During 2015-16

Total Page:16

File Type:pdf, Size:1020Kb

During 2015-16 FOR CONSTRUCTION OF RAMP/APPROACH FOR RO-RO OPERATION AT DHUBRI/HATSINGIMARI IN NATIONAL WATERWAY NO.2 (RIVER BRAHMAPUTRA) DURING 2015-16 TENDER No. IWAI/GHY/3(13)/Ro-Ro services/2015-16 BaartIya Antd-oSaIya jalamaaga- p`aiQakrNa INLAND WATERWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, Govt. OF INDIA) (paot pirvahna maM~alayaÊ Baart sarkar ) Pandu Port Complex, Pandu, Guwahati-781012 (Assam) Telephone Nos. 0361-2570109, 2676925, 266929 E mail:- [email protected], Web Site:- www.iwai.nic.in https://eprocure.gov.in/eprocure/app Page 1 of 85 BaartIya Antd-oSaIya jalamaaga- p`aiQakrNa INLAND WATERWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, Govt. OF INDIA) (paot pirvahna maM~alayaÊ Baart sarkar ) Pandu Port Complex, Pandu, Guwahati-781012 (Assam) Telephone Nos. 0361-2570109, 2676925, 266929 E mail:- [email protected], Web Site:- www.iwai.nic.in https://eprocure.gov.in/eprocure/app NOTICE INVITING TENDER No. IWAI/GHY/3(13)/Ro-Ro services/2015-16 1. Name of Work : Construction of ramp/approach for Ro-Ro operation at Dhubri/Hatsingimari in National Waterway no.2 (river Brahmaputra) during 2015-16 2. Inland Waterways Authority of India (IWAI) invites online tenders/ bids in two cover system (Cover I - Technical bid and Cover II - Financial Bid) from experienced contractors for the work of Construction of ramp/approach for Ro- Ro operation at Dhubri/Hatsingimari in National Waterway no.2 (river Brahmaputra) during 2015-16. The tenders will be placed online at https://eprocure.gov.in/eprocure/app 3. Estimated Cost of the work and EMD requirement are as under: Total Earnest Money Sl Estimated Name of work Deposit (in lakh No. Cost (in lakh of Rs.) of Rs.) Construction of ramp/ approach for Ro-Ro operation at Dhubri/ Hatsingimari in National (i) 15.40 0.31 Waterway no.2 (river Brahmaputra) during 2015-16 4 Date of Publishing: 03-07-2015 5 Download start date & time: 04-07-2015 at 10.30 hours. 6 Submission start date & Time : 09-07-2015 at 10.30 hours 7 Bid Closing/Document Download End Date & Time : 17-07-2015 at 15.00 hours 8 Bid Opening Date & Time : 17-07-2015 at 15.30 hours 9 Cost of Tender Document (Tender Fee) :Rs. 1500/- Page 2 of 85 10) The tender document can be purchased from the office of the Director , IWAI, Pandu Port Complex, Pandu, Guwahati -.Pin-781012 (ASSAM) by paying Rs 1,500/- (One Thousand Five Hundred only) in the form of DD in favour of “IWAI FUND PLAN ” payable at GUWAHATI at any Nationalized/ schedule bank. 11) Tender document can also be downloaded from IWAI website at www.iwai.gov.in or www.iwai.nic.in or https://eprocure.gov.in. The cost of tender/bid document as mentioned above should be submitted in the form of Demand Draft in favour of “IWAI FUND PLAN ” payable at GUWAHATI at any Nationalized/ schedule bank along with bids in case the tender is downloaded from website. Bid without tender cost will be rejected . 12) A signed declaration starting that no alteration has been made in any form in the downloaded tender document is to be enclosed with the tender by the bidder 13) Tenderer shall agree to the terms & conditions of the tender and submit the tender online duly signed on each page for agreeing the same. 14) The complete bid as per the tender documents should be placed online at https://eprocure.gov.in/eprocure/app by 15:00 hours on 17-07-2015 and will be opened online on same day at 15:30 hours at IWAI, Regional office Guwahati. The original demand draft for tender fee and EMD should be deposited before closing date and time of submission of bid at Inland Waterways Authority of India, Pandu port Complex, Pandu, Guwahati-781012. 