Heavenly Highlands
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Kings Lynn Hanse Regatta 2020 Saturday Entry Form V2
Kings Lynn Hanse Regatta 2020 Saturday 16th May 2019 Entry Form – Short Course sprints (Note: These 3 races will count towards the SECRF’s Nelson’s Cup; scoring based on the fastest boat for each club partaking) Name of Rowing or Sailing Club Name of Boat Class of Boat (e.g. Harker’s Yard Gig, St Ayles skiff) Colour(s) of Boat Contact Numbers (1) (in case of emergency) (2) Contact e-mail address Race Notes • A parental consent form will be required for any participants under the age of 16. All participant MUST wear a life jacket or buoyancy aid. • Races will be held in accordance with the Rules of Racing. A copy of which will be available and Coxes should ensure that they are familiar with, and abide by the rules. • Competitors participate in the event at their own risk and are responsible for their own safety and that of the boat at all times. We recommend that all boats have suitable current Public Liability Insurance (including racing cover) • Whilst safety boat cover will be provided all boats should carry a waterproofed means of communication. At a minimum this should be a fully charged mobile phone with contact numbers for race officials and preferably a working handheld VHF radio chM(37); nb; Kings Lynn Port operates on ch14 and will be on watch. • We ask all boats to display their allocated number at the start and finish of each race and a Racing Flag if at all possible, for the benefit of shore side spectators. Version: 01 Dec. -
2021 BCU Courses Booking Form
Application to use facilities at Grenville House Name of organisation/Individual Address Booking form 2021 British Canoeing Paddlesport Party leader Courses (Non-Residential) Tel. No. Fax No. Internet/E-mail address Arrival date Time Departure date Time Numbers :- Leaders/Adults :- M F Group Members :- M F Age range of group Purpose of visit Please indicate the course(s) you would like to book Sit on top Taster Paddle START Award River Dart Canoe Expedition Kayak Taster Paddle DISCOVER Award Introduction to white-water Canoe Taster Foundation Safety and Rescue Training Stand Up Paddleboard Taster Paddle EXPLORE Award The booking fee of £ is enclosed Booking fee = 50% of the total cost of the visit. I confirm that I have read and understand the complete Booking Terms and Conditions as detailed on www.grenvillehouse.com. Signed - Status Date Print name - Charging criteria for 2021: BCU Paddlesport Courses (non-residential) Course Charges Course Length Cost per person 1 Canoe/Kayak/Sit-on Top/SUP Taster 1/2 day £30.00 2 BC Paddle START Award 1 day £55.00 3 BC Paddle DISCOVER Award Per day as required £55.00 4 BC Paddle EXPLORE Award Per day as required £55.00 5 River Dart Canoe Experience Per day as required £55.00 5 Foundation Safety & Rescue Training 1 day £80.00 6 Introduction to White-water Per day as required P.O.A Note: Transport may be required. Summary of Booking Terms and Conditions Group size This will depend upon the type of course. Activities are based upon BCU Pupil: Instructor ratios and will include both practical and theoretical tuition. -
Canoeing on the River Dart 1 Canoeing on the River Dart This
Canoeing on the River Dart Canoeing on the River Dart This document has been written by the Dart Fisheries Association (DFA) for Canoeing on the Dart. Even though British Canoeing has been involved in discussions the information below has NOT been endorsed by British Canoeing as it does not fulfil the criteria outlined in the British Canoeing Access Position Statement for the Shared use of Unregulated Water. The statement is for information only and allows individuals to decide on whether they wish to adhere to the DFAs request. We do however wish to highlight the need to consider the environment impacts and advise you paddle when environmental conditions allow. The following statement has been developed through discussion between the Dart Fisheries Association, representing riparian