LOGAN CORPORATE OFFICE VOL 19 ISSUE 1 | JULY 2019 PRST STD 875 North 1000 West U.S. POSTAGE Logan, UT 84321 PAID 435-752-6405 SLC, UT Cache Valley Electric PERMIT 6 OFFICE 875 North 1000 West NEWSLETTER 1338 South Gustin Road Logan, UT 84321 Return Service Salt Lake City, UT 84104 Requested 801-908-6666

ARKANSAS OFFICE 5590 E. State Hwy. 137 Blytheville, AR 72315 870-824-6670

OREGON OFFICE 12550 SW 68th Ave. Portland, OR 97223 503-431-6600

TEXAS OFFICE 2370 West Airfield Dr., Ste 200 Dallas, TX 75261 469-844-5730

HAWAII OFFICE 733 Bishop St., Ste 2170 Honolulu, HI 96813 808-354-0080

WWW.CVE.COM

NUCOR-JFE Steel Mexico (NJSM) Our People are SILAO, GUANAJUATO, MEXICO

Our Power 713,000 NJSM NUCOR STEEL & JFE STEEL (JAPAN) SQ FT GENERAL CONTRACTOR OWNER CVE EMPLOYEE RECOGNITION BANQUET CVE DIVISION LOGAN HEAVY INDUSTRIAL The Annual CVE Employee Recognition Banquet was held on June 1, 2019 at Grand America Hotel. PROJECT OVERVIEW SCOPE OF WORK This recognition program began in 2003 to honor employees In 2016, Nucor Corporation (NYSE: NUE) • Coldmill facility containing CGL who achieved 10+ years of service. Employees receive their first formed a 50-50 joint venture with JFE (continuous galvanizing line) and RCL award—a three-ruby CVE ring—after their 10-year anniversary, Steel Corporation of Japan to build and (recoiling line) then at each additional five-year milestone. 25-year Service Awards (pictured, L to R): operate a plant in central Mexico to • CGL’s finished product will be supply that country’s automotive market. This year, all 10+ year recipients received a custom, carbon-fiber Paul Harris (ECD) automotive-grade galvanized steel CVE hard hat. Shawn Wright (TEL-SLC) Today, CVE is advising and supervising all cold coils of steel from U.S. and Seth Hansen (SER) aspects of electrical construction. Scott Japan, galvanized onsite with CVE now has 213 current employees who have worked with Jim Phelps (ECD) Michi serves as the Site Superintendent, end customers being numerous car Cache Valley Electric for over 10 years. Congratulations to all. Steve Grant (ECD) while Dave Wolf and Rafael Villegas are manufacturers, located within a three- acting Foremen. or four-hour drive from the project. • Switching station for local power 35-year Service Award: company Mike Perkes (Logan) • Receiving substation 115 KV incoming CACHE VALLEY ELECTRIC NEWSLETTER | VOL 19 ISSUE 1 | JULY 2019 PROJECTS UDOT Tech Corridor UTAH , UTAH

