Northern New South Wales

Total Page:16

File Type:pdf, Size:1020Kb

Northern New South Wales Regional Summary Northern New South Wales TransGrid owns and operates the main high Our network comprises 96 substations voltage electricity transmission network in and switching stations, and over 12,900 NSW and the ACT, connecting generators, kilometres of high voltage transmission distributors and major end users. It is lines and cables operating at voltages of TransGrid’s role to deliver a safe, secure 500kV, 330kV, 220kV and 132kV. It spans and reliable network through efficient New South Wales, from the coast to the maintenance, proficient operation of assets western-most areas of the state and from and sensible investment. the Queensland border at the north to the Victorian border at the south. TransGrid’s Role in Supplying Electricity TransGrid’s network carries bulk electricity from generators through high voltage transmission lines, underground cables and substations. The high voltage electricity is then converted to low voltage electricity suitable for household consumption at substations closer to power users. Distribution networks such as Ausgrid, Endeavour Energy and Essential Energy deliver electricity through smaller poles and wires to more than 3 million homes and businesses throughout NSW and the ACT. GENERATION Wind Farm Solar Farm Power Station Power Transformers DIRECT CONNECT CUSTOMERS Transmission Distribution Substation Substation TRANSMISSION DISTRIBUTION COMMERCIAL & INDUSTRIAL BUSINESS CONSUMERS RESIDENTIAL CONSUMERS Northern Region The Northern Region extends from the There are 29 TransGrid substations Hawkesbury River to the Queensland operating in Northern New South Wales Border and includes Central Coast, including five substations connected to Hunter Valley, New England, North West Power Stations with main system voltages Slopes, Mid North Coast and Far North ranging from 500kV, 330kV, 132kV. Coast, with over 4,000km of transmission lines. That is the same distance between TransGrid’s Northern Regional Centre is Sydney and Perth in Western Australia. located at Wirra Crescent, Newcastle. A second depot is located at Goonoo Goonoo Road, Tamworth. Mudgeeraba Bulli Creek Directlink Lismore 8M 8L 96L Dumaresq Casino Tenterfield 967 9C8 to Stroud 8E 8C 89 to Liddell Brandy Hill Moree 9U2 96R Koolkhan 9C6 to Bayswater 82 82 9C5 Inverell Glen Innes Tomago 9U4 81 95 96M 96H 9W One Steel 96N 966 89 Newcastle 94 96T INSET 90 92 96 Waratah West Narrabri 87 Coffs Harbour 9W8 Boambee South 93 96C 9W3 968 Raleigh Eraring 9W2 9U3 86 Armidale Dorrigo 9W7 24 92 9W6 Nambucca 26 85 Macksville Vales Point 969 965 Gunnedah 97A 9W5 23, 26 Tamworth 132 Tamworth 330 Kempsey 2M Munmorah 97B 96G Port Macquarie 9W9 Broken Hill 88 84 Tuggerah 964 Muswellbrook Herons Creek 26 Taree 25 79 Wollar 5A4 22 83 96P 5A1 5A2 21 Liddell 32 31 Wellington Beryl Bayswater 94B Stroud Mudgee 96F 82 3 94K 5A5 5A3 32 31 96 Burrendong Hawks Nest 2 81 94M 3 9C8 945 1 r 947 e to Tomago 72 p X2 Molong i Mt Piper Orange P Parkes 94P t INSET E 500/330 Mount 94U 94H North Ilford M Sydney 949 94 Colah Forbes Manildra94T Vineyard North Orange 944 Wallerawang 27 959 948 94X 14 20 92Z Buronga 998 Cowra Panorama 132 & 330 28 2629 OX1 76 Mount Druitt Griffith 973 999 B 5A6 5A7 77 99K an 39 17 11 932, 939 Sydney X5/3 na Gullen by East Balranald 99J Avon 10 Red Cliffs Darlington Point Yanco Murrumburrah Range 61 16 Regentville 38 Sydney West 99M Dapto 1C 8 18 Holroyd 99F 994 W 991 3J 32 Mudgeeraba X5/1 99T a Yass 4 Marulan Kangaroo Valley 1F gg North 5 30 Coleambally a 1 9R6 gga 970 Murrumbateman Bulli Creek 32 Wa 990 3W l Haymarket 63 976/2 Kemps 14 oo 99P Burrinjuck Capital Wind Farm 39 rp 99L Uranquinty 993 992 9 Creek ve a Tumut 976/1 to Li Sydney 42 Beaconsfield West 9R1 O97B2 977/1 37 South Directlink 9R2 