GOVENMENT of KHYBER PAKHTUNKHWA PUBLIC HEALTH ENGINEERING DEPARTMENT NOTICE INVITING TENDERS (Single Stage Two Envelop E-Bidding

Total Page:16

File Type:pdf, Size:1020Kb

GOVENMENT of KHYBER PAKHTUNKHWA PUBLIC HEALTH ENGINEERING DEPARTMENT NOTICE INVITING TENDERS (Single Stage Two Envelop E-Bidding GOVENMENT OF KHYBER PAKHTUNKHWA PUBLIC HEALTH ENGINEERING DEPARTMENT NOTICE INVITING TENDERS (Single Stage Two Envelop e-Bidding System) Public Health Engineering Division Swabi Government of Khyber Pakhtunkhwa invites Electronic Bids from eligible firms / contractors in accordance with KPPRA procurement rules 2014 on single stage two envelop procedure, contractors/firms must be registered with PEC (up to date), KPPRA and Provincial Enlistment Committee. TOBACCO CESS PROGRAMME ADP# 691/190263 FOR THE YEAR 2019-20 OF PK-43 A DISTT; SWABI (MR RANGEZ AHMAD CHIARMAN DDAC) BID SECURITY IN SHAPE OF CALL S.NO NAME OF SCHEME COST DEPOSIT+ STAMP DUTY 1 SANITATION SCHEME KOTHA & ADJOINING AREA PK-43 7,554,000 169850 2 SANITAITON SCHEME GANDAF & DJOINING AREA PK-43 1,761,000 41470 3 SANITATION SCHEME TOPI & ADJOINING AREA PK-43 854,000 18850 4 SANITATION SCHEME MAINI PK-43 2,590,000 58050 5 EXTENSION OF DWSS MALIK ABAD 714,000 16130 INSTALLATION OF HAND PUMPS OR PRESSURE PUMPS 6 AT U/C's KABGHANI, GANDAF, V/C MALIK ABAD & 3,894,000 84130 GADOON AREA PK-43 INSTALLATION OF HAND PUMPS AT U/C's BATAKARRA, 7 TOPI EAST, TOPI WEST, MAINI, KOTHA, ZAROBI, 1,795,000 42150 KALABAT OF PK-43 TOBACCO DEVELOPMENT CESS (2019-20) UNDER ADP NO. 691/190263" DISTRICT B SWABI (MR; MUHAMMAD ALI TARAKAI MPA PK-46) BID SECURITY IN SHAPE OF CALL S.NO NAME OF SCHEME COST DEPOSIT + STAMP DUTY 8 Sanitation scheme UC Bachai Sikandari 5,748,000 133710 9 Sanitation scheme UC Dagai 5,748,000 133710 10 Sanitation scheme UC Yarhussain East 5,748,000 133710 11 Sanitation scheme UC Yarhussain West 5,748,000 133710 12 Sanitation scheme UC Sodher 5,748,000 133710 13 Sanitation scheme UC Yaqoobi 5,748,000 133710 14 Sanitation scheme UC Sard cheena 5,748,000 133710 15 Sanitation scheme UC Dobyan 5,748,000 133710 16 Sanitation scheme UC Ismaila 5,748,000 133710 17 Sanitation scheme UC Jalbai 5,748,000 133710 18 Sanitation scheme UC Jalsai 5,743,000 133610 TOBACCO DEVELOPMENT CESS (2019-20) UNDER ADP NO. 691/190263" DISTRICT C SWABI (MR; SHAHRAM KHAN TARAKAI (MINISTER FOR LGE&RDD KPK PK-47) BID SECURITY IN SHAPE OF CALL S.NO NAME OF SCHEME COST DEPOSIT + STAMP DUTY 19 Sanitation scheme UC Tarakai 3,203,000 70310 20 Sanitation scheme UC Turlandi 3,198,000 70210 21 Sanitation scheme UC K.S.K. 3,198,000 70210 22 Sanitation scheme UC Cheknoda 3,198,000 70210 23 Sanitation scheme UC Shewa 3,198,000 70210 24 Sanitation scheme UC Asota 3,198,000 70210 25 Sanitation scheme UC Sheikh jana 3,198,000 70210 26 Sanitation scheme UC Permoli 3,198,000 70210 27 Sanitation scheme UC Naranji 