GOVERNMENT OF Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210056001W Date: 29/01/2021 File No:IW/P/IB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Damodar Headworks Division, I & W Directorate

SubjectAdministrative Approval for the Scheme for Ess ' aintenance works of functional and non• functional assets of Infrastructure loffice (total 20104 )of Block- Barjora, Kansa, Ourgapur- Faridpur, Ausgram-I and Ausgram-II,Galsi-1. P.S• , Kansa, Coke-Oven, Ausgram and Budbud of District- , Paschim , and Pu haman during 2020-21. Scheme Id-IW/MR/92/2020-21 ,Project 10:- IW 07S000

The undersigned is directed, by order of the Gov!i)l'nor, say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for Essential Maintenance works of functional and non-functional assets of Infrastructure loffice (total 20104.46 sq m)of Block- Barjora, a,'-Faridpur, Ausgram-I and Ausgram-II,Galsi-l, P.S- Barjora, Kansa, Coke-Oven, Ausgram and Budbud rAct- Bankura, Paschim Bardhaman, and Purba Bardhaman during 2020- 21. Scheme Id-IW/MR/92/2020-21 ,the det ich has been given below.

Name of the Project: Scheme ~ Essential Maintenance works of functional and non-functional assets of Infrastructure loffice (total 20104.46 sq m)of Block- Barjora, Kansa, Durgapur-Faridpur, Ausgram-I and Ausgram-II,Galsi-l, P.S- Barjora, Kansa, Coke-Oven, Ausgram and Budbud of District- Bankura, Paschim Bardhaman, and Purba Bardhaman during 2020-21. Scheme Id-IW/MR/92/2020-21

Project ID: IW202133707S000

Address: Block- Barjora, Kansa, Durgapur-Faridpur, Ausgram-I and Ausgram-II,Galsi-l, P.S- Barjora, Kansa, Coke-Oven, Ausgram and Budbud of District- Bankura, Paschim Bardhaman, and Administrative Approval: ~W§9~a~~hty Five Lakh Eighty Three Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in 8583000 1 2020-21 32-2700-80-001-00-001-19-00- V Schemes Irrigation Sector Total 8583000 Additional Conditions

Conditions Description 1 List of the part estimates (total 22 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

This order is issued with the concurrence of FINANCIALADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021019123FAOODated 19/01/2021.

~" JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G02021005600lW Date: 29/01/2021

Copy forwarded for information and ne~~\~y~

-';;,.~:f"? The Additional Chief Secretary / Secretary-(Irrigation& Waterways Department)

The PrincipalAccountant General(A&E)-West Bengal

The PrincipalAccountant General(Audit)-West Bengal

The PrincipalAccountant General(RW/LBA)-West Bengal

The FinancialAdvisor-(Irrigation & Waterways Department)

The Finance Department- (Group F&N)

JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005600IW Dated 29.01.2021. I&WD's Main scheme ID: IWIMRl92/2020-21 (Rs In lakh) Contingency @ Tendered Sl. 3% of amount Name of sub-estimates as per tender amount No. put to tender 1 2 3 4 0.14 I 1 ! Repairing work of Katabundh Irrigation Section Office Building ofl 4.52

I D~~dar Headworks Sub-Division .under. D.amodar Headworks ! I 'DIvISIOn,Katabundh, P.S & Block Barjora, District Bankura. I--~'-'------·------·----··------~---····~·--·------.--.-.----.-.----.~------.---.-- ---~.------...--..------t- --_. - --_------; i 2 :Repairing work of Durgapur Section No. III Office Building of' 4.25 I 0.13 i iDamodar Headworks Sub-Division under Damodar Headworks] ~ivision, Rajbandh, P.S , District Paschim Bardhaman. I 1-· j I Ma~t~nance-and·repai~-to damaged main ent~ance gate of Guskarai 3.83 o.u I l, Irrigation Colony in Block Ausgram-I, P.S Ausgram, District: .Burdwan under Irrigation Section of Guskara Irrigation Sub-!

.Division of Damodar Headworks Division. ------~------~------~ 4 I Maintenance and repair to Paraj Irrigation Section Office and office! 4.78 0.15 [carnpus under Damodar Canal No. II Sub-Division office of DamOdarj! IHeadworks Division. I 5 I Repairing work of Paraj Irrigation Section Office Building of! 4.83 0.15 Damodar Canal No. II Sub-Division under Damodar Headworksl iDivision. i 4.51 0.14 6 iConstruction of khalashi shed at ch. 874.00 cross regulator I' !(Krishnarampur)of LBMC under Rondia Section of Damodar Canal INo.II Sub-Division. __~~~~~~~~-i-I ~~~~-+-~~~~~_ 7 [Landdeleloping with clearing jungles at Satkahania Bungalow under' 1.06 0.04

I ! Satkahania Irrigation Section of Damodar Canal No. II Sub-Division. I l-r- .. -.-+- .. -.-- .- -.. .-.----.-.---.----~- -. ~~-i--- 0.03 I 8 ! Maintenance and repair to colony office premises for the period of' 0.77 I iJuly'20 to Oct'20 under Headworks Section of Damodar Canal No. III h ISub-D_ivi~~nunder_Damodar Headworks Division. wm_._L j~~ .__., : 9 [Maintenance and repair of the office building of Sub-Divisional] 4.85 I 0.15 I

: 'Officer of Guskara Irrigation Sub-Division of Damodar Headworksi ' I liD'" '! I i IVISIOn. ---l [101~~~7e~;;::~_;rv%:~th~::;:~:~:c~:~~:r:;:i~~i~~14.85 0.15 I ~ 10fDam~darI:leadworksDivision. ~~_._ ._.... ' _ .. .___ . ..J I 11 IMaintenance and repair of Annex Building of Guskara Irrigation. 4.85 I 0.15 ' I ,Office under Guskara Irrigation Sub-Division of Damodar' I i ~ 12--~::~:~:~~~~:il~~air to exi~ting-g~age shedofGuska~a Irrigationj- -4.821' ----0~15 ---I I I Office under Guskara Irrigation Sub-Division of Damodar I I •Headworks Division. 113-+Mai~~~~~~~·~~pair to pli~th p;~tection incl~ding out side~~inj--·· 4~85-- -- 0.15 I i and painting of exerior wall of Bhedia rest shed under Bhedia~ i i __ ~igat~on S~cti()l1_N"()~!I ?Lqus.!<-~~_!rr!gatio~_Sub-12i~ision. ---~ ------t---.-- --

: 14 Maintaining Guskara Irrigation Colony premises from July to October 1 0.77 I 0.03 2020 under Guskara Irrigation Section of Guskara Irrigation Sub- ; I !

