West Bengal Drinking Water Sector Improvement Project

Total Page:16

File Type:pdf, Size:1020Kb

West Bengal Drinking Water Sector Improvement Project Invitation for Bids Date: 8 November 2018 Loan No. 3696-IND: West Bengal Drinking Water Sector Improvement Project and Title: WBDWSIP/DWW/ICB/EM/02/2018-19 Construction of Intermediate Pumping Station, Secondary Transmission Contract No. and mains, overhead tanks, water distribution network and metering works Title: including 2 years Operation and Maintenance in Nandigram-I and Nandigram-II block in East Medinipur Deadline for Submission of Extended to 12 January 2019, 18:00 hours (IST) Bids (e-Tender): 1. India has applied for financing from the Asian Development Bank (ADB) toward the cost of West Bengal Drinking Water Sector Improvement Project (WBDWSIP). Part of this financing will be used for payments under the contract named above. Bidding is open to Bidders from eligible source countries of ADB. 2. The West Bengal Public Health Engineering Department (PHED) (“The Employer”) represented by the Project Director, West Bengal Drinking Water Sector Improvement Project. (WBDWSIP), and on his behalf Superintending Engineer, PIU East Medinipur, WBDWSIP, PHE Dte., invites eligible Bidders to submit online bids in the e-Tendering platform of the State Government of West Bengal (URL: https://wbtenders.gov.in) for the “Construction of Intermediate Pumping Station, Secondary Transmission mains, overhead tanks, water distribution network and metering works including 2 years Operation and Maintenance in Nandigram-I and Nandigram-II block in East Medinipur” (The Works). The principal quantities involved, but not limited to, are: Sl. Quantity Description of Items Unit No (Approx.) Construction of RCC overhead reservoir including foundation 1 design, based on safe bearing capacity with a staging height of Nos 29 20m all complete of assorted size from 250 K1 to 1500 K1 Supplying and laying Ductile Iron Pipes (Class K9) including all 2 specials and fittings all complete (Pipe Diameters from 150mm to Km 101 600mm) Design of DMA based WS Distribution Network including: Supplying and laying of DI (Class K7) and HDPE pipes (Grade 3 Km 1750 PE 100 and PN-10) including all specials and fittings all complete (Pipe Diameters from 63mm to 200mm) Sl. Quantity Description of Items Unit No (Approx.) Supplying and fixing of Resilient seated soft sealing Ductile Iron, 4 Nos 1860 sluice valves (5000 to 400mm) Providing and fixing property service connection with service 5 Nos 90,000 saddle (20mm, 25mm) Providing and laying of MDPE (Grade PE-80) service connection 6 Km 900 (20mm, 25 mm) Providing, installing and giving satisfactory field testing of 7 Nos 90,000 Domestic water meter (15mm, 20mm) Operation and Maintenance Services of the Intermediate Booster 8 Months 24 PS, transmission main, OHRs and WS Distribution Networks 3. International Competitive Bidding will be conducted in accordance with ADB’s Single- Stage: Two-Envelope bidding procedure and is open to all bidders from eligible countries as described in the Bidding Document. 4. Bidders are welcome to download for free the tender documents from https://wbtenders.gov.in. To obtain further information, bidders may contact: Project Implementation Unit (PIU), Purba Medinipur West Bengal Drinking Water Sector Improvement Project PHE Complex (2nd Floor), Parbatipur Tamluk, Purba Medinipur E-mail id: [email protected] and [email protected] 5. For bid submission: a) Bidders should enroll online in http://wbtenders.gov.in. b) Bidders should obtain a Digital Signature Certificate (DSC) as prescribed in the e- Tendering portal to complete online enrolment and bid submission. The e-Tendering telephonic help desk may be contacted for assistance in this regard: (+91) 1800 3070 2232, (+91) 7878007972 and (+91) 7878007973. c) Cost of non-refundable tender fee is INR 10,000.00 / USD 150 including GST, in the form of Certified Cheque (CC) or Demand Draft (DD) favoring “Project Management Unit, WBDWSIP PHED” payable at Kolkata. d) Technical bid should be accompanied with bid security as indicated in the bid