dr To N To End; Conrad Ct - Somerset Ave To S To End; Darlene Ct - Stanton Ave To Ne To End; Garrison Ave - Wilson Ave To S To End; Greenhills 20-21 Pavement Rehabilitation Program Ave - Simsbury Rd To Meadowood Rd; Jill Wy - Dominic Dr To N To Alameda 20/21 New Road Maintenance & Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 04/2021 10/2021 15-20 20 10 (Castro Valley Area) End; La Costa Ave - Parsons Ave To Lakeridge Rd; Lakecrest Ct - Dominic Dr To S To End; Lakeridge Rd - Greenhills Ave To La Costa Ave; Link Ct - Parsons Ave To W To End; Lucern Ct - Barett Ct To N To End; Meadowood Rd - La Costa

Arbor Ave - Lansing Wy N L West A St; Arbor Ct - Lansing Wy N To End; Corte Eulalia; Falgren Ave - Ricardo Ave Sw To End; Hood St; Lansing Wy - W L Hathaway Ave (Hcl) 122' Sw Arbor Ave; Medford Ct - Meekland 20-21 Pavement Rehabilitation Program Ave Sw & Se To End; Melrose Ave; Paseo Grande - Fwy 880 Overpass Alameda 20/21 New Road Maintenance & Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 04/2021 10/2021 15-20 20 10 (Hayward San Leandro) (Sw) Hesperian Bl; Rainier Ave - Se End Nw End; Ricardo Ave; Shasta St; Tallac Ct; Times Ave-Via Hermosa W Blossom Wy; Via Andeta; Via Arroyo-Via Mirlo Se & Nw-End; Via Bolsa; Via Primero; Via Rincon; Via San Marino; Via Segun

Boxer Ct; Via Buena Vista - Via Chiquita To Via La Jolla; Via Chiquita - Via Buena Vista To Via Coralla; Via Chiquita - Bockman Rd To Via Coralla; Via Cielo; Via Coralla - Via Palma To Via Del Rey; Via Del Rey; 20-21 Pavement Rehabilitation Program (Micro Alameda 20/21 New Road Maintenance & Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Via Harriet; Via Karl; Via La Jolla - Via Helena To Via Sarita; Via La Jolla Construction 04/2021 10/2021 6-10 20 10 Surfacing on Various Roadways) From Via Mesa To Via Helena; Via Margarita Ct - Via Margarita To To End; Via Melina - Bandoni Ave To Via Buena Vista; Via Milos; Via Natal; Via Owen; Via Sarita; Via Walter

Bengal Ave From Hacienda Ave Perkins Rd; Ginger Ave From Robscott Ave Bengal Ave; Melrose Ave From Ginger Ave Perkins Rd; Oxford Ave Alameda 20/21 New Road Maintenance & Rehabilitation 20-21 Slurry Seal on Various Roadways This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) From Bengal Ave Ricardo Ave; Perkins Ave From Robscott Ave Ricardo Construction 04/2021 10/2021 4-6 20 10 Ave; Robscott Ave From Hacienda Ave Perkins Rd; Via Del Rey From Via Manzanas Bockman Rd;

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Hesperian Boulevard Corridor Improvement Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane (New), Sidewalk and/or Alameda 18/19 Carried Over Complete Streets Components Hesperian Boulevard from I-880 to A Street Construction 07/2020 11/2020 18-50 20 10 Project Crosswalk Rehab/Repair (Existing) | Construct complete street improvements along a major business corridor including sidewalks, class II bike lanes, street lighting, storm drains, traffic signals, crosswalks, pavement, landscaping and streetscaping

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Alameda 19/20 In Progress Road Maintenance & Rehabilitation Somerset Ave Sidewalk Construction Project Somerset Avenue from Redwood Road to Stanton Ave Pre-Construction 12/2019 06/2023 40-50 20 10 Development, Feasibility Study, Preliminary Design

Crow Canyon Road Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Crow Canyon Road from East Castro Valley Blvd to Contra Costa County Alameda 19/20 In Progress Road Maintenance & Rehabilitation Construction 04/2020 03/2021 15-20 20 10 Project Rehab/Repair (Existing) Line

Alameda 19/20 In Progress Road Maintenance & Rehabilitation Foothill Road Storm Damage Repair Phase II This project will include: Pavement Rehab/Repair (Existing) | storm damage repair Foothill Road, MM 6.89 Construction 04/2020 03/2021 40-50 16 7

Bear Valley, Alpine County CA Alpine 20/21 New Road Maintenance & Rehabilitation Bear Valley Pavement Treatments Project This project will include: Cost Estimating, Project Scope Development Pre-Construction 07/2020 09/2020 7-10 5 1 Creekside Drive, Cub Lane, Flynn Road and John Ebbetts Road. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Clinton Rd., Shenandoah Rd., Tyler Rd., Steiner Rd., Latrobe Rd., Shake This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Amador 20/21 New Road Maintenance & Rehabilitation Countywide Dig-out Repair Project Ridge Rd., Jackson Valley Rd., Dave Brubeck Rd., Main St. - Drytown, Construction 08/2020 06/2021 10-15 5 8 (Existing Safety) Buckhorn Ridge Rd.

Forest Home Rd, Carbondale Rd, Shenandoah School Rd, Bell Rd, Ostrom Rd, Pine Gulch Rd, Old Hwy 49, Old Hwy 49, New Chicago Rd, Pioneer Creek Rd, Defender Grade, Joyce Rd, Pine Grove Volcano Rd, Pioneer Volcano Rd, Meadow Dr, Silver Dr, Sugar Pine Dr, McKenzie Dr, Amador 20/21 New Traffic Control Devices Countywide Striping Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 08/2020 06/2021 5-7 5 8 Barton Rd, Carson Dr, Mira Vista Ct, Alta Vista Ct, North Meadow, Creekside Dr, Ruggles Ct, Kings Ct, Forest Knoll Ct, Parkwood Dr East, Silver Point Dr, Fairway Dr, Parkwood Dr, along with 31 other streets within the County

This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Clinton Rd., Shenandoah Rd., Tyler Rd., Steiner Rd., Latrobe Rd., Shake Amador 20/21 New Road Maintenance & Rehabilitation Countywide Culvert Repair Project Construction 08/2020 06/2021 30-50 5 8 Rehab/Repair (Existing) Ridge Rd., Jackson Valley Rd., Dave Brubeck Rd.

Old Sacramento Rd., Sutter Creek Volcano Rd., Sutter Ione Rd., This project will include: Minor Repairs/Materials (HMA Potholes, HMA Patching, Miscellaneous Amador 20/21 New Road Maintenance & Rehabilitation Countywide Roadway Maintenance Project Carbondale Rd. , Pine Grove Volcano Rd., are location estimates. Construction 08/2020 06/2021 5-20 5 8 HMA, Rock, Minor Facilities) Locations within the County have not yet been finalized.

Amador 20/21 New Road Maintenance & Rehabilitation Countywide Crack Filling Project This project will include: Pavement Rehab/Repair (Existing) Locations within the County have not yet been finalized. Construction 08/2020 06/2021 3-7 5 8

Clinton Rd, Shenandoah Rd, Tyler Rd, Steiner Rd, Latrobe Rd, Shake Amador 20/21 New Road Maintenance & Rehabilitation Countywide Roadside Maintenance This project will include: Roadside maintenance for ditching, brushing, and cutting. Ridge Rd, Jackson Valley Rd, Dave Brubeck Rd, Buckhorn Rd. All Construction 08/2020 06/2021 3-5 5 8 locations are an estimate and have yet to be finalized.

This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Procurement/Operational Amador 20/21 New Road Maintenance & Rehabilitation Equipment and Tool Replacement County Roads 08/2020 06/2021 10-15 5 8 Works Equipment Needs

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Amador 20/21 New Road Maintenance & Rehabilitation Shenandoah Road Micro-surface Project Shenandoah Road Construction 08/2020 06/2021 7-10 5 8 (Existing Safety), Pavement Improvement (New)

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Pre-pulverizing the full depth reclamation section, spreading 3.0% Type II Cement over the surface and processing to a depth of 16 inches, shaping and re-compacting the cement treated material to 98% relative density; paving an overlay with 4-inches of HMA, replacing thermoplastic traffic stripes and markings, and retro-reflective pavement markers, all in From BSNF Railroad to Dayton Road. Located southwest of the city of conformance with the Caltrans 2010 Standard Specifications, and these Special Provisions, Chico and begins at the intersection of Hegan Lane and Dayton Road Butte 18/19 In Progress Road Maintenance & Rehabilitation Hegan Lane Construction 03/2019 12/2020 25-30 3 4 unless specified herein. | The project is located southwest of the city of Chico, and begins at the running approximately 2.35 miles northeasterly along Hegan Lane to intersection of Hegan Lane and Dayton Road running approximately 2.35 miles northeasterly approximately 80’ east of the Union Pacific Rail Road Tracks. along Hegan Lane to approximately 80’ east of the Union Pacific Rail Road Tracks. The work consists of, but is not limited to, pre-pulverizing the full depth reclamation section followed by spreading 3.0% Type II Cement over the surface and processing to a depth of 16 inches, shaping and re-compacting the cement treated material to 98%

This project will include: Preliminary Design | Grind existing structural section, grade aggregate base back to finish grade. Overlay with 3" of asphalt concrete (AC). Place striping, pavement Butte 18/19 In Progress Road Maintenance & Rehabilitation Foothill Blvd. markers, pavement markings, and prepare finish grade for the traveling public. Grade roadside Oro Bangor Hwy. to Pinedale Ave. Pre-Construction 05/2020 12/2020 20-25 3 4 ditches to drain. | This project is in preliminary design and continuation is subject to future SB1 funding.

Pre-Construction & 05/2017 04/2020 Butte 18/19 In Progress Road Maintenance & Rehabilitation Centerville Road Reconstruction (Lower) This project will include: Reconstruction Strom Damage Repairs 0.5 Miles North east of Honey Run Road Intersection 30-30 3 4 Construction 05/2020 12/2020

Butte 18/19 In Progress Road Maintenance & Rehabilitation Oro-Quincy Highway Reconstruction This project will include: Reconstruction Strom Damage Repairs | Closeout reporting Site 1 in Mt. House and Site 2 is 0.75 miles North east of Site 1. Construction 06/2019 12/2020 30-30 3 4

Butte 18/19 In Progress Safety Skyway Median Guardrail This project will include: Safety Improvement Median Guardrail 5.5 Miles East of the Intersection of Skyway and Honey Run Road. Construction 02/2020 05/2020 30-30 3 4 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Three Sites Between W. Sacramento St. on the West and Oak Lawn Ave. Butte 18/19 In Progress Road Maintenance & Rehabilitation Bidwell Avenue Strom Damage Repair This project will include: Storm Damage Repairs (Design and Permitting) Pre-Construction 04/2020 12/2020 20-20 3 4 on the East.

Pre-Construction & 06/2017 05/2020 Butte 18/19 In Progress Road Maintenance & Rehabilitation Las Plumas Avenue Overlay This project will include: Structural Overlay From Las Plumas Way to Lower Wyandotte Rd. 30-30 3 4 Construction 06/2020 12/2020

This project will include: Environmental Study/Documents, Right of Way Acquisition, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, Preliminary Pre-Construction & 01/2019 06/2019 Butte 19/20 In Progress Road Maintenance & Rehabilitation Upper Centerville Road Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Repair and Three (3) miles south of Nimshew Road. 25-30 3 4 Construction 01/2020 12/2020 Rehabilitation of existing roadway infrastructure lost during heavy rain event within the Camp Fire footprint.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Cost Estimating, Pre-Construction & 01/2019 12/2019 Butte 19/20 Carried Over Road Maintenance & Rehabilitation Dark Canyon Road Right of Way, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert 2.5 Miles Southeast of Big Bend Road 25-30 3 4 Construction 01/2020 12/2020 Rehab/Repair (Existing), Document Preparation | Repair and Rehabilitation of the existing roadway infrastructure lost during a heavy rain event with in the Camp Fire footprint.

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Butte 19/20 Carried Over Road Maintenance & Rehabilitation Monte Vista/Lower Wyandotte Lincoln Blvd. to Lower Wyandotte Road. Pre-Construction 01/2020 07/2021 20-25 3 4 Scope Development, Preliminary Design, Document Preparation

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Butte 19/20 Carried Over Road Maintenance & Rehabilitation Autrey Lane Las Plumas Ave. to Monte Vista Ave. Pre-Construction 01/2020 07/2021 20-25 3 4 Development, Right of Way, Preliminary Design, Document Preparation

Butte 19/20 Carried Over Road Maintenance & Rehabilitation Monte Vista Avenue This project will include: Preliminary Design Autry Lane to Western Property line of Las Plumas High School. Pre-Construction 01/2020 07/2021 20-25 3 4

Roads to be Slurry Sealed Achilles Ct., Adrian Dr., Arthur Ct., Athens Ct., Auroa Ct., Babson Ct., Bremer Ct., Bronx Ct., Carver Ct., Cascade Dr., Chestnut Cir., Colby Ct., Compton Dr., Concord Ct., Coppel Ct., Curtis Ct., Dade Ct., David Ct., Delta Ct., Dimitri, Ct., Drexel Dr., Drury Dr., Ed Ct., Einstoss Ct., Eureka Dr., Ferguson Dr., Finch Ct., Fritz Ct., Glendale Dr., Heller Ct., Hobart Ct., Hood Ct., Iona Ct., Janine Ct., Jarvis Cir., This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Jennifer Ct., Kingsdale Ct., La Rosa Ct., Lander Ct., Layton Ct., Linda Lee Pre-Construction & 03/2019 04/2020 Butte 19/20 Carried Over Road Maintenance & Rehabilitation 2018 Butte County Slurry Seal (Existing Safety), Right of Way Acquisition, Project Scope Development, Preliminary Design | 5-5 3 4 Ct., Lucas Ct., Marsh Ct., Metzger Ct., Molinari Ct., Mooz Ct., Napa Ct., Construction 05/2020 12/2020 Slurry Seal Various Roads throughout the County Oak Ridge Dr., Olivet Dr., Otis Ct., Pawn Ct., Penn Ct., Peterson Estates Dr., Pineland Cir., Potomac Dr., Providence Ct., Pueblo Dr., Rim Rock Dr., Rutgers Ct., Salk Ct., Sarah Ann Ct., Scripps Ct., Shaw Cir., Shoup Ct., Simonson Ct., Southwind Ct., Sunsup Ln., Tracy Ranch Rd., Tufts Ct., Tulsa Ct., Union Ct., Ventura Dr., Wake Ct., Wichita Dr., Woodbury Dr., Woodpecker Rd., Wyack Ct., Zuckerman Ct.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Right of Way Acquisition, Cost Estimating, Pre-Construction & 03/2019 12/2019 Butte 19/20 Carried Over Road Maintenance & Rehabilitation Neal Road Project Scope Development, Right of Way, Bicycle Lane Rehab/Repair (Existing), Preliminary 4.9 Miles Northeast of SR99 to Paradise Town Limit 5-10 3 4 Construction 01/2020 12/2020 Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair of existing roadway due to excessive heavy truck traffic associated with the debris removal efforts of the Camp Fire recovery.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 01/2020 12/2020 Butte 19/20 Carried Over Road Maintenance & Rehabilitation Baldwin Ave (Palermo) Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Document Lincoln Blvd. to Hewitt Ave. 20-25 3 4 Construction 01/2022 12/2022 Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Cohasset Rd.; Rock Creek Rd.; Rock Creek Dr.; Sycamore Valley Rd.; Pre-Construction & 01/2019 04/2020 Butte 19/20 Carried Over Road Maintenance & Rehabilitation 2019 Butte County Chip Seal 5-7 3 4 (Existing Safety), Cost Estimating, Project Scope Development Vilas Rd.; Harvey Rd.; Oro Quincy Hwy.; Lincoln Blvd Construction 05/2020 10/2020

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Various Butte County Roads: Peterson Estates Drive to Greenview Circle. Pre-Construction & 01/2020 04/2020 Butte 20/21 New Road Maintenance & Rehabilitation Various Streets - Crack Sealing Development, Preliminary Design, Maintenance Program Plan Development, Document 10-10 3 4 Please check Resolution for full locations. Construction 05/2020 11/2020 Preparation | Crack Sealing Pavement Surface Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Pre-Construction & 01/2020 04/2020 Butte 20/21 New Road Maintenance & Rehabilitation Cohassett Road Development, Preliminary Design, Maintenance Program Plan Development, Document Cohasset Road - Chico City limits to end of pavement 10-10 3 4 Construction 05/2020 11/2020 Preparation | Digouts/Patching/Chip Seal/Shoulder backing

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Pre-Construction & 01/2019 06/2019 Butte 20/21 New Road Maintenance & Rehabilitation Ophir Road Rehabilitation Ophir Road 20-30 3 4 Preparation | Full Depth Reclamation (FDR), Cement treated at 4%. New Pavement and shoulder Construction 07/2019 12/2019 backing.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Cohasset Road - Metal Beam Guard Rail Pre-Construction & 01/2019 07/2020 Butte 20/21 New Safety Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Cohasset Road 20-30 3 4 Project Construction 08/2020 07/2021 Document Preparation | Upgrading existing sub standard metal Beam guard rail (MBGR)

This project will include: Public Works Staffing | Pedestrian, bicycle, and education program for Procurement/Operational Butte 20/21 New Match Funds County Wide Safe Routes to Schools Program County wide - Various schools 01/2019 07/2020 20-20 3 4 low income communities Needs

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Aguas Frias Road Rehabilitation Aguas Frias Road - Hwy 162 to 2 miles north of Hwy 162 20-25 3 4 Document Preparation | Full Depth Reclamation (FDR), Cement treated 4%, pavement, shoulder Construction 08/2020 07/2021 backing, roadside ditch grading

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Lone Tree Road Rehabilitation Project Lone tree Road - 5.9mi to 7.8mi (Mile Markers) 20-25 3 4 Development, Preliminary Design, Document Preparation | Full Depth Reclamation (FDR), Construction 08/2020 07/2021 Cement treated 4%, pavement, shoulder backing, roadside ditch grading

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Foothill Blvd. Rehabilitation Foothill Blvd. - 0.0mi - 1.9mi (Mile Marker) 20-25 3 4 Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement Construction 08/2020 07/2021 treated 4%, pavement, shoulder backing, roadside ditch grading

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Miner's Ranch Road Rehabilitation Miner's Ranch Road - 0.0mi to 2.7mi (Mile Marker) 20-25 3 4 Program Plan Development, Document Preparation | Full Depth Reclamation (FDR), Cement Construction 08/2020 07/2021 treated 4%, pavement, shoulder backing, roadside ditch grading

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Lower Skyway - Fire Damaged MBGR Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Pre-Construction & 07/2019 06/2020 Butte 20/21 New Match Funds Lower Skyway - Chico City limits to Crossroads 20-30 3 4 Replacement Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Matching Construction 07/2020 09/2020 funds for the ER funded MBGR Replacement Project

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Pre-Construction & 07/2019 06/2020 Butte 20/21 New Match Funds New Skyway - MBGR Replacement New Skyway - Pentz Road to Coutolenc 20-30 3 4 Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Matching Construction 07/2020 10/2020 funds for the ER funded MBGR Replacement Project

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Pre-Construction & 07/2019 06/2020 Butte 20/21 New Match Funds Upper Skyway MBGR Replacement Upper Skyway - Coutolenc to Lakeridge Circle 20-30 3 4 Document Preparation | Replacement of Camp Fire damaged Metal Beam Guard Rail (MBGR) | Construction 07/2020 10/2020 Matching funds for the ER funded MBGR Replacement Project

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Butte 20/21 New Match Funds Lower Skyway - Debris Damaged Road Repair Lower Skyway - Chico City limits to Crossroads Pre-Construction 10/2020 10/2021 20-30 3 4 Document Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Document Butte 20/21 New Match Funds Pentz Road Repair Pentz Road - Malibu Drive to State Hwy 70 Pre-Construction 10/2020 10/2021 20-30 3 4 Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Document Butte 20/21 New Match Funds Skyway (New) Road Repair New Skyway - Paradise Town limit. Pentz Road to Coutolenc Pre-Construction 10/2020 10/2021 20-30 3 4 Preparation | Replacement of damaged roadway due to debris hauling associated with the Camp Fire | Matching funds for the ER funded Roadway Replacement Project

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain Pre-Construction & 07/2019 07/2020 Butte 20/21 New Match Funds East Gridley Road Repair Project East Gridley Road - Hutching's Drive to State Hwy 70. 20-30 3 4 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident and associated flooding. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Pre-Construction & 12/2016 01/2017 Butte 20/21 New Match Funds Glen Drive Repair Project Glen Drive - Oro Quincy Hwy to Southview Drive 20-30 3 4 Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Maintenance Program Plan Development, Preliminary Design, Storm Drain Pre-Construction & 12/2016 01/2017 Butte 20/21 New Match Funds Canyon Drive Repair Project Canyon Drive - State Hwy 162 to Royal Oaks Drive 20-30 3 4 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain Pre-Construction & 12/2016 01/2017 Butte 20/21 New Match Funds Oro Bangor Hwy Repair Oro Bangor Hwy - Miner's Ranch Road to La Porte Road 20-30 3 4 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Pre-Construction & 12/2016 01/2017 Butte 20/21 New Match Funds Kelly Ridge Road Repair Kelly Ride Road - State Hwy 162 to Royal Oaks Drive 20-30 3 4 Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Storm Pre-Construction & 12/2016 01/2017 Butte 20/21 New Match Funds La Porte Road Repair La Porte Road - Oro Bangor Hwy to Quarry Road 20-30 3 4 Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 02/2017 12/2020 roadway due to Oroville Spillway Incident. | Matching funds for the ER funded Roadway Repair Project.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Project Concow/Skyway/Various Metal Beam Guard Pre-Construction & 07/2019 07/2020 Butte 20/21 New Match Funds Scope Development, Maintenance Program Plan Development, Preliminary Design, Storm Drain Concow/Skyway/Various County Roads (Off-System Roads) 20-30 3 4 Rail (MBGR) Replacement Construction 08/2020 12/2020 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off- system MBGR due to the Camp Fire | Matching funds for the FEMA MBGR Replacement Project.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Pulga Metal Beam Guard Rail (MBGR) Development, Right of Way, Preliminary Design, Maintenance Program Plan Development, Storm Pre-Construction & 07/2019 07/2020 Butte 20/21 New Match Funds Pulga Road - State Hwy 70 to End of Pulga Road 20-30 3 4 Replacement Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged Construction 08/2020 12/2020 off-system MBGR on Pulga ROad due to the Camp Fire | Matching funds for the FEMA MBGR Replacement Project. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Concow Road Repairs Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain Concow Road - State Hwy 70 to end of pavement (7.1 Miles) 10-10 3 4 Construction 08/2020 12/2020 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off- system Concow Road due to fire debris hauling associated with the Camp Fire

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Honey Run Road Repair Development, Right of Way, Maintenance Program Plan Development, Preliminary Design, Storm Honey Run Road 10-10 3 4 Construction 08/2020 12/2020 Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off-system Honey Run Road due to fire debris hauling associated with the Camp Fire

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Pre-Construction & 07/2019 07/2020 Butte 20/21 New Road Maintenance & Rehabilitation Centerville Road Repair Scope Development, Preliminary Design, Maintenance Program Plan Development, Storm Drain Centerville Road - Honey Run Road to Nimshew 10-10 3 4 Construction 08/2020 12/2020 and/or Culvert Rehab/Repair (Existing), Document Preparation | Replacement of damaged off- system Centerville Road due to fire debris hauling associated with the Camp Fire

Calaveras 20/21 New Road Maintenance & Rehabilitation Burson Road Phase I This project will include: Pavement Rehab/Repair (Existing) Burson Road from Hillvale Drive to Camanche Parkway South Construction 07/2020 09/2020 10-20 5 8

Various sections of Murphys Grade Road between Angels Camp and Calaveras 20/21 New Road Maintenance & Rehabilitation Murphys Grade Road This project will include: Pavement Rehab/Repair (Existing) Construction 07/2020 10/2020 8-10 5 8 Murphys.

Calaveras 20/21 New Road Maintenance & Rehabilitation Parrotts Ferry Road This project will include: Pavement Rehab/Repair (Existing) Main Street to Toulumne County Line Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Main Street (Vallecito) This project will include: Pavement Rehab/Repair (Existing) to Parrotts Ferry Road Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Angels road This project will include: Pavement Rehab/Repair (Existing) Highway 4 to Main Street (Vallecito) Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Copper Cove This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Little John Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation O'Byrnes Ferry Road This project will include: Pavement Rehab/Repair (Existing) Main Street (Copperopolis) to Toulumne County Line Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Little John This project will include: Pavement Rehab/Repair (Existing) Various sections from Main Street to Kiva Drive Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Main Street (Copperopolis) This project will include: Pavement Rehab/Repair (Existing) O'Byrnes Ferry Road to Highway 4 Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Copper Cove Subdivision This project will include: Pavement Rehab/Repair (Existing) Various streets within the Copper Cove Subdivision Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Hogan Dam Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Silver Rapids Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Vista Del Lago This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hogam Dam Road Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Burson Road Phase II This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Hillvale Drive Construction 04/2021 10/2021 8-10 5 8 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Calaveras 20/21 New Road Maintenance & Rehabilitation Garner Place This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Baldwin Street This project will include: Pavement Rehab/Repair (Existing) Jenny Lind Road to Highway 26 Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Kirby Street This project will include: Pavement Rehab/Repair (Existing) Jenny Lind Road to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Silver Rapids Road This project will include: Pavement Rehab/Repair (Existing) Heney Lane to Hogan Dam Road Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Hartvickson Lane This project will include: Pavement Rehab/Repair (Existing) Vista Del Lago to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Jenny Lind Road This project will include: Pavement Rehab/Repair (Existing) Highway 26 to Baldwin Street Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Valley Springs This project will include: Pavement Rehab/Repair (Existing) Various County roads within the community of Valley Springs Construction 04/2021 10/2021 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing) Paving projects listed here under fiscal year 20/21 Construction 07/2020 10/2020 8-10 5 8

Calaveras 20/21 New Road Maintenance & Rehabilitation Contingency - Utility Coordination This project will include: Pavement Rehab/Repair (Existing) Paving projects listed here under fiscal year 21/22 Construction 04/2021 10/2021 8-10 5 8

This project will include: Resurface Lone Star Road from HWY 20 to Able Road | Extensive In the center area of the County, south of Highway 20, east of the City of Colusa 18/19 Carried Over Road Maintenance & Rehabilitation Lone Star Road Resurfacing subgrade geotechnical challenges have resulted in additional design requirements and delayed Pre-Construction 07/2020 08/2020 20-25 3 4 Williams. From Hahn Road to Able Road construction.

This project will include: Resurface Lone Star Road from HWY 20 to Able Road | Extensive sub- In the center area of the County, south of Highway 20, east of the City of Colusa 18/19 Carried Over Road Maintenance & Rehabilitation Lone Star Road Resurfacing grade geotechnical challenges have resulted in additional design requirements and delayed Construction 08/2020 10/2020 20-25 3 4 Williams. From Hahn Road to Able Road construction.

This project will include: Traffic Signing – This routine maintenance item is to perform sign repair, Work will occur on roadways throughout the County, including but not replacement, and installation along the limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, unincorporated County roadways. (RMRA = $450k) Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Procurement/Operational Contra Costa 19/20 Forecasted Road Maintenance & Rehabilitation Traffic Safety Devices Maintenance 07/2020 06/2021 2-10 11, 14, 15, 16 7, 9 Traffic Striping – This routine maintenance item is to perform new painting, routine painting and Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Needs replacement of pavement Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour striping along the unincorporated County roadways to enhance public safety. (RMRA = $500k) Road, Vasco Road, and Byron Highway

This project will include: All of the following are routine maintenance items: Ditch Cleaning – Perform drainage ditch cleaning to remove debris and vegetation which may Work will occur on roadways throughout the County, including but not obstruct the passage of stormwater and cause local flooding. (RMRA = $400k) | Clean Catch limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, Basin – Perform cleaning of sediment and prevent obstructions of catch basins (drainage inlets) Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Procurement/Operational Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Road Drainage Maintenance and related pipe systems. (RMRA $500k) 07/2020 06/2021 15-40 11, 14, 15, 16 7, 9 Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Needs Inspect Catch Basin – Perform inspections of catch basins and associated systems. This includes Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour a visual inspection of the drainage inlet and any clean water inserts. Follow- video inspections Road, Vasco Road, and Byron Highway may be required for deeper inlets and/or suspected structural issue concerning the inlets. (RMRA = $300k)

This project will include: • Pot Hole Patching – (RMRA = $500k) • Pavement Fabric Patching – (RMRA = $500k) Work will occur on roadways throughout the County, including but not • Pavement Failure Repair - Backhoe – (RMRA = $500k) limited to San Pablo Dam Road, Alhambra Valley Road, Appian Way, • Pull Box Paving – (RMRA = $525k) Fred Jackson Way, Richmond Parkway, San Pablo Avenue, Bear Creek Procurement/Operational Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation Pavement Repairs and Preparation 07/2020 06/2021 7-7 11, 14, 15, 16 7, 9 • Hand Patching – (RMRA=$500k) Road, Danville Blvd., Marsh Creek Road, Deer Valley Road, Kirker Pass Needs • Crack Sealing – (RMRA = $600k) Road, Stone Valley Road, Blackhawk Road, Camino Tassajara, Balfour • Leveling – (RMRA = $475k) Road, Vasco Road, and Byron Highway • Pavement Failure Repair – Grinder – (RMRA = $600k) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will apply a double chip seal to various roads as a pavement preservation project in the unincorporated Contra Costa County which Surface Treatments - Double Chip Seal Project This project will include: Work will also include surface preparation and pavement striping and include but are not limited to the following: Bear Creek Road, Chestnut Procurement/Operational Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation 07/2020 06/2021 7-7 11, 14, 15, 16 7, 9 (2020) markings. (RMRA funding = $2,200,000) Street, Sunset Road, Delta Road, Sellers Avenue, Eden Plains Road,, Needs Byron Highway, Knightsen Avenue, Marsh Creek Road, Point of Timber Road, Bixler Road, Byron Highway and Camino Diablo.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of The project will apply a pavement surface treatment to various roadways Surface Treatment - Asphalt Rubber Cape Seal Public Works Equipment | The project will apply an asphalt rubber chip seal covered with a type II Procurement/Operational Contra Costa 19/20 Carried Over Road Maintenance & Rehabilitation in the Bay View (19 streets), Montalvin (18 streets), Unincorporated 07/2020 06/2021 7-7 14 7 Project (2020) slurry seal to the pavement surface. Work will also include surface preparation and pavement Needs Lafayette and Martinez (67 streets) areas. striping and markings. (RMRA funding = $4,750,000)

This project will include: Storm Drain/Culvert Installation (New), Right of Way Acquisition, Pavement Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | The project consists of roadway widening for a truck lane and paved shoulder, construction of six retaining Kirker Pass Road – from Clearbrook Drive to approximately 140 feet east Contra Costa 19/20 In Progress Safety Kirker Pass Road Northbound Truck Lanes Construction 05/2019 09/2020 7-50 14 7 walls and two bioretention areas, drainage improvements, relocation of existing roadside features, of the driveway to 6141 Kirker Pass Road. signing and striping, and pavement rehabilitation on both the north and southbound lanes. Pavement rehabilitation will involve a 0.10’ grind and overlay of rubberized hot mix asphalt open grade on existing and new roadway pavement. (RMRA = $3,100,000)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Hunter Creek Road, Arlington Drive and Elk Valley Road from U.S. Del Norte 20/21 New Road Maintenance & Rehabilitation 2021 Countywide Rehabilitation Construction 07/2020 06/2021 15-20 2 2 Rehab/Repair (Existing) Highway 101 to Howland Hill Road.

Procurement/Operational Del Norte 20/21 New Other Excavator Acquisition This project will include: Procurement of Public Works Equipment County wide 07/2020 01/2021 25-25 2 2 Needs

Procurement/Operational Del Norte 20/21 New Other Facility Housing Equipment and Vehicles This project will include: Repair and Servicing of Public Works Equipment The Road Yard located at 500 E. Cooper Avenue, Crescent City. 07/2020 06/2021 50-50 2 2 Needs

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Brushing to remove Various county maintained roads throughout Placerville, CA. hazardous trees and all low hanging foliage and opening up site distances. Ditching to correct

Roads of Placerville Rehabilitation and Surface drainage issues and make sure all cross culverts are free of debris and functioning to the fullest El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Roads include but are not limited to: Mona Drive, Pierce Court, Prescott Construction 12/2019 08/2020 10-15 5 1 Treatment capacity. Culverts will be replaced as needed. Grind and pave to repair damaged asphalt. A Avenue, Jacquier Road, No Name Road, Smith Flat Cemetery Road, surface treatment with rubberized chip seal will be performed on the identified roads. Smith Flat Road and Smith Flat School Road.

Approximately 2.78 miles of roadway. Average PCI is 31.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Diamond Springs Business Park is located in Diamond Springs, CA (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening between Highway 49 and Highway 50. up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of Diamond Springs Business Park Rehabilitation El Dorado 19/20 In Progress Road Maintenance & Rehabilitation debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave Construction 12/2019 08/2020 10-15 5 1 and Surface Treatment Roads include but are not limited to: Bright Court, Capitol Avenue, Clear to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed Court, Commerce Way, Enterprise Court, Enterprise Drive, Industrial throughout the business park. Drive and Merchandise Way. Approximately 1.85 miles of roadway. Average PCI is 35.

Cameron Park Subdivision is located in Cameron Park, CA and is north This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair of Highway 50 and west of Cameron Park Drive consisting of (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening approximately 21 roads. up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of Cameron Park Subdivison Rehabilitation and debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave Roads include but are not limited to: Braniff Court, Castlebrook Road, El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Construction 12/2019 08/2020 10-15 5 1 Surface Treatment to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed Cessna Drive, De Sabla Court, De Sabla Road, Eagle View Drive, El throughout the subdivision. Dorado Royale Drive, El Encanto Road, Fairway Drive, Garden Circle, Linwood Lane, Los Santos Drive, Navion Court, No Name Court, Piper Approximately 7.01 miles of roadway. Average PCI is 34. Court, Sage Drive, Sky Court, Sudbury Road, Toronto Road and Wood Lane. This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Located in Pollock Pines, CA north of Highway 50 between Sly Park Road (Existing Safety) | Brushing to remove hazardous trees and all low hanging foliage and opening and Ridgeway Drive. up site distances. Ditching to correct drainage issues and make sure all cross culverts are free of

Roads of Pollock Pines Rehabilitation and debris and functioning to the fullest capacity. Culverts will be replaced as needed. Grind and pave El Dorado 19/20 In Progress Road Maintenance & Rehabilitation Roads include but are not limited to: Pony Express Trail, Willow Street, Construction 12/2019 08/2020 10-15 5 1 Surface Treatment to repair damaged asphalt. A surface treatment with rubberized chip seal will be performed on the Fir Drive, Fairview Drive, North Street, Polaris Street, Laurel Drive, identified roads. Balsam Drive, Maple Drive, Maple Avenue, Pine Street, Sanders Drive,

Center View Court, and Center View Drive. Approximately 5.98 miles of roadway. Average PCI is 44.

Procurement/Operational El Dorado 20/21 New Road Maintenance & Rehabilitation Forcefeed Loader This project will include: Procurement of Public Works Equipment Placerville, CA 07/2020 01/2021 15-20 5 1 Needs

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing of 3.86 miles of roadway within Franciscan Village and Marina Woods Unit 1 and 2. Franciscan Village is located in El Dorado Hills, CA between El Dorado El Dorado Hills Subdivisions Prep Work and Brushing consists of removing hazardous trees and all low hanging foliage and opening up site Hills Boulevard, El Dorado 20/21 New Road Maintenance & Rehabilitation Construction 10/2020 10/2021 13-17 5 1 Surface Treatment distances as Francisco Drive, and Green Valley Road. Marina Woods Unit 1 and 2 is needed. Phase two (2) will consist of repairing damaged asphalt in the 3.86 miles within located in El Dorado Hills, CA between Francisco Drive and Folsom Lake. Franciscan Village and Marina Woods Unit 1 and 2, if needed. Phase Three (3) will consist of a surface treatment. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The first phase will consist of roadside brushing of 5.90 miles of Bar J Ranch is located in Cameron Park, CA on both sides of Country El Dorado 20/21 New Road Maintenance & Rehabilitation Bar J Ranch Prep Work and Surface Treatment roadway within Bar J Ranch. Brushing consists of removing hazardous trees and all low hanging Construction 10/2020 10/2021 13-17 5 1 Club Drive, north of Highway 50 and west of Cambridge Road. foliage and opening up site distances as needed. Phase two (2) will consist of repairing damaged asphalt in the 5.90 miles within Bar J Ranch, if needed. Phase Three (3) will consist of a surface treatment and all ADA upgrades that are required.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | Carson Road Surface Treatment is a multi-year project. The first phases will concentrate on the preparation for the surface treatment. The first phase will consist of roadside brushing and ditching of 6. 77 miles of roadway along Carson Road. Brushing consists of Carson Road Prep Work and Surface Carson Road starts in Placerville, CA and extends into Camino, CA and El Dorado 20/21 New Road Maintenance & Rehabilitation removing hazardous trees and all low hanging foliage and opening up site distances as needed. Construction 10/2020 10/2021 13-17 5 1 Treatment runs parallel north of Highway 50. Ditching involves correcting drainage issues and verifying all cross culverts are free of debris and are functioning to their fullest capacity | At that time, all culverts will be inspected for life expectancy and be replaced if needed. Phase two (2) will consist of repairing damaged asphalt in the 6. 77 miles of Carson Road, if needed. Phase Three (3) will consist of a surface treatment.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing and ditching of 4.31 miles of roadway along Greenstone Road area. Brushing consists of removing hazardous trees and all low hanging foliage and opening up site distances as needed. Ditching involves correcting Greenstone Road Area Prep Work and Surface Greenstone Road Area is located in Placerville, CA and runs El Dorado 20/21 New Road Maintenance & Rehabilitation drainage Construction 10/2020 10/2021 13-17 5 1 Treatment perpendicular to Highway 50. issues and making sure all cross culverts are free of debris and are functioning to their fullest capacity. At that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 4.31 miles of Greenstone Road area, if needed. Phase Three (3) will consist of a surface treatment.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The first phase will consist of roadside brushing and ditching of 1.83 miles of roadway along Sawmill Road. Brushing consists of removing hazardous trees and all low hanging Sawmill Road Rehabilitation and Surface foliage and opening up site distances as needed. Ditching involves correcting drainage issues and Sawmill Road is located in South , CA between Lake Tahoe El Dorado 20/21 New Road Maintenance & Rehabilitation Construction 09/2020 10/2021 13-17 5 5 Treatment making sure all cross culverts are free of debris and are functioning to their fullest capacity. At Boulevard and . that time, all culverts will be inspected for life expectancy and be replaced if needed. | Phase two (2) will consist of repairing damaged asphalt in the 1.83 miles of Sawmill Road. Phase Three (3) will consist of a surface treatment.

Copper Avenue and Auberry Avenue Traffic Fresno 18/19 Carried Over Traffic Control Devices This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Copper Avenue and Auberry Avenue Construction 07/2020 07/2021 20-20 23 8 Signal

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Jensen Avenue Reconstruction This project will include: Preliminary Design Jensen Avenue from Chateau Fresno to Cornelia Avenue Pre-Construction 07/2021 10/2021 20-20 31 14

Travers Creek Bridge repalcement on Manning Fresno 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Right of Way Travers Creek Bridge at Manning Avenue Pre-Construction 12/2021 12/2022 50-50 31 14 Avenue

James Bypass Overflow on Manning - Replace Fresno 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Right of Way James Bypass Overflow at Manning Pre-Construction 07/2020 12/2020 50-50 31 12 2 Bridges

Delta Mendota Canal Bridge on Nees Avenue Fresno 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Right of Way Delta Mendota Canal Bridge at Nees Avenue Pre-Construction 12/2021 12/2022 50-50 31 12 Bridge Replacement

Dry Creek on Burrough Valley Road Bridge Fresno 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Environmental Study/Documents, Right of Way Dry Creek at Burrough Valley Road Bridge Pre-Construction 12/2022 12/2023 50-50 23 8 Replacement

Golden State Boulevard over Fowler Switch Fresno 19/20 Carried Over Other This project will include: Environmental Study/Documents, Right of Way Golden State Boulevard at Fowler Switch Bridge Pre-Construction 01/2023 04/2024 50-50 31 14 Bridge Replacement

North Fork Road over San Joaquin River Fresno 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Environmental Study/Documents, Right of Way | Replace Bridge North Fork Road at San Joaquin River Bridge Pre-Construction 11/2025 11/2026 50-50 23 8 Bridge Replacement

Fresno 19/20 Carried Over Road Maintenance & Rehabilitation American Avenue Road Reconstruction This project will include: Right of Way American Avenue from State Route 99 to Temperance Avenue Pre-Construction 02/2021 12/2021 50-50 31 14 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Fresno 19/20 Carried Over Other Jensen Avenue Shoulder Improvements This project will include: Preliminary Design Jensen Avenue from State Route 145 to Dickenson Avenue Pre-Construction 05/2021 10/2021 20-20 31 12

Fresno 19/20 Carried Over Other American Avenue Shoulder Improvements This project will include: Preliminary Design American Avenue from State route 145 to Placer Avenue Pre-Construction 05/2021 10/2021 20-20 31 12

Mt. Whitney Reconstruction and Pedestrian Fresno 18/19 Carried Over Road Maintenance & Rehabilitation This project will include: Preliminary Design Mt. Whitney Avenue from Marks Avenue to Blythe Avenue Pre-Construction 04/2022 10/2022 20-20 31 12 Improvements

Cerini Avenue Reconstruction and Pedestrian Fresno 18/19 Carried Over Road Maintenance & Rehabilitation This project will include: Preliminary Design Cerini Avenue from East Avenue to Cedar Avenue Pre-Construction 04/2022 10/2022 20-20 31 12 Improvements

Fresno 18/19 Carried Over Road Maintenance & Rehabilitation Jensen Avenue Reconstruction This project will include: Preliminary Design Jensen Avenue from Chateau Fresno to Cornelia Avenue Pre-Construction 07/2021 10/2021 20-20 31 14

Fresno 18/19 In Progress Road Maintenance & Rehabilitation Lincoln Avenue Cold-in-place Recycling This project will include: Preliminary Design Lincoln Avenue between Grantland Alignment and SR 145 Pre-Construction 07/2021 10/2021 10-10 31 12

W. Elkhorn Avenue approximately 1 mile west of S. Cornelia Ave. and 6.4 Fresno 20/21 New Safety Elkhorn over Liberty Millrace Canal This project will include: Environmental Study/Documents, Right of Way, Preliminary Design Pre-Construction 07/2021 12/2021 50-50 31 12 miles west of SR 41.

This project will include: Environmental Study/Documents, Project Scope Development, Right of Dinkey Creek Road over Markwood Creek, 4.87 miles east of Highway Fresno 20/21 New Safety Markwood Creek on Dinkey Creek Road Pre-Construction 07/2021 12/2021 50-50 23 8 Way, Preliminary Design 168.

This project will include: Environmental Study/Documents, Project Scope Development, Right of Community of Tranquility: Juanche Ave from Randolph Ave to Silvena Fresno 20/21 New Complete Streets Components Tranquility Road Improvements Pre-Construction 09/2021 12/2021 20-20 31 12 Way, Preliminary Design Ave, and Daniels Ave from Randolph Ave to RR tracks.

Jensen Avenue Reconstruction from Fig to This project will include: Environmental Study/Documents, Project Scope Development, Right of Fresno 20/21 New Complete Streets Components Jensen Ave from Fig Ave to Fruit Ave. Pre-Construction 05/2021 08/2021 20-20 31 14 Fruit Way, Preliminary Design

Jensen Avenue Reconstruction from Fruit Ave This project will include: Environmental Study/Documents, Project Scope Development, Right of Fresno 20/21 New Complete Streets Components Jensen Ave from Fruit Ave to West Ave. Pre-Construction 05/2023 10/2023 20-20 31 14 to West Ave Way, Preliminary Design

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Community of Laton; Fowler Ave, Bliss Ave, Gonser Ave, Latonia Ave, Fresno 20/21 New Safety Laton Sidewalk Project Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | In-road warning lights on Construction 07/2020 12/2020 20-20 31 12 and Murphy Ave. Fowler Ave.