-----'-- --_._-----'--_._. Division under Damodar----,------~-.----Headworks Division...------~--- ;. --.~-.-- ... -. -.--~- Sheet 1 of2 I&WD's Main scheme ID: IWIMRl92/2020-21 (Rs In lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount amount No. put to tender 1 2 3 4 I Ii 15 Beautification of garden within Bungalow premises under Durgapur] 4.85 0.15

I Section No. II of Damodar Headworks Sub-Division. i I 16-Renovation of drain at F-type and back side ~f Barr--ac-k-ty-p-e-(-r-ig-h-1tl--3.-4-7---+-----0-.-1-1-- -I side) under Durgapur Irrigation Section No. II of Damodarl Headworks Sub-Division. _ IRenovation of boundary wall of Quarter No. C/2 and high drain at! 4.38 0.14 [back side of Barrach type quarter (left side) under Durgapur Sectioni ]No.-II of Damodar Headworks Sub-Division. I 18 [Making shade by industrial troughed aluminium sheet including: 7.43 0.28

I frame work at top of the office building under Durgapur Section No·1 illof Damodar Headworks Sub-Division. -+--1 -+- _ 19 'Boring for submersible including fitting and fixing with submersible: 2.90 0.09

I pump, electrification etc. complete at barrage site colony premises I under Durgapur Section No. II of Damodar Headworks Sub-Division. !

t------_.--- , 20 Boring of tube well and installation of submersible pump at] 1.61 0.05

I Katabundh Irrigation Section Office, Katabundh, Block & PiS I ! Barjora, District Bankura of Damodar Headworks Sub-Division ~ Iunder Damodar Headworks Division. I 21- S~pplying -and - -i~stallatio~ of submersible pull1pincl~ding. --0-.5-1---+---0-.-02---

I electrification within Durgapur Sech Bungalow premises under: ~ __ JDur_gapur S~~_!i_o_l1_~()_'II ofPamoda~ Headworks Sub-Division, --L ----J_- - i 22 ! Construction boundary wall of Guskara Irrigation Colony premises in! 4.48 I 0.14 i Iwest side at Guskara in Block Ausgram-I, P.S Ausgram, District I I

I iPurba Bardhaman under Guskara Irrigation Section of Guskarall Irrigation Sub-Division of Damodar Headworks Division. , Total: 83.17 2.66

Estimated Cost of Main Estimate: ~ 85.83 Lakh

Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 2 of2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210056051W Date: 29/01/2021 File No:IW/P/IB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Damodar Headworks Division, I & W Directorate

SubjectAdministrative Approval for the Scheme for ess aintenance works of functional and non• functional assets irrigation canals of major irrigaiont s including structure (31 nos.) in blocks - Barjora, Durgapur-Faridpur, Kanksa, Ausgram-II, ote and Galsi - I, PS- Barjora, Cokeoven, Kanksa, Ausgram, Mangolkote and Budbud Dist, ra, Paschim Bardhaman, Purba Bardhaman during 2020-21 ~ Scheme Id - IW/MR/93/ 2020-21 ,Project 10:- IW

The undersigned is directed, by order of the Gov~r~~r, to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for essential infe~rl~nceworks of functional and non-functional assets irrigation canals of major irrigaiont schemes including structure ( s.'fin blocks - Barjora, Durgapur-Faridpur, Kanksa, Ausgram-II, Mangolkote and Galsi - I, PS- Barjora, Cok anksa, Ausgram, Mangolkote and Budbud Dist.- Bankura, Paschim Bardhaman, Purba Bardhaman during 202 Scheme Id - IW/MRl93/ 2020-21 ,the deta; 1which has been given below. ~!ih Name of the Project: Scheme f essential maintenance works of functional and non-functional assets irrigation canals of major irrigaiont schemes including structure (31 nos.) in blocks - Barjora, Durgapur-Faridpur, Kanksa, Ausgram-II, Mangolkote and Galsi - I, PS- Barjora, Cokeoven, Kanksa, Ausgram, Mangolkote and Budbud Dist.- Bankura, Paschim Bardhaman, Purba Bardhaman during 2020-21 Scheme Id - IW/MRl931 2020-21

Project ID: IW202133715S000

Address: blocks - Barjora, Durgapur-Faridpur, Kanksa, Ausgram-II, Mangolkote and Galsi - I, PS• Barjora, Cokeoven, Kanksa, Ausgram, Mangolkote and Budbud Dist.- Bankura, Paschim Administrative Approval: ~§r~B~mJm> P~~ijc[QRFlrp6R:y Six Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development 32-2700-80-001-00-001-19-00- V Expenditure in 8046000 1 2020-21 Schemes Irrigation Sector Total 8046000 Additional Conditions

Conditions Description 1 List of the part estimates (total 31 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

This order is issued with the concurrence of FINANCIALADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021019124FAOODated 19/01/2021.

G4¥ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210056051W Date: 29/01/2021 Copy forwarded for information and ne

The Additional Chief Secretary 1 Sec tary-(Irrigation & Waterways Department)

The PrincipalAccountant General(A&E)-West Bengal

The PrincipalAccountant General(Audit)-West Bengal

The PrincipalAccountant General(RW/LBA)-West Bengal

The FinancialAdvisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N) err JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005605IW Dated 29.01.2021. I&WD's Main scheme ID: IWIMR/93/2020-21 (Rs.in lakh] Contingency @ Tendered Sl. Name of sub-estimates as per tender 3% of amount amount No. put to tender 1 2 3 4 1 Removal of deposited earth from bed and slopes of WIC offtake from 2.17 0.07 .ch. 258.00 right bank of DBC for a length of 2700.00 m under [Durgapur Section No. III of Damodar Headworks Sub-Division. :Removal of deposited earth from bed and slopes ofW/C offtake froml 2.80 0.09

I ch. 267.00 left bank of DBC for a length of 3500.00 m under I ~3 -+-D_;,ur.....!g"",a,;,l,,;p..,;.;u.;_r..:...S..:...ec:....:.t:...:io...:,:n:....:.N_;,o.;_.....:I;;::II:_:o:..:f....:D:_:am::::;:,o..:...d:....:ar.::.....::.H.:..:e..:...a_;_d,,;_;w...:.o.:.,:rk.::s_S:...:u.:..:b.....:-D::.....:..;iv...:.is.:.,:i...:,:on=.~_+·~- Removal of deposited earth from bed and slopes of Durgapur Branch 3.94 -+ 0.12 iCanal from ch. 102.00 to ch. 140.00 under Durgapur Section No. III! [of Damodar Headworks Sub-Division. I Removal of deposited earth from bed and slopes of Durgapur Branch 3.11 0.10 'Canal from ch. 140.00 to ch. 165.00 under Durgapur Section No. III I iofDamodar Headworks Sub-Division. ' -----+----~-- - IRemoval of deposited earth from bed and slopes and repairs to left! 4.73! 0.15 [bank from ch. 185.00 to ch. 205.00 and deposited earth removal fromi 'bed of canal from ch. 225.00 to ch. 240.00 of DBC under Durgapurl Section No. III of Damodar Headworks Sub-Division. I6 Running repairs to water course for khar--if-f-i-rr-ig-a-tl-'o-n-s-e-a-so-n~2-02-0-1~~0-.6-0~-+-~~0-.-0-2~- under Durgapur Section No. III of Damodar Headworks Sub- Division. 7 Supplying mazdoor (male) for helping gauge reader and also 1.70 0.06

