FORM – I

FORM – IA

STANDARD TEMPLATE

&

ENVIRONMENTAL MANAGEMENT PLAN

For

“Jakkampudi Economic Township” (JET City)

MARCH – 2018

PROJECT PROPONENT PROJECT MANAGEMENT CONSULTANT M/s. Jakkampudi Economic Urban Infrastructure Township Development Asset Management Limited (APUIAML) Corporation Ltd. (JETDCL)- th JV of Go. A.P. & Municipal Corporation 4 Floor, NTR Administrative Block, Municipal Corporation Vijayawada, Pandit Nehru Bus Stand, Vijayawada, Canal Road , Krishna Dist. AP 520001 Andhra Pradesh.520013. ENVIRONMENTAL CONSULTANT: B.S. ENVI-TECH PVT. LTD., Secunderabad, Telangana. NABET Accreditation: NABET/EIA/1316/RA002 Form - I (As Per New Notification of Mo.E.F dated 1-12-2009 vide SO 3067 (E))

BASIC INFORMATION S. Item Details No 1 Name of the Project/s “Jakkampudi Economic Township” (JET City) 2 S. No. in the schedule 8(a) 3 Proposed capacity/ area/ length/ Government of Andhra Pradesh (Go tonnage to be handled/ command A.P.) Vide G.O.Ms. 7 Dated area/ lease area/ number of wells 02.01.2017 formed the Jakkampudi to be drilled Economic Township Development Corporation Ltd. (JETDCL) which is owned by the Go.A.P. and the Vijayawada Municipal Corporation (VMC).

Go.A.P. vide G.O.Ms. 517 Dated 14.11.2017 has alienated Government Revenue land to an extent of 234.55 acres in Vemavaram and Jakkampudi Villages, , Krishna District in favour of VMC for formation of Jakkampudi Economic Township.

Go.A.P. Vide G.O.Ms. 7 Dated 02.01.2017 has appointed the Andhra Pradesh Urban Infrastructure Asset Management Limited (APUIAML), Vijayawada, Andhra Pradesh as the Project Development Consultant and the Transaction Advisor for the Project.

Jakkampudi Economic Township Development Corporation Ltd. (JETDCL) (a Joint Venture of Government of Andhra Pradesh and Vijayawada Municipal Corporation) plans to develop, Phase -I of the “Jakkampudi Economic Township” on a plot area of 6.3 acres out of total plot area of 234.55 acres identified. The proposed Phase- I development is planned at Sy. No. 104-18 Vemavaram Village, Vijayawada Rural Mandal, Krishna District, A.P.

1 The proposed “Jakkampudi Economic Township” (JET City) consists of 50 - 60 flatted factories with parking facility of 600 car/utility vehicles (1 tonner).

The total built-up area of 59990.82 Sq.m. Blocks No. of No. of Parkings Floors Block-IA 2 5 Block-IB 1 4 Block-IIA 2 5 Block-IIB 1 4 Block-III 1 4 JETDCL proposes to develop the project to house the Light, Green and White Industries in the micro and small sectors like Foot Wear Making, Printing and Packing. 4 New/ expansion/ modernization New 5 Existing capacity/ Area etc. Not Applicable 6 Category of Project i.e ‘A’ or ‘B’ Category ‘B’ - (B2) 7 Does it attract the general No condition? If yes please specify. 8 Does it attract the specific No condition? If yes please specify. 9 Location Plot/ Survey/ Khasra No 104-18 Village Vemavaram Village Mandal Vijayawada Rural District Krishna District State Andhra Pradesh 10 Nearest railway station/ airport Railway Station: Rayanapadu - 6.0 along with distance in Kms. km - WSW Airport: Gannavaram (Vijayawada)– 20.5 km - ESE 11 Nearest town, city, district Vijayawada - 7.0 km - SSE headquarters along with distance in kms. 12 Village panchayaths, Zilla Vemavaram Village parishad, Municipal Corporation, Vijayawada Rural Mandal Local body (Complete postal Krishna District. addresses with telephone nos to be Andhra Pradesh given) 13 Name of the applicant M/s. Jakkampudi Economic Township Development Corporation Ltd. (JETDCL)