UDOT GENERAL CONTRACTOR, OWNER

CVE DIVISION SIGNAL & UTILITY

PROJECT OVERVIEW Ranked as UDOT’s #1 priority project for 2018, the construction of Utah’s Tech Corridor began last year. This $430 million project to widen I-15 in Utah County will improve traffic CVE SCOPE OF WORK congestion between Lehi’s Main Street and S.R. 92 • 50 or more mast lights (measuring 80 to 120 (Timpanogos Highway). This area is one of the fastest feet high) throughout the corridor Aligned Energy growing areas in Utah and is also known as Silicon • 9 signals including 3 major interchange signals at Slopes for its increasing number of technology-based S.R. 92, Triumph Blvd. and 2100 North businesses. This project will widen the section of WEST JORDAN, UTAH • 3 VMS (variable message sign) structures freeway between Salt Lake City and Spanish Fork. • 15 ATMS (advanced traffic monitoring systems) 600,000 OKLAND CONSTRUCTION ALIGNED ENERGY sites that include CCTVs (closed circuit television) UDOT SCOPE OF WORK SQ FT GENERAL CONTRACTOR OWNER and traffic monitoring systems • Two additional travel lanes in each direction • 5 electronic toll lane control systems CVE DIVISIONS ELECTRICAL CONSTRUCTION (MISSION CRITICAL), SIGNAL & UTILITY, LINE, TELEDATA • New bridge over I-15 at Triumph Boulevard • 4 miles of 2D (8 ¼” communication conduit) and 4D • One-way frontage roads and redesigned (16 ¼” communication conduit) install interchanges between S.R. 92 and 2100 North PROJECT OVERVIEW “Aligned Energy is new to the Salt Lake market so it • 13 bridge structures with underdeck lighting • Reconstructed bridges at cross streets and railroad CVE is currently repurposing the old Fairchild has been very rewarding for our team to help them • 12,500 feet of utility betterment crossings Semiconductor Building for Aligned Energy. The complete this project,” says Jeff Williams, Project • Multiple temp signals, ATMS sites, and underdeck • New bike and pedestrian connections project officially kicked off on March 8, 2018. Through Manager. “Our field leadership and skilled labor really lighting during MOT (movement of traffic) work March 2019, over 200,000 man hours have been safely rose to the occasion every time a new obstacle came performed at the job site. At the peak of construction, about. Our ‘One Team One Dream’ concept between over 110 electricians were working seven days a week Aligned Energy, Okland Construction, Cache Valley to meet a very aggressive schedule. Electric, as well as the other subcontractors, is the Project Update - Equinix Singapore reason this project was a success.” Phase One was completed in August 2018. Phase Two On April 6th, CVE Technologies successfully migrated the IT was completed at the end of March 2019 with Phase infrastructure for the Equinix SG1 data center in Singapore. Part of Three slated to go online this August. the Equinix Singapore One-North Campus, SG1 is the most network- dense data center in the region and offers access to one of the three SCOPE OF WORK GRX peering points worldwide. It is also home to the Equinix Cloud • 55 acre property, 600,000 square ft building Exchange™ in Singapore helping SG1 to be ranked as the #1 most • 130 Megawatts connected data center worldwide by Cloudscene. • Power is supplied through an A+B redundant After several weeks of careful preparation CVE design and network distribution system backed by N+1 standby engineers diligently worked throughout the night to complete this power generation. sizable migration in under 24 hours. This was the first Equinix Gen • Transmission lines, substation new and rebuild, and 2.0 migration in Asia-PAC to complete within the expected migration distribution new build and maintenance window. Up next, the team will be focusing on the preparation for SG2, • All excavation for duct banks and light pole also in Singapore. foundations PG 2 PG 3 CACHE VALLEY ELECTRIC NEWSLETTER | VOL 19 ISSUE 1 | JULY 2019 PROJECTS

Traeger WiFIRE Grills SALT LAKE CITY, UT

TRAEGER GRILLS OWNER CVE DIVISION OBSERVIAN

PROJECT OVERVIEW Traeger is reinventing the grilling industry with Wi-Fi (WiFIRE) connected grills. This technology uploads data to AWS (Amazon Web Services) for big SCOPE OF WORK data analysis, then provides new grilling automation • Transform large amounts of streaming data being options to the customer. sent from the grills to the cloud in a Parquet (column-oriented data storage) format Mountain America Credit Union The new WiFIRE connected grills help customers get • Provide easy options to utilize information from step-by-step guidance through the entire cooking complex queries on formatted data cycle on an easy to use mobile application. The new SANDY, UTAH • Store big data output in the cloud (S3) while WiFIRE feature has added value and convenience to keeping costs to a minimum Traeger’s grill lineup. 327,000 OKLAND CONSTRUCTION MOUNTAIN AMERICA • Utilize AWS tools to provide traceable costs SQ FT GENERAL CONTRACTOR CREDIT UNION OWNER

