Upper Susquehanna River Basin Flood Damage Reduction Study
Final Fish and Wildlife Coordination Act Report Upper Susquehanna Comprehensive Flood Damage Reduction Study Prepared For: U.S. Army Corps of Engineers Prepared By: Department of the Interior U.S. Fish and Wildlife Service New York Field Office Cortland, New York Preparers: Anne Secord & Andy Lowell New York Field Office Supervisor: David Stilwell February 2019 EXECUTIVE SUMMARY Flooding in the Upper Susquehanna watershed of New York State frequently causes damage to infrastructure that has been built within flood-prone areas. This report identifies a suite of watershed activities, such as urban development, wetland elimination, stream alterations, and certain agricultural practices that have contributed to flooding of developed areas. Structural flood control measures, such as dams, levees, and floodwalls have been constructed, but are insufficient to address all floodwater-human conflicts. The U.S. Army Corps of Engineers (USACE) is evaluating a number of new structural and non-structural measures to reduce flood damages in the watershed. The New York State Department of Environmental Conservation (NYSDEC) is the “local sponsor” for this study and provides half of the study funding. New structural flood control measures that USACE is evaluating for the watershed largely consist of new levees/floodwalls, rebuilding levees/floodwalls, snagging and clearing of woody material from rivers and removing riverine shoals. Non-structural measures being evaluated include elevating structures, acquisition of structures and property, relocating at-risk structures, developing land use plans and flood proofing. Some of the proposed structural measures, if implemented as proposed, have the potential to adversely impact riparian habitat, wetlands, and riverine aquatic habitat. In addition to the alternatives currently being considered by the USACE, the U.S.
[Show full text]