Hawthorne Dene, Price Hope-Under-Dinmore, Leominster, HR6 0PW £350,000 Hawthorne Dene, Hope-Under-Dinmore Leominster HR6 0PW

Total Page:16

File Type:pdf, Size:1020Kb

Hawthorne Dene, Price Hope-Under-Dinmore, Leominster, HR6 0PW £350,000 Hawthorne Dene, Hope-Under-Dinmore Leominster HR6 0PW Hawthorne Dene, Price Hope-Under-Dinmore, Leominster, HR6 0PW £350,000 Hawthorne Dene, Hope-Under-Dinmore Leominster HR6 0PW A charming two bedroom detached bungalow with beautiful large gardens situated just outside the village of Hope- Under-Dinmore amongst great Herefordshire countryside. The property has been completely refurbished to a high standard in 2015 by the current vendors. This includes complete electrical re-wiring, new boiler, new LPG central heating and multi fuel stove. Further benefits are double glazing, fully enclosed grounds, garage/workshop and ample off road parking. NO ONWARD CHAIN. • Detached bungalow • Two bedrooms • LPG heating, double glazing • Large gardens • Garage, ample parking • NO ONWARD CHAIN Directions From Leominster follow the A49 south. As you reach Dinmore Hill take the right towards Hope-Under-Dinmore. Take the next lane to the right and follow until you reach the property on the left hand side. Introduction Do you have a property to sell or rent? This detached bungalow offers spacious accommodation which comprises; We offer a free market appraisal and kitchen/dining room, living room, rear porch, two double bedrooms, a bathroom according to Rightmove we are the number and shower room. The property also benefits from LPG heating, double glazing, one agent across our region for sales and fully enclosed gardens, garage/workshop and ample parking. VIEWING IS lets agreed* ESSENTIAL TO APPRECIATE THE ACCOMMODATION ON OFFER. Property description The front door of the property enters a large kitchen/dining room which has been modernised to a high standard by the current vendors. It provides matching wall and base units with integrated dishwasher and recesses for washing machine and fridge. There is also an island, inbuilt storage cupboards and windows to the front and rear bringing in an ideal amount of natural light. The living room is also light and spacious and features a wood burner and wood effect flooring. There are two great sized double bedrooms, both of which have integrated storage cupboards. Bedroom one has double doors onto the balcony with bedroom two having two windows to the front. The property has the luxury of having both a bathroom and shower room equipped with three piece suites with heated chrome towel rails and wood effect flooring. Gardens and parking The rear of the property is surrounded by high standing decking which can be entered from the driveway, rear porch and bedroom one. Within the decking is a wonderful tree carving which was designed and created by a well know local artist and features a variety of animals. The garden is mostly laid to lawn and includes a range of mature trees and shrubbery. As well as ample off road parking the property also has a large garage (5.92m X 5.39m) with and up and over door, light and power. Along side this is also a useful workshop/office (5.93m X 3.36m) which also has light and power. Services Mains water and electricity are both connected to the property. LPG heating. Private drainage. Council Tax Band B. Location Located on the outskirts of the village of Hope Under Dinmore. The village itself is conveniently situated, being just under 5 miles from the historic town of Leominster and 10 miles from the city of Hereford. The popular market town of Leominster boasts a wealth of local shops, a weekly open air market, national supermarkets and a host of recreational facilities. Transport facilities are ample with good road links to larger towns and regular bus routes. Hereford City offers extensive entertainment and leisure facilities and a wide range of national and chain stores. CONSUMER PROTECTION FROM UNFAIR TRADING REGULATIONS 2008 (CPR) We endeavour to ensure that the details contained in our brochure are correct through making detailed enquiries of the owner but For viewings or 01568 610 310 they are not guaranteed. The agents have not tested any appliance, equipment, fixture, fitting or service and have not seen the title deeds to confirm tenure. All measurements are quoted to the nearest 1/10 metre. All liability in negligence of otherwise for any loss arising from the use of these particulars is hereby excluded. more information www.cobbamos.com MONEY LAUNDERING REGULATIONS Require prospective purchasers to produce two original ID documents prior to any offer being accepted by the owners. * Rightmove Intel - HR1, HR2, HR3, HR4, HR5,HR6, SY7, SY8 LD7, LD8 please contact [email protected].
