Form 1 1A Ambi
Total Page:16
File Type:pdf, Size:1020Kb
Application form for Environmental Clearance Project Name: Residential Project, Ambi, Pune APPENDIX - I (See paragraph – 6) FORM 1 (I) Basic Information Sr. No. Item Details 1 Name of the project/s Residential project Xrbia Developers Limited At Village Ambi, Taluka- Maval, District- Pune. 2 S. No. in the Schedule 8 (a) 3 Proposed capacity / area/ Total Plot Area 45,481.14 m2 length/tonnage to be handled/ Deduction in Road Widening 645.76 m2 command area/lease area/ number of Deduction in Amenity 6725.30 m2 wells to be drilled. Net plot area 34299.07 m2 FSI area 67483.38 m2 No n FSI area 12863.04 m2 Total construction area 80346.42 m2 Detailed Area Statement is attached as Annexure I 4 New / Expansion / Modernization New Project 5 Existing Capacity/ Area etc. Not applicable 6 Category of project i.e. A or B B Category 7 Does it attract the general condition? if No yes, please specify 8 Does it attract the specific condition? If No yes, please specify 9 Location Village- Ambi Taluka- Maval, District- Pune Plot/Survey/ Khasra No. Plot bearing Gat No. 36, 37, 39,40, 339 Village Ambi Tehsil Maval District Pune State Maharashtra 10 Nearest railway station/port along with Talegaon railway station-3 km distance in kms. 11 Nearest Town, city, District Talegaon Dabhade Headquarters along with distance in Distance 3 km kms. 12 Village Panchayat, Zilla Parishad, Village Panchayat - Ambi, Municipal Corporation, Local Zilla Parishad - Pune, body(complete postal addresses with telephone nos. to be given) Town Planning – PMRDA. 13 Name of the applicant Xrbia Developers Limited 14 Registered address Xrbia Developers Limited 929, Mantri House, First Floor, F.C. Road, Shivajinagar, Pune - 411 004 Tel.no. : 020- 66877030 Fax : 020- 66877030 Email : [email protected] 15 Address for correspondence: Xrbia Developers Limited 929, Mantri House, First Floor, F.C. Road, Shivajinagar, Pune - 411 004 Tel.no. : 020- 66877030 Fax : 020- 66877030 Email : [email protected] Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 1 Application form for Environmental Clearance Project Name: Residential Project, Ambi, Pune Name Mr. Veer Bharati Kouls Designation(Owner/ Partner/ CEO) Director Address Xrbia Developers Limited 929, Mantri House, First Floor, F.C. Road, Shivajinagar, Pune Pin code 411 004 E-mail [email protected] Telephone No. 020- 66877030 Fax No. 020- 66877030 16 Details of alternative sites examined, if Village-District-State any. Location of these sites should be We are developing residential project on our own land shown on a toposheet. 17 Interlinked projects Not Applicable 18 Whether separate application of No interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If No, Reason Stand alone construction project 21 Whether the proposal involves No approval/clearance under: if ,yes details of the same and their status to be given a) The Forest (Conservation) Act, 1980? b) The wildlife (protection) Act, 1972? c) The CRZ Notification, 1991? 22 Whether there is any Government No Order/policy relevant/relating to the site? 23 Forest land involved ( hectares) No forest land involved in proposed project site 24 Whether there is any litigation pending No such litigation pending against the project against the project and/or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders/ Directions of the court if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes Permanent change in land use change in land use, land Land reserved for Residential Project cover or topography including increase in intensity of land use (with respect to local land use plan) 2 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 2 Application form for Environmental Clearance Project Name: Residential Project, Ambi, Pune 1.2 Clearance of existing land, No vegetation and buildings? 1.3 Creation of new land uses? No Residential Project 1.4 Pre-construction Yes Soil samples taken within the plot premises for investigations e.g. bore geotechnical investigation houses, soil testing? 1.5 Construction works? No 1.6 Demolition works? No 1.7 Temporary sites used for Yes Temporary sheds will be provided for workers construction works or Housing of construction workers? 1.8 Above ground buildings, Yes Total Top Soil Excavation quantity: 500 m3 structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No mining or tunnelling ? 1.10 Reclamation works? No 1.11 Dredging? No 1.12 Offshore structures? No 1.13 Production and No manufacturing processes? 1.14 Facilities for storage of Yes Only construction material will be stored in temporary goods or materials? storage site 1.15 Facilities for treatment or Yes Municipal Solid Waste Disposal System, OWC disposal of solid waste or Composting and Sewage Treatment Plant liquid effluents? 1.16 Facilities for long term No housing of operational workers? 1.17 New road, rail or sea traffic Yes Movements of trucks for material transport while during construction or construction operation? 1.18 New road, rail, air No Existing road will be used for the transport purpose. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No transmission lines or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 3 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 3 Application form for Environmental Clearance Project Name: Residential Project, Ambi, Pune 1.23 Abstraction or transfers of No water form ground or surface waters? 1.24 Changes in water bodies or No There will not be any changes in water bodies or the the land surface affecting land surface drainage or r un -off? 1.25 Transport of personnel or Yes Construction workers and construction material materials for construction, operation or decommissioning? 1.26 Long-term dismantling or No decommissioning or restoration works? 1.27 Ongoing activity during No There will not be any impact on the Environment decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No On ly Construction workers will stay till construction either temporarily or completes permanently? 1.29 Introduction of alien No No introduction of alien species will occur as this is species? purely residential project 1.30 Loss of native species or No No threat of species loss will occur genetic diversity? 1.31 Any other actions? No No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr.No. Information/checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 2.1 Land especially undeveloped No or agricultural land (ha) 2.2 Water (expected source & Yes Particulars Water Unit competing users) unit: KLD Consumption Fresh water 619 m3/day Recycled water 305 m3/day Total Water 923 m3/day Requirement Source: Ambi Grampanchayat 2.3 Minerals (MT) 2.4 Yes Stone aggregates demand will be met from the clay / construction material – stone, soil generated after excavation and cutting of rocks aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – Yes Only door frames (if so planned) MT) 2.6 Energy including electricity Yes Energy consumption and fuels (source, competing users) Unit: fuel (MT), energy Total Energy 2,468 kW (MW) consumption Source: MSEDCL 2.7 Any other natural resources No (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with 4 Ministry of Environment & Forests, New Delhi. Prior Environmental Clearance Notification 14.09.2006 4 Application form for Environmental Clearance Project Name: Residential Project, Ambi, Pune source of information data 3.1 Use of substances or No No hazardous material will be used for construction materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people No Proposed Project will not effect the welfare of people e.g. by changing living conditions?