CVE DIVISIONS TELEDATA & MULTIMEDIA (DAS) BIM IN ACTION PROJECT OVERVIEW SCOPE OF WORK Looking Ahead... The 11-story Mountain America Credit Union building • Complete Radio Frequency survey for both carrier adjoins the Mountain America Performing Arts and public safety systems THE FUTURE OF Center in Sandy, Utah. CVE installed a multi-carrier • Multi-Carrier DAS

fiber DAS (Distributed Antenna System) capable of SEE TO SCAN • Public Safety DAS ELECTRICAL CONSTRUCTION supporting Verizon, AT&T, T-Mobile, and Sprint. “We • Cat 6 cable used low-profile antennas to ensure the system was WHAT IS BIM? manufacturing site and transporting • Server Room aesthetically pleasing,” says Lou Turner, DAS Manager. Building Information Modeling (BIM) is a those sub-assemblies to the “Additionally, CVE installed a public safety system for • Cisco room kits for: 3-dimensional digital representation of construction job site. the entire building required by the local AHJ (Authority - 50 Conference Rooms physical and functional characteristics Having Jurisdiction) for emergency responder radios.” - 27 Huddle Spaces of a facility. WHAT ARE THE BENEFITS OF - 6 Training Rooms PREFAB? - 1 Multi-use Event Center WHAT ARE THE BENEFITS OF BIM? “From a BIM model, I can produce CONCEPT TO COMPLETION - 2 Fitness Rooms “It gives us the opportunity to plan manufacturing drawings and not just for the device itself, but for premanufacture assemblies before clearance zones to meet code and they go into the field, decreasing have maintenance access,” says Jarom the amount of labor in the field and Worthen, BIM/VDC Department improving efficiencies,” says James Manager. “Our BIM team can find Martin, Director of VDC/BIM and issues in the model and correct them Prefabrication. Follow. Tag. Share. Like. before they hit construction. That means a crew in the field can work HOW DO BIM AND PREFAB WORK continuously without delay.” TOGETHER? Connect with Utilizing both BIM and Prefab lowers all our CVE WHAT IS PREFAB? supervision, the number of tools Divisions on Prefab (prefabricated construction) is needed on site, overall management @cachevalleyelectric @cvetech @observianhq social media! the practice of assembling a variety time, paperwork, and cost. Meanwhile, @wearecve @cve-technologies-group-inc @observian of components of a structure at a it increases safety and efficiency. PG 5 CACHE VALLEY ELECTRIC NEWSLETTER | VOL 19 ISSUE 1 | JULY 2019 RECENTLY AWARDED PROJECTS

