Winter Notices 2020
Total Page:16
File Type:pdf, Size:1020Kb
Winter Notices 2020 Ashton Canal ID 17470 Category Winter Notice Towpath Cllosed Yes Date 02-11-2020 08:00 to 20-11-2020 16:00 Affected Waterway Ashton Canal Locatiion Lock 13, Crabtree Lane, Openshaw, Ashton Canal. Upstream wiindiing holle Lumb Lane, Bridge 21 Downstream wiindiing holle Piccadilly/Dale Street Basin, Rochdale Canal Third party contractors require a closure to remove a redundant gas pipe from a pipe bridge located at towpath level, and the underground element within the lock. 04/05/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus ID 17527 Category Winter Notice Towpath Cllosed Yes Date 02-11-2020 08:00 to 04-12-2020 16:00 Affected Waterway Ashton Canal Locatiion Bridge 20, Kershaw Lane Road Bridge, Audenshaw, Ashton Canal Upstream wiindiing holle Bridge 21, Lumb Lane Downstream wiindiing holle Above Lock 18, Ashton canal A closure is required to undertake repairs to the spalled concrete under the bridge deck. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 1 of 85 20-07-2020 01:30:15 ID 17528 Category Winter Notice Towpath Cllosed Yes Date 02-11-2020 08:00 to 20-11-2020 16:00 Affected Waterway Ashton Canal Locatiion Beswick Aqueduct, near Etihad Stadium, Ashton Canal Upstream wiindiing holle Bridge 21, Lumb Lane Downstream wiindiing holle Piccadilly/Dale Street Basin, Rochdale canal Contractors working for the Trust will be carrying out grouting work to reduce leakage through the aqueduct. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. ID 17529 Category Winter Notice Towpath Cllosed No Date 02-11-2020 08:00 to 20-11-2020 16:00 Affected Waterway Ashton Canal Locatiion Lock 1, Ancoats, Ashton Canal Upstream wiindiing holle Bridge 21, Lumb Lane Downstream wiindiing holle Piccadilly/Dale street basin on Rochdale canal A closure is required to allow repairs to the tail gate and cill in order to reduce leakage. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 2 of 85 20-07-2020 01:30:15 Aylesbury Arm (Grand Union Canal) ID 17645 Category Winter Notice Towpath Cllosed No Date 09-11-2020 08:00 to 11-12-2020 16:00 Affected Waterway Aylesbury Arm (Grand Union Canal) Locatiion Lock 13, Aston Clinton, Aylesbury Arm (Grand Union Canal). Upstream wiindiing holle None Downstream wiindiing holle None A stoppage is required to carry out works which will include top gate and clapper post replacement, together with brickwork repairs in the chamber wall. There will be no passage for boats in or out of the Arm during this time. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 3 of 85 20-07-2020 01:30:15 Birmingham & Fazeley Canal ID 17591 Category Winter Notice Towpath Cllosed No Date 11-01-2021 08:00 to 05-03-2021 16:00 Affected Waterway Birmingham & Fazeley Canal Locatiion Farmers Bridge Lock 9, Newhall Street, Birmingham & Fazeley Canal Upstream wiindiing holle Junction with New Mainline Canal Downstream wiindiing holle Junction with the Digbeth Branch. Carry out top and bottom gate replacements, improvements to the lock ladder, brickwork and coping repairs. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 4 of 85 20-07-2020 01:30:15 Calder & Hebble Navigation ID 17543 Category Winter Notice Towpath Cllosed No Date 02-11-2020 08:00 to 18-12-2020 16:00 Affected Waterway Calder & Hebble Navigation Locatiion Sluice 2, next to Salterhebble Aqueduct, Calder & Hebble Navigation Upstream wiindiing holle Next to Bridge 4, Stern Mill Downstream wiindiing holle Below Lock 5, Bridge 3, Woodside Mills A stoppage is required to carry out works including replacement of the sluice door and the re-lining of the bywash culvert. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. ID 17544 Category Winter Notice Towpath Cllosed No Date 02-11-2020 08:00 to 11-12-2020 16:00 Affected Waterway Calder & Hebble Navigation Locatiion Lock 6 and Lock 7, Elland, Calder and Hebble Navigation Upstream wiindiing holle Downstream of Lock 5, Woodside Mills Downstream wiindiing holle Between Lock 11, Brighouse Top and Lock 12, Brighouse Bottom Works will include: Lock 6 - Polyurethene grouting works to the lock chamber to prevent leakage and structural deterioration. Lock 7 - repairs to the wash wall. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 5 of 85 20-07-2020 01:30:15 ID 17546 Category Winter Notice Towpath Cllosed No Date 11-01-2021 08:00 to 12-02-2021 16:00 Affected Waterway Calder & Hebble Navigation Locatiion Lock 18, Shepley, Ravensthorpe, Calder & Hebble Navigation Upstream wiindiing holle Cooper Bridge Junction Downstream wiindiing holle Junction with River Calder A stoppage is required to carry out repairs to the tail gates mitre. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 6 of 85 20-07-2020 01:30:15 Caldon Canal ID 17479 Category Winter Notice Towpath Cllosed Yes Date 04-01-2021 08:00 to 06-02-2021 16:00 Affected Waterway Caldon Canal Locatiion Bridge 24a, Stockton Brook, Caldon Canal Upstream wiindiing holle Endon Basin, between bridges 27 and 28. Downstream wiindiing holle Foxley, between bridges 16a and 18. Third party contractors working for Cadent Gas will be removing two redundant gas pipes which cross the canal at the railway bridge off Leek New Road. The canal will not be dewatered but a fixed scaffold will be used so the canal and towpath will be closed. The towpath is also a national cycle route and the closure will be agreed with Sustrans. 04/05/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. ID 17592 Category Winter Notice Towpath Cllosed No Date 04-01-2021 08:00 to 01-02-2021 16:00 Affected Waterway Caldon Canal Locatiion Lock 4, Engine Lock, Norton-in-the Moors, Caldon Canal Upstream wiindiing holle Endon Basin, between bridges 27 and 28. Downstream wiindiing holle Foxley, between bridges 16a and 18. A stoppage is required to enable grouting work to reduce leakage through the lock chamber walls. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme. This is subject to change depending on the latest advice from the UK government on coronavirus. Please follow our guidance relating to coronavirus when using the canals and towpaths https://canalrivertrust.org.uk/coronavirus. 7 of 85 20-07-2020 01:30:15 ID 17593 Category Winter Notice Towpath Cllosed No Date 04-01-2021 08:00 to 05-03-2021 16:00 Affected Waterway Caldon Canal Locatiion Bridge 23, Long Butts Drawbridge, near Norton Green, Caldon Canal Upstream wiindiing holle Endon Basin, between bridges 27 and 28. Downstream wiindiing holle Foxley, between bridges 16a and 18. Works will include brickwork repairs to the bridge abutment and the replacement of worn bridge timbers and handrails. 01/06/2020: The information above is a draft notice of works planned as part of our winter 2020/21 stoppages programme.