American Avenue Shoulder Improvements - This project will include: Environmental Study/Documents, Right of Way, Project Scope Fresno 20/21 New Road Maintenance & Rehabilitation American Avenue from Clovis Ave to Temperance Ave. Pre-Construction 05/2023 09/2023 20-20 31 14 Clovis to temperance Development, Preliminary Design

Lincoln Ave Shoulder Improvements - SR 145 This project will include: Environmental Study/Documents, Right of Way, Project Scope Fresno 20/21 New Road Maintenance & Rehabilitation Lincoln Ave from SR 145 to Grantland Alignment Pre-Construction 05/2021 09/2021 20-20 31 12 to Grantland Alignment Development, Preliminary Design

Fruit - San Jose to Palo Alto Barstow - Delmar to Thorne This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Sierra - Fresno CL to Fruit Fresno 20/21 New Road Maintenance & Rehabilitation County Overlays Pre-Construction 07/2020 08/2020 10-10 23, 31 12, 14, 22 Document Preparation Central - Elm to Cornelia Annadale - Newmark to Reed Alta - Dinuba to Floral

Belmont-Newcomb:Jerrold, Kamm-SR145:Stinson, Placer- Lincoln:San Joaq, Canal, Belmont-Dickenson to SR 145, Cornelia - Shields to Dakota,Garfield - Bullard to Herndon, Herndon-Parkway Dr to Dickenson, 2020-21 Day Labor Overlays - Various Kearney-Chateau Frsno to Dickenson; Drummond-Maple:Sierra Vista; Fresno 20/21 New Road Maintenance & Rehabilitation This project will include: Preliminary Design Pre-Construction 07/2020 10/2020 10-10 23, 31 8, 12, 14 Locations Sierra Vista - Jensen to Drummond; Gale - Avenal to .74 W/O Howard Alignment; Conejo-Peach to Bethel, Central-McCall to Bethel Pederson-Weldon:Princeton, Weldon-Piedra:MR, Princeton-Piedra:MR, Auberry-Powerhouse Rd: Jose Basin Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Fresno 20/21 New Road Maintenance & Rehabilitation Adams Avenue Overlay - Cherry to Clovis This project will include: Preliminary Design Adams Ave from Cherry Ave to Clovis Ave. Pre-Construction 05/2022 10/2022 10-10 23 14

Barstow - Garfield to Biola; Nees - Oxford to I-5; Paul Negra - 1-5 to County Line (Merced); Del Rey - Dinuba to Floral; Newmark - SSR 168 to End Maintenance Road; Pepperweed Rd to Squaw Valley Road; Madsen - Fresno 20/21 New Road Maintenance & Rehabilitation Bituminous Seal Coats - Various Locations This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) SR 168 to End Maintenance Road; Mendocino - SSR 168 to End Construction 05/2020 06/2020 5-5 23, 31 8, 12, 14 Maintenance Road; Newmark - 05 N/O Adams to Parlier C.L.; Elwood Road - Lupine Dr to 3.67 NW/O Bonanza; Auberry Road - 2.5 SE/O to 5.3 SE/O Jose Basin Road

Fresno 20/21 New Road Maintenance & Rehabilitation Slurry Seals-Sunnyside This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Sunnyside Area Construction 05/2020 06/2020 5-5 23 8

Van Ness - Ashlan to Holland Wilson - Saginaw to Pontiac Fresno 20/21 New Road Maintenance & Rehabilitation Slurry Seals - Fig Garden This project will include: Preliminary Design Pre-Construction 05/2021 06/2021 5-5 23 8 Valentine - Alluvial to Dewey Wishon - Ramona to Ashlan

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project Church - Orange to Cedar involves localized grinding and dig outs and placement of a hot mix asphalt overlay. Adjustment Shaw - Fresno CL to Palm Fresno County Overlays: Carry Over from FY Pre-Construction & 02/2020 07/2020 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation of utilities and installation of Americans with Disabilities Act facilities may be performed as Shaw - Blackstone to Wishon Ct 10-10 23, 31 8, 12, 14 2016/17 SB 1 Funds - Various Locations Construction 07/2020 09/2020 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be Palm - Dakota to Shaw performed as necessary. Maple - Fresno CL to Cornell

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Overlay of Lincoln from SR 41 to Chateau Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation utilities and installation of Americans with Disabilities Act facilities may be performed as Lincoln from SR 41 to Chateau Fresno Alignment 10-10 31 12 Fresno Alignment Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Chestnut from Herndon to Alluvial utilities and installation of Americans with Disabilities Act facilities may be performed as Chestnut from Herndon to Alluvial 10-10 23 8 Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Overlay of Marks from Barstow to the RR Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation utilities and installation of Americans with Disabilities Act facilities may be performed as Marks from Barstow to the RR Crossing S of Barstow 10-10 23 8 Crossing S of Barstow Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay of Barstow from Marks to Van Ness utilities and installation of Americans with Disabilities Act facilities may be performed as Barstow from Marks to Van Ness 10-10 23 8 Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation Overlay on Clovis Ave. from Jensen to SR-99 utilities and installation of Americans with Disabilities Act facilities may be performed as Clovis Ave. from Jensen to SR-99 10-10 31 8, 14 Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The project involves localized grinding and digouts and placement of a hot mix asphalt overlay. Adjustment of Overlay of Fowler from Elkhorn to the Pre-Construction & 07/2020 06/2021 Fresno 19/20 Carried Over Road Maintenance & Rehabilitation utilities and installation of Americans with Disabilities Act facilities may be performed as Fowler from Elkhorn to the Fresno/Kings County line 10-10 31 12, 14 Fresno/Kings County line Construction 07/2021 09/2021 necessary. Appurtenant construction such as signage, striping, and shoulder backing will be performed as necessary.

This project will include: Environmental Study/Documents, Cost Estimating, Preliminary Design, Fresno 20/21 New Road Maintenance & Rehabilitation McCall Overlay from SR 180 to Shaw McCall Ave from SR 180 to Shaw Pre-Construction 08/2020 10/2020 10-10 23 14 Document Preparation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

CR P, from SR 32 to CR 27; CR D, from CR 45 to CR 33; CR 9, from 4th Ave to CR 203; CR 9, from 99W to CR KK; CR S, from SR 32 to CR 21; CR S, from .5 mi s/o CR 25 to CR 33; CR 24, from CR S to SR 45; CR Chip Seal Project - Various Sites- 45 This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Maintenance Pre-Construction & 07/2020 08/2020 Glenn 20/21 New Road Maintenance & Rehabilitation 48, from 99W to CR 47; CR 47, from CR 48 to CR MM; CR MM, from CR 7-10 3 4 Centerlane Miles Program Plan Development Construction 07/2020 06/2021 45 to CR 47; CR 45, from CR MM to CR P; CR 203, from CR 9 to SR 32; CR M, from Orland City limit to CR 33; CR 27, from I-5 to CR M; and CR D, from CR 57 to CR 68.

Fog and Rejuvinating Seal- Various Sites - 14 Glenn 20/21 New Road Maintenance & Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) CR P, from CR 27 to CR 33; and CR V, from CR 29 to SR 162 Construction 08/2020 10/2020 3-5 3 4 Miles

This project will include: ADA Curb Ramp Installation (New), Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation Signalized intersections on Central Avenue, Harrison and Myrtle, Harris Pre-Construction & 07/2020 12/2020 Humboldt 20/21 New Other County-wide ADA Curb Ramp/Rehabilitation (New), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair and Walford, Harris and Harrison & various sites in the McKinleyville 20-20 2 2 Construction 01/2021 06/2021 (Existing) | This project covers the installation of accessible curb ramps in various locations area. throughout the county.

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Cost Estimating, Project Scope Development, Storm Drain and/or Culvert Rehab/Repair (Existing) | This project covers labor, materials and equipment needed for road system maintenance repairs throughout the entirety of Humboldt County. These activities include, but are not limited to; crack County-wide Roadway and Culvert County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Pre-Construction & 07/2020 12/2020 Humboldt 20/21 New Road Maintenance & Rehabilitation filling and sealing, pothole patching, grading, grader patching, dig outs, slurry seal, chip seal, 20-20 2 2 Maintenance/Rehabilitation Garberville Maintenance Areas Construction 01/2021 06/2021 striping, painting, and brush cutting. | Additionally, materials required to complete these tasks, include, but are not limited to; hot and cold mix, tar, thermoplastic striping paints, culvert piping, and couplers, aggregate and any other materials used in the express intent of repairing a roadway or projects pertaining to safety. This includes both contracted and non-contracted work.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works Equipment | This project covers the costs to Illegal Dumping and Encampment Reclamation County-wide: Hoopa, Mckinleyville, Eureka, Ferndale, Fortuna, Procurement/Operational Humboldt 20/21 New Safety clean up illegally dumped materials and restore sites where dumping has occurred and 07/2020 06/2021 1-5 2 2 Costs Garberville Maintenance Areas Needs discourage future illegal dumping. Costs include labor, materials and equipment required to clean, repair and reclaim affected sites. It is anticipated that illegal dumping will continue to occur at sites until efforts to discourage illegal dumping take effect.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Equipment | This project encompasses all costs that pertain to emergency opening of roadways and the actions made to expedite repairs or provide service to disenfranchised citizens. This County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Procurement/Operational Humboldt 20/21 New Safety Emergency Services includes both contracted and non-contracted work. | These projects include, but are not limited to, Garberville Maintenance Areas as needed related to emergency service 07/2020 06/2021 1-1 2 2 Needs culvert repair such as trenching, tunneling, compacting, armoring, as well as flagging, detouring, response. hauling, repairing, and providing essentials services such as transporting and accommodating citizens who have been deprived of the ability to utilize roadways due to unexpected road damages and closures.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear, Public Works Staffing, Procurement of Public Works Roadside Brush Clearing for Traffic Safety and County-wide: Hoopa, McKinleyville, Eureka, Ferndale, Fortuna, Procurement/Operational Humboldt 20/21 New Match Funds Equipment, Repair and Servicing of Public Works Equipment | This project covers the added cost 07/2020 06/2021 2-6 2 2 Fire Fuels Reduction Garberville Maintenance Areas Needs for labor materials and equipment required to perform brush clearing on county-maintained roads. This will also enhance the grant funding that the county has received for this type of work.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Right of Road Improvements for Baughman Rd. from Way, Preliminary Design, Document Preparation | Rehabilitate approximately 2.5 miles of road. Baughman Road from Forrester Road to Lack Road; Casey Road from Pre-Construction & 12/2017 10/2020 Imperial 19/20 In Progress Road Maintenance & Rehabilitation Forrester Rd. to Lack Rd. & Casey Rd. from 6-10 56 40 The project will include the re-paving with Asphalt Concrete and the repair of failure areas of road Griffin Road to State Route 78 Construction 11/2020 06/2021 Griffin Rd. to Hwy. 78 markings. | Funds from FY 2020-21 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c). Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Pre-Construction & 10/2017 06/2021 Imperial 19/20 In Progress Road Maintenance & Rehabilitation Schartz Road Project 1 Preliminary Design, Document Preparation | Rehabilitate approximately 1.5 miles of road. The Schartz Road McConnell Road to Old Highway 111 4-5 56 40 Construction 07/2021 06/2022 project will include the re-paving with asphalt concrete and the repair of failure areas and road markings.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair Pre-Construction & 07/2017 09/2020 Imperial 19/20 In Progress Road Maintenance & Rehabilitation Heber Avenue Project (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Heber Ave. from Correll Road to State Route 86 8-10 56 40 Construction 10/2020 12/2020 Rehabilitate approximately 0.5 miles of road. The project will include the re-paving with asphalt concrete or the resurfacing with slurry seal, construction of ADA ramps, associated drainage work and road markings. | This project is funded in part by Federal Funds.

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Preparation | The project consists of the replacement of existing road bridge to retrofit seismically Forrester Road Bridge over Westside Main Canal, County Bridge No. 58C- Pre-Construction & 07/2017 04/2022 Imperial 19/20 In Progress Safety Forrester Road Bridge Project 50-75 56 40 (Low Sufficiency rated). The project will be require a multiple years. | This project is funded in 0104 Construction 05/2022 12/2023 part by FHWA.

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Winterhaven Drive Bridge over California Wasteway Channel, County Pre-Construction & 07/2017 10/2020 Imperial 19/20 In Progress Safety Winterhaven Drive Bridge Project Preparation | The project consists of seismic retrofitting existing road bridge due to the its current 50-75 56 40 Bridge No. 58C-0094 Construction 11/2020 11/2021 low sufficiency rating. | This project is funded in part by FHWA.

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Preliminary Pre-Construction & 07/2017 11/2020 Imperial 19/20 In Progress Safety Keystone Road Intersection Project Design, Document Preparation | Highway Intersection Safety improvement. The project will Keystone Road and Austin Road Intersection 7-10 56 40 Construction 12/2020 12/2021 consist of adding lightning, paving, rumble strips, flashing beacons, and warning signs to the road intersection. | This project is funded in part by FHWA.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Forrester Road: from Evan Hewes Highway to Interstate 8, from Evan Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Hewes Highway to Hackleman Road, from 0.80 Mi. N. of Worthington Pre-Construction & 07/2019 06/2021 Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Forrester Road Improvements 7-10 56 40 Preliminary Design, Document Preparation | 3-inch Asphalt Concrete Overlay, shoulder backing, Road to Larsen Road, from 0.15 Mi. N. of Worthington Road to 0.20 Mi. S Construction 07/2021 06/2022 pavement markings, and signage. of Murphy Road, from Thompson Road to Keystone Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pre-Construction & 07/2019 12/2021 Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Dogwood Road Dogwood Road from Keystone Road to Harris Road 7-10 56 40 Preliminary Design, Document Preparation | 2-inch Asphalt Concrete Overlay, shoulder backing, Construction 01/2022 12/2022 pavement markings, and signage.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction & 07/2019 06/2021 Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Zenos Road Zenos Road from SR 115 to Melon Road 7-10 56 40 Preliminary Design, Document Preparation | 2-inch Asphalt Concrete Overlay, shoulder backing, Construction 07/2021 06/2022 pavement markings, and signage.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pre-Construction & 07/2017 06/2021 Imperial 19/20 In Progress Road Maintenance & Rehabilitation Menvielle Road Preliminary Design, Document Preparation | 3-inch Asphalt Concrete Overlay, shoulder backing, Menvielle Road from SR 98 to SR 7 7-10 56 40 Construction 07/2021 12/2021 pavement markings, and signage. | Funds from FY 2019-20 will be used to reimburse the County for its other funds used to advance the project per SHC 2034(c).

Magnolia Union Elementary at intersection of Casey Road and Silliman This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Road Pre-Construction & 09/2019 06/2021 Imperial 19/20 Carried Over Safety Rural School Safety Improvements Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pine Elementary at intersection of Holt Road and Townsend Road 5-10 56 40 Construction 07/2021 12/2021 Preliminary Design, Document Preparation | Safety Improvements Signage/striping. Meadows Union Elementary at Intersection of Bowker Road and Evan Hewes Highway

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Pre-Construction & 09/2019 06/2022 Imperial 19/20 Carried Over Road Maintenance & Rehabilitation Picacho Road Bridge Preparation | The project will consist on the design and construction of the Bridge Rehabilitation Picacho Road Bridge over Yuma Main 10-15 56 40 Construction 07/2022 12/2023 for Picacho Road Bridge over Yuma Main.

Maggio Road from HWY 7 to Rood Road, Zinetta Road from Clara Nofal Road to Rood Road, Pan American Road from Nina Lee Road to Rood Imperial 19/20 In Progress Road Maintenance & Rehabilitation Gateway of the Americas Road System This project will include: Preliminary Design Road, Rood Road from Pan American Rood to Stergios Road, Menville Pre-Construction 05/2019 12/2020 7-10 56 40 Road from HWY 7 to Menvielle Court , Nina Lee Road from Carr Road to HWY 7, Los Alamos Road from Pan American Road to North End Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Board Rd, Bowker Rd, Evan Hewes Highway, Holt Road, Hovley Road, This project will include: Pavement Rehab/Repair (Existing) | Maintenance work to be completed Imperial Road, Kalin Road, McCabe Rd, Miller Rd, Ross Rd, Rutherford Imperial 19/20 In Progress Road Maintenance & Rehabilitation AC Skin Patching for Various County Roads Construction 03/2020 12/2021 4-6 56 40 by County's forces. Rd, Underwood Rd, Wahl Road, Yuma Rd, Heber Road, and McCabe Road. Locations are estimates not yet final.

Clark Road from Wahl Road to .5 N. of HWY 98, Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road from HWY 86 to Imperial 19/20 In Progress Road Maintenance & Rehabilitation Pavement Overlay for Various County Roads This project will include: Preliminary Design Pre-Construction 08/2019 12/2021 7-10 56 40 Camino Drive, Orchard Road from Bailey Road to .25 Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Fog Seal and Pothole Repair for Various This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will Various County Roads including Seeley Townsite and Niland Townsite. Imperial 19/20 Completed Road Maintenance & Rehabilitation Construction 02/2020 06/2020 2-3 56 40 County Roads just include Fog Seal and Pothole Repair. Locations are estimates not yet final.

This project will include: Bridge Structure Rehab/Repair (Existing), Preliminary Design, Document Pre-Construction & 12/2017 06/2021 Imperial 19/20 In Progress Safety Lack Road Bridge Project Preparation | The project consists of replacement of structurally compromised road bridge over Lack Road Bridge over New River, County Brodge No. 58C-0101 50-75 56 40 Construction 07/2021 12/2022 the New River. The project is anticipated to require multiple years to be completed.

This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate pavement failure road Beal Road, Bonesteele Road, Evan Hewes Highway, Imperial Road, Kalin Imperial 20/21 New Road Maintenance & Rehabilitation AC Skin Patching for Various County Roads areas with Asphalt Concrete Skinpatching, pavement makings and restriping. | Maintenance work Road, Kubler Road, Niles Ave, Bowker Road, Spa Road, Hot Mineral Spa Construction 07/2020 06/2021 4-6 56 40 to be completed by County's forces. Road, and Cocopah Road. Locations are estimates not yet final.

"Bombay Beach Townsite: This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Avenue A, Avenue B, Avenue C, Avenue D, Avenue E, Avenue F, Avenue Pre-Construction & 09/2020 06/2021 Imperial 20/21 New Road Maintenance & Rehabilitation Bombay Beach Townsite (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost 7-10 56 40 G, Avenue H, Aisle for Palms, 1st Street, 2nd Street, 3rd Street, 4th Construction 07/2021 12/2021 Estimating, Project Scope Development, Preliminary Design, Document Preparation Street, and 5th Street. "

Fog Seal and Pothole Repair for Various This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This project will Imperial 20/21 New Road Maintenance & Rehabilitation Various County Roads. Locations are estimates not yet final. Construction 07/2020 06/2021 2-3 56 40 County Roads just include Fog Seal and Pothole Repair. | Maintenance work to be completed by County's forces.

Picacho Road from Quechan Road to Indian Rock Rd., Treadwell Road This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, from HWY 86 to Camino Drive, Orchard Road from Bailey Road to .25 Imperial 20/21 New Road Maintenance & Rehabilitation Pavement Overlay for Various County Roads Construction 07/2020 06/2021 7-10 56 40 Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Mi. S of Edwards Road. All locations listed are an estimate, and have yet to be finalized.

Imperial 20/21 New Road Maintenance & Rehabilitation Storm Damaged for Various County Roads This project will include: Rain Damage Repair. Various County Roads. Locations are estimates not yet final. Construction 07/2020 06/2021 4-6 56 40

Imperial 20/21 New Road Maintenance & Rehabilitation Storm Damaged for Various County Roads This project will include: Rain Damage Repair Various County Roads. Locations are estimates not yet final. Construction 07/2019 06/2020 4-6 56 40

Araz Road from Quick Road to Quick Road (2 Mi. W.); Brockman Road from McCabe Road to Lyons Road (.5 Mi. N.); Drew Road from Lyons Road (0.5 Mi. N.) to Diehl Road.; Austin Road from Harris Road to Larsen Road; Larsen Road from SR 86 to Clark Road; Ross Road from Forrester Road to Silsbee Road; Bowles Road from English Road to Lyerly Road; This project will include: Rehabilitate pavement failure road areas with Asphalt Concrete Road Surface Repair Program in Imperial Carter Road from Loveland Road to Webster Road (0.7 Mi. S). Imperial 18/19 In Progress Road Maintenance & Rehabilitation Skinpatching, pavement markings and re-striping | Maintenance work to be completed by Construction 03/2019 06/2021 4-6 56 40 County Carter Road from Webster Road (0.7 Mi. S) to Webster Road; Gentry County's forces Road from Eddins Road to Vail Canal; Kalin Road from Carter Road to Cady Road; Rutherford Road from Kershaw Road to HWY 115 (1.75 Mi. E); Meloland Road from Evan Hewes Highway to Grumbles Road; Neighbors Road from County Line to Arizona State Line; Worthington Road from James Road to Alamo River

This project will include: On South Lake Road, the project will pulverize and reclaim the existing pavement and portion of the existing subgrade for use as a new base course and overlay with a South Lake Road (#2022) between US 168 and the South Lake trailhead Inyo 18/19 Carried Over Road Maintenance & Rehabilitation Project# 5 Construction 05/2020 10/2020 15-20 26 8 new asphalt concrete pavement section on 6.9 miles of South Lake Road, as well as minor parking area, approximately 12 miles Southwest of Bishop, California. widening along the first 2.1 miles.

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Project #7 First St. / West Jay Street Street First (West Jay Street) is located south of the City of Bishop, West Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk Construction 07/2019 10/2020 15-20 26 8 improvement project of US395 (Main St.) and shares the City of Bishop/Inyo County Boundary. and/or Crosswalk Rehab/Repair (Existing) | This will be a County contribution using a percentage of RMRA funds for improvements that the City of Bishop will be performing to a County Road. While the City will be preforming a utility extension and upgrade for public safety. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Cactus Flat Road is located in Inyo County, just south of Olancha. The Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Project #9 Cactus Flat Road Repair This project will include: Pavement Rehab/Repair (Existing) section that will be repaired is approximately 5 miles west of the Construction 07/2020 06/2021 15-20 26 8 intersection of Cactus Flat Road and US395, 5 miles south of Olancha.

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Installation (New Safety), Landscape Safety Installation (New), Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | The North Round Valley Bridge Replacement and Project #10 North Round Valley Bridge Birchim Lane improvement project will address damages caused by a 2017 storm system that North Round Valley Road, with the damaged bridge, and Birchim Lane, Pre-Construction & 07/2020 12/2020 Inyo 19/20 Carried Over Road Maintenance & Rehabilitation Replacement, Birchim Lane improvement; destroyed the bridge and access route for the 40 Acres Community. The County is using a that intersects North Round Valley Road, is located in Inyo County, 15 20-50 26 8 Construction 01/2021 06/2021 State matching funds requirement percentage of its RMRA funds as a match for the State of California OES disaster funds being miles North West of Bishop. received for design and construction. | Total North Round Valley Bridge design and construction costs are estimated to be $3,400,000, of which the California OES will contribute 75% or $2,550,000. The remaining Inyo County match of 25% of project costs will be meet using RMRA funds

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement County-wide, the Inyo County Road Route system, where several roads Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Application of are grouped in areas, or ‘zones’ will be used for identification of the rubberized crack fill and pot-hole patching to seal asphalt pavement to prevent water intrusion to residential streets, outlying roads, and individual roads. Bishop Area; Project #13 Crack Fill, Patching, Restriping, the subgrade, protecting the subgrade from erosion and causing pavement failure. Overlay for Inyo 20/21 New Road Maintenance & Rehabilitation Routes #1001 through #1006. Big Bine Area; Routes #2001, through Construction 07/2020 06/2021 1-20 26 8 Overlay, Guardrails, and Culvert – As Required some roads that are in an advanced state of deterioration, restriping, and guardrail and culvert #2004. Independence Area; Routes #3001 through #3005, and #3008. repairs and/or replacement as necessary. | 2-5 years is the useful life of the crack fill and pot hole Lone Pine Area; Routes #4001 through #4008. Tecopa/Shoshone Area; patching. 1-2 years is the useful life of the striping, 10 years is the useful life of the overlay, and Routes 5002 through #5006 20+ years is the useful life of the guardrail and culvert repairs.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Warm Springs Road Grader Overlay involves that application of includes Project #14 Warm Springs Road – Grader Inyo 20/21 New Road Maintenance & Rehabilitation the prepping, tack coating, and application of a 2” +/- layer of Cold Mix Asphalt (CMA) to 2.3 The location is from US 395 to Eastside Construction 07/2020 06/2021 10-15 26 8 Overlay miles of existing roadway 24’ wide. Also included in this scope-of-work is any necessary shoulder backing and ditch clearing/shaping, as well as striping/asphalt markings.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Death Valley Road Chip Seal project includes the chip sealing to 4 miles of The location is the road segment from 11.2 miles and 15.2 miles east of Inyo 20/21 New Road Maintenance & Rehabilitation Project #15 Death Valley Road – Chip Seal existing roadway 24’ wide. Also included in this scope-of-work is the striping/asphalt markings for Construction 07/2020 06/2021 1-5 26 8 US 395 on Hwy 168 out of Big Pine. areas overlaid by the chip seal | The anticipated life of the chip seal is 5 years and the estimated life of the striping is 1-2 years.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Trona Wildrose Road Chip Seal project includes the chip sealing of The location of the two road segments are north of the County Line on the Inyo 20/21 New Road Maintenance & Rehabilitation Project #16 Trona Wildrose Road – Chip Seal 2) 2 mile long segments of existing roadway 22’ wide. Also included in this scope-of-work are the Construction 07/2020 06/2021 1-5 26 8 South end striping/asphalt markings for areas overlaid by the chip seal. | The estimated useful life for the chip seal is 5 years and 1-2 years for the striping and pavement markings.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The Panamint Valley Road project involves performing a paver overlay Project #17 Panamint Valley Road – Paver of intermittent segments of the 14 mile long section of existing roadway 22’ wide. Also included in The location of the Panamint Valley Road is between Highway 190 and Inyo 20/21 New Road Maintenance & Rehabilitation Construction 07/2020 06/2021 1-10 26 8 Overlay this scope-of-work is the striping/asphalt markings for areas affected by the asphalt overlay. | The Trona Wildrose Road estimated useful life for the chip seal is 5 -10 years and 1-2 years for the striping and pavement markings.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Old Spanish Trail Road project involves performing a grader overlay of Project #18 Old Spanish Trail Road – Grader The location of the Old Spanish Trail Road is between Highway 127 and Inyo 20/21 New Road Maintenance & Rehabilitation intermittent segments of the existing roadway 22’ wide. Also included in this scope-of-work is the Construction 07/2020 06/2021 1-15 26 8 Overlay the Border striping/asphalt markings for areas affected by the asphalt overlay. | The estimated useful life for the grader overlay is 10-15 years and 1-2 years for the striping and pavement markings. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The Grandview, Mesquite, and Meadow Lane Project involves applying a fiber The location of the Grandview, Mesquite, and Meadow Lane fiber seal Project #19 Grandview, Mesquite, and Meadow seal coat to approximately 1 mile of residential roadway 36’ wide. Also included in this scope-of- Inyo 20/21 New Road Maintenance & Rehabilitation coating project is in the residential area off West Line Street (CA 168 Construction 07/2020 06/2021 1-5 26 8 Lane Fiber Seal Project work is the striping/asphalt markings for areas affected by the asphalt overlay. | The estimated West) behind Manor Market. useful life for the fiber seal coating is 3-5 years and 1-2 years for the striping and pavement markings.

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Meadow Creek I/II & Lazy A Sidewalk Improvement Project involves The location of the Grandview, Mesquite, and Meadow Lane fiber seal Project #20 Meadow Creek I/II & Lazy A the identification, removal, and replacement of damaged or displaced areas of concrete sidewalk Inyo 20/21 New Road Maintenance & Rehabilitation coating project is in the residential area off West Line Street (CA 168 Construction 07/2020 06/2021 20-20 26 8 Sidewalk Improvement Project as well as sections of curb & gutter. Tree removal, root pruning, installation of root barrier, and West) behind Manor Market. asphalt patching will also be required. | The estimated useful life for the sidewalk and curb & gutter replacement will be approximately 20+ years.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The Project #21 Lasky Lane Drainage Remediation Lasky Lane Drainage Remediation Project involves the application of cold mix overlay to low The location of the Lasky Lane Drainage Remediation area is the section Inyo 20/21 New Road Maintenance & Rehabilitation Construction 07/2020 06/2021 30-30 26 8 Project areas of the existing Lasky Lane roadway to reconfigure drainage patterns to appropriate surface of Lasky Lane just north and west of Lone Pine. drainage transport mechanisms. | The estimated useful life for the Lasky Lane Drainage Remediation work will be approximately 30+ years.

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Document Preparation, ADA Curb Ramp Installation (New), Right of Way Acquisition, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This safety, Atlas Court at the San Joaquin Valley Railroad and from Standard Street Pre-Construction & 01/2014 06/2023 Kern 18/19 Carried Over Road Grade Separation Standard Street Alternate Access railroad grade separation, and complete street component project consists, in general, of 15-20 34 16 to Hageman Road Construction 07/2023 06/2024 constructing a grade separation, curb, gutter, sidewalk, drainage, and paved roadway on Atlas Court from Standard Street to Hageman Road. In the interest of public safety and aiding motor vehicle traffic, the new railroad crossing will serve as a second ingress/egress point to allow emergency responders, as well as the public, to freely enter and exit the area without disruption from rail traffic.

FY19-20 Chip Seals located on various roads; Pond Rd from Garzoli Ave to Wildwood Rd, Palm Ave from Jackson Ave to Lerdo Hwy, This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Brown Rd from Hwy 395 to County Limit, (Existing Safety), Cost Estimating, Project Scope Development, Feasibility Study, Preliminary FY19-20 Chip Seals on Various Roads in Kern Famoso Porterville Hwy from County Line Rd to Driver Rd, Famoso Rd Pre-Construction & 07/2019 06/2020 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Design, Document Preparation | This road maintenance and rehabilitation project consists, in 3-5 26, 34 16 County from Hwy 65 to C St, Construction 07/2020 09/2020 general, of placing a chip seal on approximately 44 miles of county roadways to preserve and Shafter Ave from Kimberlina Ave to Madre Ave, protect the pavement. Mahan St from Springer Ave to China Lake Blvd, China Lake Blvd from Springer Ave to County Limit, Granite Rd from Hwy 155 to Woody Rd, and Shafter Ave from Riverside St to 7th Standard Rd

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Bicycle Lane Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Located in Boron along the commercial frontage of Twenty Mule Team Pre-Construction & 08/2018 04/2020 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Twenty Mule Team Road and Boron Road 15-20 36 16 Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Road and Boron Road Construction 05/2020 09/2020 Paving and/or Striping Installation (New Safety), Preliminary Design, Bicycle Lane (New) | This bike/pedestrian path project consists, in general, of construction of curbs, gutters, sidewalks and closing gaps in existing infrastructure such as curb ramps, high profile cross walks and sidewalk.

This project will include: Storm Drain/Culvert Installation (New), Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Right of Way, Document Preparation, ADA Curb Ramp Installation (New), Project Scope Development, Various streets within Rexland Acres located east on Union Avenue, west Pre-Construction & 08/2018 04/2020 Kern 19/20 Carried Over Complete Streets Components Various Streets within Rexland Acres Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Preliminary Design, Bicycle Lane of Central Branch Kern Canal, north of Bakersfield city limit, south 15-20 32 16 Construction 05/2020 08/2021 (New), Active Transportation Plan | This project consists, in general, of construction of storm Pacheco Road drain lines, sidewalks, curb ramps, drive approaches, bike lanes, high visibility cross walks and solar powered street lights and safety signs. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, ADA Curb Pre-Construction & 08/2018 08/2021 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Belle Terrace from Wible Road to City Limit Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | This road Belle Terrace from Wible Road to City Limit 8-10 34 14 Construction 09/2021 06/2022 maintenance and rehabilitation project consists, in general, of digging out failed segments of roadway throughout approximately 1 mile and resurfacing the roadway with an asphalt overlay.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, ADA Curb Rosamond Boulevard from Sierra Highway to Pre-Construction & 08/2018 04/2021 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | This road Rosamond Boulevard from Sierra Highway to Willow Springs Road 8-10 36 16 Willow Springs Road Construction 05/2021 11/2021 maintenance and rehabilitation project consists, in general, of overlaying approximately 1 mile of roadway with asphalt.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair Westwood Blvd from Woodford Tehachapi (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Pre-Construction & 08/2018 04/2021 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Westwood Blvd from Woodford Tehachapi Road to Red Apple Avenue 8-10 34 16 Road to Red Apple Avenue Design, Document Preparation | This road maintenance and rehabilitation project consists in Construction 05/2021 11/2021 general, of reconstructing a 1.4 mile segment of roadway and resurfacing with an asphalt overlay.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Renfro Road from Rosedale Highway/State Pre-Construction & 07/2019 06/2020 Kern 19/20 Carried Over Road Maintenance & Rehabilitation Scope Development, Preliminary Design, Bicycle Lane (New), Document Preparation | This Renfro Road from Rosedale Highway/State Route 58 to Hageman Road 15-20 34 16 Route 58 to Hageman Road Construction 07/2020 10/2020 project consists, in general, of construction of 1.0 mile of asphalt concrete shoulders and class II bike lanes.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Sierra Drive from Kernville Road to Buena Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This Pre-Construction & 02/2020 07/2020 Kern 20/21 New Road Maintenance & Rehabilitation Sierra Drive from Kernville Road to Buena Vista Drive 15-20 26 16 Vista Drive road maintenance, rehabilitation, and complete street component project consists, in general, of Construction 07/2020 11/2020 constructing drainage improvements including curb, gutter, and asphalt pavement.

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Pre-Construction & 07/2018 05/2019 Kern 20/21 New Complete Streets Components Airport Drive at Norris Road Airport Drive at Norris Road 15-20 34 16 Design, Document Preparation | This safety and complete street component project consists, in Construction 06/2019 10/2021 general, of installing additional traffic signal heads.

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works FY2020-21 Spring Asphalt Concrete Stockpile Staffing | This road maintenance project consists, in general, of purchasing approximately 25,000 FY2020-21 Spring Asphalt Concrete Stockpile throughout East Kern Procurement/Operational Kern 20/21 New Road Maintenance & Rehabilitation 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16 throughout East Kern County tons of road maintenance asphalt material and self performing pothole patching and thin asphalt County Needs overlays on the road system throughout Kern County.

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works FY2020-21 Spring Asphalt Concrete Stockpile Staffing | This road maintenance project consists, in general, of purchasing approximately 50,000 FY2020-21 Spring Asphalt Concrete Stockpile throughout West Kern Procurement/Operational Kern 20/21 New Road Maintenance & Rehabilitation 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16 throughout West Kern County tons of road maintenance asphalt material and self performing pothole patching and thin asphalt County Needs overlays on the road system throughout Kern County. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works FY2020-21 Fall Asphalt Concrete Stockpile Staffing | This road maintenance project consists, in general, of purchasing approximately 25,000 Procurement/Operational Kern 20/21 New Road Maintenance & Rehabilitation FY2020-21 Fall Asphalt Concrete Stockpile throughout West Kern County 07/2020 06/2021 1-2 26, 32, 34, 36 14, 16 throughout West Kern County tons of road maintenance asphalt material and self performing pothole patching and thin asphalt Needs overlays on the road system throughout Kern County.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope FY2020-21 Chip Seal located on various roads FY2020-21 Chip Seal located on various roads in the County Maintained Pre-Construction & 07/2020 01/2021 Kern 20/21 New Road Maintenance & Rehabilitation Development, Preliminary Design, Maintenance Program Plan Development, Document 3-5 26, 32, 34, 36 14, 16 in the County Maintained System System to be determined in the pre-construction phase. Construction 02/2021 06/2021 Preparation | This road maintenance and rehabilitation project consists, in general, of placing chip seal on county roadways to preserve and protect the pavement.

Boron Avenue from 20 Mule Team Road to This project will include: This active transportation and complete streets component project Boron Avenue from 20 Mule Team Road to Cote Street and Cote Street Kern 20/21 New Complete Streets Components Cote Street and Cote Street from Boron consists, in general, of constructing Class I bike paths, multi-use paths, sidewalks, curbs, gutters, Construction 04/2020 10/2020 15-20 36 16 from Boron Avenue to Roberts Avenue Avenue to Roberts Avenue curb ramps, drive approaches, and paving hot mix asphalt.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | This safety and complete street component project consists, in general, of paving approximately 1.5 Meacham Road from Heath Road to 200 feet Pre-Construction & 07/2019 06/2020 Kern 20/21 New Complete Streets Components miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create Meacham Road from Heath Road to 200 feet East of Jenkins Road 15-20 34 16 East of Jenkins Road Construction 07/2020 11/2020 added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | This Brite Road from Buttonwillow Drive to Wasco road maintenance, rehabilitation, safety, and complete streets component project consists, in Brite Road from Buttonwillow Drive to Wasco Way, and Mirasol Avenue Pre-Construction & 07/2019 07/2020 Kern 20/21 New Road Maintenance & Rehabilitation Way, and Mirasol Avenue from Brite Road to general, of constructing 3.5 miles of roadway resurfacing and asphalt concrete shoulders. This 15-20 32 14 from Brite Road to State Route 58 Construction 08/2020 11/2020 State Route 58 project will help alleviate the PM-10 problem in the area, create added benefit for motorists by providing a paved surface to more safely elude a potential accident situations by maintaining better control of their vehicle.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Tatum Street from Hall Road to Hope Avenue, Development, Pavement Improvement (New), Preliminary Design | This complete street Wilson Lane from End to Hope Avenue, and component project consists, in general, of paving 1.0 mile of a dirt road and shoulders. Paving Tatum Street from Hall Road to Hope Avenue, Wilson Lane from End to Pre-Construction & 07/2019 08/2020 Kern 20/21 New Complete Streets Components 15-20 32 14 Hope Avenue from Tatum Street to Habecker this dirt road and shoulders will help alleviate the PM-10 problem in the area, allow for safe Hope Avenue, and Hope Avenue from Tatum Street to Habecker Road Construction 09/2020 12/2020 Road pedestrian and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Rosamond Boulevard from 25th Street West to Development, Pavement Improvement (New), Preliminary Design, Document Preparation | This Stevenson Street, 30th Street West from safety and complete street component project consists, in general, of paving approximately 2.5 Rosamond Boulevard from 25th Street West to Stevenson Street, 30th Pre-Construction & 08/2019 08/2020 Kern 20/21 New Complete Streets Components Rosamond Boulevard to Orange Street, and miles of roadway shoulders. This project will help alleviate the PM-10 problem in the area, create Street West from Rosamond Boulevard to Orange Street, and 25th Street 15-20 36 16 Construction 09/2020 12/2020 25th Street West from Rosamond Boulevard to added benefit for motorists by providing a paved surface to more safely elude a potential accident West from Rosamond Boulevard to Holiday Avenue Holiday Avenue situations by maintaining better control of their vehicle, and provide an additional correction area for inattentive drivers thus reducing "run off the road" type of accidents.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | This Signal Interconnect on Merle Haggard Drive, safety and traffic control devices project consists, in general, of constructing a wire connection Signal Interconnect on Merle Haggard Drive, Airport Drive, Norris Road Kern 20/21 New Traffic Control Devices Airport Drive, Norris Road and South Union Construction 03/2020 12/2020 15-20 32, 34 14, 16 between traffic signals for the purpose synchronizing the timing to increase efficiently, minimize and South Union Avenue Avenue delays, and improve traffic flow.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Kern River Parkway Bike Trail - Enos Lane to Development, Right of Way, Preliminary Design, Bicycle Lane (New), Document Preparation | Pre-Construction & 07/2018 08/2020 Kern 20/21 New Complete Streets Components Kern River Parkway Bike Trail - Enos Lane to Buena Vista Lake 15-20 32, 34 14, 16 Buena Vista Lake This active transportation and complete streets component project consists, in general, of Construction 09/2020 03/2021 constructing a Class I trail and multi-use path. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Roberts Lane from Plymouth Avenue to Pre-Construction & 02/2019 11/2020 Kern 20/21 New Complete Streets Components Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Roberts Lane from Plymouth Avenue to Frontier Drive 15-20 34 16 Frontier Drive Construction 12/2020 05/2021 Document Preparation | This complete street component project consists, in general, of constructing pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Right of Way, Pavement Improvement (New), Preliminary Design, Document Holiday Avenue from 65th Street West to 60th Preparation | This complete street component project consists, in general, of paving 0.5 mile of a Pre-Construction & 03/2020 05/2021 Kern 20/21 New Complete Streets Components Holiday Avenue from 65th Street West to 60th Street West 15-20 36 16 Street West dirt road. Paving this dirt road will help alleviate the PM-10 problem in the area, allow for safe Construction 06/2021 10/2021 pedestrian and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Project Mathews Avenue from Mettler Avenue to Scope Development, Pavement Improvement (New), Preliminary Design, Document Preparation | Mathews Avenue from Mettler Avenue to Timmons Avenue, Christina Timmons Avenue, Christina Street from This complete street component project consists, in general, of paving 1.8 miles of a dirt road. Pre-Construction & 03/2020 03/2021 Kern 20/21 New Complete Streets Components Street from Mathews Avenue to Cecil Avenue, and Brutton Street from 15-20 32 14 Mathews Avenue to Cecil Avenue, and Brutton Paving this dirt road will help alleviate the PM-10 problem in the area, allow for safe pedestrian Construction 04/2021 10/2021 Mathews Avenue to Cecil Avenue Street from Mathews Avenue to Cecil Avenue and bicycle travel between residential areas, commercial centers, and jobs, and improve access to public transportation systems, further enhancing mobility.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Throughout the County Maintained Road System including, but not limited Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, County Maintained Road System - Road Procurement/Operational Kern 20/21 New Road Maintenance & Rehabilitation Public Works Equipment, Repair and Servicing of Public Works Equipment | FY2020/21 Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, 07/2020 06/2021 1-5 26, 32, 34, 36 14, 16 Maintenance Program Needs Countywide Maintenance Program of road rights-of-way including, but not limited to, patching, McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, crack filling, weed abatement, overlaying, sealing, snow removal, storm damage repair, ditch Tehachapi, and Wasco. clearing, sump clearing, culvert repair, and shoulder backing.

This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement of Throughout the County Maintained Road System including, but not limited Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, to, unincorporated areas of Arvin, Bakersfield, Boron, Buttonwillow, County Maintained Road System - Traffic Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Procurement of Procurement/Operational Kern 20/21 New Road Maintenance & Rehabilitation Delano, Frazier Park, Kernville, Lake Isabella, Lamont, Lebec, Lost Hills, 07/2020 06/2021 2-5 26, 32, 34, 36 14, 16 Maintenance Program Public Works Equipment, Repair and Servicing of Public Works Equipment | FY2020/21 Needs McFarland, Mojave, Oildale, Ridgecrest, Rosamond, Shafter, Taft, Countywide Maintenance Program of traffic safety devices including, but not limited to, lights, Tehachapi, and Wasco. signals, pavement markings, and signs.

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New), Document Preparation | This active Pre-Construction & 07/2020 07/2021 Kern 20/21 New Complete Streets Components SR 184 from DiGiorgio Rd to Sunset Blvd SR 184 from DiGiorgio Rd to Sunset Blvd 15-20 32 14 transportation and complete street component project consists, in general, of constructing Construction 08/2021 01/2022 pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches and a Class I bicycle path. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Right of Way, Project Scope Development, Sidewalk and/or Crosswalk Rosamond Boulevard from 20th Street to Pre-Construction & 07/2020 08/2021 Kern 20/21 New Complete Streets Components Installation (New), Preliminary Design, Document Preparation | This active transportation and Rosamond Boulevard from 20th Street to Elberta Street 15-20 36 16 Elberta Street Construction 09/2021 01/2022 complete street component project consists, in general, of constructing pedestrian improvements of sidewalk, curb ramps, ADA accessibility, and drive approaches.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Crosswalk Improvements in Oildale, East Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document Crosswalk Improvements in Oildale, East Bakersfield, West Bakersfield, Pre-Construction & 07/2020 10/2021 Kern 20/21 New Complete Streets Components Bakersfield, West Bakersfield, Lamont 10-20 32, 34, 36 14, 16 Preparation | This safety and complete street component project consists, in general, of installing Lamont Buttonwillow, and Rosamond. Construction 11/2021 03/2022 Buttonwillow, and Rosamond. continental crosswalks, intersection warning signs, reflective signs, pedestrian crossing signs, curb ramps, curb, gutter, street lighting, cross drains, and asphalt tie-ins.

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation Street from Hall Road to Burgundy Pre-Construction & 07/2020 10/2021 Kern 20/21 New Complete Streets Components (New Safety), Preliminary Design, Document Preparation | This safety and complete street San Diego Street from Hall Road to Burgundy Avenue 15-20 32 14 Avenue Construction 11/2021 03/2022 component project consists, in general, of installing continental crosswalks, intersection warning signs, reflective signs, pedestrian crossing signs, curb ramps, curb, gutter, street lighting, cross drains, and asphalt tie-ins.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Pre-Construction & 02/2020 10/2020 Kern 20/21 New Traffic Control Devices Fairfax Road at Zephyr Lane Development, Preliminary Design, Document Preparation | This safety and traffic control devices Fairfax Road at Zephyr Lane 15-20 32 14 Construction 11/2020 03/2021 project consists, in general, of constructing a traffic signal and ancillary facilities at the intersection to increase efficiently, minimize delays, improve traffic flow, and ADA accessibility.

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), Virginia Street from Lake Street to Heritage Pre-Construction & 07/2020 12/2021 Kern 20/21 New Complete Streets Components Preliminary Design, Bicycle Lane (New), Document Preparation | This active transportation and Virginia Street from Lake Street to Heritage Park 15-20 32 14 Park Construction 01/2022 05/2022 complete streets component project consists, in general, of constructing sidewalks, bike lanes, ADA infrastructure, and high visibility crosswalks.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Kern River Parkway Path extension near Lake Development, Preliminary Design, Bicycle Lane (New), Document Preparation | This active Pre-Construction & 07/2021 06/2022 Kern 20/21 New Complete Streets Components Kern River Parkway Path extension near Lake Ming 15-20 34 16 Ming transportation and complete streets component project consists, in general, of constructing a Construction 07/2022 12/2022 Class I trail and multi-use path.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope South Chester Avenue from Ming Avenue to Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Pre-Construction & 07/2020 03/2024 Kern 20/21 New Complete Streets Components South Chester Avenue from Ming Avenue to Sandra Drive 15-20 32 14 Sandra Drive Preparation | This active transportation and complete streets component project consists, in Construction 04/2024 10/2024 general, of constructing sidewalks, ADA accessible ramps, rapid flashing beacons, signs, and lights.

Lake Isabella Boulevard from Tank Park to the This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Library and Erskine Creek Road from Lake Development, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane Lake Isabella Boulevard from Tank Park to the Library and Erskine Creek Pre-Construction & 07/2020 03/2024 Kern 20/21 New Complete Streets Components 15-20 26 16 Isabella Boulevard to Elementary/Middle/High (New), Document Preparation | This active transportation and complete streets component project Road from Lake Isabella Boulevard to Elementary/Middle/High Schools Construction 04/2024 11/2024 Schools consists, in general, of constructing bicycle and pedestrian paths.

