Monarto Masterplan

Total Page:16

File Type:pdf, Size:1020Kb

Monarto Masterplan MONARTO MASTERPLAN PREPARED FOR NOVEMBER 2016 DOCUMENT QUALITY CONTROL Jensen Planning + Design IN ASSOCIATION WITH: Unit 6/259 Glen Osmond Road Project Name Monarto Masterplan Frewville SA 5063 Rural City of Murray Bridge Project Number P6914 Tonkin Consulting T / 08 8338 5511 Client Rural City of Murray Bridge F / 08 8338 6866 Jacobs Document Monarto Enterprise Precinct Masterplan JLL Author of Document PJ / MMCK www.jensenplanning.com.au Version 4 Date of Document Release 18 November 2016 Name of Person/s document was released to Rural City of Murray Bridge Method of Release Digital Authorised By MMcK Authorisation Date 18 November 2016 2 MONARTO MASTERPLAN NOVEMBER 2016 CONTENTS 1. SUMMARY 2. INTRODUCTION 3. STRATEGIC CONTEXT 4. SUMMARY OF INVESTIGATIONS 5. COMMUNITY + STAKEHOLDER ENGAGEMENT 6. DEVELOPMENT PRINCIPLES + LONG TERM VISION 7. IMPLEMENTATION APPENDICES (Provided as separate PDF Document) • Native Vegetation and Wildlife Corridors • Employment Lands • Core Infrastructure • Aviation Facility • Monarto Zoological Park • Monarto’s Character 3 MONARTO MASTERPLAN NOVEMBER 2016 1. SUMMARY The Monarto Masterplan has been developed • The establishment of a small local activity by Jensen Planning + Design for the Rural City centre to provide services and amenities to of Murray Bridge, in association with the District support the employment land, as well as an Council of Mount Barker and RDA Murraylands improved ‘heart’ for the community. and Riverland. • A new Road-Rail Intermodal Facility to support The primary purpose of the Masterplan is to the employment land. provide a long term planning vision for Monarto, a vision which sees Monarto becoming an • The development of a Freeway Service important employment hub for the region. The Centre in association with the DPA. vision balances economic growth and new jobs with sound environmental management and the • The establishment of landscape buffers to community’s aspirations for Monarto. maintain the landscape character of the area, and provide appropriate interfaces between A series of ‘working papers’ was produced land uses. to inform the direction of the DPA and • The protection and conservation of native Concept Plan Masterplan and identify key issues, constraints vegetation areas and corridors. and opportunities to be addressed. These investigations focussed on the following themes: • Maintaining and enhancing the Monarto Zoo as a key tourism destination. • Native Vegetation and Wildlife Corridors • Future Intermodal Facility • Outlining the location and high level layout of • Employment Lands an airfield or airport, should such a facility be • Core Infrastructure needed in the future. • Aviation Facility • Monarto Zoological Park • Reducing the area of the Light Industry Zone • Monarto’s Character. east of Ferries McDonald Road to exclude a portion of land used by the State Government Industry, government and community for vegetation research. stakeholders were involved in the process to develop the Masterplan. In part this engagement • DPA buffer areas and biosecurity region as was undertaken in tandem with a Development per Concept Plan Map MuBr/3. Plan Amendment (DPA) prepared in 2015 that increased and amended the area of employment • Placemaking and ‘gateway’ improvements lands at Monarto South. around Ferries McDonald Road to enhance the legibility of the area, and improve the OPPORTUNITIES experience and amenity for locals and visitors. As well as the land use changes introduced These opportunities have been identified spatially by the 2015 DPA, the Masterplan describes in an illustrative masterplan in Section 6 of this a number of development opportunities to document. be pursued over the long term. Important opportunities include: Implementation priorities for the Rural City of Murray Bridge have been suggested to • The growth in employment land uses on the commence the delivery of the long term vision for western side of Ferries McDonald Road. Monarto