Recently Awarded Projects continued

HAWAII ELECTRICAL CONSTRUCTION Salt Lake City, UT Shafter – Video Surveillance Project Sandy, UT Kaua’i Medical Clinic Discover Financial – Replace Building Park City Municipal University of Utah South Campus – Waimea Huakai ATSs – Salt Lake City, UT Public Works – Security Upgrades Salt Lake City, UT Kauai Community College Various Dannon – Cooling Tunnel – Public Utility District No. 1 of Chelan Space Dynamics Lab Phase 2 – Improvements West Jordan, UT County Logan, UT Pacific Guardian Center – ATS Utah Sports Hall of Fame – Access Control Platform Midwest Commercial Interiors Replacement Salt Lake City, UT Replacement Showroom – Salt Lake City,UT Kapi’olani Medical Center – Dominion Energy – Engine Plant Project JSMB 8th Floor – Salt Lake City,UT Transformer Replacement Conversion - Salt Lake City, UT Rocky Mountain Power West Valley City Police Headquarters – Schofield Barracks Quad B Building 155 CIP14 – System Upgrades West Valley, UT Aqua Engineer – Transformer University of Colorado, Boulder – Folsom PacifiCorp IHC Telehealth Services – Murray, UT Replacement Field – DAS and WiFi Raceways – Substation – NVR Upgrades CHG Healthcare – Ft. Lauderdale, FL Aqua Engineer – ATS Replacement Boulder, CO S-Power WCF Insurance – Sandy, UT 1132 Bishop – Model Units JCI – Grand America Chiller – Salt Lake Big Sky Expansion - Lancaster Merit Medical – Sandy, UT City, UT Salt Lake City Department of Traeger – Salt Lake City, UT Eaton – Hill AFB Bldg. 1211 – UPS & Airports Herriman City Hall – Herriman, UT TRANSMISSION LINE & SUBSTATION Generator Installation – Ogden, UT GA50 – Video Project Mercer Substation – Rocky Mountain Eaton – UTTR Multiple Sites – UPS and Concourse Paging Re-alignment DAS Power – UT HVAC Upgrades – Dugway, UT Project UofU Housing – Salt Lake City, UT Lili’uokalani Trust Rexburg & Ammon Substation – Rocky Main Receiving Station w/ SVC, 44KV South Valley Regional – Video Project Worker Compensation Fund – Mountain Power – ID Transmission Line, 115KV Transmission Salt Lake City Department of Public Sandy, UT Palo Alto Civil Construction – Line – Fairfield, AL Utilities VZW SLC Airport A&E – MidAmerican Energy – IA Nucor Florida 2MW Line Construction – Parley’s Water Treatment Project Salt Lake City, UT SD-WAN Install Maffit Lake Substation – MidAmerican Frostproof, FL North Salt Lake Water Reclamation – ARUP Laboratories – Salt Lake City, UT Energy – IA Upgrade Project Womens Center – Salt Lake City, UT Q729 Airport Bullard Substation – Verizon SLC VZW Hexcel – Salt Lake City, UT HAWAII PacifiCorp – OR SIGNAL & UTILITY SLC Data Center Expansion Project University of Wyoming - A&E – American Fork Reconductor – Gordan Ave Aux Lanes, Layton City Western Governor’s University Laramie, WY PacifiCorp – UT SLC Airport Rental Car Light Replace Houston – Security Project LILI’UOKALANI TRUST OWNER CVE DIVISION CVE TECHNOLOGIES Lund South 35kV Rebuild – Mt. SR-134; I-15 Interchange Mods Santa Ana – Security Project Wheeler Power – NV SLC Airport Exit Road Light Ohio – Security Project CVE TECHNOLOGIES Fire Restoration – Douglas Electric Sandy City Overlay Tower 4 – Security Project The Church of Jesus Christ of Latter- PROJECT OVERVIEW Cooperative – OR Logan-Cache Airport Wind Cone Install SLC – Video Surveillance Project day Saints – Unified Communications Lili’uokalani Trust, a private operating Hawaiian SCOPE OF WORK SR10 Ridge Road – PacifiCorp – UT Traffic Signal at XBAR Road (Global) foundation, was looking for a Wide Area Network Casper Dock Work – Rocky Mountain Wolfpack Crossing Street Lights Pacificorp – Networking, Northwest • 10 sites in Hawaii on all Islands Power – WY SLC Bike Counter 9-Line Trail TELEDATA/MULTIMEDIA UVU – Security, Provo, UT Solution that was both simple to deploy, and easy to • Cloud-based, centralized management solution Red Butte Central–St. George – Rocky SR-198 at 1400 East Signal – Equinix – Security, Global manage. “We worked together with our engineer, Kyle Mountain Power – UT Spanish Fork TELEDATA Reckitt Benckiser Group – Salt Lake • Configuration done remotely, with on-site work to Hambright, to provide the customer with two different Sugarmill–Rigby 161kV/Goshen – UTA First / Last Mile Summit County JSMB 8th Floor – SLC, UT City rack and stack equipment PacifiCorp – ID Bike Share Doterra Call Center – Pleasant Grove, State of Utah Courts – Salt Lake City Cisco solutions that addressed all of their needs and Vitesse – PacifiCorp – OR Midvale Crosswalk Project UT Select Portfolio Services – Security, • 3 years of support included with the solution eventually settled on a Meraki solution,” says Mike Purple Innovation Distribution – Rocky SR-106; Main St to 1700 West, Bountiful Doterra Distribution Bldg. TI – Pleasant Salt Lake City Mountain Power – UT 11950 South Roadway Improvements Grove, UT Northwest Regional ISD – Networking, Merrill, Senior Account Manager. “This solution allows 46kV Bacchus East Power Line – US-40; W Roosevelt to Gusher Cisco – Lehi, UT Oregon for secure and reliable data sharing throughout the Orbital ATK – UT I-80 at Glendale Ave Doterra Data Center – Pleasant Grove, Nature’s Sunshine - Utah customer’s different locations on each of the islands.” 