Departmental staff in operating gates of Durgapur Barrage during I

!flood season for the period from Jun'20 to Oct'20 of Durgapur Section! i [No. I of Damodar Headworks Sub-Division under Damodar] I i IHeadworks Division. !' I

I" -8 rSupplyi~g-~-f ma~do~~f~r--the p~os~-;-f;atching, gua~ding andl4.591--D.14I i .operating gates as per requirment of various sites of Durgapur Section: I

!INO. III of Damodar Headworks Sub-Division for the period from 'I' L Aug'20 to Nov'20. ! 9 I Supplying of mazdoor and sweeper for cleaning and sweeping work I 2.14 0.07

i and also supplying skilled labour for compliances of flood data, i i irrigation data etc. for the period from Aug'20 to Nov'20 of Durgapurl' I Section No. I of Damodar Headworks Sub-Division under Damodar

, 10~::~~,-e~::~i~~0:pair to Me13, DBC/4 and O,ld,-,,16,canal-an,~d' ,2',4,,5,--:1 - 0.08 i cleaning deposited earth of Irrigation Section under lDamodar Canal No. II Sub-Division. J 11 IMai~ienance ~d rep~ir-work at-c:la~lged--~yph()~ -a~diw()-()ther! i-.17-~i - 0.04

12iEi~;~~~~~i~;~~:~':;c:;:~:7::mo:hL:;:O:~:\-4.84--1 0.15 !~~~~~i~~~~:ingremo=ing:aterh~acinthOf~amOdar~anal N~.It_~__l __ Sheet 1 of3 I&WD's Main scheme ID: IWIMRl93/2020-21 (Rs.in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount amount No. put to tender 1 2 3 4 13 Mamtenance and repair to canals (excludmg breaches) dunng the I 1.53 irrigation period of Bhedia Irrigation Section No I under Guskara Irrigation Sub-Division of Damodar Headworks Division during 2020. f--~---+----~-~~--~-~--~--~------~------~~~------+------Maintenance and repair to canals (excluding breaches) during the! 1.51 0.05 irrigation period of Guskara Irrigation Section under Guskara Irrigation Sub-Division of Damodar Headworks Division during

I khariff irrigation 2020. I 15 Supply of daily labour for guarding, controlling and operating the 2.41 0.08 regulator gates during the irrigation period of Bhedia Irrigation [Section No. I under Guskara Irrigation Sub-Division of Damodar I, I f--- Headworks Division- for the year 2020. --- - -~---~-----+------+------.-j I 16 i Supply of daily labour for guarding, controlling and operating the I 1.62 0.05 I !regulator gates during the irrigation period of Guskara Irrigation] I ISection under Guskara Irrigation Sub-Division of Damodarl I k- :Hea_c!_wor~s_PJ~~~nfor~theY~_Cl.r2020. ~_ ----~------f~------__J

17 !Maintenanceand repair to canal in between ch. 212.00 & ch. 240.001 2.01 I 0.07 i

.of Dy-C of DBC under Guskara Irrigation Section of GUSkara~ I' 'I . rrigation Sub-Division of Damodar Headworks Division. 1- M~intenance ~drepair to-~itnal in between ch.40.00~t~-~h.60.00 of --U8-- --I----0.0{i

i 135.50 Water Course of P-2 of PBC under Ramchandrapur Section of I II' , I Guskara Irrigation Sub-Division of Damodar Headworks Division. l_ 1-1"9rM~inten~~~~d-~epair to--~analbank in-between ~h.-5~Oto ch. 28J)"' 2.35 [--0.-0-8----1

I [of P/9 of PIA and construction of protection work at ch. 6.0 and I i

irepair of lining in between ch. 40.50 to ch. 51.0 of canal PIA ofPBq I j

I iunder Dignagar Irrigation Section of Guskara Irrigation Sub-DivisionI I I h under Damodar Headworks Division. r- --l 20 -1M~i~~~~nce-~ndrepair -to~can~lbankTn -btweench. 42.0 to ch. 67.ot-- 2.64-- - --0.08-- I I I i& construction of protection work at ch. 0.00 of canal P/8: I [(downstream of offtake structure) of PiA of PBC under Dignagarl Irrigation Section of Guskara Irrigation Sub-Division under Damodarl j .Headworks Division. I

i 21 ! Maintenance and repair to Anderson weri under Headworks Section 0.68 0.03 of Damodar Canal No. II Sub-Division under Damodar Headworks Division. Emergent repairs to damage slope lining VIS, right bank of KOOqUej' 4.85 0.15 Syphon at ch. 898.00 of LBMC under Rondia Irrigation Section of Damodar Canal No. IISub-Division. 23 Repairs to canal bank in between ch. 890.00 & ch. 920.00 at right 2.42 0.08 bank of LBMC under Rondia Irrigation Section of Damodar Canal

No. IISub-Division. -----~----~-----~I

Sheet2 of3 I&WD's Main scheme ID: IWIMRl93t2020-21 (Rs.in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount amount No. put to tender 1 2 3 4 24 'Emergent repairs to breaches at ch. 35.00 left bank, 15.00 nght bank, 2.40 0.08

110.00 left bank of WC-38.5 of P-2 of P.B under Ramchandrapur .Irrigation Section of Guskara Irrigation Sub-Division within Damodar

! Headworks Division. I I2s-jpainting ~~~k to -th; both~d~~~iling-~f head regulator bridg-e-o-f+-I--2-.4-2-~--- -0-.0-8-- --~

1 LBMC & RBMC, Gauge Well etc. ,md jungle cutting on the peripheral area of Durgapur Barrage and Section Office under'

, Damodar Headworks Sub-Division of Damodar Headworks Division. i

126 Clearing & removal of hyacinth from Durgapur Barrage under 2.85 0.09

I Damodar Headworks Sub-Division of Damodar Headworks Division., WI Maintenance and repair to app~~ch on the right bank of L-B-M-C-a-t-c-h-+.I--1.-6-4--+----o-.-o5-----1

i 176.00 under Damodar Headworks Sub-Division of Damodari

! i Headworks Division. i !------t ------.------.---+------.-- --j--- 28 IDetail topographical survey by using total atation and GPS system: 2.47 0.08 including preparing layout plan, cross section of both upstream & I downstream of river at 50 m ck: for a length of 250 m and long! section, built up drawing, structural drawing etc. of Anderson Weir at' Rondia under Damodar Canal No. II Sub-Division of Damodar Headworks Division. --_ .. - -_------_.------,,_- ---- .Engagement of consultant for preparation of Detailed Project Report,' 0.15 Iformation of speficication of items with rate analysis, preparation of !NITetc. in connection with rehabilitation of Anderson Weir on river I iDamodar at Village Rondia, Block Galsi-I, District Purba Bardhaman on---the basis.._--.of------_.-report of--Safety---- Audit.._----_.-during.._--_..2019-20._...-- -.. --- .j-- ---..._-+