Gadara Canberra Queanbeyan Wallerawang 12 Wagg330 O7 13 41 99A 62 O51 3C 76 Lismore Deniliquin Morven Blowering 3 ex-975 76 8M 8L 96L 9R3 Finley Lower Tumut O1 Williamsdale 78 Jindera 99H 996 77 Dumaresq Casino 64 Ingleburn 11 99B ANM 99Z 66 Upper Tumut Macarthur Tenterfield 967 65 978 97D 9C8 to Stroud O60 Hume to Bannaby 17 8E 8C 89 Murray 97K/1 Albury 995 Cooma to Avon to Dapto Snowy Adit to Liddell Brandy Hill Moree 9U2 Koolkhan 67 Geehi 9C6 96R 68 82 9C5 97G 97K/2 to Bayswater 82 Inverell Glen Innes Wodonga Tomago 9U4 Guthega Munyang 81 95 96M 96H Dederang Jindabyne 9W One Steel 96N 966 89 979 97L Newcastle 94 96T INSET 90 92 96 Waratah West Narrabri 87 Coffs Harbour 9W8 Boambee South 93 96C 9W3 968 Raleigh Eraring 9W2 9U3 86 Armidale Dorrigo 9W7 24 92 9W6 Nambucca 26 85 Macksville Vales Point 969 965 Gunnedah 97A 9W5 23, 26 Tamworth 132 Tamworth 330 Kempsey 2M Munmorah 97B 96G Port Macquarie 9W9 Broken Hill 88 84 Tuggerah 964 Muswellbrook Herons Creek 26 Taree 25 79 Wollar 5A4 22 83 96P 5A1 5A2 21 Liddell 32 31 Wellington Beryl Bayswater 94B Stroud Mudgee 96F 82 3 94K 5A5 5A3 32 31 96 Burrendong Hawks Nest 2 81 94M 3 9C8 945 1 r 947 e to Tomago 72 p X2 Molong i Mt Piper Orange P Parkes 94P t INSET E 500/330 Mount 94U 94H North Ilford M Sydney 949 94 Colah Forbes Manildra94T Vineyard North Orange 944 Wallerawang 27 959 948 94X 14 20 92Z Buronga 998 Cowra Panorama 132 & 330 28 2629 OX1 76 Mount Druitt Griffith 973 999 B 5A6 5A7 77 99K an 39 17 11 932, 939 Sydney X5/3 na Gullen by East Balranald 99J Avon 10 Red Cliffs Darlington Point Yanco Murrumburrah Range 61 16 Regentville 38 Sydney West 99M Dapto 1C 8 18 Holroyd 99F 994 W 991 3J 32 X5/1 99T a Yass 4 Marulan Kangaroo Valley 1F gg North 5 30 Coleambally a 1 9R6 gga 970 Murrumbateman 32 Wa 990 3W l Haymarket 63 976/2 Kemps 14 oo 99P Burrinjuck Capital Wind Farm 39 rp 99L Uranquinty 993 992 9 Creek ve a Tumut 976/1 to Li Sydney 42 Beaconsfield West 9R1 O97B2 977/1 9R2 Gadara Canberra Queanbeyan Wallerawang 37 12 South Wagg330 O7 13 41 99A 62 O51 3C 76 Deniliquin Blowering 3 ex-975 76 Finley Morven Lower Tumut O1 78 9R3 99H 996 Williamsdale 77 Jindera 64 Ingleburn 11 99B ANM 99Z 66 Upper Tumut Macarthur 65 978 97D O60 Hume to Bannaby 17 Murray 97K/1 Albury 995 Cooma to Avon to Dapto Snowy Adit 67 68 Geehi 97K/2 Wodonga 97G Guthega Munyang Dederang Jindabyne 979 97L Projects Northern Telecommunications Link North West Supply Upgrade The Northern Telecommunications Link Project involves setting The current network supplying the Gunnedah/Narrabri/Moree/ up six new telecommunications sites to connect communication Inverell area requires an upgrade as a result of increased demand systems between TransGrid’s Dumaresq Switching Station near from new mines in the area. TransGrid’s preferred solution is to Dumaresq Valley through to an existing telecommunications pole install new equipment at the Tamworth Substation on Burgmanns on Parrots Nest Road in South Gundurimba. The communication Lane to better manage the flow of electricity for the area and reduce sites will act as a back-up system to remotely operate, protect and the risk of outages. gather data from substations, equipment and transmission lines. This project is under construction and is expected to be completed mid 2015. Transmission Tower Life Extension Works A number of TransGrid’s transmission towers constructed in the Tamworth Substation 1950’s require significant maintenance work to extend their service life and ensure reliability. Some towers may need to be sand blasted The Tamworth 132kV Substation on Goonoo Goonoo Road is and painted to remove and prevent rust, while others need to be being rebuilt to replace the old substation that has reached the end modernised to improve tower safety and accessibility. This work of its serviceable life. The rebuild aims to ensure the reliability of will be carried out in a number of stages throughout the Northern current and future supply for Northern NSW. Construction on site Region over the coming years. is underway and is aimed to be completed in 2016. The rebuild is contained mostly within the current footprint of the existing substation property. For more information: Call 1800 222 537 Email [email protected] Visit www.transgrid.com.au www.transgrid.com.au.