document e) Bidders should upload scanned copy of all required documents, including CC/DD and bid security on e-procurement website. Original copies of the CC/DD, bid security, and other documents as required in the bid document in physical form should reach the office of the: Project Management Unit, WBDWSIP, 1st Floor, Utility Building, Tank No.: 3, Action Area-IA, New Town, Kolkata – 700156 before the date and time specified in table below. Bids will be opened as specified in the table below. f) Bidders shall take due care to ensure that the documents uploaded by them in e- procurements system are virus free. IMPORTANT DATES: Sl.No. Events Date & Time Location Start Date of From 31 October 1 downloading of 2018 Bid Document Date & time for From 15:00 hours start of online 2 on 1 November https://wbtenders.gov.in submission of 2018 Bids Deadline for Up to 18:00 hours 3 online submission on 12 January 2019 of Bids Project Implementation Unit (PIU), Purba Medinipur, WBDWSIP, At 10:30 hours on 4 Site Visit PHE Complex (2nd 14 November 2018 Floor), Parbatipur Tamluk, Purba Medinipur Project Implementation Unit (PIU), Purba Medinipur, WBDWSIP, At 12:00 hours on 5 Pre-bid Meeting PHE Complex (2nd 15 November 2018 Floor), Parbatipur Tamluk, Purba Medinipur Deadline for submission of the original Project Management documents as Unit, 1st Floor, Utility required in the At 14:30 hours on Building, Tank No.-3 6 sub-clause ITB 11 15 January 2019 Action Area-IA, of Section 2: Bid New Town, Kolkata Data 700156 Sheet of Bid Document Sl.No. Events Date & Time Location Date of opening of At 15:00 hours on Conference room, 7 Technical bids 15 January 2019 Project Management Unit, 1st Floor, Utility Building, Tank No.-3 Will be intimated to Action Area-IA, Date of opening of all technically 8 New Town, Kolkata Price bids responsive bidders 700156 later. 6. Any addendum, clarification to the bidder’s queries and corrigendum etc. will be published on e-procurement website https://wbtenders.gov.in and will not be published in Newspapers. In case there is a holiday on the day of opening of bid, activities assigned on that date shall be carried out on the next working day. 7. All the prospective bidders are encouraged to participate in Pre-bid meeting and it is advised that the work sites are visited and bid documents be studied thoroughly. .
Recommended publications
  • Date Wise Details of Covid Vaccination Session Plan
    Date wise details of Covid Vaccination session plan Name of the District: Darjeeling Dr Sanyukta Liu Name & Mobile no of the District Nodal Officer: Contact No of District Control Room: 8250237835 7001866136 Sl. Mobile No of CVC Adress of CVC site(name of hospital/ Type of vaccine to be used( Name of CVC Site Name of CVC Manager Remarks No Manager health centre, block/ ward/ village etc) Covishield/ Covaxine) 1 Darjeeling DH 1 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVAXIN 2 Darjeeling DH 2 Dr. Kumar Sariswal 9851937730 Darjeeling DH COVISHIELD 3 Darjeeling UPCH Ghoom Dr. Kumar Sariswal 9851937730 Darjeeling UPCH Ghoom COVISHIELD 4 Kurseong SDH 1 Bijay Sinchury 7063071718 Kurseong SDH COVAXIN 5 Kurseong SDH 2 Bijay Sinchury 7063071718 Kurseong SDH COVISHIELD 6 Siliguri DH1 Koushik Roy 9851235672 Siliguri DH COVAXIN 7 SiliguriDH 2 Koushik Roy 9851235672 SiliguriDH COVISHIELD 8 NBMCH 1 (PSM) Goutam Das 9679230501 NBMCH COVAXIN 9 NBCMCH 2 Goutam Das 9679230501 NBCMCH COVISHIELD 10 Matigara BPHC 1 DR. Sohom Sen 9435389025 Matigara BPHC COVAXIN 11 Matigara BPHC 2 DR. Sohom Sen 9435389025 Matigara BPHC COVISHIELD 12 Kharibari RH 1 Dr. Alam 9804370580 Kharibari RH COVAXIN 13 Kharibari RH 2 Dr. Alam 9804370580 Kharibari RH COVISHIELD 14 Naxalbari RH 1 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVAXIN 15 Naxalbari RH 2 Dr.Kuntal Ghosh 9832159414 Naxalbari RH COVISHIELD 16 Phansidewa RH 1 Dr. Arunabha Das 7908844346 Phansidewa RH COVAXIN 17 Phansidewa RH 2 Dr. Arunabha Das 7908844346 Phansidewa RH COVISHIELD 18 Matri Sadan Dr. Sanjib Majumder 9434328017 Matri Sadan COVISHIELD 19 SMC UPHC7 1 Dr. Sanjib Majumder 9434328017 SMC UPHC7 COVAXIN 20 SMC UPHC7 2 Dr.