Recommended publications
  • River Lugg SSSI Restoration Technical Report Draft for Comment and Consultation
    River Lugg SSSI Restoration Technical Report Draft for Comment and Consultation January 2015 Revision 2 Document Control Sheet BPP 04 F8 Version 16; October 2013 Project: Wye and Lugg SSSI Restoration Client: Environment Agency Project No: B228B001 Document title: River Lugg SSSI Restoration – Technical Report Ref. No: Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL Katy Kemble Helena Parsons Helena Parsons NAME As Project Manager I confirm that the INITIALS Approved by above document(s) have been subjected to Andy Lee Jacobs’ Check and Review procedure and that I approve them for issue DATE 1/09/14 Document status: First draft REVISION NAME NAME NAME 1 Katy Kemble Alison Flynn Alison Flynn NAME INITIALS Approved by As Project Manager I confirm that the Helena Parsons above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE Nov 2014 Document status: First revision for client comment REVISION NAME NAME NAME 2 Katy Kemble Sera Roberts Helena Parsons NAME INITIALS Approved by As Project Manager I confirm that the above document(s) have been subjected to Helena Parsons Jacobs’ Check and Review procedure and that I approve them for issue DATE Jan 2015 Document status: Draft for consultation Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”). Regard should be had to those terms and conditions when considering and/or placing any reliance on this document.
    [Show full text]
  • 11 Dcnc2004/0388/N
    NORTHERN AREA SUB-COMMITTEE 21ST APRIL, 2004 11 DCNC2004/0388/N - CHANGE OF USE TO A WASTE TRANSFER STATION FOR BIODEGRADABLE, ORGANIC, AQUEOUS, LIQUID WASTES, PARKING OF PLANT VEHICLES AND EQUIPMENT, ERECTION OF 5 NO. TANKS AND ASSOCIATED EARTH SCREEN BANK, REMOVAL OF 1 NO. EXISTING TANK. LAND AT MARLBROOK FARM, MARLBROOK, LEOMINSTER, HEREFORDSHIRE, HR6 0PE For: Messrs M.S. & E.M. Patrick per Mr. S.L. Willetts, 35 Bishops Cleeve, Austrey, Atherstone, Warwicks, CV9 3EU Date Received: Ward: Grid Ref: 11th February, 2004 Hampton Court 51082, 54055 Expiry Date: 7th April, 2004 Local Member: Councillor K.G. Grumbley 1. Site Description and Proposal 1.1 The site lies in open countryside approximately 0.5 kilometres north of the Marlbrook roundabout opposite the Cadbury-Schweppes building, accessed from the B4361. The site is a wedge-shaped strip between the B4361 and the railway with the A49(T) Leominster by-pass beyond. 1.2 The River Lugg Site of Special Scientific Interest and candidate Special Area of Conservation, and the Marl Brook which feeds into the Lugg, lie approximately 400m to the east and north respectively. The application site area is approximately 0.23 of a hectare, the margins having been planted up with shrubs and trees in the past to screen the A49. A deciduous hedge runs along the margin of the B4361. 1.3 The site lies just outside the Area of Great Landscape Value (LDC Local Plan) and Area Least Resilient to Change (UDP Deposit Draft). 1.4 The nearest house is approximately 175 metres to the west, and there are properties in the hamlet of Newton to the east and on the A49 to the west within 500 metres of the site, although not obviously visible from it.
    [Show full text]
  • Jalna, Hope Under Dinmore, Leominster, Herefordshire, HR6
    Offers in the region of Jalna, Hope Under Dinmore, Leominster, Herefordshire, HR6 0PP £300,000 A well presented three bedroom, detached home standing in an elevated position, enjoying over an acre of grounds and rural countryside views. Ideal for a family or retired couple. Situated in a private, secluded position within the village of Hope Under Dinmore. Benefits Gardens and Grounds Energy Performance Graphs The property is a well presented, detached home standing in an The property is accessed via a shared tarmacadam driveway elevated position enjoying rural countryside views and which leads to a private driveway providing ample off road benefiting from an acre of grounds and woodland. The spacious parking and turning facilities for several vehicles, there is also a accommodation comprises: porch, entrance hall, shower room, garage and carport. The gardens and grounds extend to over an living room, kitchen, dining room, ground floor bedroom, study, acre in total. The front gardens are laid to lawn with a range of conservatory, store room, two first floor double bedrooms and mature trees and shrubs, there is also a paved seating area family bathroom. which is ideal for enjoying the rural countryside views. The rear Internal Features gardens benefits from an ornamental pond, patio area, summer house, three garden sheds and an extensive area of woodland. The porch has a range of fitted units, space and plumbing for Location appliances and a door that leads to the entrance hall. From the entrance hall double doors lead into the living room, which has Located in a private, secluded position in the heart of the village a feature fireplace with wood burning stove and a double of Hope Under Dinmore.
