What Type of Building Is It?

Total Page:16

File Type:pdf, Size:1020Kb

What Type of Building Is It? FACT SHEET WHAT TYPE OF BUILDING IS IT? Class 1a - a single dwelling and townhouses Scope of work Classification Storey Floor area Volume Type of construction BUILDER—LOW RISE 1a 1 N/A N/A C (1) Building work on a class 1 or class 10 building. 1a 2 N/A N/A C (2) Building work on classes 2 to 9 buildings with a gross floor area not more than 1a 3 N/A N/A C 2,000m2, but not including Type A or Type B construction. Class 1b - a boarding house, guest house, hostel or the like<300m2 (3) Building work that consists of non-structural work on a Classification Storey Floor area Volume Type of construction building, regardless of— 1b 1 N/A N/A C (a) the class for the building; or 1b 2 N/A N/A RTC (b) the gross floor area of the building. 1b 3 N/A N/A RTC (4) Prepare plans and specifications that are— Class 2: a building containing 2 or more sole-occupancy units each being a (a) for the licensee’s personal use; or separate dwelling (b) for use in building work to be performed by the licensee personally. Classification Storey Floor area Volume Type of construction (5) However, the scope of work does not include— 2 1 N/A N/A C (a) a completed building inspection for an interested party for the building; or 2 2 N/A N/A B (b) personally carrying out any building work for which— 2 3 & greater N/A N/A A (i) a fire protection licence is required; or Class 3: a residential building, other than a building of Class 1 or 2 (ii) an occupational licence is required unless the licensee holds the occupational Classification Storey Floor area Volume Type of construction licence; or 3 1 N/A N/A C (c) for building work mentioned in subsection (3)—directly or indirectly causing the 3 2 N/A N/A B work to be carried out or providing building work services for the work if— 3 3 & greater N/A N/A A (i) a fire protection licence is required for the work; and Class 4: a dwelling in a building that is Class 5, 6, 7, 8 or 9 (ii) the work is— Classification Storey Floor area Volume Type of construction (A) for Type A or Type B construction on classes 4 Single N/A N/A As per type of building within 2 to 9 buildings; or (B) on classes 2 to 9 buildings with a gross floor area more than 2,000m2. Class 5: an office building used for professional or commercial purposes Classification Storey Floor area Volume Type of construction 5 1 3,000M2 Max 18,000M3 Max C BUILDER—MEDIUM RISE Scope of work 2 3 5 2 3,000M Max 18,000M Max C (1) Building work on a class 1 or class 10 building. 5 3 5,500M2 Max 33,000M3 Max B 2 3 (2) Building work to a maximum of 3 storeys, but not including Type A 5 4 & greater 8,000M Max 48,000M Max A construction on classes 4 to 9 buildings. Class 6: a shop or other building for the sale of goods by retail or supply of (3) Building work that consists of non-structural work on a services direct to the public building, regardless of— Classification Storey Floor area Volume Type of construction (a) the class for the building; or 6 1 2,000M2 Max 12,000M3 Max C (b) the gross floor area of the building. 6 2 2,000M2 Max 12,000M3 Max C (4) Prepare plans and specifications that are— 6 3 3,500M2 Max 21,000M3 Max B (a) for the licensee’s personal use; or 6 4 & greater 5,000M2 Max 30,000M3 Max A (b) for use in building work to be performed by the licensee personally. Class 7a - a carpark (5) However, the scope of work does not include— Classification Storey Floor area Volume Type of construction (a) a completed building inspection for an interested party 7a 1 2,000M2 Max 12,000M3 Max C for the building; or 7a 2 2,000M2 Max 12,000M3 Max C (b) personally carrying out any building work for which— 7a 3 3,500M2 Max 21,000M3 Max B (i) a fire protection licence is required; or 7a 4 & greater 5,000M2 Max 30,000M3 Max A (ii) an occupational licence is required unless the licensee holds the occupational Class 7b — for storage, or display of goods or produce for sale by wholesale licence; or Classification Storey Floor area Volume Type of construction (c) for building work mentioned in subsection (3)—directly or indirectly causing the 7b 1 2,000M2 Max 12,000M3 Max C work to be carried out or providing building work services for the work if— 7b 2 2,000M2 Max 12,000M3 Max C (i) a fire protection licence is required for the work; and 7b 3 3,500M2 Max 21,000M3 Max B (ii) the work is— 7b 4 & greater 5,000M2 Max 30,000M3 Max A (A) for Type A construction on classes 4 to 9 buildings; or Class 8: a laboratory, or a building in which a handicraft or process for the production (B) to more than 3 storeys. Classification Storey Floor area Volume Type of construction 8 1 2,000M2 Max 12,000M3 Max C 8 2 2,000M2 Max 12,000M3 Max C BUILDER—OPEN Scope of work 2 3 8 3 3,500M Max 21,000M Max B (1) For the licence class mentioned in section 1(1)— 8 4 & greater 5,000M2 Max 30,000M3 Max A (a) building work on all classes of buildings; and Class 9a — a health-care building (b) prepare plans and specifications that are— Classification Storey Floor area Volume Type of construction (i) for the licensee’s personal use; or 9a 1 2,000M2 Max 12,000M3 Max C (ii) for use in building work to be performed by the licensee personally. 