    [Show full text]
  • West Bengal Drinking Water Sector Improvement Program: Bulk Water Supply for 4 Blocks of Nandakumar, Chandipur, Nandigram I
    Initial Environmental Examination Updated Project Number: 49107-006 November 2020 IND: West Bengal Drinking Water Sector Improvement Program - Bulk Water Supply for 4 Blocks of Nandakumar, Chandipur, Nandigram I and Nandigram II at Purba Medinipur District Package No: WBDWSIP/WW/EM/01 Prepared by Public Health Engineering Department, Government of West Bengal for the Asian Development Bank. ABBREVIATIONS ADB – Asian Development Bank CPCB – Central Pollution Control Board CTE – Consent to Establish CTO – Consent to Operate DSISC Design, supervision and institutional support consultant EAC – Expert Appraisal Committee EHS – Environmental, Health and Safety EIA – Environmental Impact Assessment EMP – Environmental Management Plan GRC – Grievance redress committee GRM – Grievance redress mechanism GOI – Government of India GoWB – Government of West Bengal HSGO – Head, Safeguards and Gender Officer IBPS – Intermediate Booster Pumping Station IEE – Initial Environmental Examination IWD – Irrigation and Waterways Department MoEFCC – Ministry of Environment, Forest and Climate Change WBPCB – West Bengal Pollution Control Board NOC – No Objection Certificate PHED – Public Health Engineering Department PIU – Project Implementation Unit PMC – Project Management Consultant PMU – Project Management Unit PWSS - Pied Water Supply Scheme PPTA – Project Preparatory Technical Assistance REA – Rapid Environmental Assessment ROW – right of way SPS – Safeguard Policy Statement WHO – World Health Organization WTP – Water treatment plant WBDWSIP – West Bengal Drinking Water Sector Improvement Project WEIGHTS AND MEASURES C Degree Celsius km kilometre lpcd litres per capita per day m metre Mgd million gallons per day Mld million litres per day mm millimetre Nos Numbers sq.km Square Kilometer NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March.