3,198,000 70210 28 Sanitation scheme UC Kalu khan 3,198,000 70210 29 Sanitation scheme UC Adina 3,198,000 70210 GENERAL TERMS AND CONDITIONS: Tender form/BOQ can be downloaded up to one day prior to the last date of bid submission i.e. 1 11.03.2020 from Public Health Engineering Department website: www.phed.pk.gov.kp. Following documents must be attached with the bids, (i) Enlistment and Renewal copy, (ii) Original Call Deposit (2%) Earnest Money & Stamp Duty from schedule banks in the name of Executive Engineer PHE Division Swabi (iii) Original Tender Form 2 (iv) CNIC (v) Valid Registration copy in the relevant code CE-09 (vi) Registration with Provincial Enlistment Committee (vii) Registration with KPRA. If any contractor quoted rate more than 10% below on Engineer estimate, he shall attach 8% 3 Additional Security of the estimated cost in shape of Original Call Deposit with tender documents, in case of non-availability of 8% Additional Security, the bid will be rejected. Contractor shall submit affidavit with Technical Bid that he has attached the rate analysis with 4 Financial Bid if he quotes the rate more than 10% below. 5 Contractors should fill the BOQ by quoting their rate @above /below on engineer estimate. Technical / Financial bid shall be placed in separate envelop and name of work should be written 6 on the envelopes & will be received through courier only on the mentioned date at 12.00 P.M sharply. Technical proposals will be opened at 02:00 P.M on the same day. The 2% earnest money (CDR) of unsuccessful bidders will be returned after approval of the lowest 7 bid / tender by competent authority. The Financial bids of only those firms shall be opened and allowed to participate in the tender 8 process who stand qualified by the Technical Evaluation Committee. 9 All kind of materials should be procured from the approved manufacturer. All others terms and conditions will remain intact as per guidelines and rules framed by Provincial 10 Govt:. EXECUTIVE ENGINEER PHE Division Swabi. At Shah Mansoor Ph; 0938/280094 .
Recommended publications
  • Public Notice Auction of Gold Ornament & Valuables
    PUBLIC NOTICE AUCTION OF GOLD ORNAMENT & VALUABLES Finance facilities were extended by JS Bank Limited to its customers mentioned below against the security of deposit and pledge of Gold ornaments/valuables. The customers have neglected and failed to repay the finances extended to them by JS Bank Limited along with the mark-up thereon. The current outstanding liability of such customers is mentioned below. Notice is hereby given to the under mentioned customers that if payment of the entire outstanding amount of finance along with mark-up is not made by them to JS Bank Limited within 15 days of the publication of this notice, JS Bank Limited shall auction the Gold ornaments/valuables after issuing public notice regarding