PREQUALIFICATION / SHORT LISTING OF CONSULTING FIRMS (EXPRESSION OF INTEREST)

Government of Punjab, Highways Department (North Zone), intends to hire the services of Engineering Consulting Firm(s) for Resident Supervision for the following scheme. Extent & spread of assignment would be as under:- Estimated Sr. ADP Name of Scheme Time Limit Cost (Rs. in No. No. Million) PROVINCIAL HIGHWAY DIVISION, GUJRANWALA Rehabilitation of Road Sadhoki to Baigpur 1 3463 12 Months. 460.000 L=23.00 km District Gujranwala. Rehabilitation of Alipur Gujranwala Road District 2 3465 6 Months. 122.000 Gujranwala. Rehabilitation of road from Ghakar to Ahmad 3 3466 Nagar via Kot Noora Bainka Cheema Gill Wala 12 Months. 205.000 L=17.00 Km District Gujranwala. Rehabilitation of Road from Hafizabad (Raja 4 3471 Chowk) to Khanpur (Jalalpur Qadirabad Road) 12 Months. 361.000 via Kolo Tarar, L=22.85 KM District Hafizabad. Construction / Rehabilitation of road from Gujranwala Pasrur road to Ferozwala Mandiala 5 3457 6 Months. 93.000 Tega via Chak Joiya on Right Bank of Kamoke Minor L=7.60 Km in District Gurjanwala. Widening / Improvement of road from Wazirabad to Kot Harra road L=42.80 Km (Group-II) Km 6 2788 12 Months. 548.000 No.15.80 to 30.00 excet L.C.C Bridge + Approaches L=13.20 Km in District Gujranwala. PROVINCIAL HIGHWAY DIVISION, GUJRAT Construction / Rehabilitation of Road From G.T Road Thekrain To Chowk I/C Links 7 3473 Thekrian Shahjahania Jhanndi Wali Rehmat 12 Months. 206.000 Abad Saleem Abad Mirdah Miana Chak and Tullah Tehsil L=11.60 KM District Gujrat. Widening / Improvement of road from to Kharrian (carpeted road) L=21.60 Km 8 3476 12 Months. 200.000 (Group - I Km 0.00 to 10.00 L=10 km District Gujrat. Widening / Improvement of road from Kotla Arab Ali Khan to Kharrian (carpeted road) L=21.60 Km 9 3476 12 Months. 200.000 (Group - II Km 10.00 to 21.60 L=11.60 km District Gujrat. Construction of Internal roads of University of 10 652 06 Months 66.450 Gujrat. Construction of Dual carriageway from Gujrat Salam Interchange (Motorway) through M.B.Din 11 2825 12 Months. 450.000 Group No.III from Km No.68 to 75 except bride over Gujrat Branch Canal District M.B Din.

Estimated Sr. ADP Name of Scheme Time limit Cost (Rs. in No. No. Million) Construction of Dual carriageway from Gujrat Salam Interchange (Motorway) through M.B.Din 12 2825 Group No.IX (Construction of bridge over Gujrat 12 Months. 260.000 Branch Canal, LJC Head Faqirian & Phulrwan alongwith approaches) District M.B.Din. Construction of 20ft wide carpet road from Gojra to Tahli Adda via Bosal Masoor, Bosal Sukha, Nakkewal, Chak Alam, Syed, Lakha, Kadhar 13 3477 12 Months. 456.000 Gharbi and Link Pull Muhammad Panah to Nakkewal Chowk (phase-I) L=16Km District M.B.Din. Construction of road from bridge Qadirabad link 14 3478 canal road to Kot Pejo via Pindi Kalu length 6 Months. 63.000 =6.00 District M.B.Din. Construction of road from Kotli Khurd to 15 3479 6 Months. 68.000 Pahrianwali via Rajoia L=5.00 District M.B.Din. Rehabilitation / Carpeting of Phalia to Sial More 16 3480 Interchange upto Tahli Adda i/c Phalia Bye Pass 12 Months. 822.000 L=44Kms District M.B.Din. Widening / Improvement of Road from Duggal to 17 3481 6 Months. 91.000 15-R via Dhal L=9 KM District M.B.Din. Widening Improvement of Road from M.B.Din to 18 3482 6 Months. 83.000 Lakhnewala L=5KM District M.B.Din. PROVINCIAL HIGHWAY DIVISION, SIALKOT. Construction of Dual Carriageway from Daska to 19 2831 Sambrial L=16.00 KM (Section Km 4.02 to 11) 12 Months. 550.000 L=6.98 Km (G-II) District Sialkot. Construction of Dual Carriageway from Daska to 20 2831 Sambrial L=16.00 KM (Section Km 11 to 15.70) 12 Months. 400.000 L=4.70 Km (G-III) District Sialkot. Construction of Bridge over river Tavi at Saidpur Pattan i/c approaches of bridge (Additional Work 21 2843 4 Months. 36.000 of Cunette, gunda Bund and J-Head Spur) District Sialkot Construction of Bridge over Nullah Besentar near village Nadala on Noor Kot (Mangri Qila Ahmed abad road) to shah Ghareeb road i/ c Rehabilitaiton/ Improvement of raod from Noor 22 2858 Kot to Nadala length=9.40 Km, and Widening / 8 Months. 90.000 Improvement of road remaining portion Nadala Bridge to Essa chowk to Mangra i/c approach to Fatowal L=7.70 Km (Total Length=17.10 Km), in District Narowal (Group No.III). Construction of 2.79 Km of Metalled road in Bajwat for RCC already approved in flood 23 3483 Packages (on-going) Sialkot Bajwat road section 9 Months. 134.000 Tavi Bridge to Khairy Km No.3.70 to 22.45 (L=18.75 Km) in District Sialkot.