9a 2 3,500M2 Max 21,000M3 Max B (2) However, the scope of work does not include— 9a 3 5,000M2 Max 30,000M3 Max A (a) a completed building inspection for an interested party for the building; or 2 3 9a 4 & greater 5,000M Max 30,000M Max A (b) personally carrying out any building work for which— Class 9b — an assembly building, including a trade workshop, laboratory (i) a fire protection licence is required; or Classification Storey Floor area Volume Type of construction (ii) an occupational licence is required unless the licensee holds the occupational 9b 1 3,000M2 Max 18,000M3 Max C licence. 9b 2 5,500M2 Max 33,000M3 Max B (3) For the licence class mentioned in section 1(2)— 9b 3 & greater 8,000M2 Max 48,000M3 Max A (a) provide any of the following services for a consumer or a principal, for all classes Class 9c — an aged care building of building work— Classification Storey Floor area Volume Type of construction (i) administration services; 9c 1 3,000M2 Max 18,000M3 Max C (ii) advisory services; 9c 2 5,500M2 Max 33,000M3 Max B (iii) management services, other than coordinating the scheduling of building 9c 3 & greater 8,000M2 Max 48,000M3 Max A work by building contractors including as agent for another person; and (b) perform the following functions of a superintendent under a building contract, if Class 10a — a non-habitable building being a private garage, carport, shed appointed as a superintendent under the contract— Classification Storey Floor area Volume Type of construction (i) administer the contract for a principal for the contract; 10a 1 N/A N/A C (ii) certify timing, quality and cost matters under the contract. Class 10b — a structure being a fence, mast, antenna, retaining or free-standing wall (4) However, the scope of work does not include performing building work services Classification Storey Floor area Volume Type of construction under a construction management contract. 10b N/A N/A N/A N/A (5) In this section— Class 10c — a private bushfire shelter certify, for the definition superintendent, means to give advice or a report, Classification Storey Floor area Volume Type of construction including a certificate. 10c N/A N/A N/A N/A superintendent, under a building contract, means a person who is not a party to the contract and is appointed under the contract to perform the following— NOTE: This chart is for general application, for specific instances a (a) administer the contract for a principal for the contract; Certifier should be consulted. Refer to Certifier - RTC (b) certify timing, quality and cost matters under the contract. NCC 2019 Building Code of Australia - Volume One FACT SHEET WHAT TYPE OF BUILDING IS IT? continued NCC 2019 Building Code of Australia - Volume One, Part A6 Building Classification Boarding Houses, Hostels & 2 Oces Boarding Houses <300m Residential parts of; and <12 people in residence - Motels 5 Flat in 1b Townhouses - Schools Class 5,6,7,8,9 Units - Residential (only 1) Care Building Houses 4 - Jails 1a Villas Shops 6 Cafe, Restaurant Class Class Class 1 Class 3 4 5 6 2 10b Non-habitable Public Buildings Building or Structure Fences, Retaining or 9a Health Care Freestanding Walls, eg Hospitals Swimming Pools 9b Assembly eg Schools Sheds 7a Carparks 10a 10c Aged Care Factories and 9c Private Private 7b Warehouses eg Nursing Homes Laboratory Garages bushfire shelter Class Class Class Class 7 8 9 10 Atrium means a space within a building that connects 2 or more storeys, and — Storey means a space within a building which is situated between one floor level (a) is enclosed at the top by a floor or roof (including a glazed roof structure); and the floor level next above, or if there is no floor above, the ceiling or roof and above, but not — (a) a space that contains only — (b) includes any adjacent part of the building not separated by an appropriate (i) a lift shaft, stairway or meter room; or barrier to fire; but (ii) a bathroom, shower room, laundry, water closet or other sanitary (c) does not include a stairwell, rampwell or the space within a shaft; and compartment; or (iii) accommodation intended for not more than 3 vehicles; or (d) for the purpose of (a) a space is considered enclosed if the area of the (iv) a combination of the above.
