SPECIFICATIONS California Department of Corrections and Rehabilitation Folsom State Prison Represa, California Re-Roof Old Power
Total Page:16
File Type:pdf, Size:1020Kb
SPECIFICATIONS California Department of Corrections and Rehabilitation Folsom State Prison Represa, California Re-Roof Old Powerhouse Vocational Building Construction Drawings Submittal March 27, 2017 Volume 1of1 Divisions 00 through 09 THIS PAGE LEFT INTENTIONALLY BLANK SPECIFICATIONS Califomia Department of Corrections and Rehabilitation Folsom State Prison Re-Roof Old Powerhouse Vocational Building March 27, 2017 OSFM File Number: 03-34-44-0001-027 WIMS Number: 69716 Volume 1of1 Divisions 00 through 09 00 01 00 - 1 THIS PAGE LEFT INTENTIONALLY BLANK CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION Folsom State Prison Re-Roof Old Powerhouse Vocational Building 300 PRISON ROAD REPRESA, CA 95671 SPECIFICATIONS March 27, 2017 Ken Yamauchi THIS PAGE LEFT INTENTIONALLY BLANK HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package## DOCUMENT 00 0105 CERTIFICATIONS PAGE CLIENT AGENCY: CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION LOCATION: Folsom State Prison Old Powerhouse Vocational Building LEAD CONSULTANT: Firm: HY Architects Project Manager: Kristopher Maddox [email protected] Telephone Number: (530) 758-1270 Fax Number: (530) 758-4789 The Technical Specifications and Working Drawings have been prepared by or under the direct supervision of the following design professionals, licensed in the State of California: HY Architects Buehler & Buehler Structural 4602 2nd Street Engineers, Inc. Davis, CA 95618 600 Q Street, Suite 200 Phone: (530) 758-1270 Sacramento, CA Fax: (530) 758-4789 Phone: (916) 443-0303 Fax: (916) 443-0313 ARCHITECT STRUCTURAL ENGINEER CERTIFICATIONS PAGE CDCR-SDD 20151207 00 01 05 -1 Backcheck#l - MARCH 27, 2017 HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## CLIENT AGENCY: CALIFORNIA DEPARTMENT OF CORRECTIONS AND REHABILITATION LOCATION: Folsom State Prison Old Powerhouse Vocational Building REGULATORY REVIEWS: The Technical Specifications and Working Drawings have been reviewed by the following regulatory reviewers: APR 0 6 2017 Approval of this plan does not authorize or Approval of this plm does oot authorize or spproye a~ve any omission or deviation from aDDHCable regulatiOns. Final approval is s~ anrommisslonordaviatiohnm ~~, tO field ~on. One set Of approved Diana shal be aviffable on the project tJte at alf timll. Reviewed by J .n... .f.. •l!J ·17 •111> STATE FIRE MARSHAL ACCESS COMPLIANCE OSHPD OTHER END OF SECTION CERTIFICATIONS PAGE CDCR-SDD 20151207 00 01 05 - 2 Backcheck#l - MARCH 27, 2017 JOB CDCR FSP ReRoof Powerhouse Bldg BUEHLER & BUEHLER JOB NO. 2016-0288 DATE 12/20/2016 STRUCTURAL ENGINEERS, INC. CLIENT ~H-'-Y-'------ BY MTT SHEET NO. --"------ Powerhouse Vocational Education Building Wind Load Analysis Area 3 ( 120 psf) &··~····· Area 3 Area 1 (60 psf) (120 psf) Table 30.4-1 Steps to Determine C&C Wind Loads for Enclosed and Partially Enclosed Low-Rise Buildings Step 1: Determine risk category, see Table 1.5-1 Risk Ill per CDCR DCG Step 2: Determine the basic wind speed, V, for applicable risk 115 MPH category, see Fig. 26.5-lA, B, or C Step 3: Determine wind load parameters: > Wind directionality factor, Kd, see Section 26.6 and Table Kd =0.85 26.6-1 > Exposure category B, C, or D, see Section 26.7 Exposure C > Topographic factor, Kz1, see Section 26.8 and Fig. 26.8-1 K1z = 1.0 > Enclosure classification, see Section 26.10 Enclosed > Internal pressure coefficient, ( GCp;), see Section 26.11 and Table 26.11-1 Step 4: Determine velocity pressure exposure coefficient, Kz or K,,, see Kh =0.90 Table 30.3-1 2 Step 5: Determine velocity pressure, q,,, Eq. 30.3-1 qh = 0.00256 KhKz1KdV = 25.9 psf Step 6: Determine external pressure coefficient, (GCp) A 2 GC 1 8 P2a = 4 7 psf suction P2 = 58 psf 90 psf > Walls, see Fig. 30.4-1 ______. rea a p = - . > Flat roofs, gable roo~s, hip roofs, see Fig. 30.4-2 Area 3 GCP =-2.8 p = 73 psf suction p = 91 psf 120 psf > Stepped roofs, see Fig. 30.4-3 3 3 > Multispan gable roofs, see Fig. 30.4-4 - 14/66 - 0 21 > Monoslope roofs, see Fig. 30.4-5 ~ r - - · > Sawtooth roofs, see Fig. 30.4-6 Area 1 GC = P1 = 20 psf suction p1 = 25 psf 60 psf > Domed roofs, see Fig. 30.4-7 P > Arched roofs, see Fig. 27.4-3 note 4 0.85(-0. 7-0.21) = -0. 77 Step 7: Calculate wind pressure, p, Eq. 30.4-1 Area 2b GCP = -1.8 P2b =47 psf suction P2 =58 psf 90 psf _____S_te_n_.g.