2 14 Registered address Vijayawada Municipal Corporation (VMC) Canal Road, Nehru Building, Vijayawada, Andhra Pradesh 520001. 15 Address for correspondence Andhra Pradesh Urban Infrastructure Asset Management Limited 4th Floor, NTR Administrative Block, Pandit Nehru Bus Stand, Vijayawada, Andhra Pradesh-520013. Name Mr. Ramnath Velamati Designation (Owner /Partner/ Director, JETDCL CEO) Address APTIDCO, 4th Floor, NTR Administrative Block, Pandit Nehru Bus Stand, Vijayawada, Andhra Pradesh. Pincode 520013 E- mail [email protected] Telephone no. 0866-2527711 Fax no. 0866-2527711 16 Details of Alternative sites Not Applicable. examined, if any location of these sites should be shown on a topo sheet. 17 Interlinked projects Not Applicable. 18 Whether separate application of Not Applicable. interlinked project has been submitted? 19 If yes, date of submission Not Applicable. 20 If no, reason Not Applicable. 21 Whether the proposal involves Not Applicable. approval/ clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation)Act, 1980 (b) The Wild Life (Protection)Act, 1972 (c) The CRZ Notification, 1991 22 Whether there is any Government Go A.P. G.O.Ms. 7 Dated 02.01.2017 Order/ Policy relevant/ relating to and G.O.Ms. 517 Dated 14.11.2017 the site? 23 Forest land involved (hectares) Nil. 24 Whether there is any litigation No. pending against the project and/or land in which the project is propose to be set up? (a) Name of the court

3 (b) Case No (c) Orders/ directions of the court, if any and its relevance with the proposed project.

(I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (Topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There is a permanent change in the change in land use, land cover land use. The present land use is or topography including vacant, barren land with rocky increase in intensity of land strata. use (with respect to local land use plan) JETDCL proposes to construct Jakkampudi Economic Township (JET City). 1.2 Clearance of existing land, No Not required. The site is vacant vegetation and buildings? land. 1.3 Creation of new land uses? Yes It is proposed to develop the Jakkampudi Economic Township (JET City) on a plot area of 6.3 Acres with a total Built-up area of 59990.82 Sq.m.

Proposed Project consists of 3 buildings with individual floors including parking with well- developed internal Roads and STP 1.4 Pre-construction investigations Yes Geo-technical investigations will be e.g. bore houses, soil testing? done for designing the various building etc., after obtaining statutory clearances. 1.5 Construction works? Yes There will be construction activity for constructing 3 Buildings with individual floors including parking with well-developed internal Roads, STP and other facilities with Built- up area : 59990.82 Sq.m 1.6 Demolition works? No No demolition work is envisaged since the proposed area of 6.3 acres is vacant land and does not have any building or structures. 1.7 Temporary sites used for No A temporary labour colony will be construction works or housing developed preferably near to the

4 of construction workers? boundary of the project site with the following facilities: · Safe & secure accommodation · Clean drinking water · Hygienic sanitation facility 1.8 Above ground buildings, Yes Proposed Project consists of 3 structures or earthworks buildings with individual floors including linear structures, cut including parking. and fill or excavations 1.9 Underground works including Yes There will be cut and fill activity. mining or tunneling? 1.10 Reclamation works? No Not Applicable. 1.11 Dredging? No Not Applicable. 1.12 Offshore structures? No Not Applicable. 1.13 Production and manufacturing Yes The proposed township will have 50 processes? flatted factories housing Small and Micro Green and White Industries like Foot Wear Making, Printing and Packing. 1.14 Facilities for storage of goods or Yes Temporary storage facility of materials? construction material during construction will be provided.

Cement bags will be stored in closed shed. Sand will be stacked neatly under cover.

Bricks and steel will be laid in open. The storage yard will be located within the project site. 1.15 Facilities for treatment or Yes Liquid Waste: disposal of solid waste or liquid effluents? Construction Phase: Domestic wastewater generated during construction phase will be disposed off to septic tank followed by Soak Pits.

Operation Phase: The wastewater generated during operation phase will be treated in a sewage treatment plant. Treated wastewater will be reused for non- potable uses like flushing and greenbelt development.

Solid Waste

Construction Phase: The

5 construction debris will be used to a maximum extent for leveling and the surplus if any disposed to the local vendors. Other used material will be suitably disposed.

Operation Phase: The solid wastes generated during operation phase will consist of mainly used paper, cartons, thermocol, plastics, polythene bags, corrugated boxes, glass etc., will be disposed to authorize vendors.