30 Scanning of Service Books and allied works of GovernmentI 2.12 '1 Employees under Damodar Headworks Division for introduction ofl

I [online system of service book management in HRMS module of! I' _.IIFMSof Damodar I:I._eadworksDivision. I . h3i IEmergent closure ~f leakage ~hrough damaged Flap Shutter ga~9--+---0-.-0-4 - iPratappur Syphon III P.S Barjora under Damodar Headworks s-ub~1 -...

I Division. I Total :1 77.95 2.51

Estimated Cost of Main Estimate : 80.46 Lakh

0-1..l:r ~ I·I"1 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 3 of3 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G020210056061W Date: 29/01/2021 File No:IW/PIIB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Damodar Headworks Division, I & W Directorate

SubjectAdministrative Approval for the Scheme for ess aintenance works of functional and non• functional assets of infrastructurel office (total 10365 Block-Durgapur-Faridpur, Ausgram-I , Ausgram-II and Galsi-I, PS-Cokeoven Ausgram a ud of District-Paschim Bardhaman, Purba Bardhaman during 2020-21 Scheme Id - IW/MR/941 2020-21

,Project ID:- IW202133718S000

The undersigned is directed, by order of the G to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for essential ance works of functional and non-functional assets of infrastructurel office (total 10365 Sqm) in Block-Durgapur .. r, Ausgram-I , Ausgram-II and Galsi-I, PS-Cokeoven Ausgram and Budbud of District-Paschim Bardhaman, ardhaman during 2020-21 Scheme Id - IW/MRl941 2020-21

,the details of which has been given below.

Name of the Project: Scheme for essential maintenance works of functional and non-functional assets of infrastructurel office (total 10365 Sqm) in Block-Durgapur-Faridpur, Ausgram-I , Ausgram-II and Galsi-I, PS-Cokeoven Ausgram and Budbud of District-Paschim Bardhaman, Purba Bardhaman during 2020-21 Scheme Id - IW/MRl941 2020-21

Project 10: IW202133718S000

Address: Block-Durgapur-Faridpur, Ausgram-I , Ausgram-II and Galsi-I, PS-Cokeoven Ausgram and Budbud of District-Paschim Bardhaman, Purba Bardhaman Administrative Approval: Rs 1725000 (Seventeen Lakh Twenty Five Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Head Amount SI No. Financial Year Type Name

Maintenance State Development 32-2700-80-001-00-001-19-00- V Expenditure in 1725000 1 2020-21 Schemes Irrigation Sector Total 1725000 Additional Conditions

Conditions Description 1 List of the part estimates (total 7 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

This order is issued with the concurrence of FINANCIALADVISOR ( & Waterways) of this Department vide their 1 his U.O No. AA2021019125FAOODated 19/01/2021. ~- JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210056061W Date: 29/01/2021 Copy forwarded for information and n

The Additional Chief Secretary 1 Sec ary-(Irrigation & Waterways Department)

The PrincipalAccountant General(A&E)-West Bengal

The PrincipalAccountant General(Audit)-West Bengal

The PrincipalAccountant General(RW/LBA)-West Bengal

The FinancialAdvisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N) 01,,~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005606IW Dated 29.01.2021. I&WD's Main scheme ID: IWIMRl94/2020-21 (Rs in lakh) Contingency @ Sl. Tendered Name of sub-estimates as per tender 3% of amount amount No. put to tender 1 2 3 4 0.02 1 i.SuppyI ing of one no. mathor mazdoor fo washing & cleaning theiI 0.37 'Iurinal& latrine of Guskara Irrigation Sub-Division, rest shed andI.

staff quarters of Guskara Irrigation Colony under Guskara Irrigation I

.. I!:;~;~t~~:V~~Irrigation SUb-Div~on for ~er periOd. fromI ._~~ __+'I --I 2 ! Supplying of mazdoor and mathor mazdoor for the purpose of 1.24 0.04 iwatching, guarding, cleaning, sweeping, washing etc. of Bhedia rest] i shed and Colony under Bhedia Irrigation Section No. II of Guskara Jl'l'igation Sub-Division f~~~ ~ug'?Q~}\f~'(2Q_. ~___ _-----+-_ 3 •Supplying of unskilled mazdoor for the purpose of sweeping.: 1.04 0.04 [cleaning Guskara Irrigation Sub-Division Office, Office of Dignagar]

!Irrigation Section, maintaining rest shed and for maintaining water 1

'1'supply system at Guskara Irrigation Colony under Guskara IrrigationI Sub-Division of Damodar Headworks Division for the period from: _ IAu~'~Q_toN()_'(2_Q_. ._.__.._.... __~ . ' ~ _ 41Supplying labour for guarding of Rondia Irrigation Bungalow for] 2.56 0.08 Imaintaining Bungalow premises, water supply at Rondia Irrigation

! Colony and Bungalow for the period of August to November for the Iyear 2020 under Headworks Section of Damodar Canal No" I ! -sl su~i;:~!f~~~~:~o~o;::·~:::: ;;i~:~~.D£'~!~di~g-Oil-4~6i··0.14 iDVC New Colony under Durgapur Section No. II of Damodari

6 -tr~;~~f~~s ~~~~~~~rO-~!O~~~~:~~~~ef~fta~;~~;:o:~:~rding ofl 2.77 r- -0.09- i 1 .S i.tor.e.Section for the p.eri.odfrom Aug'20 t.oNoy'20 under Durgapurl I I ! Section No. II of Damodar Headworks Sub-Division of Damodar ~ iHeadworks Division. ,-7 ,Suppllying o{ masoIl,--carpente~, math~r-mazdo~r and unskilled I -4-.1-2-- -- -0-.13- -

[mazdoor for the maintenance of colony, office tee. Including I

I sanitization under DIS No. II of Durgapur Headworks Sub-DivisionI Ifor the period from Aug'20 to Nov'20. i I Total:1 16.71 0.54

Estimated Cost of Main Estimate: ~ 17.25 Lakh

~'t.1II(11 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Memo No:G02021 0056081W Date: 29/01/2021 File No:IW/PIIB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Damodar Headworks Division, I & W Directorate