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Fairfax Road from East Brundage Lane to Development, Preliminary Design, Document Preparation | This road maintenance and Pre-Construction & 07/2020 02/2021 Kern 20/21 New Road Maintenance & Rehabilitation Fairfax Road from East Brundage Lane to Edison Highway 5-10 32 14 Edison Highway rehabilitation project consists, in general, of overlaying approximately 0.3 mile of roadway with Construction 03/2021 06/2021 asphalt. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Martin Street - Resurface 1.4 miles of road. Hartley Road - Resurface 0.6 Lake 18/19 Carried Over Road Maintenance & Rehabilitation Martin Street; Hartley Road Lakeport City Limit to Riggs Rd.; Lakeport City Limit to Crystal Lake Way Construction 07/2020 09/2021 10-20 4 2 mile of road.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Document Preparation | Resurface .2 miles from exit/entrance from south bound lane to Lakeshore Blvd to Pre-Construction & 07/2020 03/2021 Lake 20/21 New Road Maintenance & Rehabilitation Nice-Lucerne Cutoff 10-20 4 2 1043 feet of road on Nice-Lucerne Cutoff to the intersections of Lakeshore Blvd and Westlake Rd. intersections of Lakeshore Blvd and Westlake Rd Construction 04/2021 06/2021 Current work includes project design and development of bid documents.

This project will include: Big Canyon Road - Resurface .8 miles of road. Current work includes Lake 19/20 Carried Over Road Maintenance & Rehabilitation Big Canyon Road Wardlaw St. to Harbin Springs Rd. Pre-Construction 06/2019 06/2021 10-20 4 2 preliminary engineering and quantity development

This project will include: Rainbow Road - Resurface 1 mile of road. Current work includes preliminary engineering and development of bid documents and construction: reconstruct and Lake 18/19 Forecasted Road Maintenance & Rehabilitation Rainbow Road;Lakeshore Blvd. resurface Rainbow Road; Lakeshore Blvd - Resurface 1.2 miles of road. Current work includes Lakeshore Blvd. to Howard Ave.; Lakeport City Limit to Park Way Construction 09/2020 06/2021 10-20 4 2 preliminary engineering and development of bid documents. | Linked projects from FY 17/18 PE phase with FY 18/19 Con Phase for Rainbow Rd

Center Road, County Road 215 (approximate 4 mile section - 0.904 miles Lassen 18/19 Carried Over Road Maintenance & Rehabilitation Center Road, County Road 215 Rehab. Project This project will include: Pavement Rehab/Repair (Existing) Construction 05/2020 07/2020 10-15 1 1 east of Cramer Lane to 1.4 miles west of Juniper Ridge Road.

Herlong Access Road, County Road 359 This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Document Pre-Construction & 07/2021 08/2021 Lassen 20/21 New Road Maintenance & Rehabilitation Herlong Access Road - Pole Line Road to California Street 10-15 1 1 Rehab. Preparation Construction 08/2021 10/2021

Various County Roads including Richmond Road, Wingfield Road, Law Drive, Capezzoli Lane, Sage Valley Road, Sierra Vista Road, Hemphill Road, Blickenstaff Road, Diamond Way, Hayden Terrace, Emerson Drive, Pre-Construction & 09/2020 11/2020 Lassen 20/21 New Road Maintenance & Rehabilitation FY 2020/21 Chip Seal Project This project will include: Pavement Rehab/Repair (Existing), Cost Estimating 5-10 1 1 Florence Lane, Emerson Court, Circle Drive, Fairway Drive, Eagle Drive, Construction 05/2021 08/2021 Circle Court, San Francisco Street, Riverside Drive, Grove Street, Bonnie Way, Prattville Road, miller Road and South Street

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), East community bounded by Interstate 10, City of Los Pre-Construction & 05/2017 07/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East Los Angeles - Whiteside St, et al. Phase I Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Angeles, and Indiana Street, and Woods Avenue from State Route 60 and 20-20 51 24 Construction 08/2021 06/2022 Installation (New Safety), Preliminary Design | Reconstruct 2.3 miles of residential roads, parkway Pomona Boulevard improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to preserve 5 miles of residential roads. The project will be constructed in two phases. Phase 1 South San Jose Hills community bounded by Giano Avenue, City of West Pre-Construction & 01/2019 07/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation South San Jose Hills - La Seda, ET AL. will include pavement preparation and all concrete related works including installation of any 7-7 57 22 Covina, La Seda Road, and Valley Boulevard Construction 07/2020 07/2021 missing sidewalks. Phase 2 will include the pavement preservation treatments. | Total project cost reflects design costs and concrete repair on roadways on streets within the limits of the project. Pavement portion is scheduled to begin June 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Ladera Heights community - West Centinela Ave from Green Valley Cir to Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Pre-Construction & 12/2017 08/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Ladera Heights - Centinela Av, ET AL. La Tijera Blvd. and South Centinela Ave from Jefferson Blvd to Compton 20-20 54 30 Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Construction 08/2021 12/2022 Creek. Improvement (New), Preliminary Design | Reconstruct 1.2 miles of roadway, parkway improvements, curb ramp upgrade | Total project cost reflects design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Windsor Hills - 59th St, ET AL. - Windsor Hills community bounded by , Slauson Pre-Construction & 01/2013 09/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp 20-20 54 30 Reconstruction Avenue, , and City of Los Angeles Construction 09/2020 09/2021 Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 2.2 miles of residential roads, parkway improvements, curb ramp upgrade | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Hacienda Heights bounded by State Route 60, Stimson Avenue, Pre-Construction & 01/2013 08/2019 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Hacienda Heights - Garo St, ET AL. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 20-20 57 32 Halliburton Road, and Fieldgate Avenue Construction 08/2019 04/2021 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 5.7 miles of residential roads, parkway improvements, curb ramps upgrade | The project cost includes design and construction. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Hacienda Heights bounded by Los Altos Drive, Hacienda Boulevard, Pre-Construction & 03/2019 03/2022 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Hacienda Heights - Leticia Dr, ET AL Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp 20-20 57 32 Colima Road, Camino Del Sur, and Vallecito Drive Construction 03/2022 12/2022 Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 7.2 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. The project cost includes design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Sidewalk and/or West Whittier - Los Nietos/South Whittier - Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair West Whittier - Los Nietos/South Whittier communities bounded by Pre-Construction & 10/2017 07/2019 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation 20-20 57 32 Sunshine Acres - Keith Dr, ET AL (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Norwalk Boulevard, Mines Boulevard, Colima Road, and City of Whittier Construction 07/2019 03/2022 Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 11.4 miles of residential roads, parkway improvements, curb ramps upgrade | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair Pre-Construction & 01/2018 12/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Chatsworth - Lake Manor Dr, ET AL. West Chatsworth unincorporated community 20-20 45 27 (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving Construction 12/2020 09/2021 and/or Striping Installation (New Safety), Preliminary Design | Reconstruct 1.9 miles of residential roads, parkway improvements, curb ramps upgrade | Estimated advertise 12/2020

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Pre-Construction & 10/2017 05/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Santa Clarita Valley - Hasley Hills South Castaic community, Hasley Hills neighborhood 20-20 38 21 ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Construction 05/2021 06/2022 Improvement (New), Preliminary Design | Reconstruct 5.8 miles of residential roads, parkway improvements, curb ramps upgrade | Currently in design. The project cost includes design and construction.

This project will include: Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Storm Drain and/or Santa Monica Mountains - Culvert Upgrades - 11 locations in unincorporated County area near Malibu, Agoura Hills, Pre-Construction & 07/2010 10/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Culvert Rehab/Repair (Existing), Document Preparation | Repair or replace existing corrugated 50-50 50 27 Phase II and Calabasas Construction 10/2020 09/2021 metal pipe culverts which have documented deterioration or less than 24 inches in diameter | Currently in design. The project cost includes design and construction.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Santa Monica Mountains - Culvert Upgrades - Development, Preliminary Design, Document Preparation | Repair or replace existing corrugated 29 locations in unincorporated County area near Malibu, Agoura Hills, Pre-Construction & 07/2010 10/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation 50-50 50 27 Phase III metal pipe culverts which have documented deterioration or less than 24 inches in diameter | The and Calabasas Construction 10/2020 09/2021 project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), South San Gabriel - Del Mar Av at Potrero Los Angeles 18/19 In Progress Traffic Control Devices Traffic Signals, Lights, and/or Signage Installation (New Safety) | Add protected left turn phasing South San Gabriel - Del Mar Av at Potrero Grande Dr Construction 12/2020 07/2021 15-15 49 22 Grande Dr to all approaches. | Project advertising date postponed

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Feasibility Study, Preliminary Design, Active Transportation Plan, Document Walnut Park - Miscellaneous crossing Los Angeles 18/19 In Progress Safety Preparation | Installation of limit lines, yield lines, continental crosswalk striping, ADA curb ramps, Walnut Park Pre-Construction 04/2019 06/2021 20-20 59 33 improvements and curb extensions at intersections throughout Walnut Park | Project plans to be completed late 2020. Construction summer 2021.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Hacienda Heights - Halliburton Rd at Stimson Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Pre-Construction & 07/2018 07/2020 Los Angeles 18/19 In Progress Traffic Control Devices Hacienda Heights - Halliburton Rd at Stimson Av 15-15 57 32 Av Design, Document Preparation | Protected left-turn phasing for east and west approaches | Construction 08/2020 01/2021 Project construction expected August 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Rowland Heights - Pathfinder Rd at Blandford Los Angeles 18/19 In Progress Traffic Control Devices Traffic Signals, Lights, and/or Signage Installation (New Safety) | Protected left-turn phasing for Rowland Heights - Pathfinder Rd at Blandford Dr Construction 02/2020 08/2020 15-15 55 29 Dr east and west approaches | Estimated start of construction February 2020

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Los Angeles 18/19 In Progress Safety Rowland Heights - Pathfinder Rd at Gallio Av Rowland Heights - Pathfinder Rd at Gallio Av Construction 10/2019 07/2020 20-20 55 29 traffic signal | Currently under construction Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lake Av at Mendocino St Traffic Signals, Lights, and/or Signage Installation (New Safety) | Add split left turn phasing on Altadena - Lake Av at Mendocino St Construction 05/2020 02/2021 15-15 41 25 Mendocino Street | Advertised May 12, 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lincoln Av at Crosby St Traffic Signals, Lights, and/or Signage Installation (New Safety) | New rapid rectangular flashing Altadena - Lincoln Av at Crosby St Construction 04/2020 07/2020 15-15 41 25 beacons | Construction began April 13, 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Los Angeles 18/19 In Progress Traffic Control Devices Altadena - Lincoln Av at Palm St Traffic Signals, Lights, and/or Signage Installation (New Safety) | New rapid rectangular flashing Altadena - Lincoln Av at Palm St Construction 04/2020 07/2020 15-15 41 25 beacons at existing marked crosswalk | The project began construction April 13, 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Protected left turn phasing | Los Angeles 18/19 In Progress Traffic Control Devices Littlerock - Palmdale Bl at 90th St East Littlerock - Palmdale Bl at 90th St East Construction 06/2020 06/2021 15-15 36 21 Design work has been completed and the project is being combined with another signal project for advertising.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Los Angeles 18/19 In Progress Traffic Control Devices Quartz Hill - Avenue L at 42nd St West Traffic Signals, Lights, and/or Signage Installation (New Safety) | New traffic signal | Project has Quartz Hill - Avenue L at 42nd St West Construction 06/2020 06/2021 20-20 36 21 been designed. This will be added to a contract advertising multiple signals.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Bicycle Lane Rehab/Repair Olympic Boulevard at Garfield Avenue- Pre-Construction & 01/2017 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | Unincorporated East Los Angeles - Olympic Bl at Garfield Av 15-15 51 24 upgrade traffic signal Construction 08/2020 09/2021 Upgrade standards, mastarms, vehicle heads, protected left-turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertise August 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope at Eastern Avenue - Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Pre-Construction & 01/2017 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated East Los Angeles - Whittier Boulevard at Eastern Avenue 15-15 51 24 upgrade traffic signal Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle Construction 08/2020 09/2021 and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertising is scheduled August 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Badillo Avenue at Irwindale Avenue - upgrade Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Pre-Construction & 01/2017 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated Covina islands - Badillo Avenue at Irwindale Avenue 15-15 48 22 traffic signal Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn phasing, bicycle Construction 08/2020 09/2021 and vehicle detection, ADA access ramps, communication, and other associated equipment. | Advertise August 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Covina Boulevard at Hollenbeck Avenue - Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Pre-Construction & 01/2017 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated Covina island - Covina Boulevard at Hollenbeck Avenue 15-15 48 22 upgrade traffic signal Preparation | Upgrade standards, mast arms, vehicle heads, bicycle and vehicle detection, ADA Construction 08/2020 06/2021 access ramps, communication, and other associated equipment. | Some work done by County force account labor. Advertising August 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | City of Palmdale/South - Unincorporated area adjacent to City of Palmdale - Avenue P at 15th Los Angeles 18/19 In Progress Traffic Control Devices Inspection of completed traffic signal and County share. | Plan review and permitting costs Construction 04/2020 07/2020 20-20 36 21 Avenue P at 15th Street East plan review Street East (including inspection) only.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Glendora Mountain Road - Big Dalton Rd to Installation (New Safety), Paving and/or Striping Installation (New Safety) | Remove existing Glendora Mountain Road north of the City of Glendora to Glendora Ridge Los Angeles 18/19 In Progress Safety Construction 04/2020 12/2020 10-10 41 25 East Fork Rd - Striping striping and install recessed thermoplastic striping and recessed pavement markers, install curve Road. advisory signs | Length of the work is 14 miles. The project cost includes design and construction. Advertised April 14, 2020. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Las Virgenes Road at Mulholland Highway and Unincorporated Santa Monica Mountains - Las Virgenes Road at Los Angeles 18/19 In Progress Traffic Control Devices Installation (New Safety) | Upgrade vehicle heads, install video detection, battery back up, CCTV Construction 04/2020 12/2020 20-20 45 27 Piuma Road - Traffic Signals Mulholland Highway and Piuma Road system and establish communications with LA County Traffic Management Center (TMC) | The project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, Cypress Street at Vincent Avenue - upgrade and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Pre-Construction & 01/2019 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated Covina islands - Cypress Street at Vincent Avenue 15-15 43 22 traffic signal Document Preparation | Upgrade standards, mastarms, vehicle heads, bicycle and vehicle Construction 08/2020 06/2021 detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Project to be advertised August 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Workman Mill Road at Lomitas Avenue - Unincorporated North Whittier area - Workman Mill Road at Lomitas Pre-Construction & 01/2019 07/2020 Los Angeles 18/19 In Progress Traffic Control Devices Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, 15-15 57 22 upgrade traffic signal Avenue Construction 08/2020 09/2021 vehicle heads, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Baldwin Park Boulevard at Amar Road - Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Pre-Construction & 01/2019 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated Bassett area - Baldwin Park Boulevard at Amar Road 15-15 57 22 Upgrade Traffic Signal Document Preparation | Upgrade standards, mast arms, vehicle heads, protected left-turn Construction 08/2020 09/2021 phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Advertising in August 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Santa Anita Avenue at Freer Street - Upgrade Pre-Construction & 01/2019 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, Unincorporated South Arcadia area - Santa Anita Avenue at Freer Street 15-15 49 22 Traffic Signal Construction 08/2020 09/2021 vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. | The project cost includes design and construction. Advertise date is August 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Azusa Avenue at Temple Avenue - upgrade Development, Preliminary Design, Document Preparation | Upgrade standards, mast arms, Pre-Construction & 01/2019 08/2020 Los Angeles 18/19 In Progress Traffic Control Devices Unincorporated Valinda area - Azusa Avenue at Temple Avenue 15-15 48, 57 22 traffic signal vehicle heads, protected left-turn phasing, bicycle and vehicle detection, access ramps, Construction 08/2020 09/2021 communication, and other associated equipment. | The project cost includes design and construction. Advertise date is August 2020.

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works 36, 38, 39, 41, Installation and modification of traffic signals and street lights and the Staffing, Procurement of Public Works Equipment | Installation and modification of traffic signals 43, 44, 45, 46, 18, 20, 21, 22, performance of other incidental and appurtenant work as-needed for one As Needed Traffic Signal Construction FY 2018- and street lights and the performance of other incidental and appurtenant work as-needed for one Procurement/Operational 48, 49, 50, 51, 23, 24, 25, 26, Los Angeles 18/19 In Progress Traffic Control Devices year. This project consists of advertising and award of the project, 06/2018 12/2020 20-20 19 year. This project consists of advertising and award of the project, preparation of engineers' Needs 52, 53, 54, 55, 27, 29, 30, 32, preparation of engineers' estimate and contract documents, and other estimate and contract documents, and other non-project specific costs. | The project was 57, 58, 59, 62, 33, 34, 35 non-project specific costs. advertised June 2018, began July 2019, and will end December 2020. 63, 64, 66, 70

This project will include: Public Works Staffing | Non-project specific expenditures related to the 36, 38, 39, 41, traffic safety program and implementation of Vision Zero, including supervision and management 43, 44, 45, 46, 18, 20, 21, 22, of line staff designing and managing projects with project IDs beginning in "TDS". | This is an Procurement/Operational 48, 49, 50, 51, 23, 24, 25, 26, Los Angeles 18/19 In Progress Safety Traffic Safety Program - Program Management Countywide program. 01/2019 06/2023 20-20 ongoing program. Estimated expenditures are $150,000/year (fully loaded rate). Per CTC Needs 52, 53, 54, 55, 27, 29, 30, 32, direction this project will be created annually and the cost and outputs reported at the end of each 57, 58, 59, 62, 33, 34, 35 fiscal year. 63, 64, 66, 70 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install flashing beacons; Traffic signal upgrades; New pedestrian signal and crosswalk relocation; New traffic signal

East Los Angeles - 1st St at Herbert Av; East Los Angeles - 1st St at Traffic signal upgrades; New pedestrian signal and crosswalk relocation; New traffic signal Los Angeles 18/19 In Progress Safety 1st St at Mednik Ave et al Mednik Av; Willowbrook - 120th St at Compton Creek/Parmalee Av; Construction 09/2019 07/2020 15-15 49, 51, 64 22, 24, 35

Arcadia - Temple City Bl at Naomi Av (This RP includes the TDS0001512, TDS0001513, TDS0001532, TDS0001533 design work - consolidated into one construction contract) | Four signal projects have been consolidated. Project was awarded 9/10/2018, however due to delays the work did not begin until September 3, 2019. The construction expenses will be reported for FY 2019-20 onward. Construction will be completed early FY 2020-21.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Los Angeles 18/19 In Progress Traffic Control Devices Covina - Arrow Hwy at Enid Av Installation (New Safety) | Traffic signal upgrade - add protected/permissive left turn phasing for Arrow Highway at Enid Avenue, unincorporated Covina area Construction 06/2018 07/2020 15-15 48 22 westbound traffic | The project cost includes design and construction. Project was advertised June 6, 2018

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety) | Upgrade the existing traffic signal on Amar Road and in the unincorporated County Los Angeles 18/19 In Progress Traffic Control Devices West Valinda - Amar Rd at Vineland Av Construction 03/2020 12/2020 15-15 57 22 Amar Road at Vineland Avenue with protected left-turn phasing for eastbound and westbound community of West Valinda traffic. | Award occurred March 2, 2020. The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair Vineland Avenue at Giordano Street in the unincorporated County Los Angeles 18/19 In Progress Traffic Control Devices West Valinda - Vineland Av at Giordano St (Existing) | Install rectangular rapid flashing beacons on the north approach of Vineland Avenue Construction 04/2020 09/2020 15-15 57 22 community of West Valinda. and Giordano Street. | The project cost includes design and construction. Project began construction April 1, 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Rowland Heights - Pathfinder Road at Upgrade the existing traffic signal on Pathfinder Road at Wellesley Drive with protected left-turn Pathfinder Road and Wellesley Drive in the unincorporated County Los Angeles 18/19 In Progress Traffic Control Devices Construction 11/2019 07/2020 15-15 55 29 Wellesley Dr phasing for westbound traffic. | The project cost includes design and construction. Project began community of Rowland Heights. construction November 28, 2019.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, West Whittier/Los Nietos - Norwalk Bl at and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Intersection of Norwalk Boulevard and Reichling Lane in the Pre-Construction & 01/2020 12/2020 Los Angeles 18/19 In Progress Traffic Control Devices 20-20 57 32 Reichling Ln Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install additional unincorporated County community of West Whittier. Construction 01/2021 06/2021 traffic signal equipment and upgrade pedestrian equipment at the intersection of Norwalk Boulevard and Reichling Lane. | The project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Agua Dulce/Leona Valley - Bouquet Cyn Rd - Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Bouquet Canyon Road beginning at Elizabeth Lake Road and ends at the Pre-Construction & 01/2019 03/2021 Los Angeles 18/19 In Progress Traffic Control Devices Elizabeth Lake Rd to City of Santa Clarita Development, Preliminary Design, Document Preparation | Install curve advisory signs in 10-10 36 21 Santa Clarita City Boundary. Construction 04/2021 06/2021 Boundary Line accordance with current California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. | The project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Agua Dulce - Sierra Hwy at Vasquez Canyon Sierra Highway at Vasquez Canyon Road in the uincorporated County Pre-Construction & 11/2019 10/2020 Los Angeles 18/19 In Progress Traffic Control Devices Development, Preliminary Design, Document Preparation | Upgrade the existing traffic signal on 15-15 38 21 Rd community of Agua Dulce . Construction 11/2020 06/2021 Sierra Highway at Vasquez Canyon Road with protected left-turn phasing for nrthbound and outhbound traffic. | The project cost includes design and construction. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | Upgrade pedestrian heads and curb ramps, install The intersection of Cienega Avenue and Sunflower Avenue in the Los Angeles 18/19 Carried Over Traffic Control Devices Charter Oak - Cienega Av at Sunflower Av Pre-Construction 10/2020 03/2021 15-15 48 22 highway safety lighting, and remove striping within crosswalk at the intersection of Cienega unincorporated County community of Covina. Avenue and Sunflower Avenue. | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the existing traffic signal on Arrow Highway The intersection of Arrow Highway and Sunflower Avenue in the Los Angeles 18/19 In Progress Traffic Control Devices Covina - Arrow Hwy at Sunflower Av Pre-Construction 10/2020 03/2021 15-15 48 22 at Sunflower Avenue with protected left-turn phasing for eastbound and westbound traffic. | The unincorporated County community of Covina. project cost includes design and construction.

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Project Stevenson Ranch - The Old Road at Pico The intersection of The Old Road and Pico Canyon Road in the Pre-Construction & 01/2020 07/2020 Los Angeles 18/19 In Progress Traffic Control Devices Scope Development, Preliminary Design, Document Preparation | Upgrade the existing traffic 15-15 38 27 Canyon Road unincorporated County community of Agua Dulce. Construction 07/2020 06/2021 signal on The Old Road at Pico Canyon Road. | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Various roadways within the Unincorporated Community of Pre-Construction & 07/2019 07/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Avocado Heights - Temple Av Et Al (Phase I) Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement 10-10 48 22 Avocado Heights. Construction 07/2021 06/2022 (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Resurface 3.9 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing. Uses recycled and in-place materials. | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, ADA East Los Angeles Community – City Terrace Various roadways within the Unincorporated Community of Pre-Construction & 08/2019 09/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement 10-10 51 24 Drive Et Al East Los Angeles Construction 09/2021 06/2022 Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Rehabilitate 3.1 miles of major roads, including parkway improvements and curb ramps upgrade. | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Unincorporated Walnut Park community bounded by City of Huntington Pre-Construction & 12/2018 08/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Walnut Park – Walnut Street Et Al. Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or 20-20 59 33 Park, Seville Avenue, and City of South Gate Construction 08/2021 06/2022 Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 7.1 miles of residential roads, including parkway improvements and curb ramps upgrade. | The project cost includes design and construction.

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Preserve 6.0 miles of residential roads, including pavement prep-work, parkway improvements, curb ramps upgrades, and Unincorporated West Puente Valley community bounded by City of La Pre-Construction & 01/2019 09/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Puente Valley – Fairgrove Avenue, et al. 7-7 48 22 pavement preservation. The proposed work includes micro-milling to improve road ride-ability; Puente, Sunset Avenue, Fairgrove Avenue, and Willow Avenue Construction 09/2020 07/2021 scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Preserve 7.7 Unincorporated Rosewood community bounded by City of Compton, Pre-Construction & 01/2019 07/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Rosewood – Stanford Avenue, et al. miles of residential roads. The project includes pavement prep-work, parkway improvements, and 7-7 64 35 Stanford Avenue, and Compton Boulevard. Construction 07/2020 07/2021 curb ramps upgrades. The proposed work includes micro-milling to improve road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction. Expenditures include concrete prep work prior to beginning of project. Project ID RMD3222007: Stanford Avenue, et al - Rosewood Concrete Repair is combined into RDC0015698

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Unincorporated community of West Carson bounded by City of Los Pre-Construction & 01/2019 10/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation West Carson – Milton Street, et al. Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design | Reconstruct 20-20 66 35 Angeles, Torrance Boulevard, and New Hampshire Avenue. Construction 10/2020 07/2021 2.4 miles of residential roads using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work . | The project cost includes design and construction. Advertising expected October 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Resurface 13 miles of residential roads. Cold mill AC to produce cold central plant Unincorporated community of Westmont bounded by City of Los Angeles Pre-Construction & 12/2018 07/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Westmont – 99th Street, et al. 20-20 59, 62 30 recycled asphalt concrete pavement (CCPRACP), pulverize & stabilize remaining AC w/ and Construction 07/2020 12/2021 underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), then place layer of rubberized hot-mix asphalt over the CCPR on CSPB; reconstruct AC alleys with PCC; and parkway improvements. | The project cost includes design and construction. Advertising July 2020

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Lambert Road, First Avenue, and in the unincorporated Pre-Construction & 01/2019 08/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East La Mirada – Imperial Highway Et Al. Safety), Preliminary Design | Reconstruct 2.7 miles of major roads. The proposed work includes 20-20 57 32 community of East La Mirada Construction 08/2021 12/2022 cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Pioneer Boulevard, Norwalk Boulevard, and Washington Boulevard in the Los Nietos Community – Pioneer Boulevard et Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Pre-Construction & 01/2019 07/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation unincorporated community of Los Nietos bounded by the Cities of Pico 10-10 48, 57 32 al Safety), Preliminary Design | Resurface 1.6 miles of major roads. The proposed work includes Construction 07/2021 06/2023 Rivera, Santa Fe Springs, and Whittier. cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. | The project cost includes design and construction.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Preserve 6.7 miles of residential roads including pavement prep-work, parkway Unincorporated community of North Whittier bounded by Cities of Pre-Construction & 01/2019 07/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation North Whittier – Mission Mill Road, et al. 7-7 57 32 improvements, and curb ramps upgrades. The proposed work includes micro-milling to improve Industry, Pico Rivera, and Whittier. Construction 07/2020 07/2021 road ride-ability; scrub seal to seal cracks; and slurry seal to preserve the pavement and provide a smoother, more finished driving surface. | The project cost includes design and construction. All concrete repair work were completed by RMD1424001. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruct 3.0 miles of residential roads. The proposed work includes cold-mill enough existing pavement to produce cold central Calle Barcelona, Calle Madrid, Crosshaven Drive, Saleroso Drive, and Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Rowland Heights – Saleroso Drive, et al. planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with Sunrise Drive bounded by Colima Road, Fullerton Road, the City of La Construction 05/2020 10/2021 20-20 55 29 the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); Habra Heights, and Schabarum Regional Park. and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction. Project advertised May 2020.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | Reconstruct 6.0 miles of residential roads. The proposed work Unincorporated community of South Whittier bounded by Carmenita Pre-Construction & 01/2019 03/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation South Whittier – Leland Avenue Et Al. 20-20 57 32 includes cold-mill enough existing pavement to produce cold central planted recycled pavement Road, Meyer Road, Leffingwell Road, and Telegraph Road. Construction 03/2021 06/2022 (CCPR); pulverize and stabilize the remaining pavement with underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB; curb ramps upgrade to comply with ADA and parkway improvement including new sidewalk along the southside of Utica St. | The project cost includes design and construction. Estimated advertise date March 2021.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this project is to rehabilitate 1.3 miles of urban major road Canyon Country – Sierra Highway- Sand Cyn Unincorporated area of Canyon Country - City of Santa Clarita to Sand Pre-Construction & 01/2019 01/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation to repair the deteriorating pavement. The project includes the following proposed work: 20-20 36 21 Rd to City Boundary Canyon Road Construction 01/2021 08/2021

- Parkway improvements - Construct PCC bus pad - Curb ramps upgrade - Roadway resurfacing | The project cost includes design and construction.

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk Castaic/Val Verde Communities – Hillcrest Unincorporated Castaic and Val Verde communities - Hillcrest Parkway Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 8.6 Construction 06/2020 07/2021 7-7 38 21 Parkway from The Old Road to 370' north of Terraza Court miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | Resurface 0.3 mile of urban major road to repair the deteriorating pavement, including pavement Unincorporated Quartz Hill community - Avenue L - 52nd Street West to Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Quartz Hill Community – Avenue L (Phase I) Construction 07/2019 07/2020 10-10 36 21 dig-outs associated with severe pavement distresses. Minor closeout work in FY 2020-21. | The 55th Street West. project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, For San Francisquito Canyon Road, it begins at Elizabeth Lake Road to Document Preparation | Install advance curve advisory signs and chevron signs in accordance San Francisquito Canyon Road and Lake the City of Santa Clarita Boundary Line. For Lake Hughes Road, it begins Pre-Construction & 01/2019 03/2021 Los Angeles 18/19 In Progress Safety with current California Manual on Uniform Traffic Control Devices requirements to enhance safety 10-10 36, 38 21 Hughes Road Signage Project at Elizabeth Lake Road to Ridge Route Road. The length of the entire Construction 03/2021 12/2021 along San Francisquito Canyon Road and Lake Hughes Road. The project will update existing project is approximately 42 miles. signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. | The project cost includes design and construction. Includes TDS0001586 and TDS0001585. Advertise date is March 2021.

36, 38, 39, 41, This project will include: Public Works Staffing | Non-project specific expenditures related to the 43, 44, 45, 46, 18, 20, 21, 22, Traffic Safety Program HSIP Cycle 9 - Program traffic safety program and management of grants using the Highway Safety Improvement Procurement/Operational 48, 49, 50, 51, 23, 24, 25, 26, Los Angeles 18/19 Completed Safety Countywide 07/2020 06/2022 20-20 Management Program. This is an annual program, under HSIP Cycle 9 projects are closed out. | All projects in Needs 52, 53, 54, 55, 27, 29, 30, 32, the Highway Safety Program are RMRA funded. 57, 58, 59, 62, 33, 34, 35 63, 64, 66, 70 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), This project is at the intersections Atlantic Blvd at 6th St, Whittier Blvd at Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, East Los Angeles - Atlantic Blvd and 6th St, et Goodrich Blvd, Sadler Ave at Beverly Blvd, and Whittier Blvd at Hoefner Pre-Construction & 05/2019 09/2020 Los Angeles 18/19 In Progress Safety and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, 15-15 51, 58 24, 32 al. Accessible Pedestrian Signals Ave in the unincorporated County of Los Angeles community of East Los Construction 09/2020 12/2020 Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The project cost Angeles and the City of Commerce. includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Covina Islands- Arrow Hwy at Barranca Av and Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Intersections of Arrow Highway at Barranca Ave, and Arrow Highway and Los Angeles 18/19 In Progress Safety Construction 01/2020 07/2020 20-20 48 22 Arrow Hwy at Citrus Av Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Audible pedestrian Citrus Ave in the unincorporated community of Charter Oak Islands. system | Total project cost reflects design costs only.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Intersection of Sierra Highway and Avenue E, in the unincorporated Pre-Construction & 01/2019 07/2020 Los Angeles 18/19 In Progress Safety Del Sur - Sierra Highway at W Avenue E Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document 20-20 36 21 County of Los Angeles community of Del Sur. Construction 08/2020 10/2020 Preparation | Shift striping 2.5' to the west along Sierra Highway at intersection. | The project cost includes design and construction.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The objective of this project is to Intersection of Amar Road and Willow Avenue, in the unincorporated Los Angeles 18/19 In Progress Safety West Valinda- Amar Road at Willow Ave install protected and permissive left-turn phasing to an existing traffic signal at the intersection of County of Los Angeles community of West Valinda and the City of La Construction 06/2020 10/2020 15-15 48, 57 22 Amar Road at Willow Avenue. | The project cost includes design and construction and total cost. Puente. County cost is $60,000. Project to be administered by City of La Puente.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | The objective of this project is to Rowland Heights- Fullerton Road and Sunrise Intersection of Fullerton Road at Sunrise Drive, in the unincorporated Los Angeles 18/19 In Progress Safety install protected and permissive left-turn phasing to an existing traffic signal at the intersection of Construction 12/2019 02/2021 20-20 55 29 Drive County of Los Angeles community of Rowland Heights Fullerton Road and Sunrise Drive | The project cost includes design and construction. Project was advertised December 2019 and awarded March 2020.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | New Avocado Heights- Don Julian Road at 5th Intersection of Don Julian Rd and 5th Ave within the unincorporated Los Angeles 18/19 In Progress Safety traffic signal. | The project cost includes design and construction. Project was advertised Construction 12/2019 09/2020 20-20 57 22 Avenue County of Los Angeles community of Avocado Heights December 2019 and awarded March 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Intersections of Leffingwell Road/Stamy Road (East) and Leffingwell Pre-Construction & 12/2019 09/2020 Los Angeles 18/19 In Progress Safety South Whittier-Leffingwell Road at Stamy Road Estimating, Project Scope Development, Preliminary Design, Document Preparation, Sidewalk Road/Stamy Road (West), in the unincorporated County of Los Angeles 20-20 57 32 Construction 09/2020 10/2021 and/or Crosswalk Rehab/Repair (Existing) | New traffic signal and appurtenant work. | The project community of South Whittier and East Whittier cost includes design and construction. Advertising date is September 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Traffic Bouquet Canyon Rd at Vasquez Canyon Rd - Intersection of Bouquet Canyon Road and Vasquez Canyon Road in the Pre-Construction & 11/2018 08/2020 Los Angeles 18/19 In Progress Safety Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, 20-20 36 21 Traffic Signal unincorporated County of Los Angeles community of Agua Dulce. Construction 08/2020 12/2020 Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | Install new traffic signal and do minor road widening. | The project cost includes design and construction. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

36, 38, 39, 41, 43, 44, 45, 46, 18, 20, 21, 22, This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works As-Needed Traffic Signal Construction FY 2019- Procurement/Operational 48, 49, 50, 51, 23, 24, 25, 26, Los Angeles 18/19 In Progress Traffic Control Devices Staffing, Procurement of Public Works Equipment | Total project cost reflects project Countywide 12/2019 03/2021 20-20 20 Needs 52, 53, 54, 55, 27, 29, 30, 32, management costs and costs of the signals. Estimated award October 2019 57, 58, 59, 62, 33, 34, 35 63, 64, 66, 70

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk Los Nietos, West Whittier- Mines Blvd at and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Sidewalk Intersection of Mines Blvd and Glengarry Ave in the unincorporated Los Angeles 18/19 In Progress Safety Construction 12/2019 12/2020 20-20 57 32 Glengarry Av and/or Crosswalk Rehab/Repair (Existing) | Install a traffic signal with marked crosswalks at the County of Los Angeles community of Los Nietos / West Whittier intersection of Mines Blvd and Glengarry Av in the unincorporated Los Nietos/West Whittier. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, East Los Angeles - Eastern Av at City Terrace and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Intersection of Eastern Ave and City Terrace Drive in the unincorporated Pre-Construction & 01/2019 12/2020 Los Angeles 18/19 In Progress Safety 15-15 51 24 Dr Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | Design & County of Los Angeles community of East Los Angeles. Construction 12/2020 06/2021 construction of protective/permissive left turn phasing for SB & EB directions and for nearside vehicle heads for the EB & WB directions. | Total project cost reflects design costs only.

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install "NO RIGHT TURN ON Stevenson Ranch - Pico Cyn Rd at Stevenson Intersection of Pico Cyn Rd at Stevenson Ranch Parkway, in the Los Angeles 18/19 In Progress Safety RED" activated blank-out signs from Pico Canyon Rd to Stevenson Ranch Pkwy. The project will Construction 05/2020 07/2020 15-15 38 27 Ranch Parkway unincorporated County of Los Angeles community of Stevenson Ranch. require removal of existing signs, installation of new signs, and preparation of updated traffic signal timing for the implementation of the new traffic signal operation. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair Intersection of Fullerton Rd at Harbor Blvd, in the unincorporated County Los Angeles 18/19 In Progress Safety Rowland Heights - Fullerton Rd at Harbor Blvd Construction 12/2019 03/2021 20-20 55 29 (Existing) | Install a new traffic signal at the intersection of Fullerton Rd at Harbor Blvd. | The of Los Angeles community of Rowland Heights. project cost includes design and construction. Project was advertised December 2019 and awarded March 2020.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair West Valinda/San Jose Hills - Gemini St at Intersection of Azusa Avenue at Gemini Street, in the unincorporated Pre-Construction & 01/2019 08/2020 Los Angeles 18/19 In Progress Safety (Existing), Project Scope Development, Paving and/or Striping Installation (New Safety), 15-15 57 22 Azusa Av County of Los Angeles community of East Valinda. Construction 08/2020 11/2020 Preliminary Design | The objective of this project is to install left-turn pocket, cut back loops, add vehicle head, update push button, and install bike detection to an existing traffic signal at the intersection of Azusa Avenue at Gemini Street. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving Intersection of Windsor Avenue and Figueroa Drive in the unincorporated Los Angeles 18/19 In Progress Safety Altadena - Windsor Av at Figueroa Dr and/or Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction 05/2020 12/2020 15-15 41 25 County community of Altadena in Supervisorial District No. 5 Install new traffic signal on Windsor Avenue at Figueroa Drive. Project advertised May 12, 2020. | The project cost includes design and construction.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Intersection of East Cesar E. Chavez Ave at Alma Ave. in the East Los Angeles - Cesar E Chavez Av at Alma Pre-Construction & 03/2019 07/2020 Los Angeles 18/19 In Progress Safety Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install pedestrian safety unincorporated County community of East Los Angeles in Supervisorial 15-15 51 24 Av Construction 07/2020 12/2020 improvements, including upgrading crosswalks, installing bulbouts, installing Rectangular Rapid- District No. 1. Flashing Beacons (RRFB's), ADA access ramps, communication, and other associated equipment at the intersections of East Cesar E. Chavez Avenue at Alma Avenue. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, Intersection of Compton Avenue and Nadeau Street in the unincorporated Pre-Construction & 03/2019 07/2020 Los Angeles 18/19 In Progress Safety Florence/Firestone - Compton Av at Nadeau St 15-15 59 32 Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this County community of Florence/Firestone. Construction 07/2020 03/2021 project is to install protected/permissive left-turn phasing. | The project cost includes design and construction. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Intersection of Del Mar Avenue and Redding Avenue, in the Pre-Construction & 11/2019 11/2020 Los Angeles 18/19 In Progress Safety South San Gabriel - Del Mar Av at Redding Av 20-20 49 22 Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a new traffic signal unincorporated County of Los Angeles community of South San Gabriel. Construction 11/2020 08/2021 and all associated equipment for the intersection of Del Mar Avenue and Redding Avenue. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, South Vallecito Drive, between Las Lomitas Drive and Manzanita Drive, is Hacienda Heights - Vallecito Dr at Las Lomitas Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Los Angeles 18/19 In Progress Safety in the unincorporated community of Hacienda Heights in the Fourth Construction 05/2019 07/2020 20-20 57 32 Dr Safety) | Install a Left Turn pocket at the north approach; install a right edgeline on e/s of Vallecito Supervisorial District. Dr; install "KEEP CLEAR" markings. Project relisted to do cleanup work.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to install approximately 380' feet of Los Angeles 18/19 In Progress Safety Mount Baldy Road Mount Baldy Rd in unincorporated Claremont area Pre-Construction 01/2019 07/2022 30-30 41 25 guardrail/concrete barrier, which will be replacing existing rock wall on the east side of Mt Baldy Road.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to reconstruct 2.7 miles of major roadways. The project Various roadways within the Unincorporated Community of Avocado Pre-Construction & 10/2019 08/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation La Puente/San Jose Hills - Valley Boulevard 20-20 57 22 includes the following proposed work: Heights/San Jose Hills. Construction 08/2021 06/2023

- Parkway improvements - Curb ramps upgrades - Roadway reconstruction | The project cost includes design and construction. Advertise date August 2021.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation Altadena - Altadena Dr and Washington Blvd (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Various roadways within the unincorporated County community of Pre-Construction & 04/2019 06/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation 20-20 41 25 Roadway Improvement Preliminary Design | The proposed work includes cold-mill enough existing pavement to produce Altadena. Construction 06/2021 12/2022 cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. | The project cost includes design and construction. Advertise date is June 2021.

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Feasibility Study, Landscape Safety Rehab/Repair (Existing), Various roadways within the Pre-Construction & 01/2020 06/2021 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation East Rancho Dominguez - Compton Bl, et al. Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Unincorporated Community of 20-20 64 35 Construction 06/2021 08/2022 Design | The primary objective of this project is to resurface 2.1 miles of major roadways. The East Rancho Dominguez. project includes the following proposed work:

- Parkway improvements - Curb ramps upgrades - Pavement resurface | The project cost includes design and construction. Does not include stormwater components. Advertise date June 2021.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Unincorporated Palmdale Palmdale - Pearblossom Hwy - 45th St East to Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or community - Pearblossom Hwy Construction 09/2019 12/2020 20-20 36 21 53rd St East Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Total between 45th St E & 53rd St E project cost reflects County share only. Administered by City of Palmdale. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Pre-Construction & 08/2019 06/2020 Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation Del Aire Community Road Improvements Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Various roadways within the Unincorporated Community of Del Aire. 20-20 62 35 Construction 06/2020 07/2021 Safety), Preliminary Design | Reconstruct 1.2 miles of residential roads in the unincorporated community of Del Aire. Related concrete improvements include repair and reconstruction of sidewalks, curb ramps, and cross gutters. | The project cost includes design and construction. Concrete prep work being completed via RMDJOC6672-300.00.

This project will include: Procurement of Road Maintenance and Rehab Materials | Prepare FRA Procurement/Operational Los Angeles 20/21 New Safety Bandini Islands - Bandini Bl at Downey Rd grant application for the subject project RR signal improvement | This is cost of application only, Bandini Bl and Downey Rd in unincorporated Los Angeles County 09/2019 06/2021 25-25 53 33 Needs total project cost TBD

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), East Los Angeles - 1st Street at Marianna Los Angeles 20/21 New Traffic Control Devices Sidewalk and/or Crosswalk Rehab/Repair (Existing) | A constituent requested Public Works to Intersection of 1st Street and Marianna Avenue in East Los Angeles. Construction 05/2020 04/2021 20-20 51 24 Avenue install a Traffic Signal for the intersection of 1st Street and Marianna Avenue. Based on the results of the study Traffic Signal was recommended. | Project advertised May 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Project Scope East Los Angeles - Cesar E Chavez Av at Pre-Construction & 02/2020 01/2021 Los Angeles 20/21 New Traffic Control Devices Development, Preliminary Design, Document Preparation | Install protected-permissive left-turn East Los Angeles - Cesar E Chavez Av at Eastern Av 15-15 51 24 Eastern Av Construction 01/2021 05/2021 phasing for eastbound and westbound traffic at the intersection of Cesar E. Chavez Avenue at Eastern Avenue. | Project initiated per constituent's request.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Walnut Park - Santa Fe Av - Sale Pl/South Walnut Park community - Santa Fe Avenue, between Sale Place and the Pre-Construction & 08/2020 12/2020 Los Angeles 20/21 New Traffic Control Devices Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Document Preparation, 15-15 59 33 Gate City Boundary - Phase II South Gate City Boundary. Construction 01/2021 06/2021 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install Rectangular Rapid Flashing Beacons, curb extension, and realign striping at intersections | Project was initiated per the Board's request.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Rosemead Boulevard at Gallatin Road, in the unincorporated County of Pre-Construction & 08/2019 12/2020 Los Angeles 20/21 New Traffic Control Devices Whittier Narrows - Rosemead Bl at Gallatin Rd Document Preparation | The objective of this project is to upgrade the traffic signal at the 15-15 57 32 Los Angeles community of Whittier Narrows and the City of Pico Rivera. Construction 12/2020 06/2021 intersection of Rosemead Boulevard at Gallatin Road.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the traffic signal at the intersection of at Los Angeles 20/21 New Traffic Control Devices Athens-Westmont - Normandie Av at 104th St 104th Street, including installing protected-permissive left turn phasing and upgrading the signal Athens-Westmont - Normandie Av at 104th St Pre-Construction 08/2020 10/2021 15-15 62 30 standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation This project is located at the intersection of at 98th Pre-Construction & 09/2020 12/2021 Los Angeles 20/21 New Traffic Control Devices Athens-Westmont - Vermont Av at 98th St (New Safety), Project Scope Development, Paving and/or Striping Installation (New Safety), Street, in the unincorporated County of Los Angeles community of 20-20 62 30 Construction 01/2022 07/2022 Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Athens/Westmont and the City of Los Angeles. Install a new traffic signal at the intersection of Vermont Avenue at 98th Street.