Recommended publications
  • NSW Infrastructure Capability Assessment: Energy Baseline Report
    NSW Infrastructure Capability Assessment Energy Baseline Report April 2012 This document is intended solely for the use and information of Infrastructure NSW Report Outline • Key Highlights • Introduction • Energy Industry Overview and Current Situation • Electricity • Gas 22 Key Highlights – Electricity • The majority of electricity generation and all transmission and distribution infrastructure assets in NSW are government owned • The NSW government recently privatised the retail electricity sector and announced plans to sell electricity generation assets • 82% (or 16,600MW) of electricity in NSW is generated by 4 key state owned corporations . Electricity is transmitted over a 12,000km transmission system and distributed over ~250,000km distribution system. The book value of this infrastructure is $34bn and the annual capital expenditure is around $4.5bn • Electricity infrastructure is planned through a number of national and operator network plans including the Electricity Statement of Opportunities, the National Transmission Network Development Plan, TransGrid's Annual Transmission Network Development Plan, the distributors Annual Network Development Plans and Performance Reports, and the 5-year Regulatory Proposals and Determinations by the Australian Energy Regulator • These reports provide evidence that, while a number of the state owned electricity distribution assets are beyond or approaching their standard design lives, electricity infrastructure appears to be in good condition and is capable of meeting demand • The performance of electricity generation, transmission and distribution infrastructure is monitored via a number of indicators. The NSW Government sets reliability and security standards through its Network licences. Key electricity operating licence performance indicators such as the average duration and frequency of interruptions have been improving over time • Electricity demand has been flat for the past 5 years partly due to slower economic growth, efficiency and in response to large price increases.
    [Show full text]
  • Bus Route Map 940/941/942/943/944/945/946
    BUS ROUTE MAP 940/941/942/943/944/945/946 Nich oll t 14 s S S t n o s t r Haines St Continues on Yenda Inset e b t o R d 54 G i l Collina l m e nnedy S Kelly Av s Dickson R e a e r C r K t n i ong Messner St a n g St l H Darlington Point Inset a D l o Ted Scobie il Madden Dr o l r o Orte Street Legend am o 35 D Sports Oval Train towards Griffith 55 36 Clifton Bvd D G lla 1. Ulong St Continues on main map St r Mayfair St 2. Burrell Pl 941 a 3. ANZAC St 15 inso Be Hanwood rk n 946 aumonts a Edmondson Av Rd P C Wyangan Ave Hanwood r Cariny 940 e 34 e Public School s Tennis Ha Noo nw Courts rilla S 945 ood Av 33 t ve 940 Calabria Rd t A Train towards Sydney r 28 Noorla St e Hi e m lla d es lu m Dr R Griffith h St North r Jubilee C B North M b Goondooloo St Konoa S 941 b West Oval a Griffith a Citrus oona Sander ve Public ca cN s St B 16 12 946 A rt M Griffith Bringagee St School hu idman Way 53 r t o Griffith St S Cinema K o d igal St m r i Base Ave o Wade er o M n bar 31 9 St A Hospital 6 w High r e e B e School d Noore g M llis R eal St Probert Av 944 i 7 940 e d Driver West End 10 e Pool t 29 L Oval ra S 56 St ko Binya St 17 en o Illiliwa St o Kooringal Av 3.