the date and time of the public auction and the proceeds realized from such auction shall be applied towards the outstanding amount due and payable by the customers to JS Bank Limited. No further public notice shall be issued to call upon the customers to make payment of the outstanding amounts due and payable to JS Bank as mentioned hereunder: Customer ID Customer Name Address Amount as of 8th April 1038553 ZAHID HUSSAIN MUHALLA MASANDPURSHI KARPUR SHIKARPUR 343283.35 1012051 ZEESHAN ALI HYDERI MUHALLA SHIKA RPUR SHIKARPUR PK SHIKARPUR 409988.71 1008854 NANIK RAM VILLAGE JARWAR PSOT OFFICE JARWAR GHOTKI 65110 PAK SITAN GHOTKI 608446.89 999474 DARYA KHAN THENDA PO HABIB KOT TALUKA LAKHI DISTRICT SHIKARPU R 781000 SHIKARPUR PAKISTAN SHIKARPUR 361156.69 352105 ABDUL JABBAR FAZALEELAHI ESTATE S HOP NO C12 BLOCK 3 SAADI TOWN
    [Show full text]
  • Overview - Swabi
    Overview - Swabi Tor Ghar Legend Takhto Sar ! Shamma Khui ! Shama Shapla !^! ! National ! Khanpur ! ! Shahole !! Natian ! Khanpur Ajarh Province Post Gadai ! Natian ! Rizzar !!! District ! Mir Dandikot Sherdarra ! Shahe ! Sherdarah ! Settlements Mir Shahai Dandai ! Tor Gat ! Naranji Administartive Boundaries Mardan ! Badrai Chatara ! Buner ! Kund International Miralai ! Mehr Kamar Burai ! ! Bako ! Ali Dhand Bural ! Birgalai Mir Dai ! ! Pirgalai Khisha Khesha ! Naogram ! Provincial Kaniza Dheri ! ! Lakha Tibba Dheri Lakha Madda Khel Jabba ! Tiga Dheri Ghulama ! Mazghund ! Sikandarabad ! Muz Ghunar ! Jabba District Parmulai Bagga ! Jabba Purmali ! Ganikot ! ! Ganrikot Kodi Dherai Kodi Dheri ! Utla Bahai Baho Leran ! ! Satketar ! Palosai ! Gabai Amankot ! Salketai Ghabasanai ! Tehsil Bar Amrai Gabasanrai ! ! ! Gumbati Dheri Gumbat Dherai Amral Bala Bar Amral Bala ! Gunj Gago ! Dheri ! ! ! ! ! ! ! ! ! Sangbalai ! Dherai ! Gani Chhatra Bar Dewalgari ! ! Line of control ! Punrawal Shewa ! Gangodher ! Aziz Dheri Banda ! Shingrai ! ! ! Katar Dheri ! Seri ! Kuz Amrai ! Achelai Rasoli Dheri Inian Dheri ! Gangu Dheri Shingrai Kuz Dewalgari ! ! Khalil ! ! ! Gangudhei Seri Injan Asota Sharif Asota Gangudher Makia ! ! Coastline Dheri Nuro Banda Chini Rafiqueabad ! Dheri ! Nakla Jogia ! Takhtaband Dheri Dagi ! Banda ! ! Spin ! Girro Sherghund Kani Aro Bore Badga ! Banda ! Katgram ! ! Sheikhjana ! Shaikh Jana Dakara Banda Roads ! Sukaili ! ! Ismaila Tali ! Adina ! ! ! Nawe Kili Pal Qadra ! Mangal Dheri Sandwa ! Chai ! Kalu Khan ! Shewa Chowk Aio Kolagar
    [Show full text]
  • Contesting Candidates NA-1 Peshawar-I