Rosecrans Avenue at Atlantic Avenue, in the unincorporated County of East Rancho Dominguez - Rosecrans Av at This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Los Angeles 20/21 New Traffic Control Devices Los Angeles community of East Rancho Dominguez and City of Pre-Construction 08/2019 10/2021 15-15 64 35 Atlantic Av Document Preparation Compton.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Florence-Firestone - Firestone Boulevard Firestone Boulevard between Central Avenue and in the Pre-Construction & 03/2019 09/2020 Los Angeles 20/21 New Safety Striping Installation (New Safety), Preliminary Design | The objective of this project is to install the 15-15 59 33 Vision Zero Project unincorporated County of Los Angeles community of Florence-Firestone. Construction 09/2020 03/2021 following traffic safety enhancements along Firestone Boulevard from Central Avenue to Alameda Street; High visibility crosswalks (22 crosswalks at 8 intersections); Leading Pedestrian Intervals (6 intersections); Curb extensions, paint and bollard (35 corners at 11 intersections; Upgrade 17 traffic signal vehicle heads from 8 inch to 12 inch; Install 1 Assessible Pedestrian Signal system; Upgrade 8 count-down pedestrian modules Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, Florence-Firestone - Gage Avenue at Hooper Gage Avenue and Hooper Avenue in the unincorporated community of Pre-Construction & 11/2019 10/2020 Los Angeles 20/21 New Traffic Control Devices and/or Signage Installation (New Safety), Project Scope Development, Preliminary Design, 15-15 59 33 Avenue Florence-Firestone in Supervisorial District 2. Construction 10/2020 06/2021 Document Preparation | Installation of protected/permissive left-turn phasing for all four approaches.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, View Park/Windsor Hills - Overhill Drive at 58th Overhill Dr at 58th Place, in the unincorporated County of Los Angeles Los Angeles 20/21 New Traffic Control Devices Document Preparation | The objective of this project is to install a new traffic signal at the Pre-Construction 12/2019 06/2021 20-20 54 30 Place/Orchid Drive community of View Park/Windsor Hills. intersection of Overhill Drive at 58th Place/Orchid Drive

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Upgrade the traffic signal at the intersection of Normandie Avenue at Normandie Avenue at 228th Street, in the unincorporated County of Los Los Angeles 20/21 New Traffic Control Devices West Carson - Normandie Av at 228th St 228th Street, including installing protected-permissive left turn phasing and upgrading the signal Pre-Construction 08/2019 10/2021 15-15 66 35 Angeles community of West Carson. standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The objective of this project is to upgrade the traffic signal at the at , in the unincorporated County of Los Los Angeles 20/21 New Traffic Control Devices Willowbrook - Broadway at El Segundo Bl intersection of Broadway at El Segundo Boulevard, including installing protected-permissive left Pre-Construction 06/2020 10/2021 15-15 64 35 Angeles community of Willowbrook. turn phasing and upgrading the signal standards, mast arms, vehicle heads, bicycle & vehicle detection, ADA access ramps, communication, and other associated equipment.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Hacienda Heights-Garo St- Stimson Garo Street from Stimson Avenue to Fieldgate Avenue, in the Los Angeles 20/21 New Safety Signals, Lights, and/or Signage Installation (New Safety), Pavement Improvement (New), Paving Construction 01/2021 02/2021 10-10 57 32 Av/Fieldgate Av unincorporated County of Los Angeles community of Hacienda Heights. and/or Striping Installation (New Safety) | The objective of this project is to install speed humps along Garo Street from Stimson Avenue to Fieldgate Avenue.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Marina Del Rey - Admiralty Way at California Admiralty Way at California Yacht Club Driveway, in the unincorporated Los Angeles 20/21 New Traffic Control Devices Striping Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install a Construction 12/2019 05/2021 20-20 62 26 Yacht Club Driveway County of Los Angeles community of Marina Del Rey. new traffic signal at the intersection of Admiralty Way at California Yacht Club Driveway. | The project cost includes design and construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | The objective of this project is to install edge striping and South Whittier - Calmada Av - Lanning Calmada Avenue, between Lanning Drive and Mulberry Drive in the Los Angeles 20/21 New Traffic Control Devices double yellow center line to improve safety on Calmada Avenue, between Lanning Drive and Construction 02/2020 07/2020 10-10 57 32 Dr/Mulberry Dr unincorporated County community of South Whittier Mulberry Drive. | Work was primarily completed April 2020 but this is listed for completeness and for final closeout.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Agua Dulce - Bouquet Canyon Rd - Santa Installation (New Safety), Cost Estimating, Project Scope Development, Preliminary Design, Bouquet Canyon Road located near the County of Los Angeles Pre-Construction & 06/2019 07/2020 Los Angeles 20/21 New Safety Clarita BL to 640' n/o MM 16.43 & 1145' n/o Document Preparation | nstall curve advisory signs and chevron signs in accordance with current 10-10 36 21 unincorporated communities of Leona Valley and Bouquet Canyon. Construction 07/2020 09/2020 MM 3.52 to 950' n/o MM 0.18 California Manual on Uniform Traffic Control Devices requirements to enhance safety along Bouquet Canyon Road. The project will update existing signing along the road including the installation of advance curve advisory signs and arrows for horizontal curves where applicable.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, Pavement Rehab/Repair (Existing), Project Castaic Road at Ridge Route Road and The Castaic Road at Ridge Route Road and The Old Road at Parker Road in Pre-Construction & 12/2019 08/2020 Los Angeles 20/21 New Traffic Control Devices Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp 20-20 38 21 Old Road at Parker Rd the unincorporated County of Los Angeles community of Castaic. Construction 09/2020 03/2022 Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design | The objective of this project is to install new traffic signals at two intersections. | Combined TDS0001697 & TDS001698 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Foothill Boulevard and Cloud Avenue in the unincorporated County Pre-Construction & 10/2019 09/2020 Los Angeles 20/21 New Traffic Control Devices La Crescenta - Foothill Blvd at Cloud Av 20-20 43 25 Development, Paving and/or Striping Installation (New Safety), Preliminary Design, Document community of La Crescenta-Montrose i Construction 09/2020 06/2021 Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install new traffic signal on Foothill Boulevard at Cloud Avenue.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, La Crescenta-Montrose - Ocean View Blvd at Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Ocean View Boulevard and Montrose Avenue is located in the Pre-Construction & 11/2019 02/2021 Los Angeles 20/21 New Traffic Control Devices 15-15 43 25 Montrose Av Development, Preliminary Design, Document Preparation | Install protected permissive left-turn unincorporated County community of La Crescenta Construction 02/2021 05/2021 phasing for north and south bound traffic. | This project will decrease the number of delay cycles.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Paving and/or Striping County of Los Angeles unincorporated communities of Claremont and Angeles Forest - Mt Baldy Rd - Mills Av to Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs Angeles National Forest, and the City of Claremont. It begins at Mills Pre-Construction & 07/2020 12/2021 Los Angeles 20/21 New Traffic Control Devices 10-10 41 25 County Boundary and centerline rumble strips in accordance with current California Manual on Uniform Traffic Avenue and ends at the County boundary. The length of the project is Construction 01/2022 07/2022 Control Devices requirements to enhance safety along Mount Baldy Road. The project will update approximately 8.0 miles. existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Barranca Avenue and Baseline Road in the unincorporated County Pre-Construction & 10/2019 08/2020 Los Angeles 20/21 New Traffic Control Devices Azusa - Barranca Av at Baseline Rd Development, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document 15-15 48 22, 25 community of Azusa Construction 08/2020 03/2021 Preparation | The objective of this project is to upgrade the existing traffic signal on Barranca Avenue at Baseline Road.

This project will include: Preparing scope of work, preliminary utility notice, field, reviewing Irwindale Av at Cypress St, Don Julian Rd at 5th Av, Vineland Av at Procurement/Operational Los Angeles 20/21 New Traffic Control Devices Mega Consultant Projects FY 2018-19 Group I consultants' proposals. | East San Gabriel Valley. The project work is listed under their respective 05/2019 12/2020 15-15 48, 55, 57 22, 29 Giordano St, Pathfinder Rd at Wellesley Dr, Fullerton Rd at Sunrise Dr Needs projects.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, ADA Curb 1st Street from Indiana St to Rowan Av and from Herbert Av to 140 feet Pre-Construction & 01/2021 11/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation East Los Angeles - 1st Street Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, 7-7 51 24 west of Vancouver Av. Construction 11/2021 06/2022 Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 1.8 miles of major roads.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design, Unincorporated County Community of East Los Angeles and the City of Pre-Construction & 10/2019 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation East Los Angeles - Floral Drive 10-10 51 24 Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary Monterey Park Construction 12/2021 12/2022 objective of this project is to resurface 0.5 mile of major roads. The project includes parkway improvements and curb ramp upgrade. | The project cost includes design and construction.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 2.6 miles of major Los Angeles 20/21 New Road Maintenance & Rehabilitation Walnut Park - , et al. Various roadways within the Unincorporated Community of Walnut Park. Pre-Construction 07/2020 06/2021 10-10 59 33 roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation Various roadways within the Unincorporated Community of West Puente Pre-Construction & 06/2021 06/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation West Puente Valley - Duff Ave et al. (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, 7-7 48 22 Valley. Construction 07/2022 06/2023 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 13.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation Various roadways within the Unincorporated Community of Florence- Pre-Construction & 10/2020 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Florence-Firestone - 58th Place, et al. (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, 7-7 59 33 Firestone. Construction 12/2021 06/2022 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 7.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Pre-Construction & 06/2021 06/2023 Los Angeles 20/21 New Road Maintenance & Rehabilitation Rosewood - , et al. Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Various roadways within the Unincorporated Community of Rosewood. 10-10 64 35 Construction 07/2023 06/2024 Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 3.5 miles of major roadways. The project includes parkway improvements, curb ramps upgrade, and pavement resurface.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Pre-Construction & 06/2021 06/2023 Los Angeles 20/21 New Road Maintenance & Rehabilitation Windsor Hills - Southridge Avenue, et al. Various roadways within the Unincorporated Community of Windsor Hills. 10-10 54 30 Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Construction 06/2023 06/2024 Safety), Preliminary Design | The primary objective of this project is to resurface 6.3 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Los Angeles 20/21 New Road Maintenance & Rehabilitation Malibu - Entrada Road, et al. Document Preparation | The primary objective of this project is to preserve 7.6 miles of residential Various roadways within the Unincorporated Community of Malibu. Pre-Construction 01/2021 07/2021 7-7 50 27 roads. The project includes pavement prep-work and pavement preservation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Pre-Construction & 01/2021 07/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Malibu - Saddle Peak Road, et al. Various roadways within the Unincorporated Community of Malibu. 10-10 50 27 Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Construction 07/2022 07/2023 Safety), Preliminary Design | The primary objective of this project is to resurface 3.6 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk Pre-Construction & 02/2020 08/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Hacienda Heights - Hacienda Boulevard and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety County Unincorporated Community of Hacienda Heights. 10-10 57 32 Construction 08/2021 06/2022 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 3.1 miles of roadways. The project includes parkway improvements, curb ramps upgrade, and pavement resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Various roadways within the Unincorporated Community of Rowland Pre-Construction & 06/2021 06/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Rowland Heights - Nearbank Street, et al. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 10-10 55, 57 29, 32 Heights. Construction 06/2022 12/2023 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 8.7 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair South Whittier - Lakeland Rd Pavement Pre-Construction & 05/2021 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Lakeland Road adjacent to the City of Santa Fe Springs. 10-10 51 24 Improvements (ABO)(SFS) Construction 12/2021 06/2022 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | This is a County contribution to the city of Santa Fe Springs for a resurfacing of 0.2 miles of residential roads.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Various roadways within the Unincorporated Community of South Pre-Construction & 06/2021 12/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation South Whittier - Lemon Dr et al. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 10-10 51 24 Whittier. Construction 12/2022 12/2023 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 5.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurface. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair Various roadways within the Unincorporated Community of West Whittier Pre-Construction & 06/2020 06/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation West Whittier Los Nietos - Aeolian Street, et al. (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, 7-7 57 32 Los Nietos. Construction 06/2021 06/2022 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 5.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Agua Dulce - 101st Street East - Avenue S to Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Pre-Construction & 09/2020 06/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated Community of Agua Dulce. 7-7 36 21 Avenue T Document Preparation | The primary objective of this project is to preserve 1.0 miles of Division Construction 06/2021 07/2022 Street. The project includes pavement prep-work and pavement preservation.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Project Scope Development, Pavement Agua Dulce - San Francisquito Canyon Road - Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Pre-Construction & 06/2021 06/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated County Community of Agua Dulce. 20-20 36 21 Elizabeth Lake Road to MM 4.6 Document Preparation | The primary objective of this project is to rehabilitate 4.6 miles of rural Construction 06/2022 07/2023 major roads. The project includes pavement prep work and pavement rehabilitation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement Agua Dulce - Sierra Highway (Phase 2) - (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Pre-Construction & 01/2021 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated community of Agua Dulce 10-10 36 21 Vasquez Canyon Road to Davenport Road Preparation | The primary objective of this project is to resurface 2.7 miles of a rural major road to Construction 12/2021 12/2022 repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurface.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation Pre-Construction & 01/2021 07/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Altadena - Marengo Avenue, et al. (New), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Various roadways within the Unincorporated Community of Altadena. 7-7 41 25 Construction 07/2021 12/2022 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to preserve 5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement Angeles National Forest - Mount Wilson Road, Pre-Construction & 01/2021 06/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Various roadways within the Angeles National Forest. 10-10 41 25 et al. Construction 06/2022 12/2023 Preparation | The primary objective of this project is to resurface 5.6 miles of rural local roads. The project includes pavement prep-work and pavement resurfacing.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Castaic/Val Verde - Commerce Center Drive, et Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Landscape Safety Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated Community of Castaic and Val Verde Construction 05/2020 07/2021 10-10 36 21 al. Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to resurface 1.8 miles of major roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Bouquet Canyon - Bouquet Canyon Road - MM Pre-Construction & 01/2020 09/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Document Preparation | The primary objective of this project is to rehabilitate 7.4 miles of Unincorporated Community of Bouquet Canyon 20-20 36 21 8.74 to Elizabeth Lake Road Construction 12/2020 07/2022 major/local roads. The project includes pavement prep work and pavement rehabilitation. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Pre-Construction & 01/2021 12/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Desert View Highlands - Mesquite Road, et al. Within the Unincorporated Community of Desert View Highlands 20-20 36 21 Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Construction 12/2022 12/2023 Safety), Preliminary Design | The primary objective of this project is to resurface 7.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, and roadway resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Various roadways within the Unincorporated Community of East La Pre-Construction & 01/2020 12/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation East La Verne - Webb Canyon Rd, et al. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 10-10 41 25 Verne. Construction 12/2022 12/2023 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to resurface 5.9 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Various roadways within the Unincorporated Community of East San Pre-Construction & 12/2020 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation East San Gabriel - Acacia Street, et al. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 7-7 49 22 Gabriel. Construction 12/2021 12/2022 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to preserve 9.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Pre-Construction & 01/2021 12/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Littlerock - 102nd Street, et al. Within the Unincorporated Community of Littlerock. 7-7 36 21 Preparation | The primary objective of this project is to preserve 15.9 miles of rural local roads. Construction 12/2021 06/2022 The project includes pavement prep-work and pavement preservation.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to reconstruct from Roosevelt - Avenue E - 130th Street East to Los Angeles 20/21 New Road Maintenance & Rehabilitation 130th St East to 140th St East (1.0 mi) of rural major roads. The project includes pavement prep Unincorporated County Community of Roosevelt. Construction 06/2020 07/2021 20-20 36 21 140th Street East work, pavement reconstruction, culvert replacement, and guardrail installation. | JOC construction started June 2020.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Roosevelt/North Lancaster - 120th Street East - Pre-Construction & 07/2020 06/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The Unincorporated Community of Roosevelt and North Lancaster. 7-7 36 21 Avenue D to Avenue I Construction 06/2021 12/2022 primary objective of this project is to preserve 5.0 miles of Division Street. The project includes pavement prep-work and pavement preservation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair South Antelope Valley - Pearblossom Highway - (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Pre-Construction & 06/2021 06/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated Community of South Antelope Valley 10-10 36 21 Sierra Highway to City of Palmdale Boundary Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The Construction 06/2022 12/2023 primary objective of this project is to resurface 1.1 miles of major roads. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Stevenson Ranch - Stevenson Ranch Tract Various roadways within the Unincorporated Community of Stevenson Pre-Construction & 12/2020 07/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 7-7 38 27 (Phase II) Ranch. Construction 07/2021 12/2022 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to preserve 4.6 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Sun Village - 95th Street East - Avenue R to Pre-Construction & 12/2020 06/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation Preliminary Design, Document Preparation | The primary objective of this project is to resurface Unincorporated community of Littlerock 10-10 36 21 Palmdale Boulevard Construction 06/2021 12/2021 0.6 miles of rural local road to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Sun Village/Lake Los Angeles - Palmdale (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Various roadways within the Unincorporated Communities of Sun Village Pre-Construction & 12/2020 02/2022 Los Angeles 20/21 New Road Maintenance & Rehabilitation Boulevard (Phase III) - 90th Street East to 20-20 36 21 Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | The and Lake Los Angeles. Construction 02/2022 12/2023 140th Street East primary objective of this project is to rehabilitate 5.0 miles of a major highway.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Preliminary Design, Document Pre-Construction & 01/2020 07/2020 Los Angeles 20/21 New Road Maintenance & Rehabilitation Ingleside Way @ MM 0.11 to 0.18 Preparation | The primary objective of this project is to provide slope and road repair in the Unincorporated Malibu area. 20-20 50 27 Construction 07/2020 07/2021 unincorporated Malibu area. The proposed work includes constructing a new wall to replace the existing deteriorating wall. The wall will stabilize the slope, protect the roadway, and secure access for residents.

6704 Provence Road Catch Basin Lateral This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair and upgrade Los Angeles 20/21 New Road Maintenance & Rehabilitation Unincorporated San Gabriel area. Construction 08/2020 09/2020 20-20 49 22 Repair Project existing catch basin and outlets to current standard.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of The intersection of Cypress St and Irwindale Ave within shared Los Angeles 19/20 In Progress Traffic Control Devices Covina Island - Cypress St at Irwindale Ave Construction 05/2020 05/2021 15-15 48 22 this project is to install protected/permissive left-turn phasing. Although this is at the same jurisdiction between the City of Irwindale and the County of Los Angeles. location as TDS0001526 (FY 18-19 expenditure report RP229), that was for prep work for coordination for this project. Project advertised May 12, 2020. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: ADA Curb Ramp Installation (New), Cost Estimating, Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Preparation | Install curb ramp and striping for crosswalk. | The work consists Covina Islands - Enid Avenue at Newburgh Pre-Construction & 01/2019 07/2020 Los Angeles 19/20 In Progress Traffic Control Devices of upgrading signing including the installation of the necessary pavement markings for the Unincorporated Covina island - Enid Avenue at Newburgh Street 10-10 48 22 Street Construction 07/2020 12/2020 uncontrolled school crossing along Enid Avenue south of Newburgh Street. It will also include the upgrading of School zoning signage along Enid Avenue. Work to be performed by County force account labor. Project not yet constructed.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Install East Los Angeles - 1st Street at Herbert Ave Los Angeles 19/20 In Progress Traffic Control Devices flashing beacons at crosswalk on west approach. Project was awarded in 2018 and completed in East Los Angeles - 1st Street at Herbert Avenue Construction 08/2018 07/2020 20-20 51 24 (17/18 Carryover) 2020, this is for remaining charges.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, East Los Angeles - Eastern Avenue at Ramona Eastern Avenue and Ramona Boulevard, in the unincorporated County of Pre-Construction & 11/2019 01/2021 Los Angeles 19/20 In Progress Traffic Control Devices Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this 15-15 51 24 Boulevard Los Angeles community of East Los Angeles. Construction 01/2021 08/2021 project is to install left-turn phasing to an existing traffic signal at the intersection of Eastern Avenue at Ramona Boulevard.

This project will include: Cost Estimating, Preliminary Design, Document Preparation | The objective of this project is to install additional traffic signal equipment and upgrade pedestrian East Los Angeles - Whittier Blvd at Atlantic equipment at the intersection of Whittier Blvd at Atlantic Blvd. Whittier Blvd at Atlantic Blvd in the unincorporated community of East Los Angeles 19/20 In Progress Traffic Control Devices Pre-Construction 07/2020 06/2021 15-15 51 24 Blvd (This work will be merged into the East LA Community Roadway Improvement Project, Los Angeles. RDC0016147, which will be Federally funded and not through RMRA; scheduled to advertise June 2021)

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Right of Way, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is Pacific Boulevard at Broadway, in the unincorporated County of Los Pre-Construction & 01/2020 03/2021 Los Angeles 19/20 In Progress Traffic Control Devices Walnut Park – Pacific Boulevard at Broadway 15-15 59 33 to install protected left-turn phasing to the north, south and east approaches to an existing traffic Angeles community of Walnut Park. Construction 03/2021 06/2021 signal at the intersection of Pacific Boulevard at Broadway. (Construction in FY 2020-21)

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs Calabasas - Kanan Rd from Mulholland Hwy to in accordance with current California Manual on Uniform Traffic Control Devices requirements to Pre-Construction & 05/2020 04/2021 Los Angeles 19/20 In Progress Traffic Control Devices County of Los Angeles unincorporated community of Calabasas 10-10 50 27 3096ft N/O Silver Creek Rd enhance safety along Kanan Rd from Mulholland Hwy to 3096ft N/O Silver Creek Rd. The project Construction 05/2021 12/2021 will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22)

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual Malibu Lake - Kanan Dume Rd from 2560ft Pre-Construction & 09/2020 04/2021 Los Angeles 19/20 Carried Over Traffic Control Devices on Uniform Traffic Control Devices requirements to enhance safety along Kanan Dume Rd from County of Los Angeles unincorporated community of Malibu Lake. 10-10 50 27 N/O Cavalleri Rd to Mulholland Hwy Construction 05/2021 12/2021 2560ft N/O Cavalleri Rd to Mulholland Hwy. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. (Construction in FY 2021-22) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual Monte Nido - Malibu Canyon Rd from 1050ft on Uniform Traffic Control Devices requirements to enhance safety along Malibu Canyon Rd from Los Angeles 19/20 Carried Over Traffic Control Devices County of Los Angeles unincorporated community of Monte Nido. Pre-Construction 01/2021 07/2021 10-10 50 27 N/O Malibu Crest Dr to Piuma Rd 1050ft N/O Malibu Crest Dr to Piuma Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair 7th Street and Patton Avenue, in the unincorporated County of Los Los Angeles 19/20 In Progress Traffic Control Devices La Rambla - 7th Street at Patton Avenue (Existing) | The objective of this project is to install rectangular rapid flashing beacons and Construction 04/2020 07/2020 15-15 70 35 Angeles community of La Rambla. required striping at the existing marked pedestrian crossing on 7th Street and Patton Avenue. Project award April 2020.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Fiji Way and Lincoln Bl, in the unincorporated County of Los Angeles Pre-Construction & 09/2020 06/2021 Los Angeles 19/20 Carried Over Traffic Control Devices Marina Del Rey - Fiji Way at Lincoln Bl Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this 15-15 62 26 community of Marina Del Rey. Construction 06/2021 12/2021 project is to install split phasing for the East and West approaches of the signalized intersection at Fiji Way and Lincoln Bl. Project carried over to FY 2020-21 with no expenses in FY 2019-20.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Via Marina at Channel Walk, in the unincorporated County of Los Angeles Los Angeles 19/20 Carried Over Traffic Control Devices Marina Del Rey - Via Marina at Channel Walk Document Preparation | The objective of this project is to install a new traffic signal at the Pre-Construction 09/2020 06/2021 20-20 62 26 community of Marina Del Rey. intersection of Via Marina at Channel Walk. No work done in FY 2019-20.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), South Whittier - Mulberry Drive at Calmada Cost Estimating, Preliminary Design, Document Preparation | The objective of this project is to Mulberry Drive at Calmada Avenue, in the unincorporated County of Los Pre-Construction & 11/2019 02/2021 Los Angeles 19/20 In Progress Traffic Control Devices 15-15 57 32 Avenue upgrade the traffic signal at the intersection of Mulberry Drive at Calmada Avenue to include left- Angeles community of South Whittier. Construction 02/2021 12/2021 turn phasing.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Agua Dulce - Sierra Hwy from 2100ft S/O Document Preparation | Install curve advisory signs in accordance with current California Manual County of Los Angeles unincorporated community of Agua Dulce/Acton. Pre-Construction & 08/2020 07/2021 Los Angeles 19/20 Carried Over Traffic Control Devices 10-10 38 21 Quinn Dr to Avenue S on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from 2100ft The length of the entire project is approximately 27 miles. Construction 07/2021 06/2022 S/O Quinn Dr to Avenue S. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No work in FY 2019-20.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair Arcadia - Temple City Bl at Naomi Av (17/18 Temple City Boulevard and Naomi Avenue Los Angeles 19/20 In Progress Traffic Control Devices (Existing) | New traffic signal at Temple City Boulevard and Naomi Avenue. | The project was Construction 08/2018 07/2020 20-20 49 22 Carryover) is in the unincorporated community of Arcadia. combined into the 1st/Herbert et al project (TDS0001562) for construction. This reflects remaining work in FY 2020-21.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Castaic - Copper Hill Dr at Avenida Rancho Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The Copper Hill Dr at Avenida Rancho Tesoro, in the unincorporated County Pre-Construction & 08/2020 11/2020 Los Angeles 19/20 Carried Over Traffic Control Devices 15-15 38 21 Tesoro objective of this project is to upgrade the traffic signal at the intersection of Copper Hill Dr at of Los Angeles community of Castaic and the City of Santa Clarita. Construction 11/2020 01/2021 Avenida Rancho Tesoro by installing additional vehicle heads, countdown pedestrian heads, and bicycle detection. (No work completed in FY 2019-20) (Construction in FY 2020-21) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Safety), Hillcrest Pkwy at Beryl Place, in the unincorporated County of Los Los Angeles 19/20 In Progress Traffic Control Devices Castaic -Hillcrest Pkwy at Beryl Place Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The objective of this project is to install Construction 05/2020 12/2020 15-15 38 21 Angeles community of Castaic/Val Verde. flashing beacons and required striping at the existing marked school crossing on Hillcrest Pkwy at Beryl Place. Project advertised May 12, 2020.

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk Sunflower Ave and Cypress Street In the unincorporated community of Pre-Construction & 04/2020 07/2020 Los Angeles 19/20 In Progress Traffic Control Devices Charter Oak - Sunflower Ave at Cypress Street and/or Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk 20-20 48 22 Charter Oak. Construction 07/2020 11/2020 Rehab/Repair (Existing), Document Preparation | The objective of this project is to install a new traffic signal. (Construction in FY 2020-21)

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Document Preparation | Install curve advisory signs in accordance with current California Manual Pre-Construction & 08/2020 04/2021 Los Angeles 19/20 Carried Over Traffic Control Devices Del Sur - Sierra Hwy - Avenue G to Avenue A County of Los Angeles unincorporated community of Del Sur. 10-10 36 21 on Uniform Traffic Control Devices requirements to enhance safety along Sierra Hwy from Avenue Construction 04/2021 05/2022 G to Avenue A. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No work done in FY 2019-20. Estimated advertise date April 2021.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Desert View Highlands - Elizabeth Lake Rd at Elizabeth Lake Rd at Mesquite Rd, in the unincorporated County of Los Pre-Construction & 07/2020 08/2020 Los Angeles 19/20 Carried Over Traffic Control Devices Crosswalk Installation (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair 15-15 36 21 Mesquite Rd Angeles community of Desert View Highlands. Construction 08/2020 01/2021 (Existing), Document Preparation | The objective of this project is to upgrade the traffic signal at the intersection of Elizabeth Lake Rd at Mesquite Rd by installing vehicle heads, bicycle detection, and detectable warning surface. No expenses in FY 2019-20.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Design, Leona Valley/Lake Hughes - Elizabeth Lake Rd Document Preparation | Install curve advisory signs in accordance with current California Manual County of Los Angeles unincorporated community of Leona Valley/Lake Pre-Construction & 07/2020 07/2021 Los Angeles 19/20 Carried Over Traffic Control Devices from Lake Hughes Rd to 2095ft E/O Bouquet 10-10 36 21 on Uniform Traffic Control Devices requirements to enhance safety along Elizabeth Lake Rd from Hughes. Construction 07/2021 06/2022 Cyn Rd Lake Hughes Rd to 2095ft E/O Bouquet Cyn Rd. The project will update existing signing along the road including installing advance curve advisory speed signs and arrows for horizontal curves where applicable. No expenses in FY 2019-20.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Covina Islands - Arrow Highway at Lark Ellen Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The objective of this Arrow Highway and Lark Ellen Avenue, in the unincorporated County of Pre-Construction & 03/2020 12/2020 Los Angeles 19/20 In Progress Traffic Control Devices 15-15 48 22 Avenue project is to install left-turn phasing to an existing traffic signal at the intersection of Arrow Los Angeles community of Covina Islands. Construction 12/2020 06/2021 Highway and Lark Ellen Avenue. (Construction in FY 2020-21)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Avocado Heights – 6th – Valley Bl and Lomitas (Existing Safety), Pavement Improvement (New) | The primary objective of this project is to Unincorporated County community of Avocado Heights and City of Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Construction 06/2021 12/2021 20-20 57 22 Ave (City/County Coop) rehabilitate 0.8 miles of local roads. The project includes roadway reconstruction. Cost is only Industry County share.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Pavement Improvement (New), Preliminary Design, Sidewalk Various roadways within the Unincorporated Community of Avocado Pre-Construction & 08/2019 07/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Avocado Heights - Pellisier Village 7-7 57 22, 32 and/or Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this Heights. Construction 07/2020 10/2020 project is to preserve 1.4 miles of residential roads.

Unincorporated County This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Community adjacent to Claremont/Pomona – Towne Avenue Los Angeles 18/19 In Progress Road Maintenance & Rehabilitation (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Total project cost includes Claremont and Pomona, Towne Construction 10/2019 07/2020 20-20 52 20 Rehabilitation design and construction. This is the County contribution to the project cost. Ave from Foothill Blvd to Bonita Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Various roadways within the Unincorporated Community of East Los Pre-Construction & 09/2019 01/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation East Los Angeles - Cesar E Chavez Avenue 10-10 51 24 Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Angeles. Construction 01/2022 12/2022 Safety), Preliminary Design | The primary objective of this project is to resurface 1.9 miles of major roads, including parkway improvements, curb ramps upgrade, and pavement resurface. (Construction in FY 2022-23) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Various roadways within the Unincorporated Community of East Los Pre-Construction & 01/2020 09/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation East Los Angeles - Michigan Avenue, et al. 7-7 51 24 Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Preliminary Design | Angeles Construction 09/2020 07/2021 The primary objective of this project is to preserve 8.7 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramps upgrades, and pavement preservation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Various roadways within the Unincorporated Community of West Rancho Pre-Construction & 01/2020 12/2021 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation West Rancho Dominguez - 139th Street, et al. Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety 20-20 64 35 Dominguez. Construction 12/2021 12/2022 Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary objective of this project is to reconstruct 4.4 miles of residential roads. The project includes parkway improvements, curb ramps upgrades, and roadway reconstruction.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair Pre-Construction & 07/2019 08/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Westchester - Sophomore Drive, et al. (Existing), Preliminary Design, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair Various roadways within the Unincorporated Community of Westchester 7-7 54, 62 26, 30 Construction 08/2020 07/2021 (Existing) | The primary objective of this project is to preserve 1.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Pre-Construction & 02/2020 06/2021 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Rolling Hills - Crenshaw Blvd Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Various roadways within the Unincorporated Community of Rolling Hills 10-10 66 26 Construction 06/2021 11/2022 Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to resurface 0.6 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Document Preparation, Various roadways within the Unincorporated Community of Rowland Pre-Construction & 01/2020 08/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Rowland Heights - Otterbein Avenue, et al. 7-7 55 29 Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to Heights. Construction 09/2020 07/2021 preserve 5.9 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. (Construction in FY 2021-22)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb West Whittier/Los Nietos - Mines Boulevard, et Various roadways within the Unincorporated Community of West Whittier Pre-Construction & 05/2020 03/2023 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement 10-10 57 32 al. Los Nietos. Construction 03/2023 12/2023 Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to rehabilitate 3.0 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Various roadways within the Unincorporated Community of West Whittier Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation West Whittier Los Nietos - Rivera Road, et al. Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to Construction 05/2020 07/2021 7-7 57 32 Los Nietos. preserve 4.0 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. Project began construction May 2020.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Preliminary Design, Sidewalk and/or Pre-Construction & 06/2019 06/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Altadena - Glenrose Avenue, et al. Crosswalk Rehab/Repair (Existing), Document Preparation | The primary objective of this project Various roadways within the Unincorporated Community of Altadena. 7-7 41 25 Construction 06/2020 06/2022 is to preserve 9.5 miles of residential roads. The project includes pavement prep-work, parkway improvements, curb ramp upgrades, and pavement preservation. Project ID recoded. Concrete work begins June 2020 and ends August 2020. (Construction in FY 2021-22) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement Angeles National Forest - Big Tujunga Canyon Pre-Construction & 01/2020 06/2021 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Various roadways within the Angeles National Forest. 20-20 39, 43 25 Road (Ph I) Construction 06/2021 12/2022 Preparation | The primary objective of this project is to rehabilitate 10.1 miles of major roads. The project includes pavement prep work and pavement rehabilitation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement Del Sur - Avenue G - 20,040' W/O 90th Street (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Pre-Construction & 05/2020 06/2021 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Unincorporated community of Del Sur 10-10 36 21 West to 70th Street West Preparation | The primary objective of this project is to resurface 3.4 mile of rural major roads to Construction 06/2021 12/2022 repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Kagel/Lopez Canyons - Kagel Canyon Road, et Landscape Safety Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Various roadways within the Unincorporated Community of Kagel/Lopez Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Construction 05/2020 07/2021 10-10 39 25 al. Crosswalk Rehab/Repair (Existing) | The primary objective of this project is to resurface 8.6 miles Canyons of major urban roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk La Crescenta-Montrose – La Crescenta and/or Crosswalk Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Unincorporated La Crescenta-Montrose area surrounded by the Cities of Pre-Construction & 06/2019 01/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation 20-20 43 25 Avenue, et al. Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Glendale and La Canada Flintridge. Construction 01/2022 06/2022 Safety), Preliminary Design | Rehabilitate 5.2 miles of major roads, including parkway improvements and curb ramps upgrade. Formerly known as La Crescenta-Montrose – Pennsylvania Avenue, et al.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 9.5 miles of major Various roadways within the Unincorporated Community of Lake Los Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Lake Los Angeles - 240th Street East, et al. 10-10 36 21 roads. The project includes parkway improvements, curb ramp upgrades, and pavement Angeles. Construction 06/2022 12/2022 resurfacing.

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | The primary objective of this project is to resurface 4.5 miles of major Lake Los Angeles - Palmdale Boulevard Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation rural roads. The project includes parkway improvements, curb ramp upgrades, and pavement Various roadways within the Unincorporated Community of Palmdale 10-10 36 21 (Phase II) - 170th St East to 215th St East Construction 06/2022 12/2022 resurfacing. (Construction in FY 2022-23)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Leona Valley - Godde Hill Road Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Various roadways within the Unincorporated Community of Leona Valley 20-20 36 21 Construction 06/2022 06/2023 Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The primary objective of this project is to rehabilitate 2.4 miles of major roads. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Quartz Hill - 20th St West - Avenue O-12 to Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Unincorporated area of Quartz Hill. 10-10 36 21 Avenue M Rehab/Repair (Existing), Pavement Improvement (New), Preliminary Design | The primary Construction 06/2022 12/2022 objective of this project is to resurface 2.8 miles of local roads. The project includes parkway improvements, curb ramp upgrades, and pavement resurfacing. (Construction in FY 2022-23)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Pavement Improvement (New), Quartz Hill - 55th Street West - Avenue M to Pre-Construction & 04/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Preliminary Design, Document Preparation | The primary objective of this project is to resurface Unincorporated community of Quartz Hill 10-10 36 21 Avenue M-8 Construction 06/2022 06/2023 0.75 mile of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design, Document Quartz Hill - Avenue L (Phase 2) - 52nd Street Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Preparation | The primary objective of this project is to resurface 1.2 mile of urban major roads to Unincorporated community of Quartz Hill 10-10 36 21 West to 40th Street West Construction 06/2022 12/2022 repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing. (Construction in FY 2022-23) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Pavement Improvement Roosevelt - Avenue J - 150th Street East to Pre-Construction & 04/2020 09/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation (New), Preliminary Design, Document Preparation | The primary objective of this project is to Unincorporated community of Roosevelt 10-10 36 21 240th Street East Construction 09/2020 08/2021 resurface 9 miles of rural major roads to repair the deteriorating pavement. The project includes pavement dig-outs associated with severe pavement distresses and pavement resurfacing.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety South Antelope Valley - Avenue N - 50th St Pre-Construction & 05/2020 06/2022 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Unincorporated Community of Palmdale. 20-20 36 21 East to 90th St East Construction 06/2022 06/2023 Safety), Preliminary Design | The primary objective of this project is to rehabilitate 4 miles of local roads. The project includes parkway improvements curb ramp upgrades, and roadway reconstruction. (Construction in FY 2022-23)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb South Monrovia Islands - Walnut Grove Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Pavement Various roadways within the Unincorporated Communities of Mayflower Pre-Construction & 05/2020 03/2023 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation 20-20 48, 49 22 Avenue, et al. Improvement (New), Paving and/or Striping Installation (New Safety), Preliminary Design | The Village and East San Gabriel. Construction 03/2023 12/2023 primary objective of this project is to reconstruct 3.8 miles of major roadways. The project includes parkway improvements, curb ramp upgrades, and roadway reconstruction. (Construction in FY 2023-24)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Pavement Improvement (New), Preliminary Design, Document White Fence Farm - 30th Street West - Avenue Pre-Construction & 04/2020 07/2020 Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Preparation | The primary objective of this project is to resurface 1.2 miles of major highway. Unincorporated Community of Quartz Hill 20-20 36 21 N-8 to Avenue O-12 Construction 07/2020 07/2021

Previously known as White Fence Farm - 30th Street West - Avenue N-8 to Avenue O-12

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Santa Monica Mountains - Malibu Canyon Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Preliminary Malibu Canyon Road approximately one mile north of Francisco Ranch Pre-Construction & 05/2020 06/2022 Los Angeles 20/21 New Safety 30-30 50 27 Road at MM 2.32 Design, Document Preparation | Install approximately 695 feet of guard rail on Malibu Canyon Road in the Santa Monica Mountains. Construction 06/2022 12/2022 Road approximately one mile north of Francisco Ranch Road.

This project will include: Storm Drain/Culvert Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Project Scope Development, Sidewalk and/or Crosswalk Installation Pre-Construction & 05/2020 06/2022 Los Angeles 20/21 New Safety Lancaster - Sierra Highway at Avenue E Avenue E and Sierra Highway in unincorporated Antelope Valley. 30-30 41 25 (New), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Construction 06/2022 06/2023 Preliminary Design | Improve truck turning radius at Avenue E and Sierra Highway, by widening Sierra Highway to shift left turn pockets, extend reinforced box culvert and relocate the 36 inch drain pipe, reconfigure the guardrail and restripe the roadway.

This project will include: Upgrade the existing vehicle heads, pedestrian heads and pedestrian Los Angeles 18/19 In Progress Traffic Control Devices East Los Angeles - Olympic Bl at Saybrook Av pushbuttons at the intersection of Olympic Boulevard and Saybrook Avenue. | Total project cost Olympic Boulevard and Saybrook Avenue - East Los Angeles Construction 06/2020 07/2020 15-15 51 24 reflects design costs only.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Safety), Project Scope Development, Roundabout Installation The intersections of Northside Drive at Montebello Parkway, and East Los Angeles and Saybrook Communities Pre-Construction & 07/2019 02/2021 Los Angeles 19/20 In Progress Safety (New), Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Southside Drive at Coolidge Way, in the unincorporated County of Los 10-10 51 24 Traffic Safety Improvements Construction 03/2021 06/2021 Preparation | The objective of this project is to install traffic circle/islands for traffic calming Angeles communities of East Los Angeles and Saybrook. purposes at the intersections of Northside Drive at Montebello Parkway, and Southside Drive at Coolidge Way.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Fairgrove Ave at Sandia Ave et al West Valinda - Fairgrove Av at Sandia Av; Hacienda Heights - Gale Av at Installation (New Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Install flashing Los Angeles 19/20 In Progress Traffic Control Devices (Gale/Falstone, Hacienda/Shadybend, Falstone Av; Hacienda Heights - Hacienda Bl at Shadybend Dr ; South Construction 05/2020 12/2020 15-20 48, 57 22, 32 beacon and restripe crosswalk; New traffic signal; New traffic signal with left turn phasing; Telegraph/Victoria) Whittier - Telegraph Rd at Victoria Av Protected left-turn phasing for west approach. Includes TDS0001514, TDS0001516, TDS0001517, TDS0001545. | Advertised May 12, 2020. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Installation (New), Landscape Safety East Los Angeles - Whiteside Street, et al. Rehab/Repair (Existing), Feasibility Study, Pavement Improvement (New), Paving and/or Striping Various roadways within the Unincorporated Community of East Los Pre-Construction & 05/2017 07/2021 Los Angeles 20/21 New Road Maintenance & Rehabilitation 20-20 51 24 (Phase II) Installation (New Safety), Preliminary Design | Resurface 2.1 miles of residential roads, parkway Angeles. Construction 07/2021 07/2022 improvements, curb ramp upgrade. | The project cost includes design and construction. The project will be split into two phases for construction. The primary objective of this project is to resurface 2.1 miles of residential roads. The project includes parkway improvements, curb ramp upgrades, new sidewalks (as appropriate), and roadway resurfacing.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Installation Stevenson Ranch - Stevenson Ranch Tract (New), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Various roadways within the Unincorporated Community of Stevenson Los Angeles 19/20 In Progress Road Maintenance & Rehabilitation Construction 08/2020 08/2021 7-7 38 21 (Phase I) Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | The primary Ranch. objective of this project is to preserve 4.0 miles of residential roads. The project includes parkway improvements, curb ramps upgrade, pavement prep-work, and pavement preservation.

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 12 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 30 and end at Road 30 1/2 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 14 2"Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 23 and end at Road 23 1/2 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 17 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at city limit and end 684 feet West Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 18 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 15 and end at Road 16 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 200 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Mountain View Peak Road and end at Road 8082 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 222 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Power House Road and end at Tunoi Pl Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 225 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Rainbow Drive and end at Whiskey Pines Drive Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 7 1/2 and end at Avenue 8 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 23 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 9 1/2 and end at Avenue 10 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 26 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Avenue 21 and end at Avenue 23 Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Road 28 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Ellis Street and end at Harper Blvd. Construction 10/2020 06/2021 15-25 5 12

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 1/2 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 8 1/2 and end at Road 9 Construction 10/2020 06/2021 15-25 5 12

Begin at Chowchilla Canal Road and end 4,770 ft. east of Chowchilla Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Construction 10/2020 06/2021 15-25 5 12 Canal Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Madera 20/21 New Road Maintenance & Rehabilitation Avenue 7 2" Hot Mix Asphalt Overlay This project will include: Pavement Rehab/Repair (Existing) Begin at Road 20 and end at Road 21 Construction 10/2020 06/2021 15-25 5 12

Procurement/Operational Madera 20/21 New Road Maintenance & Rehabilitation Self-Loading Patch Trucks This project will include: Procurement of Public Works Equipment Countywide 10/2020 06/2021 15-25 5 12 Needs

Rehabilitate roads in the Loma Verde neighborhood: This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Pre-Construction & 07/2020 06/2021 Marin 20/21 New Road Maintenance & Rehabilitation Northern Region Road Resurfacing 2020-2021 Calle Empinado, Corte Escuela, Corte Norte, Corte Colina, Calle 15-30 2 2 Development, Preliminary Design, Document Preparation Construction 07/2021 11/2021 Arboleda, Via Herbosa

Rehabilitate roads in Central Region: This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Pre-Construction & 07/2020 06/2021 Marin 20/21 New Road Maintenance & Rehabilitation Central Region Road Resurfacing 2020-2021 Auburn St, Woodland Ave, Baytree Rd, Circle Rd, Indian Rd, Knoll Way, 15-30 2 2 Development, Preliminary Design, Document Preparation Construction 06/2021 11/2021 Oak View Dr, Ranch Road, Red Rock Way

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair Marin 20/21 New Road Maintenance & Rehabilitation Sir Francis Drake - Point Reyes Seashore (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Storm Sir Francis Drake Blvd In Point Reyes Seashore Construction 04/2021 12/2021 15-30 2 2 Drain and/or Culvert Rehab/Repair (Existing)

This project will include: Bridge Structure Rehab/Repair (Existing) | Roadway Bridge Approaches Mariposa 20/21 New Match Funds Replace Darrah Road Bridge Darrah Road one half mile from the intersection of Darrah and HWY 49 Construction 03/2021 05/2022 20-40 5 8 and Safety Improvements

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Procurement/Operational Mariposa 20/21 New Other Road Equipment Purchase Equipment Use Countywide 11/2020 05/2021 15-20 5 8 Public Works Equipment Needs

Mariposa 20/21 New Safety Roadway Striping Countywide This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Countywide Heavy ADT Roadways Construction 03/2021 07/2021 4-7 5 8

Gravel Roadway Maintenance Easterm Region Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Grading Eastern Section of County Construction 07/2020 06/2021 4-6 5 8 of the County

Gravel Roadway Maintenance Northern Region Mariposa 20/21 New Other This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Grading Northern Sector of the County Construction 07/2020 06/2021 4-7 5 8 of the County

Gravel Roadway Maintenance West Region of Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Gravel Roadway Maintenance Western Region of the County Construction 07/2020 06/2021 4-7 5 8 the County

This project will include: Procurement of Public Works Equipment | Roadway Drainade Procurement/Operational Mariposa 20/21 New Road Maintenance & Rehabilitation Road Shoulder Drainage and Weed Abatement Countywide 07/2020 04/2021 3-5 5 8 Maintenance and Weed Abatement on County Roads Needs

This project will include: Procurement of Public Works Equipment | Remove roadside trees that Procurement/Operational Mariposa 20/21 New Safety ROW Tree Hazard Removal Countywide 07/2020 06/2021 15-20 5 8 are a safety concern Needs

Upgrade Pavement within the Central Business Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Improvement (New) 3rd Street to 12th Street Construction 03/2021 06/2021 15-20 5 8 District 3rs St. to 12th St.