15) Under provisions of this contract the work is to be carried out during 2015-16. IWAI shall reserve the right to carry out the work for successive period through the successful contractors at the same terms and conditions of this contract of 2015-16, after getting the willingness from the contractor and subject to their satisfactorily performance of the works. 16) IWAI reserves the right to accept or reject any or all tenders without assigning any reason and no correspondence shall be entertained in this regard. 17) Time of completion of the work is 45 days. Pre-Qualification Criteria:- 1) The tenderer shall be registered with Central Public Works Department, Railways, MES or State PWD/ Irrigation Department or non-registered contractors having experience of working with IWAI. 2) Tenderer shall have Permanent Account Number issued by Income Tax Deptt. Page 3 of 85 3) The tenderer shall be registered with service tax department and during submission of bills service tax component shall be shown separately in the bill/invoice by the tenderer (i.e. the successful bidder, if work is awarded and executed by him) and the amount will be released to the tenderer as reimbursement upon production of proof of its remittance. 4) Average annual financial turnover during last three years ending 31st March of last financial year (i.e. 2014-15), should be at least 30% of the cost of the work mentioned at Schedule A (a) mentioned in this tender. 5) Experience of having successfully completed similar works related to Inland water transport, flood Control, WRD, river conservancy works and operation and maintenance of terminal in Major Rivers of India like Brahmaputra ( NW– 2) and Ganga (NW –1) etc during the last 7 years ending last day of month previous to the one in which this tender is invited should be either of following: a) Three works costing not less than 40% of the estimated cost; or b) Two works costing not less than 50% of the estimated cost; or c) One work completed not less than 80% of the estimated cost 6) Latest certificate of solvency from Nationalized / scheduled Bank included in the second schedule of the RBI Act for not less than the value as indicated below: Bank solvency required for undertaking the Name of work works of each stretch (Rupees in lakhs) Construction of ramp/approach for Ro-Ro operation at Dhubri/ Hatsingimari in National Waterway no.2 (river Brahmaputra) during 2015- 4.7 16 Director Page 4 of 85 NIT FOR ‘E’ PROCUREMENT Page 5 of 85 INLAND WATERWAYS AUTHORITY OF INDIA , PANDU PORT,PANDU,GUWAHATI-12 ‘E’ Tender for Construction of ramp/approach for Ro-Ro operation at Dhubri/ Hatsingimari in National Waterway no.2 (river Brahmaputra) during 2015- 16 . Earnest Cost of Sl. Estimated Cost Money Description Tender No Deposit for Document each stretch Construction of ramp/ approach for Ro-Ro operation at Dhubri/ Rs. 0.31 A. Hatsingimari in National Rs. 15.40 lakh Rs.1500/- Lakh Waterway no.2 (river Brahmaputra) during 2015- 16 ‘E’ Tenders are published in IWAI Website. Firms are requested to log in to [email protected] / https://eprocure.gov.in/eprocure/app and quote against this Tender. Manual Quotations will not be entertained for this Tender. Closing & Opening of this Tender is 17.07.2015 at 15.00 hrs. & 17.07.2015 at 15.30 hrs. respectively. For other terms & conditions please refer to IWAI website www.iwai.nic.in . DIRECTOR Page 6 of 85 INDEX Sl.No. CONTENT 1. Tender issue letter 2. Notice Inviting Tender 3. Index PART – I 1. Form of Tender 2. Instruction for submission of bid PART-II 1. Integrity Agreement 2. General Conditions of Contract PART – III 1. Technical Specifications and Special Conditions 2. Annexure-I (Agreement Format) 3. Annexure-II (Proforma