    Form-V: List of Contesting Candidates NA-1 Peshawar-I Serial No Name of contestng candidate in Address of contesting candidate Symbol Urdu Alphbeticl order Allotted 1 Sahibzada PO Ashrafia Colony, Mohala Afghan Cow Colony, Peshawar Akram Khan 2 H # 3/2, Mohala Raza Shah Shaheed Road, Lantern Bilour House, Peshawar Alhaj Ghulam Ahmad Bilour 3 Shangar PO Bara, Tehsil Bara, Khyber Agency, Kite Presented at Moh. Gul Abad, Bazid Khel, PO Bashir Ahmad Afridi Badh Ber, Distt Peshawar 4 Shaheen Muslim Town, Peshawar Suitcase Pir Abdur Rehman 5 Karim Pura, H # 282-B/20, St 2, Sheikhabad 2, Chiragh Peshawar (Lamp) Jan Alam Khan Paracha 6 H # 1960, Mohala Usman Street Warsak Road, Book Peshawar Haji Shah Nawaz 7 Fazal Haq Baba Yakatoot, PO Chowk Yadgar, H Ladder !"#$%&'() # 1413, Peshawar Hazrat Muhammad alias Babo Maavia 8 Outside Lahore Gate PO Karim Pura, Peshawar BUS *!+,.-/01!234 Khalid Tanveer Rohela Advocate 9 Inside Yakatoot, PO Chowk Yadgar, H # 1371, Key 5 67'8 Peshawar Syed Muhammad Sibtain Taj Agha 10 H # 070, Mohala Afghan Colony, Peshawar Scale 9 Shabir Ahmad Khan 11 Chamkani, Gulbahar Colony 2, Peshawar Umbrella :;< Tariq Saeed 12 Rehman Housing Society, Warsak Road, Fist 8= Kababiyan, Peshawar Amir Syed Monday, April 22, 2013 6:00:18 PM Contesting candidates Page 1 of 176 13 Outside Lahori Gate, Gulbahar Road, H # 245, Tap >?@A= Mohala Sheikh Abad 1, Peshawar Aamir Shehzad Hashmi 14 2 Zaman Park Zaman, Lahore Bat B Imran Khan 15 Shadman Colony # 3, Panal House, PO Warsad Tiger CDE' Road, Peshawar Muhammad Afzal Khan Panyala 16 House # 70/B, Street 2,Gulbahar#1,PO Arrow FGH!I' Gulbahar, Peshawar Muhammad Zulfiqar Afghani 17 Inside Asiya Gate, Moh.
    [Show full text]
  • SWABI-Regefc.Pdf
    New Registration List S/NO REG# / NAME FATHER'S PRESENT ADDRESS DATE OF ACADEMIC REG NAME BIRTH QUALIFICATION DATE 1 143785 NASIRA WAZIR ZADA VILLAGE MAMAI MOHALLAH KOZ KHADY , 18/5/1980 FA 1/9/2014 SWABI, KPK 2 143791 MUHAMMAD ZARSHAD RAHIM GUL BANDIA SAKRO DHND AMAN KOT 13/2/1981 BA 2/9/2014 AYAZ MEHBOOB ZAI P.O SHEWA , SWABI, KPK 3 143792 NAILA NAZ DILAWAR KHAN MOHALLAH BAT PSI VILLAGE AMBAR TEH 16/4/1989 BA 2/9/2014 LHORE DISTT SWWABI, SWABI, KPK 4 145084 BILAL AHMED SARDAR ALI MOH. SHAGAI V.P.O ANBAR TEH LAHOHOR 25/3/1988 MATIRC 6/4/2015 DISTT, SWABI, KPK 5 145095 MAQSOOD METAB SHAH MOH. INAYAT KHAIL P.O AND DISTT, SWABI, KPK 12/2/1973 MATIRC 6/4/2015 ANWAR 6 145126 ABIDA AMAIR PARWAR MOH. SOFI KHAIL RAZABI DISTT, SWABI, KPK 10/4/1988 MATIRC 7/4/2015 7 145127 MUAHMMAD MUHAMMAD VILLAGE KHALIL P.O KARNAL SHER KILI TEH 28/12/1976 MATRIC 7/4/2015 NAEEM ISMAIL RAZAR , SWABI, KPK 8 145133 MUHAMMAD LIQAT ALI MOH. PHOOR HAMLAT TEH TUPI DISTT, SWABI, 22/3/1993 MATIRC 7/4/2015 TAYYAB KPK 9 145201 MUHAMMAD SHAH REHMAN VILLAGE MANGAI CHAI P.O CHANAI TEH AND 18/2/1978 MATIRC 8/4/2015 AMIN DISTT, SWABI, KPK 10 145255 BAHRAMAN ABDUR MOH. FAZALABAD KARMAL SHER KILLI 20/1/1970 MATRIC 9/4/2015 REHMAN TEH.DISTT, SWABI, KPK 11 145256 FAIZAN ULLAH DEEDAR SAID HABIB KHEL FAQIR KILI V.P.O MAINAI TEH . 10/2/1967 MATRIC 9/4/2015 DISTT, SWABI, KPK 12 145230 TAJ UL ISLAM HAFIZ ABDUL AMANABAD V.P.O YAR HUSSAIN TEH LAHORE 1/1/1974 MATRIC 9/4/2015 SALAM LAHORE , SWABI, KPK 13 145338 NAHEED SAHIB ZAR MOH.