owners, and British Canoeing. It outlines how the varying interests on the river can work together harmoniously. Aim: The aim of this arrangement is to enable canoeing to take place on the River Dart, as set out below, without confrontation or challenge, and without prejudice to the views on the legalities of river access of either British Canoeing or riparian owners. Information for Canoeists Canoeists are welcome to canoe on the river between the following dates: • Upper section – below Dartmeet bridge to Newbridge from 15th october until 14th march • Middle/lower section – Newbridge, Poundsgate to Totnes weir from 1st October to 14th March Please note that: • Canoeists descend the river entirely at their own risk and are requested to be off the river before sunset • Canoeists are urged to take every care to conserve the environment in general and particularly in the SSSIs (Sites of Special Scientific Interest) and SACs (Special Areas of Conservation). -
The C-SCOPE Marine Plan (Draft)
The C-SCOPE Marine Plan (Draft) C-SCOPE Marine Spatial Plan Page 1 Contents List of Figures & Tables 3 Chapter 5: The Draft C-SCOPE Marine Plan Acknowledgements 4 5.1 Vision 67 Foreword 5 5.2 Objectives 67 The Consultation Process 6 5.3 Policy framework 68 Chapter 1: Introduction 8 • Objective 1: Healthy Marine Environment (HME) 68 Chapter 2: The international and national context for • Objective 2: Thriving Coastal Communities marine planning (TCC) 81 2.1 What is marine planning? 9 • Objective 3: Successful and Sustainable 2.2 The international policy context 9 Marine Economy (SME) 86 2.3 The national policy context 9 • Objective 4: Responsible, Equitable and 2.4 Marine planning in England 10 Safe Access (REA) 107 • Objective 5: Coastal and Climate Change Chapter 3: Development of the C-SCOPE Marine Plan Adaptation and Mitigation (CAM) 121 3.1 Purpose and status of the Marine Plan 11 • Objective 6: Strategic Significance of the 3.2 Starting points for the C-SCOPE Marine Plan 11 Marine Environment (SS) 128 3.3 Process for producing the C-SCOPE • Objective 7: Valuing, Enjoying and Marine Plan 16 Understanding (VEU) 133 • Objective 8: Using Sound Science and Chapter 4: Overview of the C-SCOPE Marine Plan Area Data (SD) 144 4.1 Site description 23 4.2 Geology 25 Chapter 6: Indicators, monitoring 4.3 Oceanography 27 and review 147 4.4 Hydrology and drainage 30 4.5 Coastal and marine ecology 32 Glossary 148 4.6 Landscape and sea scape 35 List of Appendices 151 4.7 Cultural heritage 39 Abbreviations & Acronyms 152 4.8 Current activities 45 C-SCOPE -
Dartmouth Harbour Guide 2019
HARBOUR GUIDE 2019 Dart Harbour www.dartharbour.org Ch 11 DARTNAV Dart Harbour Ch 11 DARTNAV Yacht Taxi - Ch 69 tel: 07970 346571 1 ESSENTIAL INFORMATION Dart Harbour The speed limit within the harbour is 6 knots ■ 6 Oxford Street, Dartmouth, TQ6 9AL The harbour limit begins at the Castle Ledge ■ Tel : 01803 832337 Buoy and extends to the weir at Totnes. The ■ Website : www.dartharbour.org 6 knot speed limit must not be exceeded and wash must be kept to a minimum. ■ Email: [email protected] Vessels in Home Reach should not travel at ■ VHF : Channel 11 Callsign DARTNAV speed greater than necessary to maintain steerage way and must not create any wash ■ Emergency Out of Hours number: (byelaw 6). 07968 839846 Dart Harbour is not run as a 24 hour port. IMPORTANT CONTACT NUMBERS The harbour extends from just seaward of the Castle Ledge starboard hand light buoy ¾ mile Emergency: 999 or 112 SE of Kingswear Castle to Totnes Weir and is Where life is in danger ask for the administered by the Authority. Coastguard (if afloat) or Police, Fire or Ambulance. Customs Display of lights at night Those requiring UK Border Agency should All power-driven vessels are to exhibit telephone 0845 723 1110 (24 hours) for advice. navigation lights appropriate for their Coastguard length and, as a minimum, at least one all round white light when under way at night. Emergencies : 999 Daytime : 01326 317575 Police Emergencies : 999 Animals All Vessels from outside the UK with animals Non emergency :101 onboard are not permitted to land the animals Routine Information Numbers: ashore (Rabies risk). -