for performance Guarantee) 4. Annexure-III (Sample form for site orders book) 5. Annexure-IV (Proforma for Hindrance Register) 6. Annexure-V (Notice for appointment of Arbitrator) 7. Annexure-VI (Details of Bank Account) PART – IV 1. Schedule of Quantities 2. Annexure- A, VII(a), VII(b), VII(C) & VII(d). Page 7 of 85 PART-I FORM OF TENDER To, THE DIRECTOR, INLAND WATERWAYS AUTHORITY OF INDIA, PANDU PORT COMPLEX, PANDU, GUWAHATI – 781 012 (ASSAM). Sub: Construction of ramp/ approach for Ro-Ro operation at Dhubri/ Hatsingimari in National Waterway no.2 (river Brahmaputra) during 2015-16. Sir, 1. Having visited the site and examined the information and instructions for submission of tender, general conditions of contract, Special Condition of contracts, Technical, General and Detailed specification, Schedules and Bill of Quantities, agreement and bank guarantee forms, etc. for the above named work, I/ We hereby tender for execution of the work referred to in the tender documents in conformity with the said Conditions of Contract, Specifications, Schedule of quantities for the sum as stated in Bill of quantities of this tender Document or such other sum as may be ascertained in accordance with the said conditions of contract. 2. I/ We undertake to complete and deliver the whole of the works comprised in the Contract within the time as stated in the tender and also in accordance in all respects with the specifications, designs, drawings and instructions as mentioned in the tender documents. 3. I am tendering for the works mentioned in the table below and submitting the EMD separately in the form of demand draft in favour of “IWAI FUND PLAN ” payable at GUWAHATI on Nationalized / schedule bank as per the details given therein: Demand Details of Bank Sl. draft No. EMD (Name of Bank, Name of work No. & Date (Rs.) Branch and address) Construction of ramp/ approach for Ro- Ro operation at Dhubri/ Hatsingimari in A. National Waterway no.2 (river Brahmaputra) during 2015-16. 4. I/ We agree to abide by this tender.
Recommended publications
  • Government of Assam Office of the Deputy Commissioner & District Election Officer South Salmara Mankachar District::Hatsingimari (Election Branch)
    GOVERNMENT OF ASSAM OFFICE OF THE DEPUTY COMMISSIONER & DISTRICT ELECTION OFFICER SOUTH SALMARA MANKACHAR DISTRICT::HATSINGIMARI (ELECTION BRANCH) O R D E R No. HEL-3/2019/27 dtd. 23/02/2021.In partial modification of this office order No. HEL- 3/2019/26 dtd. 17/02/2021 & in view of ensuing Assam Legislative Assembly Election, 2021, the following officers are hereby detailed as Constituency Magistrate, Zonal Officer and Sector Officer in respect of 22-Salmara South LAC for the Polling Stations as shown against their names with immediate effect. They are instructed to perform their duties as per guideline of Election Commission of India for smooth conduct of upcoming Assam Assembly Election, 2021 without fail. Name of Constituency Magistrate: - Sri Abbas Mirza Ahmed,ALRS Circle Officer, S- Salmara Revenue Circle. (Contact No. 7002665311) Zone Name of Polling Stations of South Salmara Name Sector Officer PS NO No. No. LAC Zonal Secor Secor Name Sector Sector Officer Officer & No ofName 1 Chirakhawa M.V. School (R) 2 Chirakhowa High School 3 Chirakhawa M.V. School (L) 4 Chirakhawa Part-6 L.P. School Nur Hussain Mollah, 5 2167 No Poyesti Kawnbari L P School Secy.,Bahir Salmara GP S-1 6 Chirakhowa PT II L.P. School Mobile No.9954148815 Fulkatari 7 Chirakhawa L.P. School Right 7(A) Chirakhawa L.P. School Left 8 1650 No Chirakhawa L.P. School (Right) 9 1650 No. Chirakhowa L.P. School (Left) 16 MACHIPARA M E MADRASSA Poyesti Bahir Salmara ME 17 Madrassa 18 Bahir Salmara M E Madrassa 19 2406 No.
