MaineDOT Updated Construction Advertisement Schedule This report was lasted refreshed on September 27, 2021.

Dates and cost estimates are subject to change as projects become more fully developed. This report will be updated each Monday. Questions about specific projects should be directed to the Program Manager listed below.

Click here to view the current Construction Advertisement Plan (CAP)

Bridge Construction

Planned Location/Title Project Total Project Estimate Advertise Date ID

U.S. ROUTE 1 SAFETY IMPROVEMENTS TO MITIGATE SEA LEVEL RISE IN WOOLWICH 09/08/2021 Scope: New Construction 023929.01 $6,000,000 Description: Pleasant Cove Bridge (#6667) to replace three large culverts (#1005163, #270177, #959668) located at George Wright Road. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 WOOLWICH, STA 46 BRIDGE #3039

09/08/2021 Scope: Bridge Replacement 023929.00 $26,520,000 Description: Station 46 Bridge (#3039) over Back River Creek. Located 1.20 miles east of the Bath town line. FHWA BUILD Grant recipient. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 I-295 BRIDGES #1509 AND #5833

09/22/2021 Scope: Bridge Replacement 023106.01 $22,871,000 Description: I-295 SB/Route 1 Bridge (#1509) over Route 1 in Yarmouth. I-295 NB/Route 1 Bridge (#5833) over Route 1 in Yarmouth. CHBP Grant recipient. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 I-295 BRIDGES #5720 AND #5721

09/22/2021 Scope: Bridge Replacement 021726.01 $19,237,000 Description: Merrill Road Bridge (#5720) in Freeport. Approach Road Interchange Bridge (#5721) in Freeport. Work includes new/updated signals for interstate interchanges and the intersection of Desert Road and Route 1. CHBP Grant recipient. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 BLUE HILL, FALLS BRIDGE #5038

10/13/2021 Scope: Bridge Replacement 017712.00 $10,850,000 Description: Blue Hill Falls Bridge (#5038) over the tidal basin. Located 0.66 of a mile south of Route 172. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490

Page 1 of 8 Planned Location/Title Project Total Project Estimate Advertise Date ID

JACKSON, GREAT FARM BR #3128

10/20/2021 Scope: Bridge Replacement 023567.00 $1,333,000 Description: Great Farm Bridge (#3128) over Great Farm Brook. Located 0.12 of a mile south of Great Farm Road. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 BUCKFIELD, HALL BR #3287

11/10/2021 Scope: Bridge Replacement 021876.00 $4,300,000 Description: Hall Bridge (#3287) over Nezinscot River. Located 0.05 of a mile west of East Buckfield Road. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 T11-R4 RAIL BRIDGE 7801

11/10/2021 Scope: Bridge Replacement 023460.00 $930,000 Description: Presque Isle Rail Bridge 14.04 (#7801) over Small Brook. Located on the Presque Isle Sub rail line. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 LISBON, FRAZIER BRIDGE (#3954)

11/24/2021 Scope: Bridge Replacement 023118.00 $1,065,000 Description: Frazier Bridge (#3954) over Frazier Brook. Located 0.16 of a mile north of Summer Street. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 FORT KENT, PERLEY BRK BR #3468

12/01/2021 Scope: Bridge Replacement 021882.00 $3,681,000 Description: Perley Brook Bridge (#3468) over Perley Brook. Located 0.08 of a mile north of South Perley Brook Road. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 OLD TOWN, STILLWATER #1 BRIDGE

12/08/2021 Scope: Bridge Replacement 022512.01 $4,775,000 Description: Stillwater #1 Bridge (#1472) over the South Channel Stillwater River. Located 0.06 of a mile north of Free Street. FHWA INFRA Grant recipient. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490

Page 2 of 8 Planned Location/Title Project Total Project Estimate Advertise Date ID

OLD TOWN, STILLWATER #2 BRIDGE

12/08/2021 Scope: Bridge Replacement 022511.01 $8,250,000 Description: Stillwater #2 Bridge (#2806) over the North Channel Stillwater River. Located 0.13 of a mile north of Free Street. FHWA INFRA Grant recipient. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 WEST PARIS, PENLEY AVE BR#3460