Annual Report 2020 Contents
Annual Report 2020 Contents 04 Chair’s Report 07 President’s Report 08 British Canoeing Board Report 11 Governance and Risk Committee Report 11 HR and Remunerations Committee Report 12 Finance and Audit Committee Report 12 Nominations Committee Report 13 Financial Report 15 Annual Accounts 2019/2020 16 Annual Governance Statement 20 British Canoeing Committee Structure 22 British Canoeing Freestyle Committee Report 24 British Canoeing Lifeguards Committee Report 25 British Canoeing Marathon Committee Report 27 British Canoeing Polo Committee Report 28 British Canoeing Rafting Committee Report 29 British Canoeing Sailing Committee Report 30 British Canoeing Slalom Committee Report 32 British Canoeing Sprint Committee Report 34 British Canoeing Wild Water Racing Committee Report 02 www.britishcanoeing.org.uk Coaching Strategy Group Report 36 Performance Wellbeing Group Report 38 Athlete Representative Group Report 41 British Canoeing Safety Advisory Panel Report 43 Access and Environment Advisory Group Report 47 International Relations Update 49 British Canoeing Events Limited 50 The English Forum 52 Cumbria Regional Development Team Report 54 East Regional Development Team Report 56 East Midlands Regional Development Team Report 58 North East Regional Development Team Report 59 South East Regional Development Team Report 62 South West Regional Development Team Report 63 West Midlands Regional Development Team Report 65 Yorkshire and Humberside Regional Development Team Report 67 Safeguarding Update 69 Membership Update 72 British Canoeing Executive Team 73 Partners 75 03 03 Chair’s Report Professor John Coyne CBE To say that 2020 has been an extraordinary and challenging year is a massive understatement. Yet it has also been a year of great progress for your organisation which required extraordinary commitment from so many parts of our community. -
Dart Estuary, Devon
EC Regulation 854/2004 CLASSIFICATION OF BIVALVE MOLLUSC PRODUCTION AREAS IN ENGLAND AND WALES SANITARY SURVEY REPORT Dart Estuary (Devon) 2010 SANITARY SURVEY REPORT DART ESTUARY Cover photo: Pacific oysters in bags at Flat Owers (Dart Estuary). CONTACTS: For enquires relating to this report or further For enquires relating to policy matters on information on the implementation of the implementation of sanitary surveys in sanitary surveys in England and Wales: England and Wales: Simon Kershaw/Carlos Campos Linden Jack Food Safety Group Hygiene & Microbiology Division Shellfish Hygiene (Statutory) Team Food Standards Agency Cefas Weymouth Laboratory Aviation House Barrack Road, The Nothe 125 Kingsway Weymouth London Dorset WC2B 6NH DT43 8UB ( +44 (0) 1305 206600 ( +44 (0) 20 7276 8955 * [email protected] * [email protected] © Crown copyright, 2010 Overall Review of Production Areas 2 SANITARY SURVEY REPORT DART ESTUARY STATEMENT OF USE: This report provides information from a study of the information available relevant to perform a sanitary survey of bivalve mollusc production areas in the Dart Estuary. Its primary purpose is to demonstrate compliance with the requirements for classification of bivalve mollusc production areas, laid down in EC Regulation 854/2004 laying down specific rules for the organisation of official controls on products of animal origin intended for human consumption. The Centre for Environment, Fisheries & Aquaculture Science (Cefas) undertook this work on behalf of the Food Standards Agency (FSA). DISSEMINATION: Food Standards Agency, South Hams District Council (Environmental Health), Devon Sea Fisheries Committee, Environment Agency. RECOMMENDED BIBLIOGRAPHIC REFERENCE: Cefas, 2010. Sanitary survey of the Dart Estuary (Devon). -
DORSET's INDUSTRIAL HERITAGE Ulh 17