South. Monarto landscapes and Masterplan Concept Plan excerpt 4 MONARTO MASTERPLAN NOVEMBER 2016 2. INTRODUCTION BACKGROUND + PURPOSE STUDY AREA + CONTEXT A joint economic development initiative Situated between the emerging urban growth between the Rural City of Murray Bridge centres of Murray Bridge and Mount Barker (RCMB) and the District Council of Mount and approximately 60 kilometres south-east of Barker (DCMB), the Monarto Masterplan central Adelaide, the rural township of Monarto recognises the economic potential of Monarto is well positioned on the National Highway, the to provide employment to support the future Adelaide - Melbourne railway corridor, and within growth of the region. The Masterplan was commuting distance of metropolitan Adelaide. initiated to further evaluate the potential for, and provide an implementable yet high level A focus of the Masterplan is on providing local framework for: employment opportunities for current and future residents of Murray Bridge and Mount Barker • an expanded employment base to reduce the need for daily commutes to the • a potential road/rail intermodal hub Metropolitan Adelaide area for work. • a potential future regional airport Through careful planning and with As well as examining environmental, consideration given to the region’s distinctive infrastructure, local character and other issues tourism, cultural and environmental assets, the relevant to the development of Monarto. Monarto Region (South Enterprise Precinct) provides a significant opportunity for economic The primary purpose of the Masterplan activity and employment within the region. is to provide a long term planning vision for Monarto. The Masterplan (and its The study area for the Masterplan is shown investigations) also provide an evidence in the figure alongside and includes the area base to support the recent Monarto South subject to the recent Development Plan Development Plan Amendment (that expanded Amendment that was granted interim effect the extent of employment lands in the short/ on 27th August 2015. The policies were then medium term) as well as protect the potential altered after public consultation and the DPA for a future airport and intermodal terminal. approved on 11 August 2016. Monarto South Study Area (above, red line area) + DPA Affected Area (left) The Masterplan will become a guiding economic development document for both Councils and other agencies concerned with the expansion of employment lands and economic opportunities for the broader region. 5 MONARTO MASTERPLAN NOVEMBER 2016 Recent industrial development at Arbon Court SE Freeway at Monarto South Big W Distribution Centre, Ferries McDonald Road Adelaide-Melbourne railway (and passing loop), Vittera grain silos, Monarto South Former General Store Ferries McDonald Road, looking south from SE Freeway overpass Land south of Freeway, suggested for future airfields Current signage on approach to township development 6 MONARTO MASTERPLAN NOVEMBER 2016 Notice board and signage near Monarto War Memorial Hall Ferries McDonald Road showing access into industrial areas through vegetation buffer on the left. Australian Portable Camps manufacturing site, Monarto South. Viewed from Ferries McDonald Road. 7 MONARTO MASTERPLAN NOVEMBER 2016 STRATEGIC CONTEXT 8 MONARTO MASTERPLAN NOVEMBER 2016 3. STRATEGIC CONTEXT STATE PLANNING CONTEXT LOCAL PLANNING CONTEXT Murray and Mallee Regional Plan Monarto is regarded as one of South Australia’s most planned precincts, due to Currently, the Planning the number of planning studies and reports Strategy for the area of that have focused on the area. This includes Monarto and surrounds is the Monarto South Intermodal and Land Use Study Murray and Mallee Regional undertaken in 2008 for the Monarto Common Plan (2011). This plan Purpose Group. provides direction and advice on land use and development Today the most important local planning within the area, outlines target documentation includes the Murray Bridge population movements for the Council Development Plan and the Monarto