    [Show full text]
  • 47024-004: Pehur High Level Canal Extension Project
    Land Acquisition & Resettlement Plan (LARP) __________________________________________ Project Number: 47024-004 Loan Number: 3470-PAK Document Type: Final May 2019 PAK: Pehur High Level Canal Extension Project Land Acquisition and Resettlement Plan for LOT-1 Prepared by: Khyber Pakhtunkhwa Irrigation Department for the Asian Development Bank (ADB). NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report “$” refer to US dollars. The Land Acquisition and Resettlement Plan is the document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Access to Information Policy and as agreed between ADB and the Khyber Pakhtunkhwa Irrigation Department. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. PROJECT MANAGEMENT OFFICE (PMO) KHYBER PAKHTUNKHWA IRRIGATION DEPARTMENT GOVERNMENT OF KHYBER PAKHTUNKHWA PEHUR HIGH LEVEL CANAL EXTENSION PROJECT ADB LOAN NO. 3470 PAK LAND ACQUISITION & RESETTELMENT PLAN LOT-I: JANDA BOKA PRESSURE PIPE & IRRIGATION SYSTEM MARCH, 2019 PROJECT IMPLEMENTATION CONSULTANTS: Engineering Consultants (Pvt.) Ltd, Sri Lanka (Lead Firm) Techno Legal Consultants (Pvt.) Ltd, Pakistan (JV Firm) AGES Consultants, Pakistan (JV Firm) Geotechnical Consultancy Services, Pakistan (JV Firm) ADB Loan 3470-PAK: Lot-I: Land Acquisition and Pehur High Level Canal Extension Project Resettlement Plan ADB Loan 3470-PAK: Detail Design of PHLCE Project Lot-I: Janda Boka Pressure Pipe & Irrigation System Land Acquisition & Resettlement Plan TABLE OF CONTENTS TABLE OF CONTENTS ...........................................................................................................
    [Show full text]
  • Autochthonous Aryans? the Evidence from Old Indian and Iranian Texts
    Michael Witzel Harvard University Autochthonous Aryans? The Evidence from Old Indian and Iranian Texts. INTRODUCTION §1. Terminology § 2. Texts § 3. Dates §4. Indo-Aryans in the RV §5. Irano-Aryans in the Avesta §6. The Indo-Iranians §7. An ''Aryan'' Race? §8. Immigration §9. Remembrance of immigration §10. Linguistic and cultural acculturation THE AUTOCHTHONOUS ARYAN THEORY § 11. The ''Aryan Invasion'' and the "Out of India" theories LANGUAGE §12. Vedic, Iranian and Indo-European §13. Absence of Indian influences in Indo-Iranian §14. Date of Indo-Aryan innovations §15. Absence of retroflexes in Iranian §16. Absence of 'Indian' words in Iranian §17. Indo-European words in Indo-Iranian; Indo-European archaisms vs. Indian innovations §18. Absence of Indian influence in Mitanni Indo-Aryan Summary: Linguistics CHRONOLOGY §19. Lack of agreement of the autochthonous theory with the historical evidence: dating of kings and teachers ARCHAEOLOGY __________________________________________ Electronic Journal of Vedic Studies 7-3 (EJVS) 2001(1-115) Autochthonous Aryans? 2 §20. Archaeology and texts §21. RV and the Indus civilization: horses and chariots §22. Absence of towns in the RV §23. Absence of wheat and rice in the RV §24. RV class society and the Indus civilization §25. The Sarasvatī and dating of the RV and the Bråhmaas §26. Harappan fire rituals? §27. Cultural continuity: pottery and the Indus script VEDIC TEXTS AND SCIENCE §28. The ''astronomical code of the RV'' §29. Astronomy: the equinoxes in ŚB §30. Astronomy: Jyotia Vedåga and the
    [Show full text]
  • Part-I: Post Code Directory of Delivery Post Offices