90th South Bangerter Interchange SR-126; SR-39 Intersection UT McKinney ISD - Data Center - Dallas Distribution – Rocky Mountain Power 2540 West Roadway Extension Paramount Homeless Shelter – SLC, – UT UT Nucor Longview 69kV Transmission American Express – Sandy, UT OBSERVIAN Line – Nucor Steel - TX AVTEC Allied Health Building – Ogden, UT CHG Healthcare Portland Dock Work – PacifiCorp – OR Avista Corporation Hillcrest Elementary – Logan, UT Traeger Recently Awarded Projects Medford Dock Work – PacifiCorp – OR Mission Gate 1 – Entrance Security Canyon Crest Elementary – Provo, UT MyTechHigh 2019 Yakima Reconductor – PacifiCorp Project Cascade Elementary – American Fork, Prestige Financial ELECTRICAL CONSTRUCTION HEAVY INDUSTRIAL Skyline Steel Busway 2 Replacement – Design/Build Nucor Building Systems – WA Coeur d’Alene – Video Surveillance UT AutoLiv Verizon Data Center, Salt Lake City Intertape Polymer Line 7 Install – Blytheville, AR – Brigham City, UT Walla Walla Dock Work – PacifiCorp Project Central Elementary – Layton, UT International Financial Services Confidential Data Center – Phases 3 & Garland, UT Skyline Steel Yard Lighting – Addition USU Merrill Library Lighting – WA Dollar Road – Phase III IHC CC Redundant Fiber – Saint Merrick Bank 4, New Mexico Eccles Theater Upgrades – Logan, UT Blytheville, AR Control Upgrade – Logan, UT Dominion Energy: George, UT Veteran’s Advantage Aligned Energy – multiple projects Big River Steel (BRS) Phase 2, 15kv and Dell Power Plant Cooling Tower Fans – Misc. Thermo-Fisher projects – SLOC – Security Upgrades BYU Hawaii Backbone – Laie, HI Albany Engineered Composites – 35kv power distribution – Osceola, AR Dell, AR Logan, UT SERVICE DIVISION Logan Fab Shop – Security Upgrades Grand Wailea GPON Upgrade – Wailea, multiple projects BRS Coil Storage Building, Unit sub and Calstrip – Blytheville, AR Misc. Prismview projects – Logan, UT Power Plant – Unit 3 Logan OPS Center – Security HI Confidential Manufacturing Facility – 480-volt Distribution Plum Point Powerhouse Cooling Tower Misc. JBS projects – Hyrum, UT Precipitator Rewire – Point of Rocks, WY Upgrades Turtle Bay Network – Kahuku, HI Northern Utah BRS Cold Mill Lab Expansion MCC replacement – Osceola, AR US Steel EAF Project – Fairfield, AL Endurance Data Center – Chiller Power Cash Station – Security Upgrades BRS Heavy Gauge Sampling line NYS Unit-sub Scada – Blytheville, AR New EAF, Baghouse, Water Treatment Confidential Data Center – Phases 1 & Upgrades – Provo, UT Kastler Station – Security Upgrades MULTIMEDIA embedded conduit and grounding NYS Unit-sub 4 Feeders – Blytheville, Plant, VTD, Main Receiving Station 2, Utah County IHC – TOSH – Chilled Water System Flexential South Jordan City Council Chambers – BRS Refractory Storage Building AR w/ SVC, Melt Shop Building, Alloy Government Project, Salt Lake City Replacement – Murray, UT Security Controls Projects: South Jordan, UT Grounding NYS2 Tandem Mill Project – Handling System IHC – McKay Dee Hospital – Data Center Nucor Florida Micro Mill – Blytheville, AR US Steel New Caster & Revamp Project Plano, TX Allied Health Building – Ogden, UT Frostproof, FL Logan City Wastewater Facility – – Fairfield, AL Mechanical System Upgrade – Portland, OR Okland Construction Office Remodel – Precoat Metals Capacitor Bank Logan, UT Nucor Steel Kankakee Reheat Furnace Ogden, UT Salt Lake City, UT Salt Lake City,UT Installation – Blytheville, AR Design/Build Logan Gateway Project – and Roll Mill – Kankakee, IL Discover Financial – 3rd Floor Remodel – GAF Layton Construction South Building – Logan, UT PG 7 PG 6 CONTINUED ON PAGE 7 LOGAN CORPORATE OFFICE VOL 19 ISSUE 1 | JULY 2019 PRST STD 875 North 1000 West U.S. POSTAGE Logan, UT 84321 PAID 435-752-6405 SLC, UT Cache Valley Electric PERMIT 6 SALT LAKE CITY OFFICE 875 North 1000 West NEWSLETTER 1338 South Gustin Road Logan, UT 84321 Return Service Salt Lake City, UT 84104 Requested 801-908-6666

