GOLDEN MILE Vision and Concept Masterplan Report Presented by Urban Initiatives Studio Ltd

Total Page:16

File Type:pdf, Size:1020Kb

GOLDEN MILE Vision and Concept Masterplan Report Presented by Urban Initiatives Studio Ltd LONDON BOROUGH OF HOUNSLOW GOLDEN MILE VISion And ConCEPT MASTERPLAN REPORT PRESENTED BY URBAN INITIATIVES STUDIO LTD IN ASSOCIATION WITH (SUB CONSULTANT) STATUS FINAL ISSUE NO. 01 DATE ISSUED 16 APRIL 2014 FILE NAME 4050_20140416_GoldenMileReport_DS_Final.indd AUTHOR David Syme REVIEWED BY Hugo Nowell PROJECT DIRECTOR APPROVED BY DESIGN DIRECTOR This document has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing by Urban Initiatives Studio Limited, no other party may copy, reproduce, distribute, make use of, or rely on its contents. No liability is accepted by Urban Initiatives Studio Limited for any use of this document, other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document are on the basis of Urban Initiatives Studio Limited using due skill, 36-40 York Way care and diligence in the preparation of the same and no explicit warranty is provided as to their accuracy. It should London N1 9AB be noted and is expressly stated that no independent verification of any of the documents or information supplied to Urban Initiatives Studio Limited has been made. +44 (0)20 7843 3165 Urban Initiatives Studio Limited. Registered in England No. 8236922 www.uistuido.co.uk CONTENTS INTRODUCTION ....................................................................................5 HOW TO USE THE DOCUMENT .................................................................. 5 01 OVERVIEW ..................................................................................................27 EXISTING CHARACTER AND TOWNSCAPE ............................................ 27 LOCATION ................................................................................................... 7 4050 HISTORY ..................................................................................................... 8 STRATEGIC CONTEXT ............................................................................... 9 ECONOMIC CONTEXT ...............................................................................11 Golden Mile HOUNSLOW CONTEXT .............................................................................13 Vision and Concept Masterplan WHY A VISION AND CONCEPT MASTERPLAN ........................................14 THE SPATIAL STRATEGY ..........................................................................17 The Team: AREAS OF TRANSFORMATION AND/OR CONSOLIDATION....................20 Urban Initiatives Studio Urban Movement 02 A PORTRAIT OF THE AREA ............................................................27 GVA EXISTING CHARACTER AND TOWNSCAPE ............................................ 27 MOVEMENT AND ACCESS ....................................................................... 34 Project Director: SOCIAL AND ECONOMIC CONTEXT ........................................................ 34 David Syme DEVELOPMENT ACTIVITY ....................................................................... 36 SWOT ........................................................................................................ 42 Document type: Final Report 03 CONCEPT MASTERPLAN ........................................................................45 16 April 2014 URBAN STRUCTURE ............................................................................... 45 QUANTUM OF DEVELOPMENT.................................................................47 MOVEMENT AND ACCESS ....................................................................... 48 MIX OF USES ............................................................................................ 50 SCALE, HEIGHT AND MASSING .............................................................. 52 04 STAKEHOLDER ENGAGEMENT ..............................................................55 STAKEHOLDER EVENT 1 ......................................................................... 55 APPENDICES .....................................................................................57 01 PROPERTY MARKET REVIEW ............................................................ 57 02 SCENARIO TESTING ............................................................................67 03 CONSULTATION NOTES .......................................................................69 GREAT WEST ROAD 4 INTRODUCTION The Golden Mile Vision and Concept Masterplan has been prepared as a non-statutory planning document for the London Borough of Hounslow. The document has no planning status but will be used as part of the evidence base as a visioning document supporting the Council’s emerging Local Plan. The key principles of this masterplan will be embedded in the Local Plan - the statutory planning document that will provide the vision and overarching direction to guide the future development of the whole borough. This document is visionary and deliberately aspirational. It has been prepared to explore several opportunities and at this stage does not seek to close down options which may be challenging. Brentford Lock The M4 raised above the Great West Road The areas of transformation/consolidation which have been identified within the An Area Action Plan (AAP) for the corridor Section 03 - Concept Masterplan: provides a document do not necessarily represent areas will be developed in due course where a more detailed overview of how the corridor will for comprehensive redevelopment. A range of programme of consultation and more thorough develop over that time including parameters on scenarios will