    [Show full text]
  • Investigating Groundwater Condition and Seawater Intrusion Status in Coastal Aquifer Systems of Eastern India
    water Article Investigating Groundwater Condition and Seawater Intrusion Status in Coastal Aquifer Systems of Eastern India Subrata Halder 1,* , Lingaraj Dhal 2 and Madan K. Jha 1 1 AgFE Department, IIT Kharagpur, Kharagpur 721302, India; [email protected] 2 WRD&M Department, IIT Roorkee, Roorkee 247667, India; [email protected] * Correspondence: [email protected]; Tel.: +91-943-259-4699 Abstract: Providing sustainable water supply for domestic needs and irrigated agriculture is one of the most significant challenges for the current century. This challenge is more daunting in coastal regions. Groundwater plays a pivotal role in addressing this challenge and hence, it is under growing stress in several parts of the world. To address this challenge, a proper understanding of groundwater characteristics in an area is essential. In this study, spatio-temporal analyses of pre-monsoon and post-monsoon groundwater levels of two coastal aquifer systems (upper leaky confined and underlying confined) were carried out in Purba Medinipur District, West Bengal, India. Trend analysis of seasonal groundwater levels of the two aquifers systems was also performed using Mann-Kendall test, Linear Regression test, and Innovative Trend test. Finally, the status of seawater intrusion in the two aquifers was evaluated using available groundwater-quality data of Chloride (Cl−) and Total Dissolved Solids (TDS). Considerable spatial and temporal variability was found in the seasonal groundwater levels of the two aquifers. Further, decreasing trends were spotted in the pre-monsoon and post-monsoon groundwater-level time series of the leaky confined and confined aquifers, except pre-monsoon groundwater levels in Contai-I and Deshpran blocks, and the post- Citation: Halder, S.; Dhal, L.; Jha, monsoon groundwater level in Ramnagar-I block for the leaky confined aquifer.
    [Show full text]
  • Land Use and Development Control Plan for Nandigram I & Ii Blocks
    LAND USE AND DEVELOPMENT CONTROL PLAN FOR NANDIGRAM I & II BLOCKS FINAL REPORT FEBRUARY 2018 Land Use and Development Control Plan for Nandigram I & II Blocks Table of Contents: Contents 1 BACKGROUND ............................................................................................................... 5 2.0 LEGAL FRAMEWORK ............................................................................................... 7 2.1 Statutory Provision .................................................................................................... 7 2.2 Provision under the Act ............................................................................................. 7 2.2.1 Preparation of Land Use and Development Control Plan .................................. 7 2.2.2 Approval of the State Government to the publication of notice of preparation of Land Use and Development Control Plan ..................................................................... 9 2.2.3 Public notice of the preparation of the Land Use and Development Control Plan ........................................................................................................................... 9 2.2.4 Approval of the State Government .................................................................. 10 2.2.5 Coming into operation of the Land Use and Development Control Plan ........ 10 2.2.6 References to High Court questioning the validity of the Land Use and Development Control Plan .............................................................................................