SubjectAdministrative Approval for the Scheme for ess aintenance works of functional and non• functional assets of inspection/ campus road of 7.88 block - Barjora, Kanksa, Ausgram-I , Ausgram-II, , Galsi-I, P.S- Barjora, Kanksa, .A m, Bhatar and Budbud of District Bankura, Paschim Bardhaman, Purba Bardhaman Scheme Id - IW/MR/95/ 2020-21 ,Project ID:- IW202133720S000 I' The undersigned is directed, by order of the Gov~n2r, to say that the Governor has been pleased to accord Administrative Approval for the Project Scheme for essentiallTjafnteT\ilnce works of functional and non-functional assets of inspection/ campus road of 7.886 Km in block - Barjora, KanKsa;"Ausgram-1 , Ausgram-II, Bhatar, Galsi-I, P.S- Barjora, Kanksa, Ausgram, Bhatar and Budbud of District Ba(lk!J(~;;Paschim Bardhaman, Purba Bardhaman Scheme Id - IW/MR/95/ 2020-21 .. ,the details of which has been given belp.

Name of the Project: Scheme fot essential maintenance works of functional and non-functional assets of inspection/ campus road of 7.886 Km in block - Barjora, Kanksa, Ausgram-I ,Ausgram-II, Bhatar, Galsi-I, P.S- Barjora, Kanksa, Ausgram, Bhatar and Budbud of District Bankura, Paschim Bardhaman, Purba Bardhaman Scheme Id - IW/MR/95/ 2020-21

Project ID: IW202133720S000

Address: block - Barjora, Kanksa, Ausgram-I ,Ausgram-II, Bhatar, Galsi-I, P.S- Barjora, Kanksa, Ausgram, Bhatar and Budbud of District Bankura, Paschim Bardhaman, Purba Bardhaman Administrative Approval: Rs 4852000 (Forty Eight Lakh Fifty Two Thousand Only.)

Phaslnq amount and chargeable head of accounts

Scheme Scheme Financial Year Head Amount SI No. Type Name

Maintenance State Development 2020-21 32-2700-80-001-00-001-19-00-V Expenditure in 4852000 1 Schemes Irrigation Sector Total 4852000 Additional Conditions

Conditions Description 1 List of the part estimates (total 12 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

This order is issued with the concurrence of FINANCIAL ADVISOR ( & Waterways) of this Department vide their / his U.O No. AA2021019127FAOO Dated 19/01/2021.

JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Memo No: G020210056081W Date: 29/01/2021

Copy forwarded for information and ne

The Additional Chief Secretary / Sec ary-(lrrigation & Waterways Department)

The Principal Accountant General(A&E)-West Bengal

The Principal Accountant General(Audit)-West Bengal

The Principal Accountant General(RW/LBA)-West Bengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance Department- (Group F&N) O-1,.v JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005608IW Dated 29.01.2021. I&WD's Main scheme ID: IWIMR/95/2020-21 IRs in lakh) Contingency @ Tendered Sl. 3% of amount Name of sub-estimates as per tender amount No. put to tender 4 1 2 3 0.13 1 Repairing inspection of LBMC (left bank) in between ch. 848.00 tOI 4.28 ch. 852.00 and diversion road for a length of 77.00 m including approach road and repairing secured zone of bridge approach at ch.] ! 1 927.00 under Rondia Irrigation Section of Damodar Canal No. II Sub-I Division. I 0.15 2 Maintenance and repair to approach road from Dangapara to I 4.82 Shaldanga bridge under Headworks Section of Damodar Canal No. II' ______-4 4- ~ Sub-Division under Damodar Headworks Division. I 3 ,Maintenance and repair to inspection path from Gate-II to Gate-III 4.75 0.15

I (outside of Rondia Irrigation Campus) under Headworks Section of! iDamodar Canal No. II Sub-Division under Damodar Headworksl

0.13 -4 l~~:~~inspecti()n path from ch. 0.00 to~h. 30:00 of canal P/2 of 11. 4.32 1'- '--1 'PBC of Dignagar Irrigation Section under Guskara Irrigation Sub- !

~.. __tPJ'v'ision.<:If Damodar H~adworks Division. I: l ! 5 lRepai~ingof-~~pe'cti~n path-~t right-b~ f~o;:;~h. -900.00 -to-ch. - -4.83 ---I 0.15 I ! 1932.00of Durgapur Branch Canal under Guskara Irrigation Section of, ! l. J_9-uskaraIrrigation Sub-Division of Damodar Headworks Division.. I ! 1--6-IMaintenan~-~and ~ep;ir to inspection path at"Zh."87.00to-~h: 112.000651 0.14 I I of right bank of P-3 of PBC at Ramchandrapur Irrigation Section I l I under Guskara Irrigation Sub-Division of Damodar Headworks] i

1~ .,__Division. .. _.______._ _ __ ._ .__ J_.-' .. ---~ i ..--_.- . 0.07 i 7 :.Maintenanceand repair to inspection path from ch. 1460.00 to ch. "1 2.12

11 ! 1468.00 of left bank of PBC at Ramchandrapur Irrigation Section junder Guskara Irrigation Sub-Division of Damodar Headworksl L IDivision. -+\ +------1 . 8 Maintenance and repair to inspection path at ch. 60.00 to ch. 85.00 ofl 4.69 0.15 [right bank of P-3 of PBC at Ramchandrapur Irrigation Section under! !GuskaraIrrigation Sub-Division of Damodar Headworks Division. \ 9 iConstruction of approach road for hassle-free access to Durgapur 3.47 0.11 ISection No. III Office from Rajbandh Station Road under Damodar 'Headworks Sub-Division. 2.89 0.09 10 I Construction of approach road for hassle-free access to Durgapur I' Section No. III Office from Durgapur Branch Canal at ch. 7.00 under , .Damodar Headworks Sub-Division. -11------' 0.08 iTi '\Repairsto pot-holes on the Durg.a.purBa~;ge RO.~din bet..ween 2.34 =. ____ J 1 __ J1'-l.<:l:2 & (}~!~l'J.<:l..~8 in p.~ Barjo_!"a,Di~ti<;_t_Bankl!!"~_ -- --_------'---

Sheet 1 of2 I&WD's Main scheme ID: IWIMR/9S/2020-21 (Rs in lakh] Contingency @ Tendered Sl. 3% of amount Name of sub-estimates as per tender amount No. put to tender 2 3 4 1 1 12 Repair of damaged W.B.M layer ill btween 0.00 m to 840.00 m of] 3.89 0.l2

head regulator of HLBMC of Durgapur Barrage to Birbhanpur Bridge I over Water Supply Canal Road under Durgapur Section No. I of Damodar Headworks Sub-Division of Damodar Headworks Division. Total: 47.05 1.47 I I