__th_v_al_u_e_s __~J With Factor Use J of Safety Factory Mutual uses a Safety Factor of 2 on ASD loads. To convert Strength loads to ASD loads divide by Load Factor of 1.6 Factor Strength by 2/1.6 = 1.25 then round up. HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## SECTION 00 0110 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 00 Project Title Page 00 01 05 Certifications Page Structural Wind Load Calculations 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets Bidding Requirements To Be Included With Bid Package Contract Forms To Be Included With Bid Package Conditions of the Contract To Be Included With Bid Package SPECIFICATIONS GROUP GENERAL REQUIREMENTS SUBGROUP DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 Summary of Work 01 31 19 Project Meetings 01 32 00 Scheduling 01 33 00 Submittal Procedures 01 33 23 Shop Drawing, Product Data, and Samples 01 33 50 Certificate of Product Compliance 01 35 43 Environmental Procedures 01 35 53 Security Procedures 01 41 00 Regulatory Requirements 01 42 00 References 01 43 39 Mockups 01 45 00 Quality Control 015000 Temporary Facilities and Controls 015213 Field Offices and Sheds 01 65 00 Product Delivery Requirements 01 71 23 Field Engineering 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management and Disposal 01 78 23 Operation and Maintenance Data TABLE OF CONTENTS CDCR-SDD 20160914 00 0110-1 Backcheck#l - MARCH 27, 2017 HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## FACILITY CONSTRUCTION SUBGROUP DIVISION 02 - EXISTING CONDITIONS 02 41 00 Demolition 02 82 13 Asbestos & Lead Abatement 02 81 00 Transportation and Disposal of Hazardous Materials DIVISION 03 - CONCRETE (Not Used) DIVISION 04 - MASONRY (Not Used) DIVISION 05 METALS (Not Used) DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 22 00 Roof and Deck Insulation 07 54 19 Polyvinyl-Chloride (PVC) Roofing 07 60 00 Flashing and Sheet Metal 07 90 00 Joint Protection DIVISION 08 - OPENINGS (Not Used) DIVISION 09-FINISHES 09 90 00 Painting and Coating DIVISION 10 - SPECIAL TIES (Not Used) DIVISION 11 - EQUIPMENT (Not Used) DIVISION 12 - FURNISHINGS (Not Used) DIVISION 13 - SPECIAL CONSTRUCTION TABLE OF CONTENTS CDCR-SDD 20160914 00 0110- 2 Backcheck#l - MARCH 27, 2017 HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## (Not Used) DIVISION 14 - CONVEYING EQUIPMENT (Not Used) DIVISION 15 -RESERVED DIVISION 16 -RESERVED DIVISION 17 - RESERVED DIVISION 18 - RESERVED DIVISION 19- RESERVED FACILITY SERVICES SUBGROUP DIVISION 20 - RESERVED DIVISION 21 - FIRE SUPPRESSION (Not Used) DIVISION 22 - PLUMBING (Not Used) DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) (Not Used) DIVISION 24 - RESERVED DIVISION 25 - INTEGRATED AUTOMATION (Not Used) DIVISION 26 - ELECTRICAL (Not Used) DIVISION 27 - COMMUNICATIONS (Not Used) DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (Not Used) DIVISION 29 - RESERVED SITE AND INFRASTRUCTURE SUBGROUP TABLE OF CONTENTS CDCR-SDD 20160914 00 0110- 3 Backcheck#l - MARCH 27, 2017 HY Architects CDCR Folsom State Prison 4722.000 Re-Roof 0 ld Powerhouse Vocational Building Bid Package ## DIVISION 30 - RESERVED DIVISION 31 - EARTHWORK (Not Used) DIVISION 32 - EXTERIOR IMPROVEMENTS (Not Used) DIVISION 33 - UTILITIES (Not Used) DIVISION 34 -TRANSPORTATION (Not Used) DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION (Not Used) DIVISION 36 - RESERVED DIVISION 37 - RESERVED DIVISION 38 - RESERVED DIVISION 39 - RESERVED PROCESS EQUIPMENT SUBGROUP DIVISION 40 - PROCESS INTEGRATION (Not Used) DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT (Not Used) DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT (Not Used) DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT (Not Used) DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT (Not Used) TABLE OF CONTENTS CDCR-SDD 20160914 00 0110- 4 Backcheck#l - MARCH 27, 2017 HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT (Not Used) DIVISION 46 - WATER AND WASTEWATER EQUIPMENT (Not Used) DIVISION 47 - RESERVED DIVISION 48 - ELECTRICAL POWER GENERATION (Not Used) DIVISION 49 - RESERVED END OF SECTION TABLE OF CONTENTS CDCR-SDD 20160914 00 0110- 5 Backcheck#l - MARCH 27, 2017 THIS PAGE LEFT INTENTIONALLY BLANK HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## SECTION 00 01 15 LIST OF DRAWING SHEETS SHEET NO. SHEET TITLE T0.1 TITLE SHEET Al.O SITE PLAN A2.0 DEMOLITION ROOF PLAN A2.1 REMODEL ROOF PLAN A4.0 REMODEL ELEVATIONS A5.0 REMODEL SECTIONS A8.0 EXISTING ROOF CONDITIONS A9.0 ROOF DETAILS S2.1 ROOF FRAMING PLAN END OF SECTION LIST OF DRAWING SHEETS CDCR-SDD 20141120 00 0115- 1 Backcheck#l - MARCH 27, 2017 THIS PAGE LEFT INTENTIONALLY BLANK HY Architects CDCR Folsom State Prison 4722.000 Re-Roof Old Powerhouse Vocational Building Bid Package ## SECTION 0111 00 SUMMARY OF WORK PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Project Description. 2. Owner Furnished Contractor Installed Products. 3. Use of Premises. 4. Contractor's Acceptance of Other Work.