Recommended publications
  • The Construction of a High-Rise Development Using Volumetric Modular Methodology
    ctbuh.org/papers Title: The Construction of a High-Rise Development Using Volumetric Modular Methodology Author: Phillip Gardiner, Managing Director, Irwinconsult Subjects: Architectural/Design Building Case Study Construction Economics/Financial Keywords: Design Process Economics Modular Construction Sustainability Publication Date: 2015 Original Publication: The Future of Tall: A Selection of Written Works on Current Skyscraper Innovations Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Phillip Gardiner The Construction of a High-Rise Development Using Volumetric Modular Methodology Phillip Gardiner, Managing Director, Irwinconsult The SOHO Tower is a 29-level modular building the cost and shortage of a skilled construction Another driver was the foundation in Darwin, in the far north of Australia, a workforce led to a decision to investigate a conditions. Darwin is underlain cyclonic region. The building was designed to volumetric modular alternative, with modules predominantly by a crust of soft Porcellanite incorporate a basement and eight floors built delivered complete with all finishes, joinery rock overlying softer Cretaceous sedimentary with conventional reinforced concrete followed and fittings. It was essential however that deposits of Phyllite to a very significant by 21 levels of volumetric modular apartments. the building layout and appearance not be depth. Buildings have been typically founded The modules were constructed and fully finished changed in any substantial way. This was a on pads or rafts founded in the soft rocks in Ningbo, China and shipped to Darwin. Unlike significant challenge. at bearing pressures that would not cause most modular systems, a concrete floor was unacceptable levels of settlement.
    [Show full text]
  • Evaluating Skyscraper Design and Construction Technologies on an International Basis
    EVALUATING SKYSCRAPER DESIGN AND CONSTRUCTION TECHNOLOGIES ON AN INTERNATIONAL BASIS by Saad Allah Fathy Abo Moslim B.Sc., Mansoura University, Egypt, 1984 M.Eng., The University of British Columbia, Canada, 2000 A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE AND POSTDOCTORAL STUDIES (Civil Engineering) THE UNIVERSITY OF BRITISH COLUMBIA (Vancouver) November 2017 © Saad Allah Fathy Abo Moslim, 2017 Abstract Design and construction functions of skyscrapers tend to draw from the best practices and technologies available worldwide in order to meet their development, design, construction, and performance challenges. Given the availability of many alternative solutions for different facets of a building’s design and construction systems, the need exists for an evaluation framework that is comprehensive in scope, transparent as to the basis for decisions made, reliable in result, and practical in application. Findings from the literature reviewed combined with a deep understanding of the evaluation process of skyscraper systems were used to identify the components and their properties of such a framework, with emphasis on selection of categories, perspectives, criteria, and sub-criteria, completeness of these categories and perspectives, and clarity in the language, expression and level of detail used. The developed framework divided the evaluation process for candidate solutions into the application of three integrated filters. The first filter screens alternative solutions using two-comprehensive checklists of stakeholder acceptance and local feasibility criteria/sub-criteria on a pass-fail basis to eliminate the solutions that do not fit with local cultural norms, delivery capabilities, etc. The second filter treats criteria related to design, quality, production, logistics, installation, and in-use perspectives for assessing the technical performance of the first filter survivors in order to rank them.
