Commercial IT Building Development at Plot No. 9/9A, TTC Industrial Area, MIDC Turbhe, Navi Mumbai by M/S. Nagesh Buildtech Pvt. Ltd. September 28
Total Page:16
File Type:pdf, Size:1020Kb
“Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial September 28th, area, MIDC Turbhe, Navi Mumbai by M/s. 2018 Nagesh Buildtech Pvt. Ltd. FORM 1 Commercial IT Building Development at Plot No. 9/9A, T.T.C. Industrial area, MIDC, Turbhe, Navi Mumbai Submitted to State Level Expert Appraisal Committee (SEAC-II), Maharashtra Submitted by M/s. Nagesh Buildtech Pvt. Ltd. Environmental Consultants M/s. Building Environment (India) Pvt. Ltd. C.B.D. Belapur, Navi Mumbai- 400614 Contact details: +91 22- 41237072; Website: www.beipl.co.in & M/s. Kesari Infrabuild Pvt. Ltd. Vashi, Navi Mumbai- 400703 Contact details: +91- 22 27813317 / 27811612; Website: www.kiplenviro.com “Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial area, MIDC Turbhe, 2018 Navi Mumbai by M/s. Nagesh Buildtech Pvt. Ltd. APENDIX I (See Paragraph-6) FORM-1 (I) Basic Information Sr. No. Item Details 1 Name of the Project “Plan M” Commercial IT Building development at Plot No. 9/9A, T.T.C. Industrial area, MIDC, Turbhe, Navi Mumbai. 2 S. No. in the Schedule The project falls under category B2 of project activity number 8(a) as per MOEF EIA notification dated 14th September, 2006. 3 Proposed capacity/area /length/tonnage The subject project will be developed in the to be handled/command area/lease area/ Total Plot area: 10015.18 Sq. Mt. number of wells to be drilled Deduction: Nil Net plot area: 10015.18 Sq. Mt. 4 New/Expansion/Modernization This is a new project. 5 Existing Capacity/Area etc. Total Plot area: 10015.18 Sq. Mt. FSI area: 10015.18 Sq. Mt. Non FSI area: 20030.36 Sq. Mt. Total BUA: 30045.54 Sq. Mt. 6 Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7 Does it attract the general condition? If No Yes, Please specify 8 Does it attract the specific condition? It No yes, Please specify 9 Location The Project site is located at Plot No. 9/9A, T.T.C. Industrial area, MIDC, Turbhe, Navi Mumbai. Plot/Survey/ Khasra No. Plot No. 9/9A, T.T.C. Industrial area, MIDC, Turbhe Village -- Taluka -- District Thane State Maharashtra 10 Nearest railway station/airport along Turbhe Railway Station: 0.50 Km. with distance in kms. Mumbai Airport: 24.70 Km. 11 Nearest Town, City, District The nearest town from the project site is Turbhe. Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, The project site comes under MIDC. Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/s. Nagesh Buildtech Private Limited Office No. 321, B-wing, Arenja Corner, Plot No. 71, 1 “Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial area, MIDC Turbhe, 2018 Navi Mumbai by M/s. Nagesh Buildtech Pvt. Ltd. Sector-17, Vashi, Navi Mumbai- 400705 14 Registered Address M/s. Nagesh Buildtech Private Limited Office No. 321, B-wing, Arenja Corner, Plot No. 71, Sector-17, Vashi, Navi Mumbai- 400705 15 Address for correspondence: M/s. Nagesh Buildtech Private Limited Office No. 321, B-wing, Arenja Corner, Plot No. 71, Sector-17, Vashi, Navi Mumbai- 400705 Name Mr. Dinkar Sharma Designation(Owner/Partner/CEO) Director Address Pin Code Authorized Representative Mr. K Srinivasan E-mail [email protected] Telephone No. 022- 27813317 Fax No. NA 16 Details of Alternative Sites examined, If No any. Location of these sites should be shown on a top of sheet 17 Interlinked Projects NA 18 Whether separate application of NA interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22 Whether there is any Government NA Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its Relevance with the proposed project. 2 “Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial area, MIDC Turbhe, 2018 Navi Mumbai by M/s. Nagesh Buildtech Pvt. Ltd. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Confirmation Yes/No Details thereof (with approximate No. quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land No Basically land is Barren land. The use, land cover or topography including proposed project site is designated for the increase in intensity of land use (with intended purpose and the proposed built- respect to local land use plan) up area is 30045.54 Sq. Mt. 1.2 Clearance of existing land, vegetation No NA and building? 