    [Show full text]
  • Consultation Statement
    Neighbourhood Development Plan Consultation Statement May 2016 Hope-under-Dinmore Parish Council Prepared by DJN Planning Ltd. for Hope-under-Dinmore NDP Project Group CONTENTS Page 1. INTRODUCTION 1 2. THE NEIGHBOURHOOD DEVELOPMENT PLAN 1 3. ESTABLISHING THE NEIGHBOURHOOD AREA AND PROJECT GROUP 4 4. COMMUNITY AND LANDOWNER ENGAGEMENT 6 5. RESIDENT SURVEY 8 6. CONSULTATION ON THE DRAFT PLAN 11 Appendices 1 ESTABLISHING THE NEIGHBOURHOOD AREA AND PROJECT GROUP 14 2 EXPLORING THE ISSUES 17 3 HOUSEHOLD SURVEY 35 4 CONSULTATION ON THE DRAFT PLAN 37 5 RESPONSES ON THE DRAFT PLAN 47 1. INTRODUCTION 1.1 This consultation statement has been prepared to accompany the submission of the Hope-under- Dinmore Neighbourhood Development Plan (NDP) to Herefordshire Council (HC), the local planning authority, and to ensure that the relevant statutory requirements are met.1 The Statement: Contains details of the persons and bodies who were consulted about the proposed Plan; Explains how they were consulted; Summarises the main issues and concerns raised by those consulted; and Describes how these issues and concerns have been considered and, where relevant, addressed in the proposed Plan. 2. THE NEIGHBOURHOOD DEVELOPMENT PLAN The parish and village 2.1 Hope-under-Dinmore Neighbourhood Area comprises the two parishes of Hope–under-Dinmore and Newton, and lies between Hereford and Leominster in north Herefordshire. It is bisected north- south by the A49 trunk road and the Cardiff – Crewe railway line, which run parallel to each other. The A417 joins the A49 to the north of the village of Hope-under-Dinmore. 2.2 Hope-under-Dinmore village is situated hard against the northern foot of Dinmore Hill, and its character is defined by the distinctive local topography, the surrounding woodland and the road and rail transport corridors which run immediately adjacent.
    [Show full text]
  • Yarpole Parish Council Response to Examiner's Questions
    EXAMINATION OF THE YARPOLE GROUP NEIGHBOURHOOD DEVELOPMENT PLAN 2011 to 2031 Examiner’s comments and questions I have completed my initial appraisal of the submitted Yarpole Group Neighbourhood Development Plan (‘the YGNDP’) and I have read the written representations made in response to the Regulation 16 consultation. From this appraisal I have identified a number of matters upon which I require further information or clarification and to this end I pose a number of questions to which I require responses by the Yarpole Group Parish Council (YGPC) as the ‘Qualifying Body’ for the preparation of this plan. In this note I set out the background considerations leading to my questions by the use of italic script. Where appropriate I indicate the representation which has given rise to a particular comment and question. I raise an issue only where I consider it possible that I may need to recommend that the plan be modified in order that it fully satisfies the basic conditions. The italicised comments in this document give an indication of my preliminary views on the listed topics. The questions are then posed in such a way as to provide the YGPC with an opportunity to respond either to the questions themselves or to my preliminary view(s) should that be considered appropriate. My final conclusions and recommendations will be given in my formal report to the Herefordshire Council at the end of the examination. It is important that the examination is undertaken in an open and fair manner and any important documents will be made available on the Herefordshire Council website for this plan.