area, and sets policy for the South Development Plan Amendment, 2015- changes to the population 16. and climate. The plan was implemented following Murray Bridge Council Development Plan, community groups and government bodies August 2015 and 11 August 2016 working together in order to develop strategies that will lead to a sustainable future for the The local planning context for the Monarto Murray and Mallee areas. South Masterplan area is found within the Murray Bridge Council Development Plan. The Murray and Mallee Regional Plan As the land included in the Masterplan spans recognises that population growth and economic over a large area, there is not one single development must be balanced with the overall Zone, Policy Area or Precinct impacted by this preservation of the environment. Further to this process, but a variety of different Development the plan suggests that the retention of heritage, Plan Areas. history and character of areas such as Monarto will attract and also retain a skilled workforce Monarto South Development Plan which will ultimately benefit future generations. Amendment, 2015 In direct reference to the Monarto area, the On behalf of the Rural City of Murray Bridge, plan aims to promote industrial growth, and Jensen Planning + Design prepared a plan for the expansion of industrial land in the Development Plan Amendment for the area area. The plan also discusses the possibility to of Monarto South in 2015, which was granted further develop the existing north-south road Interim Effect
Recommended publications
  • Southern & Hills Local Government
    HDS Australia Civil Engineers and Project Managers Southern & Hills Local Government Association 2020 TRANSPORT PLAN – 2015 UPDATE Adelaide Final Report Melbourne Hong Kong HDS Australia Pty Ltd 277 Magill Road Trinity Gardens SA 5068 telephone +61 8 8333 3760 facsimile +61 8 8333 3079 email [email protected] www.hdsaustralia.com.au December 2016 Safe and Sustainable Road Transport Planning Solutions Southern & Hills Local Government Association HDS Australia Pty Ltd Key Regional Transport Infrastructure Initiatives Freight Development of the South Coast Freight Corridor as a primary cross regional gazetted 26m B-Double GML route (ultimately upgraded to a PBS Level 2A route) running from Cape Jervis, via Victor Harbor and Strathalbyn, to the South East Freeway Interchange at Callington, with a branch to Mount Barker. Development of the Southern Vales Wine Freight Corridor as a secondary cross regional gazetted 26m B-Double GML route running from McLaren Vale to the South East Freeway Interchange at Mount Barker. Development of the Kangaroo Island Freight Corridor as a secondary cross regional gazetted 23m B-Double GML route (upgraded to 26m B- Double when the Sealink Ferry capability permits) running from Gosse to Penneshaw, then via the Ferry to Cape Jervis. Tourism Development of the Fleurieu Way as a primary cross regional tourism route, suitably signposted and promoted, from Wellington, via Strathalbyn, Goolwa, Victor Harbor, Delamere / Cape Jervis, Normanville / Yankalilla, Aldinga, Willunga and McLaren Vale, to Adelaide. Development of the Kangaroo Island South Coast Loop and North Coast Loop as primary regional tourism routes, suitably signposted and promoted, and connected via the Sealink Ferry and the Fleurieu Way to Adelaide and Melbourne.
    [Show full text]
  • Public Road Register As at 29 May 2017
    Adelaide Hills Council - Public Road Register as at 29 May 2017 NAME FROM TO SUBURB Hierachy CLASS SURFACE SEGMENTNO LENGTH (in Meters) ACKLAND AVENUE Glenside Road White Avenue CRAFERS Local LOCL SEALED 10 260.29 ACKLAND AVENUE White Avenue End of Road CRAFERS Local LOCL SEALED 20 173.8 ADELAIDE GULLY ROAD Millbrook Road Mount Gawler Road INGLEWOOD Medium Use LOCL UNSEALED 10 1092.03 ADELAIDE GULLY ROAD Mount Gawler Road Bagshaw Road INGLEWOOD Medium Use LOCL UNSEALED 20 1660.08 ADELAIDE GULLY ROAD Bagshaw Road South Para Road KERSBROOK Medium Use LOCL UNSEALED 30 1095.46 AGNES STREET Forreston Road Jamieson Street