The dry waste is typically foot wear and paper trimming which is about 7,500 kg/day will be segregated and disposed to Cement Plant for incineration in Kiln.

The domestic waste from the JET City is 450 kg/day and sludge from STP is about 10 kg/day.

Solid waste generation details are given in Annexure – 1. 1.16 Facilities for long term housing No Not Applicable. of operational workers? 1.17 New road, rail or sea traffic No Not Applicable. during construction or operation? 1.18 New road, rail, air waterborne No Not Applicable. or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Applicable. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not Applicable. lines or pipelines? 1.21 Impoundment, damming, No Not Applicable. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not Applicable. 1.23 Abstraction or transfers from Yes Ground water from existing

6 ground or surface waters? borewell will be used during the construction. 1.24 Changes in water bodies or the No Proper storm water drainage plan land surface affecting drainage will be implemented to direct the or run-off? run off. The greenbelt development and implementation of storm water management plan will have positive impact. 1.25 Transport of personnel or Yes There will be transport of personnel materials for construction, and material during construction operation or decommissioning? and operation phase. 1.26 Long-term dismantling or No Not Applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of people during either temporarily or construction and operation. permanently? 1.29 Introduction of alien species? No Local/Native species will be planted in the proposed project site. 1.30 Loss of native species or genetic No Not Applicable. diversity? 1.31 Any other actions? No Not Applicable.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The land is undulating and barren agricultural land (ha) having rocky strata. 2.2 Water (expected source & Yes The average consumption of water competing users) unit: KLD per day during construction period is estimated to be about 90 - 100 kld.

Total water requirement of the project during operation phase is 160 kld.

The source of water is from existing borewell and VMC.

The water balance and waste water

7 generation details are furnished in the Annexure – 2. 2.3 Minerals (MT) Yes Mineral based construction material like Sand, Iron, stones etc., will be used from the approved quarries, sand reaches and iron from the open market. 2.4 Construction material – stone, Yes The construction material is aggregates, sand / soil procured locally. The estimated (expected source – MT) quantities are given below: S.No. Description Quantity (Approx.) 1 Reinforcement 3270 steel (MT) 2 Cement (m3) 10,700 3 Bricks (No’s) 84,50,775 2.5 Forests and timber (source – No Not required. MT) 2.6 Energy including electricity and Yes Source: APSPDCL fuels (source, competing users) The estimated power requirement Unit: fuel (MT), energy (MW) for the project during operation is 3MW.

Construction Phase

1x100 kVA DG set will be provided.

Operation Phase

1x1000 kVA DG set will be provided for emergency power back up. 2.7 Any other natural resources No Not Applicable. (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes Used batteries, used lube oil from which are hazardous (as per DG sets. MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

8 3.2 Changes in occurrence of No Nil. disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes The proposed project will provide by changing living conditions? necessary infrastructure like power, water, sewage treatment and solid waste management to White & Green Industries and help in economic development.

The project will result in secondary development in terms of service providers, suppliers. 3.4 Vulnerable groups of people No Nil. who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Nil.

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist Yes Details thereof (with No. confirmation /No approximate quantities/ rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine Yes There will be generation of wastes excavated earth.

The surplus excavated soil will be reused in the project site/nearby area for leveling. 4.2 Municipal waste (domestic and Yes The solid wastes generated during or commercial wastes) operation phase will consist of mainly used paper, cartons, plastics, polythene bags, corrugated boxes etc., will be disposed to authorize vendors.

The dry waste is typically foot wear and paper trimming which is about 7,500 kg/day will be segregated and disposed to Cement Plant for incineration in Kiln.

The domestic waste from the JET City is 450 kg/day and sludge from STP is about 10 kg/day.

9 Solid waste generation details are given in Annexure – 1. 4.3 Hazardous wastes (as per Yes There will be generation of Hazardous Waste hazardous waste such as used Management Rules) oil/waste oil from the DG Sets, which will be disposed to authorized vendors of APPCB. 4.4 Other industrial process wastes No Not Applicable. 4.5 Surplus product No Not Applicable. 4.6 Sewage sludge or other sludge Yes There will be generation of about from effluent treatment 10 kg/day of dewatered/dried sludge from STP (Sewage Treatment Plant). This will be utilized as manure for Greenbelt development. 4.7 Construction or demolition Yes During construction phase, the wastes construction debris will be used to a maximum extent for leveling and the surplus if any disposed to the local vendors. Other used material will be suitably disposed. 4.8 Redundant machinery or No Not Applicable equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes Yes E-waste generated will be disposed to authorized vendors of APPCB.