    [Show full text]
  • Hope Under Dinmore Consultation Statement
    Neighbourhood Development Plan Consultation Statement November 2017 Hope-under-Dinmore Parish Council Prepared by DJN Planning Ltd. for Hope-under-Dinmore NDP Project Group CONTENTS Page 1. INTRODUCTION 1 2. THE NEIGHBOURHOOD DEVELOPMENT PLAN 1 3. ESTABLISHING THE NEIGHBOURHOOD AREA AND PROJECT GROUP 4 4. COMMUNITY AND LANDOWNER ENGAGEMENT 6 5. RESIDENT SURVEY 8 6. CONSULTATION ON THE DRAFT PLAN 11 7. CONSULTATION ON LOCAL GREEN SPACE AND SETTLEMENT 14 BOUNDARY AT HOPE-UNDER-DINMORE Appendices 1 ESTABLISHING THE NEIGHBOURHOOD AREA AND PROJECT GROUP 17 2 EXPLORING THE ISSUES 20 3 HOUSEHOLD SURVEY 38 4 CONSULTATION ON THE DRAFT PLAN 40 5 RESPONSES ON THE DRAFT PLAN 50 6 CONSULTATION ON LOCAL GREEN SPACE AND SETTLEMENT 62 BOUNDARY AT HOPE-UNDER-DINMORE 1. INTRODUCTION 1.1 This consultation statement has been prepared to accompany the submission of the Hope-under- Dinmore Neighbourhood Development Plan (NDP) to Herefordshire Council (HC), the local planning authority, and to ensure that the relevant statutory requirements are met.1 The Statement: • Contains details of the persons and bodies who were consulted about the proposed Plan; • Explains how they were consulted; • Summarises the main issues and concerns raised by those consulted; and • Describes how these issues and concerns have been considered and, where relevant, addressed in the proposed Plan. 1.2 The NDP was originally submitted to Herefordshire Council in May 2016 and examined in September 2016. The Examiner recommended a number of modifications, including the deletion of policy HUD7 which proposed the designation of land to the rear of Tavern Meadow, Hope-under-Dinmore, as Local Green Space.
    [Show full text]
  • Bodenham Parish Council Minutes of the Parish
    776 BODENHAM PARISH COUNCIL MINUTES OF THE PARISH COUNCIL MEETING AT THE SIWARD JAMES CENTRE AT 7.46pm ON MONDAY, 13th MAY 2013 Attendance Cllr Bob Clarke (Chair) Cllr Robin Knott Cllr Roger Austin Cllr Alec Avery Cllr Dennis Jackson Cllr Tony Mitcheson Cllr Jeff Pollard Cllr Rhian Powell Cllr Jeremy Millar (District Councillor) 10 members of the public were present. ITEM ACTION AGENDA ITEM 1– APOLOGIES FOR ABSENCE 1. Apologies were received from Cllrs Davis and James-Moore. AGENDA ITEM 2 – DECLARATIONS OF INTEREST 2. Cllrs Mitcheson and Powell declared an interest in Item 29. AGENDA ITEM 3 – MINUTES OF THE PREVIOUS MEETING 3. The Minutes were accepted as a true record. (Proposer: Cllr Avery. Seconder: Cllr Mitcheson). AGENDA ITEM 4 - MATTERS ARISING FROM THE MINUTES 4. Minute 6: Playground Repairs and Painting. The Clerk reported that one quotation for playground repairs had been received, but that a second quotation had not arrived, as had been expected. The matter was deferred until the next Meeting. Cllr Jackson had been advised by Cllr Pollard that the cost of materials for the painting of the playground equipment was in the order of £100. Cllr Jackson said that the painting would be done by volunteers. Cllr Mitcheson proposed and Cllr Avery seconded that £100 be made available for the cost of materials. This was accepted unanimously. 5. Minute 7: Footpaths Officer. The Clerk reported that one request for information had been received, but no formal application had resulted. The Clerk was requested to contact the person concerned before the next Meeting. CS 6.