    [Show full text]
  • Annual Report on Traffic National Waterways: Fy 2020-21
    ANNUAL REPORT ON TRAFFIC NATIONAL WATERWAYS: FY 2020-21 INLAND WATERWAYS AUTHORITY OF INDIA MINISTRY OF PORTS, SHIPPING & WATERWAYS A-13, SECTOR-1, NOIDA- 201301 WWW.IWAI.NIC.IN Inland Waterways Authority of India Annual Report 1 MESSAGE FROM CHAIRPERSON’S DESK Inland Water Transport is (IWT) one of the important infrastructures of the country. Under the visionary leadership of Hon’ble Prime Minister, Shri Narendra Modi, Inland Water Transport is gaining momentum and a number of initiatives have been taken to give an impetus to this sector. IWAI received tremendous support from Hon’ble Minister for Ports, Shipping & Waterways, Shri Mansukh Mandaviya, to augment its activities. The Inland Waterways Authority of India (IWAI) under Ministry of Ports, Shipping & Waterways, came into existence on 27th October 1986 for development and regulation of inland waterways for shipping and navigation. The Authority primarily undertakes projects for development and maintenance of IWT infrastructure on National Waterways. To boost the use of Inland Water Transport in the country, Hon’ble Prime Minister have launched Jibondhara–Brahmaputra on 18th February, 2021 under which Ro-Ro service at various locations on NW-2 commenced, Foundation stone for IWT terminal at Jogighopa was laid and e-Portals (Car-D and PANI) for Ease-of-Doing-Business were launched. The Car-D and PANI portals are beneficial to stakeholders to have access to real time data of cargo movement on National Waterways and information on Least Available Depth (LAD) and other facilities available on Waterways. To promote the Inland Water Transport, IWAI has also signed 15 MoUs with various agencies during the launch of Maritime India Summit, 2021.
    [Show full text]
  • Action Taken Report
    ACTION TAKEN REPORT F I N A N C E M I N I S T E R ' S B U D G E T S P E E C H 2 0 1 6 - 1 7 March 12, 2018 Printed at Assam Government Press, Bamunimaidam, Guwahati-781021 DEPARTMENT-WISE CONTENT . AGRICULTURE DEPARTMENT [1] . ADMINISTRATIVE REFORMS AND TRAINING DEPARTMENT [2] . ANIMAL HUSBANDRY & VETERINARY [3] . ASSAM LEGISLATIVE ASSEMBLY SECRETARIAT [4] . IMPLEMENTATION OF ASSAM ACCORD [4] . BORDER PROTECTION AND DEVELOPMENT DEPARTMENT [5] . BODOLAND TERRITORIAL COUNCIL [6] . CO-OPERATION DEPARTMENT [7] . CULTURAL AFFAIRS DEPARTMENT [8] . EDUCATION (ELEMENTARY) DEPARTMENT [9] . EDUCATION (HIGHER) DEPARTMENT [11] . EDUCATION (SECONDARY) DEPARTMENT [12] . ENVIRONMENT & FOREST DEPARTMENT [15] . FINANCE (BUDGET) DEPARTMENT [16] . FINANCE (ECONOMIC AFFAIRS) DEPARTMENT [18] . FINANCE (ESTABLISHMENT B) DEPARTMENT [19] . FISHERY DEPARTMENT [21] . FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS DEPARTMENT [22] . GENERAL ADMINISTRATION DEPARTMENT [24] . GUWAHATI DEVELOPMENT DEPARTMENT [25] . HANDLOOM, TEXTILE & SERICULTURE DEPARTMENT [27] . HEALTH AND FAMILY WELFARE DEPARTMENT [28] . HILL AREAS DEPARTMENT [35] . HOME DEPARTMENT [36] . INDUSTRIES AND COMMERCE DEPARTMENT [40] . INFORMATION & PUBLIC RELATION DEPARTMENT [42] . INFORMATION & TECHNOLOGY DEPARTMENT [43] . IRRIGATION DEPARTMENT [45] . JUDICIAL DEPARTMENT [46] . LABOUR & EMPLOYMENT DEPARTMENT [47] . LEGISLATIVE DEPARTMENT [49] . PANCHAYAT & RURAL DEVELOPMENT DEPARTMENT [51] . PARLIAMENTARY AFFAIRS DEPARTMENT [51] . PENSION & PUBLIC GRIEVIENCES DEPARTMENT [52] . PERSONNEL DEPARTMENT [53] . POWER (ELECTRICITY) DEPARTMENT [54] . PRINTING & STATIONERY DEPARTMENT [55] . PUBLIC HEALTH ENGINEERING DEPARTMENT [56] . PUBLIC WORKS (BUILDINGS & NH) DEPARTMENT [57] . PUBLIC ENTERPRISE DEPARTMENT [58] . PUBLIC WORKS (ROADS) DEPARTMENT [59] . REVENUE AND DISASTER MANAGEMENT DEPARTMENT [60] . SECRETARIAT ADMINISTRATION DEPARTMENT [62] . SCIENCE & TECHNOLOGY DEPARTMENT [63] . SOCIAL WELFARE DEPARTMENT [64] . SOIL CONSERVATION DEPARTMENT [65] . SPORTS & YOUTH WELFARE DEPARTMENT [66] . TEA TRIBES DEPARTMENT [68] .