Mariposa 20/21 New Traffic Control Devices Upgrade Traffic Signage This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Countywide Construction 07/2020 06/2021 8-12 5 8

Mariposa 20/21 New Other Conduct Traffic Studies This project will include: Feasibility Study Countywide Pre-Construction 07/2020 06/2021 4-7 5 8

Pavement Maintenance North Sector of the Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Northern Sector of the County Construction 07/2020 06/2021 5-5 5 8 County

Pavement Repair and Maintenance Eastern Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Eastern region of the County Construction 07/2020 06/2021 5-5 5 8 Region Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Pavement Repair and Maintenance West Mariposa 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) West Region of the County Construction 07/2020 06/2021 5-5 5 8 Region

Mariposa 20/21 New Match Funds Indian Gulch Bridge This project will include: Bicycle Lane (New) Indian Gulch Road at Creek Construction 07/2020 07/2021 20-35 5 8

Mariposa 20/21 New Match Funds Ben Hur Road Rehab This project will include: Pavement Improvement (New) Ben Hur Rd. Post Mile 15.00 - 18.50 Construction 03/2021 06/2021 15-20 5 8

Flynn Creek Road, CR 135, MP 0.00-8.97; 2020 Corrective/Preventative Maintenance Mendocino 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Albion Little River Road, CR 403, MP 0.00-3.19; Construction 08/2020 09/2020 15-21 2 2 Projects Comptche Ukiah Road, CR 223, MP 0.00-10.00

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Rahilly Road Overlay Project, from SR59 to Merced 19/20 Carried Over Road Maintenance & Rehabilitation specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing On Rahilly Road from SR59 to 3.0 miles west of SR59. Construction 07/2020 06/2021 10-15 21 12 End (FY 19/20 CARRYOVER) shoulder backing.

This project will include: Bridge Structure Rehab/Repair (Existing) | Local match requirement for FHWA funding. This project involves the replacement of the existing 2-lane bridge on La Grange La Grange Road Over Dry Creek Bridge Road at Dry Creek. The new bridge will provide adequate and safe vehicle access by realigning On La Grange Road approximately 4.0 miles north of the community of Merced 19/20 Carried Over Match Funds Replacement Project - Local Match (FY 19/20 Construction 07/2020 06/2021 25-50 21 12 the north and south approaches and increasing the sight distance. Therefore, meeting current Snelling. CARRYOVER) safety design standards and enhancing public safety. This project is 88.53% federally funded with an 11.47% local match requirement.

Gurr Road at SR 140 Intersection This project will include: Pavement Rehab/Repair (Existing) | The project consists of widening the Merced 19/20 Carried Over Road Maintenance & Rehabilitation Improvements and Overlay (FY 19/20 turning radius of the southern shoulder of State Route 140 and Gurr Road and resurfacing 0.62 Gurr Road from SR 140 to Wardrobe Road. Construction 10/2020 04/2021 10-15 21 12 CARRYOVER) miles of Gurr Road.

Childs Avenue Rehabilitation Project (FY 19/20 This project will include: Pavement Rehab/Repair (Existing) | Full Depth Reclamation (FDR) and Merced 19/20 Carried Over Road Maintenance & Rehabilitation Childs Avenue between Tower Road and Plainsburg Road Construction 06/2020 01/2021 15-20 21 12 CARRYOVER) Overlay or 4.5-miles of road.

This project will include: Project Scope Development, Active Transportation Plan | This project Misc Roadway Repairs/Overlay Preparation consists of routine pot-hole repairs and thin asphalt overlays within unincorporated areas of Specific locations are yet to be determined; all locations will be selected Merced 20/21 New Road Maintenance & Rehabilitation Work within Unincorporated Areas of the Pre-Construction 07/2020 06/2021 1-10 21 12 Merced County. This project also includes roadway surface and shoulder preparation work for based upon priority need, resources and available funding. County upcoming overlays on various roads.

This project will include: Project Scope Development, Active Transportation Plan | This project Roadway Surface Treatments within consists of applying pavement preservation asphalt surface treatments to existing roadways. This Specific locations are yet to be determined; all locations will be selected Merced 20/21 New Road Maintenance & Rehabilitation Pre-Construction 07/2020 06/2021 1-5 21 12 Unincorporated Areas of the County preventative maintenance project will increase pavement life and improve safety for all traveling based upon priority need, resources and available funding. motorists.

This project will include: Project Scope Development, Active Transportation Plan | This project Install Shoulder Backing within Unincorporated Specific locations are yet to be determined; all locations will be selected Merced 20/21 New Road Maintenance & Rehabilitation consists of maintaining existing road shoulders by replenishing the shoulder material. Therefore, Pre-Construction 07/2020 06/2021 1-5 21 12 Areas of the County based upon priority need, resources and available funding. extending the pavement life and improve safety for all traveling motorists.

This project will include: Project Scope Development, Active Transportation Plan | This project Bridge Maintenance & Repairs within consists of routine maintenance and constructing needed repairs to existing bridges. Therefore, Specific locations are yet to be determined; all locations will be selected Merced 20/21 New Road Maintenance & Rehabilitation Pre-Construction 07/2020 06/2021 5-10 21 12 Unincorporated Areas of the County maintaining the safety and integrity of the County’s existing bridge structures and improving based upon priority need, resources and available funding. safety for all traveling motorists.

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Merced 20/21 New Road Maintenance & Rehabilitation Central Avenue Overlay Project specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing Central Avenue from Turner Avenue to County Line. Construction 07/2020 06/2021 10-15 21 12 shoulder backing.

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Merced 20/21 New Road Maintenance & Rehabilitation River Road Overlay Project specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing River Road from Keaton Road to SR165. Construction 07/2020 06/2021 10-15 21 12 shoulder backing.

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Merced 20/21 New Road Maintenance & Rehabilitation Dan Ward Road Overlay Project specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing Dan Ward Road from Franklin Road to Beachwood Drive Construction 07/2020 06/2021 10-15 21 12 shoulder backing. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Merced 20/21 New Road Maintenance & Rehabilitation August Avenue Overlay Project specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing August Avenue from Griffith Avenue to Shanks Road Construction 07/2020 06/2021 10-15 21 12 shoulder backing.

This project will include: Pavement Rehab/Repair (Existing) | This project consists of repairing Merced 20/21 New Road Maintenance & Rehabilitation Hinton Avenue Overlay Project specific structural failures (digouts), resurfacing the roadway with an asphalt overlay and placing Hinton Avenue from August Avenue to Schendel Avenue Construction 07/2020 06/2021 10-15 21 12 shoulder backing.

County Roads 99, 102, 108, 120, 122, 135, 154, 176, 176A, 260, 261, Modoc 20/21 New Road Maintenance & Rehabilitation Chip Seal Modoc County Roads 20/21 This project will include: Maintenance Program Plan Development Pre-Construction 07/2020 08/2020 7-9 1 1 262, 115, 57, 59, 59A, 59B, 56, & 65

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Long Valley Streets Rehabilitation PS&E and Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Long Valley - Including Crowley Lake, Sunny Slopes, and a portion of Pre-Construction & 01/2020 04/2021 Mono 19/20 In Progress Road Maintenance & Rehabilitation 10-25 5 8 Construction Contingencies Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Swall Meadows Construction 05/2021 12/2021 Design, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Mono 19/20 In Progress Road Maintenance & Rehabilitation Twin Lakes Road Maintenance Bridgeport Valley Construction 03/2020 12/2020 5-5 5 8 Rehab/Repair (Existing)

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Mono 19/20 Carried Over Road Maintenance & Rehabilitation Bridge Maintenance Program Antelope Valley, Bridgeport, Long Valley, etc. Pre-Construction 07/2020 12/2020 10-10 5 8 Development, Maintenance Program Plan Development, Document Preparation

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Airport Road Rehabilitation PS&E and Pre-Construction & 01/2020 04/2021 Mono 20/21 New Road Maintenance & Rehabilitation Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane (New), Airport Road and a portion of Hot Creek Hatchery Road 25-25 5 8 Construction Contingencies Construction 05/2021 12/2021 Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Mono 20/21 New Road Maintenance & Rehabilitation Rock Creek Road Drainage Repairs Rock Creek Road near the Mono-Inyo County Line Construction 09/2020 11/2020 25-35 5 8 Rehab/Repair (Existing)

This project will include: Project Scope Development, Preliminary Design, Maintenance Program Mono 20/21 New Road Maintenance & Rehabilitation Road Division Crack Sealing and Striping County-wide Pre-Construction 07/2020 06/2021 5-5 5 8 Plan Development

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Mono 20/21 New Road Maintenance & Rehabilitation Virginia Lakes Road Maintenance Virginia Lakes Road Pre-Construction 01/2021 06/2021 5-5 5 8 Development, Preliminary Design, Document Preparation

Rock Creek Rd, Mt Morrison Rd, Convict Lake Rd, Aspen Springs Ranch This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Mono 20/21 New Road Maintenance & Rehabilitation 2021 Pavement Preservation Rd, Gregory Lane, Larkspur Ln, Shanna Cr, Camp Antelope Rd, Patricia Pre-Construction 01/2021 06/2021 5-5 5 8 Development, Preliminary Design, Document Preparation Ln

On Iverson Road, from Gloria Road to Johnson Canyon Road; on Gloria Iverson Road, Gloria Road, Johnson Canyon This project will include: Pavement Rehab/Repair (Existing) | Reconstruct/rehabilitate 5 miles of Monterey 18/19 Carried Over Road Maintenance & Rehabilitation Road, from Tavernettie Road to Iverson Road; & on Johnson Canyon Construction 07/2020 06/2021 10-20 30 12 Road road (Iverson Rd-2.2 mi, Gloria Rd-1.9 mi, Johnson Cyn Rd-0.9 mi). Road, from Iverson Road to SVSWA entrance; near the City of Gonzales.

This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate River Road from State On River Road, From State Route 68 to Las Palmas Parkway, near the Monterey 18/19 Carried Over Road Maintenance & Rehabilitation River Road Route 68 Construction 07/2020 06/2021 10-20 29, 30 12, 17 Route 68 to Las Palmas Parkway, 2.6 miles of road. City of Salinas.

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct/rehabilitate River Road On River Road, from Limekiln Road to Gonzales River Road Bridge, near Monterey 20/21 New Road Maintenance & Rehabilitation River Road Limekiln Rd Construction 07/2020 06/2021 10-20 30 12, 17 from Limekiln Road to Gonzales River Road Bridge, 4.6 miles of road. the City of Gonzales.

This project will include: Pavement Rehab/Repair (Existing) | Project is to rehabilitate Alisal Road Monterey 18/19 Carried Over Road Maintenance & Rehabilitation Alisal Road On Alisal Road, near Salina Appx 700 feet of road Construction 07/2021 06/2022 10-20 30 12 near Salinas

Carmel Communities – Scenic Point, Mission Fields, Mid Valley, Brookdale Carmel Valley Communities – Carmel Village, Carmel Woods, This project will include: Procurement of Road Maintenance and Rehab Materials | Perform street High Meadows, Jacks Peak Highway 68 Communities – Toro Park & sweeping on County roads at various urbanized locations, totaling approximately 300 miles of Procurement/Operational Monterey 20/21 New Road Maintenance & Rehabilitation Street Sweeping Serra Village, Las Palmas, San Benancio, Corral de Tierra, Spreckles 09/2020 04/2021 1-1 29, 30 12, 17 sweeping. Sweeping is performed at least twice per year for each location, typically in September Needs Northern County Communities – Castroville, Pajaro, Las Lomas, and April. (NPDES) Prunedale, Bolsa Knolls, Boronda, Moss Landing, Oak Hills, Aromas, Davis Rd & Blanco Rd Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

County wide at various locations. A partial list of roads is as follows: Carpenteria Rd, Dunbarton Rd, Hall Rd, Las Lomas Dr, Oak Vale Rd, This project will include: Public Works Staffing | Perform drainage clearing on County roads at Rodgers Rd, Hartnell Rd, Old Stage Rd, Potter Rd, Potter Rd, Rosehart Procurement/Operational Monterey 20/21 New Road Maintenance & Rehabilitation Drainage Clearing various locations to prevent localized flooding during rain/storm events, which could lead to road Way, Rosehart Way, Arroyo Seco Rd, Camphora - Gloria Rd, Camphora 07/2020 06/2021 1-1 29, 30 12, 17 Needs pavement failure. Rd, Central Ave South, Chualar Rd, Clark Rd, Colony Rd, Fairview Rd, Foothill Rd, Fort Romie Rd, Gloria Rd, Hobson Ave, Jolon Rd, Lagomarsino Ave, Lewis Creek Rd, Lonoak Rd, Los Coches Rd

County wide at various locations. A partial list of roads is as follows: Allison Rd, Amaral Rd, Archer Rd, Aromas Rd, Avila Rd, Baumann Rd, This project will include: Public Works Staffing | Perform vegetation clearing/removal along Bay Farms Rd, Bay View Rd, Bayhill Rd, Berry Rd, Berta Canyon Rd, Procurement/Operational Monterey 20/21 New Road Maintenance & Rehabilitation Vegetation Clearing/Removal County roads at various locations. Vegetation often encroaches onto road right-of-way blocking 07/2020 06/2021 1-1 29, 30 12, 17 Bishop St, Blackie Rd, Blohm Ave, Bluff Rd, Boronda Rd, Brentwood Ct, Needs and hindering motorists' sight distance. This would ensure to keep sight distance clear. Calle Del Adobe, Carneros Ct, Carneros Rd, Carpenteria Rd, Castroville Blvd, Chester Dr, Clausen Rd, Coker Rd, Collins Rd, Corey Rd

On Las Lomas Drive, from Hall Road to Thomas Road, the community of Monterey 20/21 New Road Maintenance & Rehabilitation Las Lomas Drive This project will include: Storm Drain/Culvert Installation (New) Construction 07/2020 06/2021 20-30 29 17 Las Lomas.

County wide at various locations. A partial list of roads is as follows: 15th Street, 17th Street, Abbott Street, Alvarado Road, Artichoke Road, Associated Lane, Avila Road, Berta Canyon Road, Bradley Road, Bunte Road, Burns Road, Cachuaga Road, Camphora Gloria Road, Canada Procurement/Operational Monterey 20/21 New Road Maintenance & Rehabilitation Countywide Road Striping This project will include: Procurement of Road Maintenance and Rehab Materials 03/2021 06/2021 2-5 29, 30 12, 17 Drive, Carmel Knolls Drive, Carmel Valley Road, Central Avenue, Needs Cholame Road, Colony Road, Corda Road, Country Club Drive, Cypress Avenue, Del Monte Farms Road, Doud Road, Dunbarton Road, Elkhorn Road, Elm Avenue

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Napa 20/21 New Road Maintenance & Rehabilitation Olive Hill Lane Paving Olive Hill Lane - Hagen Road to Hagen Road Construction 07/2020 12/2020 20-20 4 3 (Existing Safety)

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Napa 20/21 New Road Maintenance & Rehabilitation Mount George Road Paving Mount George Road - Olive Hill Lane to end. Construction 07/2020 12/2020 10-20 4 3 (Existing Safety)

Napa 20/21 New Other Brookside Drive Storm Repair This project will include: Pavement Rehab/Repair (Existing) | Storm damage road repair Brookside Drive at Conn Creek Construction 07/2020 12/2020 10-20 4 3

All county roads. The following link reflects project locations in which work will be performed and will be updated by the County as work takes This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Striping of Pre-Construction & 07/2019 06/2020 Napa 20/21 New Road Maintenance & Rehabilitation Countywide striping place. 10-20 4 3 various county roads Construction 07/2020 12/2023 https://napacounty.maps.arcgis.com/apps/webappviewer/index.html?id=7 5012d06d08342159b9e9094f1b275a6/

Traffic Signal and Street Light Installation and This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signals-Airport Road, Atlas Peak Road, Trancas St. at Silverado Pre-Construction & 07/2019 06/2020 Napa 18/19 In Progress Road Maintenance & Rehabilitation 15-20 4 3 Rehabilitation Upgrade for existing traffic signals and install and repair approximately 10 street lights. Trail. New street lights-Old Sonoma Road/Congress Valley Road Construction 07/2020 12/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Napa 18/19 Carried Over Road Maintenance & Rehabilitation Mount Veeder Road Rehabilitation Mount Veeder Road Construction 07/2020 12/2020 20-50 4 3 Rehab/Repair (Existing) | Sub grade stabilization and overlays

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Napa 18/19 Carried Over Road Maintenance & Rehabilitation Soda Canyon Road Rehabilitation From Loma Vista continuing east 1 mile Construction 07/2020 12/2020 20-50 4 3 (Existing Safety) | Sub grade stabilization and overlays

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Napa 18/19 Carried Over Road Maintenance & Rehabilitation Partrick Road Rehabilitation End of County road continuing East for 1 mile Construction 07/2020 12/2020 20-50 4 3 Rehab/Repair (Existing) | Sub grade stabilization and overlays

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Napa 18/19 Forecasted Road Maintenance & Rehabilitation Soda Canyon Road Paving Silverado Trail to Loma Vista Construction 07/2021 12/2022 20-20 4 3 (Existing Safety) | Pavement overlay Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Arroyo Grande Drive, Arroyo Lindo Court, Bahia Vista Court, Black Oak Lane, Blue Cove Drive, Cape Cod Court, Carlson Way, Clearwater Court, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Eastridge Drive, Headlands Drive, Jasmine Court, Kona Court, Manzanita Napa 18/19 Forecasted Road Maintenance & Rehabilitation Berryessa Highlands Construction 07/2023 12/2023 20-20 4 3 Rehab/Repair (Existing) | Rebuild, Overlay, seal, as required Lane, Neptune Court, Nile Court, Noah Court, Overland Drive,Parkview Lane, Poppy Lane,Redrock Drive, Rimrock Drive, Steele Canyon Road, WestridgeDrive, Woodhaven Court

Bridle Street, Colt Court, DeputyDrive, Harness Drive, Lariat Street, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Mustang Court, Pony Court, Sage Court, Spur Court, Spur Street, Napa 18/19 Forecasted Road Maintenance & Rehabilitation Berryessa Estates Construction 07/2023 12/2023 10-10 4 3 Rehab/Repair (Existing) | Seals Stagecoach Canyon Road, Stallion Court, Wagon Wheel Drive, Wagon Wheel Court

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Napa 18/19 Forecasted Road Maintenance & Rehabilitation Silverado Trail Phase K Oak Knoll Avenue to Yountville Crossroad Construction 07/2021 12/2021 20-20 4 3 Rehab/Repair (Existing) | Prep work for Pavement Overlay

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Pre-Construction & 07/2019 06/2020 Napa 18/19 In Progress Road Maintenance & Rehabilitation Zinfandel Lane Overlays Zinfandel Lane-State Highway 29 to Silverado Trail 20-25 4 3 Development, Bicycle Lane Rehab/Repair (Existing), Preliminary Design, Document Preparation, Construction 07/2020 12/2020 Active Transportation Plan | Pavement Overlay

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 07/2020 06/2021 Napa 18/19 Forecasted Road Maintenance & Rehabilitation Buhman Road Bridge Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Bicycle Lane (New) | Bridge Buhman Avenue at Congress Valley Road 40-40 4 3 Construction 07/2021 12/2021 Replacement

This project will include: Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair Pre-Construction & 06/2020 09/2020 Napa 18/19 Forecasted Other Mt. Veeder Road Bridge Mt. Veeder Road, Mile Post Marker 2.13 40-75 4 3 (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety), Construction 09/2020 12/2020 Bicycle Lane (New) | Bridge Repair

lower Colfax rd, willow Valley Rd, Quaker Hill rd, Tammy Way, Alexandra 2020 Microsurface and Pavement This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 05/2020 10/2020 Nevada 20/21 New Road Maintenance & Rehabilitation Way, Alta Sierra Way, Karen Dr, Barde Ct, Curtis Ct, ernest Ct, Jon Eric 3-15 1 1 Rehabilitation Project Project Scope Development, Preliminary Design, Document Preparation Construction 05/2020 10/2020 ct, Michael Way, Sean Way, Tony Ct,

various locations, not limited to lower Colfax Way, willow Valley Rd, 2020 Brushing, Shoulder General Maintenace This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Quaker Hill Rd, Tammy way, Alexandra Way, Alta Sierra Dr, Karen Dr, Pre-Construction & 05/2020 11/2020 Nevada 20/21 New Road Maintenance & Rehabilitation 3-15 1 1 Project Signage Rehab/Repair (Existing Safety), Pavement Improvement (New) Barde Ct, Curtis Ct, Ernst Ct, Jon Eric Ct, Michael Way, Sean Way, Tony Construction 07/2020 12/2020 Ct.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, Various streets within Rossmoor South of Katella Avenue, East of 605 Pre-Construction & 04/2020 05/2020 Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance - Rossmoor 7-10 72 34 grind and overlay, RAP Slurry Seal, Microsurfacing, traffic striping, pavement marking and related Freeway, North of 405 Freeway and West of Los Alamitos Blvd Construction 07/2020 12/2021 minor construction

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Various Streets North of Ball Road, East of Gilbert Street, South of Pre-Construction & 04/2020 05/2020 Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance Anaheim Island (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and 7-10 65 29 Broadway and West of Brookhurst Street Construction 08/2020 12/2021 overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Hewes Avenue from 17th Street to Foothill Blvd, Dodge Avenue from Pre-Construction & 06/2020 07/2020 Orange 19/20 In Progress Road Maintenance & Rehabilitation Annual Road Maintenance Northwest Tustin (Existing Safety) | The project consists of performing remedial Repairs of AC & PCC, grind and Hewes Avenue to Newport Avenue and various Streets South of Dodge 7-10 68 37 Construction 09/2020 12/2021 overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction. Avenue

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Various streets within East Tustin; East of Newport Avenue, South of Pre-Construction & 07/2020 08/2020 Orange 20/21 New Road Maintenance & Rehabilitation Annual Road Maintenance East Tustin Rehab/Repair (Existing) | The project consists of performing remedial repairs of AC & PCC, grind 7-10 68 37 Skyline Drive, North of Bryan Avenue and West of Tustin Ranch Road Construction 10/2020 12/2021 and overlay, RAP Slurry Seal, traffic striping, pavement marking and related minor construction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 02/2020 04/2020 Orange 20/21 New Road Maintenance & Rehabilitation Annual Road Maintenance Ladera Ranch Rehab/Repair (Existing) | The project consists of remedial repairs of AC & PCC, grind and Along Sienna Parkway and O'Neill Drive in Ladera Ranch 7-10 73 36 Construction 06/2020 12/2021 overlay, traffic striping, pavement marking and related minor construction.

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of Bridge Maintenance–Arroyo Trabuco Creek ( Oso Parkway Bridge (# 55C0606); Pre-Construction & 07/2020 12/2020 Orange 20/21 New Road Maintenance & Rehabilitation performing remedial repairs to utility opening in soffit, corrosion repair in girders, plug utility 10-15 73 36 55C0606 & 55C0637) Crown Valley Bridge (# 55C0637) Construction 01/2021 06/2021 drainage leak, and related minor construction

Bridge Maintenance– Santiago Canyon Road This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of Pre-Construction & 07/2020 12/2020 Orange 20/21 New Road Maintenance & Rehabilitation Santiago Canyon Road Bridge over Santiago Creek 7-10 68, 73 36, 37 (55C0049) performing bridge deck treatment and related minor construction. Construction 01/2021 06/2021 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of Pre-Construction & 07/2020 12/2020 Orange 20/21 New Road Maintenance & Rehabilitation Bridge Maintenance- Island Way (55C0561) performing remedial repairs of slope pavement under abutment, railings, and related minor Island Way Bridge over Dana Point Harbor 7-10 73 36 Construction 01/2021 06/2021 construction.

This project will include: Bridge Structure Rehab/Repair (Existing), Sidewalk and/or Crosswalk Bridge Maintenance- Hamilton-Victoria Pre-Construction & 07/2020 12/2020 Orange 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing) | The project consists of performing remedial repairs of sidewalk at bridge Hamilton-Victoria Bridge over Santa Ana River 7-10 74 37 (55C0103) Construction 01/2021 06/2021 approach, and related minor construction.

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project will reconstruct approximately 2.8 Trabuco Creek Road Stabilization (Design Along Trabuco Creek Road at Trabuco Canyon Road to Cleveland Orange 18/19 In Progress Road Maintenance & Rehabilitation miles of existing Pre-Construction 07/2019 12/2022 5-10 73 36 Phase) National Forest dirt road with environmentally friendly geofabric material, previous base material, and construct roadway drainage to facilitate emergency vehicle access.

From Santiago Canyon Road and Modjeska Grade Road intersection to Modjeska Grade Road, Road and Drainage This project will include: Preliminary Design | The project will provide a proper drainage system, a Orange 20/21 New Safety 100 feet south of Markuson Road and Modjeska Canyon Road Pre-Construction 01/2020 06/2025 25-25 73 36 Improvements (Design Phase) structurally sound pavement and stabilized slope. intersection.

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project consists of installing traffic signal Along Gilbert Street at Pacific Place Union Pacific Railroad (UPRR) Orange 18/19 In Progress Safety Gilbert Street Improvements - Phase II Pre-Construction 01/2018 06/2023 20-20 65 29 equipment, upgrading railroad appurtenances, and constructing ADA accessible curb ramps and Crossing in the Cities of Anaheim and Stanton refuge area.

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair ADA (Americans with Disabilities Act) (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Orange 19/20 In Progress Safety Various streets within the unincorporated Anaheim island Construction 08/2019 06/2021 25-25 65 29 Upgrades (Annual)-Anaheim Island Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, driveway upgrades and improvements to satisfy current ADA standards and requirements.

This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair ADA (Americans with Disabilities Act) Upgrade (Existing), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Pre-Construction & 02/2020 10/2020 Orange 20/21 New Safety Various streets within unincorporated portions of Midway City 20-20 72 34 (Annual)-Midway City Rehab/Repair (Existing) | The project consists of curb ramp, sidewalk, and driveway upgrades Construction 12/2020 06/2021 and improvements to satisfy current ADA standards and requirements.

This project will include: Project Scope Development, Right of Way, Preliminary Design, Sidewalk Sidewalk Gap Closure - Kellogg Drive (Design Pre-Construction & 02/2020 10/2020 Orange 20/21 New Safety and/or Crosswalk Rehab/Repair (Existing), Document Preparation | provides accessibility for all Kellogg Drive between McCarthy Lane and Old Ranch Road 25-25 55 29 & Construction Phases) Construction 12/2020 06/2021 people while satisfying current ADA standards and requirements

This project will include: Environmental Study/Documents, Project Scope Development, Right of Way, Preliminary Design, Document Preparation | The project consists of extending sidewalk Along Crawford Canyon Road from Willis Lane to Newport Avenue; Crawford Canyon Road Sidewalk Extension Orange 19/20 In Progress Safety along Crawford Canyon Road to enhance pedestrian safety and access by addressing the gap in Newport Avenue from Hyde Park to 750 feet east of Crawford Canyon Pre-Construction 07/2019 12/2023 25-25 68 37 (Design Phase) connectivity. The project also includes upgrades to the existing traffic signal system at the Road Newport Avenue intersection.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Various streets with the Olive Heights area in City of Anaheim (Orange Olive Heights Sidewalk Gap Closure (Design Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation, Sidewalk and/or Pre-Construction & 07/2019 10/2020 Orange 18/19 In Progress Safety Olive Road, Buena Vista St, Olive Avenue, Palm Ave, Orange Ave, View 10-10 68 37 and Construction Phase) Crosswalk Rehab/Repair (Existing) | The project work consists of removing and reconstructing Construction 10/2020 06/2021 Ave) pavement within the roadway, construct 4 feet ADA sidewalk, driveways, and curb ramps, upgrade signs, and small retaining walls, along 3000 feet of roads.

This project will include: Environmental Study/Documents, Project Scope Development, Traffic Management Center Fiber Optic Preliminary Design, Document Preparation | The project consists of expanding the fiber optics Orange 20/21 New Traffic Control Devices Various street segments along Oso Parkway and Los Patrones Parkway Pre-Construction 02/2020 06/2020 20-20 73 36 Expansion (2020-2021) network components to provide real- time data in order to improve transportation safety and mobility.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Upgrades (Annual) – 17th St at Orange 20/21 New Traffic Control Devices The project consists of upgrading the existing traffic signal system by replacing aged, damaged, Intersection of 17th Street and Esplanade Avenue. Construction 02/2020 06/2020 20-20 68 37 Esplanade Ave. and/or obsolete equipment with new equipment.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Upgrades (Annual) – Newport Intersection of Newport Avenue at La Loma Drive in the county Orange 19/20 In Progress Traffic Control Devices The project consists of upgrading the existing traffic signal system to current state standards by Construction 02/2020 06/2020 20-20 68 37 Avenue at La Loma Drive unincorporated area of North Tustin replacing aged, damaged, and/or obsolete equipment with new equipment.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Traffic Signal Upgrades (Annual) – Newport Intersection of Newport Avenue at La Colina Drive in the county Orange 19/20 In Progress Traffic Control Devices The project consists of upgrading the existing traffic signal system to current state standards by Construction 02/2020 06/2020 20-20 68 37 Avenue at La Colina Drive unincorporated area of North Tustin replacing aged, damaged, and/or obsolete equipment with new equipment. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Traffic Signal Upgrades (Annual) – Newport This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Intersection of Newport Avenue at Cowan Heights Drive/Rockhurst Orange 19/20 In Progress Traffic Control Devices Avenue at Cowan Heights Drive/Rockhurst The project consists of upgrading the existing traffic signal system to current state standards by Construction 02/2020 06/2020 20-20 68 37 Avenue in unincorporated North Tustin Avenue replacing aged, damaged, and/or obsolete equipment with new equipment.

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Traffic Signal Upgrade- Newland St at Hazard Rehab/Repair (Existing Safety), Preliminary Design | The project consists of upgrading the Pre-Construction & 02/2020 12/2020 Orange 20/21 New Traffic Control Devices Intersection of Newland Street and Hazard Avenue 20-20 72 34 Ave (Design & Construction) existing traffic signal system by replacing aged, damaged, or obsolete equipment with new Construction 12/2020 06/2021 equipment, and modifying the signal phasing.

This project will include: Environmental Study/Documents, Storm Drain/Culvert Installation (New), Project Scope Development, Right of Way, Feasibility Study, Pavement Improvement (New), Laguna Canyon Road - Segment 4, Phases II Preliminary Design, Bicycle Lane (New), Document Preparation | The project will widen shoulders Pre-Construction & 07/2019 11/2020 Orange 18/19 In Progress Complete Streets Components El Toro Road to SR-73 25-25 74 37 to IV to facilitate a 3500 feet Class II bike lane and undergrounding Edison power Construction 12/2020 06/2023 poles. Combined project with Caltrans includes construction of drainage culvert, roadway widening, and restriping and mitigation.

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Sidewalk and/or Crosswalk Collins Avenue cul-de-sac to the intersection at Eckhoff Street, and Collins Avenue and Eckhoff Street Cul-De-Sac Rehab/Repair (Existing) | The project consists of building out the cul- de-sacs along Orange 18/19 In Progress Complete Streets Components Eckhoff Street cul-de-sac to the intersection of Collins Avenue, within the Construction 12/2019 12/2021 15-15 68 37 Improvements approximately 650 LF of streets following a cell tower relocation. Work consists of removal and City of Orange replace asphalt concrete, replace fencing and gate, curb and gutter, ADA improvements, and replacement of driveways.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Landscape Safety Southeast corner of Santa Ana Avenue and University Drive; and Santa Ana Avenue and University Drive Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Project name Orange 18/19 In Progress Complete Streets Components University Drive from Santa Ana Avenue to Willo Lane, within the City of Construction 10/2019 12/2021 50-50 74 37 Drainage & Pavement Improvements changed from Santa Ana Avenue Storm Drain Improvements and Pocket Park | The project Costa Mesa and unincorporated County consists of reconstructing storm drain catch basin to accommodate ADA access ramps, reconstructing pavement and constructing a neighborhood park facility to treat roadway runoff.

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement City of Anaheim - Brookhurst Street Road and Orange 19/20 In Progress Complete Streets Components (New), Bicycle Lane (New) | The project consists of constructing an additional southbound lane to Brookhurst Street from Cerritos Avenue to Ball Road Construction 07/2020 06/2021 25-25 65 29 Sidewalk Improvements improve traffic flow, as well as construction of a bike lane and sidewalk improvements

Barrett Lane Drainage Improvements (Pre- This project will include: Preliminary Design | The project consists of installing a storm drain Orange 20/21 New Safety Along Circula Panorama, Fairhaven Extension and Barrett Lane Pre-Construction 02/2020 06/2023 25-25 68 37 Design) system and constructing sidewalk improvements.

This project will include: Environmental Study/Documents, Project Scope Development, Trabuco Canyon Bridge (55C0008) Orange 20/21 New Safety Preliminary Design, Document Preparation | The project consists of replacing the existing bridge On Trabuco Canyon Road over Trabuco Creek Channel (L02) Pre-Construction 07/2020 06/2024 50-75 73 36 Replacement (Design Phase) with a new bridge of adequate lane width which will also address overtopping during storm events

This project will include: Cost Estimating, Project Scope Development, Preliminary Design, Along various streets within North Tustin area of unincorporated Orange Orange 20/21 New Safety Guardrail Project Document Preparation | The project consists of upgrading damaged, substandard, and missing Pre-Construction 07/2020 06/2021 10-20 68 37 County guardrails along various streets

This project will include: Pavement Improvement (New), Paving and/or Striping Installation (New 1,500 feet along Antonio Parkway from the end of City of Rancho Santa Pre-Construction & 07/2020 01/2021 Orange 20/21 New Safety Antonio Parkway Gateway Improvements Safety), Preliminary Design | The project consists of constructing a raised median to enhance 20-20 73 36 Margarita boundary Construction 02/2021 06/2023 traffic safety along the corridor.

This project will include: Storm Drain/Culvert Installation (New), Environmental Study/Documents, Right of Way Acquisition, Project Scope Development, Right of Way, Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Installation (New Brea Blvd, Bridge Replacement and Corridor Canyondale Drive to Orange County / Los Angeles County Boundary Pre-Construction & 08/2017 01/2021 Orange 18/19 In Progress Other Safety), Preliminary Design, Document Preparation | Project Name changed from Brea Blvd/Brea 20-25 55 29 Enhancement Project Limit Construction 01/2021 06/2024 Canyon Road Widening Project - Phase 1 | The project consists of removal and reconstruction of 3 new bridges, construction of retaining walls, roadway and intersection grading, and utility relocations.

This project will include: Environmental Study/Documents, Right of Way, Project Scope Along Jamboree Road from Canyon View Avenue to Pioneer Road; and Peters Canyon Bikeway Extension (Design Orange 19/20 In Progress Other Development, Preliminary Design, Document Preparation | The project consists of 3.1 miles of along Pioneer Road from Pre-Construction 07/2019 06/2024 25-25 68 37 Phase) class I and class II bikeways Jamboree Road to Pioneer Way

This project will include: Environmental Study/Documents, Project Scope Development, Right of OC Loop Segment D Carbon Canyon Creek Orange 19/20 In Progress Other Way, Feasibility Study, Preliminary Design, Document Preparation | The project consists of .67 Bastanchury Road to Imperial Avenue Pre-Construction 07/2019 06/2024 25-25 55 29 Bikeway (Design Phase) miles long class I (off-road) bikeway. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Right of Way, Project Scope OC Loop Segment O Coyote Creek Bikeway Orange 19/20 In Progress Other Development, Feasibility Study, Preliminary Design, Document Preparation | The project consists North Fork Trail to Pre-Construction 07/2019 06/2025 25-25 58, 65 32 (Design Phase) of 1.1 miles long class I (off-road) paved bikeway.

This project will include: Environmental Study/Documents, Project Scope Development, OC Loop Segment P Coyote Creek Bikeway Orange 19/20 In Progress Other Feasibility Study, Preliminary Design, Document Preparation | The project consists of .6 miles Artesia Boulevard to Knott Avenue Pre-Construction 07/2019 06/2026 25-25 57, 65 32 (Design Phase) long class I (off-road) paved bikeway

This project will include: Environmental Study/Documents, Right of Way, Project Scope OC Loop Segment Q Coyote Creek Bikeway Orange 19/20 In Progress Other Development, Feasibility Study, Preliminary Design, Document Preparation | The project consists Knott Avenue to La Mirada Boulevard Pre-Construction 07/2019 06/2027 25-25 57, 65 32 (Design Phase) of 1 miles long class I (off-road) paved bikeway

This project will include: Environmental Study/Documents, Project Scope Development, Coast Highway Bikeway and Pedestrian Bridge Preliminary Design, Document Preparation | Project name changed from Surfside Inn Pedestrian Orange 18/19 In Progress Complete Streets Components Over Metrolink railroad tracks Pre-Construction 01/2019 06/2022 50-75 73 36 at Capistrano Beach Overcrossing Phase II, Over Metrolink Railroad Tracks (Design Phase) | The project consists of retrofitting the bridge per Caltrans seismic standards

Totaling in approximately 75 miles of various County roads within the This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Placer 20/21 New Road Maintenance & Rehabilitation HMA Overlay/Slurry Seal 2020 following areas: Tahoe West Shore, Meadow Vista, Colfax, Penryn, Construction 10/2020 08/2021 7-25 1, 5, 6 1, 4 (Existing Safety) Foresthill, Auburn, Granite Bay, Newcastle.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Penryn, Newcastle, Auburn, Foresthill, Meadow Vista, Colfax, Alta/Dutch Placer 20/21 New Road Maintenance & Rehabilitation Chip Seal - Western Placer County Construction 07/2020 08/2021 7-10 1, 5, 6 1, 4 Rehab/Repair (Existing) Flat

Various locations throughout the County pending road review. Materials Purchase of Aggregate/Asphalt Material for Procurement/Operational Placer 20/21 New Road Maintenance & Rehabilitation This project will include: Procurement of Road Maintenance and Rehab Materials will be used for pothole patching and repair of surface pavement 07/2020 06/2021 2-7 1, 5, 6 1, 4 miscellaneous repairs Needs rideability.

Placer 20/21 New Road Maintenance & Rehabilitation Alta Forestry Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Alta Forestry Road, Alta Construction 07/2020 11/2020 20-50 1 1

Placer 20/21 New Road Maintenance & Rehabilitation Rollins Lake Road Slide Repair This project will include: Cut Slope Rehab/Repair to protect roadway (Existing). Rollins Lake Road, Colfax Construction 07/2020 11/2020 20-50 1 1

Miscellaneous Concrete/ADA Curb Repair Various locations - Auburn area subdivisions, Granite Bay subdivisions, Placer 20/21 New Road Maintenance & Rehabilitation This project will include: Project Scope Development Pre-Construction 07/2020 05/2021 30-50 1, 5, 6 1, 4 Purchase Order and West Roseville area subdivisions if needed

Various locations - Foresthill Road corridor to Robinson Flat, roads Tree Trimming/Vegetation Management Placer 20/21 New Road Maintenance & Rehabilitation This project will include: Project Scope Development adjacent to the I-80 corridor from Meadow Vista to Donner Lake, English Pre-Construction 07/2020 05/2021 5-7 1, 6 1, 4 Purchase Order Colony Road

Locations:Tahoe West Shore, Meadow Vista, Colfax, Penryn, Foresthill, Auburn, Granite Bay, Lincoln, Sheridan. HMA Overlay-Tahoe West Shore and Kings Beach, Todd Valley/Foresthill, Meadow Vista, Lincoln, Sheridan This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Placer 19/20 In Progress Road Maintenance & Rehabilitation HMA Overlay / Slurry Seal 2019 Slurry Seal - Granite Bay subdivisions: Treelakes, Greyhawk, Douglas Construction 04/2020 08/2020 7-25 1, 6 1, 4 (Existing Safety) Ranch, Grosvenor Downs, Hidden Lakes, Lakeland, Wood Bridge Ranch; Subdivision roads in Auburn, Penryn and Foresthill: Lomida, The Vineyard, New Airport Rd, Trailhead, Blackhawk, Monte Verde, Walter's Way.

Auburn Ravine/Foresthill Road Overpass Placer 19/20 Carried Over Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Auburn Ravine/Foresthill Road overpass Construction 06/2020 10/2020 25-50 1 1 Surface Repairs and Rehabilitation

Placer 19/20 Carried Over Road Maintenance & Rehabilitation 36" Culvert Lining This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Greenstone Ct, Auburn, CA Construction 06/2020 08/2020 30-35 1 1

This project will include: Curb, Gutter & Sidewalk Repairs - in conjunction with a pavement repair Plumas 18/19 In Progress Complete Streets Components Greenville Streets Pavement Rehabilitation Grand Street, Jessie Street, Bush Street Construction 07/2020 06/2021 15-25 1 1 project. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Lake Davis Road, 6.5 miles, Grizzly Road, 1.3 Miles, Bush Street in Greenville, All Hamilton Branch Subdivision Streets, 3.2 miles, Lake Pre-Construction & 05/2020 06/2020 Plumas 20/21 New Road Maintenance & Rehabilitation RMRA FY20-21 Pavement Treatments This project will include: Pavement Rehab/Repair (Existing) 7-15 1 1 Almanor Dr., 0.7 miles, Peninsula Dr., 0.25 miles, all Valley Ranch Construction 07/2020 09/2021 Subdivision Sts., 2.7 miles, County Route A15, 1.2 miles.

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Procurement/Operational Plumas 20/21 New Road Maintenance & Rehabilitation RMRA FY20-21 Maintenance and Operations Countywide 07/2020 09/2021 1-5 1 1 Staffing Needs

RMRA FY20-21 Equipment Acquisition for Procurement/Operational Plumas 20/21 New Other This project will include: Procurement of Public Works Equipment Countywide 07/2020 09/2021 25-25 1 1 CARB Compliance Needs

This project will include: Bridge Replacement over the Middle Fork of the Feather River - Final Blairsden-Graeagle Road Bridge Replacement - Design Phase | The consultant team has been selected and the contract for the final design phase Blairsden-Graeagle Road Bridge, Br. No. 9C-0134, over the MFFR near Plumas 18/19 In Progress Road Maintenance & Rehabilitation Pre-Construction 07/2020 12/2020 50-50 1 1 Final Design Phase is scheduled to go to the Board of Supervisors for approval in Late October or early November Blairsden 2018.

Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Akley St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Gillette St to Deeble Entrance 12-15 67 28 Construction 06/2020 07/2020

Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Anthony Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Adelfa St to Landerville Blvd 12-15 67 28 Construction 07/2020 08/2020

Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Bodkin Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Brand St to Landerville Blvd 12-15 67 28 Construction 07/2020 08/2020

Pre-Construction & 06/2020 07/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Brand St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Landerville Blvd to Anthony Ave 12-15 67 28 Construction 08/2020 09/2020

Pre-Construction & 06/2020 07/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Buena Vista St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Grand Ave to S'ly .15mi 12-15 61 31 Construction 08/2020 09/2020

Pre-Construction & 07/2020 08/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Coleman Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Gilette St to Adelfa St 12-15 67 28 Construction 09/2020 10/2020

Pre-Construction & 07/2020 08/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Cottrell Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Adelfa St to Blackwell Blvd 12-15 67 28 Construction 09/2020 10/2020

Pre-Construction & 07/2020 08/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Marshall St to Cowie St 12-15 67 28 Construction 09/2020 10/2020

Pre-Construction & 08/2020 09/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Cowie St to Cox St 12-15 61 31 Construction 10/2020 11/2020

Pre-Construction & 09/2020 10/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Deprad St This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Resurface Road Cox St to E'ly .13mi 12-15 61 31 Construction 11/2020 12/2020

Pre-Construction & 09/2020 10/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Encina Dr This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Naranjo St to Short St 12-15 67 28 Construction 11/2020 12/2020

Pre-Construction & 10/2020 11/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Gilette St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Coleman Ave to Akley St 12-15 60 31 Construction 12/2020 01/2021

Pre-Construction & 10/2020 11/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Haynes Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Brand St to Landerville Blvd 12-15 67 28 Construction 12/2020 01/2021

Pre-Construction & 11/2020 12/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Landerville Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Brand St to Cotterell Blvd 12-15 67 28 Construction 01/2021 02/2021 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 07/2020 09/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Grand Ave (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Plumas St to Patrick Ct 12-15 61 31 Construction 03/2021 07/2021 Rehab/Repair (Existing) | Resurface Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 11/2020 03/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Mockingbird Cyn Rd (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Markham St to Van Buren Blvd 15-20 61 31 Construction 09/2021 12/2021 Rehab/Repair (Existing) | Resurface Road

Pre-Construction & 11/2020 12/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Peeler Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Adelfa St to Landerville Blvd 12-15 67 28 Construction 01/2021 02/2021

Pre-Construction & 12/2020 01/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Ranspot Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Landerville Blvd to Adelfa St 12-15 67 28 Construction 02/2021 03/2021

Pre-Construction & 12/2020 01/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Short St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Encina Dr to Brand St 12-15 61 31 Construction 02/2021 03/2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Repair Pre-Construction & 08/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Van Buren Blvd RR Bridge near I-215 7-10 61 31 Settlement Construction 12/2020 03/2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), ADA Pre-Construction & 11/2020 03/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Van Buren Blvd .10 mi NW Pine Ct to Capella St 15-20 61 31 Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction 09/2021 12/2021 Resurface Road

Pre-Construction & 01/2021 02/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Zellar St This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Akley St to S'ly .30 mi 12-15 67 28 Construction 03/2021 04/2021

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Pre-Construction & 04/2020 12/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Center St/ Stephens Ave I-215 to W'ly Versailles Pl 12-15 61 31 Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Construction 09/2020 03/2021 Crosswalk Installation (New) | Resurface Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 04/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Evelyn St (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Katy Way to .05 mi S'ly El Cerrito Rd 15-20 61 31 Construction 08/2020 11/2020 Rehab/Repair (Existing) | Resurface Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 02/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Frances St Katy Way to El Cerrito Rd 15-20 61 31 Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road Construction 08/2020 11/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 02/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Grand View Dr Katy Way to Marilyn Dr 15-20 61 31 Rehab/Repair (Existing) | Resurface Road Construction 08/2020 11/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 02/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Grant St Temescal Cyn Rd to SW'ly .30 mi 15-20 61 31 Rehab/Repair (Existing) | Resurface Road Construction 08/2020 11/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 02/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Katy Way El Cerrito Rd to S'ly Frances St .08 mi 15-20 60 31 Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road Construction 08/2020 11/2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 02/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Marilyn Dr El Cerrito Rd to Grant St 15-20 60 31 (Existing Safety) | Resurface Road Construction 08/2020 11/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 08/2019 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Rainbow Cyn Rd Frontage Rd to N'ly .98 mi 12-15 75 28 Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Reconstruct Road Construction 01/2021 09/2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 08/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Chicago Ave (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Storm Drain and/or Culvert Palm Ave to Cedar Ave 15-20 61 31 Construction 08/2020 11/2020 Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Pre-Construction & 05/2019 02/2020 Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Johnston Ave San Jacinto St. to E'ly Stanford .12 mi 15-20 67 23 Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Construction 11/2020 08/2021 Crosswalk Rehab/Repair (Existing) | Resurface Road

Pre-Construction & 01/2021 02/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Allen Ave This project will include: Resurface Road Olson Ave to White Ave 12-15 67 23 Construction 03/2021 04/2021

Pre-Construction & 02/2020 03/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Bohlen Rd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Mitchell Rd to N'ly .16 mi 12-15 71 28 Construction 04/2020 07/2020

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 01/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Lloyd St Fairview Ave to E'ly .10 mi 15-20 71 23 (Existing Safety) | Resurface Road Construction 08/2020 11/2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Pala Rd S'ly Pechanga Rd .07 mi to SD Co. Line 15-20 75 28 Rehab/Repair (Existing) | Resurface Road Construction 01/2021 03/2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Pre-Construction & 01/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Ramona Expy W'ly Warren Rd .55 mi to E'ly .65 mi 15-20 61 31 Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction 11/2020 02/2021 Resurface road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 01/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Rancho California Rd (Existing Safety), Roundabout Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair Anza Rd 15-20 75 28 Construction 01/2021 09/2021 (Existing) | Reconstruct Roundabout

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 08/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Soboba St (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Stetson Ave to SR 74 12-15 71 28 Construction 05/2021 08/2021 Rehab/Repair (Existing) | Resurface Road

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Pre-Construction & 06/2019 01/2020 Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Stetson Ave Santa Fe St to Hemet St 15-20 67 23 Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Construction 11/2020 08/2021 Crosswalk Rehab/Repair (Existing) | Resurface Road

Pre-Construction & 01/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Thomas St This project will include: Resurface Road Fairview Ave to E'ly .10 mi 15-20 61 31 Construction 08/2020 03/2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 09/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 52nd Ave (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Jackson St to Van Buren St 15-20 60 31 Construction 03/2021 10/2021 Rehab/Repair (Existing) | Resurface Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Installation Pre-Construction & 07/2014 05/2020 Riverside 19/20 Carried Over Road Maintenance & Rehabilitation Bubbling Wells Rd Dillion to Camino Campanero 15-20 42 28 (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction 03/2021 07/2021 Resurface Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 06/2020 07/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Camino Aventura Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Bubbling Wells to E'ly .25 mi 15-20 42 28 Construction 03/2021 07/2021 Resurface Road

Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 11th Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Neighbours Blvd to Arrowhead Blvd 10-10 42 28 Construction 07/2020 05/2021

Pre-Construction & 03/2021 04/2021 Riverside 20/21 New Road Maintenance & Rehabilitation 14th Ave This project will include: Pavement Rehab/Repair (Existing) | Resurface Road Stephenson Blvd to SH 78 10-12 42 28 Construction 05/2021 06/2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Reconstruct Pre-Construction & 04/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 59th Ave Polk St to Fillmore St 12-15 56 28 Road Construction 06/2020 03/2021

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 11/2018 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Calhoun St 54th Ave to 52nd Ave 15-20 42 28 (Existing Safety) | Reconstruct Road Construction 03/2021 10/2021 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Pre-Construction & 01/2021 02/2021 Riverside 20/21 New Road Maintenance & Rehabilitation Keim Blvd This project will include: Pavement Rehab/Repair (Existing) | Resurface Road 20th Ave to 18th Ave 10-12 56 28 Construction 03/2021 04/2021

Pre-Construction & 02/2020 03/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Lemon Blossom Ln This project will include: Pavement Rehab/Repair (Existing) | Resurface Road 66th Ave to 68th Ave 10-12 42 28 Construction 04/2020 02/2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Pre-Construction & 08/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Hobson Way Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk .24 mi W'ly De Frain Blvd to E'ly .50 mi 12-15 56 28 Construction 08/2020 11/2020 Rehab/Repair (Existing) | Resurface Road

Various roads in Riverside county 4th District This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 08/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation North Shore Area Resurfacing Group Map:https://rctlma.org/Portals/0/districts/content/documents/district4_Jun 12-15 42 28 (Existing Safety) | Resurface Road Construction 03/2021 10/2021 e2017.pdf

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 01/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Ramon Rd (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Varner Rd to Monterey Ave 12-15 42 28 Construction 05/2021 07/2021 Lane (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Resurface Road

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 07/2020 10/2020 Riverside 18/19 Carried Over Road Maintenance & Rehabilitation Thousand Palms Cyn Rd Ramon Rd to Dillion Rd 12-15 56 28 (Existing Safety) | Resurface Road Construction 02/2021 07/2021

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction & 01/2020 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Varner Rd 38th Ave to Berkey Dr 12-15 42 28 ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Sidewalk and/or Construction 03/2021 10/2021 Crosswalk Rehab/Repair (Existing) | Resurface Road

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction & 09/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Varner Rd Monterey Ave to .13 mi SE'ly Boca Chica Trl 12-15 42 28 ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Construction 03/2021 09/2021 Resurface Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Pre-Construction & 03/2020 07/2020 Riverside 18/19 Carried Over Road Maintenance & Rehabilitation Ramona Expy Rider St to E'ly 5th St .10 mi 15-20 42, 61, 67 23, 31 Paving and/or Striping Installation (New Safety), Bicycle Lane (New), Sidewalk and/or Crosswalk Construction 11/2020 02/2021 Rehab/Repair (Existing) | Resurface road

This project will include: Pavement Rehab/Repair (Existing) | Resurface road | Pavement Pre-Construction & 12/2019 01/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Jonathan Ave Brookside Ave to N'ly 1.12 mi 12-15 42 23 Rehab/Repair (Existing) Construction 02/2020 05/2021

This project will include: Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction & 08/2008 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation San Timoteo Cyn Rd Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Live Oak Cyn Rd 12-15 61 31 Construction 01/2021 06/2023 Installation (New), Pavement Improvement (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Install Traffic Signal

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Slurry Seal, Various Roads in 1st District Pre-Construction & 12/2019 05/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 1st District Slurry Seal 5-7 67 28 Paving and/or Striping Rehab/Repair (Existing Safety) Map: https://rctlma.org/Portals Construction 12/2020 07/2021

Various Roads in 1st District Pre-Construction & 06/2020 07/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 1st District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal 12-15 67 28 Map: https://rctlma.org/Portals Construction 08/2020 09/2020

Various Roads in 3rd District Pre-Construction & 05/2020 06/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 3rd District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal 5-7 42, 67, 75 23, 28 Map: https://www.rctlma.org Construction 07/2020 08/2020

Various Roads in 4th District Pre-Construction & 07/2020 08/2020 Riverside 20/21 New Road Maintenance & Rehabilitation 4th District Chip Seal This project will include: Pavement Rehab/Repair (Existing) | Chip Seal Map:https://rctlma.org/Portals/0/districts/content/documents/district4_Jun 5-7 42, 56 28 Construction 09/2020 04/2021 e2017.pdf

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Reconstruct Various Roads in 1st District Pre-Construction & 09/2019 02/2020 Riverside 20/21 New Road Maintenance & Rehabilitation Culvert Rehab I 15-20 67 28 Culverts Map: https://rctlma.org/Portals Construction 07/2020 06/2021 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

• W. Elverta Rd from Powerline Rd to Pritchard Ave (Moved to 2020) • Powerline Rd from Elverta Rd to W. Elkhorn Blvd This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement • San Juan Rd from Garden Hwy to City Limits Rehab/Repair (Existing), Cost Estimating | Pavement Maintenance and Rehabilitation • Bar Du Lane, from Rogers Rd. to 4,000 ft. South Pavement Maintenance and Rehabilitation Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, • Reese Rd from Gerber Rd. to 3,000 ft. North Pre-Construction & 05/2019 06/2019 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation 20-25 6, 7, 8, 9 1, 4, 6, 8 Force Account 2019 including: removal and replacement of failed pavement and base material, pothole repair, • Rogers Rd from Bradshaw Rd to East End Construction 06/2019 06/2020 patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. • Campoy St from Minnesota Ave to Fair Oaks Blvd RMRA funding for FY 2020-21 will be used for construction only. • Vincent Ave from Hazel Ave to East End • 18th St from Elkhorn Bl. to Q St. See additional locations on FY20/21 submittal

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, 47th Avenue Pedestrian and Bicycle Feasibility Study, Preliminary Design, Bicycle Lane (New), Document Preparation | Construct a 47th Ave, between the City of Sacramento/Sacramento County border Pre-Construction & 07/2017 02/2020 Sacramento 20/21 New Safety 40-50 7, 9 6 Improvements Project continuous 2-mile Class II bicycle and pedestrian facility and will connect to the existing bicycle and light rail tracks (western limit) to Stockton Blvd (eastern limit). Construction 07/2020 10/2020 lane network.

Approximately 95 curb ramp locations are from the constituent special request list, and are yet to be finalized for the unincorporated area in the This project will include: ADA Curb Ramp Installation (New), Cost Estimating, Feasibility Study, County of Sacramento. Please see the link Pre-Construction & 07/2019 02/2020 Sacramento 20/21 New Safety Accessible Curb Ramp Improvements - 2020 Preliminary Design | Install and upgrade curb ramps to current ADA standards at non-signalized https://sacdot.saccounty.net/Documents/Projects/ADA/Updated%20ADA 50-60 6, 7, 8, 9 4, 6 Construction 07/2020 12/2020 intersections throughout the unincorporated areas of Sacramento County. %20Curb%20Ramp%20List%20for%202020%20CDBG%20%20FY20- 21%20Projects%20Ver%204-20-20%20%28003%29.pdf for the complete list of curb ramp locations from the constituent special request list.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or *El Camino Ave - Mission Ave - Garfield Ave (Moved from RF0D90) Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair *Hazel Ave - Pershing Ave - Greenback Ln Pavement Rehabilitation and Overlay Project Pre-Construction & 06/2019 02/2020 Sacramento 18/19 In Progress Complete Streets Components failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; *Kingsford Ave - American River Dr - Arden Way 20-25 6, 7, 8 1, 4, 6 (SB1 Phase 3) Construction 03/2020 11/2020 repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay *Marconi Ave - Eastern Ave - Walnut Ave including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. *Rio Linda Blvd - Elverta Rd - Placer County Line RMRA funding for FY 2020-21 will be used for construction only.

*Ashton Dre - Saverien Dr - Wixford Way *Barberry Lane - Morse Ave - Watt Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, *California Ave - Oak Ave - Palm Ave Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or *Charleston Dr - Rustic Road - Winding Way Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair *Holly Dr - Crocker Rd - Larch Lane Pavement Rehabilitation and Overlay Project Pre-Construction & 06/2019 07/2020 Sacramento 19/20 In Progress Complete Streets Components failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; *Robertson Ave - Walnut Ave - Fair Oaks Blvd 20-25 6, 7, 8, 9, 11 1, 3, 4, 6, 8 (SB1 Phase 4) Construction 07/2020 11/2020 repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay *Saverien Dr American River Dr Fair Oaks Blvd including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. *Watt Ave - Cottage Way - El Camino Ave RMRA funding for FY 2020-21 will be used for construction only. *Wixford Way - American River - Drive End *W Elkhorn Blvd - West 2nd St -2nd St See Project List for additional 20 locations.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair Pavement Rehabilitation and Overlay Project * Kenneth Ave - Central Ave - Oak Ave Pre-Construction & 06/2019 05/2020 Sacramento 19/20 In Progress Complete Streets Components failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; 20-25 6, 8 1, 4 (SB1 Phase 5) * Madison Ave - Dewey Dr - San Juan Ave Construction 06/2020 11/2020 repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. RMRA funding for FY 2020-21 will be used for construction only.

* W. Elverta Rd from Powerline Rd to Pritchard Ave (from 2019) * Terminous Rd - Oxbo Dr - Hwy 12 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating | * Jackson Slough Rd - Terminous Rd - Hwy 12 Repair and rehabilitate failed areas of pavement on arterial, residential and rural roadways, * Doneva Ave - Minnesota Ave - East End including: removal and replacement of failed pavement and base material, pothole repair, Pavement Maintenance and Rehabilitation * Arnold Way - Mather Subdivision - Mather Boulevard Pre-Construction & 06/2019 07/2019 Sacramento 20/21 New Road Maintenance & Rehabilitation patching, crack sealing, pavement balancing, slurry and chip sealing, and pavement overlay. This 20-25 6, 7, 8, 9, 11 1, 3, 5, 6, 8 Force Account 2020 * Colony Rd - Valensin Rd - Woods Rd Construction 07/2019 09/2020 project is continuous throughout the fiscal year and involves pavement maintenance on roadways * Main St - Locke Rd - Levee Rd in all communities of unincorporated Sacramento County. RMRA funding for FY 2020-21 will be * Sherman Island Rd - Hwy 160 - Levee used for construction only. * Terminous Rd - Jackson Slough Rd - Oxbo Dr * Sargent Ave - New Hope Rd - Kost Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Multiple locations with the list starting at Mendocino Blvd, Fruitridge to Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or 22nd Ave and ending at Sloughhouse Rd, Grant Line Rd to Cresthill Dr. Crosswalk Rehab/Repair (Existing) | Rehabilitate arterial and residential streets, including: repair Pavement Rehabilitation and Overlay Project Please see the the locations listed under Project Location for the project Pre-Construction & 06/2020 07/2020 Sacramento 20/21 New Complete Streets Components failed areas of the pavement (base repair); overlay the roadway with asphalt concrete pavement; 20-25 6, 7, 8, 9, 11 3, 6, 7, 9 (SB1 2021) Pavement Rehabilitation and Overlay Project (SB1 2021) on the Project Construction 07/2020 09/2021 repair damaged curb, gutter, sidewalk; and various items of work to complete the overlay List (part of the attached file "Executed by the Board-Reso & Project including but not limited to placing slurry seal, adjusting manholes, and restriping the roadway. List.pdf"). RMRA funding for FY 2020-21 will be used for construction only. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Right of Way Acquisition, Bridge Twin Cities Road Bridge Replacement at Structure Rehab/Repair (Existing), Right of Way, Preliminary Design | Replace the existing Twin Cities Road at Snodgrass Slough, located 2.0 miles east of River Pre-Construction & 04/2017 12/2020 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation 75-90 9 3 Snodgrass Slough structurally deficient movable swing, steel bridge with a new concrete structure and roadway Road Construction 04/2022 11/2023 approaches.

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair Franklin Blvd Bridge Replacement at Lost Franklin Boulevard at Lost Slough waterway, located south of Twin Cities Pre-Construction & 05/2010 11/2019 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient two-lane 75-90 9 3 Slough Road and east of Interstate 5 Construction 07/2020 10/2020 timber trestle bridge with a new two-lane steel reinforced concrete bridge.

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair Michigan Bar Road Bridge Replacement at (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient modular Michigan Bar Road at the Cosumnes River, located approximately one Pre-Construction & 07/2011 10/2020 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation 75-90 8 8 Cosumnes River concrete panel deck on modular steel box deck trusses and steel girders bridge with a new one- mile north of State Route 16 Construction 05/2021 11/2021 lane concrete slab bridge.

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair Alta Mesa Rd Bridge Replacement at Laguna Pre-Construction & 05/2012 10/2020 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation (Existing), Right of Way, Preliminary Design | Replace the existing structurally-deficient two-lane Alta Mesa Road at Laguna Creek, located north of State Route 104 75-90 8 8 Creek Construction 04/2021 09/2022 concrete deck on timber stringers bridge with a new two-lane concrete slab bridge.

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Pavement Rehab/Repair (Existing), Right of Way Acquisition, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Right of Way, Sidewalk and/or Crosswalk Installation (New), Landscape Safety Installation (New), Pre-Construction & 08/2016 12/2020 Sacramento 18/19 In Progress Complete Streets Components Power Inn Rd Improvements Project Power Inn Road, from 450 feet south of Loucreta Drive to 52nd Avenue 50-60 9 6 Preliminary Design, Bicycle Lane (New) | Construct complete street improvements including new Construction 05/2021 12/2021 sidewalks, curb and gutter, ADA-compliant curb ramps, bike lanes, street lighting, and center medians. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay.

This project will include: Environmental Study/Documents, Bridge Structure Rehab/Repair New Hope Road Bridge Replacement at Grizzly New Hope Road at Grizzly Slough waterway, located approximately one Pre-Construction & 05/2012 12/2020 Sacramento 18/19 In Progress Road Maintenance & Rehabilitation (Existing), Right of Way, Preliminary Design | Replace the existing structurally deficient two-lane 75-90 9 5 Slough half-mile north of the San Joaquin County line Construction 05/2021 11/2021 concrete bridge with a new two-lane pre-tension multiple-girder bridge.

This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, Right of Way Acquisition, Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Right of Way, Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Landscape Safety Installation (New), Bicycle Lane (New) | Pre-Construction & 07/2014 11/2018 Sacramento 18/19 In Progress Complete Streets Components Old Florin Town Improvements Phase 2 Construct complete street improvements including new sidewalks, curb and gutter, ADA- Florin Road, from Power Inn Road to French Road/Florin Perkins Road 50-60 9 6 Construction 07/2019 09/2020 compliant curb ramps, bike lanes, street lighting, center medians, and traffic signal upgrades including ADA-compliant pedestrian signals. Rehabilitate the existing roadway including repair of failed pavement areas, slurry seal and asphalt concrete pavement overlay. RMRA funding for FY 2020-21 will be used for construction only.

This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New •Coyle Ave from Woodleigh Dr to Dewey Dr Pre-Construction & 07/2019 11/2021 Sacramento 20/21 New Safety HSIP Street Light Installation Safety), Right of Way, Preliminary Design, Document Preparation | Install new LED street lighting •Hillsdale Blvd from Frizell Ave. to McCloud Dr 20-30 6, 7, 8 4 Construction 07/2022 10/2022 and other safety improvements on unincorporated area streets for pedestrian and traffic safety. •Watt Ave from Elkhorn Blvd to 700’ north of Elkhorn Blvd.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Cienega Rd Entension Medium Maintenance, Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance From 0.4 Mi S/Union Road to Hospital Road 5-10 30 12 CAPE Seal (Chip Seal w/ Slurry Seal) Construction 04/2021 06/2021 Program Plan Development, Document Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Cienega Rd Extension Medium Maintenance, Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance From Union Road to COP 1475' S/O Union Rd 5-10 30 12 CAPE Seal (Chip Seal with Slurry Seal) Construction 04/2021 06/2021 Program Plan Development, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Cienega Road Medium Rehab, Cold-in-Place Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, From Ashford Circle to Mudstone Ranch 10-15 30 12 Recycling with HMA Overlay Construction 04/2021 06/2021 Maintenance Program Plan Development

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Fairview Rd Medium Rehab, Cold-in-Place Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Project Scope Development, Maintenance Program Plan From Los Viboras to Acquistapace Rd 10-15 30 12 Recycling with HMA Overlay Construction 04/2021 06/2021 Development, Preliminary Design Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Cole Road Heavy Maintenance, CAPE - Double Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program From 104' N Ricardo Dr to 2100' N Ricardo Dr 10-15 30 12 Chip Seal w/ Slurry Seal Construction 04/2021 06/2021 Plan Development, Preliminary Design, Document Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Cole Road Medium Maintenance, CAPE Seal Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Maintenance From 2100' N Ricardo Drive to Anzar Road 5-10 30 12 (Chip Seal w/ Slurry Seal) Construction 04/2021 06/2021 Program Plan Development, Document Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Anzar Road Heavy Maintenance, CAPE - Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Project Scope Development, Maintenance Program Plan From Cole Road to School Road 10-15 30 12 Double Chip Seal with Slurry Seal Construction 04/2021 06/2021 Development, Preliminary Design, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Anzar Road Medium Maintenance, CAPE Seal Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, From School Road to Searle Rd 5-10 30 12 (Chip Seal w/ Slurry Seal) Construction 04/2021 06/2021 Maintenance Program Plan Development, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Anzar Road Heavy Maintenance, CAPE - Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program From Searle Road to San Juan -15 30 12 Double Chip Seal with Slurry Seal Construction 04/2021 06/2021 Plan Development, Preliminary Design, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Carr Avenue Medium Rehab, Cold-in-Place Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program From Anzar Rd to Carpenteria Rd 10-15 30 12 Recycling with HMA Overlay Construction 04/2021 06/2021 Plan Development, Preliminary Design, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Salinas Road Medium Rehab, Cold-in-place Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program From Cl @ San Juan Hollister Rd to Mission Vineyard Rd 10-15 30 12 Recycling with HMA Overlay Construction 04/2021 06/2021 Plan Development, Preliminary Design, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Fairview Rd Medium Rehab, Cold-in-place Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, From San Felipe Rd to Ludis Lane 10-15 30 12 Recycling with HMA Overlay Construction 04/2021 06/2021 Maintenance Program Plan Development, Document Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Cienega Rd Heavy Maintenance, Full Depth Pre-Construction & 08/2020 02/2021 San Benito 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Maintenance Program From Mudstone Ranch to HHSRP 10-15 30 12 Reclamation with HMA Overlay Construction 04/2021 06/2021 Plan Development, Preliminary Design, Document Preparation

Mountain Avenue and other roads (Previously This project will include: Preliminary Design | Mill and overlay as well as ADA curb ramp update San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Various roads in the San Antonio Heights area Pre-Construction 07/2019 06/2021 12-15 40, 41 23, 25 San Antonio Heights Chip Seal) on 20.56 miles in the San Antonio Heights area.

Garnet Street (0.29 Miles South of Newport Ave North to Florida St), San Bernardino 18/19 In Progress Road Maintenance & Rehabilitation Garnet Street and Other Roads This project will include: Preliminary Design | Overlay of 1.39 miles in the Redlands area. Florida St (Greenspot Rd East to Garnet St), Greenspot Rd (0.19 Miles Pre-Construction 08/2019 10/2020 10-12 40 23 North of Florida St South to Florida Street)

This project will include: Preliminary Design | Reconstruction of 1.79 miles on Merrill Avenue. Merrill Avenue from Cherry Avenue east to Catawba Avenue; Randall San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation Merrill Avenue and other roads Reconstruction of 1.51 miles on Randall Avenue. Avenue (Cherry Avenue east to Poplar Avenue); Sequoia Avenue Pre-Construction 07/2019 06/2021 12-20 52 20 Overlay of 0.25 miles on Sequoia Avenue. (Hemlock Avenue east to Beech Avenue);

Sheep Creek Drive and other roads (Previously San Bernardino 18/19 Carried Over Road Maintenance & Rehabilitation This project will include: Overlay on 27.83 miles in the Wrightwood area. Various roads in the Wrightwood area. Pre-Construction 07/2020 08/2020 7-10 36 23 Wrightwood area Chip Seal)

Various Roads in San Bernardino 20/21 New Complete Streets Components South Fontana Area ADA Project This project will include: Cost Estimating, Preliminary Design Pre-Construction 07/2019 06/2021 15-20 52 20 Fontana Area

San Bernardino 20/21 New Complete Streets Components North San Bernardino ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components South San Bernardino ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

San Bernardino 20/21 New Complete Streets Components Southeast Del Rosa ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components Southwest Del Rosa ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in San Bernardino Area Pre-Construction 07/2019 06/2021 15-20 40 23

San Bernardino 20/21 New Complete Streets Components South Mentone ADA Project This project will include: Preliminary Design Various Roads in Mentone Area Pre-Construction 06/2020 09/2023 15-20 42 23

Various Roads in San Bernardino 20/21 New Complete Streets Components Chino/Montclair ADA Project This project will include: Cost Estimating, Preliminary Design Chino and Pre-Construction 06/2020 09/2023 15-20 52 20 Montclair Area

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Amboy Road: Bullion Mountain Road east to 0.12 miles west of Ironage Pre-Construction & 05/2020 07/2020 San Bernardino 20/21 New Road Maintenance & Rehabilitation Amboy Road And Pole Line Road 10-12 42 16 Development Road; Pole Line Road: Lear Ave east to Morongo Road Construction 07/2020 07/2021

Various Roads/Locations in the Lake San Bernardino 20/21 New Road Maintenance & Rehabilitation Brentwood Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 07/2020 09/2020 10-12 33 23 Arrowhead area

Various Roads/Locations in the San Bernardino 20/21 New Road Maintenance & Rehabilitation Arrowbear Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 06/2020 07/2020 10-12 33 23 Arrowbear area

Mount Baldy Road and Ice House Canyon Mount Baldy Road: Los Angeles County line north 4.87 miles; Ice House San Bernardino 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Construction 07/2020 08/2020 7-10 40 23 Road Canyon Road: Mount Baldy Road east 0.16 miles

San Bernardino 20/21 New Road Maintenance & Rehabilitation Bernard Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Roads/Locations in the Crestline area Construction 07/2020 08/2020 10-12 33 23

SH 395 North to Searless Station Cutoff San Bernardino 20/21 New Road Maintenance & Rehabilitation Trona Road This project will include: Pavement Rehab/Repair (Existing) Construction 10/2021 11/2021 10-12 33 16 Rd; Trona area

.56 miles north of I-15 SB off ramp north to Excelsior Mine Road; 11.11 San Bernardino 20/21 New Road Maintenance & Rehabilitation Kingston Road This project will include: Pavement Rehab/Repair (Existing) Construction 04/2020 06/2020 10-12 33 16 miles northerly of Excelsior Mine northerly to Nevada State Line

Various Roads/Locations in the Big Bear San Bernardino 20/21 New Road Maintenance & Rehabilitation North Shore Lane and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 06/2020 07/2020 10-12 33 16, 23 area

Various Roads/Locations in the Nipton San Bernardino 20/21 New Road Maintenance & Rehabilitation Nipton Road and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 05/2020 07/2020 10-12 33 16 area

San Bernardino 20/21 New Road Maintenance & Rehabilitation Lynwood Drive and Other Roads This project will include: Pavement Rehab/Repair (Existing) Various Locations in the San Bernardino area Construction 09/2021 11/2021 7-12 40 23

Various Roads/Locations in the Highland San Bernardino 20/21 New Road Maintenance & Rehabilitation Date Street and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 11/2021 10-12 40 23 and San Bernardino area

Various Roads/Locations in the Chino and San Bernardino 20/21 New Road Maintenance & Rehabilitation Roswell Avenue and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 09/2020 11/2021 10-12 52 20 Montclair area

Various Roads/Locations in the Mentone San Bernardino 20/21 New Road Maintenance & Rehabilitation Fifth Avenue and Other Roads This project will include: Pavement Rehab/Repair (Existing) Construction 06/2021 09/2021 10-12 40, 42 23 area

San Bernardino 20/21 New Complete Streets Components Crestline ADA Project This project will include: Cost Estimating, Preliminary Design Various Roads in Crestline Area Pre-Construction 09/2020 06/2024 15-20 33 23 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

District 5: Palm Canyon Dr., Wranglers Dr., Wheel Hub Pl., Pointing Rock This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), dr., For a complete listing of the roads proposed as part of this project Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane please visit the following website which includes both a list and an 20/21 Pavement Seal, ADA Ramps and Pre-Construction & 07/2020 03/2021 71, 75, 77, 79, San Diego 20/21 New Road Maintenance & Rehabilitation Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, interactive map identifying the location and name of roads in this project 7-10 36, 38, 40 Culverts Construction 07/2021 12/2021 80 Maintenance Program Plan Development, Storm Drain and/or Culvert Rehab/Repair (Existing), (Fiscal Year Bicycle Lane (New), Document Preparation 20/21):https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacin g_Program.html

Enrico Fermi, Airway Drive, Robinwood Dr., Colling Rd., Winnetka Dr., Pluto Ct. For a complete listing of the roads proposed as part of this This project will include: ADA Curb Ramp Installation (New), Environmental Study/Documents, project please visit the following website which includes both a list and an Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Bicycle Lane Pre-Construction & 07/2020 03/2021 71, 75, 77, 79, San Diego 20/21 New Road Maintenance & Rehabilitation FY 2020-21 AC Overlay interactive map identifying the location and name of roads in this project 10-15 36, 38, 40 Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Construction 07/2021 12/2021 80 (Fiscal Year Maintenance Program Plan Development, Bicycle Lane (New), Document Preparation 20/21):https://www.sandiegocounty.gov/content/sdc/dpw/roads/Resurfacin g_Program.html

Pavement Renovation on; Anson Pl : End to Powell St Himmelmann Pl : Broadway to Pacific Ave This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair- (Existing), Jackson St : Drumm St to Columbus Ave Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Joice St : End to Clay St PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Construction of Leroy Pl : End to Sacramento St San Francisco 20/21 New Road Maintenance & Rehabilitation - Construction 03/2021 01/2022 14-21 17 11 No 51 -20 ADA compliant curb ramps Mason St : Bush St to California St Grind and pave 24 Blocks Parkhurst Aly : Clay St to End Grind and pave 8 Intersections Sabin Pl : California St to End Security Pacific Pl : Ofarrell St to End Trader Vic Aly : Post St to Cosmo Pl Walter U Lum Pl : Clay St to Washington St

This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping- Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Construction Fulton St : Franklin St to Arguello Blvd San Francisco 20/21 New Road Maintenance & Rehabilitation Fulton St and Grove St Pavement Renovation - Construction 05/2021 05/2022 14-21 17, 19 11 -of 35 ADA compliant curb ramps Grove St : Lyon St to Central Ave Grind and pave 26 Blocks Grind and pave 19 Intersections

Several blocks on: 30th St Andover St Aztec St Bessie St Coso Ave Ellsworth St This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), - Eugenia Ave Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Heyman Ave PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | Construction of San Francisco 20/21 New Road Maintenance & Rehabilitation - Lundys Ln Construction 10/2021 07/2022 14-21 17 11 No 52 60 ADA compliant curb ramps - Manchester St Grind and pave 33 Blocks Mirabel Ave Grind and pave 12 Intersections Montezuma St Mullen Ave Peralta Ave Precita Ave Prospect Ave Stoneman St Treat Ave

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair- (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Several blocks on: 15th St ; 18th St ; 19th St ; 23rd St ; 26th St ; Alabama PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | # of curb St ; Buena Vista Ave East ; Buena Vista Ave West ; De Haro St ; Harrison San Francisco 20/21 New Road Maintenance & Rehabilitation - Construction 09/2021 09/2022 14-21 17 11 No 53 -ramps TBD St ; Indiana St ; Jamestown Ave ; Mariposa St ; Minnesota St ;Missouri St Grind and pave 45 Blocks ; Tennessee St ; Upper Ter ; Wisconsin St ; Woodward St Grind and pave 20 Intersections Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

10th St : Fell St \ Market St \ Polk St to Brannan St \ Division St \ Potrero This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair- (Existing), Ave; 12th St : Howard St to Harrison St; Brussels St : Wilde Ave to Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Campbell Ave; Bryant St : The Embarcadero to Beale St; Campbell Ave : PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | # of curb Brussels St to Goettingen St; Leland Ave : Cora St to End; Rutland St : San Francisco 20/21 New Road Maintenance & Rehabilitation - Construction 10/2021 10/2022 14-21 17 11 No 54 -ramps TBD Arleta Ave to Visitacion Ave; South Van Ness Ave : 12th St to 17th St Grind and pave 47 Blocks Velasco Ave : Schwerin St to Calgary St \ Sawyer St Grind and pave 35 Intersections Visitacion Ave : Loehr St to Hahn St Wilde Ave :Brussels St to Alpha St \ Goettingen St

18th St : Treat Ave to Dolores St 21st St : Florida St to Treat Ave 22nd St : Shotwell St to Church St This project will include: ADA Curb Ramp Installation (New), Paving and/or Striping Rehab/Repair - 23rd St : Ames St to Chattanooga St (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), 25th St : York St to Mission St PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | # of curb San Francisco 20/21 New Road Maintenance & Rehabilitation - Bryant St : 21st St to Cesar Chavez St Construction 12/2021 11/2022 14-21 17 11 No 55 ramps TBD - Cesar Chavez St : Guerrero St to Noe St Grind and pave 51 Blocks Harrison St : 23rd St to 25th St Grind and pave 28 Intersections Linda St : 19th St to End Noe St : 23rd St to Elizabeth St Still St : Rousseau St to Lyell St

15th St :08th St\Carolinat to Vermont; 19th St :Connecticut to Carolina This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), - 26th St :Wisconsin to Rhode Island; Mariposa St :Texas to Rhode Island; Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Mckinnon Ave :End to Lane; Mendell St :Williams Ave to Yosemite Ave; PW Various Locations Pavement Renovation Pavement Improvement (New), Paving and/or Striping Installation (New Safety) | # of curb San Francisco 20/21 New Road Maintenance & Rehabilitation - Oakdale Ave :End to Keith; Palou Ave :End to Griffith; Pennsylvania Ave Construction 12/2021 12/2022 14-21 17 11 No 56 ramps TBD - :20th St to Cesar Chavez St\I-280NOff Ramp; Revere Ave :Keith to 03rd Grind and pave 43 Blocks St\Bay View; Shafter Ave :Hawes to 03rd St; Thomas Ave :Griffith to Grind and pave 26 Intersections Lane; Utah St :23rd St to 24th St; Yosemite Ave :Hawes to 03rd St

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 04/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Lammers Road Resurfacing (West Side Only) Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Tracy City Limits to Middle Road 10-15 13 5 Construction 04/2021 05/2021 resurface approximately 0.7 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 04/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Lillian Avenue and Stokes Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Miner Avenue to State Route 26; State Route 26 to North End 10-15 13 5 Construction 04/2021 05/2021 resurface approximately 0.6 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair Pre-Construction & 04/2020 05/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Wilcox Road Resurfacing Cherokee Road to North End 10-15 13 5 (Existing) | Design and construction to repair and resurface approximately 0.4 mile of existing Construction 05/2021 06/2021 roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 04/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Alhambra Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Shippee Lane to Morada Lane 10-15 13 5 Construction 04/2021 05/2021 resurface approximately 0.6 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 05/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Brady Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Manteca Road to East End 10-15 12 5 Construction 05/2021 06/2021 resurface approximately 1 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 05/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Briggs Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and West End to Manthey Road 10-15 12 5 Construction 05/2021 06/2021 resurface approximately 1.1 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 05/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Campbell Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Escalon City Limits to Magnolia Avenue 10-15 12 5 Construction 05/2021 06/2021 resurface approximately 1.2 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 05/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Seidner Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and State Route 120 to Kelly Road 10-15 12 5 Construction 05/2021 06/2021 resurfacing approximately 1.3 miles of existing roadway with asphalt concrete. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 06/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Brennan Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Escalon City Limits to Mariposa Road 10-15 12 5 Construction 06/2021 07/2021 resurface approximately 3 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 06/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Turner Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Davis Road to Lodi City Limits 10-15 9 5 Construction 06/2021 07/2021 resurface approximately 1.5 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 06/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Van Allen Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and State Route 120 to Lone Tree Road 10-15 12 5 Construction 06/2021 07/2021 resurface approximately 2 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Sidewalk and/or Crosswalk Rehab/Repair Lake Drive: South End to North End; Middlefield Avenue: Carlton Pre-Construction & 04/2020 07/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation East Country Club Reconstruction, Phase 4 15-20 13 5 (Existing) | Design and construction to reconstruct approximately 0.4 mile of existing roadway with Avenue to Lake Drive Construction 07/2021 09/2021 asphalt concrete, and repair curb, gutter, and sidewalk where needed.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 07/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation S. 99 Frontage Road (E) Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Stockton City Limits to Munford Avenue 10-15 13 5 Construction 07/2021 09/2021 resurface approximately 1.3 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 07/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Castle Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Northland Road to French Camp Road 10-15 12 5 Construction 07/2021 08/2021 resurface approximately 1.5 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2020 08/2021 San Joaquin 20/21 New Road Maintenance & Rehabilitation Melton Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Manteca Road to Austin Road 10-15 12 5 Construction 08/2021 09/2021 resurface approximately 2 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2019 07/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Ellen Street and Shaw Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and SR 26 to North End 10-15 13 5 Construction 07/2020 08/2020 resurface approximately 0.9 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2019 08/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Horner Avenue Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Drake Avenue to Walker Lane 10-15 13 5 Construction 08/2020 09/2020 resurface approximately 0.9 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Paloma Avenue and Portola Avenue Paloma Avenue: Thornton Road to Lower Sacramento Road Pre-Construction & 04/2019 08/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and 10-15 13 5 Resurfacing Portola Avenue: Balboa Avenue to Cortez Avenue Construction 08/2020 09/2020 resurface approximately 0.5 mile of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Magnolia Avenue and Mahon Avenue Pre-Construction & 04/2019 07/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and Escalon-Bellota Road to Campbell Road (both roads) 10-15 12 5 Resurfacing Construction 07/2020 08/2020 resurface approximately 2.0 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2019 07/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Shippee Lane Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and N 99 Frontage Road E to Alhambra Avenue 10-15 13 5 Construction 07/2020 08/2020 resurface approximately 0.9 mile of existing roadway with asphalt concrete.

SD1:Access St; Austin Rd; Mathews Rd; Newcastle Rd; JackTone Rd W/S. SD2:N 99 Frontage Rd E; McAllen Rd; Newton Rd SD3: Austin Rd; Howard Rd; Lathrop Rd; Roberts Rd; Thornton Rd W/S. SD4:Cometa Rd; This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Comstock Rd; Davis Rd; Dodds Rd; French Camp Rd; Harney Ln; Pre-Construction & 04/2019 06/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Chip Seal 2019-2020 Cost Estimating, Right of Way, Preliminary Design | Design and construction to resurface and 5-7 9, 12, 13 5 JackTone Rd; JackTone Rd E/S; Lone Tree Rd; Lower Sacramento Rd; N Construction 06/2020 08/2020 rehabilitate approximately 63 miles of existing roadways with chip seal. 99 Frontage Rd E; N 99 Frontage Rd W; New Hope Rd; River Rd; Thornton Rd; Turner Rd; West Ripon Rd S/S. SD5:Corral Hollow Rd; 11th St; Grant Line Rd; Linne Rd; West Ripon Rd Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

SD1: Boggs Tract; Burkett Gardens/Orchard Homesites; French Camp; Mosswood/Taft Park. SD2: Alpine Heights; Lincoln Village Central; This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Slurry Seal Arterial and Collector Roads 2019- Lincoln Village East; Lincoln Village West; Lower Sacramento Rd; Pre-Construction & 04/2019 06/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Cost Estimating, Right of Way, Preliminary Design | Design and Construction to repair and apply 5-7 9, 12, 13 5 2020 Oakridge. SD3: Elkhorn Golf Course Estates; Lathrop Rd; Lower Construction 06/2020 07/2020 slurry seal to approximately 14.9 miles of existing arterial and collector roadways. Sacramento Rd; Wagner Heights. SD4: Morada North; Morada South; Morada Central. SD5: Larch Rd; Woodward Ave.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair Pre-Construction & 04/2019 09/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation West Country Club Reconstruction, Phase 9 (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to De Ovan Avenue: Kirk Avenue to Ryde Avenue 15-20 13 5 Construction 09/2020 11/2020 reconstruct approximately 0.3 mile of existing roadway with asphalt concrete, and repair curb, gutter, and sidewalk where needed.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair Monterey Avenue: Franklin Avenue to Marine Avenue. Sonoma Avenue: Pre-Construction & 04/2019 08/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation East Country Club Reconstruction, Phase 3 (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing) | Design and construction to 15-20 13 5 Plymouth Avenue to Delaware Avenue. Construction 08/2020 09/2020 reconstruct approximately 0.4 mile of existing roadway with asphalt concrete, and repair curb, gutter and sidewalk where needed.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2019 09/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Durham Ferry Road Resurfacing Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and SR 33 to 1.5 miles West of Kasson Road 10-15 13 5 Construction 09/2020 10/2020 resurface approximately 1.6 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), New Hope Road, Nowell Road and Thornton Thornton Road to Nowell Road; South End to New Hope Road; Walnut Pre-Construction & 04/2019 08/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair and 10-15 13 5 Road Resurfacing Grove Road to New Hope Road Construction 08/2020 09/2020 resurface approximately 1.2 miles of existing roadway with asphalt concrete.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Pre-Construction & 04/2019 10/2020 San Joaquin 19/20 In Progress Road Maintenance & Rehabilitation Peltier Road Resurfacing/Widening Cost Estimating, Right of Way, Preliminary Design | Design and construction to repair, resurface Thornton Road to Ray Road 10-15 13 5 Construction 10/2020 11/2020 and widen approximately 1.7 miles of existing roadway with asphalt concrete.

The scope of the work includes surface treating approximately 59.4 miles of various County Roads including: 2020-21 Surface Treatment Various County •8.4 miles in rural west Paso Robles area Pre-Construction & 06/2020 08/2020 San Luis Obispo 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) 5-15 35 17 Roads •16.0 miles in rural east Templeton area Construction 01/2021 06/2021 •21.7 miles in rural east Cayucos and Morro Bay areas •13.3 miles in Cayucos area

The scope of the work includes resurfacing approximately 12.6 miles of 2020-21 HMA Overlay Various South County This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair various Pre-Construction & 08/2020 02/2021 San Luis Obispo 20/21 New Road Maintenance & Rehabilitation 20-25 35 17 Roads Nipomo (Existing) South County Roads including: Construction 06/2021 12/2021 •12.6 miles in Nipomo area

The scope of the work includes resurfacing approximately 6.9 miles of various 2020-21 HMA Overlay Various North County This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pre-Construction & 05/2020 12/2020 San Luis Obispo 20/21 New Road Maintenance & Rehabilitation North County Roads including: 20-25 35 17 Roads (10th/Chimney Rock) (Existing Safety) Construction 01/2021 06/2021 •1.2 miles in west San Miguel area •5.7 miles in rural west Paso Robles area

This project will include: Preliminary Design | This Project consists of replacing the existing bridge Mirada Road Bridge and Bank Stabilization San Mateo 18/19 In Progress Road Maintenance & Rehabilitation with a prefabricated aluminum bridge and stabilizing the banks adjacent to the bridge with bank Miramar Beach, Half Moon Bay Pre-Construction 07/2018 12/2021 50-75 13 24 Project protection (soil nail walls and rock slope protection).

This project will include: Preliminary Design, Document Preparation | Seal projects can be a chip Cape Seal Project in the Broadmoor Village, seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road Burlingame Hills, Harbor/Industrial, Menlo Unincorporated San Mateo County. Broadmoor Village, Burlingame Hills, oil, immediately followed by an application of small rocks called chips. Chip seals are San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Oaks, North Fair Oaks, San Mateo Highlands, Harbor/Industrial, Menlo Oaks, North Fair Oaks, San Mateo Highlands, Pre-Construction 07/2018 12/2021 5-10 11, 13 19, 22, 24 approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the and West Menlo Park Areas (2021 OBAG and West Menlo Park Areas. application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in Cape Seal) depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

This project will include: Preliminary Design | This Project consists of installing a concrete pile San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Scenic Drive Repair wall with a subsurface soil drainage system and reconstructing the damaged road portion of Scenic Drive, La Honda Pre-Construction 07/2018 12/2020 20-25 13 24 Scenic Drive.

This project will include: Preliminary Design, Document Preparation | This project consists of Madera Bridge Rehabilitation Project (Bridge San Mateo 18/19 In Progress Road Maintenance & Rehabilitation bridge rehabilitation work on Madera Madera Lane Bridge over El Corte de Madera Creek, San Gregorio, Ca. Pre-Construction 07/2018 12/2020 20-30 13 24 Preventative Maintenance Program) Lane Bridge over El Corte de Madera Creek. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

9 bridges located in the unincorporated areas of San This project will include: Cost Estimating, Preliminary Design, Document Preparation | This Mateo County.; Pescadero Creek Road Bridge at Cloverdale Road; Bridge Preventative Maintenance Project Project consists of performing bridge preventative maintenance rehabilitation work on nine Pescadero Road [Anderson Bridge]; Pescadero Road Bridge at Alpine San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Pre-Construction 07/2018 12/2021 20-30 13 24 (BPMP Phase 2) existing bridges within the County of San Mateo, such as treating bridge decks with methacrylate, Creek; Sand Hill Road Bridge; Lobitos Creek Road; Butano Cut-Off repairing concrete spalling, and repairing scour protection at existing slope protection. Bridge ; Wurr Road Bridge ; Entrada Way Bridge; Gazos Creek Road Bridge;

This project will include: Preliminary Design, Document Preparation | This project consists of San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Old La Honda Slipout Permanent Repairs conducting a feasibility analysis and Old La Honda Rd. Unincorporated San Mateo County. Pre-Construction 07/2018 12/2020 30-50 13 24 constructing improvements to rebuild the road and stabilize the road embankment

This project will include: Preliminary Design, Document Preparation | This project consists of San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Higgins Canyon Road Slipout conducting a feasibility analysis and Higgins Canyon Road Unincorporated San Mateo County Pre-Construction 07/2018 12/2020 30-50 13 24 constructing improvements to rebuild the road and stabilize the road embankment

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Concrete Repairs (North Fairs Oaks Area) (Existing Safety) | This Project consists of repairing and installing concrete infrastructure North Fair Oaks Area Construction 07/2018 12/2020 20-25 13 24 such as sidewalk, curbs and gutters, valley gutters and access ramps.

This project will include: Preliminary Design, Document Preparation | This project consists of removing failed concrete slope protection and coarse woody debris adjacent to the bents of the Cloverdale Road Bridge is located approximately 3 miles south of the San Mateo 18/19 In Progress Road Maintenance & Rehabilitation Cloverdale Bridge Scour Counter Measures bridge and intersection of Pescadero Creek Road and Cloverdale Road, just south of Pre-Construction 01/2019 12/2020 50-75 13 24 constructing permanent scour countermeasures to stabilize the bents from further scour due to Eden West Road. creek bed degradation. Some emergency debris removal occurred in Winter 2018.