    [Show full text]
  • Environmental Report
    Environmental Report Hope under Dinmore Group Neighbourhood Area October 2015 Hope-under-Dinmore Environmental Report Contents Non-technical summary 1.0 Introduction 2.0 Methodology 3.0 The SEA Framework 4.0 Appraisal of Objectives 5.0 Appraisal of Options 6.0 Appraisal of Policies 7.0 Implementation and monitoring 8.0 Next steps Appendix 1: Initial SEA Screening Report Appendix 2: SEA Scoping Report incorporating Tasks A1, A2, A3 and A4 Appendix 3: Consultation responses from Natural England and English Heritage Appendix 4: SEA Stage B incorporating Tasks B1, B2, B3 and B4 Appendix 5: Options Considered Appendix 6: Environmental Report checklist SEA: Task C1 Hope-under-Dinmore Group Environmental Report (October 2015) _____________________________________________________________________________________________________ Non-technical summary Strategic Environmental Assessment (SEA) is an important part of the evidence base which underpins Neighbourhood Development Plans (NDP), as it is a systematic decision support process, aiming to ensure that environmental assets, including those whose importance transcends local, regional and national interests, are considered effectively in plan making. The Hope-under-Dinmore Group Parish has undertaken to prepare an NDP and this process has been subject to environmental appraisal pursuant to the SEA Directive. The Parish comprises the Parishes of Hope-under-Dinmore and Newton, and lies between Hereford and Leominster in north Herefordshire. It is bisected north-south by the A49 trunk road and the Cardiff – Crewe railway line which run parallel to each other. The Draft Hope-under-Dinmore Group NDP includes 10 objectives and it is intended that these objectives will be delivered by 11 criteria based planning policies; no site allocations are proposed here.
    [Show full text]
  • The London Gazette, 11 May, 1928. 5323
    THE LONDON GAZETTE, 11 MAY, 1928. 5323 " 2x That upon the union baking effect the the same Measure to receive Notice requiring Extra Parochial Place known as Fordsbridge any objections to such draft Scheme to be (or The Ford) hereinbefore referred to shall stated or transmitted in writing to the said -be transferred and annexed for all ecclesias- Ecclesiastical Commissioners within the time tical purposes to the Parish of the United prescribed in the Statutory Rules applicable Benefice of Hope under Dinmore with Ford. to proceedings under the said Union of Bene- " 3. That the Church of the Parish of Hope fices Measure, 1923: under Dinmore shall be the Parish Church And whereas the prescribed time has of the Parish of the United Benefice and that elapsed and no such objections have been so the Table of Fees for the said Parish of Hope stated or transmitted to the said Ecclesias- under Dinmore shall (until revised or altered tical Commissioners: by proper authority) be the Table of Fees for And whereas public notice of the certifica- such Parish. tion to His Majesty in Council of the said " 4. That upon the day when any Order Scheme and the consent thereto in writing of of Your Majesty in Council ratifying this the Bishop of Hereford has been duly given Scheme shall be published in the London in the manner and within the time prescribed •Gazette the union shall forthwith take effect in the Statutory Rules aforesaid: •and the said Percival Lovell Snowden if he is then Incumbent of the said Benefices of And whereas the said Scheme has been Fordsbridge (or The Ford) and Hope under approved by His Majesty in Council: Dinmore shall be the first Incumbent of the Now, therefore, His Majesty, by and with United Benefice.
    [Show full text]
  • Hope Under Dinmore Neighbourhood Development Plan
    Neighbourhood Development Plan 2011-2031 Hope-under-Dinmore Group Parish Council Prepared by DJN Planning Ltd. for Hope under Dinmore Group Parish Council CONTENTS Page 1. SETTING THE SCENE 1 Introduction 1 Format of the Plan 2 National and local planning policy context 2 2. THE NEIGHBOURHOOD AREA 4 3. VISION AND OBJECTIVES 9 4. SOCIAL AND COMMUNITY 10 Housing requirement 10 Housing strategy 11 Settlement boundary 13 Criteria for new housing development 14 Flood risk 15 Community facilities 17 5. ENVIRONMENT AND HERITAGE 19 Landscape character 19 Local green space 20 Biodiversity and heritage assets 23 Renewable energy 23 6. ECONOMY AND EMPLOYMENT 25 Employment development 25 Communications infrastructure 26 7. DELIVERING THE PLAN 27 Social and community 27 Environment and heritage 27 Economy and employment 27 PLANS 1 Hope-under-Dinmore and Newton Neighbourhood Area 1 2 SEA Map 1: Heritage assets 7 3 SEA Map 2: Biodiversity and flood risk 8 Accompanying Policies Maps for the Neighbourhood Area and village of Hope-under-Dinmore APPENDICES A: EVIDENCE BASE 28 B: NATIONAL AND LOCAL PLANNING POLICIES 29 1. SETTING THE SCENE Introduction 1.1 New planning powers were given to local communities by the Localism Act 2011. These include the ability to prepare Neighbourhood Development Plans, as part of the statutory planning framework guiding development in the area. When planning applications are made, they must be determined in accordance with this framework unless there are overriding circumstances to the contrary. 1.2 Hope-under-Dinmore Group Parish Council considers that such a Plan should be prepared for the area, to make use of the new planning powers and help ensure that decisions on future development are guided locally.