    [Show full text]
  • Expanding Tradable Benefits of Inland Waterways Case of India
    Expanding Tradable Benefits of Inland Waterways Case of India Published By D-217, Bhaskar Marg, Bani Park, Jaipur 302016, India Tel: +91.141.2282821, Fax: +91.141.2282485 Email: [email protected], Web site: www.cuts-international.org With the support of © CUTS International, 2017 First published: December 2017 This document has been produced by CUTS International Printed in India by M S Printer, Jaipur This document is the output of the study designed and implemented by CUTS International and its strategic partners – Royal Society for Protection of Nature (RSPN), South Asia Watch on Trade, Economics and Environment (SAWTEE) and Unnayan Shamannay which contributes to the project ‘Expanding tradable benefits of trans-boundary water: Promoting navigational usage of inland waterways in Ganga and Brahmaputra basins’. More details are available at: www.cuts- citee.org/IW/ This publication is made possible with the support of The Asia Foundation. The views and opinions expressed in this publication is that of CUTS International and partners and not of The Asia Foundation. #1715 2 Contents Acknowledgement...................................................................................................... 5 Abbreviations ............................................................................................................ 6 Contributors .............................................................................................................. 7 Executive Summary...................................................................................................
    [Show full text]
  • Answered On:03.03.2003 Erosion and Flood Control in Assam Moni Kumar Subba
    GOVERNMENT OF INDIA WATER RESOURCES LOK SABHA UNSTARRED QUESTION NO:1770 ANSWERED ON:03.03.2003 EROSION AND FLOOD CONTROL IN ASSAM MONI KUMAR SUBBA Will the Minister of WATER RESOURCES be pleased to state: (a) whether the Government have cleared projects for flood control and erosion in Assam caused by Brahmaputra year after year; (b) if so, the details thereof indicating the costs and schedule for completion; and (c) the steps taken so far in respect of each project? Answer THE MINISTER OF STATE IN THE MINISTRY OF WATER RESOURCES (SMT. BIJOYA CHAKRAVARTY) (a) Yes, Sir. (b) and (c) Flood Management including river erosion being a state subject, investigation, planning and implementation of flood management schemes are within the purview of the State Govt. The Central Governmentr enders assistance which are technical, catalytical and promotional in nature. As informed by the Government of Assam, 51 number of flood control and anti erosion schemes for river Brahmaputra during 1995 to 2003 have been cleared to combat the menace of flood erosion from river Brahmaputra in Assam. In addition to the above, two more projects have been taken up by Brahmaputra Board under Central Sector Schemes. The details of costs and schedule for completion of each scheme are given in Annexure. The schemes are at different stages of implementation as per the availability of funds. Annexure Flood control and anti erosion schemes for river Brahmaputra being implemented by State Government of Assam and Brahmaputra Board A. State Government of Assam Sl Name of Scheme Estimated Tentative No. cost Target date completion.