    [Show full text]
  • E2767 V. 2 Public Disclosure Authorized ACCELERATED DEVELOPMENT of MINOR IRRIGATION (A.D.M.I) PROJECT in WEST BENGAL
    E2767 v. 2 Public Disclosure Authorized ACCELERATED DEVELOPMENT OF MINOR IRRIGATION (A.D.M.I) PROJECT IN WEST BENGAL ENVIRONMENTAL ASSESSMENT Public Disclosure Authorized ANNEXURE (Part II) November 2010 Public Disclosure Authorized Public Disclosure Authorized Annexure - I - Map of West Bengal showing Environmental Features Annexure – II - Sample Blocks Annexure – III - Map of West Bengal Soils Annexure – IV - Ground Water Availability in Pilot Districts Annexure – V - Ground Water Availability in non-pilot districts Annexure – VI - Arsenic Contamination Maps of Districts Annexure – VII - Details of Wetlands more than 10 ha Annexure – VIII - Environmental Codes of Practice Annexure – IX - Terms of Reference for Limited EA Annexure – X - Environmental Survey Report of Sample Blocks Annexure – XI - Stakeholder Consultation Annexure – XII - Primary & Secondary Water Quality Data Annexure – XIII - Primary & Secondary Soil Quality Data Annexure – XIV - EMP Master Table ii Annexure II Sample Blocks for Environmental Assessment Agro- Hydrogeological No. of climatic Soil group District Block Status of the Block Samples zone Hill Zone Acid soils/sandy Jalpaiguri Mal Piedmont zone 1 loam Terai Acid soils/sandy Darjeeling Phansidewa Piedmont zone 1 Teesta loam Flood plain Acid soils/sandy Jalpaiguri Dhupguri Recent to sub-recent 1 loam alluvium Acid soils/sandy Coochbehar Tufangunge II Recent to sub-recent 1 loam alluvium Acid soils/sandy Coochbehar Sitai Recent to subrecent 1 loam alluvium Vindhyan Alluvial/sandy Dakshin Gangarampur( Older alluvium
    [Show full text]
  • Volunteer Name with Reg No State (District) (Block) Mobile No APSANA KHATUN (61467) WEST BENGAL (Darjiling) (Fanside
    Volunteer Name with Reg No State (District) (Block) Mobile no APSANA KHATUN (61467) WEST BENGAL (Darjiling) (Fansidewa) 9547651060 RABINA KHAWAS (64657) WEST BENGAL (Darjiling) (Kalimpong-I) 7586094862 NITSHEN TAMANG (64650) WEST BENGAL (Darjiling) (Takda) 9564994554 ARBIND SUBBA (61475) WEST BENGAL (Darjiling) (Takda) 7001894077 SANTOSH KUMAR PASWAN (61593) WEST BENGAL (Darjiling) (Nakshalbari) 8917830020 SAMIRAN KHATUN (64837) WEST BENGAL (Darjiling) (Fansidewa) 7407206018 ANISHA THAKURI (64645) WEST BENGAL (Darjiling) (Bijanbari) 7679456517 BIKASH SINGHA (61913) WEST BENGAL (Darjiling) (Kharibari) 9064394568 PUSKAR TAMANG (64607) WEST BENGAL (Darjiling) (Garubathan) 8436112429 ANIP RAI (61968) WEST BENGAL (Darjiling) (Bijanbari) 7047337757 SUDIBYA RAI (61976) WEST BENGAL (Darjiling) (Kalimpong-II) 8944824498 DICHEN LAMA (64633) WEST BENGAL (Darjiling) (Kalimpong-II) 9083860892 YOGESH N SARKI (62019) WEST BENGAL (Darjiling) (Kurseong) 7478305517 BIJAYA LAXMI SINGH (61586) WEST BENGAL (Darjiling) (Matigara) 9932839481 SAGAR RAI (64619) WEST BENGAL (Darjiling) (Garubathan) 7029143177 DEEPTI BISWAKARMA (61491) WEST BENGAL (Darjiling) (Garubathan) 9734902283 ANMOL CHHETRI (61496) WEST BENGAL (Darjiling) (Kurseong) 9593951858 BIJAY CHANDRA SHARMA (61470) WEST BENGAL (Darjiling) (Kalimpong-I) 9233666950 KHAGESH ROY (61579) WEST BENGAL (Darjiling) (Nakshalbari) 8759721171 SANGAM SUBBA (61462) WEST BENGAL (Darjiling) (Mirik) 8972908640 LIMESH TAMANG (64627) WEST BENGAL (Darjiling) (Bijanbari) 9679167713 ANUSHILA LAMA TAMANG (61452) WEST BENGAL
