World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
First 18 months Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan February 1, 2017 2. Date of General Procurement Notice: July 2017 3. Period covered by this procurement plan: first 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Category Prior Review Threshold Comments US$ Public Disclosure Authorized 1. Goods and >= US$ 4 million All 2. Works >= US$ 15 million All 3. (Non-Consultant Services) >= US$ 4 million All 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Construction of New school buildings (30 sites), additional classrooms (100 sites), teacher accommodations (30 sites), on-demand school rehabilitation (70 sites), and rehabilitation of 25 POE, 99 DOE, and three RTTCs would be procured following the community participation procedures set out in the project operational manual. Public Disclosure Authorized 4. Reference to (if any) Project Operational/Procurement Manual: As specified in the project legal agreement. 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness. 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) Public Disclosure Authorized million nce (yes/no) Constructio 11.35 At least No Post Communi n of New 357 ty school contract participat buildings packages ion (30 sites), procedur additional e classrooms (100 sites), teacher accommod ations (30 sites), on- demand school rehabilitati on (70 sites), and rehabilitati on of 25 POE, 99 DOE, and three RTTCs Procureme 3.15 Multiple No Post To be nt of contracts procured vehicles, centrally office by equipment, MoEYS office furniture, motorcycle s, school furniture, etc. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comment 1. Competitive Methods (Firms) >= US$2,000,000 2. Individual >= US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Baseline and 0.4 1 Post CQS end line survey Integrated 0.05 1 Post SSS financial audit and procurement post review consulting firm Individual 2.57 Multiple Post national and contracts international consultants for the project implementati on support at national level and school community level (finance, procurement, construction supervision, etc.) PROCUREMENT Cambodia : Secondary Education Improvement Project PLAN General Information Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2017-07-26 Revised Plan Date(s): (comma delineated, leave blank if none)2019-06-28 Project ID: P157858 GPN Date: 2017-08-02 Project Name: Secondary Education Improvement Project Loan / Credit No: IDA / 59780 Executing Agency(ies): Ministry of Education Youth and Sport WORKS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOEYS-SEIP-NS-CW001 / Request for Single Stage - One Renovation of GSED office IDA / 59780 Post Open - National 0.00 Canceled 2018-04-06 2018-05-01 2018-06-15 Quotations Envelope and meeting room MOEYS-FST-032 / School Community Facility Construction of Koh IDA / 59780 Post Driven Direct 65,429.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Dach Bun Rany Hun Sen Development School MOEYS-FST-052 / School Community Facility Construction of Prek IDA / 59780 Post Driven Direct 62,876.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Taten Development MOEYS-FST-054 / School Community Facility Construction of IDA / 59780 Post Driven Direct 61,576.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Jayvaramann 7 School Development MOEYS-FST-055 / School Community Facility Construction of IDA / 59780 Post Driven Direct 63,277.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Sampeuv Poun School Development MOEYS-FST-051 / School Community Facility Construction of IDA / 59780 Post Driven Direct 62,112.00 Signed 2018-03-25 2018-03-26 2018-03-29 2018-10-01 Porng Teuk School Development MOEYS-FST-005 / School Community Facility Construction of Prek IDA / 59780 Post Driven Direct 170,666.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-12-30 Prasap School Development MOEYS-FST-001 / School Community Facility Construction of IDA / 59780 Post Driven Direct 63,176.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Mesar Chrey School Development MOEYS-FST-002 / School Community Facility Construction of IDA / 59780 Post Driven Direct 81,159.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Chhin Lean-Hann Chey Development School MOEYS-FST-003 / School Community Facility Construction of IDA / 59780 Post Driven Direct 120,682.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Hun Sen Samporng Chey Development School MOEYS-FST-004 / School Community Facility Construction of Prek IDA / 59780 Post Driven Direct 121,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Dambauk School Development MOEYS-FST-034 / School Community Facility Construction of IDA / 59780 Post Driven Direct 117,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Samaki Meanchey School Development MOEYS-FST-042 / School Community Facility Construction of Ang IDA / 59780 Post Driven Direct 61,376.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Say School Development MOEYS-FST-043 / School Community Facility Construction of Slap IDA / 59780 Post Driven Direct 62,876.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Leng School Development MOEYS-FST-044 / School Community Facility Construction of IDA / 59780 Post Driven Direct 117,882.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Toap Meanchey School Development MOEYS-FST-048 / School Community Facility Construction of IDA / 59780 Post Driven Direct 63,612.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Kansoam Ark School Development MOEYS-FST-049 / School Community Facility Construction of Prey IDA / 59780 Post Driven Direct 63,312.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Khley School Development MOEYS-FST-050 / School Community Facility Construction of IDA / 59780 Post Driven Direct 64,812.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Trasek Koang School Development MOEYS-FST-022 / School Community Facility Construction of IDA / 59780 Post Driven Direct 121,354.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Samrong Ponley School Development Page 1 MOEYS-FST-023 / School Community Facility Construction of Sok IDA / 59780 Post Driven Direct 120,554.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 An-Tram Khnar School Development MOEYS-FST-024 / School Community Facility Construction of Kiri IDA / 59780 Post Driven Direct 63,012.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Vong School Development MOEYS-FST-026 / School Community Facility Construction of Sok IDA / 59780 Post Driven Direct 63,212.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 An-Prey Melorng School Development MOEYS-FST-027 / School Community Facility Construction of Sok IDA / 59780 Post Driven Direct 128,752.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 An-Prey Sandek School Development MOEYS-FST-028 / School Community Facility Construction of Prey IDA / 59780 Post Driven Direct 64,712.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Tub School Development MOEYS-FST-008 / School Community Facility Construction of Hun IDA / 59780 Post Driven Direct 61,876.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Sen Char Thmei School Development MOEYS-FST-009 / School Community Facility Construction of Hun IDA / 59780 Post Driven Direct 62,076.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Sen Dambe School Development MOEYS-FST-010 / School Community Facility Construction of IDA / 59780 Post Driven Direct 121,282.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Krek School Development MOEYS-FST-011 / School Community Facility Construction of IDA / 59780 Post Driven Direct 61,476.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-10-01 Hun Sen Trapaing Russey Development School MOEYS-FST-038 / School Community Facility Construction of IDA / 59780 Post Driven Direct 168,400.00 Signed 2018-03-26 2018-03-27 2018-03-30 2018-12-30 Anlung Vil School Development MOEYS-FST-039 / School Community Facility Construction of IDA / 59780 Post Driven Direct