1.3 Creation of new land uses: No NA 1.4 Pre-construction investigations e.g. Yes Ground water quality and Soil testing bore houses, soil testing? analysis has been carried out. 1.5 Construction Works? Yes About 30045.54 Sq. Mt. will be construction work. Building configuration are as follows: 06 shops + 542 offices + 1 Conference room 1.6 Demolition Works? No NA 1.7 Temporary sites used for construction Yes Temporary labour sheds and adequate works or housing of construction sanitation facilities will be provided to the workers? construction laborers at the site during the construction work. 1.8 Above ground buildings, structures or Yes Plot area is barren land. Excavated earthworks including linear structures, material during construction will be used cut and fill or excavations. for landscape and backfilling therefore there will not be any solid waste problem from the generation of construction- excavated earth. 1.9 Underground works including mining No NA or tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing Process? No NA 1.14 Facilities for storage of goods or Yes Temporary sheds will be constructed for materials? the storage of construction materials during construction phase as per the material requirement. 1.15 Facilities for treatment or disposal of Yes Solid Waste Management 3 “Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial area, MIDC Turbhe, 2018 Navi Mumbai by M/s. Nagesh Buildtech Pvt. Ltd. Sr. Information/Checklist Confirmation Yes/No Details thereof (with approximate No. quantities/ rates, wherever possible) with source of information data solid waste or liquid effluents? Construction Phase During the construction phase, soak pits and septic tanks will be provided for disposal of waste water. Temporary sanitary toilets will also be provided during peak labor force. Operation Phase Total residing population of the commercial scheme is 7184 Nos. Quantity of Total Solid waste – 2281.00 Kg/day Quantity of Wet Waste – 1354.00 Kg/day Quantity of Dry Waste – 927.00 Kg/day Biodegradable and non biodegradable waste will be segregated. Dry waste will be sent for recycling and wet waste will be treated by “Kesari Fully automatic Organic Waste Converter” for composting. Liquid Waste Management During Construction: From Local Authority: 12 KLD (For workers) From Water Tankers: 10 – 20 KLD (Depending on construction activity) During Operation: Source: MIDC Total Water Demand: 398.00 M3/Day Domestic Water Demand: 144.00 M3/Day Flushing water Demand: 249.00 M3/Day Car washing Requirement: 05.00 M3/Day Total treated water available: 341.00 M3/Day 3 Treated water reused: 254.00 M /Day 1.16 Facilities for long term housing of No NA operational workers? 1.17 New road, rail or sea traffic during No NA construction of operation? 4 “Plan M” Commercial IT Building Development at Plot No. 9/9A, TTC industrial area, MIDC Turbhe, 2018 Navi Mumbai by M/s. Nagesh Buildtech Pvt. Ltd. Sr. Information/Checklist Confirmation Yes/No Details thereof (with approximate No. quantities/ rates, wherever possible) with source of information data 1.18 New road, rail, air waterborne or other No NA transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing No NA transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No NA pipelines? 1.21 Impoundment, damming, culverting, No NA realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No NA 1.23 Abstraction or transfers of water from No During construction phase MIDC water ground or surface waters? supply/ Tanker water will be used for the construction purpose. 1.24 Changes in water bodies or the land No NA surface affecting drainage or run-off 1.25 Transport of personnel or materials for No NA construction, operation or decommissioning? 1.26 Long-term dismantling or No NA decommissioning or restoration works? 1.27 Ongoing activity during No NA decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Construction Phase temporarily or permanently? 150 Nos. workers and 35 Nos. staff. Operation Phase Total population is expected to be 7184. 1.29 Introduction of alien species? No NA 1.30 Loss of native species or genetic No NA diversity? 1.31 Any other actions? No NA 2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).