ELLUPUDAYAMPATTY ROUGH STONE QUARRY LEASE APPLIED AREA (2.02.5HA) The proponent Mr. I.D.Alavudeen Basha has applied for Environmental clearance for the proposed quarry Rough stone for over an extent of 2.02.5Ha in S.F.No:2(P) at Ellupudayampatty Village, Taluk, District and Tamilnadu Salient features of the proposal are as follows: 1. Name of the Owner + Firm : I.D.Alavudeen Basha, Page No: S/o.Dhasthaheer, 1,15,26,28,29,3 Ellupudayampatty Taluk, 0,31,32,35,38, . 57,79,80,81,82, Mobile No: 94432 39459 83,84,85,91, 109, 2. Location of the quarry- : S.F.No: 61/2B at Ellupudayampatty Village, 1,8,26,28,29, S.F.No. Harur Taluk, Dharmapuri District 30,31,32,35,39, 56,79,80,81,82, 83,84,85,86,91, 109,110 3. Purpose of Application : It is a Rough stone Quarry project in 1,8,26,28,29,30 Ellupudayampatty Village. ,31,32,35,39, 56,79,80,81,82, 83,84,85,86, 4. Extent of quarry in Ha- : 2.02.5Ha 1,8,14,16,26,28 ,29,30,31,32,35 ,39,56,79,80,81 ,82,83,84,85,86 ,90,96,91,109,1 00,102,104,110 5. Land use planning : Area at the 12,49,88,103, Present area a) Mining Description end of lease in (Ha) b) Storage of Topsoil over period (Ha.) burden c) Infrastructure Road Area Under Quarrying 0.40.7 1.24.7 Infrastructure Nil 0.01.0 d) Utilized Area Roads 0.02.0 0.02.0 Total Green belt Nil 0.10.0 Unutilized 1.59.8 0.64.8 Grand Total 2.02.5 2.02.5

6. Production (quantity in m3) : The proposed quantity of reserves for remaining 1,9,35,87,88,97 plan period is to be mine is 69760m3(or) 12325 Lorry Loads of Rough stone up to a depth of 11m depth of top of the hill for a period of Five years only.

Rough Topsoil Description stone in m3 in m3 Geological Resources 367825 20195 Available Mineable reserves 142165 8910 Five years plan period As in 69760 8910 the approved mining plan 7. Top soil & overburden : The overburden is the form of Topsoil formation, 43,44,89,99 (quantity in m3) the Topsoil formation will be removed and preserved all along the boundary barrier to facilitate the afforestation, there is propose of removal of top soil for this remaining plan period.

3

8. Method of Mining : The quarrying operation will be carried out by 36,42,88,96, Semi Mechanized Opencast Method in 102, conjunction with conventional method of mining using Jack hammer drilling and blasting, excavation, loading and transportation of Rough stone to the needy crushers.

9. Life of Mine as per approved : The lease deed was executed 11.07.2010 and the 38,87, mining plan lease will get expiry on 10.07.2020. The remaining lease period is Five years. 10. Height / width of the bench : Height 5.0 m & Width 5.0 m. 12, 43, 11. Source of water / quantity Quantity Source 17,89,98,104, required required (in litres) a. Drinking&Domestic 0.3 KLD Approved Water vendors Purpose b. Dust Suppression 0.3KLD Nearby well or water vendors c. Green belt development 0.4KLD Nearby well or water vendors 12. Waste water There is no waste water. 50,54,107, Sewage water : The septic tank isconstructed on permanent structure with in the quarry lease area. Mode of disposal : To local Panchyat Authority 13. APC Measures : 1.Mist Spray using water tankers, 50,54,107, 2. Enclosed covered system. (Tarpaulin) for transportation. 14. Ariel distance of nearest : Approximate 24,39,49,102, distance & habitation S. Approximat Name of the Village Direction from No e population lease area 1. Kammalampatty 1km – NE 700 2. Keeraipatty 2km- NW 800 3 Ellupudayampatty 2km -SE 600 4 Harur 3km - SW 500

15. Ariel distance from Reserve : Wildlife sanctuary-Nil 23,89,101, forest, Sensitive areas, Forest, National Park – Nil Bird sanctuaries, Wild life Monuments – Nil sanctuaries, National parks, Bird sanctuaries-Nil Monuments etc., within 15km Reserve Forest is located about 7km on the Eastern side of the lease area.

16. Land owner ship document : It is a Government poramboke land, the applicant 16,35,39,52,91, Own patta land : has obtained tender from the Government. refer 94,100, Lease : (Annexure No: I) Govt. Poromboke 17. Land use classification : It is a Fresh Quarry lease of Rough stone quarry 1,8,26,28,29,30 (the area has been quarrying operation earlier) in ,31,32,35,39, Ellupudayampatty Village 56,79,80,81,82, 83,84,85,86, 18. Mining plan A.Jagannathan BE.,F.C.C.,M.M.E.A., 29,31,32,55,79, Prepared by : RQP/MAS/019/87/A 80,81,82,83,84, 85,108,115,

4

Approved by : The Mining Plan was got approval by the 10,26,38,91 Assistant Director, Department of Geology and Mining, Dharmapuri Rc.No.379/2015(Mines) Dated: 29.07.2015. 19. Precise area statement : The Proceeding letter: Rc.No.144/2010(Mines) 10,35,38,56,91 Approved by dated 13.06.2010 The District Collector, Dharmapuri, passed letter: Rc.No. 213/2015(Mines) dated 20.05.2015 20. Nearby quarries : There is few quarry is present within 500m radius 89,90,101, 21. Nearby lake / river/ odai / : There are no major water bodies like river, Pond, 47, channel etc. lake, etc., within 500m radius.

22. Latitude / Longitude : 12002’55’’N to 12002’49’’N 9,36,39,79,80,8 78030’48’’E to 78030’43’’E 1,88,94,95 23. TopoSheet No. : 57 L/12 36,39,79,80,81, 88,94 24. Total Project cost (Fixed : The Project cost: 37,53,89,106 asset cost + Operational Cost A. Fixed asset cost =Rs. 5,10,000/- + EMP cost) B. Operational cost= Rs.42,00,000/- C. EMP cost = Rs. 4,80,000/- Total cost = Rs. 51,90,000/- The total project cost including EMP cost (A+B+C) is about Rs.51,90,000/-(Rupees Fifty One lakhs Ninety thousand only) 25. EMP cost : The total EMP cost is around Rs. 4,80,000/- 37,50,53,89,10 (Rupees Four lakhs Eighty thousand only) 6 26. Water table : The Ground water is about 40mt depth from 15,40, ground level. 49,54,101,110, 27. Interstate boundary : There is no interstate boundary within the radius 23,89,101, of 15km 28. Western Ghats : The Western Ghats is situated 10km away from 23,89,101, the North-western side of the area.

5