    [Show full text]
  • Exploring the Riverina 5 Day Tour
    Exploring the Riverina 5 Day Tour Itinerary Sunday 10 to Thursday 14 October 2021 Image courtesy Tourism Australia DAY 1: Sunday 10 October Sydney to Narrandera This morning we greet our friendly coach captain and tour escort from Southern Star Coaches and depart on our Exploring the Riverina Tour. Leaving Sydney we can relax, settle into our comfy seats and take in the view. Our lunch break today is in Yass and then this afternoon we continue our journey, passing by Gundagai and Wagga Wagga. On arrival in Narrandera we check into our motel that will be our base for the next 4 nights. ACCOMMODATION Newell Motor Inn MEALS Lunch at Yass Country Kitchen, dinner in Motel Exploring the Riverina 5 Day Tour DAY 2: Monday 11 October Leeton and Darlington Point Following breakfast we head directly to the Altina Wildlife Park at Darlington Point. This safari style park is home to a range of exotic animals. We will be given a guided tour around the park whilst travelling in style in horse-drawn or motorised carts. Following lunch we travel through to Leeton. The town is a showcase of contemporary rural Australia with many examples of Art Deco architecture, diverse agriculture and renowned country hospitality. At the Visitors Information Centre, we are welcomed to the town and given a Taste of Leeton tour. Afterwards we return to Narrandera. ACCOMMODATION Newell Motor Inn MEALS Breakfast & dinner in Motel, lunch at Rivadestra Pizza & Pasta DAY 3: Tuesday 12 October Junee, Temora and Coolamon This morning we head north to Junee, a quaint rural town set between rolling hills and the Murrumbidgee River.
    [Show full text]
  • Tariff Structure Statement (27 November 2015)
    Tariff Structure Statement (27 November 2015) Supporting Documentation: Customer and Stakeholder Report TARIFF STRUCTURE STATEMENT CUSTOMER AND STAKEHOLDER REPORT NOVEMBER 2015 Further information contact: Kate McCue Manager Corporate Affairs, Endeavour Energy Ph: 02 9853 6141 Email: [email protected] Contents EXECUTIVE SUMMARY 3 OVERVIEW OF OUR TSS STAKEHOLDER ENGAGEMENT 6 TABLE 1 - PHASES ONE AND TWO: TSS STAKEHOLDER CONSULTATION AND ENGAGEMENT 2013-2015 6 TABLE 2 - WHAT STAKEHOLDERS SAID AND HOW WE RESPONDED 9 PHASES ONE AND TWO – HOW WE ENGAGED 17 TABLE 3 - PHASES ONE AND TWO - MODES OF TSS STAKEHOLDER ENGAGEMENT 2013 - 2015 17 TABLE 4 - PHASE TWO: INITIAL STAKEHOLDER ENGAGEMENT CONDUCTED BY ACIL ALLEN CONSULTING AROUND PREFERENCES ON ENGAGING THE NSW NETWORK BUSINESSES ON TSS ISSUES 20 TABLE 5 - PHASE TWO: INTERVIEWS (ONE-ON-ONE) OF UP TO ONE HOUR WITH TSS STAKEHOLDERS POST RELEASE OF THE NNSW TSS ISSUES PAPER 21 TABLE 6 - PHASE TWO: ENA AND NETWORKS NSW STAKEHOLDER WORKSHOP ON VULNERABLE CUSTOMER ISSUES AND FUTURE TARIFF STRUCTURES 21 TABLE 7 – PHASE TWO: NETWORKS NSW ELECTRICITY RETAILERS STAKEHOLDER ROUNDTABLE ON FUTURE TARIFF STRUCTURES 22 TABLE 8 - PHASE TWO: NETWORKS NSW FOOD AND FIBRE STAKEHOLDER ROUNDTABLE ON FUTURE TARIFF STRUCTURES 23 TABLE 9 - PHASE TWO: NETWORKS NSW ENVIRONMENT AND CONSUMER ADVOCATES ROUNDTABLE ON FUTURE TARIFF STRUCTURES 24 TABLE 10 - PHASE TWO: NETWORKS NSW ENVIRONMENT AND CONSUMER ADVOCATES SECOND ROUNDUNDTABLE ON FUTURE TARIFF OPTIONS 24 TABLE 11 - PHASE TWO: NETWORKS NSW ENVIRONMENTAL AND CONSUMER ADVOCATES THIRD ROUNDTABLE ON FUTURE TARIFF STRUCTURES 25 PHASE TWO: POST TSS ISSUES PAPER RELEASE INTERVIEWS WITH TIER ONE STAKEHOLDERS 26 1 TABLE 12 - ONE-ON-ONE STAKEHOLDER INTERVIEW QUESTIONS 27 1.
