Burgeo Lifeboat Station

AS-BUILT DRAWING AS-BUILT DRAWING Goose Bay Marine Communications and Traffic Service (MCTS) Centre

Lark Harbour Lifeboat Station

AS-BUILT DRAWING AS-BUILT DRAWING Previous Port Aux Basques Marine Communications and Traffic Service (MCTS) Centre

Port Aux Basques Marine Communications and Traffic Service (MCTS) Centre

Port Au Choix Lifeboat Station

St. Anthony Lifeboat Station

St. Lewis Conservation and Protection Office

Stephenville Base

Twillingate Lifeboat Station

C

1 2 3 4 5.1 5 4.1 6 7 8 Public Works and Travaux Publics et Government Services Services gouvernementaux Canada

A A

BERTOIA HS TS

VESTIBULE GEAR AND DRYING VESTIBULE 115 114 101

HP -005

B B

RG RL LIVING/RECREATION RECYCLING OPS WR TS 112 111 110 ELECTRICAL OPS ROOM CO2 109 103

CORRIDOR 6 102 12 HP -003 12 6 TS CO2 HP -006 RG RG RG RL RL RL 2018.07.18 10 MECHANICAL 10 6 TS CO2 16 107 16 12 HP -002 HP -001 10 HP -004 20

KITCHEN RL FITNESS DDC PANEL STAIR OPS STOR ENGINEER CO OFFICE

117 RG 108 S01 106 105 104

16mm REFRIGERANT GAS AND 10mm TS TS REFRIGERANT LIQUID UP TO LEVEL 2

C C

CU -001 CU -002

FOR DETAILED REFRIGERANT LINE SIZING 1 2 3 4 5.1 5 4.1 6 7 8 INFORMATION SEE HEAT PUMP SCHEMATICS DRAWING H601.

1 HEATING AND A/C PLAN - LEVEL 1 H104 SCALE 1 : 75

C

1 2 3 4 5.1 5 4.1 6 7 8

A A

B B 0 ISSUED FOR TENDER 2018.07. 18

BEDROOM #5 WASHRM #2 revisions date 208 206 project projet HP -010 BEDROOM #3 CO BEDROOM #2 207 TS DFO FACILITY - SAR LAUNDRY WASHRM #1 203 HP -012 TS 205 204 HP -008 STATION -

TS CORRIDOR HP -009 6 212 12 TWILLINGATE, AND RL RL RG RG 16 16 HP -013 TS 10 TS 10 HP -011 10 12 HP -007 drawing dessin BEDROOM #6 LAN ROOM 16 6 CORRIDOR TS 209 TS

201 RG 210 BEDROOM #4 STAIR BEDROOM #1 RL 211 S01 16 202 10 HEATING AND A/C PLANS - OPS

C C BUILDING 16mm REFRIGERANT GAS AND 10mm REFRIGERANT LIQUID FROM LEVEL 1.

designed B.K.D. conçu

date 04/23/18 drawn J.E.L. dessiné

1 2 3 4 5.1 5 4.1 6 7 8 date 04/23/18 approved approuvé FOR DETAILED REFRIGERANT LINE SIZING -- INFORMATION SEE HEAT PUMP SCHEMATICS DRAWING H601. date 04/23/18 Tender Soumission

PWGSC Project Manager Administrateur de projets TPSGC project number no. du projet 2 HEATING AND A/C PLAN - LEVEL 2 R.089926.001 H104 SCALE 1 : 75 drawing no. no. du dessin

C H104

PWGSC A1 (2004) E-DRM/GDD-E: 552726 0 10 20mm 40 60 80 100 120 140 160 180 200mm C DRAWING NOTES: DRAWING NOTES:

1 600x900 STORMPROOF EXHAUST LOUVER WITH 600x900x450 PLENUM. PLENUM SHALL BE 1 FLEXIBLE CONNECTION TO MATCH GENERATOR SET RADIATOR/DUCT CONNECTION Public Works and Travaux Publics et WELDED, WATERTIGHT WITH 25mm CAPPED DRAIN AT BASE. INSULATE PLENUM AND EXHAUST Government Services Services gouvernementaux DUCT FROM HRV TO PLENUM PER SPECIFICATION. 2 1725x2225 INSULATED MOTORIZED DAMPER. DAMPER TO FAIL OPEN. Canada Canada 2 600x900 STORMPROOF INTAKE LOUVER WITH 600x900x450 PLENUM. PLENUM SHALL BE 3 350x250 INSULATED MOTORIZED DAMPER IN COOL DOWN EXHAUST DUCT. DAMPER TO FAIL CLOSED. WELDED, WATERTIGHT WITH 25mm CAPPED DRAIN AT BASE. INSULATE PLENUM AND INTAKE DUCT FROM HRV TO PLENUM PER SPECIFICATION. 4 1725 WIDE x 2225 HIGH STORMPROOF EXHAUST LOUVER. MOUNT BOTTOM OF LOUVER 600mm ABOVE FINISHED FLOOR. LOUVER AND WALL ASSEMBLY BELOW LOUVER TO BE REMOVABLE TO 3 200x150 SUPPLY DUCT DOWN TO WORKSHOP AT 70 L/S. ALLOW INSTALLATION/REMOVAL OF GENERATOR. 5 GENERATOR EXHAUST PIPE. TERMINATE WITH TAPERED END 450mm BEYOND BUILDING WALL. 4 200x150 EXHAUST DUCT FROM WASHROOM BELOW AT 40 L/S. 6 MANUFACTURED THIMBLE

7 550 WIDE x 1000 HIGH INSULATED MOTORIZED DAMPER. DAMPER TO FAIL CLOSED.

8 1000x750 FRESH AIR INTAKE HOOD

9 1000x750 INSULATED MOTORIZED DAMPER. DAMPER TO FAIL OPEN.

10 SILENCER AND FLEX SUPPLIED WITH GENERATOR, INSTALLED BY THIS DIVISION. THERMALLY INSULATE AND JACKET SUITABLE FOR HIGH TEMPERATURE APPLICATIONS. SEE SPECIFICATION. 11 GENERATOR EXHAUST PIPE. THERMALLY INSULATE AND JACKET SUITABLE FOR HIGH TEMPERATURE APPLICATIONS. SEE SPECIFICATION. 12 350x250 COOL DOWN EXHAUST DUCT CONNECTION AT EXHAUST PLENUM.

13 250x150 SUPPLY DUCT FROM ABOVE AT 70 L/S.

14 250x150 SANITARY EXHAUST DUCT UP AT 40 L/S.

15 250x350 INSULATED MOTORIZED COOL DOWN INTAKE DAMPER. DAMPER TO FAIL CLOSED.

2018.07.18

9 10 11 12 9 10 1135 LITRE11 DOUBLE WALL FUEL 12 STORAGE TANK 6 1 F' F' F' F' 5 100ø 11 1725x2225 PLENUM. 9 10 12

4

3 GENERATOR ROOM 2 8 350/250 121 7 GENERATOR SET 15 F F F F

TS F-002

RC 400/200 155 L/s

FRC STORAGE BAY 1 120 RC HP -016 400/200 C 155 L/s

300/250 6 RC 12 400/200 155 L/s 2 RG

500/250 RL

CO NO2 E E E E 4 TS TS 14 500/200 FRC STORAGE BAY 2 EB 122 150/200 HRV-3 40 L/s

STORAGE LOFT 214 500/200 3 0 ISSUED FOR TENDER 2018.07. 13 18 SC SC SC RG SC 300/200 300/200 300/200 WORKSHOP revisions date 145 L/s 145 L/s 145 L/s RL 150/200 123 70 L/s project projet 300/250 400/250 6 12 1 16 HP -014 DFO FACILITY - SAR 10 HP -015 12 RL RG 6 STATION -

D D D D TWILLINGATE TWILLINGATE, NEWFOUNDLAND AND LABRADOR CU-003

9 10 11 12 9 10 11 12 drawing dessin

HEATING, A/C AND VENTILATION PLANS - FRC BUILDING

designed B.K.D. conçu

date 05/17/18 drawn J.E.L. dessiné

date 05/17/18 approved -- approuvé

date 05/17/18 Tender Soumission

PWGSC Project Manager Administrateur de projets TPSGC VENTILATION - FRC BUILDING - project number no. du projet R.089926.001 MEZZANINE VENTILATION - FRC BUILDING 2 1 drawing no. no. du dessin H106. SCALE 1 : 75 H106. SCALE 1 : 75 C H106.

PWGSC A1 (2004) E-DRM/GDD-E: 552726 0 10 20mm 40 60 80 100 120 140 160 180 200mm