be tested through further, more testing of proposals will be carried out. movement and access, land uses and building detailed, design work at the next stage. This heights. will explore the re-use of existing buildings, the How to use this document intensifying of development around existing Section 04 - Stakeholder Engagement: provides an summary of the stakeholder buildings and comprehensive redevelopment The masterplan document is divided into four engagement carried out to date. scenarios. sections: The spatial proposals and infrastructure Section 01 - Overview: This section provides projects presented here will require further and overview of the key issues to address detailed investigation to test their feasibility, when considering physical development of the deliverability and potential costs. It will also corridor and our proposed strategic responses; be essential to carry out consultation with provides a adjacent communities to get their views on the Section 02 - Portrait of the Area: detailed evaluation of the existing context both future of the corridor. physically and economically; and THE GOLDEN MILE VISION AND CONCEPT MASTERPLAN DRAFT REPOrt 5 4 22 5 12 7 2 3 6 11 9 23 1 8 10 21 6 01 OVERVIEW 15 Location 20 The Golden Mile is a stretch of the A4 / Great 18 West Road (GWR) that runs from the Chiswick roundabout in the east, 2.5 miles to Gillette Corner in the west, and forms an important, strategic corridor into central London from Heathrow Airport. The adjacent aerial image identifies important 19 buildings, places and streets within the Golden Mile corridor. 13 1. Former Gillette Factory 2. Grasshoppers Rugby Club 17 3. BSkyB Campus 4. Boston Manor Station 5. Boston Manor Park 24 6. GlaxoSmithKline 7. University of West London 8. Brentford Lock 9. Brentford Station 16 10. Brenford High Street 11. Brentford Football Club 12. Great West Quarter 13. Carville Hall Park 14. Kew Palace 15. Gunnersbury Park 16. Kew Bridge 17. Kew Bridge Station 18. Kensington Cemetery 14 19. Chiswick roundabout 20. Chiswick Park 21. Syon Lane Station 22. The M4 23. The Great West Road (A4) 24. Kew Bridge Steam Museum 7 History The Golden Mile is so named as a result of the concentration of prominent businesses it attracted following the construction of the GWR in 1925. Large companies with household names such Beechams, Gillette, Firestone and Lucozade took advantage of the strategic location and began locating their headquarters there, beginning an era of innovative, modern offices and factories and establishing a collection of iconic, art deco buildings along its length. Constructed as a bypass for the heavily congested London Road that runs through Hounslow and Brentford, the Golden Mile (A4) was extended to Kensington through Chiswick and Hammersmith between 1955 and 1957. Two years later work began on the elevated Historic aerial M4 that passes through Brentford and out of London towards South Wales. This, and the rapid expansion of Heathrow Airport, saw a new wave of large multi-national companies such as Glaxo-Smith Kline, Sky and Mercedes locate along the Golden Mile taking advantage of the national and international connections. Whilst there has been significant and continued investment along the Golden Mile, structural problems are apparent today, with severe traffic congestion and some empty and under used commercial premises. Recent development activity however including the construction of the Great West Quarter, refurbishment of Wallis House, the Alfa Laval Site and Kia showcase demonstrate the corridors continued attraction for global companies to invest, locate and develop. Gillette building 8 Strategic context WESTERN CoRRidoR The Golden Mile is a key component of the eastern M4/A4 Economic Corridor often described as England’s “Silicon Valley” due to the concentration of technology companies and which extend from Hammersmith through to Newbury, Reading and Swindon. The corridor is also home to a large number of financial service businesses
Recommended publications
  • In This Issue
    eNewsletter – 23rd February 2020 Welcome to the third OWGRA eNewsletter of 2020. In terms of impact on our area, far and away the most important item is the proposed development on the Tesco and Homebase Osterley sites by St. Edward, part of the Berkeley Group. So please can we ask all residents (and friends and neighbours) to read the article on the next stage of this (the first article in the Planning section on page 2) and go to the exhibition of the revised plans and make your views known.…... In this issue In Planning (page 2-7), we have news on the 2nd Public Exhibition of the Tesco/Homebase Osterley redevelopment (please read this article), an update on the Bolder Academy con- struction, Brentford FC news, Osterley Station (flats and lifts), Syon Lane lifts, plans for an- other hotel and Conservation Area updates Under London Borough of Hounslow (LBH) News (pages 8 -11) there’s news of the coun- cil’s unsuccessful bid to be London Borough of Culture 2021, problems at council leisure centres, updates on parking restrictions and consultations underway. In Local News (pages 12 - 14) there’s news of Brentford Sports Fest, events at Osterley Park, The Watermans Centre in Brentford (including Bollywood dance classes…), Brentford Musical Museum and Gunnersbury Park, an art exhibition, two local history stories and events at Grasshoppers and Thistleworth clubs Under Crime and Local Policing (pages 15 - 18) there’s news of burglaries, doorstep cons, bicycle and car theft, good news (at last !) on catalytic convertor thefts, more police coming, latest crime stats and how to meet your local police.