Estimated Cost of Main Estimate : ~ 48.52 Lakh

Grl.tr~ I' r 11 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 2 of2 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 29/01/2021 Memo No:G020210056091W File No:IW/P/IB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer, Damodar Headworks Division, I & W Directorate

"t'tMaintenance works of functional and non• SubjectAdministrative Approval for the Scheme for Es Block-Ausgram-I P.S-Ausgram of Purba functional assets of Infrastructure loffice (total 17700 f Paschim during 2020-21 Bardhaman District and Block-Kanksa, ,P.S-Kank Scheme Id - IW/MR/961 2020-21

,Project ID:-IW202133722S000

t'K,~r~, to say that the Governor has been pleased to accord Administrative The undersigned is directed, by order of the G enance works of functional and non-functional assets of Infrastructure Approval for the Project Scheme for Essential sgram of and Block-Kanksa, ,P.S-Kanksa loffice (total 17700 sq m in Block-Ausgram and of Paschim Bardhaman District - 1 Scheme Id - IW/MRl96/2020-21

,the details of which has been given below. Scheme for Essential Maintenance works of functional and non-functional assets of Name of the Project: Infrastructure loffice (total 17700 sq m in Block-Ausgram-I P.S-Ausgram of Purba Bardhaman District and Block-Kanksa, ,P.S-Kanksa and of Paschim Bardhaman District during 2020-21 Scheme Id - IW/MRl96/2020-21

Project 10: IW202133722S000

Address: Block-Ausgram-I P.S-Ausgram of Purba Bardhaman District and Block-Kanksa, ,P.S• Kanksa and of Paschim Bardhaman District Administrative Approval: Rs 403000 (Four Lakh Three Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount SI No. Financial Year Head Type Name

Maintenance State Development Expenditure in 403000 32-2700-80-001-00-001-27 -OO-V 1 2020-21 Schemes Irrigation Sector 403000 Total Additional Conditions

Conditions Description 1 List of the part estimates (total 2 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

& Waterways) of this Department vide their 1 This order is issued with the concurrence of FINANCIAL ADVISOR ( his U.O No. AA2021019128FAOO Dated 19/01/2021.

@J1Y JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department

Date: 29/01/2021 Memo No: G020210056091W

Copy forwarded for information and ne

The Additional Chief Secretary 1 Se ary-(Irrigation & Waterways Department)

The Principal Accountant General(A&E)-WestBengal

The Principal Accountant General(Audit)-WestBengal

The Principal Accountant General(RW/LBA)-WestBengal

The Financial Advisor-(Irrigation & Waterways Department)

The Finance Department- (Group F&N) C?r1..lr"._ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005609IW Dated 29.01.2021.

I&WD's Main scheme ID: IWIMR/96/2020-21

(Rs in lakh) Contingency @ Tendered 3% of amount SI. Name of sub-estimates as per tender amount No. put to tender 3 4 1 2 2.64 0.08 1 Maintenance and repair to Four Unit Barrack of Guskara Irrigation! , " Colony in Block Ausgram-I, P.S Ausgram, District Burdwan under \ Guskara Irrigation Section of Guskara Irrigation Sub-Division of

! Damodar Headworks Division. I 1.27 0.04 2 \Emergent repairing of Section Office cum quarter premises and I lkhalashi shed ofPanagarh Irrigation Section of Damodar Canal No. IIi Sub-Division, Rondia under Damodar Headworks Division. i Total: 3.91 0.12

Estimated Cost of Main Estimate: t 4.03 lakh

G-1,J..;2-f r, I '1 Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 1 of 1 GOVERNMENT OF WEST BENGAL Irrigation & Waterways Department Jalasampad Bhawan, 3rd Floor, Western Block, Salt Lake,

Date: 29/01/2021 Memo No:G020210056101W File No:IW/P/IB-SDS-13/2020-21

From:- JOINT SECRETARY Irrigation & Waterways GOVERNMENT OF WEST BENGAL Irrigation & Waterways

To:The Executive Engineer-II, Lower Damodar Construction Division W Directorate

works of functional and non-functional SubjectAdministrative Approval for the Essential Maint nels in Blocks--I, Shyampur-I and assets covering total length of 120.40 km of Oraina a, P.S-Uluberia, Shyampur and Bagnan, II, Bagnan-I and II and Uluberia Municipal Corpora Oistrict- duirng 2020-21. Scheme Id - IW/MR/97/2020-21

,Project 10:- IW202133806S000 The undersigned is directed, by order of the G " to say that the Governor has been pleased to accord Administrative Approval for the Project Essential Maintenanc k~vof functional and non-functional assets covering total length of 120.40 km of Drainage Channels in Blocks-Uluberi'lll1; ampur-I and II, Bagnan-I and II and Uluberia Municipal Corporation area, P.S-Uluberia, Shyampur and Bag , (J)!strict-Howrah duirng 2020-21. Scheme Id -IW/MRl97/2020-21

,the details of which has been given below. Essential Maintenance works of functional and non-functional assets covering total length Name of the Project: of 120.40 km of Drainage Channels in Blocks-Uluberia-I, Shyampur-I and II, Bagnan-I and II and Uluberia Municipal Corporation area, P.S-Uluberia, Shyampur and Bagnan, District- Howrah duirng 2020-21. Scheme Id - IW/MRl97/2020-21

Project ID: IW202133806S000

Address: Blocks-Uluberia-I, Shyampur-I and II, Bagnan-I and II and Uluberia Municipal Corporation area, P.S.-Uluberia, Shyampur and Bagnan, District-Howrah Administrative Approval: Rs 7564000 (Seventy Five Lakh Sixty Four Thousand Only.)

Phasing amount and chargeable head of accounts

Scheme Scheme Amount Name SI No. Financial Year Head Type Maintenance State Development Expenditure in Flood 7564000 32-2711-01-001-00-002-27 -OO-V 1 2020-21 Schemes Control Sector 7564000 Total Additional Conditions Conditions Description 1 List of the part estimates (total 30 numbers) of the main scheme is attached as Annex, which is an offline document and authenticated by the undersigned. The pdf version of the online AAFS generated G.O. of Administrative Approval together with the Annex is available on the Departmental website www.wbiwd.gov.in under Notification link. The part estimates are also deemed to have been administratively approved along with the main scheme. While submitting bills to the treasuries, the Divisional Engineers will quote the G.O. Number of the main scheme as reference to Administrative Approval to the part estimates and produce the relevant G.O. with Annex with the part estimate duly marked.

& Waterways) of this Department vide their 1 This order is issued with the concurrence of FINANCIALADVISOR ( his U.O No. AA2021019129FAOODated 19/01/2021.