    PART-I POST CODE DIRECTORY OF DELIVERY POST OFFICES POST CODE OF NAME OF DELIVERY POST OFFICE POST CODE ACCOUNT OFFICE PROVINCE ATTACHED BRANCH OFFICES ABAZAI 24550 Charsadda GPO Khyber Pakhtunkhwa 24551 ABBA KHEL 28440 Lakki Marwat GPO Khyber Pakhtunkhwa 28441 ABBAS PUR 12200 Rawalakot GPO Azad Kashmir 12201 ABBOTTABAD GPO 22010 Abbottabad GPO Khyber Pakhtunkhwa 22011 ABBOTTABAD PUBLIC SCHOOL 22030 Abbottabad GPO Khyber Pakhtunkhwa 22031 ABDUL GHAFOOR LEHRI 80820 Sibi GPO Balochistan 80821 ABDUL HAKIM 58180 Khanewal GPO Punjab 58181 ACHORI 16320 Skardu GPO Gilgit Baltistan 16321 ADAMJEE PAPER BOARD MILLS NOWSHERA 24170 Nowshera GPO Khyber Pakhtunkhwa 24171 ADDA GAMBEER 57460 Sahiwal GPO Punjab 57461 ADDA MIR ABBAS 28300 Bannu GPO Khyber Pakhtunkhwa 28301 ADHI KOT 41260 Khushab GPO Punjab 41261 ADHIAN 39060 Qila Sheikhupura GPO Punjab 39061 ADIL PUR 65080 Sukkur GPO Sindh 65081 ADOWAL 50730 Gujrat GPO Punjab 50731 ADRANA 49304 Jhelum GPO Punjab 49305 AFZAL PUR 10360 Mirpur GPO Azad Kashmir 10361 AGRA 66074 Khairpur GPO Sindh 66075 AGRICULTUR INSTITUTE NAWABSHAH 67230 Nawabshah GPO Sindh 67231 AHAMED PUR SIAL 35090 Jhang GPO Punjab 35091 AHATA FAROOQIA 47066 Wah Cantt. GPO Punjab 47067 AHDI 47750 Gujar Khan GPO Punjab 47751 AHMAD NAGAR 52070 Gujranwala GPO Punjab 52071 AHMAD PUR EAST 63350 Bahawalpur GPO Punjab 63351 AHMADOON 96100 Quetta GPO Balochistan 96101 AHMADPUR LAMA 64380 Rahimyar Khan GPO Punjab 64381 AHMED PUR 66040 Khairpur GPO Sindh 66041 AHMED PUR 40120 Sargodha GPO Punjab 40121 AHMEDWAL 95150 Quetta GPO Balochistan 95151
    [Show full text]
  • Gandhara Journal of Research in Social Science ISSN: 2415-2404, Vol.: 1, N0
    2016 Gandhara Research Society, Pakistan Sutandra Singha Ph.D. Scholar, Centre for Russian and Gandhara Journal of Central Asian Studies (CRCAS), Research in Social Science School of International ISSN: 2415-2404 Studies(SIS), Jawaharlal Nehru University, Volume 1, No. 2, Summer 2016 New Delhi, India Climate Change Induced Bangladeshi Migration and its Implications for India Climate change is increasingly affecting ecosystems and the communities who rely on them. People can adapt and mitigate those problems or can leave the affected areas. Cross border migration is one of the anthropogenic responses to environmental stress, and in this case, the pace of change in the environment plays a significant role on the mode and direction of migration. Bangladesh is one of the most vulnerable countries of South East Asia because of its geographic location, flat and low-lying topography, high population density, riverbank and coastal erosion, water logging, reliance of many livelihoods on climate sensitive sectors, erratic rainfall, increased frequency and intensity of cyclone, storm surge, floods, droughts and salinity. Such environmental problems are forcing people to involve in illegal migration to the nearby areas of India. Large volume of Bangladeshi migration is triggering various socio-economic, security, ethnic and communal problems in India. In this context, this study aims to focus on the past, present and future climate change scenario and resultant migration of Bangladeshi people into India and, Indo-Bangladesh approach to tackle this problem. The concluding section suggests certain practicable policy measures. Gandhara Journal of Research in Social Science ISSN: 2415-2404, Vol.: 1, N0. 2, Summer 2016 _____________________________________________________________________________________ Climate Change Induced Bangladeshi Migration and its Implications for India Sutandra Singha Introduction Climate change is the single most important global issue and climate refugees are the human face of this ongoing tragedy.