12/08/2021 Scope: Bridge Deck Replacement 021758.00 $1,075,000 Description: Penley Avenue Bridge (#3460) over the Little . Located 0.20 of a mile west of Main Street Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 FALMOUTH, BUCKNAM RD BR #5830

12/27/2021 Scope: Bridge Replacement 021720.00 $7,555,000 Description: Bucknam Road/ I-295 Bridge (#5830) over . Located 0.30 of a mile northwest of Route 1. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490 WEST GARDINER, GOSLINE BRIDGE (#2321)

12/29/2021 Scope: Bridge Replacement 023090.00 $1,015,000 Description: Gosline Bridge (#2321) over Cold Stream. Located 0.07 of a mile east of Cold Creek Drive. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490

Page 3 of 8

Bridges Other

Planned Location/Title Project Total Project Estimate Advertise Date ID

PRESQUE ISLE RAIL BRIDGE 7805

11/10/2021 Scope: Bridge Rehabilitation 023454.00 $1,700,000 Description: Presque Isle Rail Bridge 24.91 (#7805) over Presque Isle Stream. Located on the Presque Isle Sub rail line. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 HOULTON SUB RAIL LINE RR BRIDGE #7750

11/10/2021 Scope: Bridge Rehabilitation 024345.00 $800,000 Description: Houlton Sub Rail Bridge (#7750) over Meduxnekeag River. Located at rail mile point 17.16. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 MAPLETON RAIL BRIDGE 7804

11/10/2021 Scope: Bridge Rehabilitation 023456.00 $610,000 Description: Presque Isle Rail Bridge 21.06 (#7804) over the North Branch Presque Isle Stream. Located on the Presque Isle Sub rail line. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 T11 R4 RAIL BRIDGE #7800

11/10/2021 Scope: Bridge Rehabilitation 023458.00 $1,350,000 Description: Presque Isle Rail Bridge 10.07 (#7800) over west inlet of Scopan Lake. Located on the Presque Isle Sub rail line. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 ROCKLAND RAIL BRIDGES

12/08/2021 Scope: Bridge Rehabilitation 024603.00 $1,315,000 Description: Rockland 36.24 Rail Bridge (#7647) over Sewalls Creek and Rockland 50.49 Rail Bridge over Sheepscot River (#7653). Located on the Rockland Branch rail line. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 FALMOUTH, JOHNSON RD BR #5792

12/26/2021 Scope: Bridge Rehabilitation 021721.00 $5,660,000 Description: Johnson Road/ I-295 Bridge (#5792) over Interstate 295. Located 0.25 of a mile west of Route 1. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490

Page 4 of 8

Highway Construction

Planned Location/Title Project Total Project Estimate Advertise Date ID

BREWER-EDDINGTON, I-395/9 CONN

09/15/2021 Scope: New Construction 018915.80 $2,300,000 Description: Beginning 0.47 of a mile west of the intersection of and Route 1A and extending north 6.05 miles roughly parallel to the Brewer-Holden town line to Route 9 approximately 0.90 of a mile west of Chemo Pond Road. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 BREWER-EDDINGTON, I-395/9 CONN

10/06/2021 Scope: New Construction 018915.00 $99,375,000 Description: Beginning 0.47 of a mile west of the intersection of Interstate 395 and Route 1A and extending north 6.05 miles roughly parallel to the Brewer-Holden town line to Route 9 approximately 0.90 of a mile west of Chemo Pond Road. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 LISBON, ROUTE 125

11/17/2021 Scope: Reconstruction 014862.00 $8,521,000 Description: Beginning at Route 196 and extending northeast 0.95 of a mile to Huston Street. ATRC Sponsored. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 OLD TOWN, STILLWATER AVE

12/08/2021 Scope: Intersection Reconstruction 022950.01 $7,030,000 Description: Beginning 0.01 of a mile north of the Orono town line and extending north 0.72 of a mile (includes all approaches). Excludes the bridge over the Penobscot River. FHWA INFRA Grant recipient. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 AUBURN, ROUTE 4