    [Show full text]
  • Consultation Boards
    WELCOME TO OUR CONSULTATION Hello and welcome to our public exhibition. We have organised the event today to start a discussion with local residents and community groups about the future of these two important strategic sites. We want to hear your thoughts about how the TESCO OSTERLEY redevelopment of these sites can make a positive contribution to the local area. The aim of today’s exhibition is to present our aspirations for each site at this early stage and to listen to what you have to say. Your views will help inform our scheme going forward. Please take your time to read through all of the information on display and feel free to put any questions you might have to a member of the project team. HOMEBASE BRENTFORD ABOUT ST EDWARD St Edward is a joint venture between Berkeley Group and the Prudential Assurance Company. We build homes and neighbourhoods with a focus on creating beautiful, successful places across London and the South of England. Our team has a wealth of experience in delivering complex developments that provide much needed homes, community facilities and improvements to local infrastructure. SOME KEY FACTS ABOUT US • Berkeley has built a total • We take the issue of climate of 19,660 homes over change seriously, and in 2018 the last five years and we committed to become supported 29,250 jobs the UK’s first Carbon Positive annually. housebuilder. • On all our sites we now • Since 2011, over £18m has deliver a Net Bio-diversity been committed by the Gain, and we work closely Berkeley Foundation to with the London Wildlife over 100 charities, and our Trust to ensure this.
    [Show full text]
  • Buses from Brentford Station (Griffin Park)
    Buses from Buses Brentford from Brentford Station Station (Griffin (Grif fiPark)n Park) 195 Charville Lane Estate D A O Business R W NE Park I R Bury Avenue N OU D TB M AS School IL E L AY GREAT WEST Charville W R QUARTE R Library O T D O D R M - K 4 RD YOR TON ROA RD M O R LAY RF Lansbury Drive BU for Grange Park and The Pine Medical Centre O D A OA E R A D D EW L R N I N Uxbridge County Court Brentford FC G B EY WEST R TL T R Griffin Park NE B Brentford TON RD D O OS IL O R OAD T AM O R A R GREA O H K N D MA D Church Road 4 M A R A A RO O RAE for Botanic Gardens, Grassy Meadow and Barra Hall Park NO EN A B R LIFD D R C SOU OA TH D Library Hayes Botwell Green Sports & Leisure Centre School © Crown copyright and database rights 2018 Ordnance Survey 100035971/015 Station Road Clayton Road for Hayes Town Medical Centre Destination finder Hayes & Harlington Destination Bus routes Bus stops Destination Bus routes Bus stops B K North Hyde Road Boston Manor 195 E8 ,sj ,sk ,sy Kew Bridge R 65 N65 ,ba ,bc Boston Manor Road 195 E8 ,sj ,sk ,sy Kew Road for Kew Gardens 65 N65 ,ba ,bc for Boston Manor Park Kingston R 65 N65 ,ba ,bc Boston Road for Elthorne Park 195 E8 ,sj ,sk ,sy Kingston Brook Street 65 N65 ,ba ,bc Bulls Bridge Brentford Commerce Road E2 ,sc ,sd Kingston Cromwell Road Bus Station 65 N65 ,ba ,bc Tesco Brentford County Court 195 ,sm ,sn ,sz Kingston Eden Street 65 N65 ,ba ,bc ,bc ,by 235 L Brentford Half Acre 195 E8 ,sm ,sn ,sz Western Road Lansbury Drive for Grange Park and 195 ,sj ,sk ,sy E2 ,sc ,sd The Pine
    [Show full text]
  • A4 Great West Road
    A4 Great West Road Proposed toucan crossing with the junction of Ridgeway Road December 2015 A4 Great West Road Proposed toucan crossing with the junction of Ridgeway Road Contents 1 Background ................................................................................................................ 3 2 Introduction ................................................................................................................. 3 3 The consultation ......................................................................................................... 4 4 Overview of consultation responses ............................................................................ 6 5 Responses from members of the public ...................................................................... 8 6 Responses from statutory bodies and other stakeholders ......................................... 12 7 Conclusion ................................................................................................................ 14 Appendix A – Copy of letter to occupiers of 719 and 721 Great West Road ........................ 15 Appendix B – Copy of letter and drawing to other residents ................................................ 18 Appendix C – Copy of the bus stop notice ........................................................................... 21 Appendix D – List of stakeholders consulted ....................................................................... 22 Appendix E – Response to issues raised ...........................................................................