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Pedestrian Improvements on El Camino San Mateo 19/20 Carried Over Complete Streets Components Installation (New) | This Project is a joint project with City of Daly City to install concrete sidewalks Daly City along a portion of El Camino Real and Mission Rd. Construction 07/2019 12/2020 20-25 19 11 Real/ and access ramps along a portion of El Camino Real/Mission Road.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and Reconstruction of Roads in the West Menlo placement of a new road surface. The road bed is the layer below the road surface. It can be Pre-Construction & 07/2019 12/2020 San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Roads in the West Menlo Park Area 20-25 24 13 Area () reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into Construction 12/2020 12/2021 the existing structural section to a depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Rehab/Repair (Existing), Preliminary Design, Document Preparation | A reconstruction project consists of removal of the existing road surface, reconstructing or rehabilitating the road bed, and Reconstruction of Roads in the North Fair Oaks placement of a new road surface. The road bed is the layer below the road surface. It can be Pre-Construction & 07/2019 07/2020 San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Roads in the North Fair Oaks Area 20-25 24 13 Area (Loyola Avenue) reconstructed with similar material or it can be rehabilitated by pulverizing and mixing cement into Construction 07/2020 12/2020 the existing structural section to a depth of approximately 1 foot. | Replacing or rehabilitating the road bed increases the structural capacity of the road section to a level that is required for long term performance. The new road surface is typically 2 inches of asphalt concrete or seal placed on top of the road bed.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Overlay Project in Road Maintenance Districts Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp 3, El Granada, Emerald Lake Hills, Moss Rehab/Repair (Existing), Preliminary Design, Document Preparation | An overlay or resurfacing El Granada, Emerald Lake Hills, Moss Beach, Palomar Park, Princeton Pre-Construction & 07/2019 07/2020 San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Beach, Palomar Park, Princeton By The Sea, project involves the application of approximately 2 inches of asphalt concrete to the existing 10-15 22, 24 13 By The Sea, San Mateo Highlands, and West Menlo Park Areas Construction 07/2020 12/2020 San Mateo Highlands, and West Menlo Park surface or pavement of the road to help prolong the life of the road. Overlaid or resurfaced roads Areas (2020 Resurfacing) may include repairs to fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, ADA Curb Ramp Cape and Slurry Seal Project in the El Rehab/Repair (Existing), Preliminary Design, Document Preparation | Seal projects can be a chip Granada, Ladera, Los Trancos Woods, seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, a type of road El Granada, Ladera, Los Trancos Woods, Montara, Moss Beach, and Pre-Construction & 07/2019 07/2020 San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation 5-10 24 13 Montara, Moss Beach, and Skylonda Areas oil, immediately followed by an application of small rocks called chips. Chip seals are Skylonda Areas Construction 07/2020 12/2020 (2020 Cape) approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the Chip Seal Project in the Road Maintenance application of asphaltic emulsion, a type of road oil, immediately followed by an application of Pre-Construction & 07/2019 07/2020 San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Road Maintenance Districts 8, 9, and Skylonda Areas 5-10 24 13 Districts 8, 9, and Skylonda Areas (2020 Chip) small rocks called chips. Chip seals are approximately ¼ to 3/8 inch in depth over the existing Construction 07/2020 12/2020 road surface. A slurry seal is the application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal.

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Project Scope Development, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Storm Damage Improvement Project in La Pre-Construction & 07/2019 07/2020 San Mateo 19/20 Carried Over Other Preparation | This project consists of removing and replacing eroded or collapsed culverts with La Honda, Road Maintenance Districts 8 and 9. 20-25 24 13 Honda, Road Maintenance Districts 8 and 9 Construction 07/2020 12/2020 new sections to provide a continuous network of storm drainage system and constructing improvements to rebuild the damaged roads caused by storm water erosion.

This project will include: Cost Estimating, Project Scope Development, Landscape Safety Rehab/Repair (Existing), Feasibility Study, Preliminary Design, Document Preparation | This Lerida Court and Garbada Way Retaining Wall Pre-Construction & 07/2019 12/2020 San Mateo 19/20 Carried Over Other project consists of conducting a feasibility analysis and constructing improvements, including Ladera/Portola Valley 50-75 24 13 Project Construction 12/2020 12/2021 retaining walls to stabilize hillside slopes along Lerida Court and Garbada Way in the Ladera Area.

This project will include: Procurement of Public Works Equipment | This project consists of performing bridge maintenance such as deck treatments for short span bridges throughout the Procurement/Operational San Mateo 19/20 Carried Over Road Maintenance & Rehabilitation Bridge Maintenance Project San Mateo County wide 07/2019 12/2021 20-30 19, 22, 24 11, 13 San Mateo County. The deck treatment shall consist of a methacrylate or concrete polyester Needs overlay.

This project will include: Procurement of Public Works Equipment | This Project consists of Procurement/Operational San Mateo 20/21 New Other Annual Coastside Vegetation Various streets in County of San Mateo 07/2020 12/2021 1-5 22, 24 13 maintenance of vegetation along roadway and within County maintained areas Needs

This project will include: Procurement of Road Maintenance and Rehab Materials | This Project Procurement/Operational San Mateo 20/21 New Other Concrete repairs (Countywide) consists of repairing and installing concrete infrastructure such as sidewalk, curbs and gutters, Various streets in County of San Mateo 07/2020 06/2021 20-25 22, 24 13 Needs valley gutters and access ramps.

Street and Regulatory Sign Replacement This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pre-Construction & 07/2020 12/2020 San Mateo 20/21 New Other (Country Club, Burlingame Hills and San Mateo Traffic Signals, Lights, and/or Signage Installation (New Safety) | This Project consists of Country Club, Burlingame Hills and San Mateo Highlands 20-25 22, 24 13 Construction 01/2021 06/2021 Highlands) replacing existing street and regulatory signs to meet reflectivity and sizing requirements.

This project will include: Procurement of Public Works Equipment | This project consists of Procurement/Operational San Mateo 20/21 New Other 2020 Coastside Culvert Repairs removing and replacing eroded or collapsed culverts with new sections to provide a continuous Various county own parts of San Mateo County 07/2020 06/2021 20-25 22, 24 13 Needs network of storm drainage system and minimize damage to the road system.

This project will include: Repair and Servicing of Public Works Equipment | This project consists Procurement/Operational San Mateo 20/21 New Other 2020 Slipout Repairs Various county own streets in County of San Mateo 07/2020 06/2021 30-50 22, 24 13 of constructing improvements to rebuild the road and stabilize the road embankment. Needs

This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | This project consists of removing and replacing a 60 inch eroded culvert Pre-Construction & 07/2020 12/2020 San Mateo 20/21 New Other Lower Bear Gulch 60 in. Culvert Repair Lower Bear Gulch Road in La Honda Area 20-25 22, 24 13 with a new section to provide a continuous network of storm drainage system and minimize Construction 01/2021 06/2021 damage to the road system.

This project will include: Procurement of Public Works Safety Materials and Gear | Seal projects can be a chip seal, slurry seal, or cape seal. A chip seal is the application of asphaltic emulsion, Chip Seal Project in the Road Maintenance a type of road oil, immediately followed by an application of small rocks called chips. Chip seals Procurement/Operational San Mateo 20/21 New Other Various county owned streets in County of San Mateo 07/2020 12/2021 5-10 22, 24 13 Districts 8 and 9 (2021 Chip) are approximately ¼ to 3/8 inch in depth over the existing road surface. A slurry seal is the Needs application of asphaltic emulsion and fine aggregate. Slurry seals are approximately ¼ inch in depth over the existing road surface. A cape seal is a chip seal covered by a slurry seal. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating | An overlay or resurfacing project involves the Overlay Project in Emerald Lake Hills, Palomar application of approximately 2 inches of asphalt concrete to the existing surface or pavement of Emerald Lake Hills, Palomar Park, San Mateo Highlands, and West Pre-Construction & 07/2020 12/2020 San Mateo 20/21 New Other Park, San Mateo Highlands, and West Menlo 10-15 22, 24 13 the road to help prolong the life of the road. Overlaid or resurfaced roads may include repairs to Menlo Park Construction 01/2021 12/2021 Park Areas (2021 Resurfacing) fix cracks and/or potholes in advance of the surface treatment. These repairs won’t be visible after the final road treatment.

This project will include: Procurement of Public Works Safety Materials and Gear | This project Procurement/Operational San Mateo 20/21 New Other 2021 Countywide Culvert Repairs consists of removing and replacing eroded or collapsed culverts with new sections to provide a County of San Mateo 07/2020 12/2021 20-25 22, 24 13 Needs continuous network of storm drainage system and minimize damage to the road system.

This project will include: Procurement of Road Maintenance and Rehab Materials | This project Procurement/Operational San Mateo 20/21 New Other 2021 Countywide Striping Project Various county owned streets in County of San Mateo. 07/2020 12/2021 5-10 22, 24 13 consists of replacing and installing striping for the road and bicycle facilities Needs

Aliso Canyon Rd,Betteravia Rd Black Rd to Sinton Rd,Black Rd; Orcutt Rd Telephone Rd; Santa Maria Mesa Rd; Bonita School Rd; Roblar Ave; Ballard ; Canyon Rd; Figueroa Mountain Rd; Santa Rosa Rd; Jalama Rd; Santa Barbara 20/21 New Road Maintenance & Rehabilitation Countywide Paving This project will include: Pavement Rehab/Repair (Existing) Foxen Canyon Rd; Happy Canyon Rd; Zaca Station Rd; Bell St; HWY Construction 07/2020 06/2021 10-15 35, 37 19 135; 1660' E HWY 135; Hapgood Rd; HWY 246 E End; HWY 246 W End; Sweeney Rd; Roble Dr; Las Olas Dr;Marina Dr; Mayrum St; Anita Ln; Rhoads Ave; Burtis St; San Marcos Rd; Anita Ln; Via Miguel S End ; Anita Ln; Glenn Annie Rd; Refugio Rd

Summit Rd (Middle Rd Hot Springs Rd); La Mirada Dr (Hwy 192 ) Paquita Dr La Mirada DrPaquita DrE End Paquita Dr; La Mirada Dr to E End; Walnut Park Dr; Ribera Dr to S End This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Walnut Park Ln; Walnut Park Dr to S End Pre-Construction & 07/2020 04/2021 Santa Barbara 20/21 New Road Maintenance & Rehabilitation Countywide Pavement Rehabilitation 10-20 35, 37 19 Rehab/Repair (Existing), Cost Estimating, Project Scope Development Calle Barquero; University Dr to Santa Rosalia; Tiburon Pl; Calle Construction 05/2021 07/2021 Barquero to W End; Brown Rd; 2 MI E HWY 1 to 2.45 MI E HWY 1 Mission Gate Rd Purisima Rd to HWY 246 Cherry Ave Clark Ave to Patterson Ave Foxen Canyon Rd MP 23.00 to MP 24.00

School zones around the following schools: Cuyama Christian Academy, El Camino School, Hollister School, Mountain View School, Winfred Santa Barbara 20/21 New Safety School Zone Striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Wollam School, Santa Ynez School, Olga Reed School, Los Berros Construction 07/2020 04/2021 3-5 35, 37 19 School, Buena Vista School, Cabrillo High School, Arellanes School, and Patterson School.

San Ysidro Rd, N & S Jameson Ln, Padaro Ln, Calle Real, Lillie Ave, Santa Claus Ln, Sheffield Dr, Ortega Hill Rd, Santa Monica Rd, Cravens Ln, Mission Canyon Rd,Tunnel Rd,Gobernador Canyon Rd,Rincon Hill Rd, Shepard Mesa Rd, Lambert Santa Barbara 20/21 New Safety Countywide Striping and Pavement Marking This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 07/2020 04/2021 3-5 35, 37 19 Rd, Toro Canyon Rd,Via Real,La Cumbre Rd,Park Ln,Romero Canyon Road,San Leandro Ln,Santa Rosa Ln,E Mountain Dr,Hollister Ave,Turnpike Rd,Calle Real,Cathedral Oaks Rd,San Marcos Rd,Patterson Ave,Palmer Rd,Jalama Rd, and 30 other locations throughout the County

This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement and Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Uvas Creek Bridge @ Uvas Rd Uvas Rd Construction 12/2020 10/2022 30-50 29 17 realign roadway.

Replacement of Hooker Creek Bridge @ Santa Clara 19/20 Forecasted Road Maintenance & Rehabilitation This project will include: Bridge Structure Rehab/Repair (Existing) | Bridge replacement. Aldercroft Heights Road Construction 09/2022 10/2024 30-50 28 15 Aldercroft Heights Road (37C0506)

Mitigation and Monitoring of Isabel Creek This project will include: Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Bridge (37C0089) at San Antonio Valley Road (New) | Once bridge is constructed, plantings have to be done as mitigation. Monitor and reporting San Antonio Valley Road Construction 09/2019 08/2029 30-50 25, 30 15 (10Yr) to regulatory agencies are conditions of permits. 10-yr monitoring and reporting requirement.

This project will include: Landscape Safety Rehab/Repair (Existing) | Once bridge is constructed, Environmental Mitigation, Monitoring & Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation plantings have to be done as mitigation. 10-yr monitor and reporting to regulatory agencies are Carnadero Creek Bridge at Bloomfield Avenue Construction 07/2018 06/2028 30-50 30 17 Reporting-Scour G I - 37C0103 (ON SYSTEM) conditions of permits. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Pavement and Other General Road Staffing, Procurement of Public Works Equipment, Repair and Servicing of Public Works County Wide all locations are yet to be finalized and are determined Procurement/Operational 24, 25, 27, 28, Santa Clara 20/21 New Road Maintenance & Rehabilitation 07/2020 06/2021 7-10 10, 13, 15, 17 Maintenance Equipment | Annual Maintenance activities such as patching, chip seal, crack seal, overlay, based on priority need, resources, and funding throughout the year. Needs 29, 30 striping and other general road and roadside maintenance as needed throughout the county.

Metal Beam Guard Rail Improvements - Phase This project will include: Preliminary Design | Repair existing damaged guard rails and new Hicks Road, Alum Rock Avenue, Leavesley Road, Page Mill Road, Moody Pre-Construction & 07/2020 03/2021 25, 27, 28, 29, Santa Clara 20/21 New Road Maintenance & Rehabilitation 25-50 13, 15, 17 2 installation which includes terminal systems. Road, Canon Vista, Almaden Expressway, Henwood Road Construction 04/2021 06/2021 30

Signal Mast Arms at Foothill This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Arboretum Avenue at Foothill Expressway, Forbes Avenue at San Tomas Pre-Construction & 07/2019 12/2019 Santa Clara 20/21 New Traffic Control Devices Expressway/Arboretum and San Tomas 30-50 24, 25 10, 13 Safety), Preliminary Design Expressway Construction 01/2020 02/2020 Expressway/Forbes

Traffic Signal at Watsonville Road and Uvas This project will include: Cost Estimating, Traffic Signals, Lights, and/or Signage Installation (New Pre-Construction & 07/2021 11/2021 Santa Clara 20/21 New Traffic Control Devices Watsonville Road at Uvas Road 10-10 17 30 Road Safety), Preliminary Design Construction 12/2021 06/2022

Almaden Expressway, Capitol Expressway, San Tomas Expressway, Pedestrian Striping and Sign Enhancements on This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Pre-Construction & 06/2020 07/2020 Santa Clara 20/21 New Safety Foothill Expressway, Montague Expressway, San Tomas Expressway, 30-50 24, 25 15, 17 County Expressways Estimating, Paving and/or Striping Installation (New Safety), Preliminary Design Construction 08/2020 06/2021 Page Mill Expressway

County Expressways This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Central, Lawrence, Foothill, Page Mill-Oregon, San Tomas, Montague, Preliminary Design | Replace front vehicle detector loops at signalized intersections to promote Pre-Construction & 08/2020 11/2020 24, 25, 27, 28, Santa Clara 19/20 Carried Over Traffic Control Devices Front Loops Replacement at Various Locations Almaden, and Capitol (all locations are yet to be finalized and are 10-15 13, 15, 17 efficiency of signals. Works in conjunctions with the County's Intelligent Transportation System Construction 12/2020 06/2021 30 determined based on priority need, resources, and funding throughout the network. year)

Pedestrian Sensor Installation and Mast Arm This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) | Santa Clara 19/20 In Progress Safety Foothill Expressway Construction 08/2018 09/2020 30-50 27, 28 15 on Foothill Expressway Improve pedestrian safety

Leavesley Road at New Avenue - New Traffic Santa Clara 19/20 Carried Over Traffic Control Devices This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) Leavesley Road at New Avenue Construction 09/2020 08/2021 10-10 30 17 Signal Installation

County Expressways; Central, Lawrence, Foothill, Page Mill-Oregon, San This project will include: Landscape Safety Rehab/Repair (Existing) | The project will repair or Tomas, Montague, Almaden, and Capitol. All locations are yet to be 24, 25, 27, 28, Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Soundwall Replacement Project Construction 06/2019 06/2021 50-50 10, 13, 15, 17 replace existing damaged sound walls along the County Expressway system. finalized and are determined based on priority need, resources, and 29 funding throughout the year.

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project 24, 25, 27, 28, Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Trash Capture Systems enables the County to meet on-going trash reduction mandates by retrofitting existing storm drain County Expressways Construction 06/2019 06/2021 20-20 10, 13, 15, 17 29 inlets with trash capturing screens.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | The project will Metal Beam Guard Rail Improvements - Phase Hicks Road, Alum Rock Avenue, Leavesley Road, Page Mill Road, Moody 24, 25, 27, 28, Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation repair or replace existing damaged Guard Rails along the County roads and add additional Guard Construction 07/2020 10/2020 25-50 10, 13, 15, 17 1 Road, Canon Vista, Almaden Expressway, Henwood Road 29, 30 Rails where warranted for safety.

Tallent Avenue, Freeman Avenue, Ridgetop Drive, McKee Road, Fairway Drive, Alum Rock Avenue, Gion Avenue, Ridgeview Avenue, Piazza Way, Santa Clara 19/20 Carried Over Complete Streets Components ADA Pedestrian Ramps This project will include: ADA Curb Ramp Installation (New) Construction 05/2020 06/2021 25-50 27, 30 15, 17 Porter Lane, McVay Avenue, Woodhaven Drive, Tunis Avenue, San Martin Avenue, Lawrence Expressway

This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation and provide Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Uvas Road Pavement Rehabilitation Uvas Road Construction 06/2020 10/2020 15-20 25 17 better access for bicyclists

Intersection Improvements Stevens Creek @ This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Project will Santa Clara 19/20 Forecasted Complete Streets Components Stevens Creek Blvd at San Tomas Expressway Construction 06/2023 10/2024 30-40 28 17 San Tomas provide 2nd left turn lane at intersection of Stevens Creek and San Tomas Expressway.

Santa Clara 19/20 Carried Over Road Maintenance & Rehabilitation Almaden Expressway Pavement Rehabilitaiton This project will include: Pavement Rehab/Repair (Existing) Almaden Expressway Construction 07/2020 12/2020 15-25 25 15

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Traffic Signals, Lights, and/or Signage Installation (New Safety), Sidewalk and/or Crosswalk Capitol Expressway Sidewalk and Soundwall Installation (New), Preliminary Design | Project will provide new sidewalks and replace damaged Pre-Construction & 04/2012 03/2024 Santa Clara 19/20 Carried Over Complete Streets Components Capitol Expressway 30-50 27, 28 15 Improvements soundwalls along certain sections of Capitol Expressway. Phase I & II completed. Phase III on Construction 04/2024 03/2025 hold due to LRT extension project and Expressway Program Widening. May incorporate Phase III Soundwall Project into Expressway Widening Project once LRT project is completed. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Landscape Safety Installation (New) | Pre-Construction & 07/2019 08/2019 Santa Clara 19/20 In Progress Road Maintenance & Rehabilitation Soda Springs Road Soil Stabilization Due to soil instability roads are too narrow for safety. Soil stabilization will allow the road to be Soda Springs Road 10-10 28 15 Construction 09/2019 10/2020 widened to allow for safe passage and for the use of first responders in emergency situations.

Replacement of Los Gatos Creek Bridge @ Pre-Construction & 03/2016 08/2022 Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation This project will include: Bridge replacement. Aldercroft Heights Road 30-50 28 15 Aldercroft Heights Road (37C0508) Construction 09/2022 10/2024

Replacement of Los Gatos Creek Bridge @ Pre-Construction & 03/2016 08/2022 Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation This project will include: Bridge replacement. Aldercroft Heights Road 30-50 28 15 Aldercroft Heights Road (37C0507) Construction 09/2022 10/2024

This project will include: Bridge Structure Rehab/Repair (Existing) | Once bridge is constructed, Mitigation & Monitoring of Stevens Canyon Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation plantings have to be done as mitigation. Monitor and reporting to regulatory agencies are Stevens Canyon Construction 06/2016 05/2028 30-50 28 13 Bridges 37C0604 & 605 (Old 37C0574 & 575) conditions of permits. 10-yr monitoring and reporting requirement.

Pre-Construction & 06/2003 11/2020 Santa Clara 18/19 In Progress Safety Red Fox Creek Bridge @ New Ave. 37C-172 This project will include: Bridge replacement. New Ave. 30-50 30 17 Construction 12/2020 10/2022

This project will include: Bridge Structure Rehab/Repair (Existing), Feasibility Study, Preliminary Pre-Construction & 09/2003 06/2018 Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Cochrane Bridge Monitoring Program 37C-166 Cochrane bridge at Anderson Lake 30-50 25 17 Design | Continuous seismic monitoring of bridge over Anderson Lake. Construction 11/2020 06/2028

This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Pre-Construction & 07/2013 08/2018 Santa Clara 18/19 In Progress Safety Alma Pump Station Upgrades at Alma Street and Oregon Expressway 30-50 24 13 Safety and electrical improvements Construction 09/2018 10/2020

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Pre-Construction & 06/2018 06/2020 Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation McKean Road Pavement Rehabilitation McKean Road 15-20 25 17 (Existing), Preliminary Design | Pavement rehabilitation and provide better access for bicyclists Construction 07/2020 10/2020

This project will include: Preliminary Design | Construct new bike/ped trail to connect City of San Jose's, Caltrans', and County's ROW along Alum Rock Rd from White Rd to Alum Rock City Santa Clara 18/19 In Progress Complete Streets Components Alum Rock Ave Multimodal Trail Alum Rock Ave Pre-Construction 08/2019 05/2025 20-30 25 15 Park. SB1 funds to be used for staff cost to initiate project and for contract administration. Construction, Construction Engineering, and inspection costs to come from Measure B.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Pre-Construction & 06/2018 06/2020 Santa Clara 18/19 In Progress Road Maintenance & Rehabilitation Capitol Expressway Pavement Rehabilitation Design | Pavement rehabilitation of Capitol Expressway. Will evaluate CIR and HMA to promote Capitol Expressway 15-25 24 15 Construction 07/2020 11/2020 longevity and cost effectiveness over mill/fill process.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Santa Cruz 20/21 New Traffic Control Devices Holohan Road and College Road at Hwy 152 Hwy 152 Construction 05/2022 12/2022 50-75 30 17 Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Installation (New Safety)

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Slipout - 25'L x Santa Cruz 20/21 New Other Jamison Creek Road PM 1.61 PM 1.61 Construction 05/2022 12/2022 50-75 29 17 10'D - Recommend Roadway and Shoulder Reconstruction and Installation of Soldier Pile Wall

This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Santa Cruz 20/21 New Safety Pinehurst Dr at Greenbrier Dr Greenbrier Dr Construction 05/2021 12/2021 50-75 29 17 Installation (New)

Santa Cruz 20/21 New Other Soquel San Jose Rd PM 1.25 This project will include: Slipouts - 60' long. Recommend soil nail reatining wall PM 1.25 Construction 05/2023 12/2023 50-75 29 17

State Park Dr at Santa Cruz Av, Broadway, & This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving Santa Cruz 20/21 New Safety Santa Cruz Av, Broadway, Center Ave Construction 05/2022 12/2022 50-75 29 17 Center Ave and/or Striping Installation (New Safety), Landscape Safety Installation (New) Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Glen Arbor Rd; Hihn Rd; East Zayante Rd; Upper Zayante Rd; West Vine Hill Rd; Vine Hill Rd; Mountain View Rd; North Rodeo Gulch Rd; Laurel Santa Cruz 20/21 New Road Maintenance & Rehabilitation 2020 RSTP/STIP Resurfacing Project This project will include: Pavement Rehab/Repair (Existing) Construction 05/2020 12/2020 10-10 29 17 Glen Rd; Mount Hermon Rd; Lockwood Ln; Graham Hill Rd; Pioneer Rd; Varni Rd; Empire Grade

Santa Cruz 20/21 New Other Countywide Roadway Culvert Survey This project will include: Maintenance Program Plan Development All Roads Pre-Construction 05/2020 12/2022 50-50 29 17

Graham Hill Rd ; Bonny Doon Rd; Bear Creek Rd ;East Zayante Countywide Roadside Vegetation Maintenance Santa Cruz 20/21 New Road Maintenance & Rehabilitation This project will include: Landscape Safety Rehab/Repair (Existing) | Vegetation Maintenance Rd;Empire Grade Rd;Eureka Canyon Rd; Highland Way; Summit Rd; N Construction 05/2020 07/2021 5-5 29 17 Project Rodeo Gulch Rd; Larkin Valley Rd; Soquel San Jose Rd

Graham Hill Rd; Felton Empire Rd; Bear Creek Rd; East Zayante Rd; Countywide Roadside Drainage Maintenance Glen Arbor Rd; El Rancho Dr; Swanton Rd; Browns Valley Rd; Hazel Dell Santa Cruz 20/21 New Road Maintenance & Rehabilitation This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Construction 05/2020 07/2021 5-5 29 17 Project Rd; Larkin Valley Rd; N Rodeo Gulch Rd; Laurel Glen Rd; Mountain View Rd

Orchard Dr; Mill St; Double Bogey Dr; Boulder St; El Rancho Dr; Prescott Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Culvert Maintenance Project This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Rd; Soquel San Jose Rd; Bowen Ave; Valencia Rd; Fletcher Ct; Old Construction 05/2020 07/2021 50-75 29 17 Chittenden Rd; Buena Vista Dr

Empire Grade Rd; Eureka Canyon Rd; Highland Way; Swanton Rd ; N Santa Cruz 20/21 New Road Maintenance & Rehabilitation Countywide Roadbed Maintenance Project This project will include: Pavement Rehab/Repair (Existing) Construction 05/2020 07/2021 10-20 29 17 Rodeo Gulch Rd; Browns Valley Rd; Hazel Dell Rd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Striping Two Bar Rd; Newell Creek Rd; Glen Arbor Rd; Rio Del Mar Blvd; Bonita Santa Cruz 20/21 New Safety Countywide Striping Maintenance Project Construction 05/2020 07/2021 5-5 29 17 Maintenance Dr; Soquel Dr; 17th Ave; Green Valley Rd; Casserly Rd; Corralitos Rd

Empire Grade Rd; Glenwood Dr; Bear Creek Rd; Felton Empire Rd; Ice Cream Grade Rd; Bonny Doon Rd; Soquel Dr; East Cliff Dr; Portola Dr; Santa Cruz 20/21 New Safety Countywide Signage Maintenance Project This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Construction 05/2020 07/2021 10-20 29 17 17th Ave; Soquel/San Jose Rd; Buena Vista Dr; Freedom Blvd; Corralitos Rd; Eureka Canyon Rd; Carlton Rd ; Casserly Rd

EL RANCHO DR; LA MADRONA DR; BEAR CREEK RD; SOQUEL/SAN Santa Cruz 20/21 New Safety Countywide Guardrail Maintenance Project This project will include: Guardrail Maintenance Construction 05/2020 07/2021 50-75 29 17 JOSE RD; GLENWOOD DR

Road Drainage Master Plan Study - Zone 5 This project will include: Feasibility Study, Preliminary Design | Road Drainage Master Plan Study Santa Cruz 20/21 New Other All Roads Pre-Construction 05/2020 06/2022 50-75 29 17 roads - Zone 5 roads

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Alba Road PM 0.73 50-75 29 17 Preliminary Design, Document Preparation | Retaining Wall Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (70' L) - Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Bear Creek Rd PM 4.99 PM 4.99 50-75 29 17 Recommend WB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Construction 05/2020 12/2020 Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Bear Creek Rd PM 7.0 Preliminary Design, Document Preparation | Slipout (25' L) - Recommend EB Travelled Way and PM 7.0 50-75 29 17 Construction 05/2020 12/2020 Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Branciforte Dr PM 2.22 Preliminary Design, Document Preparation | Slipout (15' W x 75' L) - Recommend SB Shoulder PM 2.22 50-75 29 17 Construction 05/2020 12/2020 Reconstruction, Creek Bank Armoring and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Lompico Road PM 0.22 Preliminary Design, Document Preparation | Slipout (40' W x 100' L) - Recommend SB Travelled PM 0.22 50-75 29 17 Construction 05/2020 12/2020 Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Lompico Road PM 2.38 Preliminary Design, Document Preparation | Slipout (10' W x 25' L) - Recommend NB Travelled PM 2.38 50-75 29 17 Construction 05/2022 12/2022 Way and Shoulder Reconstruction and Installation of Retaining Wall (Crib)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Redwood Lodge Road PM 2.02 Preliminary Design, Document Preparation | Large Slipout (30' W x 120' L) and Landslide - PM 2.02 50-75 29 17 Construction 05/2021 12/2021 Recommend Roadway Reconstruction and Retaining Wall (Stitch Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Soquel San Jose Road PM 5.91 Preliminary Design, Document Preparation | Large Slipout (24' W x 115' L) - Recommend PM 5.91 50-75 29 17 Construction 05/2021 12/2021 Roadway Reconstruction and Retaining Wall (TBD) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Stetson Road PM 1.20 Preliminary Design, Document Preparation | Slipout (60' L x 15' D) - Recommend EB Traveled PM 1.20 50-75 29 17 Construction 05/2020 12/2020 Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 8' Concrete Arch Culvert Failure and Slipout (54' L) - Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Road Maintenance & Rehabilitation Swanton Road PM 0.72 PM 0.72 50-75 29 17 Recommend Temporary Creek Diversion System, SB Travelled Way and Shoulder Construction 05/2022 12/2022 Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Alba Road Preliminary Design, Document Preparation | Slipout (75' L) - Recommend Travelled Way and PM 1.58 50-75 29 17 Construction 05/2020 12/2020 Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Branciforte Drive Preliminary Design, Document Preparation | Slipout (15' W x 75' L) - Recommend SB Shoulder PM 1.77 50-75 29 17 Construction 05/2020 12/2020 Reconstruction, Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road Preliminary Design, Document Preparation | Large Slipout/ landslide 85' long x 10' deep, slip PM 2.00 50-75 29 17 Construction 05/2021 12/2021 potential - Retaining Wall Installation

This project will include: Large Slipout, Recommend Roadway Reconstruction, Drainage Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road PM 2.08 50-75 29 17 Improvements and Retaining Wall (TBD) Installation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road Preliminary Design, Document Preparation | Slipout - 30' wide by 10' deep, Recommend Shoulder PM 2.13 50-75 29 17 Construction 05/2021 12/2021 Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Settling Roadway 85' long, possible cross culvert Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road PM 2.16 50-75 29 17 damage, Recommend Culvert Replacement, Roadway and Shoulder Reconstruction and Construction 05/2021 12/2021 Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road Preliminary Design, Document Preparation | Failing Crib Wall - 50' long x 12' tall, Recommend PM 2.21 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction and Retaining Wall Structure Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road Preliminary Design, Document Preparation | Slipout with Embankment Settlement, Recommend PM 2.37 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction and Retaining Wall

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hazel Dell Road Preliminary Design, Document Preparation | Failed Crib Wall, Reconstruct Damaged Shoulder PM 2.58 50-75 29 17 Construction 05/2021 12/2021 and Roadway, Retaining Wall (Soldier Pile) Installation

This project will include: Slipout - 55'L x 15'D - Recommend Roadway and Shoulder Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Jamison Creek Road PM 0.70 50-75 29 17 Reconstruction and Installation of Soldier Pile Wall Construction 05/2020 12/2020

This project will include: Slipout - 80'L x 8'D - Recommend Roadway and Shoulder Reconstruction Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Jamison Creek Road PM 0.80 50-75 29 17 and Installation of Soldier Pile Wall Construction 05/2020 12/2020

This project will include: Slipout - 30'L x 10'D - Recommend Roadway and Shoulder Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Jamison Creek Road PM 1.44 50-75 29 17 Reconstruction and Installation of Soldier Pile Wall Construction 05/2020 12/2020

This project will include: 85' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Mt. Charlie Road PM 0.26 50-75 29 17 Shoulder Reconstruction Construction 05/2020 12/2020

This project will include: 50' L slipout, Recommend Installing Soldier Pile Wall, Pavement and Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Mt. Charlie Road PM 2.47 50-75 29 17 Shoulder Reconstruction Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Rider Road Preliminary Design, Document Preparation | 35' L slipout, Recommend Installing Retaining Wall PM 0.07 50-75 29 17 Construction 05/2021 12/2021 (TBD), Pavement and Shoulder Reconstruction

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Rider Road Preliminary Design, Document Preparation | 80' L slipout, Recommend Installing Soldier Pile PM 0.80 50-75 29 17 Construction 05/2021 12/2021 Wall, Pavement and Shoulder Reconstruction

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Schulties Road Preliminary Design, Document Preparation | Large Slipout and roadway failure - Recommend PM 2.05 50-75 29 17 Construction 05/2021 12/2021 Roadway and Shoulder Reconstruction and Retaining Wall Installation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Stetson Road Preliminary Design | Slipout (55' L x 18' D) - Recommend EB Traveled Way and Shoulder PM 1.08 50-75 29 17 Construction 05/2020 12/2020 Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Swanton Road Preliminary Design, Document Preparation | 60' L slipout, Recommend Installing Soldier Pile PM 3.00 50-75 29 17 Construction 05/2021 12/2021 Wall, Pavement and Shoulder Reconstruction

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Alta Via Rd Preliminary Design, Document Preparation | Roadway Failure (12' W x 50' L)- Recommend PM 0.42 50-75 29 17 Construction 05/2020 12/2020 Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Bean Creek Rd Preliminary Design, Document Preparation | Slipout (25+/-' L) - Recommend SB (Outboard) PM 2.10 50-75 29 17 Construction 05/2022 12/2022 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' W x 20+/-' L) - Recommend NB/EB Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Bear Creek Rd PM 2.12 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2022 12/2022 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Bear Creek Rd Preliminary Design, Document Preparation | Slipout (40' L) - Recommend SB/WB Shoulder PM 7.26 50-75 29 17 Construction 05/2020 12/2020 Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Existing Retaining Wall Damaged - Recommend Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Browns Valley Rd PM 2.14 50-75 29 17 WB/SB Traveled Way and Shoulder Reconstruction, Drainage Improvements and 18" Culvert and Construction 05/2022 12/2022 Repair of Existing Retaining Wall (Crib)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Browns Valley Rd Preliminary Design, Document Preparation | Slipout (10' L) - Recommend NB Shoulder PM 2.93 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, RSP and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Casserly Rd Preliminary Design, Document Preparation | Slipout (20' W x 80' L) - Recommend EB/SB PM 2.93 50-75 30 17 Construction 05/2021 12/2021 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Casserly Rd Preliminary Design, Document Preparation | Slipout (20' W x 20' L) - Recommend EB/SB PM 3.39 50-75 30 17 Construction 05/2021 12/2021 Shoulder Reconstruction and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10+/-' W x 60' L) and Roadway/Embankment Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Cathedral Dr PM 1.21 50-75 29 17 Settling (60' L) - Recommend SB Traveled Way and Shoulder Reconstruction, , Drainage Construction 05/2022 12/2022 Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Slipout (40' L) - Recommend WB Shoulder Reconstruction, Drainage Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Cox Rd PM 1.93 50-75 29 17 Improvements (New Storm Drain Through Wall) and Retaining Wall (Soldier Pile) Installation Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (60'W x 100' L) - Recommend WB Traveled Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Cox Rd PM 2.03 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Construction 05/2020 12/2020 Pile)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2023 Santa Cruz 19/20 Carried Over Other East Cliff Dr Preliminary Design, Document Preparation | Damage to Roadway Caused By Wave Runup - @Corcoran Lagoon 50-75 29 17 Construction 05/2023 12/2023 Recommend NB and SB Shoulder Reconstruction, Clearing and Grubbing, and Placement of RSP

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other East Zayante Rd PM 0.59 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2022 12/2022

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure and Slipout (12' L) - Recommend SB Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd PM 3.16 50-75 29 17 (Outboard) Shoulder Reconstruction, Drainage Improvements including 36" Culvert Replacement Construction 05/2021 12/2021 and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Document Preparation | Major Slipout (20+/-' W x 70' L) with Potential Deep Seated Landslide - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd PM 3.36 50-75 29 17 Recommend NB Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (20' L) Caused by Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd Fallen Trees and Near Existing Retaining Wall (Crib) - Recommend NB and SB Traveled Way PM 4.67 50-75 29 17 Construction 05/2021 12/2021 and Shoulder Reconstruction, Drainage Improvements including RSP and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd Preliminary Design, Document Preparation | Slipout (25' L) - Recommend SB Shoulder PM 5.05 50-75 29 17 Construction 05/2021 12/2021 Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd Preliminary Design, Document Preparation | Slipout (25' L) - Recommend NB Shoulder PM 5.31 50-75 29 17 Construction 05/2021 12/2021 Reconstruction, RSP and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Eureka Canyon Rd Preliminary Design, Document Preparation | Slipout (50' L) - Recommend SB Shoulder PM 8.39 50-75 29 17 Construction 05/2021 12/2021 Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (60' L) - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Felton Empire Rd PM 1.40 50-75 29 17 Recommend NB/EB Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Construction 05/2021 12/2021 Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Roadway/Embankment Settling (36' L) Near Existing Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Felton Empire Rd PM 1.62 50-75 29 17 Crib Wall - Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Construction 05/2021 12/2021 Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (70' L) Near Existing Retaining Wall (Crib) - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Felton Empire Rd PM 2.62 50-75 29 17 Recommend WB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Gaffey Rd Preliminary Design, Document Preparation | Slipout (20' L) - Recommend EB (Outboard) PM 0.03, 0.04, 0.08 50-75 30 17 Construction 05/2022 12/2022 Embankment Reconstruction, RSP and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (4' W x 35' L) - Recommend WB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Glenwood Cutoff PM 0.02 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Glenwood Dr Preliminary Design, Document Preparation | Erosion Under Existing Retaining Wall (Soldier Pile) - PM 2.02 50-75 29 17 Construction 05/2021 12/2021 Recommend Backfill of Eroded Slope, Drainage Improvements and Erosion Control

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Retaining Wall Failure Caused by Erosion Under Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Glenwood Dr PM 2.60 50-75 29 17 Footing, Adjacent to Existing Retaining Walls (Crib) - Recommend Backfill Eroded Footing, Install Construction 05/2022 12/2022 Drainage Improvements and Retaining Wall (Crib)

Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Glenwood Dr This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 4.27 50-75 29 17 Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Granite Creek Rd Preliminary Design, Document Preparation | Slipout (50' L) - Recommend NB Shoulder PM 0.47 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, RSP and Overside Drain Replacement

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Granite Creek Rd Preliminary Design, Document Preparation | Slipout (3'+/- W x 10' L) - Recommend SB Traveled PM 2.10 50-75 29 17 Construction 05/2022 12/2022 Way and Shoulder Reconstruction and Placement of RSP

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Green Valley Rd PM 1.85 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure/Slipout (15' L) - Recommend SB Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Highland Way @ Spanish Ranch Rd 50-75 29 17 Shoulder Reconstruction, Drainage Improvements including 36" Culvert, and Retaining Wall Construction 05/2022 12/2022 (Soldier Pile) Installation

This project will include: Large Slipout (200' L) - Recommend Roadway Reconstruction, Drainage Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Highland Way PM 3.19 50-75 29 17 Improvements and Retaining Wall (Soldier Pile) Installation Construction 05/2020 12/2020

This project will include: Landslide Caused Damage to Existing Downdrain and Retaining Wall - Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Highland Way Recommend Removal of Debris, Installation of Inlet Debris Protection Wall and New Overside PM 3.24 50-75 29 17 Construction 05/2020 12/2020 Drain

This project will include: Slipout (8' W x 36' L) - Recommend SB (Outboard) Traveled Way and Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Highland Way PM 3.74 50-75 29 17 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Construction 05/2020 12/2020 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Slipout (10+/-' W x 25' L) - Recommend SB (Outboard) Traveled Way Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Highland Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) PM 3.91 50-75 29 17 Construction 05/2020 12/2020 Installation

This project will include: Slipout (70' L) - Recommend SB Traveled Way and Shoulder Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Highland Way PM 5.45 50-75 29 17 Reconstruction, 18" Culvert and Retaining Wall (Soldier Pile) Installation Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' W x 40' L) - Recommend EB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Hubbard Gulch Rd PM 0.80 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Road/Embankment Settling (65' L) - Recommend EB Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd PM 1.36 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2022 12/2022 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (37' L) Due to Downed Tree - Recommend Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd PM 1.55 50-75 29 17 WB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Geogrid Construction 05/2022 12/2022 Reinforced MSE) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Road/Embankment Settling (12' W x 100' L) - Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Ice Cream Grade Rd PM 1.60 50-75 29 17 Recommend EB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Construction 05/2022 12/2022 Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Jarvis Rd Preliminary Design, Document Preparation | Slipout (6' W x 20+/-') - Recommend NB (Outboard) PM 0.64 50-75 29 17 Construction 05/2022 12/2022 Traveled Way and Shoulder Reconstruction, Earth backfill and Downdrain

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure & Roadway/Embankment Settling - Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Jarvis Rd Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and PM 0.68 50-75 29 17 Construction 05/2022 12/2022 Headwalls Recommend SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation,

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 1.02 - Slipout (20+/-' W x 60' L) - Recommend Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Jarvis Rd SB Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) PM 1.02, 1.04, 1.07 50-75 29 17 Construction 05/2022 12/2022 Installation, PM 1.04 - Slipout (6' W x 40' L) - Recommend SB (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure & Roadway/Embankment Settling - Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Jarvis Rd PM 1.66 50-75 29 17 Recommend Roadway Reconstruction and Drainage Improvements including 18" Culvert and Construction 05/2022 12/2022 Headwalls

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Kings Creek Rd Preliminary Design, Document Preparation | Slipout and Damaged Downdrain - Recommend PM 1.65 50-75 29 17 Construction 05/2022 12/2022 Installation of Gabion Baskets or RSP, Backfill and Reinstall Culvert

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Kings Creek Rd Preliminary Design, Document Preparation | Slipout (40' L) and Landslide - Recommend PM 3.03 50-75 29 17 Construction 05/2022 12/2022 Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout and Roadway/Embankment Settling - Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Kings Creek Rd PM 3.16 50-75 29 17 Recommend Roadway Reconstruction, Drainage Improvements, and Retaining Wall (Stitch Pile) Construction 05/2022 12/2022 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Laurel Glen Rd Preliminary Design, Document Preparation | Slipout (25' L) - Recommend NB/WB Shoulder PM 1.97 50-75 29 17 Construction 05/2021 12/2021 Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Little Basin Rd Preliminary Design, Document Preparation | Slipout (35' L) - Recommend EB (Outboard) PM 0.64 50-75 29 17 Construction 05/2021 12/2021 Roadway Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (80' L) - Recommend SB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Little Basin Rd PM 0.85 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Lockhart Gulch Rd Preliminary Design, Document Preparation | Slipout (55'L) - Recommend NB Shoulder PM 0.24 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, Drainage Improvements, and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Loma Prieta Av Preliminary Design, Document Preparation | Slipout (20'L) - Recommend SB Shoulder PM 2.82 50-75 29 17 Construction 05/2021 12/2021 Reconstruction, Drainage Improvements, and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Loma Prieta Way Preliminary Design, Document Preparation | Slipout (60' L) - Recommend EB Traveled Way and PM 3.33 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Lompico Rd Preliminary Design, Document Preparation | Slipout (45' L) - Recommend NB Shoulder PM 1.22 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, Drainage Improvements, RSP and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Lorenzo Av Address 12415 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Lower Highland Way Preliminary Design, Document Preparation | Slipout (18' W x 65'L) - Recommend Traveled Way PM 0.34 50-75 29 17 Construction 05/2021 12/2021 and Shoulder Reconstruction, RSP, and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other McGregor Dr Preliminary Design, Document Preparation | Slipout (15' L) - Recommend SB Shoulder PM 1.35 50-75 29 17 Construction 05/2020 12/2020 Reconstruction and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Merk Rd Preliminary Design, Document Preparation | Slipout (15' W x 25' L) - Recommend NB (Outboard) PM 1.10 50-75 29 17 Construction 05/2022 12/2022 Shoulder Reconstruction, RSP and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2023 Santa Cruz 19/20 Carried Over Other Morrell Rd Preliminary Design, Document Preparation | Slipout and Culvert Failure- Recommend Roadway PM 0.15 50-75 29 17 Construction 05/2023 12/2023 Reconstruction, 18" and 24" Culvert Replacement and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 85'L) Adjacent to Existing Crib Wall Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Miller Cutoff Rd PM 0.49 50-75 29 17 (Installed 2016) - Recommend NB (Outboard) Traveled Way and Shoulder Reconstruction, Construction 05/2022 12/2022 Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (15' W x 25' L) - Recommend Roadway Pre-Construction & 02/2017 05/2023 Santa Cruz 19/20 Carried Over Other Morrell Rd PM 0.50 50-75 29 17 Reconstruction, Drainage Improvements and Installation of Geogrid Reinforced Earth Retaining Construction 05/2023 12/2023 Structure

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (13' W x 40' L) - Recommend EB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Mt. Bache Rd PM 0.14 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) PM 0.54 50-75 29 17 Construction 05/2020 12/2020

This project will include: Roadway Settling (10' W x 45'L) - Recommend New Roadway Structural Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd PM 1.35 50-75 29 17 Section and Drainage Improvements Construction 05/2020 12/2020

This project will include: Roadway Settling (10' W x 40'L) - Recommend New Roadway Structural Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Mountain Charlie Rd PM 1.89 50-75 29 17 Section and Drainage Improvements Construction 05/2020 12/2020 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 05/2020 05/2021 Santa Cruz 19/20 Carried Over Other Mt. Madonna Rd PM 0.96 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | 3 Slipouts (Varying 30 to 50' L) - Recommend NB Pre-Construction & 02/2017 05/2023 Santa Cruz 19/20 Carried Over Other Nelson Rd PM 0.43 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2023 12/2023 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Nelson Rd PM 0.44 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2021 12/2021

This project will include: Slipout (50'+/- W x 66' L) - Recommend NB (Outboard) Traveled Way Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd and Shoulder Reconstruction, 18" Culvert Replacement and Retaining Wall (Soldier Pile) PM 0.92 50-75 29 17 Construction 05/2020 12/2020 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (6' W x 50' L) - Recommend SB Traveled Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd PM 3.82 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (30'+/- W x 40' L) -Recommend SB Traveled Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd PM 4.31 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other North Rodeo Gulch Rd Preliminary Design, Document Preparation | Slipout (48' L) - Recommend SB (Outboard) PM 4.94 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 36' L) - Recommend WB Traveled Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Old Bear Creek Rd PM 0.01 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2020 12/2020 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50'L) - Recommend NB/EB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy PM 1.01 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy Preliminary Design, Document Preparation | Slipout - Recommend NB/EB Traveled Way and PM 1.06 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10' W x 50' L) - Recommend NB/EB Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy PM 1.20 50-75 29 17 Traveled Way, Drainage Improvements and Shoulder Reconstruction and Retaining Wall (Crib) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (12' W x 90' L) - Recommend NB/EB Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Old Santa Cruz Hwy PM 1.36 50-75 29 17 (Outboard) Traveled Way and Shoulder Reconstruction and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2023 Santa Cruz 19/20 Carried Over Other Paper Mill Rd Preliminary Design, Document Preparation | Slipout (20' W x 30' L) - Recommend NB Shoulder Address 3559 50-75 29 17 Construction 05/2023 12/2023 Reconstruction and Retaining Wall (Soldier Pile)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 05/2020 05/2021 Santa Cruz 19/20 Carried Over Other Paulsen Rd PM 0.43 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (8' W x 35' L) - Recommend NB Traveled Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Porter Gulch Rd PM 0.33 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2022 12/2022 Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 05/2020 05/2022 Santa Cruz 19/20 Carried Over Other Prescott Rd Preliminary Design, Document Preparation | Slipout - Recommend NB Shoulder Reconstruction, PM 0.52 50-75 29 17 Construction 05/2022 12/2022 Drainage Improvements and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend EB (Outboard) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd PM 1.50 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2021 12/2021 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd Preliminary Design, Document Preparation | Slipout Along Existing Stitch Pile Wall (65' L) - PM 1.65 50-75 29 17 Construction 05/2021 12/2021 Recommend Replace Damaged Guardrail and Backfill Eroded Slope

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (50' L) - Recommend SB (Outboard) Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Redwood Rd PM 0.15 50-75 29 17 Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2022 12/2022 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure - Recommend embankment Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Redwood Lodge Rd PM 1.80 50-75 29 17 reconstruction, excavation and backfill, concrete headwall, 120'' culvert, erosion control and Construction 05/2021 12/2021 revegetation.