    [Show full text]
  • WGP 107 (18) Offshore Oil and Gas Platforms
    Corporate Solutions WGP 107 (18) Offshore Oil and Gas platforms Eric Brault - Energy Practice Leader PROTECT PREVENT SERVE RESOLVE PARTNER OFFSHORE OIL& GAS PLATFORMS IMIA WGP 107 (18) Part icipant s: Eric Brault – AXA Coporate Solutions - Chairman Ma r t in Ka u t h - Partner Re Mark Mackay - AXA Corporate Solutions Al a i n Padet - AXA Corporate Solutions Mik e McMahon - Charles Taylor Consultant Mohamed F. El-Ai l a h - Qatar General Ins Javier Rodriguez Gomez - Reinsurance Consultancy Mexico Roman Emelyanov - SOGAZ Insurance Group Thomas Friedrich – Munich Re Eve Ong - Helvetia Stephan Lämmle – Munich Re – Sponsor 2 PROTECT PREVENT SERVE RESOLVE PARTNER Technical description of Offshore Plat forms Construction process and components Information needed and Underwriting Consideration Pure Insurance Aspect s MPL Considerat ions and Accumulation driving system Ex am p l e of Loss Recommendat ions Conclusion 3 Executive summary The development of an oil field is a broad complex subject, which needs strong analysis. The Presentation is a overhaul view of the risks assessment, concerning the construction of the offshore platforms. We do not focused on specific subjects such as: Covers of the drilling of wells , risk inherent to the research for new oilfield, operation of the platforms, processes for NG and oil, pressurizing, storage, market absorption and dismantling ... We pay attention on the risks to anticipate and balance the construction phase, weather and sea condition impact, importance of the design, the safety systems, details on the MPL scenarios during the construction, putting in place of the platform and starting of operation phase. The MWS role and his importance is also described.
    [Show full text]
  • Report on Texas Boarding Houses H.B. 1168
    Report on Texas Boarding Houses H.B. 1168 Submitted to the Governor and the Texas Legislature January 2009 Members of the 81st Texas Legislature, In compliance with House Bill (HB) 1168, 80th Legislature, Regular Session, 2007, the Texas Health and Human Services Commission (HHSC) contracted with Health Management Associates to prepare this report outlining methods for regulating boarding houses, including recommendations on clarifying the authority of and granting additional authority to counties and municipalities to establish health and safety standards for boarding houses. The report highlights issues for legislative consideration surrounding boarding houses in the state, primarily concerns surrounding the care and treatment of the aged, disabled and mentally ill. As indicated in the report, very few housing options are available for these individuals given their low income level. Boarding houses have developed as an alternative option to the lack of appropriate and affordable housing for these individuals. Despite filling that void, there is a considerable amount of concern for boarding house residents, particularly unsafe environments and access to personal care services. HMA has included fourteen recommendations in the report, grouped in three categories: strengthening housing options, strengthening enforcement and monitoring, and better education regarding boarding houses. One of the recommendations includes increasing the availability of Community-based Alternatives (CBA) waiver slots to allow for more Medicaid-funded assisted living options for these individuals. If more CBA slots were available, individuals would not need to rely on boarding houses and would be able to receive personal care services that they are currently unable to receive in boarding houses. In the report, HMA recommends that the Legislature create a new funding item that would provide housing stipends to mental health consumers.
    [Show full text]
  • Documenting the Dissin's Guest House: Esther Bubley's Exploration of Jewish-American Identity, 1942-43
    Brigham Young University BYU ScholarsArchive Theses and Dissertations 2013-06-03 Documenting the Dissin's Guest House: Esther Bubley's Exploration of Jewish-American Identity, 1942-43 Vriean Diether Taggart Brigham Young University - Provo Follow this and additional works at: https://scholarsarchive.byu.edu/etd Part of the Art Practice Commons BYU ScholarsArchive Citation Taggart, Vriean Diether, "Documenting the Dissin's Guest House: Esther Bubley's Exploration of Jewish- American Identity, 1942-43" (2013). Theses and Dissertations. 3599. https://scholarsarchive.byu.edu/etd/3599 This Thesis is brought to you for free and open access by BYU ScholarsArchive. It has been accepted for inclusion in Theses and Dissertations by an authorized administrator of BYU ScholarsArchive. For more information, please contact [email protected], [email protected]. Documenting the Dissin’s Guest House: Esther Bubley’s Exploration of Jewish- American Identity, 1942-43 Vriean 'Breezy' Diether Taggart A thesis submitted to the faculty of Brigham Young University in partial fulfillment of the requirements for the degree of Master of Arts James Russel Swensen, Chair Marian E. Wardle Heather Jensen Department of Visual Arts Brigham Young University May 2013 Copyright © 2013 Vriean 'Breezy' Diether Taggart All rights reserved ABSTRACT Documenting the Dissin’s Guest House: Esther Bubley’s Exploration of Jewish- American Identity, 1942-43 Vriean 'Breezy' Diether Taggart Department of Visual Arts Master of Arts This thesis considers Esther Bubley’s photographic documentation of a boarding house for Jewish workingmen and women during World War II. An examination of Bubley’s photographs reveals the complexities surrounding Jewish-American identity, which included aspects of social inclusion and exclusion, a rejection of past traditions and acceptance of contemporary transitions.