    [Show full text]
  • Former Syon Gate Service Station, Land South of Gillette Corner, Great
    PLANNING COMMITTEE 2 May 2019 Melek Ergen [email protected] References: P/2018/4691 00505/AF/P28 Address: Former Syon Gate Service Station, Land at South of Gillette Corner, Great West Road, Isleworth TW7 5NP Proposal: Erection of up to six storey building to provide Class B1 (office) and Class B8 (self-storage) uses, with associated car parking and landscaping This application is being taken to Planning Committee as a Major Scheme with a Legal Agreement 1.0 SUMMARY 1.1 The applicant seeks planning approval for a part three-, part four-, part five- storey building with lower ground floor to provide self-storage (Use Class B8) and offices (Use Class B1). 1.2 The application site was formerly the Syon Gate Service Station and the principle of office development as well as storage use on this site was previously accepted/established (see ‘History’ and the site has been allocated for mixed use development in the Local Plan. Therefore the Council would like to see the delivery of this site in line with its allocation. 1.3 The proposed building would not compete with nearby heritage buildings and would still carry Art Deco features interpreted in a modern way. The building, particularly for a storage building would have some visual and historic merit and would create sense of place as well as some interest to the site. 1.4 The building would be a suitable addition to this vacant, prominent corner site. It would be set back from the pavement to allow landscaping along the boundaries, which would be an improvement to the townscape.
    [Show full text]
  • Harlesden Neighbourhood Plan
    Appendix A: Harlesden Neighbourhood Plan HARLESDEN NEIGHBOURHOOD PLAN 2019 - 2034 May 2019 Images in this document produced by Harlesden Neighbourhood Hood Forum unless otherwise stated. With thanks to Crisis Brent Community Researcher volunteers and photography group, as well as to our Forum members, local volunteers and all those who have contributed to the preparation of this document. A welcome from the Chair of the Harlesden Neighbourhood Forum Welcome to the Harlesden Neighbourhood Plan - a vision of how Harlesden can develop and grow over the next fifteen years whilst preserving its distinct heritage. Policies within the Neighbourhood Plan are restricted to matters amenable to planning – primarily the built, physical environment. The Plan’s remit does not extend to local services, cultural and arts activities or economic development, although of course planning policies can contribute to the protection and growth of all these things. Harlesden Neighbourhood Forum’s ambitions for our area however go far beyond planning policy. We hope you will continue to engage with the development of the Plan and work of the Forum throughout the formal process and beyond. Beyond the Plan we are keen to develop an exciting and unique offer for visitors and residents alike based on Harlesden’s cultural and artistic diversity. Harlesden is a colourful, neighbourhood in north west London, home to people from across the world, where you can sample a dizzying range of cultures and cuisines from Brazilian to Polish, Trinidadian to Somali. Where, in a single visit, you can pop into some of the best Caribbean food stores in London, admire the beauty and history of Harlesden’s churches or enjoy the outdoors in beautiful Roundwood Park or one of our newly regenerated pocket parks.