FORRESTON Local LOCL SEALED 10 119.25 AIRSTRIP ROAD Lower Hermitage Road Rural Property Address 122 LOWER HERMITAGE Low Use LOCL UNSEALED 10 1219.97 AIRSTRIP ROAD Rural Property Address 122 Rural Property Address 230 LOWER HERMITAGE Low Use LOCL UNSEALED 20 1073.47 AIRSTRIP ROAD Rural Property Address 230 Mount Gawler Road LOWER HERMITAGE Low Use LOCL UNSEALED 30 871.42 ALAN STREET Randell Terrace Cul de sac GUMERACHA Minor Collector LOCL SEALED 10 280.1 ALAN STREET Cul-de-sac North End GUMERACHA Local LOCL SEALED 20 24.69 ALBERT AVENUE Sheoak Road George Avenue CRAFERS WEST Local LOCL SEALED 10 220.35 ALDERLEY ROAD Edgeware Road Arundel Road ALDGATE Local LOCL SEALED 10 251.38 ALDERLEY ROAD Arundel Road Suffolk Road ALDGATE Local LOCL SEALED 20 218.38 ALDGATE TERRACE Strathalbyn Road End of Seal BRIDGEWATER Local LOCL SEALED 10 347.73 ALDGATE VALLEY ROAD Stock Road Mi Mi Road MYLOR Minor Collector COLL SEALED 10 768.49 ALDGATE
    [Show full text]
  • DCLW Annual Report 2013-14
    DISTRICT COUNCIL OF LOXTON WAIKERIE ANNUAL REPORT 2013-14 DISTRICT COUNCIL OF LOXTON WAIKERIE ANNUAL REPORT 2013-14 CONTENTS District Council of Loxton Waikerie Annual Report INTRODUCTION Mayor’s Report - Leon Stasinowsky 2 Council & Committees - Elected Member Committee Representation 4 Certificates - Outstanding Commitment 9 Chief Executive Officer’s Report - Peter Ackland 10 GOVERNANCE STATEMENT Decision Making Structure - Local Government Act 1999, Section 41 �����������������������������������������������13 Section 41 Committees - Purpose of Committees �����������������������������������������������������������������������������13 Allowance Paid - to Elected Members of Council or a Committee 16 Training & Development - Elected Members �������������������������������������������������������������������������������������17 Member Information - Attendance at Meetings ���������������������������������������������������������������������������������18 Delegation Register - Acts of Parliament, Local Government Act 1999 ���������������������������������������������19 Council Elections - Local Government (Elections) Act 1999 ���������������������������������������������������������������19 Policy Manual Index ���������������������������������������������������������������������������������������������������������������������������20 COMPLIANCE STATEMENT Confidentiality
    [Show full text]
  • History of History the About Information Bushland
    .southaustraliantrails.com www Extract from the National Trust of SA historical overview historical SA of Trust National the from Extract UMONT BEA to VERDUN trodden in the footsteps of previous generations. generations. previous of footsteps the in trodden April 2007 April in the preparation of the map, however no responsibility can be accepted for any errors or omissions. or errors any for accepted be can responsibility no however map, the of preparation the in Since then thousands of enthusiastic walkers have walkers enthusiastic of thousands then Since Persons using the map and supporting information do so at their own risk. Every care has been taken been has care Every risk. own their at so do information supporting and map the using Persons Disclaimer the National Trust’s Silver Jubilee celebrations. Jubilee Silver Trust’s National the of full length took place on the 20 April 1980 as part as 1980 April 20 the on place took length full www.ahc.sa.gov.au ph:(08) 8408 0400 8408 ph:(08) www.ahc.sa.gov.au showing this Trail. The first public walk along its along walk public first The Trail. this showing Adelaide Hills Council Hills Adelaide produced on 18 June 1841 by surveyor F R Nixon R F surveyor by 1841 June 18 on produced www.walkingsa.org.au ph:(08) 8361 2491 8361 ph:(08) www.walkingsa.org.au Trust of South Australia followed a map a followed Australia South of Trust National alking SA alking W In 1980 six members of the Hahndorf Branch, Hahndorf the of members six 1980 In www.heysentrail.asn.au ph:(08) 8212 6299 8212 ph:(08) www.heysentrail.asn.au continued until the late 1850s.
