The World Bank Report No: ISR5173

Implementation Status & Results HN Rural Infrastructure Project (P086775)

Operation Name: HN Rural Infrastructure Project (P086775) Project Stage: Implementation Seq.No: 13 Status: ARCHIVED Archive Date: Country: Honduras Approval FY: 2006

Public Disclosure Authorized Product Line:IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Finance Secretariat (SEFIN), Fondo Hondureno de Inversion Social, empresa nacional de energia electrica Key Dates Board Approval Date 07-Jul-2005 Original Closing Date 30-Jun-2010 Planned Mid Term Review Date Last Archived ISR Date 29-Jun-2011 Public Disclosure Copy Effectiveness Date 04-Aug-2006 Revised Closing Date 30-Jun-2012 Actual Mid Term Review Date

Project Development Objectives HN Rural Infrastructure Project (P086775) Project Development Objective (from Project Appraisal Document) The project development objectives are (i) to improve access, quality and sustainability of infrastructure services (roads, water & sanitation, and electricity) for the rural poor in Honduras; and (ii) to develop capacities and enabling environment for locally-driven service provision and planning. Has the Project Development Objective been changed since Board Approval of the Program?

Public Disclosure Authorized Yes No

Rural Electrification Project (P090113) Global Environmental Objective (from Project Appraisal Document) The GEF project development objectives are: (i) improving access, quality and sustainability of electricity services through the development of offgrid electrification model projects, and (ii) developing capacities and enabling environment for offgrid electrification in a decentralized setting.

The project's global environmental objective is to achieve greenhouse gas (GHG) reductions through the reduction of policy, informational, financing and institutional capacity barriers that currently hinder renewable energy technology (RET) dissemination and market development in Honduras Has the Global Environmental Objective been changed since Board Approval of the Program?

Yes No

Public Disclosure Authorized Component(s)

Component Name Component Cost Participatory local planning 1.30 Infrastructure Service Delivery 40.20

Public Disclosure Copy Local Capacity Building and Policy Development TA 3.50 Project management, monitoring and evaluation 2.00

Page 1 of 10 Public Disclosure Authorized The World Bank Report No: ISR5173

Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating

Implementation Status Overview The project is in a good position to be able to achieve its development objectives. All integrated rural infrastructure investment plans are either approved and/or under execution. Greater attention is now being paid to the development objective concerning increased capacity for locally-driven planning and implementation of infrastructure services as well as to

Public Disclosure Copy ensure that the mancomunidades are in a position to meet their ongoing financial obligations to the project. Substantial progress has been made during 2011 towards increasing the rate of commitment of remaining funds and increasing the rate of disbursement of funds from the IDA credit and the GEF grant which has now reached 69% and 47% of total respectively. About $12 million in IDA credit proceeds should be disbursed in this year alone. The project coordinating unit has been effective in accelerating project implementation and addressing bottlenecks. The rating on implementation performance is being raised from "moderately satisfactory" to "satisfactory"

Locations Country First Administrative Division Location Planned Actual Honduras Departamento de Olancho Yocon

Honduras Departamento de Santa Barbara Trinidad

Honduras Departamento de Olancho

Honduras Departamento de Ocotepeque Sensenti

Honduras Departmento de La Paz Santiago Puringla

Honduras Departamento de Copan Santa Rita

Honduras Departmento de La Paz Santa Maria

Honduras Departamento de Choluteca Santa Ana de Yusguare

Honduras Departmento de La Paz San Pedro de Tutule

Honduras Departamento de Copan San Nicolas

Honduras Departamento de Choluteca San Marcos de Colon

Honduras Departamento de Santa Barbara San Marcos

Honduras Departamento de Santa Barbara San Luis Public Disclosure Copy Honduras Departamento de Santa Barbara San Jose de Colinas

Page 2 of 10 The World Bank Report No: ISR5173

Country First Administrative Division Location Planned Actual Honduras Departmento de La Paz San Jose