    [Show full text]
  • Project Energyconnect Review of Economic Assessment
    Project EnergyConnect Review of economic assessment 31 March 2021 Project EnergyConnect Review of economic assessment Copyright and Disclaimer Copyright in this material is owned by or licensed to ElectraNet. Permission to publish, modify, commercialise, or alter this material must be sought directly from ElectraNet. Reasonable endeavours have been used to ensure that the information contained in this report is accurate at the time of writing. However, ElectraNet gives no warranty and accepts no liability for any loss or damage incurred in reliance on this information. Revision Record Date Version Description Author Checked By Approved By 31 Mar 2021 1.0 For submission to the Brad Harrison Simon Appleby Rainer Korte AER and publication Hugo Klingenberg Page 1 of 12 Project EnergyConnect Review of economic assessment Project EnergyConnect material change in circumstances assessment Executive Summary On 14 September 2020, ElectraNet submitted an updated economic cost benefit analysis for Project EnergyConnect (PEC) to the AER for approval. The AER confirmed on 28 September 2020 that: “…the AER considers that the updated cost benefit analysis provides a not unreasonable basis for ElectraNet’s opinion that PEC remains the preferred option. We expect both ElectraNet and TransGrid to submit full and complete contingent project applications for PEC as soon as possible.” On 29 September 2020, the ElectraNet Board approved submission of a contingent project application (CPA) based on the AER’s confirmation and the CPA was submitted to the AER on 30 September 2020. This note reviews several subsequently announced policies and other changes in the National Electricity Market (NEM) and considers the impact that these could have on the benefits of PEC.
    [Show full text]
  • Distribution Loss Factor Calculation Methodology Paper 2021-22
    Distribution Loss Factor Calculation Methodology Paper March 2021 Distribution Loss Factor Calculation Methodology Paper March 2021 CONTENTS 1 INTRODUCTION .......................................................................................................................... 1 1.1 Requirements of the National Electricity Rules .................................................................. 1 1.2 Ausgrid’s general approach in deriving non-site specific DLFs ......................................... 2 1.3 Energy entering the distribution network ............................................................................ 4 1.4 Energy exiting the distribution network .............................................................................. 4 1.5 Proposed approach to loss estimation for financial year 2021-22 ..................................... 4 2 BREAKDOWN OF TECHNICAL LOSSES ................................................................................. 5 2.1 Calculation of site specific loss factors............................................................................... 5 2.2 Calculation of loss load factors .......................................................................................... 5 2.3 Sub-transmission network series losses ............................................................................ 5 2.4 Sub-transmission network shunt losses ............................................................................. 5 2.5 High voltage network series losses ...................................................................................