Qr1~L'- JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Date: 29/01/2021 Memo No: G0202100561OIW Copy forwarded for information and nec;~§s The Additional Chief Secretary 1 Se2r~tary-(lrrigation& Waterways Department)

The PrincipalAccountant General(A&E)-West Bengal

The PrincipalAccountant General(Audit)-West Bengal

The PrincipalAccountant General(RW/LBA)-West Bengal

The FinancialAdvisor-(Irrigation & Waterways Department)

The Finance Department-(Group F&N)

~ JOINT SECRETARY Government of West Bengal Irrigation & Waterways Department Enclosure to I&W D's AA GO No. G02021005610IW Dated 29.01.2021. I&WD's Main scheme ID: IWIMR/97/2020-21 (Rs.in lakh) Contingency @ Tendered 3% of amount si Name of sub-estimates as per tender amount No. put to tender 3 4 1 2 1.20 0.04 1 AMC of clearing and removing of drainge congestion of waterways & slope of Gusoro Khal for a length of2.S0 km from Sitala Mandir tot I KhaIore of Gusoro Khal m. G.P Khalore, Block Bagnan-I, P.S Bagnan !

~~ under Section of Sejberia Irrigation Sub-Division. 4-~~---~.~~~~--

2 AMC of clearing and removing of drainge congestion of waterways! 0.53 I 0.02 & slope of Sontoshpur Khal for a length of 1.00 km from Sontoshpur] sluice to Kalatala of Sontoshpur Khal in G.P Antila, Block Bagnan-II,I P.S Bagnan under Bansberia Section of Sejberia Irrigation Sub-l

Division. I ___.~.__l _ 3 IAMC of clearing and removing of drainge congestion of waterways: 1.87 0.06 I 1 \& slope of Kalatala Khal for a length of 4.80 km from confluence] ipoint of Khal to Rastia in G.P Khalore & Antila, Blocks Bagnan-I &! !n, P.S Bagnan under Bansberia Section of Sejberia Irrigation Sub-!

lDivision. i .------+----.-~- 4 IAMC of clearing and removing of drainge congestion of waterwaysi 3.80 0.l1 1& slope of MMC (Reach-VIII) for a length of 3.30 km fromI [Bansbcria lockgate to Cahdipur RCC bridge in G.P Chandipur, Block, [Uluberia-I, P.S Uluberia under Bansberia Section of Sejberia\ , ' !IrrigationSub-Division. 5 AMC of clearing and removing of drainge congestion of waterways 2.94 0.09 & slope of branch channel of MMC (Reach-VIII) from Duttapara toI Gharsalav for a length of 4.50 km in Meshpur G.P & Hirapur G.P,I iBlock Uluberia-I, P.S Uluberia under Rajapur Section of Sejberia]

\Irrigation Sub-Division. II .. 1.36 0.04 i 6 'iAMCof clearing and removing of drainge congestion of waterwaysI i& slope of Rajapur Branch Khal for a length of 5.00 km fromI K~talghata Musl~mpara to. Nabod.o~ S.angha and upto .Jagatpurl [Primary School in Ulubena Municipality, Block Ulubena-I, P,SI

Uluberia under Rajapur Section of Sejberia Irrigation Sub-Division. I: 0.05 7 'IAMCof clearing and removing of drainge congestion of waterways\ 1.58 i& slope ofMMC (Reach-VIII) for a length of 3.20 km from Uluberia] Ilockgate to RCC bridge in Uluberia Municipality.l \Block Uluberia-I, P.S Uluberia under Rajapur Section of Sejberia\

I [lrngation Sub-Division. 0.l2 AMC of clearing and removing of drainge congestion of waterways 3.89 & slope of MMC (Reach-VIII) for a length of 5.00 km fromI Gangarampur RCC briege to Chandipur RCC bridge in Uluberia\ Municipality, Maheshpur G.P & Chandipur G.P, Block Uluberia-L] P.~ . ~luberia under Rajapur Section of Sejberia Irrigation Sub-\

'DIVISIOn. .-~--~~~~~~_!_I~~~~~~~~~~-

Sheet 1 of 4 I&WD's Main scheme ID: IWIMRl97/2020-21 (Rs.in lakh) Contingency @ Tendered 3% of amount Sl. Name of sub-estimates as per tender amount No. put to tender 4 2 3 1 0.05 9 AMC of cleanng and removmg of dramge congestion of waterways] 1.70 & slope of Baghaberia Khal for a length of 5.00 krn from Baghaberia] sluice to Rasti in G.P Antilla, Block Bagnan-II, P.S Bagnan underl

Kulitapara Section of Sejberia Irrigation Sub-Division. I--~1 0.04 10 AMC of clearing and removing of drainge congestion of waterways] 1.37 & slope of Dhanpatia Khal for a length of 2.50 krn from Dhanpatia to \ Sasati in G.P Sasati, Block Sharnpur-II, P.S Sharnpur under! Kulitapara Section of Sejberia Irrigation Sub-Division. 0.03 11 AMC of clearing and removing of drainge congestion of waterways I 0.96 & slope of Kulitapara Khal for a length of 3.00 krn from Kullitapara, sluice to to Antilla in G.P Chadvagga, Block Bagnan-II, P.S Bagnan\ \ under Kulitapara Section of Sejberia Irrigation Sub-Division. -+-----~-----1 0.06 IAMC of clearing and removing of drainge congestion of waterways] 2.14

I & slope of Laharipara Khal for a length of 6.50 krn from Amantapur] Ito Kantapukur via Belpukur & towards Hoglashi in G.pl IDihimondalgha~-I & II, Blocks Shampur-I & IT,.P.S Shampur underi [Kulitapara Section ofSeJbena Irrigation Sub-Division. I 0.04 AMC of clearing and removing of drainge congestion of waterways! 1.37 \13 & slope of Polgoria Khal for a length of 3.00 km from Polgoria to I ! I Bhanghar in G.P Amardaha, Block Shampur-II, P.S Shampur under I I I Kulitapara Section of Sejberia Irrigation Sub-Division. ~, ,AMC of clearing and removing of drainge congestion of waterways, . 0.04 i 14 155-1- - \& slope of Sarkarpara Khal for a length of 4.00 km from sarkarparai [sluice to Kulitapara in G.P Chadvagga, Block Bagnan-I, P.S Bagnan\ I I I under Kulitapara Section of Sejberia Irrigation Sub-Division. I \ ---~---I I 1-- i 0.12 ; 15 IAMC of clearing and removing of drainge congestion of waterways I 3.87 I i& slope of Chapa Khal for a length of 4.40 krn from Kalinagar to\ I iDarnodarpur in G.P Kalinagar & Bahira, Block Uluberia-I, P.Sl

