Amita H. Kosambi [email protected] | [email protected] | 405.801.7128 1032. E Lindsay St Apt A , Norman, Oklahoma 73071, USA

OBJECTIVES M.S. student in Natural Gas Engineering & Management at University of Oklahoma with 10+ years of professional experience. Acquired work experience in Oil & Gas, LNG downstream projects. Willing to secure a career opportunity at your organization, to utilize my knowledge, experience and skills while contributing towards the growth of organization.

PROFESSIONAL SUMMARY | CAPABILITIES TECHNICAL PROFICIENCIES: . During work acquired experience on FEED & Basic Engineering projects, EPC projects | Worked on Process Descriptions, Process Design Basis & Operating Manuals, BEDP, Vessels Sizing, Process equipment and Instruments Datasheets, Hydraulic calculations, Line sizing using Prodraw and HydroAce software| Cause-and-Effect Diagram . PFS, PEFS, PSFS, MSD | Heat & Material Balance | Man-hours estimation & project estimation Coordination between involved project participants | Documents review . Relief scenarios identification and load calculations, worked with PPM (Pressure Protection Manager software), Process Safeguarding Memorandum, Process Safety Time calculations, Depressurization using CAPES software and HYSIS . Worked with Aspen HYSIS and Honeywell’s UNISIM simulation| Participated in HAZOP and SIL review . During the Master’s course while working on academic projects, acquired knowledge on using software: ProMax, NOV Drilling Simulator, OLGA, PIPESIM, CMG-WINPRO . Worked on AutoCAD, HTRI, Aspen FLARENET, Microsoft Office Suite (Word, Excel, Power Point, Outlook), Lotus Notes LANGUAGE PROFICIENCIES: . English: Fluent & proficient in speaking, reading & writing . Marathi and Hindi: Native languages

EDUCATION | CERTIFICATIONS M.S. in Natural Gas Engineering & Management | University of Oklahoma (OU) OK, USA| Dec. 2019 Relevant Coursework: Advanced Production Engineering |Natural Gas Engineering | Advanced Reservoir Engineering | Natural Gas Finance- Valuation & Investment | Advanced Drilling| Natural Gas Processing | Natural Gas Utilization| Natural Gas Finance Trading & Risk Management GPA: 3.5 Graduate Research Assistant – MPGE, OU |Advisor Dr. Hamidreza Karami |December 2019 Research: Foam Lift Efficiency for Gas Well Deliquification in Presence of Condensates. This study is carried out for experimental evaluation of various surfactants’ performances of in the presence of both water and condensates with regards to unloading the liquids from downhole of Natural Gas wells.

Bachelor of Chemical Engineering | Shivaji University | Maharashtra, India |July 2004 GPA: 72.87 / 100 | First Class with Distinction

Diploma in Piping Technology | Vishwakarma Institute of Technology | Pune, India | 2006 - 07 Industrial in-plant training at Star Oxochem Pvt. Ltd. (An ISO 9002 Company) | India | June 2003 Gained knowledge on the process and plant operation, gas chromatography. Worked on the report which includes the process, heat and energy balance, manufacturing cost. National level Technical Paper Presentation on ‘Fuel cell technology’ at ‘Eureca-2004’ held by Tatyasaheb Kore Institute of Engineering & Technology, Warnanagar, India. State level Project exhibition participation on ‘Manufacturing of Furfuryl Alcohol’ at Nirmiti-2004 held by Padmarshri Vasantdada Patil Institute of Technology, Budhgaon, India.

PROFESSIONAL EXPERIENCE . Sr. Process Engineer Jacobs Engineering India Pvt. Ltd | Mumbai, India | Apr 2012 – Jul 2017 Deputed to Shell Technology Center Bangalore as a Process Engineer at BPDO, Bangalore Project Design Office, India | Apr 2012 – Mar 2016 BPDO is an engineering alliance between Shell & Jacobs at the Shell Technology Center.

. Sr. Process Engineer L&T Chiyoda Ltd. | Mumbai, India | Dec 2006 – Apr 2012 L&T-Chiyoda Limited (LTC) is a design and engineering consultancy organization formed by a joint venture between Larsen & Toubro Limited, India's premier Engineering, Manufacturing & Construction company and Chiyoda Corporation, Japan, world renowned Engineering Company with experience in Hydrocarbon and related fields.