    [Show full text]
  • E(*|I"/I?/,, Joint Secretary to the Gbvt of Assam Finance (Estt-B) Deoartment
    GOVERNMENT OF ASSAM FINANCE (ESTABLISHMENT-B) DEPARTMENT DISPUR ORDERS BY THE GOVERNOR NOTIFICATION Dated Dispur the 3'd May,2018 NO.FEB 33U2077137: ln the interest of public service, Sri Saifuddin Ahmed, AFS, Treasury Officer, Hatsintimari Treasury is allowed to hold additional charges as Treasurer in the office of the District Water & Sanitation Committee (DWSC), South Salmara Mankachar rn addition to his own dutres with effect from the date of taking over charges. Sd/-Debeswar Malakar, IAS Secretary to the Govt ofAssam Finance (Estt-B) Department Memo No: FEB 331/2017131-A Dated Dispur the 3'd May,2018 Copy forwarded for information and necessary action: 1. The Accountant General{A& E), Assam, Maidamgaon, Beltola, Guwahati-29. 2. The P.S to Principal Secretary to the Govt of Assam, Finance Department/ Dispur, 3. The P.S to Conimissioner and Secretary/ Secretary/Addl. Secretary to the Govt of Assam, Finance Depanment/Public Health EngineerinE Department, Dispur. 4, The Deputy Commissioner, South Salmara Mankachar District. 5. The Deputy Commissioner, Dhubri District. 6. The Chairperson, District Water & Sanitation Committee (DWSC), South Salmara Mankachar. 7. The Chief Engineer, Public Health Engineering (Water), Assam, Hengrabari, Guwahati. 8. The Chief Engineer, Public Health EngineerinB (Sanitation), Assam, Hentrabari, Guwahati. 9. The Executive Engineer (PHE), Dhubri Division, Dhubri. 10. The Assistant Engineer (PHE), Hatsingimari Sub Division, Hatsingimari. 11. The DirectorofAccounts and Treasuries, Assam, Kar Bhawan, DiSpur, Guwahati-6 12. sri saifuddin Ahmed, AFS, Treasury Offcer, Hatsingimari Treasury, Hatsingimari. 13-e-6overnance Unit, Finance Department for necessary uploading. V By Orders etc., E(*|i"/i?/,, Joint Secretary to the Gbvt of Assam Finance (Estt-B) Deoartment..
    [Show full text]
  • And Chilmari (Kurigram
    Boating Towards Inclusivity Facilitating short haul cross-border trade between Dhubri (Assam, India) and Chilmari (Kurigram, Bangladesh) through waterways Boating Towards Inclusivity Facilitating short haul cross-border trade between Dhubri (Assam, India) and Chilmari (Kurigram, Bangladesh) through waterways Published By D-217, Bhaskar Marg, Bani Park, Jaipur 302016, India Tel: +91.141.2282821, Fax: +91.141.2282485 Email: [email protected], Web site: www.cuts-international.org With the support of © CUTS International, 2018 First published: August 2018 Citation: CUTS (2018), Boating Towards Inclusivity: Facilitating short haul cross-border trade between Dhubri (Assam, India) and Chilmari (Kurigram, Bangladesh) through waterways This document has been produced by CUTS International Printed in India by M S Printer, Jaipur ISBN 978-81-8257-270-6 This document is the output of the study designed and implemented by CUTS International and its strategic partner – Unnayan Shamannay which contributes to the project ‘Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational Usage of Inland Waterways in Ganga and Brahmaputra Basins’. More details are available at: www.cuts-citee.org/IW/PHASE2.htm This publication is made possible with the support of The Asia Foundation. The views and opinions expressed in this publication is that of CUTS International and partners and not of The Asia Foundation. #1828, Suggested Contribution M250/US$25 Content Abbreviations 4 Contributors 5 Acknowledgement 6 Preface 7 Executive Summary 9 Introduction
    [Show full text]
  • Mahabahu-Brahmaputra
    Mahabahu-Brahmaputra February 19, 2021 In news : Recently, the Prime Minister launched ‘Mahabahu- Brahmaputra’ and laid the foundation stone of two bridges in Assam( Dhubri Phulbari Bridge & Majuli Bridge ) Key updates The launch of Mahabahu-Brahmaputra was marked by the inauguration of the Ro-Pax vessel operations between Neamati-Majuli Island, North Guwahati-South Guwahati and Dhubri-Hatsingimari The programme also includes shilanyas for construction of tourist jetties at four locations, namely, Neamati, Biswanath Ghat, Pandu and Jogighopa with the financial assistance of Rs. 9.41 crores from the Ministry of Tourism. A permanent Inland Water Transport Terminal will also be built at Jogighopa under the program, which will connect with the Multi-Modal Logistics Park also coming up at Jogighopa. This Terminal will help in reducing the traffic on the Siliguri Corridor towards Kolkata and Haldia. It will also facilitate the uninterrupted movement of cargo even during flood season to various North-Eastern States like Meghalaya and Tripura and to Bhutan and Bangladesh as well. Ro-pax service Prime Minister said that the three Ro-Pax services which were launched recently makes Assam a front-runner state to be connected with Ro-Pax services at this scale. He added Ro-pax service between Majuli and Nemati is one such route which would reduce the distance from about 425 km to just 12 km. Two indigenously procured Ro-Pax vessels, namely, M.V. Rani Gaidinliu and M.V. Sachin Dev Burman, shall become operational. Introduction of Ro-Pax vessel M.V. J.F.R. Jacob between North and South Guwahati will reduce travelling distance of around 40 Km to a mere 3 Km.