    [Show full text]
  • Government of Khyber Pakhtunkhwa Communication & Works Department Notice Inviting E-Bidding
    GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT NOTICE INVITING E-BIDDING (Single Stage Two Envelope E-Bidding System) C & W Department (Division District Swabi), Government of Khyber Pakhtunkhwa invites Electronic Bids from eligible firms / bidders in accordance with KPPRA procurement rules 2014 on Single Stage Two Envelope procedure for the following works. Required Last date and Date and time Work category of Bid Period of time of of opening of Name of Work No. PEC & Security completion submission E- Technical Codes Bids Proposal Construction of Technically & Economically Feasible 100-KMs in Mardan Division ADP No.1706-200252 (2020-21) SH: Constn: of roads at UC s Saleem Khan, Maneri Bala, (A) ’ -- -- -- -- -- Kalabat, Kotha, Zaroobi, Manai, Topi West, Topi East, Batakara, Gandaf, Kabgani, Gabasani, and Ghani Chatra District Swabi S/W:- (i) Construction of Saleem Khan Road U/C Saleem Khan (0.85-KM) (ii) Construction C-5 & 2% of Maneri Bala Road U/C Maneri Bala (0.9-KM) As per 15-02-2021 15-02-2021 1 Relevant Estimated (iii)Construction of Kalabat Road U/C Kalabat work order At 12:00 PM 12:30 P.M Codes Cost (0.66-KM) (iv) Construction of Kotha Road U/C Kotha (0.60-KM) (Package-I). (i) Construction of Zaroobi U/C Zaroobi (0.71- KM) (ii) Construction of Manai Road U/C C-5 & 2 Manai(0.80-KM) (iii) Construction of Topi East Relevant -do- -do- -do- -do- Road U/C Topi (0.60-KM) (iv) Construction of Codes Topi West U/C Topi (0.63-KM) (Package-II) (i) Construction of Bataka Karra Road U/C U/C Bata Kara (0.60-KM) (ii) Construction
    [Show full text]
  • FLOOD RISK ASSESSMENT REPORT a Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level
    2015 FLOOD RISK ASSESSMENT REPORT A Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level A PROPOSAL IN VIEW OF LESSONS LEARNED ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 205-C 2nd Floor, Evacuee Trust Complex, F-5/1, Islamabad 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar Landline: +92.51.282.0449, +92.91.525.3347 E-mail: [email protected], Website: www.alhasan.com ALHASAN SYSTEMS PRIVATE LIMITED A Hi-Tech Knowledge Management, Business Psychology Modeling, and Publishing Company 205-C, 2nd Floor, Evacuee Trust Complex, Sector F-5/1, Islamabad, Pakistan 44000 195-1st Floor, Dean Trade Center, Peshawar Can ; Peshawar, Pakistan 25000 Landline: +92.51.282.0449, +92.91.525.3347 Fax: +92.51.835.9287 Email: [email protected] Website: www.alhasan.com Facebook: www.facebook.com/alhasan.com Twi er: @alhasansystems w3w address: *Alhasan COPYRIGHT © 2015 BY ALHASAN SYSTEMS All rights reserved. No part of this publica on may be reproduced, stored in a retrieval system, or transmi ed, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior wri en permission of ALHASAN SYSTEMS. 