    [Show full text]
  • South Eastern Freeway Pavement Rehabilitation – Tollgate to Heysen Tunnels Project Works, April – May 2021
    Notification · April 2021 Roads South Eastern Freeway Pavement Rehabilitation – Tollgate to Heysen Tunnels Project Works, April – May 2021 Throughout April and May 2021, weather permitting, a number of activities will take place on-site for the South Eastern Freeway pavement rehabilitation works. Please see below and refer to plans overleaf for specific details. Please note that no works will occur over the Easter long weekend but some speed restrictions will remain in place on the citybound lanes of the freeway between the Heysen Tunnels and the Portrush Road intersection. During the week commencing 5 April, up to two nights of Stage 2 works will be undertaken to complete this stage of work. Please observe on-site signage and traffic restrictions associated with these works. During the daytime on Wednesday 6 April, 2021, from 7am to 7pm, maintenance works will be undertaken in the Heysen Tunnels in both directions requiring a lane closure to undertake the works, please observe signage for changed traffic conditions. Major Weekend Occupation: 9 – 12 April 2021 (weather permitting) From 7pm Friday, 9 April, until 6am Monday, 12 April, 2021, the final layer of pavement will be placed on the citybound lanes of the freeway between the Heysen Tunnels and the Tollgate. Works will be undertaken continuously during this period. In the event of unfavourable conditions these works will be finalised the following weekend, commencing from 7pm Friday, 16 April, until 6am Monday, 19 April 2021. Weekend Occupation Traffic Arrangements: The citybound lanes of the freeway in this location will be closed, with vehicles directed onto the opposite side of the freeway.
    [Show full text]
  • Maloney Field Services Forecast Site Values SA Power Networks July 2014
    Attachment 20.5 Maloney Field Services: Forecast Site Values SA Power Networks July 2014 Valuation Forecast Site Values SA Power Networks July 2014 SA Power Networks Forecast Site Values Table of Contents INTRODUCTION 1 DEFINITION & METHODOLOGY ADOPTED 1 GENERAL COMMENTS 3 DECLARATION 3 DISCLAIMER 4 CERTIFICATION 5 Appendix 1 SA Power Networks Forecast Site Values Appendix 2 Distribution Lessor Corporation Forecast Site Values Appendix 3 Future Sites to be Acquired Forecast Site Values Appendix 4 Expert’s Qualifications of Experience J:\CLIENT\SA Power Networks\Revenue Reset 2015-2020\Report\SA Power Networks Forecast Site Values Date Printed: August 19, 2014 July2014.Docx SA Power Networks Forecast Site Values Introduction The following report has been prepared in accordance with written instructions provided by Ms Ashley Muldrew, Regulatory Analyst for SA Power Networks on 8 July 2014. The said instructions were to provide an assessment of site values as follows: 1. Forecast site values for existing properties in the ownership of Distribution Lessor Corporation and SA Power Networks from financial year 2014/2015 through to 2019/2020. 2. Provide consolidation and estimated site values for future site acquisitions and forecast site values for each parcel of land from the date of proposed acquisition through to 2019/2020. The valuer confirms that the relevant Federal Court of Australia Practice Note CM7 – Expert Witness in Proceedings in the Federal Court of Australia have been read and understood and the report prepared herein is therefore compliant for use in relation to matters that may be heard by the Federal Court of Australia Subsequent research enquiries and deliberations have enabled us to report as follows: Definition & Methodology Adopted Site value is defined in the Valuation of Land Act 1971 as the: “Value of land excluding structural improvements” In accordance with the Valuation of Land Act 1971 the Valuer General currently revalues every property in South Australia on an annual basis.