AfarsWs\?l ) •O ITNDUSTRIALONDUS TR I AL • 7/ 'rl/ f / 71 TO l) / vlJI/ b 1-/ |, / -] ) I ) ll ,, ' I ilittu It ,rtlll r ffi I ll I E l! ll l[! ll il- c t!H I I I H ltI --'t li . PETER. STANIER' SeIISIIOG IDVIIUIH IDVIIUIH DORSET'SIVIUISNONI INDUSTRIAL HERITAGE Jeled Peter Stanier JaruEls I r \ • r IT, LaS \-z'- rnol rnol 'r.pJV 'r.pJV lllPno lllPno Lano'ss,our1 Arch, Tout Quarry. INTRODUCTIONNOII)NCOU1NI lHt lINnol lINnol ,o ,o ;er'r1snpu| ]asJoc ]asJoc eql eql qlrr' qlrr' sr sr pa!.raluo) pa!.raluo) lSoloaeq:.re lSoloaeq:.re dn dn e e uorsr^ THE COUNTY of Dorset summonssuouJLLrns up a Industrial archaeology is concerned with the vision 1o lP.rn.r lP.rn.r ]sed ]sed re] plaleru sr;er )llllpr )llllpr ruorl ruorl lllpoedsa pa^ouJar pa^ouJar ue:,futsnpur, 'seqr^rpe s,ueul s,ueul puPl puPl far removed from)pq) 'industry': an idyllic rural land- material relics of man's past activities, especially lnq lnq op op u aq] u aq1 ur qlrM'edels pepoo^ pepoo^ su,^ su,^ qtuaalaLr qtuaalaLr Suruur8aq 'lrnluer 'lrnluer -rale^^ -rale^^ 'selP^ 'selP^ scape, with chalk downs, wooded vales, water- in the nineteenth century, but beginning in1o the aqt aqt ue ue Lnlua: Lnlua: d d aql aql anbsarnp anbsarnp sa8ell^ oppau] pouad pouad e8eur e8eur prur s,^ s,^ qluaatq8ra qluaatq8ra meadows andpLre picturesque villages — an image mid-eighteenth century — the period of the le-r]snpu lq lq jo jo eqt eqt se se euros euros qrns Ll)nLu seu.roqf seu.roqf s8uqr.r,,rl s8uqr.r,,rl pa)uequa pa)uequa 'serrlsnpllr 'serrlsnpllr much enhanced by the writings of Thomas Industrial -
News Lett Volume 5 Er Issue 2 S U M M E R 2 0 1 5
NEWS LETT VOLUME 5 ER ISSUE 2 S U M M E R 2 0 1 5 The success of this newsletter relies on contributions from YOU! If you've been on a trip, From the Editor in a race, or just have an opinion or some news you want to share, please send it to s I write this, the sun is shining, the [email protected] air is warm, and I'm just about to Articles should be short (between Ahead down to the Club for a cheeky 1 00 and 250 midweek paddle. words) and can be Even the Medway is warm – relatively – accompanied by a and the squeals from those doing capsize picture. The drills on the Beginner Sessions aren't quite as deadline for piercing as they were back in March! submissions for the I've had a pretty exciting few months next issue is 1 0th paddling since the last newsletter, mainly August, 201 5. because I finally bought a canoe. After years Mark Corti, Editor of scrounging boats from friends, borrowing [email protected] them from the Club, and (occasionally) putting The Daffodil Explorer being ushered through Radcot Lock on Maidstone Marathon the Thames 5% NT the Committee” item later in the newsletter. 1 OU 14th June We've a pretty packed issue this summer, ISC UB The Hasler Marathon is the biggest event so I hope you'll take the time to read through D CL in the Club's Racing Year, and relies on a the whole thing. A huge thank-you to all of OR RS huge number of volunteers to make it those who've contributed, either by putting F BE work. -
Swanage Area Forum Including Surrounding Villages
SWANAGE AREA FORUM INCLUDING SURROUNDING VILLAGES NEWSLETTER JUNE 2021 - No. 12 Welcome to the June/July issue of the Swanage & Purbeck Development Trust and Swanage Area Forum Newsletter. When you read this latest newsletter I’m sure that, like me, you will witness a different feel in the articles from the many contributors, compared to previous issues. The past 15 months and all their trauma, have seen just how, when a community like Purbeck comes together to help each other, to share information, and not be left isolated, amazing things happen. It’s drawn us all together … and long may that continue. There seems to be a more optimistic and busier atmosphere compared to earlier months, which obviously relates to more upbeat news regarding the Covid-19 crisis. For though there are still real worries and concerns relating especially to the latest Delta variant and its potential negative impact, mostly on those still not yet fully vaccinated, the overall mood is more hopeful than earlier in the year. The Purbeck holiday crowds are back and we haven’t even got to the main season yet. Hopefully