    [Show full text]
  • I Tender No. WTL/PAR/AC/19-20/006 Dated 07/06/2019
    WEBEL TECHNOLOGY LIMITED CORRIGENDUM – I Tender No. WTL/PAR/AC/19-20/006 dated 07/06/2019 1. Date and time of Bid Submission has been extended up to 8th July 2019 at 12.00 hrs. 2. Date and time of Bid Opening has been extended up to 10th July 2019 at 12.00 hrs. 3. Date and time of EMD & Tender Fee submission has been extended up to 10th July 2019 at 11.00 hrs. WEBEL TECHNOLOGY LIMITED Contact Details of WBSWAN SL Mobile DHQ Contact Name Location DHQ POP No. Number Details Total Total Webel SL 1 Jadu Gopal Mondal 9051041622 DHQ Name Number of Number of Bhavan No. SDHQ BHQ Webel 2 Soma Dey 9831056289 1 Bankura 2 22 Bhavan Webel 3 Subrata Dutta 9830325404 2 Birbhum 2 19 Bhavan Mrinmoy Webel 4 9832250828 3 Coochbehar 4 13 Chattopadhaya Bhavan 5 Ambar Nath Banerjee SHQ 9836383806 4 Dakshin Dinajpur 1 8 Aniruddha 6 SHQ 9051377550 5 Darjeeling 3 12 Chakroborty 7 Anupam Ghosh SHQ 9051309988 6 East Medinipur 4 25 7 Hooghly 3 18 8 Biplab Dhar SHQ 9231815309 8 Howrah 1 14 9 Debasish Senapati SHQ 9903364334 9 Jalpaiguri 2 7 10 Hemanta Mondal SHQ 8013604600 10 Malda 1 16 11 Prasanta Ghosh SHQ 8621053778 11 Murshidabad 5 26 12 Pulakesh Das SHQ 9836368068 12 Nadia 4 17 North 24 13 Rahul Tripathi SHQ 9051345445 13 3 22 Parganas Ram Rajib Pashchim 14 SHQ 9830753488 14 2 8 Bhattacharjee Burdwan 15 Saikat Goswami SHQ 9051569955 15 Purba Burdwan 2 23 16 Sougata Polley SHQ 9432169916 16 Purulia 1 19 South 24 17 Sudip Kundu SHQ 9051073838 17 5 29 Parganas 18 Sumanendu Das SHQ 9836303300 18 Uttar Dinajpur 2 9 19 Suvodip Roy SHQ 9830244528 19 West Medinipur 2 21 20 Thakur Das Sur SHQ 9831660438 20 Alipurduar 0 6 21 Jhargram 0 8 WEBEL TECHNOLOGY LIMITED SOUTH 24 PARGANS SL.
    [Show full text]
  • PHC Raipur II Dumurtor 10 BHP 44 Hatgram P.H.C
    Sl. Upgraded Under Name of the Institution Block Post Office Beds No. Program District : Bankura Sub- Division : Sadar 1 Helna Susunia P.H.C. Bankura-I Helna Susunia 10 BHP 2 Kenjakura P.H.C. Bankura-I Kanjakura 10 BHP 3 Narrah P.H.C. Bankura-II Narrah 4 4 Mankanali P.H.C. Bankura-II Mnkanali 10 5 Jorhira P.H.C. Chhatna Jorhira 10 6 Salchura (Kamalpur) P.H.C. Chhatna Kamalpur 2 7 Jhantipahari P.H.C. Chhatna Jhantipahari 6 8 Bhagabanpur P.H.C. Chhatna Bhagabanpur 6 9 Gogra P.H.C. Saltora Gogra 10 BHP 10 Ituri P.H.C. Saltora Tiluri 10 BHP 11 Kashtora P.H.C. Saltora Kashtora 6 12 Gangajalghati P.H.C. Gangajalghati Gangajalghati 4 Ramharipur P.H.C.(Swami 13 Gangajalghati Ramharipur 4 Vivekananda) 14 Srichandrapur P.H.C. Gangajalghati Srichandrapur 10 15 Ramchandrapur P.H.C. Mejhia Ramchandrapur 4 16 Pairasole P.H.C. Mejhia Pairasole 10 17 Beliatore P.H.C. Barjora Beliatore 10 18 Chhandar P.H.C. Barjora Chhandar 4 19 Godardihi (Jagannathpur) P.H.C. Barjora Godardihi 4 20 Pakhanna P.H.C. Barjora Pakhanna 10 Sl. Upgraded Under Name of the Institution Block Post Office Beds No. Program 21 Ratanpur P.H.C. Onda Ratanpur 10 BHP 22 Nakaijuri P.H.C. Onda Ghorasol 10 BHP 23 Ramsagar P.H.C. Onda Ramsagar 10 BHP 24 Santore P.H.C. Onda Garh Kotalpur 10 BHP 25 Nikunjapur P.H.C. Onda Nikunjapur 10 BHP Sub- Division : Khatra 26 Bonabaid P.H.C. Khatra-I Kankradara 10 27 Mosiara (Dharampur) P.H.C.