    [Show full text]
  • Full Report (PDF, 11.5MB)
    Regional road assessment – Fleurieu Peninsula and McLaren Vale – August 2021 i Regional road assessment – Fleurieu Peninsula and McLaren Vale – August 2021 Prepared by RAA Safety and Infrastructure 08 8202 4517 [email protected] RAA Government and Public Policy [email protected] Disclaimer This report has been prepared by Royal Automobile Association of South Australia Incorporated (RAA) as at August 2021. By receiving this report, you acknowledge the following: • RAA is not responsible for any errors in or omissions from this report, whether arising out of negligence or otherwise. • RAA make no representation or warranty, express or implied that this report is accurate or is sufficient and appropriate for your purposes or contains all information that you may require. You must not rely on the information contained in this Report and RAA is not responsible to you or anyone else for any loss suffered or incurred if you rely on the Report. ii Regional road assessment – Fleurieu Peninsula and McLaren Vale – August 2021 Contents Prepared by ii Disclaimer ii Contents iii Executive Summary v RAA’s key recommendations for the Fleurieu Peninsula and McLaren Vale vi Index of recommendations viii Mobility and Tourism ................................................................................................... viii Roads and Safety ....................................................................................................... viii Notes ix Notes on crash data ......................................................................................................ix
    [Show full text]
  • Adelaide Hills
    Regional Road Assessment: Adelaide Hills Report: December 2020 Regional road assessment – Adelaide Hills – December 2020 i Regional road assessment – Adelaide Hills – December 2020 Prepared by RAA Safety and Infrastructure 08 8202 4517 [email protected] RAA Public Policy [email protected] Disclaimer This report has been prepared by Royal Automobile Association of South Australia Incorporated (RAA) as at December 2020. By receiving this report, you acknowledge the following: • RAA is not responsible for any errors in or omissions from this Report, whether arising out of negligence or otherwise. • RAA make no representation or warranty, express or implied that this report is accurate or is sufficient and appropriate for your purposes or contains all information that you may require. You must not rely on the information contained in this Report and RAA is not responsible to you or anyone else for any loss suffered or incurred if you rely on the Report. ii Regional road assessment – Adelaide Hills – December 2020 Contents Contents iii Executive Summary iv RAA’s key recommendations for the Adelaide Hills v Notes vii Background 1 Recommendations 3 Recommendation colour scales 3 Full list of recommendations 4 Discussion and survey analysis 12 Objectives and methodology 12 Respondent demographics 12 Mobility profile 13 Road standards and improvements 16 Freight 19 Road safety 22 Safety on the South Eastern Freeway 25 Speed zones and limits 27 Cycling 30 Motorcycling 33 Walking 35 Public and community transport 37 Taxi/app-based ride-sharing
    [Show full text]
  • Hon Corey Wingard MP Minister for Infrastructure and Transport
    Hon Corey Wingard MP Minister for Infrastructure and Transport Saturday 20 February 2021 Stimulus spending boosting jobs and road safety Hundreds of local jobs will be created and road safety improved across the state with around $233 million in contracts awarded and tenders for release by the Marshall Liberal Government in the first two months of 2021. A total of 19 contracts worth nearly $85 million were awarded during January 2021, as the South Australian and Australian governments invest in metropolitan and regional road upgrades from the South Eastern Freeway to Ceduna. Nine tenders released to market in January 2021, total around $78 million which include pavement rehabilitation and sealing on the Stuart Highway. Expected tenders for release to market in February 2021, total at least $70 million which include pavement rehabilitation along Port Road between Junction Road and East Avenue. Minister for Infrastructure and Transport, Corey Wingard, said the Marshall Government was committed to boosting jobs, business and infrastructure. “The Marshall Liberal Government’s congestion busting response to the COVID-19 pandemic is in full swing,” Minister Wingard said. “South Australia is facing its most challenging economic period in living memory and investing in projects that will get people into jobs sooner will keep our economy firing during this extremely difficult time. “This is another part of our plan to keep South Australia safe and strong, by creating jobs, backing business and building what matters. “The Marshall Government is focused on getting people from A to B faster so they can spend less time sitting in traffic and more time with their families doing what they love.
    [Show full text]
  • Fleurieu PENINSULA Visitor Guide
    Fleurieu PENINSULA Visitor Guide SOUTH AUSTRALIA fleurieupeninsula.com.au Adelaide FP_2015_cover_FA.indd 1 9/09/2015 1:52 pm ECO CRUISING IN THE COORONG NATIONAL PARK OF THE COORONG ADVENTURE CRUISE 6 Hrs & 60 kms Cruise from Goolwa through the lock, across the Mouth of the Murray River and into the wetland wilderness of the Coorong National Park. Stop for a guided walk across Younghusband Peninsula to a Southern Ocean beach. Enjoy a delicious lunch on board cruising further into the Coorong past spectacular sand dunes. Stop again at Cattle Point for a guided walk to a significant old Aboriginal site amongst the dunes. Afternoon tea is served cruising back past prolific birdlife and across the Murray Mouth to Goolwa. Wed & Sun (Oct -May); Sun only (Jun-Sep) COORONG DISCOVERY CRUISE 3.5 Hrs & 25 km Enjoy a delicious picnic lunch cruising from Goolwa through the lock to the Murray Mouth and into the wetlands, spectacular sand dunes, and birdlife of the Coorong. Take a guided walk to a Southern Ocean beach - afternoon tea is served cruising back to Goolwa. Mon, Thurs (Oct-May); Sat (Oct-Apr); Thurs only (June-Sept) MURRAY MOUTH CRUISE 2 Hrs & 15 km Cruise from Goolwa to view the Murray Mouth. OF THE Sat (Oct - Apr) and Thurs (School Holidays only) Main Wharf, Goolwa, SA 5214 Phone: 08 8555 2203 Toll Free: 1800 442 203 www.coorongcruises.com.au Welcome to the Fleurieu Peninsula Sip world-class wines, hike through ancient forests, surf, swim and in winter spot Southern Right whales – you’re sure to have fun on the Fleurieu Peninsula.
