The Planning Inspectorate National Infrastructure Planning Temple Quay House 2 The Square Bristol BS1 6PN Emailed to:
[email protected] FAO Mr Hefin Jones 25 July 2019 Dear Sir/Madam Location: Southampton to London Pipeline Project Proposal: Notification from Esso of acceptance of their DCO application (by the Planning Inspectorate) and deadline for registering as a Interested Party Following the Planning Inspectorate’s acceptance of an application for a Development Consent Order (DCO) for the Southampton to London Pipeline, Runnymede Borough Council requests to be registered as an Interested Party at the Examination. Runnymede Borough Council (RBC) is a host Borough and also landowner affected by the development. Chertsey Meads, a public open space owned by the Council is a key parcel of land required to be used to enable the pipeline to go under the River Thames. Runnymede Borough Council is not a unitary authority and therefore a number of matters, such as Highways, Transport and Archaeology fall within the remit of Surrey County Council (SCC). Esso’s discussions with SCC have not been shared with RBC and therefore RBC are now making enquiries as to SCC’s position. This letter provides a summary of the main aspects of the proposal which RBC is presently in a position to confirm that it agrees and/or disagrees, together with an appropriate explanation, in accordance with the Planning Inspectorate Advice Note 8.3. The response below is an initial response as the Council is currently reviewing the detailed documentation submitted with the DCO application and therefore the Council reserves the right to make further written representations during the examination should it be required.