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Redwood Rd Preliminary Design, Document Preparation | Slipout (18' W x 35' L) - Recommend NB (Outboard) PM 0.23 50-75 29 17 Construction 05/2022 12/2022 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 0.29 Roadway/Embankment Settling (120' L) Near Existing Retaining Wall - Recommend NB (Outboard) Shoulder Reconstruction and Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Redwood Rd Retaining Wall (Soldier Pile) Installation, PM 0.31 Slipout (40' L) - Recommend NB PM 0.29, 0.31, 0.33 50-75 29 17 Construction 05/2022 12/2022 (Outboard) Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP and Retaining Wall (Soldier Pile) Installation, PM 0.33 Culvert Failure & Slipout (30' L) - NB (Outboard) Shoulder Reconstruction, Drainage Improvements including 18" Culvert

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | PM 0.38 Slipout (50' L) - Recommend NB (Outboard) Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Redwood Rd Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier PM 0.38, 0.40 50-75 29 17 Construction 05/2022 12/2022 Pile) Installation, PM 0.40 ULTRABLOCK Retaining Wall Failure - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile)

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other San Andreas Rd Preliminary Design, Document Preparation | Slipout (20' W x 40' L) - Recommend SB Shoulder PM 1.24 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other San Andreas Rd PM 1.30 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2022 12/2022

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Storm Drain and/or Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Schulties Rd Culvert Rehab/Repair (Existing) | Large Slipout (17' W x 100' L) - Recommend Roadway PM 0.51 50-75 29 17 Construction 05/2020 12/2020 Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Seacliff Dr PM 0.56 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2022 12/2022

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Siesta Rd Preliminary Design, Document Preparation | Slipout (20' L) - Recommend EB Embankment PM 0.04 50-75 29 17 Construction 05/2021 12/2021 Reconstruction and Erosion Control Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Smith Grade Rd PM 0.43 50-75 29 17 Preliminary Design, Document Preparation | slipout/settlement pavement separation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Smith Grade Rd PM 1.38 50-75 29 17 Preliminary Design, Document Preparation | Road slump. Slurry and earth backfill repair Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Smith Grade Rd PM 1.90 50-75 29 17 Preliminary Design, Document Preparation | 3' diameter sinkhole Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Smith Grade Rd PM 2.83 50-75 29 17 Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Smith Grade Rd Preliminary Design, Document Preparation | Slipout (25' W x 12' L) - Recommend EB (Outboard) PM 4.06 50-75 29 17 Construction 05/2021 12/2021 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Soquel Dr This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) @ Aptos Creek Rd. 50-75 29 17 Construction 05/2021 12/2021

This project will include: Environmental Study/Documents, Traffic Signals, Lights, and/or Signage Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other Soquel Dr Installation (New Safety), Cost Estimating, Right of Way, Preliminary Design, Document @ Robertson St. 50-75 29 17 Construction 05/2022 12/2022 Preparation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd PM 3.97 50-75 29 17 Preliminary Design, Document Preparation | 2 slipouts, 20x50x10 & 50x150x10 Construction 05/2020 12/2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Soquel San Jose Rd Preliminary Design, Document Preparation | Slipout (39' L) - Recommend Roadway PM 5.67 50-75 29 17 Construction 05/2020 12/2020 Reconstruction, Drainage Improvements, RSP and Retaining Wall (Soldier Pile) Installation

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Slipout (30' L) Located Adjacent to Existing Crib Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd PM 0.20 50-75 29 17 wall Installed 2002 - Recommend NB (Outboard) Shoulder Reconstruction, Drainage Construction 05/2020 12/2020 Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Spanish Ranch Rd Rehab/Repair (Existing) | Slipout (70' L) - Recommend Roadway Reconstruction, 18" Culvert and PM 0.37 50-75 29 17 Construction 05/2020 12/2020 Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 40' L) - Recommend NB Traveled Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd PM 1.16 50-75 29 17 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Culvert Failure and Slipout (18' W x 25' L) - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd PM 1.18 50-75 29 17 Recommend NB Traveled Way and Shoulder Reconstruction and 18" Culvert and Retaining Wall Construction 05/2021 12/2021 (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd Preliminary Design, Document Preparation | Slipout (20+/-' W x 50' L) - Recommend SB Traveled PM 1.85 50-75 29 17 Construction 05/2021 12/2021 Way and Shoulder Reconstruction, RSP. and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Large Slipout (40+/-' L) Near Existing Cross Culvert - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd PM 1.90 50-75 29 17 Recommend SB Traveled Way and Shoulder Reconstruction, 18" Culvert, RSP, and Retaining Construction 05/2021 12/2021 Wall (Soldier Pile) Installation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd Preliminary Design, Document Preparation | Slipout (20' W x 20' L) Due to Fallen Tree - PM 2.36 50-75 29 17 Construction 05/2021 12/2021 Recommend SB Traveled Way and Shoulder Reconstruction and Drainage Improvements

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Trout Gulch Rd Preliminary Design, Document Preparation | Slipout (15+/-' W x 20' L) - Recommend NB Traveled PM 3.05 50-75 29 17 Construction 05/2021 12/2021 Way and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (40' W x 65' L) - Recommend NB/EB Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Two Bar Rd PM 1.13 50-75 29 17 Traveled Lane and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Construction 05/2020 12/2020 Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (45' L) Near Existing Retaining Wall (Crib) Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Upper East Zayante Rd PM 1.68 50-75 29 17 and Landslide - Recommend SB Traveled Way and Shoulder Reconstruction, Drainage Construction 05/2021 12/2021 Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing) | Slipout (12' W x 60' L) - Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Valencia Rd PM 0.34 50-75 29 17 Recommend WB Traveled Way and Shoulder Reconstruction, Drainage Improvements and Construction 05/2021 12/2021 Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Valencia Rd Preliminary Design, Document Preparation | Slipout (90' L) - Recommend Traveled Way and PM 2.43 50-75 29 17 Construction 05/2020 12/2021 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (10+/-' W x 60' L) - Recommend WB Pre-Construction & 02/2017 05/2021 Santa Cruz 19/20 Carried Over Other Valencia School Rd PM 0.35 50-75 29 17 (Outboard) Traveled Way and Shoulder Reconstruction, Drainage Improvements and Retaining Construction 05/2021 12/2021 Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Vine Hill Rd Preliminary Design, Document Preparation | Slipout 30' L) - Recommend Traveled Way and PM 1.18 50-75 29 17 Construction 05/2020 12/2020 Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Slipout (20' W x 50' L) - Recommend NB Shoulder Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Vine Hill Rd PM 1.27 50-75 29 17 Reconstruction, Drainage Improvements including 24" Culvert and Retaining Wall (Soldier Pile) Construction 05/2020 12/2020 Installation

This project will include: Environmental Study/Documents, Cost Estimating, Right of Way, Pre-Construction & 02/2017 05/2022 Santa Cruz 19/20 Carried Over Other West Park Av Preliminary Design, Document Preparation | Slipout (15' L) - Recommend SB Roadway PM 0.80 50-75 29 17 Construction 05/2022 12/2022 Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Installation

This project will include: Slipout - 49'L x 8'D - Recommend Roadway and Shoulder Reconstruction Pre-Construction & 02/2017 05/2020 Santa Cruz 19/20 Carried Over Other Jamison Creek Rd PM 1.09 50-75 29 17 and Installation of Soldier Pile Wall Construction 05/2020 12/2020

This project will include: Slipout (40' W x 35' L) - Recommend SB Traveled Way and Shoulder Pre-Construction & 02/2017 05/2020 Santa Cruz 18/19 In Progress Road Maintenance & Rehabilitation Glen Haven Road PM 0.81 PM 0.81 50-75 29 17 Reconstruction, Drainage Improvements and Retaining Wall (Crib) Installation Construction 05/2020 12/2020 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Preparation of design and environmental documents for slipout (19' W x Pre-Construction & 02/2017 05/2020 Santa Cruz 18/19 In Progress Road Maintenance & Rehabilitation Glen Haven Road PM 2.27 100' L) - Recommend NB Traveled Way and Shoulder Reconstruction, New Culvert and Retaining PM 2.27 50-75 29 17 Construction 05/2020 12/2020 Wall (Soldier Pile) Installation

This project will include: Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), Document Preparation | Slipout (15'+/- W x 50' L) - Recommend NB (Outboard) Traveled Way Pre-Construction & 02/2017 05/2021 Santa Cruz 20/21 New Other Laurel Rd PM 1.97 PM 1.97 50-75 29 17 and Shoulder Reconstruction, Drainage Improvements and Retaining Wall (Soldier Pile) Construction 05/2021 12/2021 Installation

CHINA GULCH DR from Oak St to Canyond Rd; GAS POINT RD from W Anderson Dr to SH005; MEADOW VIEW DR from Churn Creek Rd to Rdg C/L; OAK RUN RD from Old 44 Dr to Terri Rand Ln; OLD This project will include: New asphalt concrete overlay of roadway, restripe, and replace OREGON TRL from SH005 (E. side of overpass) to Rdg C/L (S/O Miller Pre-Construction & 01/2021 04/2021 Shasta 18/19 Forecasted Road Maintenance & Rehabilitation 2021 SB-1 PAVEMENT REHABILITATION 8-12 1 1 pavement markers. Butte Rd); PLACER RD from Rdg C/L (@ Thompson Ln) to Muletown Construction 06/2021 10/2021 Rd; DEE KNOCH RD from Jim Day Rd to Pittville Rd; PALM AVE from Oak St to Happy Valley Rd; OASIS RD from Rdg C/L to Rdg C/L; SWEDE CREEK RD from Old 44 Dr to Buckboard Trl

RIVERLAND DRIVE WIDENING PROJECT This project will include: Highway Safety Improvement Project (HSIP) to widen roadway Pre-Construction & 06/2020 12/2020 Shasta 18/19 In Progress Safety RIVERLAND DRIVE from Knighton Rd to 2 miles south of Knighton Rd 8-12 1 1 HSIPL-5906(128) shoulders. Widen Shoulders to improve safety for motorized and non-motorized users. Construction 06/2021 10/2021

GAS POINT ROAD AT NO NAME DITCH BOX Shasta 19/20 Forecasted Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Replace box culvert and widen road. GAS POINT ROAD between Anthony St and Charles St Construction 07/2021 10/2021 50-50 1 1 CULVERT REPLACEMENT BRLS-5906(119)

Shasta 19/20 Forecasted Traffic Control Devices DESCHUTES ROAD AT CEDRO LANE This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety) DESCHUTES ROAD at CEDRO LANE Construction 07/2022 10/2022 50-50 1 1

QUARTZ HILL RD from Redding City Limit to Keswick Dam Rd; This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), RAINBOW LAKE RD from Baker Ridge Rd to End of Paving; OAK RUN Pre-Construction & 04/2020 05/2020 Shasta 20/21 New Road Maintenance & Rehabilitation 2020 SB-1 PAVEMENT REHABILITATION Cost Estimating, Project Scope Development, Preliminary Design, Document Preparation | Chip 5-9 1 1 RD from Lookout Mountain Rd to Buzzard Roost Rd; OLD ALTURAS RD Construction 08/2020 10/2020 seal surface treatments, restriping, and replacing pavement markers. from Abernathy Ln to Arapaho Dr

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), GAS POINT ROAD PAVEMENT Pre-Construction & 03/2020 05/2020 Shasta 20/21 New Road Maintenance & Rehabilitation Cost Estimating, Preliminary Design, Document Preparation | New asphalt concrete overlay of the GAS POINT RD from Interstate 5 to West Anderson Dr 8-12 1 1 REHABILITATION Construction 07/2020 10/2020 roadway, restriping, and replacing pavement markers.

This project will include: Procurement of Road Maintenance and Rehab Materials | Purchase of materials and equipment for maintaining county roadways regarding roadway surface, reforming Procurement/Operational Sierra 20/21 New Road Maintenance & Rehabilitation Countywide Road Maintenance Program Countywide 07/2020 06/2021 2-5 1 1 drainage to protect the road and storm runoff removing vegetation to improve visual clearances Needs and guardrail.

All paved Siskiyou County Roads that currently have pavement striping, Siskiyou 20/21 New Road Maintenance & Rehabilitation Roadway Striping and Pavement Markings This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 07/2020 06/2021 1-2 1 1 stenciling or thermoplastic delineation.

Location will be determined by priority based on routine Retro-reflectivity This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Signals, Siskiyou 20/21 New Road Maintenance & Rehabilitation Road Sign Upgrade and Maintenance study. Location subject to change based upon need and available Construction 07/2020 06/2021 5-7 1 1 Lights, and/or Signage Rehab/Repair (Existing Safety) resources.

Vegetation Management - Including tree This project will include: This project consists of hazardous tree removal, tree trimming, mowing, Siskiyou 20/21 New Road Maintenance & Rehabilitation Various areas throughout Siskiyou County. Construction 07/2020 06/2021 1-2 1 1 trimming, mowing, and noxious weed control. roadside brush and grass removal/control combined with noxious weed control.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | This routine Various locations throughout Siskiyou County's unpaved road system. Siskiyou 20/21 New Road Maintenance & Rehabilitation Gravel Road Maintenance maintenance item includes grading and re-contouring of gravel roads. This process will include Locations include but not limited to: Louie Road, Old State Highway, Construction 07/2020 06/2021 1-5 1 1 application of crushed aggregate where required. Sheepy Creek, Willow Creek Road.

This project will include: Procurement of Road Maintenance and Rehab Materials | This project Procurement/Operational Siskiyou 20/21 New Road Maintenance & Rehabilitation Aggregate Production will consist of production of aggregate materials at the County's Yellow Butte and Little Lynne Yellow Butte and Little Lynne Mine Sites 07/2020 06/2021 1-3 1 1 Needs mine sites.

Countywide project. Shoulder improvement location will be dictated by Siskiyou 20/21 New Road Maintenance & Rehabilitation Roadside Shoulder Maintenance This project will include: Pavement Rehab/Repair (Existing) Construction 07/2020 06/2021 1-3 1 1 current condition and need. Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This is a Countywide project. Location will be dictated by need and Siskiyou 20/21 New Road Maintenance & Rehabilitation Pavement Patching and Repair This project will include: Pavement Rehab/Repair (Existing) Construction 07/2020 06/2021 1-5 1 1 roadway safety.

Procurement/Operational Siskiyou 20/21 New Road Maintenance & Rehabilitation Maintenance of Public Works Equipment This project will include: Repair and Servicing of Public Works Equipment Located at all facilities Countywide. 06/2020 07/2021 1-5 1 1 Needs

Ager Beswick Road Siskiyou 20/21 New Road Maintenance & Rehabilitation District 1 - Ager Beswick Road - Asphalt Repair This project will include: Pavement Rehab/Repair (Existing) Construction 05/2021 09/2021 5-7 1 1 From Mile Post 0 - Mile Post 3.81

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 2, Mt. Shasta Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Holiday Lane, Holiday Court, Lake Court, Michelle Drive. Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 2, McCloud Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Quincy Ave. and California Ave. Construction 05/2021 09/2022 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 3 Gazelle Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Desoza Lane, White Rock Road, Scarface Road, Timmons Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 4 - Fort Jones Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Patterson Creek Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 5 Etna Area - Chip Seal This project will include: Pavement Rehab/Repair (Existing) Gazelle Callahan Road Construction 05/2021 09/2021 5-7 1 1

Siskiyou 20/21 New Road Maintenance & Rehabilitation District 6 Macdoel Area - Asphalt Repair This project will include: Pavement Rehab/Repair (Existing) Shady Dell Road Construction 05/2021 09/2021 5-7 1 1

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | This project will consist of debris removal from flow lines, drainage ditches and culverts, reestablishing ditch lines Siskiyou 19/20 Carried Over Road Maintenance & Rehabilitation Ditch and Culvet Maintenance Various locations though out the Siskiyou County road system. Construction 12/2020 06/2021 1-3 1 1 in an effort to maintain flow lines and reduce the potential for flooding and sediment disbursement into waterways.

Liberty Island Road from 1.53 miles north of the Shag Slough Bridge to Pre-Construction & 07/2020 12/2020 Solano 20/21 New Road Maintenance & Rehabilitation Liberty Island Road This project will include: Pavement Rehab/Repair (Existing), Preliminary Design 10-20 4 3 Swan Road. Construction 12/2020 06/2021

Location details at: https://www.solanocounty.com/depts/rm/public_works/default.asp Captial Improvement Plan. Baker Bartlett Binghamton Bulkley King Midway Campbell Canal Ln Solano 20/21 New Road Maintenance & Rehabilitation Chip Seals 20-21 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Cantelow Casey Chadbourne Circle C Currey Currie Denverton Doyle Construction 07/2020 06/2021 10-10 4, 11 3 Gentile Griffin Hackman Mills Noble Nunes O'Day Schroeder Serenity Serpa Shelton Steiger Hill Stevenson Bridge Rd Sweeney Thomasson Tremont Rd old Vaughn Dixon Rds (Pedrick S of I-80 – Vaughn), Fairfield Rds, Benicia Rds-Lake Herman)Reservoir to I-680).

Durbin Lane (Green Valley Road -End) Fox Road (Hawkins Road-Weber Road) Green Valley Road (Rockville Road-211' N/Rockville Road) Green Valley Road (211' N/Rockville Road-.765 mi N/@ Valley End This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Preliminary Pre-Construction & 06/2020 07/2020 Solano 20/21 New Road Maintenance & Rehabilitation Overlays 20-21 Lane) 20-30 4, 11 3 Design Construction 07/2020 06/2021 Green Valley Road (.765 mi N/@ Valley End Lane-End) Sievers Road (Currey Road-Pedrick Road) Weber Road (Lewis Road-Fox Road) West Cordelia Road (End-Fairfield C/L)

Solano 20/21 New Safety Peabody Road This project will include: Right of Way Peabody Road from Fairfield City limit to Vacaville City limit. Pre-Construction 07/2020 06/2021 50-99 11 3 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Sidewalk Improvements: Beach St (170’ w of Cypress Ave - Central Ave), Glen Cove Rd (Robles wy - Bush Ave), Idora Ave (Benicia Rd to Pine Ave), aPine Ave and 160 feet of Woodrow w of Pine Ave, Lewis Ave (120 This project will include: ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk feet w of Glen Cove Rd to Glen Cove Rd), Lincoln Ave East (210 feet w of Solano 20/21 New Safety Sidewalk Improvement Project 2020 Installation (New), ADA Curb Ramp Rehab/Repair (Existing), Sidewalk and/or Crosswalk Construction 07/2020 06/2021 50-80 4, 14 3 Laurel St - 80 feet w of Laurel St), Magazine St (Vallejo City Limit to Rehab/Repair (Existing) | Valley Gutter Replacement Aspen Ct). Valley Gutter Improvements: Via Palo Linda at the intersection with Walnut Dr and Via Palo Linda at the intersection of Peach Ct.

Green Valley Road Pedestrian Path-(Fairfield City limit to Rockville This project will include: Preliminary Design | Rehabilitate two asphalt pedestrian paths and Road), Suisun Parkway Pedestrian Path-(Fairfield City limit near I-80 to Pre-Construction & 07/2020 12/2020 Solano 20/21 New Other Microsurfacing/Slurry Seal 20-21 6-8 4, 11 3 Suisun Valley Court. Fairfield City limit near Suisun Creek) and Suisun Valley Court-(Suisun Construction 12/2020 06/2021 Valley Road to End).

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Pre-Construction & 07/2020 12/2020 Solano 20/21 New Safety RTIF Safety Improvement Project 2020 Rockville Road and Midway Road 10-15 4, 11 3 Paving and/or Striping Rehab/Repair (Existing Safety) Construction 12/2020 06/2021

Locations at: https://www.solanocounty.com/depts/rm/public_works/default.asp Captial Improvement Plan. Beach Benicia Carlson Carquinez St Clayton Cordelia Rubberized Chip Seal with Microsurfacing 20- Creed Cypress Evans Flannery Fry Gilcrest Ave (ALL), Goose Haven Pre-Construction & 07/2020 12/2020 Solano 20/21 New Road Maintenance & Rehabilitation This project will include: Pavement Rehab/Repair (Existing), Preliminary Design 10-15 4, 11, 14 3 21 Hargus Idora Kildeer Lambie Leisure Town Lemon Lopes Orchard Construction 12/2020 06/2021 Peabody Pennsylvania Phillip Reis Ridge Ritchie Scally Sperry Starr Thomas Walters Rd (Frontage) West Cordelia Woodrow Ave City of Vallejo Roads (S. Regatta, Admiral Calahan and Benicia Rd).

Lake Herman Road - Reservoir Road to 2.6 miles east of the City of Solano 20/21 New Road Maintenance & Rehabilitation Lake Herman Road This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 07/2020 06/2021 10-20 14 3 Vallejo limits.

Sonoma 18/19 Carried Over Road Maintenance & Rehabilitation Grind & Patch Pave This project will include: Pavement Rehab/Repair (Existing) River Road Construction 07/2020 06/2021 5-10 2, 10 2, 3

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Sonoma 19/20 Carried Over Road Maintenance & Rehabilitation Culvert and Viaduct Replacement Projects Lawndale Road, Liberty Road Construction 07/2020 06/2021 20-20 2, 4, 10 2, 3 Includes repair of damage culverts and viaducts, cleaning and repair of road signs, removal of roadside vegetation, and repair of slip outs and landslides.

Sonoma 18/19 Carried Over Road Maintenance & Rehabilitation Viaduct Replacement This project will include: Bridge Structure Rehab/Repair (Existing) | Viaduct Replacement Summerhome Park Road Construction 07/2020 06/2021 30-30 2 2

Sonoma 20/21 New Safety Sing Reflectivity Upgrade This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Guerneville Area in West Sonoma County Construction 07/2020 06/2021 5-5 2, 10 2, 3

Sonoma 20/21 New Road Maintenance & Rehabilitation Grind/Pave and Grader Patch Pave This project will include: Pavement Rehab/Repair (Existing) Old Redwood Highway and Wagnon Drive Construction 07/2020 06/2021 5-10 2, 10 2, 3

This project will include: Storm Drain/Culvert Installation (New), Storm Drain and/or Culvert Canyon Road, Sperring Road, Trinity Road, Lakeville Road, Mark West Sonoma 20/21 New Road Maintenance & Rehabilitation Culvert Repair and Replacement Construction 07/2020 06/2021 15-20 2, 10 2, 3 Rehab/Repair (Existing) Springs, River Road, Dry Creek Road, Hidden Valley Road, Donald Street

Grove Street, Linden Street, Solano Avenue, Barnett Valley Road, Grange This project will include: Pavement Rehab/Repair (Existing) | Full Depth Reclamation and Sonoma 20/21 New Road Maintenance & Rehabilitation 20/21 Pavement Preservation Program Road, Tomales Road, East Cotati Avenue, and Lake Center Drive Construction 07/2020 06/2021 10-20 2, 10 2, 3 Overlays Lark Center D

Various Roads in unincorporated Sonoma County in the general proximity This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Approximately Sonoma 20/21 New Safety Striping and Stenciling to the following cities: Annapolis, Cotati, Guerneville, Healdsburg, and Construction 07/2020 06/2021 5-5 2, 10 2, 3 156 miles of Striping and Stenciling of an estimated 252 intersections. Sonoma

Annapolis, Cotati, Guerneville, Healdsburg, Santa Rosa, and Sonoma Procurement/Operational Sonoma 20/21 New Other Procurement of Public Works Equipment This project will include: Procurement of Public Works Equipment 07/2020 06/2021 15-20 2, 10 2, 3 yards. Needs Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Bridge Structure Rehab/Repair (Existing) | Hickman Bridge was inspected by Caltrans in 2017 and has a sufficincy rating of 64.7 and is classified as structurally Stanislaus 20/21 New Match Funds Hickman Road Bridge Replacement HIckman Road over the Tuolumne River Construction 07/2020 06/2022 75-100 21 8 deficient it also has been deemed scour deficient. The County is using SB1 to as match funding to HBP and LSSRP - State 1B for replacement of the bridge

This project will include: Bridge Structure Rehab/Repair (Existing) | The Crows Landing Road Bridge Replacement, will be a 3-lane bridge replacement. The bridge was determined to be scour Stanislaus 20/21 New Match Funds Crows Landing Road Bridge Replacement Crows Landing Road over San Joaquin River Construction 07/2020 06/2023 75-100 21 12 critical and functionally obsolete. SB1 will be used as a match to HBP and LSSRP State bond funding

Stanislaus 20/21 New Road Maintenance & Rehabilitation Gates Road/Dakota Ave/Diablo Grande Blvd This project will include: Pavement Rehab/Repair (Existing) Gates Road, Dakota Ave and Diablo Grande Blvd Construction 07/2020 06/2021 7-10 21 12

Supervisor District 1 - East Oakdale / Knights Ferry area - multiple roads. Roads have been identified and listed in the PDF uploaded as Project - Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020 Annual Chip This project will include: Pavement Rehab/Repair (Existing) 2020 Annual Chip - Locations. The Supervisor District 1 can be identified Construction 05/2020 06/2021 5-7 12 8 in the attached PDF labled Stanislaus County Supervisor District Locations

Supervisor District 2 - Turlock and 3 - Salida numerous roads. While the Supervisor Dristricts have been identified, specific roads have not been Stanislaus 20/21 New Road Maintenance & Rehabilitation 2021 Chip Seal This project will include: Project Scope Development determined and are still being evaluated by staff. The Supvisor District Pre-Construction 07/2020 06/2021 5-7 5, 8 12 map has been uploaded as a PDF labled Stanislaus County Supervisor District Locations

Countywide in all Supervisor Districts as reported or identified through out Stanislaus 20/21 New Safety 2020 Countywide Center and Edge-line Striping This project will include: Maintenance Program Plan Development the year. Supervisor Districts are shown in PDF labled Stanislaus County Pre-Construction 07/2020 06/2021 2-2 12, 21 5, 8, 12 Supervisor District Locations

Countywide location to include all Supervisor Districts 1-5. Work will be done as shoulders are identified as needing improvements. Supvisor Stanislaus 20/21 New Safety 2020 Countywide Shoulder Improvemnets This project will include: Maintenance Program Plan Development Pre-Construction 07/2020 06/2021 5-10 12, 21 5, 8, 12 Districts are shown in PDF labled Stanislaus County Supervisor District Locations

This project will include: Bridge Structure Rehab/Repair (Existing) | Replace Keyes Rd Bridge over Stanislaus 18/19 In Progress Other Keyes Road Bridge over TID Canal Keyes Rd between Moffett and Esmar Road Construction 07/2020 06/2021 75-100 21 12 TID canal

Stanislaus 19/20 Carried Over Other Schell Road Bridge over SSJIID Canal This project will include: Bridge Structure Rehab/Repair (Existing) Schell Road off Sonora Road North of Knights Ferry Construction 07/2020 06/2021 50-100 12 12

This project will include: Pavement Rehab/Repair (Existing) | Crows Landing Road Pavement Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Crows Landing Road Pavement Rehabilitation Crows Landing Road from Hatch Road to Whitmore Avenue Construction 07/2020 06/2021 20-20 21 12 Rehabilitation from Hatch Road to Whitmore Avenue

This project will include: Pavement Rehab/Repair (Existing) | Albers Road Pavement Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Albers Road Repavement Albers Road from Claribel Rd to the City of Oakdale Construction 07/2020 06/2021 15-15 12 8 Rehabilitation

This project will include: Pavement Rehab/Repair (Existing) | Garner Road Pavement Pre-Construction & 07/2020 12/2020 Stanislaus 18/19 Forecasted Road Maintenance & Rehabilitation Garner Road Repavement Garner Road at Yosemite Blvd (SR132) to Leckron 15-15 21 8 Rehabilitation Construction 01/2021 12/2021

This project will include: Pavement Rehab/Repair (Existing) | Sisk Road Pavement Rehabilitation Pre-Construction & 07/2020 12/2020 Stanislaus 19/20 Carried Over Road Maintenance & Rehabilitation Sisk Road Pavement Rehabilitation Sisk Road from Green Leaf Court to Kiernan Avenue 15-15 12 5 from Green Leaf Court to Kiernan Avenue Construction 01/2021 12/2021

This project will include: Maintenance Program Plan Development | The County has over 200 Countywide in all Supervisor Districts 1-5 as reported or identified by Stanislaus 20/21 New Other 2020-2021 Countywide Bridge Maintenace bridges that it is responsible for maintaining. Included would be spaul repair, deck sealing and staff. Supervisor areas our shown in PDF labled Stanislaus County Pre-Construction 07/2020 06/2021 10-10 12, 21 5, 8, 12 vegatation removal. Supervisor District Locations

Countywide in all Supervisor Districts 1-5 as are reported or identified by Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020-2021 Countywide Patch Trucks This project will include: Maintenance Program Plan Development crews. Supervisor Districts are shown in PDF labled Stanislaus County Pre-Construction 07/2020 06/2021 5-7 12, 21 5, 8, 12 Supervisor District Locations

Countywide in all Supervisor Districts 1-5 as identified by staff. Supervisor Stanislaus 20/21 New Road Maintenance & Rehabilitation 2020-2021 Countywide Crack Seal This project will include: Maintenance Program Plan Development Pre-Construction 07/2020 06/2021 5-5 12, 21 5, 8, 12 Districts are shown in PDF labled Stanislaus Supervisor District Locations Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Countywide in all Supervisor Districts 1-5 as reported or identified by 2020 Countywide Pavement Markings and Stanislaus 20/21 New Safety This project will include: Maintenance Program Plan Development crews. Supervisor Districts are shown in PDF labled Stanislaus County Pre-Construction 07/2020 06/2021 5-10 12, 21 5, 8, 12 Signs Supervisor District Locations

This project will include: Bridge Structure Rehab/Repair (Existing), Project Scope Development | Pre-Construction & 07/2019 12/2020 Stanislaus 18/19 In Progress Other Quincy Road Bridge Quincy Road @ E Taylor Road 75-75 12 8 Replace Bridge over TID Lateral No. 3 Construction 01/2021 12/2021

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Stanislaus 18/19 In Progress Road Maintenance & Rehabilitation 9th Street Repavement 9th Street from Pecos Avenue to Tuolumne River Bridge Construction 01/2021 12/2021 20-20 21 12 Rehab/Repair (Existing) | 9th Street Pavement Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Pavement Improvement (New) | The project will widen three intersections with the addition of asphalt and base rock to allow for large The Project will take place at the following intersections:; Intersection of Sutter 19/20 Carried Over Road Maintenance & Rehabilitation Truck Route Intersection Improvements trucks to make the turns without conflict with other motorists. In addition new striping will be Reed Road and Muir Road; Intersection of Muir Road and Barry Road; Construction 02/2021 07/2021 10-20 3 4 provided to make the intersection movements clear to all drivers. (This project is only partly Intersection of Railroad Avenue and Barry Road funded by SB1)

Sinard Road from Paseo Avenue to Pennington Road; Sheldon Road Sutter 20/21 New Road Maintenance & Rehabilitation FY2020-21 Road Overlay Project This project will include: Pavement Rehab/Repair (Existing) from Paseo Avenue to Pennington Road; Farmlan Road from SR99 to Construction 02/2021 06/2021 10-20 3 4 Decker Road

Franklin Road from Township Road to Acacia Avenue; Elmer Avenue from CYC Limit to Eckhart Road; Eckhart Road from Elmer Avenue to Tierra Buena Road; East Onstott Frontage Road from CYC Limit to Eager Road; Villa Avenue from Butte House Road to North End; Romero Street Sutter 20/21 New Road Maintenance & Rehabilitation FY2020-21 Road Seals Project This project will include: Pavement Rehab/Repair (Existing) Construction 02/2021 06/2021 7-15 3 4 from Butte House Road to North End; Long Street from Romero Street to East End; Valencia Street from Romero Street to East End; Capistrano Street from Romero Street to West End; Laredo Street from Romero Street to West End; Peralta

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Dist A- no carryover roads from prior years. New roads include: Rawson, Tehama 20/21 New Road Maintenance & Rehabilitation District A - Road Rehabilitation Construction 07/2020 06/2021 7-10 3 4 Rehab/Repair (Existing) Paskenta, Benson, Bowman, Evergreen, Dusty.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement District B roads that were not rolled forward from prior FY. Shasta Blvd, Tehama 20/21 New Road Maintenance & Rehabilitation District B - Road Rehabilitation Construction 07/2020 06/2021 7-10 3 4 Rehab/Repair (Existing) Manton Rd., South Ave., Forward Rd., Wildcat Rd.

District C roads that were not rolled over from prior FY. This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Tehama 20/21 New Road Maintenance & Rehabilitation District C - Road Rehabilitation Black Butte, Boggs Champlin, Capay, Corning, Glenn, Hall, Kirkwood, Construction 07/2020 06/2021 7-10 3 4 (Existing Safety) Long Hollow, Lowery, Paskenta, Round Valley, South, Toomes Camp

This project will include: Procurement of Public Works Equipment, Repair and Servicing of Public Procurement/Operational Tehama 20/21 New Road Maintenance & Rehabilitation Shop Equipment Works Equipment | Equipment Purchase: Culvert Cleaning Jet trailer, Snow Blower, Grader, Skip Shasta Blvd, Manton Rd., South Ave., Forward Rd., Wildcat Rd., 07/2020 06/2021 15-20 3 4 Needs Loader, Patch Truck, Pressure Washer, 3/4 Ton 2-Whl Drv Ext. Cab Truck

This project will include: Environmental Study/Documents, Cost Estimating, Project Scope Pre-Construction & 07/2019 06/2020 Tehama 20/21 New Road Maintenance & Rehabilitation Engineering Department - Bridge Repair Woodson Bridge, South Avenue @Sacramento River 30-30 3 4 Development, Feasibility Study, Preliminary Design, Document Preparation Construction 07/2020 06/2021

Trinity Dam, China Gulch, DC School, E. Weaver Creek, Roundy, Trinity 20/21 New Road Maintenance & Rehabilitation North County Chip Seal Project (Weaverville) This project will include: Pavement Rehab/Repair (Existing) Steelbridge, Steiner Flat, China, Coon Creek, Flame Tree, and Hennessey Construction 06/2021 10/2021 15-15 2 2 Road

Trinity 20/21 New Road Maintenance & Rehabilitation Pavement Preparation Project (Hayfork) This project will include: Pavement Rehab/Repair (Existing) Amort, Corral Bottom, Hyampom, and Lower South Fork Roads Construction 06/2021 10/2021 10-10 2 2

Carter Gulch, Demos, East, Hardy, Mill, Nelson, Summit Creek, and Trinity 20/21 New Road Maintenance & Rehabilitation Mid County Chip Seal project (Hayfork) This project will include: Pavement Rehab/Repair (Existing) Construction 06/2021 10/2021 15-15 2 2 Garrett Roads

Trinity 20/21 New Road Maintenance & Rehabilitation South County Chip Seal Project (Ruth) This project will include: Pavement Rehab/Repair (Existing) Ruth Zenia, and Van Duzen Roads Construction 06/2021 10/2021 15-15 2 2 Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

Slurry seal approximately 11 short road sections consisting of Trinity 20/21 New Road Maintenance & Rehabilitation County Wide Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing) approximately 2.1 miles. Actual road sections to be reported at Construction 08/2020 10/2020 7-7 2 2 conclusion of project

This project will include: Environmental Study/Documents, Feasibility Study | Evaluate Select E. Fork Stuarts Fork-Guy Covington Road, Price Creek – Price Creek Trinity 20/21 New Safety Advance Bridge Study County Bridges to determine if the bridge needs to be replaced or can be rehabilitated and/or Road, Salt Creek – Long Ridge Road, Kerlin Creek – Lower South Fork Pre-Construction 12/2020 06/2023 1-5 2 2 Scour Analysis. Road, Long Canyon Creek – Power House Road.

The proposed project locations are: Ave 272 between Rd 128 and Rd 140; This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Rd 168 between A296 (Mineral King) and Ave 315; Ave 256 between Rd Pre-Construction & 05/2020 12/2020 Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 1 (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or 10-15 26 14, 16 140 and Rd 152; Ave 416 between Rd 144 and Rd 152; and Rd 168 Construction 01/2020 10/2021 asphalt pulverization and overlay. between Ave 315 and State Route 216.

The proposed project locations are: Ave 184 between Rd 28 and Rd 80; This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair D112A (I St.) between Ave 200 and Ave 211; Rd 208 between State Pre-Construction & 05/2020 12/2020 Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 2 (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or 10-15 26 14, 16 Route 190 and Ave 152; Rd 236 between Ave 100 and Ave 104; and Construction 01/2020 10/2021 asphalt pulverization and overlay. D238 between Ave 104 and Ave 112.

The proposed project locations are: Rd 228 between Ave 228 (Honolulu) and Ave 232 (Tulare); Avenue 228 (Honolulu) between Rd 228 This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Strathmore) and D236 (Round Valley); Ave 216 (Paige) between Rd 68 Pre-Construction & 05/2020 12/2020 Tulare 20/21 New Road Maintenance & Rehabilitation 2021 RRAA Project 3 (Existing Safety), Preliminary Design | Road rehabilitation through asphalt concrete overlay or 10-15 26 14, 16 and Rd 84 (Enterprise); Ave 320 between Rd 92 (Shirk) and Rd 108; Ave Construction 01/2020 10/2021 asphalt pulverization and overlay. 160 between Rd 192 and Rd 200; and M137 (Reservation Rd) between MP 7.0 to MP 8.18.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Cost Estimating, Right of Way, Preliminary Design, Document Preparation | Preliminary Engineering should be complete by 6/2020. Construction costs are higher then revenues Pre-Construction & 04/2019 06/2020 Tuolumne 18/19 In Progress Road Maintenance & Rehabilitation Tuolumne Road North Surface Treatment Located on Tuolumne Road North from Ponderosa Way to SR108 7-20 5 8 anticipated for 20/21 so County will allocate a portion of 20/21 revenues to go to construction in Construction 07/2020 06/2022 2022. | This is for the testing and preparation of plans for the project. Construction will occur using 20/21 funds.

This project will include: Environmental Study/Documents, Paving and/or Striping Rehab/Repair Pre-Construction & 04/2019 06/2020 Tuolumne 18/19 In Progress Road Maintenance & Rehabilitation Kewin Mill Road Reconstruction Located on Kewin Mill Road 20-20 5 8 (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design Construction 07/2020 06/2022

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), Capital-Tuolumne Road Surface Treatment Pre-Construction & 07/2019 06/2020 Tuolumne 19/20 In Progress Road Maintenance & Rehabilitation Cost Estimating, Preliminary Design | Preliminary Engineering performed in 19/20 and looking at Tuolumne Road from Mono Way to Tuolumne Road North 5-8 5 8 Project Construction 07/2020 06/2023 20/21 for construction.

This project will include: Environmental Study/Documents, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Pre-Construction & 07/2019 06/2020 Tuolumne 19/20 In Progress Road Maintenance & Rehabilitation Capital-Standard Road Rehabilitation Project Standard Road from Mono Way to Camage Ave. 7-20 5 8 Sidewalk and/or Crosswalk Installation (New), Preliminary Design, Bicycle Lane (New) | Construction 07/2020 06/2023 Preliminary Engineering performed in 19/20 and looking at 20/21 for construction.

Procurement/Operational Tuolumne 20/21 New Other Special Departmental Expense This project will include: Procurement of Public Works Systems/Databases All of Tuolumne county 07/2020 06/2021 1-1 5 8 Needs

Various Roads through the county. Roads are selected within the County Procurement/Operational Tuolumne 20/21 New Road Maintenance & Rehabilitation Spray Program This project will include: Procurement of Road Maintenance and Rehab Materials 07/2020 06/2021 1-1 5 8 maintained system. Needs

This project will include: Repair and Servicing of Public Works Equipment | Annual routine Procurement/Operational Tuolumne 20/21 New Traffic Control Devices Traffic and Signal Maintenance 13 various signal locations throughout the County. 07/2020 06/2021 1-1 5 8 maintenance and emergency work of all county traffic signals. Needs

Contract work on LaGrange and Mono Way. Force Account work on Procurement/Operational Tuolumne 20/21 New Road Maintenance & Rehabilitation Crack Fill Program This project will include: Procurement of Road Maintenance and Rehab Materials 08/2020 06/2021 1-2 5 8 various roads through out County. Needs

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pavement Resurfacing - Lockwood Valley Western half of Lockwood Valley Road From SR 33 to Mutau Road Pre-Construction & 07/2020 05/2022 Ventura 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair 15-20 37 19 Road (16.40 centerline miles) Construction 08/2022 10/2022 (Existing), Document Preparation

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair Pavement Resurfacing - Sulphur Mountain Sulphur Mountain Road from End of road to SR 150 (4.64 centerline Pre-Construction & 07/2020 05/2022 Ventura 20/21 New Road Maintenance & Rehabilitation (Existing Safety), Cost Estimating, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair 15-20 37 19 Road miles) Construction 08/2022 10/2022 (Existing), Document Preparation Final Adopted County Submitted - Fiscal Year 2020-21 Local Streets and Roads List of Projects *Listed projects are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1). October 21, 2020

This project will include: Bridge Structure Rehab/Repair (Existing), Paving and/or Striping West County areas including: Ojai, Ventura, Oxnard, Limoneira, and Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Shoulder Ventura 20/21 New Road Maintenance & Rehabilitation Road Maintenance Activities Countywide Yerba Buena. East County areas including: Moorpark, Somis, Piru, Construction 07/2020 06/2021 1-2 37, 38, 44, 45 19, 27 maintenance, striping, sign replacement, ditch cleaning, culvert cleaning and other routine Camarillo, and Simi. maintenance operations.

This project will include: Environmental Study/Documents, Pavement Rehab/Repair (Existing), South River Road from the City of West Sacramento to the Freeport Pre-Construction & 09/2019 05/2022 Yolo 19/20 In Progress Road Maintenance & Rehabilitation South River Road Reconstruction Cost Estimating, Preliminary Design, Document Preparation | Full Reconstruction, shoulder 15-20 4 3 Bridge Construction 06/2022 12/2022 backing, restriping, and pavement marking of 5.2 miles of road.

Various roads, including Alberta Ave, Albrecht Ave, Ames Rd, Ash Way, Baywood Way, Birch Ct, Boyer Rd, Chandler Rd, Country Club Ct, Deborah Rd, Doc Adams Rd, Ella Rd, Elmwood Ct, Fern Ct, Fernwood This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Dr., Gold St, Grove Ave, Jewett Ave, Kenwood Way, Laurellen Rd, Pre-Construction & 03/2020 05/2020 Yuba 20/21 New Road Maintenance & Rehabilitation 2020 Overlay Project 10-20 3 4 Rehab/Repair (Existing), Cost Estimating, Project Scope Development Magnolia, Maywood Ct, Maywood Dr., Moon, Moonshine, N. Roberta, S. Construction 07/2020 12/2020 Roberta, Noble Rd, Oakwood Dr., Park Circle, Park Ct, Pinewood Way, Redwood Ct, Second Ave, Star, Sun, Vine Ct., Volk St, Wiget, Wildwood Dr., Woodland Circle, Woodland Dr