Honduras Departamento de Copan San Jeronimo

Honduras Departamento de Copan San Antonio

Honduras Departamento de Olancho Salama

Honduras Departamento de Santa Barbara Petoa

Honduras Departamento de Choluteca Orocuina

Public Disclosure Copy Honduras Departamento de Copan Nueva Arcadia

Honduras Departmento de La Paz Marcala

Honduras Departamento de Olancho

Honduras Departamento de Ocotepeque Lucerna

Honduras Departamento de Olancho La Union

Honduras Departmento de La Paz La Paz

Honduras Departamento de Ocotepeque La Labor

Honduras Departamento de Copan La Jigua

Honduras Departamento de Olancho La

Honduras Departamento de Olancho

Honduras Departamento de Olancho

Honduras Departamento de Ocotepeque Fraternidad

Honduras Departamento de Copan Florida

Honduras Departamento de Olancho

Honduras Departamento de Olancho El Rosario

Honduras Departamento de Copan El Paraiso

Honduras Departamento de Choluteca El Corpus

Public Disclosure Copy Honduras Departamento de Choluteca Duyure

Honduras Departamento de Ocotepeque Dolores Merendon

Page 3 of 10 The World Bank Report No: ISR5173

Honduras Departamento de Copan Copan Ruinas

Honduras Departamento de Olancho Concordia

Honduras Departamento de Choluteca Concepcion de Maria

Honduras Departamento de Santa Barbara Concepcion del Norte

Honduras Departamento de Santa Barbara Chinda

Honduras Departmento de La Paz Chinacla

Honduras Departmento de La Paz Cane Public Disclosure Copy Honduras Departamento de Olancho Campamento

Honduras Departamento de Copan Cabanas

Honduras Departamento de Choluteca Apacilagua

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target % population in target areas with access to Text Value 62 67 water and sanitation, provided with quality and sustainability (Cra and Chorti). Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments This will be measured at the conclusion of the project % population in target areas with access to Text Value 33 38 electricity service, provided with adequate quality and sustainability (Cra and Chorti). Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments This will be measured at the conclusion of the project Population with improved all year road access Text Value 0 200,000 in target areas (Cra and Chorti). Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

Value of contracts successfully procured by Text Value 0 US$9.8 million to date US$10 million (Cra and UTIs (cumulative) Chorti) Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Public Disclosure Copy Comments This is for all 6 mancomunidades

Page 4 of 10 The World Bank Report No: ISR5173

Indicator Name Core Unit of Measure Baseline Current End Target Share of rural population with access to an all- Percentage Value 75.00 season road Date 19-Oct-2011 30-Jun-2012 Comments To be measured at the conclusion of the project Number of rural people with access to an all- Number Value 0.00 130000.00 200000.00 season road Sub Type Date Supplemental Comments

Number of people in rural areas provided with Number Value 0.00 35200.00 60000.00 Public Disclosure Copy access to Improved Water Sources under the project Date 01-Aug-2006 19-Oct-2011 30-Jun-2012 Comments

Direct project beneficiaries Number Value 0.00 235800.00 318595.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Female beneficiaries Percentage Value

Sub Type Date Supplemental Comments

Female beneficiaries Percentage Value 0.00 54000.00

Sub Type Date Supplemental Comments

Access to sanitatino Number Value 16340.00 47000.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

access to grid electricity Number Value 50064.00 75260.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

access to off-grid electricity Number Value 20060.00 32800.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012

Public Disclosure Copy Comments

Page 5 of 10 The World Bank Report No: ISR5173

Kilometers under routine roadmaintenance Kilometers Value 110.00 430.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments 6 micro-enterprises started up in July 2011

Global Environmental Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Tons CO2 (greenhouse gas) emissions Text Value 160,000 (revised) avoided Date 07-Jul-2005 19-Oct-2011 30-Jun-2012

Public Disclosure Copy Comments 121,000 is now the revised expectation due to having 2 rather than 8 micro-hydros completed under the project slaes of accredited solar companies Amount(USD) Value 1880000.00 4800000.00

Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

households with solar systems installed Number Value 3344.00 5000.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

community renewable energy installations Number Value 13.00 100.00

Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

village micro grids Number Value 0.00 8.00

Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

Intermediate Results Indicators Public Disclosure Copy

Page 6 of 10 The World Bank Report No: ISR5173

Indicator Name Core Unit of Measure Baseline Current End Target Number of integrated mancomunal Text Value 0 6 infrastructure plans completed Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments CRA and Chorti essentially completed, other 4 are under implementation Planned infrastructure works completed Text Value 0 353 km of rural roads; 6.6 km 400 km of roads rehabilitated of municipal roads; 6,648 new with adequate maintenance or improved water established; 6,800 new or connections; 2,030 new or improved water and sanitation improved latrines; 8,344 new connections; 4,500 new Public Disclosure Copy electricity connections electricity connections (Cra and Chorti) Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Implementation of new sustainable service Text Value 0 6 rural road micro-enterprises (i) 20 (ii) 2 delivery models in selected sectors: (i) rural set up road micro-enterprises; (ii) village micro-grids Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Monitoring and Evaluation Systems Text Value 0 Yes Yes established. Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Roads rehabilitated, Rural Kilometers Value 0.00 352.00 400.00

Date 01-Aug-2006 19-Oct-2011 30-Jun-2012 Comments

New piped household water connections that Number Value 0.00 1440.00 6000.00 are resulting from the project intervention Date 01-Aug-2006 19-Oct-2011 30-Jun-2012 Comments

Volume of Bank Support: Lines of Credit - Amount(USD) Value 855260.00 1500000.00 Microfinance Date 19-Oct-2011 30-Jun-2012 Comments

Volume of Bank Support: Institutional Amount(USD) Value 113146.00 300000.00 Public Disclosure Copy Development - Microfinance Date 19-Oct-2011 30-Jun-2012

Page 7 of 10 The World Bank Report No: ISR5173

Indicator Name Core Unit of Measure Baseline Current End Target Comments

Number of new household electricity Number Value 0.00 11712.00 4500.00 connections Date 06-Jun-2005 21-Oct-2010 30-Jun-2012 Comments 8344 grid extension, 3344 solar PV, 24 solar community Piped household water connections that are Number Value 0.00 5208.00 6000.00 benefiting from rehabilitation works undertaken by the project Date 01-Aug-2006 19-Oct-2011 30-Jun-2012 Comments Public Disclosure Copy Percentage of planned sub projects actually Percentage Value 75.00 60.00 implemented Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Latrines constructed Number Value 2030.00 5760.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

Transmission and distribution lines constructed Kilometers Value 456.00 712.00

Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

solar companies accredited Number Value 6.00 6.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

micro-financing companies accredited Number Value 8.00 7.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments

UTIs operating with trained staff Number Value 6.00 6.00

Date 07-Jul-2005 19-Oct-2011 30-Jun-2012 Comments MAMNO is however receiving specific help from the UCP to meet its obligations Public Disclosure Copy

Page 8 of 10 The World Bank Report No: ISR5173

Water Boards trained in operations and Number Value 28.00 50.00 maintenance Date 07-Jul-2005 09-Jun-2011 30-Jun-2012 Comments

Data on Financial Performance (as of 26-Oct-2011)

Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P086775 IDA-40990 Effective 07-Jul-2005 16-Nov-2005 04-Aug-2006 30-Jun-2012

Public Disclosure Copy P090113 TF-55968 Effective 21-Mar-2006 21-Mar-2006 04-Aug-2006 30-Jun-2012

Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P086775 IDA-40990 Effective USD 47.00 47.00 0.00 33.20 16.95 71.00 P090113 TF-55968 Effective USD 2.35 2.35 0.00 1.23 1.12 52.00

Disbursement Graph

Public Disclosure Copy Key Decisions Regarding Implementation The Bank has received a Government request for an extension of the closing date of the credit and the grant to December 31, 2012. The justification for this request is currently under review by the Bank. The additional time would be required to assure completion of all sub-projects currently under implementation or due to be contracted by December 2011.

Page 9 of 10 The World Bank Report No: ISR5173

Restructuring History Level two Approved on 08-Apr-2010, Level two Approved on 29-Jun-2010

Related Projects P090113-Rural Electrification Project Public Disclosure Copy Public Disclosure Copy

Page 10 of 10