    [Show full text]
  • APPENDIX 6 Page 1 BED and BREAKFAST ESTABLISHMENTS PROVISIONS of SELECTED MUNICIPALITIES
    APPENDIX 6 Page 1 BED AND BREAKFAST ESTABLISHMENTS PROVISIONS OF SELECTED MUNICIPALITIES Municipality Official Plan Policy Zoning Provisions/Guidelines/ Definitions Licensing By-law City of Barrie Information not provided. Bed and Breakfast Establishments are permitted in Residential zones in A bed and breakfast establishment shall mean a detached detached dwellings, be owner occupied, and are restricted to a maximum residence which is owner occupied and operated to provide the of three (3) guest rooms. travelling public with sleeping accommodation and meals. Parking for Bed and Breakfast Establishment in Residential zones - 1 space per guest bedroom to be provided in the side or rear yard. Tandem parking will be permitted. Bed and Breakfast Establishments are also permitted in Commercial zones. Parking for hotels and motels, bed and breakfast establishments in Commercial zones - 1 space for each guest room or suite plus 1 space to be accommodated according to maximum capacity in any tavern, restaurant, or assembly hall appurtenant thereto. No licensing By-law regulating Bed and Breakfast Establishments. City of Official Plan permits Bed and Breakfast Bed and Breakfast Home permitted in most zones subject to certain Bed and Breakfast Home means an owner-occupied detached Burlington uses in the Rural Settlement Area and conditions: dwelling offering short term lodging for compensation to the in Agricultural Area designations and • permitted in a detached dwelling only. travelling and vacationing public. Guest rooms or suites may defines the Bed and Breakfast Home. • minimum lot width: 18 m (59 ft.). include a private bath but shall not include cooking facilities. In urban areas, Bed and Breakfast uses • a maximum of three guest rooms or suites; no exterior alteration Breakfast and other meals, services, facilities or amenities may be are permitted as Home Occupations.
    [Show full text]
  • No Longer Just a Hole in the Ground the Adaptive Re-Use of Derelict Quarries
    1 NO LONGER JUST A HOLE IN THE GROUND The Adaptive Re-Use of Resource Depleted Quarries Catherine McCandless Urban Nature and City Design Professor Anne Whiston Spirn MIT 4.213J/11.308J Fall 2013 2 Table of Contents ABSTRACT 3 Introduction 4 Quarrying Activity 5 Cases 6 1. Brownstone Park 7 2. Quarry Falls 9 3. Bellwood Quarry 11 4. Butchart Gardens 13 5. Groundscraper Hotel 15 Conclusion from Cases 17 Looking Forward 18 REFERENCES 19 3 Abstract A quarry is an area from which rocks such as marble, limestone, and granite are extracted for industrial use. Once depleted of their desired resources, quarries are frequently abandoned. The resulting gaping holes can fill with water and form dangerous quarry lakes while others are turned into unsightly landfills. When quarries are in close proximity to urban environments, inhabitants are subjected to pollution and noise, and the undeniable eyesore of an abandoned quarry remains long after excavation is completed. Sustainable redevelopment has become a shining solution for these abandoned, resource-depleted quarries. Dozens of cities in America and abroad have undertaken adaptive re-use projects to transform quarries into a variety of public and private spaces. The potential new uses for these expanses of land include sites for research and education, aquaculture, recreational activities, storage, industry and housing. The goal of my research is to encourage the rehabilitation of land disturbed by quarrying by making the areas suitable for new sustainable land uses. I will examine cases that successfully transformed resource-depleted quarries into commercial and residential communities, and will discuss how further to improve future redevelopment of quarries with greater consideration to environmental impact and biodiversity.