Estimated Sr. ADP Name of Scheme Time limit Cost (Rs. in No. No. Million) Dualization of Sialkot Emanabad Road Upto 24 3487 Dharam Kot L=37.20 km District Sialkot (Group-I) 12 Months. 800.000 Section Km 0.00 to 7.20 (L=7.20 km). Rehabilitation / Improvement of Kingra- Sanial – Naju Chak –Masial Road L=9.75 Km section Km 25 3488 4 Months. 55.000 No.0/0 to 7/0 (L=7.00 Km) (Phase-I) District Sialkot. Rehabilitation of Metalled Road From Gondal Road City School to Gondal Protection Band 26 3489 8 Months. 86.000 (TST) (L=11.70) section City School Km 0/0 to 2.60 and 5.58 to 9.00 District Sialkot. Construction / Rehabilitation / Widening of road from Rasheed pur to New Lahore Road L=18.50 27 3491 9 Months. 125.000 KM (Group - I Km No.0.00 to 9.50 L=9.50 km ) in District Narowal. Construction / Rehabilitation / Widening of road from Rasheed pur to New Lahore Road L=18.50 28 3491 9 Months. 130.000 KM (Group – II) Km No.9.50 to 18.50 (L=9.00 km) District Narowal. Widening / Improvement of road from Gumtala chowk Shakargarh to Noor Kot Shahghareeb Road via Mota Pandori Khanowal Manka 29 3495 12 Months. 260.000 Gumtala Sathiali Chak Qazian and Rangra (L=17.00 km) District Narowal. (Excluding Bridge / approaches).

Expression of interest (EOI) is invited, under Punjab Procurement Rules 2014, from the consulting firms registered with engineering Council, supported with following information/ documents:- 1. Certificate of registration with Pakistan Engineering Council, renewed for the year 2016. 2. Copy of Registration with Securities & Exchange Commission or Registrar of firms. 3. Copy of Registration with income Tax Department. 4. List of permanent professional staff along with C.Vs of relevant core staff, showing project wise experience with exact time duration for each project supported with appointment letters and pay slips/ salary vouchers to authenticate employment of the personnel with the applicant firms. 5. List of similar works completed by the firm, during last ten (10) years and of similar works in hand, indicating cost of each work supervised by the firm and cost of consultancy services received against the assignment along with date of start and completion or expected date of completion supported with performance certificate 9s) from the employer(s). 6. Financial position of the firm supported with authenticated financial statement (s) from Financial Institutions / Regulatory Bodies. Audited statements of accounts of the firm for the last three (3) years.

7. Managerial capability of the firm. 8. A certificate / affidavit that the firm is not black listed by any Govt. Autonomous Body. 9. Brochure for each work should be submitted separately. Interest firms may obtain / purchase set of pre-qualification documents / criteria for short listing / prequalification, on a request to the Superintending Engineer, Provincial Highways circle, Gujranwala on payment of Rs.1000/- for each work. Only prequalified firms shall be entitled to participate in the subsequent procurement proceedings. Last date to purchase prequalification criteria and submission of application (EOI) from / in the office of Superintending Engineer, provincial Highway Circle Gujranwala would be as under:-

i. Last date for purchase of prequalification criteria. 29-08-2016 ii. Last date for submission of applications (EOI) 01-09-2016.

Superintending Engineer Provincial Highway Circle Gujranwala.