58 p.; 8.5x11.5 = A3 Size Map ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 CATALOGING REFERENCE: Disaster Risk Reduc on – Disaster Risk Management – Disaster Risk Assessment Hyogo Framework for Ac on 2005-2015 Building the Resilience of Na ons and Communi es to Disasters IDENTIFY, ACCESS, AND MONITOR DISASTER RISKS AND ENHANCE EARLY WARNING x Risk assessments
    [Show full text]
  • DFG Part-L Development Settled
    DEMANDS FOR GRANTS DEVELOPMENTAL EXPENDITURE FOR 2020–21 VOL-III (PART-L) GOVERNMENT OF KHYBER PAKHTUNKHWA FINANCE DEPARTMENT REFERENCE TO PAGES DFG PART- L GRANT # GRANT NAME PAGE # - SUMMARY 01 – 23 50 DEVELOPMENT 24 – 177 51 RURAL AND URBAN DEVELOPMENT 178 – 228 52 PUBLIC HEALTH ENGINEERING 229 – 246 53 EDUCATION AND TRAINING 247 – 291 54 HEALTH SERVICES 292 – 337 55 CONSTRUCTION OF IRRIGATION 338 – 385 CONSTRUCTION OF ROADS, 56 386 – 456 HIGHWAYS AND BRIDGES 57 SPECIAL PROGRAMME 457 – 475 58 DISTRICT PROGRAMME 476 59 FOREIGN AIDED PROJECTS 477 – 519 ( i ) GENERAL ABSTRACT OF DISBURSEMENT (SETTLED) BUDGET REVISED BUDGET DEMAND MAJOR HEADS ESTIMATES ESTIMATES ESTIMATES NO.
    [Show full text]
  • Swabi Blockwise
    POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL KHYBER PAKHTUNKHWA (SWABI DISTRICT) ADMIN UNIT POPULATION NO OF HH SWABI DISTRICT 1,624,616 214,209 LAHOR TEHSIL 306,168 39,528 LAHOR I QH 264,748 34113 ANBAR PC 17,437 2227 ANBAR 10,625 1331 033010201 1,928 255 033010202 1,764 223 033010203 634 80 033010204 884 122 033010209 2,537 306 033010210 1,382 144 033010211 1,496 201 JANGI DHER 2,756 341 033010207 775 87 033010208 1,981 254 SHEIKH DHERI 4,056 555 033010205 1,926 252 033010206 1,722 217 033010212 408 86 BEKA PC 16,758 1978 BEKA 11,209 1345 033010301 1,713 222 033010302 1,685 213 033010303 1,589 207 033010304 1,102 140 033010305 2,262 235 033010310 1,283 164 033010311 1,575 164 NABI 5,549 633 033010306 1,902 228 033010307 1,316 144 033010308 1,357 131 033010309 974 130 HARYAN PC 8,400 1141 DHERI ZAKRIA 1,259 189 033010403 1,259 189 HARYAN 3,251 430 033010401 1,384 157 033010404 434 71 033010405 1,433 202 SALLAH 3,890 522 033010402 1,130 157 033010406 911 107 033010407 1,849 258 HUND PC 11,435 1505 HUND 11,435 1505 Page 1 of 32 POPULATION AND HOUSEHOLD DETAIL FROM BLOCK TO DISTRICT LEVEL KHYBER PAKHTUNKHWA (SWABI DISTRICT) ADMIN UNIT POPULATION NO OF HH 033010101 812 69 033010102 299 49 033010103 460 74 033010104 713 106 033010105 239 44 033010106 452 76 033010107 423 69 033010108 1,007 121 033010109 454 67 033010110 679 81 033010111 608 78 033010112 437 70 033010113 1,385 149 033010114 248 40 033010115 562 69 033010116 648 94 033010117 266 38 033010118 730 101 033010119 748 70 033010120 265 40 JAHANGIRA PC 42,081 4952
    [Show full text]