5. Release of pollutants / hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist Yes/ Details thereof (with No. confirmation No approximate quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes The operation of proposed project fossil fuels from stationary or does not envisage any air mobile sources pollution sources except emission from DG sets which are used for emergency power supply only. It will be mitigated by providing adequate stack height as per CPCB norms and procuring DG sets which are CPCB certified for emissions and noise. 5.2 Emissions from production No Not Applicable processes 5.3 Emissions from materials Yes Construction material like sand, handling including storage or cement etc., will be properly

10 transport covered with suitable cover to minimize the fugitive dust emission. 5.4 Emissions from construction Yes Fugitive dust will be controlled by activities including plant and spraying water and erecting equipment barricades during construction period. Some emissions are envisaged from construction equipment such as Earth moving equipment, tractors, lorries, DG sets etc., during construction phase which is limited to the construction period. 5.5 Dust or odours from handling Yes Construction activities may lead of materials including to temporary increase in dust construction materials, sewage levels. Sprinkling of water will be and waste done to minimize the fugitive dust emission. 5.6 Emissions from incineration of No Not Applicable. waste 5.7 Emissions from burning of No Not Applicable. waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable. sources waste 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. Information/Checklist Yes Details thereof (with No. confirmation /No approximate quantities/ rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes There will be generation of noise e.g. engines, ventilation plant, due to the operation of concrete crushers mixers and other associated machinery during the construction phase which is temporary.

During operation the DG sets will be used during power shut down. The DG sets will be housed in a building with acoustic enclosure. 6.2 From industrial or similar No Not applicable processes 6.3 From construction or Yes During construction work noise will demolition be generated from construction machinery which is limited to construction period. 6.4 From blasting or piling No Not required

11 6.5 From construction or Yes Some noise pollution may be there operational traffic due to the vehicular traffic. However, this is limited to construction period. Suitable traffic management plan will be implemented so as to mitigate the noise to acceptable limits. 6.6 From lighting or cooling No Not applicable systems 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. Information/Checklist Yes Details thereof (with No. confirmation /No approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No Not applicable spillage of hazardous materials 7.2 From discharge of sewage or Yes Wastewater will be treated in STP. other effluents to water or the Treated wastewater will be reused land (expected mode and place for flushing and greenbelt of discharge) development within the project area. 7.3 By deposition of pollutants Yes DG sets meeting CPCB norms will emitted to air into the land or be installed. into water 7.4 From any other sources No The waste water is treated in STP and reused. 7.5 Is there a risk of long term No None. buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist Yes Details thereof (with No. confirmation /No approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No Not Applicable etc from storage, handling, use or production of hazardous substances 8.2 From any other causes No None. 8.3 Could the project be affected by No The proposed project is in inland natural disasters causing area. The proposed project site falls environmental damage (e.g. under Zone III (Moderate Damage

12 floods, earthquakes, landslides, risk zone), according to the Seismic cloudburst etc.)? Zone Map of (IS: 1893, 2002). The structures shall be designed with adequate safety factors.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Checklist Yes Details thereof (with No. confirmation /No approximate quantities/ rates, wherever possible) with source of information data 9.1 Lead to development of Yes The supporting infrastructure like supporting utilities, ancillary roads, power supply, water and development or development waste water management, solid stimulated by the project which waste management will be could have impact on the developed. environment e.g.: This will induce further Supporting infrastructure development of the area. (roads, power supply, waste or waste water treatment, etc.)  Housing development Yes The development of JET City spurs the development of entire region including housing.  Extractive industries No Not Applicable  Supply industries No Not Applicable  Other No Not Applicable 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment 9.3 Set a precedent for later Yes The project will improve the developments aesthetics in the area and also support the development of the area. 9.4 Have cumulative effects due to No Not Applicable. proximity to other existing or planned projects with similar effects