    [Show full text]
  • Brent Valley & Barnet Plateau Area Framework All London Green Grid
    All Brent Valley & Barnet Plateau London Area Framework Green Grid 11 DRAFT Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 9 Area Description 10 Strategic Context 11 Vision 14 Objectives 16 Opportunities 20 Project Identification 22 Clusters 24 Projects Map 28 Rolling Projects List 34 Phase One Early Delivery 36 Project Details 48 Forward Strategy 50 Gap Analysis 51 Recommendations 52 Appendices 54 Baseline Description 56 ALGG SPG Chapter 5 GGA11 Links 58 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA11 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg . Cover Image: View across Silver Jubilee Park to the Brent Reservoir Foreword 1 Introduction – All London Green Grid Vision and Methodology Introduction Area Frameworks Partnership - Working The various and unique landscapes of London are Area Frameworks help to support the delivery of Strong and open working relationships with many recognised as an asset that can reinforce character, the All London Green Grid objectives.
    [Show full text]
  • Regeneration and ED Strategy 2016
    Draft for adoption Ss1234 1 London Borough of Hounslow London Borough of Hounslow Regeneration and Economic Development Strategy 2016 - 20 Contents 1. Executive Summary ................................................................................................................... 3 2. Introduction ................................................................................................................................. 4 3. Context ......................................................................................................................................... 6 4. Vision and Strategies ................................................................................................................. 9 5. Objectives .................................................................................................................................. 12 6. Objective 1 – Growing Business ........................................................................................... 17 7. Objective 2 – Improving Connectivity ............................................................................... 35 8. Objective 3 – Place-making ................................................................................................. 40 A. Town centres ........................................................................................................................ 40 B. Context and character of the borough’s places ..................................................... 52 C. Sustainable mixed communities ....................................................................................
    [Show full text]
  • Heritage at Risk Register 2016, London
    London Register 2016 HERITAGE AT RISK 2016 / LONDON Contents Heritage at Risk III The Register VII Content and criteria VII Criteria for inclusion on the Register IX Reducing the risks XI Key statistics XIV Publications and guidance XV Key to the entries XVII Entries on the Register by local planning XIX authority Greater London 1 Barking and Dagenham 1 Barnet 2 Bexley 5 Brent 5 Bromley 6 Camden 11 City of London 20 Croydon 21 Ealing 24 Enfield 27 Greenwich 30 Hackney 34 Hammersmith and Fulham 40 Haringey 43 Harrow 47 Havering 50 Hillingdon 51 Hounslow 58 Islington 64 Kensington and Chelsea 70 Kingston upon Thames 81 Lambeth 82 Lewisham 91 London Legacy (MDC) 95 Merton 96 Newham 101 Redbridge 103 Richmond upon Thames 104 Southwark 108 Sutton 116 Tower Hamlets 117 Waltham Forest 123 Wandsworth 126 Westminster, City of 129 II London Summary 2016 he Heritage at Risk Register in London reflects the diversity of our capital’s historic environment. It includes 682 buildings and sites known to be at risk from Tneglect, decay or inappropriate development - everything from an early 18th century church designed by Nicholas Hawksmoor, to a boathouse built during WWI on an island in the Thames. These are sites that need imagination and investment. In London the scale of this challenge has grown. There are 12 more assets on the Heritage at Risk Register this year compared to 2015. We also know that it’s becoming more expensive to repair many of our buildings at risk. In the face of these challenges we’re grateful for the help and support of all those who continue to champion our historic environment.
    [Show full text]
  • TREC Section 4: Acton Town Station/Gunnersbury Park to Boston Manor Station (Optional Extension to Ealing Broadway)
    TREC Section 4: Acton Town Station/Gunnersbury Park to Boston Manor Station (optional extension to Ealing Broadway). Distance: 8.4 km (5.4 miles). Public Transport: Section 4 starts at Acton Town Underground Station (District and Piccadilly lines), finishing at Boston Manor Underground Station (Piccadilly Line). There is an optional exit en route at Brentford Station or an optional 3.7 km (2.3 miles) extension from Boston Manor to Ealing Broadway Station (using part of the TREC Section 1 route). Surface and Terrain: The first half of the route is along level paths, including through parks: Gunnersbury and Carville Hall Park South; however the section along the Thames Path and the River Brent/Grand Union Canal Walk does involve some steps (an alternative route avoiding the steps is suggested); the route eventually reaches Boston Manor Park and Station. Refreshments: Acton Town Station; Gunnersbury Park Café; Brentford High Street (near Brentford Lock); Boston Manor Park Café (seasonal), Boston Manor Station and shops nearby. Covid-19 restrictions: Check availability of refreshments and toilets before your walk. Public Toilets: Acton Town Station (charge); Gunnersbury Park; Boston Manor Park Café (seasonal). The route starts from south-west Acton, one of the seven towns of the London Borough of Ealing, Acton means "oak farm" or "farm by oak trees". This final section of TREC does stray into the north east of the London Borough of Hounslow going through parts of old Brentford, however as this was historically part of the Parish of Ealing when it did extend to the River Thames we think it’s appropriate to include in TREC.