    [Show full text]
  • Schedule of Registers/EU Regions/Constituencies/Wards
    Schedule of Registers/EU Regions/Constituencies/Wards Printed: 26 March 2015 EU Regions Constituencies Wards Registers AY01S: Hereford (Aylestone West Midlands Region Hereford & South Aylestone Hill Hill) Herefordshire AY02S: Hereford (Aylestone Hill) AY03S: Hereford (Aylestone Hill) BE01S: Belmont Rural Belmont Rural BE02S: Belmont Rural BH01S: Aconbury Birch BH02S: Garway BH03S: Harewood BH04S: Little Birch BH05S: Llandinabo BH06S: Llanwarne BH07S: Much Birch BH08S: Orcop BH09S: Pencoyd BH10S: St Weonards BH11S: Tretire with Michaelchurch BS01S: Hereford Bobblestock (Bobblestock) BS02S: Hereford (Bobblestock) CE01S: Hereford (Central) Central CE02S: Hereford (Central) CE03S: Hereford (Central) CL01S: Hereford (College) College CL02S: Hereford (College) DH01S: Ballingham Dinedor Hill DH02S: Bolstone DH03S: Dinedor DH04S: Hentland DH05S: Holme Lacy DH06S: Little Dewchurch DH07S: Lower Bullingham (Lower Bullingham) DH08S: Lower Bullingham (Withy Brook) EH01S: Hereford (Eign Hill) Eign Hill EH02S: Hereford (Eign Hill) EH03S: Hereford (Eign Hill) GN01S: Blakemere Golden Valley North GN02S: Bredwardine GN03S: Clifford GN04S: Cusop GN05S: Dorstone GN06S: Moccas GN07S: Peterchurch GN08S: Preston-on-Wye GN09S: Tyberton Golden Valley South PDWDCONS - List of Areas and Their Registers Page: 1 Report Version Date: 12/12/2011-1 Schedule of Registers/EU Regions/Constituencies/Wards Printed: 26 March 2015 EU Regions Constituencies Wards Registers GS01S: Abbeydore West Midlands Region Hereford & South Golden Valley South GS02S: Bacton Herefordshire
    [Show full text]
  • 2017-18 Annual Report and Accounts
    Annual Report and Accounts 2017-18 Forewords 3 Contents | Performance Report Overview | 5 Performance Analysis | 7 Performance Tables | 16 Key Financial Information | 19 Sustainable Development | 23 Statement of Disclosure | 23 Accountability Report Corporate Governance Report | 24 Governance Statement | 27 Remuneration and Staff Report | 37 Financial Statement and Notes to the Accounts | 48 2 FOREWORDS Chief Executive’s foreword Looking back over the last 12 months there had our Perfect Week (and weekend), are many milestones which illustrate our Red2Green, Hospital at Night and Silver commitment to improving our services as Week to help us test different ways of we seek to provide the quality of care we’d working to improve patient fl ow. want for our family and friends. In May we ran our Hospital@OutofHours Encouragingly, these milestones indicate a programme which adopted a multi- direction of travel which puts us in a great professional and multi-speciality approach position to build on the changes we’ve to deliver care at night and out of hours made, many of which have been embedded During the summer last year we agreed a in our processes and routines and which memorandum of understanding with our are, above all, sustainable in the long term. commissioners, the Herefordshire Clinical Whilst it’s the Board’s responsibility to Commissioning Group. This paved the way set the Trust strategy and to facilitate and for the move towards the principles of an monitor its delivery, successful healthcare Accountable Care System for Herefordshire. organisations devolve responsibility to This was signifi cant as it ushered in a clinical teams and support them to operate new relationship between the Trust and and innovate.
    [Show full text]