    [Show full text]
  • Essential Energy 2019-24
    DRAFT DECISION Essential Energy Distribution Determination 2019 to 2024 Attachment 18 Tariff structure statement November 2018 18-0 Attachment 18 – Tariff structure statement | Draft decision - Essential Energy distribution determination 2019–24 © Commonwealth of Australia 2018 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attributions 3.0 Australia licence, with the exception of: • the Commonwealth Coat of Arms • the ACCC and AER logos • any illustration, diagram, photograph or graphic over which the Australian Competition and Consumer Commission does not hold copyright, but which may be part of or contained within this publication. The details of the relevant licence conditions are available on the Creative Commons website, as is the full legal code for the CC BY 3.0 AU licence. Requests and inquiries concerning reproduction and rights should be addressed to the: Director, Corporate Communications, Australian Competition and Consumer Commission, GPO Box 3131, Canberra ACT 2601 or [email protected]. Inquiries about this publication should be addressed to: Australian Energy Regulator GPO Box 520 Melbourne Vic 3001 Tel: 1300 585165 Email: [email protected] 18-1 Attachment 18 – Tariff structure statement | Draft decision - Essential Energy distribution determination 2019–24 Note This attachment forms part of the AER's draft decision on the distribution determination that will apply to Essential Energy for the
    [Show full text]
  • Stage3lessonbook Online 17J
    1 Acknowledgements This unit of work was developed by Ausgrid, Endeavour Energy and Essential Energy in collaboration with the NSW Department of Education. It has been developed to align with part of the NSW Science and Technology Syllabus and outcomes in other key learning areas. The following advisers have made a contribution to the development of these materials. Vicki Morante, Swansea Public School NSW Department of Education, Learning and Teaching Division The sections ‘How to use a Scitech journal’ and ‘How to organise a cooperative learning group’ are sourced from the Australian Academy of Science Primary Connections series, and are reproduced with permission. Electricity & Safety Unit Lesson Book for Stage 3 2 Contents Unit Overview 6 Unit Outcomes 8 1 What do we know about electricity? 14 Attachment: KWL Chart 16 Attachment: Word Wall Cards (enlarge for display on wall) 18 Attachment: How to Use a SciTech Journal 20 2 Electricity Safety 21 Attachment: Electricity Safety Quiz 23 3 What is Energy? 26 Attachment: Word Cards 28 STEM Design Challenge: Transferred Energy 29 Attachment: Planning Page 30 Attachment: Explanation Page 32 Attachment: Student Reflection Checklist 33 4 Transforming Energy 34 Attachment: How to organise a cooperative learning group 36 Attachment: Example of a Science Report 42 Attachment: Quiz – Types of Energy 43 Attachment: Cloze Passage – Types of Energy 45 STEM Design Challenge: Transformed Energy 46 Attachment: Planning Page 47 Attachment: Explanation Page 49 Attachment: Student Reflection Checklist 50
    [Show full text]
  • April 2017 Newsletter
    NEWSLETTER MURRUMBIDGEE MAGAZINE April 2017 Volume 2 Issue 3 New LRC Member appointed Well-known Darlington Point resident Gordon Beaumont has been appointed to Council’s Local Representation Committee (LRC). Mr Beaumont was the candidate with the next highest number of votes at the 2012 elections. Message from the Administrator Last week I had the pleasure of He replaces Phillip Wells and attended his first LRC Meeting last week. welcoming our new Local Representation Committee (LRC) Five former Murrumbidgee Shire and four former Jerilderie Shire Councillors member Gordon Beaumont to were appointed to the LRC by Murrumbidgee Council Administrator, Austin his first meeting. I look forward to his input in helping work Evans at an Extraordinary Meeting of Council on Wednesday, 25 May collaboratively with the other 2016.The LRC is a sunset committee whose tenure will conclude when members as we continue to set elections for the new Murrumbidgee Council take place later this year on the Council and our three towns up for a bright future. 9 September. The LRC meets on a monthly rotating schedule (in each of the Due to Anzac Day we have three communities) and is held two days prior to the monthly Council rescheduled the next LRC meeting. Meeting for Monday 24 April commencing 1pm in Coleambally. The next Council Meeting will be held on Thursday 27 April at Coleambally, commencing10am as previously advertised. A reminder to community groups that Round 2 of the Community Grants Fund is open. Application forms are available from the three branch offices or online. Completed application forms must be submitted by 5pm Monday 24 April 2017.