    [Show full text]
  • Lodging Houses, Hotels, and Motels) As Defined, and Accessory Structures Thereto, Located in Any Part of the State
    DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Division of Environmental Health and Sustainability SANITARY STANDARDS AND REGULATIONS FOR PUBLIC ACCOMMODATIONS 6 CCR 1010-14 [Editor’s Notes follow the text of the rules at the end of this CCR Document.] ______________________________________________________________________ 1.0 ADMINISTRATION 1.1 AUTHORITY Chapter 25-1-107(m), Colorado Revised Statutes 1973. 1.2 ADOPTED; February 17, 1971 1.3 EFFECTIVE DATE: April 15, 1971 1.4 PURPOSE The purpose of these “Sanitary Standards and Regulations” is to provide minimum requirements for the protection of the health and safety of the occupants of public accommodations and residents of the general communities. 1.5 APPLICATION The provisions of these “Sanitary Standards and Regulations” are applicable to the maintenance, sanitation, ventilation, occupancy, and use of public accommodations, (rooming houses, boarding houses, lodging houses, hotels, and motels) as defined, and accessory structures thereto, located in any part of the state. 1.6 SCOPE Occupancies and uses of existing buildings used for transient or public housing facilities may be continued provided that such buildings were constructed in compliance with; applicable state or local building codes in effect at the time the buildings were constructed, other state or local housing codes, laws, and ordinances and further, that such continued use is not hazardous to the health or safety of the occupants, and is in compliance with the following standards for maintenance and operation. These requirements shall not be construed to pre-empt or limit the authority of any town, city, or county, to concurrently regulate the housing types defined under Public Accommodations, provided, that such local ordinances or regulations are not less stringent than these regulations.
    [Show full text]
  • NMB Bank Headquarters the Impressive Performance of a Green Building W ILLIAM B ROWNING
    Reprinted with pemission from the Urban Land Institute the Urban Land Institute www.uli.org In project design and construction, “green” means putting environmen- June June 1992 tal concerns first. Doing so ENVIRONMENT can mean big pay offs, as this Amsterdam office building proves. NMB Bank Headquarters The Impressive Performance of A Green Building W ILLIAM B ROWNING hen Nederlandsche Middenstandsbank (NMB), then the number four bank in the Netherlands, felt the need, in 1978, for a W new image and a new headquarters, its board of directors set out some unusual criteria. The board asked for an organic building that would integrate art, natural materials, sunlight, green plants, energy conservation, low noise levels, and water, reports Tie Liebe, head of Maatschappij voor Bedrijfsobjecten (MBO), NMB’s real estate develop- ment subsidiary. Per vote of the bank’s employees, the new headquarters would be built in a growing area south of Amsterdam. An integrated team instructed to work across disciplines–an architect, a construction engineer, a landscape architect, an energy expert, and artists– worked for three years designing the building. Construction began in 1983 and was completed in 1987. The NMB building is no monolithic tower. To the contrary, its 538,000 square feet (50,000 square meters) of office space housing 2,400 employees is broken up into a series of 10 slanting towers arranged in an irregular S-curve with gardens and courtyards interspersed. Portions of the complex are supported by a 301,280-square-foot structure (28,000 square meters) containing parking and service areas. Restaurants and meeting rooms line the internal “street” that connects the towers on the mezzanine level.
    [Show full text]
  • Chapter 14.01 Purpose and Definitions
    EXHIBIT B: ORDINANCE NO. 2144, AMENDING CITY OF NEWPORT SHORT-TERM RENTAL REGULATIONS (New or amended definitions are in red. Language in underline or strikethrough has been added since the 4/15/19 City Council meeting. Explanatory notes, in italics, are provided for context and will not be included in the adopted code.) CHAPTER 14.01 PURPOSE AND DEFINITIONS 14.01.010 Purpose The several purposes of this ordinance are: To implement the Comprehensive Plan; to encourage the most appropriate use of the land; to conserve and stabilize the value of property; to aid in the rendering of fire and police protection; to provide adequate open spaces for light and air; to lessen the congestion on streets; to allow for orderly growth in the city; to prevent undue concentration of population; to facilitate adequate provisions for community utilities and facilities such as water, sewerage, electrical distribution systems, transportation, schools, parks, and other public requirements; and, in general, to promote public health, safety, convenience, and general welfare. The standards and conditions contained herein have been reviewed and deemed consistent with Comprehensive Plan policies. 14.01.020 Definitions As used in this ordinance, the masculine includes the feminine and neuter, and the singular includes the plural. The following words and phrases, unless the context otherwise requires, shall mean: Accessory Dwelling Unit. An interior, attached, or detached residential structure that is used in connection with or that is accessory to a single-family dwelling. Accessory Structure or Use. A structure or use incidental and subordinate to the primary use of the property and which is located on the same lot or parcel as the primary use or is on a contiguous lot or parcel under the same ownership.
