PRESENT REQUIREMENT OF FOREST LAND FOR CONSTRUCTION OF STRUCTURES AND FOR LAYING OF PUMPING AND GRAVITY MAINS IN FOREST LAND OF GADAG RURAL WATER SUPPLY SCHEME IN - DBOT PKG-2

LENGTH AREA (in SI NO DESCRIPTION (Km) Hectare)

1 Structures 1.097

2 Pipeline 37.91 2.410

3 New road formation 0.393

TOTAL 37.91 3.900

The Executive Engineer RWS&SD GADAG,

AREA STATEMENT OF PIPELINE IN FOREST LAND

Area of Length of Width of SI Pipeline From To Pipeline in alignment No alignment Mtr. in Mtr. in Mtr. GDG-01 MBR 700 0.9 0.063 1

GDG-02 MBR 800 0.6 0.048 2

Soratur Mahalingapur 1000 0.3 0.030 3

GDG-04 MBR Advisomapur 500 0.3 0.015 4

GDG-04MBR Nagavitanda 500 0.6 0.030 5

Nabapur Jn Kabalayatkatti 500 0.3 0.015 6

Doni tanda Doni 500 0.4 0.020 7

Doni 200 0.4 0.008 8

Doni tanda Attikatti 1300 0.6 0.078 9

Doni tanda Singatarayanakeri 2300 0.65 0.150 10

Dindur Attikatti 300 0.7 0.021 11

Chikawadatti Doni tanda 9900 0.8 0.792 12

jalawadagi Mudwad 900 1.2 0.108 13

Jalawadagi Kalakeri 1250 0.5 0.063 14

Jalawadagi Kalakeri 550 0.5 0.028 15

Bagewadi Jalawadagi 1050 1.2 0.126 16

Bagewadi Mallikarjunapura 500 0.3 0.015 17

Area of Length of Width of SI Pipeline From To Pipeline in alignment No alignment Mtr. in Mtr. in Mtr. Bagewadi Chikkawadatti 0.07 18

Mallikarjunapur JN Banikoppa 500 0.5 0.025 19

MDG-02 MBR Kelur 3400 0.8 0.272 20

Parasapur Channapatana 1300 0.3 0.039 21

Varavi Jallageri 900 0.4 0.036 22

Varavi Majjur 1000 0.3 0.030 23

Kadakol Kusalapur 1300 0.3 0.039 24

Kudralli Kudralli tanda 135 0.3 0.004 25

Akkigund settikeri 500 0.3 0.015 26

Suranagi 580 0.3 0.017 27

Koganur Tangod 380 0.3 0.011 28

Ranatur 1280 0.4 0.051 29

Narayanpur 50 0.3 0.002 30

Narayanpur hosur 360 0.3 0.011 31

Bannikoppa Tarikoppa 72.3 0.3 0.002 32

Kerahalli Sevanagar 720 0.3 0.022 33

GDG - 02 135 0.9 0.012 34

GDG - 01 510 0.9 0.046 35 Area of Length of Width of SI Pipeline From To Pipeline in alignment No alignment Mtr. in Mtr. in Mtr. GDG - 04 60 0.6 0.004 36

SHT-05 450 0.6 0.027 37

IBPS-02 30 0.8 0.002 38

LS-02, MDG-02 & MDG- 300 0.9 0.027 39 03

MDG-01, LS-04 313 0.9 0.028 40

TOTAL 2.410

The Executive engineer RWS&SD GADAG

AREA STATEMENT OF STRUCTURES IN FOREST LAND Area of the Area of the SI Land for Land for Structure Name Village names No structure structure in Sqm. In Ha. 1 IBPS 02 Chikawadatti 2000 0.200

2 LS 02 1000 0.100

3 LS 04 Singatarayanakeri 1000 0.100

4 GDG 01 Binkadakatti 1250 0.125

5 GDG 02 Papanashi 1250 0.125

6 GDG 04 Near Jalashankar temple 750 0.075

7 MDG 01 Singatarayanakeri 1000 0.100

8 MDG 02 Harogeri 1000 0.100

9 MDG 03 Harogeri 1000 0.100

10 SHT 04 Alagilawada 750 0.075

11 SHT 05 Srimanthgadag,Devihal 750 0.075

TOTAL 10970 1.097

The Executive Engineer RDW&SD GADAG

AREA STATEMENT OF NEW ROAD FORMATION

Length of Width of Area of Structure Village names road road Road Name in Mtr. In Mtr. In Mtr. Chikawadatti pump house MBR 30 3.5 0.011

Harogeri MBR 300 3.5 0.105

Singatarayanakeri MBR 200 3.5 0.070

Binkadakatti MBR 510 3.5 0.178

Papanashi MBR 48 3.5 0.017

Near Jalashankar temple MBR 35 3.5 0.012

TOTAL 1123 0.393