    [Show full text]
  • Adelaide Oval Footy Express Bus Route Descriptions
    King William Rd Brougham Pl Jeffcott St Jeffcott Kerode St Adelaide OvalPalmer Pl Footy Express interchange map Pennington Tce The Memorial North Hospital Legend King William Rd AOX1 Adelaide Oval Footy Express bus stop Train line & station Tram line & stop University Oval Rd Walking route Montefiore Rd Montefiore Hospital Shopping Centre Adelaide Metro InfoCentre diagrammatic map - not to scale AO26 to Glenelg Interchange Victoria Dr War Memorial Dr AO24 AO25 to Mitcham Square AOX15 to Elizabeth Shopping Centre AOX1 to Greenwith AO15 to Mawson Interchange AOX2 to St Agnes Depot AO16 to Rosewater AOX3 to Northgate AOX4 to Hope Valley AO17 to Port Adelaide & Outer Harbor AOX5 to Salisbury East AO18 to West Lakes Centre Interchange AOX6 to Woodcroft Community Centre AO19 to Henley Beach AOX7 to South Adelaide Footy Club AO20 to Blair Athol Festival Dr AOX21 to Ottoway AOX31 to Oaklands Interchange AO8 to Old Reynella Interchange AOX22 to Aberfoyle Hub AOX9 to Mount Barker AOX23 to Morphettville Depot AO10 to Aldgate Adelaide Railway Station AO14 to Rosslyn Park North Tce North Tce King William St City West Adelaide Railway Station AO11 to Paradise Interchange Montefiore Rd Montefiore to Athelstone Charles St Gresham St Gresham AO12 Victoria St to Burnside Bank St Blyth St AO13 Rundle Mall Rundle Hindley St Mall Currie St Grenfell St Adelaide Oval Footy Express services network map Legend North AOX Gawler Central AOX1 Bus route Common route AOX1 Bus route terminates Train line & station Tram line & stop Train service Tram service Smithfield
    [Show full text]
  • Issues Paper Mallee South Country Cabinet, 11 - 13 September 2016
    Issues Paper Mallee South Country Cabinet, 11 - 13 September 2016 On 11 to 13 September 2016, the South Australian Cabinet visited the Mallee South region, covering the District Councils of Tatiara, Southern Mallee and Karoonda East Murray. Over three days, the Premier and Ministers travelled across the region to speak with local people about the issues that concern them most. This document summarises the issues, listed by topic, that were raised with the Government by the local community during the Mallee South Country Cabinet visit: Transport, roads and infrastructure Infrastructure Inadequate power supply to the region is preventing industry expansion. The single power line and its fragility of supply during peak load presents a financial risk to businesses. The cost of power is noted as being detrimental to industrial expansion, with opportunities being lost to Victoria due to their significantly lower power costs. The area has more than 50 registered mobile black spots. Limited broadband coverage impacts the economic output and wellbeing of the community. The community understands it is an unrealistic expectation to obtain 100% coverage, however, consider it important to have coverage along all major roads. The economic impact of poor mobile coverage is felt by primary producers. This loss to the producers also has a flow-on impact to the local community and to the state’s economy. There are also the safety concerns of not being able to easily contact someone in the case of an emergency. The three Councils have allocated funding towards tower development as part of their applications for Round 2 of the Federal Government’s Mobile Black Spot Program.
    [Show full text]