    [Show full text]
  • Teacher Background
    Teacher Background Inquiry Description In many parts of the world today, notably in Asia, societies are rapidly transforming. A major part of this transformation is urbanization, the flocking of people from the countryside to cities. A sign of this transformation is the construction of tall buildings. Since the Lincoln Cathedral surpassed the Pyramids of Egypt in 1300 CE, all of the tallest buildings in the world were in Europe and North America. Then, in 1998, the Petronas Towers opened in Kuala Lumpur, Malaysia. Today the five tallest buildings are in Asia (One World Trade Center in New York City is #6) These areas are being transformed because of their integration into the world economic system that itself was the result of the Industrial Revolution in the 19th century in Western societies and the subsequent growth and expansion of those western societies. Interestingly, tall buildings, known as skyscrapers, were a sign of urbanization and industrial growth in Europe and North America at that time. This unit explores the connections between industrialization, urbanization, and skyscrapers, and how it was that skyscrapers were able to be built when and how they were. Key areas of attention will be building materials and related technologies that allowed for taller structures. Teachers are encouraged to use the following notes as they prepare for this unit, and additional secondary resources are listed at the end of this document. Historical Background Agriculture and Monumental Architecture In the long arc of human history, there are two interesting phenomena that might seem separate, but in hindsight are closely related. On the one hand, people have continually intensified their food production, leading to the ability to sustain larger populations on the same amount of land with fewer direct food producers.
    [Show full text]
  • Town of Provincetown Zoning By-Laws
    TOWN OF PROVINCETOWN ZONING BY-LAWS Provincetown Planning Board September 1, 1978 Last Updated: August 18, 2021 Town of Provincetown, Massachusetts – Zoning By-laws Page 2 Amendments Adoption Revisions APPROVED BY TOWN APPROVED BY THE APPROVED BY TOWN APPROVED BY THE MEETING ATTORNEY GENERAL MEETING ATTORNEY GENERAL November 13, 1978 April 6, 1979 April 6, 2009 ATM July 14, 2009 March 10, 1980 November 8, 2010 STM February 22, 2011 March 9, 1981 December 16, 1981 April 4, 2011 June 20, 2011 March 8, 1982 July 12 and 13, 1982 October 24, 2011 STM November 3, 2011 October 27, 1982 January 11, 1983 April 2, 2012 ATM May 7, 2012 March 14, 1983 April 26, 1983 October 21, 2013 STM January 13, 2014 March 12, 1984 July 5, 1984 April 7, 2014 ATM May 15, 2014 March 11, 1985 June 11, 1985 April 6, 2015 ATM May 19, 2015 June 10, 1985 August 19, 1985 October 26, 2015 STM December 10, 2015 October 15, 1985 January 31, 1986 April 4, 2016 ATM July 11, 2016 March 10, 1986 April 11, 1986 April 3, 2017 ATM July 6, 2017 October 27, 1986 November 25, 1986 September 13, 2017 STM January 11, 2018 March 9, 1987 April 17, 1987 April 2, 2018 ATM July 18, and Oct 12, 2018 March 14, 1988 May 19, 1988 October 29, 2018 STM February 22, 2019 March 13, 1989 June 5, 1989 April 1, 2019 ATM May 6, 2019 March 12, 1990 May 7 and June 8, 1990 May 1, 2021 ATM August 18, 2021 April 1, 1991 June 12, 1991 April 6, 1992 July 2, 1992 November 5, 1992 January 11, 1993 April 7, 1993 July 13, 1993 October 27, 1993 January 7, 1994 April 1, 1996 May 6, 1996 October 28, 1996 November
    [Show full text]