13 (II) Environmental Sensitivity S. Areas Name/ Aerial distance (within No. Identity 15 km.) Proposed project location boundary 1 Areas protected under Yes Undavalli Caves – 11.2 international conventions, km – SSW national or local legislation for Fort – 9.9 their ecological, landscape, km –WNW cultural or other related value 2 Areas which are important or Yes Budameru River – 7.0 sensitive for ecological reasons Water Bodies km – N - Wetlands, watercourses or Eluru Canal – 7.3 km – other water bodies, coastal SE zone, biospheres, mountains, Krishna River – 7.8 km forests – SSW Budameru Canal – 7.4 km – W Yes Kottur RF – 1.0 km – E Reserved Adavinekkalam Forest (RF) Extension RF – 1.3 km – SE Kondapalle RF – 9.2 km – W 3 Areas used by protected, No Not Applicable. important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not Applicable. underground waters 5 State, National boundaries No Not Applicable 6 Routes or facilities used by No Not Applicable the public for access to recreation or other tourist, pilgrim areas 7 Defence installations No None within 15 Km radius 8 Densely populated or built-up Yes Vijayawada – 7.0 km - area SSE 9 Areas occupied by sensitive No Not Applicable man-made land uses (hospitals, schools, places of worship, community facilities)

14 10 Areas containing important, Water Bodies Budameru River – 7.0 high quality or scarce km – N resources Eluru Canal – 7.3 km – (ground water resources, SE surface resources, forestry, Krishna River s– 7.8 km agriculture, fisheries, tourism, – SSW minerals) Budameru Canal – 7.4 km – W Tourism Undavalli Caves – 11.2 Places km – SSW Kondapalli Fort – 9.9 km –WNW Reserved Kottur RF – 1.0 km – E Forest (RF) Adavinekkalam Extension RF – 1.3 km – SE Kondapalle RF – 9.2 km – W 11 Areas already subjected to None Not Applicable pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No The proposed project is hazard which could cause in inland area. The the project to present proposed project site environmental problems falls under Zone III (earthquakes, subsidence, (Moderate Damage risk landslides, erosion, flooding or zone), according to the extreme or adverse climatic Seismic Zone Map of conditions) India (IS: 1893, 2002). The structures shall be designed with adequate safety factors.

15

ANNEXURE – 1

JAKKAMPUDI ECONOMIC TOWNSHIP (JET CITY) Basis A. Per-capita Waste Total Number of Generation waste Persons kg/person/day Users 3000 0.15 450

B. Dry waste from JET City = 7,500 kg/day (Foot wear trimming)

C. Solid waste from STP = 10 kg/day (Dry Weight Basis )

SUMMARY OF SOLID WASTE GENERATION (kg/Day)

Domestic Waste : 450 Dry waste : 7,500 STP Sludge : 10 Total Waste generation : 7,960

SOLID WASTE DISPOSAL

 The Domestic waste will be collected and stored separately and the same will be disposed to local Municipal Authority for further disposal.

 The food waste from the canteen will be sent to an organic waste composter. The compost from OWC will be used for greenbelt development.

 The dry waste (footwear trimmings etc.,) will be baled and transported to nearby Cement plant for incineration in kiln.

 The STP sludge will be conditioned and dried. The dried sludge cakes will be used as manure for greenery development.

Page 1 of 1

ANNEXURE – 2

JAKKAMPUDI ECONOMIC TOWNSHIP (JET CITY)

a. WATER REQUIREMENT (KLD) Sl. DESCRIP Number DOMES FLUSHIN DOMESTIC FLUSHING TOTAL No TION of TIC G WATER WATER WATER persons WATER WATER (@5L/day/ (@45 REQUIREM L/day/ (L/day/p person) L/day/pers ENT person) erson) on) 1 Users 3000 5 45 15 135 150

WATER AREA (sq.m) REQUIREMENT (KLD) Greenbelt requirement 5100 10

Total water requirement is 150 + 10 = 160 kld

b. WASTE WATER GENERATION (KLD)

Sl. No DESCRIPTION TOTAL WATER WASTE WATER GENERATION REQUIREMENT ( 80% of Domestic & Flushing Requirement) 1 Users 150 120

 Total waste water generation = 120 KLD  Proposed STP Capacity = 150 KLD  Treated Waste Water from STP= 102 KLD

TREATED WASTE WATER UTILISATION (KLD) S. No DESCRIPTION TOTAL WATER 1 Flushing 80 2 Greenbelt development 10 3 Floor Wash 12 TOTAL 102