Environmental Clearance to SEIAA
Total Page:16
File Type:pdf, Size:1020Kb
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:January 22, 2020 To, M/s. Plutonium Business solutions Pvt. Ltd. (Mr. Ratilal Patodia –Director) at Plot No. 7 & 7A adjoining Ikea, Near Turbhe Railway Station, Thane Belapur Road, Turbhe, Navi Mumbai. Subject: Environment Clearance for Environment Clearance for IT Park Sir, This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification - 2006, by the State Level Expert Appraisal Committee-II, Maharashtra in its 116th meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its 184th meetings. 2. It is noted that the proposal is considered by SEAC-II under screening category 8 (a) B2 as per EIA Notification 2006. Brief Information of the project submitted by you is as below :- 1.Name of Project “Plutonium Business Park” at Turbhe, Navi Mumbai. 2.Type of institution Private 3.Name of Project Proponent M/s. Plutonium Business solutions Pvt. Ltd. (Mr. Ratilal Patodia –Director) 4.Name of Consultant M/s. ULTRA TECH 5.Type of project IT Park 6.New project/expansion in existing project/modernization/diversification New Project in existing project 7.If expansion/diversification, whether environmental clearance Not Applicable has been obtained for existing project Plot No. 7 & 7A adjoining Ikea, Near Turbhe Railway Station, Thane Belapur Road, Turbhe, Navi 8.Location of the project Mumbai. 9.Taluka Navi Mumbai 10.Village Turbhe Correspondence Name: M/s. Plutonium Business Solutions Pvt. Ltd. (Mr. Ratilal Patodia –Director) Room Number: -- Floor: Plot No.7 Building Name: -- Road/Street Name: Turbhe-Thane Belapur Road Locality: Belapur Road City: Navi Mumbai 11.Whether in Corporation / Maharashtra Industrial Development Corporation (MIDC) Municipal / other area Application No.: SWC/14/521/20190408/625263 Dated 27.09.2019 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Application No.: Approval Number SWC/14/521/20190408/625263 Dated 27.09.2019 Approved Built-up Area: SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 1 of 15 SEIAA) 13.Note on the initiated work (If Not Applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not Applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) 10268.00 Sq. mt. 16.Deductions -- 17.Net Plot area 10,268.00 Sq. mt. FSI area (sq. m.): 30,785.60 Sq. mt. 18 (a).Proposed Built-up Area (FSI & Non FSI area (sq. m.): 36,908.05 Sq. mt. Non-FSI) Total BUA area (sq. m.): 67693.65 Approved FSI area (sq. m.): -- 18 (b).Approved Built up area as per Approved Non FSI area (sq. m.): -- DCR Date of Approval: 27-09-2019 19.Total ground coverage (m2) 5313.093 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open 51.74 % to sky) 21.Estimated cost of the project 3087071281 SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 2 of 15 SEIAA) 22.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 23.Total Water Requirement Source of water M.I.D.C. Fresh water (CMD): 74 KLD Recycled water - 68 KLD Flushing (CMD): Recycled water - 15 KLD Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) 157 KLD : Fire fighting - Underground water 2 tanks with combine capacity of 200 KL tank(CMD): Fire fighting - Overhead water 30 KL tank(CMD): Excess treated water 31 KLD Source of water M.I.D.C./ Partly by RWH in monsoon season Fresh water (CMD): 74 KLD (53 from MIDC + 21 KLD from RWH) Recycled water - 68 KLD Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) 142 KLD : Fire fighting - Underground water 2 tanks with combine capacity of 200 KL tank(CMD): Fire fighting - Overhead water 30 KL tank(CMD): Excess treated water 46 KLD Details of Swimming NA pool (If any) SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 3 of 15 SEIAA) 24.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable Level of the Ground Details shall be submitted water table: Size and no of RWH tank(s) and RWH Tank of Capacity 70 KL Quantity: Location of the RWH Underground tank(s): Quantity of recharge 25.Rain Water Nil Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Rs. 8.00 Lacs (Capital cost) : Budgetary allocation Rs. 0.31 Lacs/annum (O & M cost) : Details of UGT tanks Location of UG tanks: Underground if any : Natural water The storm water collected through the storm water drains of adequate drainage pattern: capacity will be discharged in to the municipal SWD. 26.Storm water Quantity of storm 0.23 m3/sec drainage water: Size of SWD: 450 mm X 600 mm channel with slope 1:300 Sewage generation 127 KLD in KLD: STP technology: MBBR (Moving Bed Bio Reactor) Capacity of STP STP of Capacity 140 KL (CMD): 27.Sewage and Location & area of Location: Ground; Area: 113 Sq. mt. Waste water the STP: Budgetary allocation Rs. 52.95 Lacs (Capital cost): Budgetary allocation Rs. 12.59 Lacs/annum (O & M cost): SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 4 of 15 SEIAA) 28.Solid waste Management Waste generation in Waste generation: Excavation material shall be disposed to Authorized landfill site. the Pre Construction Disposal of the Construction waste material shall be partly reused/ recycled and and Construction construction waste remaining shall be disposed to the authorized site. phase: debris: Dry waste: 261 Kg/day Wet waste: 174 Kg/day Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry 19 kg/day sludge): Others if any: E-waste: 222 kg/month Dry waste: To Authorized recyclers Wet waste: Treatment in Organic Waste Convertor Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Use as manure sludge): Others if any: E- Waste: To Authorized recyclers Location(s): Ground Area Area for the storage of waste & other 13 Sq. mt. requirement: material: Area for machinery: 12 Sq. mt. Budgetary allocation Capital cost: Rs. 9.00 Lacs (Capital cost and O&M cost): O & M cost: Rs. 0.81 Lacs/annum SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 5 of 15 SEIAA) 29.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 6 of 15 SEIAA) 30.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not app45) Hazardous Waste Details Description Not Not Not Not Cat UOM 1 Not applicable Not applicable applicable applicable applicable applicable Existing Proposed Total Method of Disposal licable 31.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 DG Set -- -- -- -- -- 32.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 HSD Not applicable -- -- 33.Source of Fuel -- 34.Mode of Transportation of fuel to site -- 35.Energy Source of power MSEDCL supply : During Construction Phase: (Demand 150 KW Load) DG set as Power back-up during As per requirement construction phase During Operation phase (Connected 4158 KW load): Power During Operation requirement: phase (Demand 2495 KW load): Transformer: 4 nos. of 1000 kVA DG set as Power back-up during 1 no. of 750 kVA and 2 nos. of 1000 kVA each operation phase: Fuel used: HSD Details of high tension line passing No through the plot if any: SEIAA Meeting No: 184 Meeting Date: December 30, 2019 ( SEIAA-STATEMENT-0000003335 ) SEIAA-MINUTES-0000002876 Shri. Anil Diggikar (Member Secretary SEIAA-EC-0000002317 Page 7 of 15 SEIAA) Energy saving by non-conventional method: • Provision of LED lights • Use of VFDs • Energy efficient system • Use of Solar power for external lighting, lift lobby passage and staircase lighting, parking lights 36.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Overall energy saving 25 % 2 37.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Sewage -- STP Solid -- Organic Waste Convertor waste Budgetary allocation Capital cost: Rs. 26.00 Lacs (Capital cost and O&M cost): O & M cost: Rs.