12/15/2021 Scope: Intersection Reconstruction 021766.00 $3,685,000 Description: Located at the intersection of Route 4, Fair Street, Martin Street, Public Boat Launch, and Turner Street. ATRC Sponsored. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480

Page 5 of 8

Highway Safety and Spot Improvements

Planned Location/Title Project Total Project Estimate Advertise Date ID

FORT FAIRFIELD, C421I

11/17/2021 Scope: Large Culvert Improvements 022859.00 $516,000 Description: Cross culvert (#97545) located 1.43 miles south of Dumond Road. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 SOUTH PORTLAND, ROUTE 77

11/17/2021 Scope: Install or Replace Traffic Signals 018665.00 $706,000 Description: Multifaceted approach to corridor improvements to address traffic, safety, and bicycle/pedestrian needs and deficiencies on/off Route 77. PACTS Sponsored. Administered by: MaineDOT Program Manager: Jeffrey Tweedie Phone: 624-3420 ST AGATHA C309I(XC-182487)

11/17/2021 Scope: Large Culvert Improvements 021830.00 $574,000 Description: Large culvert (#182487) located 0.48 of a mile west of the Madawaska town line. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 WESTBROOK, ROUTE 25

12/15/2021 Scope: Intersection Improvements w/ Signal 023797.00 $2,311,000 Description: Beginning at Mechanic Street and extending west 0.28 of a mile. PACTS Sponsored. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 [RAMP] LINCOLN, RTE 2

12/21/2021 Scope: Drainage Improvements 021847.00 $290,000 Description: Beginning at Goding Avenue and extending north 0.80 of a mile to Lee Road. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480 DOVER-FOXCROFT, ROUTE 15

12/22/2021 Scope: Large Culvert Replacement 022851.00 $552,000 Description: Large culvert (#967780) located 0.48 of a mile north of Norton Hill Road. Administered by: MaineDOT Program Manager: Brad Foley Phone: 624-3480

Page 6 of 8 Planned Location/Title Project Total Project Estimate Advertise Date ID

FALMOUTH,I295 NB RAMP/BUCKNAM

12/22/2021 Scope: Safety Improvements 022672.00 $767,000 Description: Installing signal with turn lanes at Interstate 295 northbound off-ramp. Administered by: MaineDOT Program Manager: Wayne Frankhauser Phone: 624-3490

Page 7 of 8

Multimodal

Planned Location/Title Project Total Project Estimate Advertise Date ID

BATH, SIDEWALKS

10/27/2021 Scope: New Construction 021665.00 $1,109,000 Description: Beginning at Crawford Drive and extending south 0.41 of a mile, including 0.02 of a mile for divided highway. Then beginning at Oak Grove Avenue and extending west 0.15 of a mile to Old Brunswick Road. Administered by: Other Agency Program Manager: Jeffrey Tweedie Phone: 624-3420 BROOKSVILLE, BETSY'S COVE SHIP

11/17/2021 Scope: Rehabilitation 025213.00 $615,000 Description: Located 0.14 of a mile east of Steamboat Wharf Road. Administered by: Other Agency Program Manager: Jeffrey Tweedie Phone: 624-3420 HARPSWELL, SAFE HARBOR GREAT ISLAND BIG 11/17/2021 Scope: New Construction 025215.00 $801,000 Description: Located off of Harpswell Island Road (Route 24). Administered by: Other Agency Program Manager: Jeffrey Tweedie Phone: 624-3420 PORTLAND, FORE POINTS MARINA BIG

11/24/2021 Scope: Rehabilitation 025217.00 $292,000 Description: Located at the end of Fore Street. Administered by: Other Agency Program Manager: Jeffrey Tweedie Phone: 624-3420 PHIPPSBURG, SHIP

12/01/2021 Scope: Rehabilitation 020848.00 $490,000 Description: Pier rehabilitation, located on Fort Popham Pier. Administered by: Other Agency Program Manager: Jeffrey Tweedie Phone: 624-3420

Page 8 of 8