    [Show full text]
  • Sanction List of Educational Assistance Extended to the Beneficiaries of the District Dhubri for the Year 2020 List:2
    Page No.1 of 16 Sanction list of Educational Assistance extended to the beneficiaries of the District Dhubri for the year 2020 List:2 Sl. Student/ Beneficiary Address Registration Name of the Institute/ College Class A/c Holder Bank Detail Amount No. Applicant Name Village P.O No. & Registration Name Name Bank A/c Number IFSC Branch Name Date Office Name L.I. Mankachar (Resubmitted Application) 1 Sayed Zamal Nal Miah Puran Diara Puran Diara DHB/MCR/42 L.I. Puran Diara Jatiya VIII Sayed Zamal SBI 38371966832 SBIN0008267 Hatsingimari 4000 Sk dt.29.11.2016 Mankachar Vidyalaya Sk 2 Khairul Islam Abdul Khalek Chengur Puran Diara DHB/MCR/22 L.I. Janata HS School IX Khairul SBI 36081830804 SBIN0008267 Hatsingimari 4000 SK Char dt.09.02.2016 Mankachar Islam 3 Prokash Paul Lakhi Kanta Paul Para Mankachar DHB/MCR/51 L.I. Vivekananda ME VIII Prokash Paul SBI 36275137934 SBIN0014257 Mankachar 4000 Paul dt.02.06.2018 Mankachar School 4 Sumi Barman Sunil Barman Barman Para Mankachar DHB/MCR/48 L.I. 1926 No. Bapuji IV Sumi SBI 32896405023 SBIN0014257 Mankachar 1500 dt.02.06.2018 Mankachar Girls LP School Barman 5 Shekh Forid Ishadul Bhat Jhagrar Kakri Para DHB/MCR/62 L.I. Gyandeep Jatio IV Ishadul SBI 38464906232 SBIN0014257 Mankachar 1500 Hoque Char dt.02.06.2018 Mankachar Vidyalaya Hoque 6 Ashik Ekbal Abdul Matin Baliabil Kalapani DHB/MCR/19 L.I. All Ameen Ismail VIII Ashik Ekbal UCO 26383211001799 UCBA0002638 Jhawdanga Pt 4000 Mollah Mollah dt.09.02.2016 Mankachar Hussain Ideal Mollah III School 7 Rakesh Ch Sanjay Kr Kukur Mara Radha DHB/MCR/67 L.I.
    [Show full text]
  • Pdf | 195.93 Kb
    150 route de Ferney, P.O. Box 2100 1211 Geneva 2, Switzerland Tel: 41 22 791 6033 Fax: 41 22 791 6506 Appeal e-mail: [email protected] Coordinating Office India Assam Cyclone – ASIN32 Appeal Appeal Target: US$ 353,534 Balance Requested from ACT Network: US$ 248,340 Geneva, 23 May 2003 Dear Colleagues, A short but devastating storm with torrential rains lashed the areas of Dhubri, Dhemaji, and Sointpur districts of Assam on 22 April 2003. Mancachar Sub division of Dhubri district situated in the western corner of Assam and bordering Bangladesh, bore the brunt of the fury. The whole area is also mult- hazard prone as earthquakes, cyclones and high floods have created havoc in this area in the past. The latest cyclone has added to the miseries of the State, which is already in a dire situation economically due to various other problems such as riots, insurgencies, etc. The cyclone, although brief, left a trail of death and destruction that prompted many to call it the worst storm to hit the district of Dhubri for forty years. The district authorities are providing relief to the most affected but it is insufficient to cover the vast needs. Some NGOs and several medical teams have been working round-the-clock to restore some semblance of normalcy. Almost all the affected villages are situated in remote areas with a very poor communication network. After consultation amongst the ACT members in India, is was agreed that ACT member Lutheran World Service India (LWSI) would respond to this emergency. LWSI was able to provide immediate relief in the form of BP-5 compact food and non-food items.