    [Show full text]
  • Network Vision 2056 Is Prepared and in All Cases, Anyone Proposing to Rely on Or Use Made Available Solely for Information Purposes
    Disclaimer and copyright The Network Vision 2056 is prepared and In all cases, anyone proposing to rely on or use made available solely for information purposes. the information in this document should: Nothing in this document can be or should be taken as a recommendation in respect of any 1. Independently verify and check the currency, possible investment. accuracy, completeness, reliability and suitability of that information The information in this document reflects the forecasts, proposals and opinions adopted by 2. Independently verify and check the currency, TransGrid as at 30 June 2016 other than where accuracy, completeness, reliability and suitability otherwise specifically stated. Those forecasts, of reports relied on by TransGrid in preparing this proposals and opinions may change at any document time without warning. Anyone considering this 3. Obtain independent and specific advice from document at any date should independently seek appropriate experts or other sources the latest forecasts, proposals and opinions. Accordingly, TransGrid makes no representations This document includes information obtained or warranty as to the currency, accuracy, from the Australian Energy Market Operator reliability, completeness or suitability for particular (AEMO) and other sources. That information purposes of the information in this document. has been adopted in good faith without further enquiry or verification. Persons reading or utilising this Network Vision 2056 acknowledge and accept that TransGrid This document does not purport to contain all and/or its employees, agents and consultants of the information that AEMO, a prospective shall have no liability (including liability to any investor, Registered Participant or potential person by reason of negligence or negligent participant in the National Electricity Market misstatement) for any statements, opinions, (NEM), or any other person or Interested Parties information or matter (expressed or implied) may require for making decisions.
    [Show full text]
  • Summary: Improving Stability in South-Western NSW
    Summary: Improving stability in south-western NSW RIT-T – Project Specification Consultation Report Region: South Western New South Wales Date of issue: 31 July 2020 Disclaimer This suite of documents comprises TransGrid’s application of the Regulatory Investment Test for Transmission (RIT-T) which has been prepared and made available solely for information purposes. It is made available on the understanding that TransGrid and/or its employees, agents and consultants are not engaged in rendering professional advice. Nothing in these documents is a recommendation in respect of any possible investment. The information in these documents reflect the forecasts, proposals and opinions adopted by TransGrid as at July 2020 other than where otherwise specifically stated. Those forecasts, proposals and opinions may change at any time without warning. Anyone considering information provided in these documents, at any date, should independently seek the latest forecasts, proposals and opinions. These documents include information obtained from the Australian Energy Market Operator (AEMO) and other sources. That information has been adopted in good faith without further enquiry or verification. The information in these documents should be read in the context of the Electricity Statement of Opportunities, the Integrated System Plan published by AEMO and other relevant regulatory consultation documents. It does not purport to contain all of the information that AEMO, a prospective investor, Registered Participant or potential participant in the National Electricity Market (NEM), or any other person may require for making decisions. In preparing these documents it is not possible, nor is it intended, for TransGrid to have regard to the investment objectives, financial situation and particular needs of each person or organisation which reads or uses this document.
    [Show full text]
  • Australian Labor Party, New South Wales Branch Annual Conference, 29 – 31 March 1929
    CHAPTER 7 Australian Labor Party, New South Wales Branch Annual Conference, 29 – 31 March 1929 Report in The Sydney Morning Herald One can detect that the Lang machine was already in election mode at the 1929 Conference and confident of victory. Almost no business was conducted and the meeting took only three days (allowing delegates to go to the races on Easter Monday!). No sign of disunity was allowed to develop. Part of the rationale given by the Executive was that the two preliminary regional conferences had done their work so well that there was little for the State Conference to do. However, it was almost certainly true that the Rural and Metropolitan Conferences had been stage‐managed as efficiently as the State Conference. The one matter of controversy that surfaced was some dissatis‐ faction with instances of graft in preselection ballots, leading to suggestions that these ballots should be abolished – with all decisions presumably to be made by the Executive. That proposal (originating from the radical left as a veiled criticism of Inner Group meddling) was not taken up, although the Inner Group would not hesitate to interfere, officially or unofficially, in any preselections not already sewn up. ξ 211 LABOR PAINS VOLUME V Executive Report of NSW ALP for 1928-29 (Mitchell Library Manuscripts, 329.3106/3) Australian Labor Party, State of New South Wales, Executive Report Ladies and Gentlemen: The 38th Annual Report and Balance-sheet of the Australian Labor Party, State of New South Wales, is hereby submitted for your consideration. Since the presentation of the last report many of the old Branches have been reconstituted, and the following new ones brought into being: Metropolitan Country South Bankstown.
    [Show full text]