    [Show full text]
  • 187 Bus Time Schedule & Line Route
    187 bus time schedule & line map 187 Finchley Road, O2 Centre - Central Middlesex View In Website Mode Hospital The 187 bus line (Finchley Road, O2 Centre - Central Middlesex Hospital) has 2 routes. For regular weekdays, their operation hours are: (1) Central Middlesex Hospital: 12:10 AM - 11:50 PM (2) Finchley Road, O2 Centre: 12:00 AM - 11:40 PM Use the Moovit App to ƒnd the closest 187 bus station near you and ƒnd out when is the next 187 bus arriving. Direction: Central Middlesex Hospital 187 bus Time Schedule 40 stops Central Middlesex Hospital Route Timetable: VIEW LINE SCHEDULE Sunday 12:10 AM - 11:50 PM Monday 12:10 AM - 11:50 PM O2 Centre / Sainsbury's (FC) Tuesday 12:10 AM - 11:50 PM O2 Centre (FH) 132 Finchley Road, London Wednesday 12:10 AM - 11:50 PM Finchley Road Station (FJ) Thursday 12:10 AM - 11:50 PM 1 Goldhurst Terrace, London Friday 12:10 AM - 11:50 PM Finchley Road / College Crescent (B) Saturday 12:10 AM - 11:50 PM 13 Northways, London Swiss Cottage Station / Avenue Road Adelaide Road, London 187 bus Info Boundary Road (V) Direction: Central Middlesex Hospital Boundary Road, London Stops: 40 Trip Duration: 56 min Queen's Grove (U) Line Summary: O2 Centre / Sainsbury's (FC), O2 Centre (FH), Finchley Road Station (FJ), Finchley St John's Wood Station (C) Road / College Crescent (B), Swiss Cottage Station / 63 Finchley Road, London Avenue Road, Boundary Road (V), Queen's Grove (U), St John's Wood Station (C), Cavendish Avenue (E), Cavendish Avenue (E) Grove End Road (T), Hall Road / Maida Vale (D), Sutherland Avenue
    [Show full text]
  • 5 Lower Place Business Centre
    AVAILABLE TO LET 5 Lower Place Business Centre 5 Lower Place Business Centre, Steele Road, Park Royal NW10 7AT Light Industrial / Storage Building in Park Royal To Let 5 Lower Place Business Centre Light Industrial / Storage Rent £14,500 per annum Building in Park Royal To Let S/C Details £2,300 per annum plus VAT. 5 Lower Place is a ground floor light industrial / storage unit in the Heart of Park Royal. The unit is Building type Industrial located in a small modern estate off Steele Road. The space is open plan and benefits from a concrete Planning class B1 floor, roller shutter, pedestrian entrance and W/C towards the front. Secondary classes B8 A number of storage / light industrial uses will be Size 784 Sq ft considered but please note the property would not be suitable for the motor trade. VAT charges Plus VAT. Lease details A new Full Repairing and Insuring Lease for a Term by arrangement. EPC category G Marketed by: Dutch & Dutch For more information please visit: http://example.org/m/43211-5-lower-place-business- centre-5-lower-place-business-centre 5 Lower Place Business Centre Central Park Royal location Open Plan warehouse Parking Excellent access to Central London W/C Loading door Walking distance to Harlesden Station Walking Distance to Central Park Royal 5 Lower Place Business Centre 5 Lower Place Business Centre 5 Lower Place Business Centre, 5 Lower Place Business Centre, Steele Road, Park Royal NW10 7AT Data provided by Google 5 Lower Place Business Centre Floors & availability Unit Floor Size sq ft Rent psf Total pa Status Warehouse Ground floor 784 £18.49 £14,500.00 Available Location overview Lower Place Business Centre is located in a small estate on Steele Road just off Barrett's Green Road in Park Royal.
    [Show full text]