\11 \ Uluberia under Heaquarter Section of Sejberia Irrigation Sub- \ Division. I --T------~ 2.96 I 0.09 r-i6 I\AMC of clearing and removing of drainge congestion of waterways 1'\ I 1& slope of Chapa Khal and branch of Chapa Khal for a length of2.70 \ I ikrn from Damodarpur to Birepur More in G.P Bahira, Block Uluberia] \1, P.S Uluberia under Heaquarter Section of Sejberia Irrigation Sub-\ IDivision. 2.59 0.08 17 IIAMC of clearing and removing of drainge congestion of waterways I& slope of Chapa Khal and branch of Chapa Khal for a length of 2.51 'km from Birepur More to Kantakhali in G.P Kashrnul, Block , iUluberia-I, P.S Uluberia under Heaquarter Section of SejberiaL ' I I ___ 'I_!TJgatioIl~~b~I>i-~~on:__------: ~~------

Sheet 2 of 4 I&WD's Main scheme ID: IWIMRl97/2020-21 (Rs in lakh) Contingency @ Tendered Sl. 3% of amount Name of sub-estimates as per tender amount No. put to tender 4 2 3 1 0.08 \AMC of clearing and removing of drainge congestion of waterways] 2.56 I 18 I !& slope of Manicktala Khal for a length of 3.20 km from Kalinagarl !Bazar to Amsha sluice m G.P Kalmagar, Bahira & Dhulosimla, Block I \Uluberia-I, P.S Uluberia under Heaquarter Section of Sejberia\

! Irrigation Sub-Division. 2.l2 0.06 19 IAMC of clearing and removing of drainge congestion of waterways I 1&slope of Manicktala Khal for a length of2.8 km from Amsha sluice \ i .to Bhetpota in G.P Bahira, Block Uluberia-I, P.S Uluberia under

l IHeaquarter Section of Sejberia Irrigation Sub-Division. ! 0.03 ' 20 IAMC of clearing and removing of drainge congestion of waterways & slope of Branch of Manicktala Khal for a length of 1.60 km from I \ I \,Amsha sluice to Choto Amsha in G.P Bahira, Block Uluberia-I, P.S1 I IUluberia under Heaquarter Section of Sejberia Irrigation Sub- i I !Division.. . . . I 3.63 0.l1 , 21 IAMC of clearmg and removmg of dramge congestion of waterways I & slope of Bagganda Khal for a length of 3.40 km from Baggandai\ 'sluice to Dhulosimla in G.P Dhulosimla, Block Uluberia-I, P.S I [Uluberia under Heaquarter Section of Sejberia Irrigation Sub-! I If__ IDivision. --_J---~------__i I 22 AMC of clearing and removing of drainge congestion of waterways, 1.86! 0.06 \ I& slope of Bagganda Khal for a length of 2.60 km from Dhulosimla' , :to Moulbesia Swasan in G.P Dhulosimla, Block Uluberia-I, P.SI \ [Uluberia under Heaquarter Section of Sejberia Irrigation Sub-

~3~1~~-~-~-~-~-~-·-cl-e-ar-~-g-a-n-d-r-e-mo-v-~-g-0-f-d-rn-i-~-e-c-oo-g-e-s-ti-oo-o-f-w-a-t-e-rwa-y-s~--2-.-50--1!---~~-7~-~~:" " i& slope of Branch of Bagganda Khal for a length of 3.10 km from \ I:Dhulosimla to Moulbesia Tetultala to Pitala in G.P Dhulosimla, \1 \

[Block Uluberia-I, P.S Uluberia under Heaquarter Section of Sejberia' I r-_~\Irr~ig~a_ti_o_n_S_u_b_-D-iv_i_si_o_n_.------+I----4------~ 24 IAMC of clearing and removing of drainge congestion of waterways! 3.82 0.11 \& slope of Rangamati Khal for a length of 5.00 km from Rangamati] [sluice to Gauripur in G.P Hirapur, Block Uluberia-I, P.S Uluberia\ ! under Heaquarter Section of Sejberia Irrigation Sub-Division. I ----~-l-~ ------3.42 i 0.l0 25 IAMC of clearing and removing of drainge congestion of waterways I 1,&slope of Belari Khal for a length of 5.00 km from Belari sluice to , " [Kenduali sluice in G.P Belari, Block Syampur-I, P.S Shyampur under Ii i

1 ,Heaquarter Section of Sejberia Irrigation Sub-Division. \ -l------2.48 I 0.07 26 IAMC of clearing and removing of drainge congestion of waterways' 1& slope of Chandipur Khal and Branch of Chandipur Khal for a IIlength of 4.00 km from Zilla Parishad Bungalow to Nabagram I,Culvert in G.P Belari & Nabagram, Block Syampur-I, P.S Shyampur under Heaquarter Section of Sejberia Irrigation Sub-Division. - _--_------,------"------

Sheet 3 of 4 I&WD's Main scheme ID: IWIMRl97/2020-21 (Rs in lakh) Contingency @ Tendered 3% of amount Sl. Name of sub-estimates as per tender amount No. put to tender 4 2 3 1 3.13 0.09 27 AMC of clearing and removing of drainge congestion of waterways & slope of Tawali Khal and Branch of Tawali Khal for a length ofl 4.00 km from Tawali sluice to Mollapara in G.P Nabagram, Block

Syampur-I, P.S Shyampur under Heaquarter Section of Sejberia I Irrigation Sub-Division. I 0.10 AMC of clearing and removing of drainge congestion of waterwaysl 3.26 : 28 I I I 1& slope of Joynagar Khal and Branch of Joynagar Khal for a length] lof 4.00 km from Joynagar sluice to Bissaspur in G.P Dhandali &\ I \Kashmul, Block Syampur-I, P.S Shyampur under Heaquarter Section \ I I ----~--~----j I lof Sejberia Irrigation Sub-Division. l f--- 1---- 0.05 I 29 IAMC of clearing and removing of drainge congestion of waterways! 1.74 l& slope of Branch of Bagganda Khal for alength of 4.50 km from, \Dhulosimla Bechuram's house to Bablu Mondal's house, DhuloSimlal\ \Bazar to Kalu Khaner Pole and High School to Khanpara in iG.P Dhulosimla, Block Uluberia-I, P.S Uluberia under Heaquarterll ISection of Sejberia Irrigation Sub-Division. ------1 0.19 ! 30 AMC of clearing and removing of drainge congestion of waterways 6.31 & slope of Hallyan Khal from Damodar to Rupnarayan in G.P Hallyan, Block Bagnan-II, P.S Bagnan, District Howrah under Kulitapara Section of Sejberia Irrigation Sub-Division. Total : 73.44 2.20

Estimated Cost of Main Estimate : ~ 75.64 lakh

81..(.,;,"(~ Joint Secretary (Works) Irrigation & Waterways Department Government of West Bengal

Sheet 4 of 4