ARKANSAS OFFICE 5590 E. State Hwy. 137 Blytheville, AR 72315 870-824-6670

OREGON OFFICE 12550 SW 68th Ave. Portland, OR 97223 503-431-6600

TEXAS OFFICE 2370 West Airfield Dr., Ste 200 Dallas, TX 75261 469-844-5730

HAWAII OFFICE 733 Bishop St., Ste 2170 Honolulu, HI 96813 808-354-0080

WWW.CVE.COM

NUCOR-JFE Steel Mexico (NJSM) Our People are SILAO, GUANAJUATO, MEXICO

Our Power 713,000 NJSM NUCOR STEEL & JFE STEEL (JAPAN) SQ FT GENERAL CONTRACTOR OWNER CVE EMPLOYEE RECOGNITION BANQUET CVE DIVISION LOGAN HEAVY INDUSTRIAL The Annual CVE Employee Recognition Banquet was held on June 1, 2019 at Grand America Hotel. PROJECT OVERVIEW SCOPE OF WORK This recognition program began in 2003 to honor employees In 2016, Nucor Corporation (NYSE: NUE) • Coldmill facility containing CGL who achieved 10+ years of service. Employees receive their first formed a 50-50 joint venture with JFE (continuous galvanizing line) and RCL award—a three-ruby CVE ring—after their 10-year anniversary, Steel Corporation of Japan to build and (recoiling line) then at each additional five-year milestone. 25-year Service Awards (pictured, L to R): operate a plant in central Mexico to • CGL’s finished product will be supply that country’s automotive market. This year, all 10+ year recipients received a custom, carbon-fiber Paul Harris (ECD) automotive-grade galvanized steel CVE hard hat. Shawn Wright (TEL-SLC) Today, CVE is advising and supervising all cold coils of steel from U.S. and Seth Hansen (SER) aspects of electrical construction. Scott Japan, galvanized onsite with CVE now has 213 current employees who have worked with Jim Phelps (ECD) Michi serves as the Site Superintendent, end customers being numerous car Cache Valley Electric for over 10 years. Congratulations to all. Steve Grant (ECD) while Dave Wolf and Rafael Villegas are manufacturers, located within a three- acting Foremen. or four-hour drive from the project. • Switching station for local power 35-year Service Award: company Mike Perkes (Logan) • Receiving substation 115 KV incoming