    [Show full text]
  • Industrialising India's North-Eastern Region
    INDUSTRIALISING INDIA’S NORTH-EASTERN REGION A Study of District Industries Centres Bishwanath Goldar i Devendra B. Gupta Study Sponsored by the Development Commissioner, Small Scale Industries, Ministry of Industry, Government of India, New Delhi May, 1989 NIPFP Library 25389 338.0954 Q57I M9;1 Institute of Economic Growth St National Institute of Public Finance and Policy, New Delhi FOREWORD The present study is an attempt to evaluate the working of the District Industries Centres Programme in the States of West Bengal, Assam, Mizoram, Sikkim, Tripura, Nagaland, Manipur, Arunachal Pradesh and the Union Territory of Andaman & Nicobar. This study has been sponsored by the Development Commissioner (Small Scale Industries), Ministry of Industry, Government of India. We would like to place on record our appreciation for the financial support to carry out this evaluation. Also our thanks are due to Shri Raj Kumar, Director (DIC) and various officia ls of the DIC's Directorates of Industries and financial institutions of various states who provided valuable information. In this study we received fie ld support and research assistance from Dr. D.K. Goel, Ms. Sarabjeet Dhody, Mr.O.P. Sharma, Mr. B. B. Deb Choudhury, Mr. S- Dutta Choudhury, Mr. S. Ruivah and Ms. Vasundhara Chandra. In the processing of data we received generous help fron Shri K. Lai and Shri Satyendra Kumar. Needless, without their help, it would have been d ifficu lt to carry out this study. Finally, for encouragement in our endeavour, we would like to place on record our gratitude to Professor T. N. Madan, Director, Institute of Economic Growth and Dr.
    [Show full text]
  • Protection of Majuli from Floods and Erosion
    ANNUAL REPORT BRAHMAPUTRA BOARD BASISTHA, GUWAHATI Annual Report 2018-19 ANNUAL REPORT OF BRAHMAPUTRA BOARDFOR THE YEAR 2018-19 CONTENT Page No Chapter -I General 1.1 Brahmaputra Valley and its flood problems; establishment of 176-13 Board’s office, giving the list of the members of the Board, 109-118 number of Board’s meetings held and organizational set-up of the Board 1.2 Establishment of Brahmaputra Board and its Functions 118-119 1.3 High Powered Review Board Meeting 120 1.4 Meetings of Brahmaputra Board 120 1.5 Standing Committee of Brahmaputra Board 120 1.6 Meeting of Advisory Committee of NEHARI 120 1.7 Organizational set up of Brahmaputra Board 120 Chapter -II General Review 2.1 Administration and Organization 133 2.2 Finance, Accounts and Audit 133 2.3 Review in progress of works during 2018-19 134-139 Chapter -III Review of progress in preparation of Master Plan; Survey and Investigation; execution, maintenance and operation of multipurpose dams and other works; drawing up of standards and specifications for construction, operation and maintenance of dams; phased programme for construction by State Governments of all dams and other projects/ schemes incorporated in Master Plan 3.1 Progress of Survey and Investigation and Preparation of Master Plans, Detailed Project Reports (DPR) for Drainage 141 Development Schemes and DPRs of Multi-Purpose Projects 3.1.1 Preparation of Master Plan 141 3.1.2 Current assignment for preparation of Master Plan 142 3.2 Drainage Development Schemes (DDS) 142-146 3.3 Survey and Investigation of Water Resources Projects 146-150 3.4 Construction Activities 150 3.4.1 Pagladiya Dam Project 150 3.4.2 Construction of Raised Platforms 151 3.4.3 North Eastern Hydraulic & Allied Research Institute 152 3.5 Flood Management and Anti -erosion 153 Schemes(Implementation of Anti-erosion measures) 3.5.1 Anti-erosion measures completed 153 3.5.2.
    [Show full text]