PROJECTS WORKED With Jacobs Engineering India Pvt. Ltd. . Worked in Workshare with Jacobs Nederland Meerssen office, British Petroleum Netherlands, Shell (Vito deep-water project) at Gulf of Mexico. (Duration: collectively 16 months) Worked on: Hydraulics calculations, Line list, P&ID preparation, and Instrument engineering database preparation.

With Shell Technology Center Bangalore . Karratha Gas Facility Woodside LNG: Client- Woodside Energy Ltd. (Australia) & Shell Global Solution International. Worked on: Process Safety Time calculations, PSM & PSFS, coordination and document review | Duration: 14 months . Brunei LNG: Client: Brunei LNG Sad. Bhd. (Brunei) & Shell Global Solution International | LNG Capacity 6.71 MTPA | Duration: 10 months Worked on: Relief Scenarios, PSV Load calculations, PSFS, Process Safeguarding Memorandum . FOIP (Field Operations Integrity Project): Performed adequacy check for relief system on existing facilities for Upstream International Europe (UIE) assets of Shell | Assets involved: St. Fergus, Ameland, Den Helder, K-15, L9, Braefoot Bay Terminal, , and Anasuria | Duration: collectively 12 months . iMMLS (independent Movable Modular Liquefaction System), FEED project | This project was conceptualized and initiated for a small scale, modularized LNG plant for a nominal 0.20 ~ 0.25 MPTA LNG production for various feed gas composition cases & intended this design will be implemented for various projects across the globe. Worked on: PEFS, PFS, PSFS, Safeguarding Philosophy, Process Safeguarding Memorandum, Basis for Design, participated Hazop and SIL review, Hazop closed-out report | Duration: 12 months

With L&T Chiyoda Ltd. . Ravva field Gas Lift Pressure Upgradation Project Glycol Dehydration Unit, (RAVVA field, Andhra Pradesh India), Client/Owner: Cairn Energy India Ltd. Product: Sales Gas (35 MMSCFD) Worked on: Prepared BEDB, Process Design Basis for Glycol Dehydration package, GDU Specification, Compressor datasheet |Duration 6 months . B2K (Browse to Kimberly) FEED stage Project, Client: Woodside Energy Ltd. (Australia) | Product: LNG | Capacity: 4MMTPA x 3 trains Worked on: Prepared Hydraulic calculations, Depressurizing calculations using CAPES software and HYSIS | Duration 8 months . PLNG Papua New Guinea LNG (FEED & EPC project). Client: Highlands Ltd, Esso Australia Pty Ltd. | Product: LNG | Capacity: 3.3 MMTPA x 2 trains Worked on: Reviewed Hydraulics calculations, IPDS, line list, Prepared Depressurizing calculations, operating manual | Duration 9 months . Barzan Onshore Feed & Execution Planning Project (Ras Gas Company Limited, Qatar). Owner: Barzan Limited & Qatar Petroleum | Product: Sales Gas (Ethane, Propane, Butane) | Capacity: 950 MSCFD x 3 trains Worked on: Hydraulics calculations, Depressurising calculations, PSV using PPM (Pressure Protection Manager software), Relief load summary, Vessel sizing, Datasheets – equipment, package items| Duration: 18 months collectively for FEED1 & FEED2 stages . Hydrogen Generation Unit (HGU) at GGSR Guru Govind Singh Refinery (Bhatinda India) | Capacity: 9MMTPA | VHGU (HGU Vizakh Refinery) Capacity: 36000 MTPA |Proposal engineering stage: equipment costing | HGU - MRPL Refinery Project at Mangalore I Capacity: 70000 TPA | Duration: 6 months . MX4 Mizushima Plant, Japan, Mitsubishi Gas Chemicals Company I Product: Meta Xylene I Licenser: UOP | Hydraulics calculations, P&ID | Duration: 4 months . SFCCL (Saudi Formaldehyde Chemical Co. Ltd.) |Product and capacity: 700 MTPD Methanol & 100 MTPD CO | Licenser: Haldor Topsoe | Hydraulics, P&IDs (process & utility), IPDS | Duration: 6 months

INVOLVEMENT . Member of Integrity Council at Oklahoma University - involved as a Peer Educator. . Member of SPE at Oklahoma University . ACEDS (Association of Chemical Engineering Department Students 2004) at D. Y. Patil College. Part of organization team for Paper Presentation event. Performed Technical quiz anchoring, stage designing, and certificate designing.