    [Show full text]
  • West Bengal Drinking Water Sector Improvement Program
    Initial Environmental Examination Document Stage: Draft Project Number: 49107-006 November 2018 IND: West Bengal Drinking Water Sector Improvement Program – Subproject : Water Supply Distribution System for Nandigram I & II Blocks (Purba Medinipur District) [Package WB/EM/02] Prepared by Public Health Engineering Department, Government of West Bengal for the Asian Development Bank. ABBREVIATIONS ADB – Asian Development Bank CPCB – Central Pollution Control Board CTE – consent to establish CTO – consent to operate DSISC design, supervision and institutional support consultant EAC – Expert Appraisal Committee EHS – Environmental, Health and Safety EIA – Environmental Impact Assessment EMP – Environmental Management Plan GRC – grievance redress committee GRM – grievance redress mechanism GOI – Government of India GoWB – Government of West Bengal HSGO – Head, Safeguards and Gender Officer IBPS – Intermediate Booster Pumping Station IEE – Initial Environmental Examination IWD – Irrigation and Waterways Department MoEFCC – Ministry of Environment, Forest and Climate Change WBPCB – West Bengal Pollution Control Board NOC – No Objection Certificate PHED – Public Health Engineering Department PIU – Project Implementation Unit PMC – Project Management Consultant PMU – Project Management Unit PWSS - Pied Water Supply Scheme PPTA – Project Preparatory Technical Assistance REA – Rapid Environmental Assessment ROW – right of way SPS – Safeguard Policy Statement WHO – World Health Organization WTP – water treatment plant WBDWSIP – West Bengal Drinking Water Sector Improvement Project WEIGHTS AND MEASURES m3/hr cubic meter per hour dBA decibel C degree Celsius ha hectare km kilometre lpcd liters per capita per day m meter mbgl meters below ground level mgd million gallons per day MLD million liters per day mm millimeter km2 square kilometer NOTES In this report, "$" refers to US dollars. CURRENCY EQUIVALENTS (as of 24 September, 2018) Currency unit = Rupee (INR) INR 1.00 = 0.014 USD USD 1.00 = 72.44 INR This initial environmental examination is a document of the borrower.
    [Show full text]
  • Rural Hospital 2 Anchuri Rural Hospital * Bankura-I Anchuri 03242 - 254056 30 KFW-GTZ [email protected]
    Upgraded Sl. Name of the Institution Block Post Office Telephone No. Beds E-mail Id. No. Under Program District : Bankura Sub-Division : Sadar Gangajalghati (Amar Kanan) 1 Gangajalghati Amar Kanan 03241 - 265226 30 [email protected] Rural Hospital 2 Anchuri Rural Hospital * Bankura-I Anchuri 03242 - 254056 30 KFW-GTZ [email protected] 3 Chhatna Rural Hospital * Chhatna Chhatna 03242 - 205497 30 KFW-GTZ [email protected] 4 Saltora Rural Hospital * Saltora Saltora 03241 - 273228 30 KFW-GTZ [email protected] 5 Barjora Rural Hospital * Barjora Barjora 03241 - 257228 30 BHP [email protected] 6 Onda Rural Hospital * Onda Medinipur Gram 03242 - 203113 30 KFW-GTZ [email protected] Sub-Division : Khatra 7 Taldangra Rural Hospital Taldangra Taldangra 03243 - 265234 30 [email protected] 8 Raipur Rural Hospital Raipur I Nutangarh 03243 - 267540 30 [email protected] Amjhuri (Hirbandh) Rural 9 Khatra-II Hirbandh 03243 - 252300 30 BHP [email protected] Hospital * 10 Ranibandh Rural Hospital * Ranibandh Ranibandh 03243 - 250235 30 HSDI [email protected] 11 Simlapal Rural Hospital * Simlapal Simlapal 03243 - 262247 30 NRHM [email protected] 12 Sarenga Rural Hospital * Raipur II Krishnapur 30 HSDI [email protected] 13 Indpur Rural Hospital * Indpur Indpur 03242 - 260221 30 BHP [email protected] Sub-Division : Bishnupur 03244 - 14 Sonamukhi Rural Hospital Sonamukhi Sonamukhi 30 [email protected] 275154/275250 15 Kotalpur Rural Hospital Kotalpur Kotalpur 03244 - 240243 60 [email protected] Hat- 16 Patrasayer Rural Hospital * Patrasayer 03244 - 266239 30 NRHM [email protected] Krishnanagar 17 Indas Rural Hospital * Indas Indas 03244 - 263237 30 NRHM [email protected] Upgraded Sl.