this summer will pass off well for residents and visitors alike, with our many holiday-based businesses flourishing, local fetes, festivals and galas thriving - and to cap it all and some good old English weather (not sure about that!). So let’s keep our fingers crossed, keep up our amazing community spirit - but still try to keep cautious, careful and safe. Mel Norris, Chair Swanage Area Forum and Swanage & Purbeck Development Trustee [email protected] Photograph by Gwenda Yeomans In line with the national picture, we have started to see case rates increase in both the Dorset Council areas and Bournemouth, Christchurch and Poole Council areas. -
The Jurassic Shales of the Wessex Area: Geology and Shale Oil and Shale Gas Resource Estimation
THE JURASSIC SHALES OF THE WESSEX AREA: GEOLOGY AND SHALE OIL AND SHALE GAS RESOURCE ESTIMATION The Jurassic shales of the Wessex area: geology and shale oil and shale gas resource estimation Lias, Black Ven, Dorset. Photograph from the Geologists’ Association Carrack Archive. © NERC i © OGA 2016 THE JURASSIC SHALES OF THE WESSEX AREA: GEOLOGY AND SHALE OIL AND SHALE GAS RESOURCE ESTIMATION Disclaimer This report is for information only. It does not constitute legal, technical or professional advice. The Oil and Gas Authority does not accept any liability for any direct, indirect or consequential loss or damage of any nature, however caused, which may be sustained as a result of reliance upon the information contained in this report. All material is copyright and is licensed under the Open Government Licence v3.0. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, Richmond, Surrey, TW9 4DU. It may be produced in whole or in part subject to the inclusion of an acknowledgement of the source, but should not be included in any commercial usage or sale. Reproduction for purposes other than those indicated above requires the written permission of the Oil and Gas Authority. Suggested citation: Greenhalgh, E. 2016. The Jurassic shales of the Wessex Area: geology and shale oil and shale gas resource estimation. British Geological Survey for the Oil and Gas Authority, London, UK. Requests and enquiries should be addressed to: Toni Harvey Senior Geoscientist - UK Onshore Email: [email protected] ii © OGA 2016 THE JURASSIC SHALES OF THE WESSEX AREA: GEOLOGY AND SHALE OIL AND SHALE GAS RESOURCE ESTIMATION Foreword This report has been produced under contract by the British Geological Survey (BGS), as an addendum to the Weald Basin study (Andrews, 2014). -
Canoe and Camp, River Dart – Year 9 Thursday 24Th to Friday 25Th June 2021
Chapel Hill, Uffculme, Devon, EX15 3AG | 01884 840458 [email protected] | www.uffculmeschool.net Canoe and Camp, River Dart – Year 9 Thursday 24th to Friday 25th June 2021 Thank you for signing up for the above activity. The plan is: • There will be a meeting at 8:55am in the school library on Monday 21st June for all the participants to talk through arrangements and sort out tent and cooking groups. We will also talk through what they should bring. • On the Thursday, they should wear clothing suitable to canoe in, to school. • They should drop their bag in the OP store on arrival at school. • They will go to lessons 1-4 as normal. • They will be able to buy lunch at the start of the lunch hour. • We will aim to depart at 1:45pm and head to Totnes. • We will boat in Totnes and paddle to our camping field. • That evening, they will set up camp, prepare their own meals and may get a chance for a swim. • On the Friday, they will start by preparing their own breakfast. • They will then strike camp and load the boats. • We will then paddle down the Dart towards Dartmouth. • We will have a lunch stop on the way (they should bring their own food for this). • There may be an opportunity to buy an ice cream (they should have a bit of money just in case!). • We will finish our journey in Dartmouth. • We aim to be back at school for 6:00pm. Kit list: Points to remember when selecting your kit: • We are going for one night and one day.