    [Show full text]
  • Nandigram I & II Blocks 2017 Interim LUDCP 1
    Haldia Development Authority – Nandigram I & II Blocks 2017 Contents 1.1 Introduction ........................................................................................................................... 2 2.1 Location and connectivity ...................................................................................................... 3 3.1 Demography .......................................................................................................................... 4 4.1 Existing Scenario .................................................................................................................... 9 5.1 Development Control Regulation ......................................................................................... 13 6.1 Vision & Objective................................................................................................................ 13 Interim LUDCP 1 Haldia Development Authority – Nandigram I & II Blocks 2017 1.1 Introduction Nandigram I & II Blocks as part of the Haldia Planning Area are situated in Haldia Sub-division of the PurbaMedinipur district of West Bengal. The area is bounded by distinct physical boundaries namely the Hooghly River and Haldi River on two sides, Khejuri and Chandipur Blocks on other two sides. The total area of the Planning Area is 287.58 sq km. The planning area includes two Blocks – Nandigram I (99 mouzas) and Nandigram II (41 mouzas). There is no notified urban area within the planning area; however, 2no.s of Census Towns has been identified in Census of India,
    [Show full text]
  • 10640-A-2018.Pdf
    Available Online at http://www.recentscientific.com International Journal of CODEN: IJRSFP (USA) Recent Scientific International Journal of Recent Scientific Research Research Vol. 9, Issue, 4(I), pp. 26181-26185, April, 2018 ISSN: 0976-3031 DOI: 10.24327/IJRSR Research Article GENDER DISPARITIES IN THE LEVELS OF LITERACY RATE: A BLOCK LEVEL ANALYSIS OF PURBA MEDINIPUR DISTRICT, WEST BENGAL, INDIA Sanjib Sau1., Nayan Hazra2 and Manishree Mondal3 1Department of Geography, Prabhat Kumar College, Contai, Purba Medinipur, West Bengal, India 2Department of Geography, Medinipur City College, Paschim Medinipur, West Bengal, India 3Department of Geography, Medinipur College (Autonomous), Paschim Medinipur, West Bengal, India DOI: http://dx.doi.org/10.24327/ijrsr.2018.0904.2008 ARTICLE INFO ABSTRACT Article History: Every Society is composed of people and characterized by various socio-cultural, economic & Received 5th January, 2018 political attributes. Literacy is an indispensable means to acquire skills for improving socio- Received in revised form 20th economic development of well-being. The National Adult Education Programme launched February, 2018 countrywide during 1978 has viewed literacy as a means to bring about fundamental change in Accepted 8th March, 2018 socio-economic development. Literacy and education attainment are the key variable influencing Published online 28th April, 2018 fertility, mortality and migration. Therefore, literacy is the decisive factor for development and population control as well Inequality in literacy rate tends to lead to a number of socio-economic Key Words: problems, which in turn give rise to regional imbalance. Despite trying our efforts in bridging the gap between male female variation in literacy, women are still far behind and there exists a large Disparity, Spatial pattern, Non-primary gender bias in the area under study.
    [Show full text]